Flexifloat Field Assembly Guide

Similar documents
"CRANE SAFETY IN CONSTRUCTION ENVIRONMENTS"

Cranes. OSHA Office of Training & Education 1

PRESENTER'S GUIDE "CRANE SAFETY" Part of the "SAFETY MEETING KIT" Series Quality Safety and Health Products, for Today...

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Disassembly and Assembly

HitchHoist Assembly & Operating Instructions IMPORTANT NOTICE

PARTS MANUAL MODELS. For AST, ATU, FP-3, and SM Model Tuckunder Liftgates

Owner s Manual Gantry Cranes

Disassembly and Assembly

Important. Contents. Contact us:

Planning Advisory Notice

Important. Contents. Contact us:

SECTION 11 INTERMODAL EQUIPMENT

Procedure for Disassembly and Removal of Top Portion of Central Baffle Stack from 4m Mayall Telescope

LOS ANGELES UNIFIED SCHOOL DISTRICT

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

IB-TPK Tight Pack Kit ibox Series Suspension Brackets

Series 1300 Hydraulic Crane 30 Ton Load Ratings

Smart-Till. Models ST101, ST151, ST203, and ST303. HCC, inc st Avenue Mendota, IL

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

Series 1400A Hydraulic Crane 33 Ton

Series 1400 Hydraulic Crane 33 Ton Load Ratings


: 1250 gpm in the deck mode : 800 gpm while operating in the ground base - Dual Inlet : 1000 gpm while operating in the ground base - Single Inlet

SBRL-SERIES SPREADER BEAMS INSTRUCTION MANUAL

Water Wizard Arch. Service Manual W 34th St, Houston, TX

SECTION 12. Lifting & Spreader Beams

NOTE: Refer to hardware list provided to identify fasteners supplied. Figure 2-1

STANDARDS PRESENTATION Attachment No. 1 TO Page 1 of 6 CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD

Below the Hook Lifting

Rev. 10/27/2015 CDL-2000, MANUAL

INSTRUCTION MANUAL VERTICAL PLATE CLAMP MODEL EPC (10, 20, 40, & 80)

Brake System H TX, H2.0TXS [B475]; H TX [B466] Safety Precautions Maintenance and Repair

Heavy Duty Jack Stands

Series 1300A Hydraulic Crane 30 Ton Load Ratings

Vehicle and Container Fall Protection

MODEL 2604 WARNING <THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> Custom 5th Wheel Hitch Mounting Rail Installation Instructions

K EN R A ugu st Specifications Industrial Engine. M G D (Engine) MGB (Engine)

Package Contents Part A (3) I-Beam (1) Base (2) Other parts

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

Contents Anthony Liftgates, Inc.

Assembly and Modular Table Power System Installation Instructions for Train Tables

OVERHEAD & GANTRY CRANE / RIGGING

Portable Ladder Safety

Table of Contents. Chapter 2 Safety Fundamentals for Bridge Inspectors. Methods of Access Introduction

Hydraulic Transmission Jack, Telescopic

Hydraulic Wheel Dolly

MANUFACTURING CO. THE FIRST NAME IN QUALITY COUPLINGS. Installation, Inspection, Operation & Maintenance Guide. Model 880 Coupling IMPORTANT

Instruction Manual Crane Fork NOTE:

HYDRAULIC HITCH CRANE

Responsible Unit: Facilities Management

OPERATOR'S MANUAL & PARTS LIST

Hydraulic Wheel Dolly

Portable Tower S21M USERS MANUAL

Model 521 Universal Oxygen Cylinder Bracket

270PK SERVICE GUIDELINES

Large Hydraulic Bead Breaker

LAD-EZ Series Portable Warehouse Ladders, 6-12 Steps Assembly Manual

Installation Instructions

RE-SLRSYS SAFETY, STORAGE, INSTALLATION, OPERATION & MAINTENANCE MANUAL

LAD-series Portable Warehouse Ladders, 6-12 Steps Instruction Manual

Crane Safety Resource Guide P AGE 1

LOAD CHART & RIGGING PRACTICE EXERCISES

ALUMINUM CARGO CARRIER WITH FOLDING RAMP

OnBoard Drum Major Podium

Work Experience Form Mobile Crane Operator

Provided by: Operating, Maintenance & Parts Manual

2000 lb Adjustable Gantry Crane

Up-Armored HMMWV CASEVAC Conversion Kit (UAH-CCK)

Intermodal Operations Committee

BACKREST, SEAT & SISSYBAR BAG BR 3400

One- Touch Installation Instructions

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

CRANE, HOIST AND SLING SAFETY PROGRAM

COYOTE ENTERPRISES, INC. 9/10 BLAST WHEEL MAINTENANCE & ASSEMBLY MANUAL

Monicon Instruments Co., Ltd. CHR-1285/2485 CHR-1285/2485 BATTERY CHARGER

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F:

