LEED v4 Building Design and Construction Quiz #3 LT

Similar documents
Fill-In, Multiple Choice, Matching

Chapter : 2 Location & Transportation

appendix 4: Parking Management Study, Phase II

APPENDIX VMT Evaluation

D. Motor vehicle parking, bicycle parking, and loading areas shall be separated from one another.

Parking Management Element

MOTOR VEHICLE PARKING AREA STANDARDS

DOMINICK S FINER FOODS Traffic Impact Analysis Sheridan Road and Foster Avenue (#2890) March 17, 2009

San Joaquin Valley Air Pollution Control District Indirect Source Review (ISR) - Air Impact Assessment (AIA) Non-Residential Project Application Form

Address Land Use Approximate GSF

6.16 OFF-STREET PARKING AND LOADING REQUIREMENTS

UTA Transportation Equity Study and Staff Analysis. Board Workshop January 6, 2018

vision42

Re: Amend Sections and File No ZA Marcus Lotson, Development Services Planner

Transit Hub Case Study: Owings Mills Metro Station. By: Kathleen Cary Rose, J. Luke Byrne and Catherine Buhler

Table 1: Existing Trip Generation A.M. Peak Hour P.M. Peak Hour Land Use ITE Code Intensity Daily Total In Out Total In Out

Transit Oriented and City Center Development

2.0 Development Driveways. Movin Out June 2017

Rapid Transit and Land-Use Integration a Reality

Downtown Community Plan Adopted April 2006

Green Line Long-Term Investments

August 2, 2010 Public Meeting

Metra Milwaukee District West Line Transit-Friendly Development Plan

Charlotte-Mecklenburg Region Rapid Transit and Land-Use Integration

Garrett Hill Master Plan

2. ELIGIBILITY REQUIREMENTS

Parking And Loading

METRO Orange Line BRT American Boulevard Station Options

CORE AREA SPECIFIC PLAN

Article 10 Parking and Loading Standards

Chevy Chase Lake. Preliminary Plan # B TRAFFIC STATEMENT. Prepared for: Chevy Chase Land Company & Bozzuto Development Company

DOWNTOWN PARKING STUDY AND STRATEGIC PLAN

The South Waterfront District and the Portland Aerial Tram

Parking Management Strategies

San Rafael Civic Center Station Area Plan May 2012 DRAFT FOR PUBLIC REVIEW

Jeff s House. Downtown Charlottesville. PEC Office

SUSTAINABILITY CODE AMENDMENTS ELECTRICAL VEHICLE INFRASTRUCTURE AND BICYCLE PARKING DRAFT

SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St

Release Date Summary of Changes 03/12/2015

residents of data near walking. related to bicycling and Safety According available. available. 2.2 Land adopted by

Major Widening/New Roadway

Appendix C. Parking Strategies

SECTION 500. PARKING, LOADING AND STORAGE REGULATIONS

4 Circulation & Transportation

Fresno County. Sustainable Communities Strategy (SCS) Public Workshop

Purpose: General Provisions:

ANDERSON PROPERTY SITE ANALYSIS

Article 6: Off Street Parking and Loading Standards. Table of Contents. page

SANDAG 3D Visualization Howard Blackson 6:15. Sub Area A Coalition Massing/Phasing - Mike Labarre 6:30

PAWG Meeting #3a Tier 1 Evaluation

Landmark Asset Services, Inc. 406 E. Fourth St., Winston-Salem, NC Phone (336) Fax (336)

Title 33, Planning and Zoning Chapter /1/11 Parking And Loading

ANN ARBOR CITY NOTICE ORDINANCE NO. ORD OFF STREET PARKING CHAPTER 59

Sustainability SFMTA Path to Platinum

OFF-STREET PARKING REFORM IN MINNEAPOLIS AND ST. PAUL

CONTENTS I. INTRODUCTION... 2 II. SPEED HUMP INSTALLATION POLICY... 3 III. SPEED HUMP INSTALLATION PROCEDURE... 7 APPENDIX A... 9 APPENDIX B...

