FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) BAKER COUNTY Highways: Interstate 4386501 I-10 BAKER CO SPRAYFIELD EB REST AREA IMPROVEMENTS REST AREA.382 570 RRU 7,128 CST 4350031 I-10(SR8) @ CR125 INTERCHANGE LIGHTING.616 51 CST 4350021 I-10(SR8) @ CR229 INTERCHANGE LIGHTING.001 1,033 CST 53 CST 4357451 I-10(SR8) @ SR121 OPERATIONAL IMPROVEMENTS PD&E/EMO STUDY 1.600 550 PDE 4350011 I-10(SR8) @ US90 INTERCHANGE EXIT 324 LIGHTING.684 51 CST 2130017 I-10(SR8) FROM: CR125 TO: US301 ADD MANAGED LANES 7.074 510 PDE Highways: State Highways 4135181 D2-BAKER COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT TRAFFIC CONTROL DEVICES/SYSTEM.000 44 OPS 45 OPS 46 OPS 48 OPS 49 OPS 4376131 SR228(5TH ST) CR228 FROM: I-10 UNDERPASS TO: US90 RESURFACING 1.927 15 PE 4,251 CST 16 CST 4360241 US90 @ I-10 TO WEST OF THE OVERPASS INTERSECTION IMPROVEMENT.100 3,198 CST Highways: Local Roads 4381751 CR125 BRIDGE NO270014 BRIDGE-REPAIR/REHABILITATION.060 350 CST 4396751 CR125 NORTH FROM: BLAIR CIRCLE SOUTH TO: PARK STREET WIDEN/RESURFACE EXIST LANES.857 650 CST 4396741 CR125 SOUTH FROM: SR121 TO: SOUTH OF WOODLAWN WIDEN/RESURFACE EXIST LANES 3.845 1,800 CST 4381811 CR127 FROM: CR120 TO: MOCCASIN CREEK CIRCLE RESURFACING 5.978 1,900 CST 4394971 CR23A(WOODLAWN RD) FROM: CR125 TO: SR121 PAVE SHOULDERS 2.612 2,184 CST 2 CST Highways: Off State Hwy Sys/Off Fed Sys 4363301 CLET HARVEY ROAD BRIDGEOVER MUD LAKE SWAMP BRIDGE NO274091 BRIDGE REPLACEMENT.012 554 PE 14 ROW 23 ROW 10 ROW 2,211 CST 4357152 MIDPOINT PARKWAY FROM: US90 TO: SR228 PRELIMINARY ENGINEERING.300 2,034 CST 4381681 NURSERY BOULEVARD FROM: US90 TO: CR125 ROAD RECONSTRUCTION - 2 LANE 1.354 500 CST 4364502 TURNER CEMETERY ROAD FROM: CR127 TO: HAMP REGISTER ROAD ROAD RECONSTRUCTION - 2 LANE 1.519 1,500 CST 4413241 WILLIS HODGES ROAD FROM: 0.24 MILES W OF SR121 TO: SR121 ROAD RECONSTRUCTION - 2 LANE.240 325 CST Maintenance: Interstate 2149991 BAKER ROUTINE MAINTENANCE.000 250 MNT 250 MNT 250 MNT 250 MNT 250 MNT Maintenance: State Highways 2143591 BAKER ROUTINE MAINTENANCE.001 500 MNT 500 MNT 500 MNT 500 MNT 500 MNT 4144041 LIGHTING AGREEMENTS BAKER COUNTY LIGHTING.000 47 MNT 49 MNT 50 MNT 52 MNT 53 MNT
FLORIDA DEPARTMENT OF TRANSPORTATION 5 - YEAR TRANSPORTATION PLAN ($ IN THOUSANDS) TENTATIVE FY 2019-2023 (10/01/2017 20:15:01) BAKER COUNTY Freight, Logistic And Passenger Operation: Transit 4272511 BAKER COUNTY FED SECT 5311 RURAL TRANSIT FUNDING OPERATING/ADMIN. ASSISTANCE.000 296 OPS 310 OPS 326 OPS 342 OPS 359 OPS
Selection Criteria Report Element Requested Value Report Description: Styled PDF Detail Report: By Local Name Component Groups: Highways=Yes; FLP=Yes; Turnpike=Yes; Maintenance=Yes; Planning=Yes; FCO=Yes; Research and Testing=Yes; Fl Rail Enterprise=Yes; Transportation Disadvantaged=Yes; Miscellaneous=Yes; Version: G1 Fiscal Year: 2019 Number of Years: 5 District: Budgeting District 02 County: N/A Snapshot: 10/01/2017 20:15:01 Allocation Type: H Report Format: PDF Transportation System: Not specified (Select All) Contract Class: B Work Mix: Not specified (Select All) Phase Group: Not specified (Select All) Phase Type: Not specified (Select All) Program Number: Not specified (Select All) Fund Group: Not specified (Select All) Item Status - from: Not specified Item Status - to: Not specified Item Group: Not specified (Select All)
Phase Group Descriptions Phase Phase Phase Description Group Type Exceptions ADM Administration A Any Excl pgm 52;Ph A8 w/pgm 39 CAP Capital 9 Any CST Construction 5,6 Any Excl Ph 5A,5D,56,57; Cnclss 9 DSB Design Build 5,6 Any With Conclass 9 only ENV Environmental C Any INC Contract Incentives 5 A LAR Local Advance Reimburse A 8 With Program 39 only MNT Brdg/Rdwy/Contract Maint 7 Any Excl Phase 76 and 77 OPS Operations 8 Any PDE P D & E 2 Any PE Preliminary Engineering 3 Any Excl Phase 36 and 37 PLN Planning 1 Any RES Research B Any RPY Repayments 5 D Also incl Ph A8 w/pgm 61,78,SB ROW Right of Way 4 Any Excl Phase 46 and 47 RRU Railroad & Utilities Any 6,7 Excl Phase Group 1 and 2 MSC Miscellaneous Other Other
Component Descriptions Trans Phase Phase Budget Component Description System Group Type Dist Highways 01,03-07,16 Any Any Any Turnpike 02 Any Any Any Fixed Capital Outlay 12 Any Any Any Research & Testing Any B Any Any Transportation Planning 13 1 Any Any Maintenance Any 7 Any Any F, L and PO 08-11,15 Any Any Any Transportation Disadvantaged 14 Any Any Any Florida Rail Enterprise Any any Any 31 Miscellaneous Any Other Other Other Any
System Group Descriptions Trans System Group System Program Exceptions Interstate 01 Any Excl pgm 90 State Highways 03,04,05 Any Excl pgm 90 Local Roads 06,07 Any Excl pgm 90 Intermodal 08-11,15 Any Excl pgm 90 High Speed Rail Development Any 90 Other Any Other Other Excl pgm 90