Service Manual. 854E Diesel Engine. Specifications. 854E model is for FD70N Chassis Service Manual B101

It don t mean a thing If it ain t got the swing

RUTGERS UNIVERSITY POWERED INDUSTRIAL TRUCK PROGRAM

1000-lb Hydraulic Truck Crane

Agricultural Track Service Procedures Removal, Installation, Inspection and Alignment

GRADE 8O ALLOY STEEL CHAIN CARE, USE & INSPECTION OF GRADE 80 CHAIN & SLINGS

Type 3571 Pneumatic Actuator. Actuator areas: 27 in² 54 in² 116 in². Original instructions. Mounting and Operating Instructions EB 8820 EN

1000 lb. Adjustable Gantry Crane

Ratcheting Pullers Reversible Puller Combination Pullers Slide Hammer Pullers Heavy Duty C-Clamps...

3 TON JACK STANDS. Operator s Instruction Manual. Rated Capacity 6,000-lb MODEL# T43002T

JBL VTX-V20-DF SUSPENSION MANUAL

INSTALLATION INSTRUCTIONS

CRANE OPERATION INSTRUCTION AND GUIDELINES

EZ LINER EXPRESS USERS MANUAL

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

ov-lifting_bolts_divider - Updated Lifting Bolts

COLUMBUS McKINNON CORPORATION

Interlocks 200 Series

specialized in modular PONTOON solutions for various purposes and applications

SAVE THESE INSTRUCTIONS WARNING

MODEL HD99 HYDRAULIC ONE MAN TOWABLE EARTHDRILL

Owner s Manual. ELECTRIC WIRE ROPE HOIST and TROLLEY RH SERIES

Transcription:

Flexifloat Field Assembly Guide Important: Read contents carefully prior to use. This Field Assembly Guide is intended to give users a basic understanding on how to assemble Flexifloat units. It is important that you read this guide carefully prior to use. If there is anything in this Guide that is not clear or you do not understand, immediately contact Robishaw Engineering, Inc. (REI). As the recipient of this Guide, it is your responsibility to ensure that it is provided to any person assembling, disassembling, using, maintaining or repairing this equipment. This is only a guide and cannot anticipate every possible circumstance that might involve a potential hazard. You must satisfy yourself that the application and operating conditions are safe for you and others. Contact REI or other qualified professional prior to use. REI offers its engineering services free of charge to all Flexifloat users.

WARNING! The use of Flexifloat equipment requires competent personnel and the application of engineering principles. The improper use, operation, modification, maintenance or repair of Flexifloat equipment can be dangerous and result in property damage, injury or death. Contact Robishaw Engineering, Inc. (REI) or other qualified professional prior to use. REI offers its engineering services free of charge to all Flexifloat users. Equipment used on or with Flexifloat barges must have the manufacturer s approval for use in marine applications. Accidents involving the use, maintenance and repair of Flexifloat equipment are often caused by failure to observe basic safety rules or precautions. The majority of accidents can be avoided by recognizing potentially hazardous situations and observing basic safety rules and procedures. Flexifloat users must always be aware of potential hazards and possess the necessary training, skills and tools to safely operate Flexifloat equipment. Failure to do so could result in injury or death. REI cannot anticipate every possible circumstance that might involve a potential hazard. If REI does not recommend or is not consulted, you must satisfy yourself that the application and operating conditions are safe for you and others. You should also make certain that the product will not be damaged or made unsafe by the use, operation, modification, maintenance or repair procedure you choose. P.O. BOX 79246 HOUSTON, TX 77279-9246 10106 MATHEWSON LANE HOUSTON, TX 77043 800.877.1706 (phone) 713.468.1706 (phone) 713.468.5822 (fax) info@flexifloat.com

INSTALLATION & ASSEMBLY Flexifloat modules are specifically designed for easy handling and rapid, in-water assembly. Most installations can be completed within one or two normal workdays. The primary tools needed for assembly are sledge hammers, pry bars, and short lengths of rope for hand lines. Certain modules or attachments may require additional slings or other standard lifting hardware, typically available on most jobsites. See attached Suggested Tools list. Due to the orientation of the male and female Flexilocks, individual Flexifloat modules cannot be inserted into a corner, bounded by two adjacent units. The modules are usually first assembled into rows, or strings, then connected to a second, third or fourth row until the entire configuration is complete. Ancillary attachments, such as Loading Ramps and Spud systems, should be added after all Flexifloat units have been assembled. WARNING! Keep hands and feet away from locks when they are in the raised position! WARNING! Never assemble or disassemble FLEXIFLOAT modules under loaded conditions! CUSTOMER SERVICE Robishaw Engineering, Inc. is the sole designer and manufacturer of Flexifloat Construction Systems. For over 60 years of operations we have dedicated ourselves to providing not only superior products, but in-depth technical support and complementary engineering services. We offer comprehensive project analysis, barge design, and, when necessary, on-site consultation to assist users in the application of Flexifloat technology. Working closely with the customer, we develop and analyze information as to the scope of work to be performed, site conditions, access, and environmental restrictions as well as the type, weight, and layout of the equipment for the project.