ARTICLE 501 OFF-STREET PARKING AND LOADING

Amman Green Policies Projects and Challenges. Prepared by: Eng. Sajeda Alnsour Project coordinator Sept. 20, 2017

DOWNTOWN CONCORD SPECIFIC PLAN

SERVICE DESIGN GUIDELINES

Newmarket GO Station Mobility Hub Study. Open House #1 MAY 18, 2017

M E M O R A N D U M INTRODUCTION. POTENTIAL TDM STRATEGIES Marketing & Management. Residents & Employees. Exhibit 6

Troost Corridor Transit Study

Sales and Use Transportation Tax Implementation Plan

Parking Investigation / San Antonio UDC

Traffic Impact Statement (TIS)

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY

Appendix A. Community Workshop Results PUBLIC REVIEW DRAFT

4.1 Land Use. SECTION CONTENTS Land Use Transit Transportation Technology

STAFF REPORT # CHANGE OF ZONING

Regional Transportation District. Dave Genova Interim General Manager and CEO August 21, 2015

Navigating in Different Rivers

JTA S MOBILITY CORRIDORS. Improving System Performance Through Urban Design

* * * * * * * * * * * *

DOWNTOWN CONCORD SPECIFIC PLAN

The Brick Yard Buildings F & J Mid Atlantic Blvd. Laurel/Beltsville, Maryland. 10,000 to 122,136 SF

Welcome. Green Line in Your Community

The City of Toronto s Transportation Strategy July 2007

Otay Ranch Station 2020 MOBILITY SERVICES MAP REGIONAL MOBILITY HUB IMPLEMENTATION STRATEGY

2018 Long Range Development Plan Update Community Advisory Group- February 21, 2018

MONTEREY BAY UNIFIED AIR POLLUTION CONTROL DETAILED SUMMARY OF FINAL APPLICATIONS

Central Park Drives Traffic Management Overview

Downtown Parking/Wayfinding Study. Review of Recommendations to City Council: January 16, 2018

TRAFFIC CALMING PROGRAM

ZONING CODE PARKING REGULATIONS

FOR SALE Lancaster Avenue- Bryn Mawr, PA SALE PRICE: $1,095,000.00

When Do We Talk About the Future?

We Want Your Input! Review the design alternatives and tell us what s important to you in the design of these areas of the approved BRT Network:

Public Meeting. June 15, :30 7:30 p.m.

2030 Comprehensive Plan Goals, Objectives, and Policies Mobility Working Document

Stoughton Center Parking

BUS STOP DESIGN & PLANNING GUIDE

Mercer Island Town Center Parking Study Joint Commission Presentation March 16, 2016

Traffic Impact Study. Eastern Springs. A Proposed Development in Manorville, NY. April Haas Group Inc Transportation Planners and Engineers

Utilizing GIS Models in Prioritizing and Selecting Transportation Projects

ARTICLE III. PARKING*

Property details Harrison st. batesville, ar ROPERTY SUMMARY

Traffic Impact Analysis West Street Garden Plots Improvements and DuPage River Park Garden Plots Development Naperville, Illinois

CITY PLANNING COMMISSION AGENDA

Transcription:

LEED v4 Building Design and Construction Quiz #3 LT 1. How are walking and bicycling distance measured? A. Straight-line radius from a main building entrance B. Straight-line radius from any building entrance C. Sum of the continuous segments along public streets and sidewalks D. Sum of the continuous segments along infrastructure that is safe and comfortable 2. Which of these parking spaces must be included in a projects total parking capacity? [Choose three] A. Any off-street parking spaces outside the project boundary that are available to the building s users B. On-street parking spaces on public rights of way C. New and existing surface parking spaces D. Motorbike parking spaces E. New and existing garage or multilevel parking spaces 3. To earn LT Credit LEED for Neighborhood Development Location what must the team provide to confirm that the LEED ND neighborhood or plan area in which the project is located meets credit criteria? [Choose three] A. Rating system and rating system version B. Certification designation C. Certification level and certification date D. Map of certified LEED ND neighborhood or plan boundary 4. Which of these sites could a project locate the development footprint on and meet the criteria for not being built on sensitive land? [Choose two] A. Previously developed land that is within 50 feet from a stream B. Previously undeveloped land that is within 50 feet from a stream C. Previously undeveloped land that is within 100 feet from a stream D. Previously undeveloped land that is within 40 feet from a wetlands 5. A project site has had no previous development. The team determines that an adjacent wetlands extends across the project boundary and finds a small stream within the project boundary. The project team designed the development footprint such that it is not within 100 feet of the wetlands. The stream is 40 feet from the building footprint. The project team provides an impervious pedestrian pathway from the main building entrance to the stream to allow the building users access in order to satisfy the criteria for LT Credit Sensitive Land Development. Which of these applies to the project? A. The project earns the credit B. The project earns the credit if the pedestrian pathway is 12 feet wide C. The project does not earn the credit D. The project earns the credit if they locate the development footprint within 50 feet of the wetlands E. The project earns the credit if they donate $0.40 per square foot to a locally recognized land trust 6. Identify the options projects can choose to locate the project site on in order to earn LT Credit High-Priority Site. [Choose three] A. Historic District B. International Destination C. Priority Designation D. Brownfield Remediation E. Redevelopment Area F. Urban Community

7. What percentage of a site, prior to the project, must be previously developed land in order to be designated a previously developed site? A. 25% B. 50% C. 75% D. 100% 8. Which of these can LEED for Schools projects exclude in the LT Credit Surrounding Density and Diverse Uses development density calculation? [Choose three] A. Gymnasium B. Playgrounds C. Soccer field D. Physical education building E. Football stadium concession stand 9. A LEED NC project is constructing a new office building in a central business district. The building s main entrance is within a ½ mile walking distance of the main entrance to a supermarket, bank, health club, movie theater, museum, and five restaurants. How many points could the project earn for LT Credit Surrounding Density and Diverse Uses? A. 1 point for Option 2. Diverse Uses B. 2 points for Option 2. Diverse Uses C. 2 points for Option 1. Surrounding Density and 1 point for Option 2. Diverse Uses D. 2 points for Option 1. Surrounding Density and 2 points for Option 2. Diverse Uses 10. Which of these should be included on the walking map to document nearby uses for LT Credit Surrounding Density and Diverse Uses? [Choose two] A. Street names B. Walking routes C. Scale D. Crosswalks E. Bus stops 11. A new commercial building is surrounded by a variety of residential, nonresidential, and mixed-use buildings within a 1/4 mile (400-meter) radius of the project boundary. The total residential land area is 68 acres (2,962,080 square feet) and there are 680 dwelling units within ¼ mile. The nonresidential land area is 62 acres (2,700,720 square feet) and the nonresidential space (including all nonresidential buildings and nonresidential space in mixed-use buildings) within the radius totals 1,600,000 square feet. What is the Residential Density? A. 0.10 FAR B. 0.59 FAR C. 4356 SF / DU D. 10 DU / acre 12. Which of these could help a LEED BD+C: Core and Shell project earn LT Credit Access to Quality Transit? A. Project is located within a ¾ mile walking distance of an existing bus rapid transit stop B. Project is located within a ¼ mile walking distance of a planned bus rapid transit stop C. Project is located within a ½ mile walking distance of a commuter ferry terminal D. Project is providing a private shuttle to a light rail station that provides service on the weekdays and weekends