Suggested Tools The following tools and equipment are normally required for the loading/unloading and assembly of Flexifloat equipment: 2 ea. Pry Bars, 5 length. 2 ea. Sledge Hammers, 10 to 12 lbs. 300 ft. 3/4 manila, nylon or poly rope for hand lines. 3 ea. 1½ to 2-ton cable pull ratchets ( come-a-longs ). 1 ea. Single-leg wire rope sling with appropriate hook or shackle to fit the 1¾ dia., 25-ton round pin chain lift shackle built into the Flexifloat decks. Select wire size according to the following unit weights shown below: Equipment Series Maximum Weight *Minimum Crane Capacity for Assembly H-50 14,500 lbs. 35-ton S-50 27,000 lbs. 50-ton S-70 33,000 lbs. 80-ton *Crane selection is dependent upon several factors including hook load weight, dimensions, required reach (radius), site conditions, and rigging. Appropriate crane and rigging selection is the responsibility of the user. Additional Tools for Spuds and Spudwells: One two-leg sling with appropriate hooks or shackles for lifting spud pipe sections weighing up to 12,000 lbs. (60-foot-long x 24 diameter spuds). Please note, non-standard spuds may weigh more. Warning Always ensure the load does not exceed the sling s maximum capacity. Failure to comply can lead to property damage, injury, or death.

Important Notices All Flexifloat female locks have a ½ bolt, friction plate, and nut located approximately 12 below each upper female casting. This bolt is used to adjust the friction force that enables the locking bar to remain in the raised position during assembly operations. The proper force was set at the factory. Field adjustment should not be necessary for the initial barge installation. THIS IS NOT A PACKING BOLT. Warning When the locking bar is in the raised position, never use a female lock connection as a toe or hand hold for climbing onto a float or to pull floats together by grabbing the top portion of the locking bar. Any inadvertent downward force could cause the locking bar to fall resulting in severe injury to fingers and hands. No! No!

Loading & Unloading Equipment Flexifloat barge sections and attachments are typically delivered to the jobsite using conventional tractor trailers. Flotation units have a single recessed lift shackle located on the deck at the center of balance for rapid loading and unloading of the equipment. Taglines (long ropes) should be used when lifting the barge sections with a crane. Lines attached to one or two points will help stabilize the load and prevent unwanted rotation that may cause a collision with other equipment or the crane itself. This also provides a safe working distance between ground personnel and the load (never stand under the load). Ropes may be fastened through the rope thimbles (tube turns) that are located around the perimeter of each barge section.

Lock Operation Step 1 Insert pry bar into female lock behind the spring bar and raise locking bar upwards. Step 2 Continue raising the locking bar. Step 3 Turn pry bar over and push it through the opening in the upper locking bar casting.

Step 4 Lift pry bar and continue raising locking bar until the opening in the female lock casting is completely clear and the locking bar stops. Step 5 Repeat Steps 1 through 4 for all connectors along the row. Be sure all locking bars are completely raised; otherwise the connection cannot be completed.

Step 6 Drift the Flexifloats together, using hand lines until the male pin enters the female lock casting. Step 7 Continue to pull the adjoining Flexifloat rows together until the shoulder of the male pin is in close proximity to the female lock casting. All upper and lower lock connections along the entire row must be in this position before attempting further lock operations. Note: Barges can be pulled together by utilizing rope and the rope thimbles (tube turns) located along the perimeter of the deck.

Note: The use of multiple hand lines and/or small come-a-long installed across the deck of the two rows may be necessary to overcome friction forces. Check bottom locks are also properly engaged by inspecting the vertical gap between the Flexifloats. Note: Under certain conditions, it may be helpful to thread a small wire rope sling through a matching pair of the rope thimbles and gently lift with the crane. This will help close the upper lock gap and engage the lower lock faces. Step 8 Begin driving the locking bar starting at the first connector location on one end of the row.

Step 9 Continue driving the locking bar. If driving becomes difficult or a metal-on-metal sound is heard; stop, raise the locking bar, and reinspect the vertical gap to ensure both the top and bottom male pins are being engaged, then continue driving. Step 10 Drive locking bar until the spring bar secures in place under the two protrusions at the back of the female lock. Repeat Steps 8 through 10, in sequence (like closing a zipper), along the entire length of the row.

Lock Operation Summary Use pry bar to raise locks Raise all locks on connection row Use rope to pull floats together, inserting male pin into female lock casting. Use sledgehammer to drive locks down. Check that floats are securely connected by making sure all locking bars are down and flush with deck.