13. A LEED BD+C: Schools project has an attendance boundary such that 60% of the student population is within walking distance. The project site also allows pedestrian access to the site from some of the residential neighborhoods that house the planned student population. How many points could the project earn for LT Credit Access to Quality Transit? A. 0 B. 1 C. 2 D. 4 14. If existing transit service is temporarily rerouted outside the required distances for LT Credit Access to Quality Transit, the project may meet the requirements, provided the local transit agency has committed to restoring the routes with service at or above the prior level and are scheduled for completion within what time frame? A. One-year B. Two-years C. Five-years D. The transit service cannot be counted E. Certificate of occupancy 15. A LEED BD+C: New Construction and Major Renovations commercial project will have 200 full-time employees and 5 peak visitors. How many short-term bicycle storage spaces and on-site showers with changing facility do they need to provide for LT Credit: Bicycle Facilities? A. 1 short-term bicycle storage space and 1 shower B. 2 short-term bicycle storage spaces and 1 shower C. 4 short-term bicycle storage spaces and 1 shower D. 4 short-term bicycle storage spaces and 2 showers E. 14 short-term bicycle storage spaces and 2 showers 16. For LEED BD+C: Retail in order to qualify as a Bicycle Network for LT Credit: Bicycling Facilities which of these must be meet? A. Connects to 5 diverse uses that are located within a 2-mile bicycling distance from the project boundary. B. Connects to 10 diverse uses that are located within a 3-mile bicycling distance from the project boundary. C. Connects to 5 diverse uses that are located within a 3-mile bicycling distance from the project boundary. D. Connects to 10 diverse uses that are located within a 2-mile bicycling distance from the project boundary. 17. For all projects for LT Credit: Bicycling Facilities within what distance must the short-term bicycle storage be located? A. 100 feet walking distance of any main entrance B. 200 feet walking distance of any main entrance C. 100 feet walking distance of any functional entrance D. 200 feet walking distance of any functional entrance 18. Which of these would qualify as part of a bicycle network? [Choose three] A. Bike trails B. Streets with speed limit under 30 mph C. Dedicated bike lanes D. Slow-speed streets

19. What is the required documentation for LT Credit: Bicycle Facilities for a LEED BD+C: Schools project? [Choose three] A. Vicinity map showing bicycle network and route and distance along network to eligible destination(s) B. Site plan showing bicycle storage locations C. Site plan showing bicycle storage location with walking route to main entrance and bicycling route to project boundary D. Calculations for storage and shower facilities E. Description of programs to support bicycle use 20. Projects that have not earned points under LT Credit Surrounding Density and Diverse Uses or LT Credit Access to Quality Transit must achieve what percentage reduction from the base ratios to earn LT Credit Reduced Parking Footprint? A. 20% B. 25% C. 30% D. 40% 21. A fitness club located in a central business district has no local code requiring the building to provide parking spaces. The building is 20,000 square feet and the parking capacity base ratio from the Transportation Planning Handbook is 7 spaces per 1000 square feet. No off-street parking is provided. The project will earn points for LT Credit Access to Quality Transit. To comply with LT Credit Reduced Parking Footprint requirements what is the maximum number of parking spaces that the project can provide? A. 140 B. 112 C. 105 D. 84 22. A LEED BD+C: Core and Shell project has 100 total parking spaces used by the project. To earn LT Credit Green Vehicles how many of the parking spaces must be preferred parking spaces for green vehicles and how many spaces must be alternative-fuel fueling stations? A. 2 preferred spaces for green vehicles. Alternative-fuel fueling stations are not required B. 2 preferred spaces and 2 alternative-fuel fueling spaces C. 5 preferred spaces for green vehicles. Alternative-fuel fueling stations are not required D. 5 preferred spaces and 2 alternative-fuel fueling spaces 23. To qualify as a green vehicle what is the minimum green score on the American Council for Energy Efficient Economy (ACEEE) annual vehicle rating guide that must be achieved? A. 30 B. 40 C. 45 D. 50 24. What is an acceptable substitute for preferred parking for green vehicles? A. A discounted parking rate of at least 20%. The discounted rate must be publicly posted at the entrance of the parking area and permanently available to all of the building occupants. B. A discounted parking rate of at least 20%. The discounted rate must be publicly posted at the entrance of the parking area and permanently available to every qualifying vehicle. C. A discounted parking rate of at least 20%. The discounted rate must be publicly posted at the entrance of the parking area and available for two years to all of the building occupants. D. A discounted parking rate of at least 20%. The discounted rate must be publicly posted at the entrance of the parking area and available for two years to every qualifying vehicle.

25. Which of these LT Credit: Green Vehicles options can a LEED BD+C: Hospitality project use to earn the credit? [Choose two] A. Install electrical vehicle supply equipment (EVSE) B. Provide an electrical connection at dock door locations to limit truck idling at the dock C. Install liquid or gas alternative fuel fueling facilities or a battery switching station D. Designate preferred parking for green vehicles