ACEforward. BART Connectivity Alternatives Preliminary Forecasts and Costs Altamont Regional Rail Working Group July 13, 2016

Similar documents
ACEforward. Livermore Valley Chamber of Commerce Business Alliance Meeting. September 6, 2017

ACEforward. ACEforward includes a range of potential near-term and longer-term improvements.

4.17 Transportation and Traffic

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010

Successful Passenger Rail in the State of California

Caltrain Downtown Extension Study Ridership Forecast Summary

BART Silicon Valley. Berryessa Extension Project Community Update. October 27, 2010

Transit in Bay Area Blueprint

Leveraging Land Use Changes through Transportation Funding

REGIONAL RAIL RIGHT OF WAY ACTION PLAN TECHNICAL MEMORANDUM #1 RIGHT OF WAY INVENTORY

Speaker Information Tweet about this presentation #TransitGIS

SAN FRANCISCO TO SAN JOSE PROJECT SECTION. City of Brisbane Baylands Public Hearing June 7, 2017

APPENDIX I: [FIXED-GUIDEWAY TRANSIT FEASIBILITY]

BART: The Next 40 Years

Westchester County Department of Public Works and Transportation First and Last Mile Connections TNC Partnership Study

2.0 INTRODUCTION. Around the Bay Rail Study LS Transit Systems, Inc. in association with DKS & Nelson\Nygaard

QUALITY OF LIFE EXECUTIVE SUMMARY REPORT I O N S TAT I O N

U.S. System Summary: CALIFORNIA

Agenda. Preliminary Station Footprint High Speed Train Station in the City of Millbrae

More than $9 Million coming to Central Valley for transportation

Metro Green Line to LAX Alternatives Analysis. March 2012

Goods Movement Plans. Summary of Needs Assessments. January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6

High Speed Rail Conference

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

Successful Strategies. for Managing the Complex ebart Extension

October 20, 2017 Meeting

Chicago Milwaukee Intercity Passenger Rail Corridor

Measure R Funded Transit Projects

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

EMU Procurement Seats/Standees/Bikes/Bathroom

SAN FRANCISCO TO SAN JOSE PROJECT UPDATE

I 680 Transit Investment/Congestion Relief Options Study

This Evening s Agenda. Open House 7:00 7:30 Presentation 7:30 8:00 Community Feedback8:00 9:00 Adjourn

I 680 Transit Investment/Congestion Relief Options Study

U.S. System Summary: ARIZONA/SOUTHWEST

First of four service increases delivered in April 2015

Rail~Volution 2005 Hal Ryan Johnson, AICP, Bus Rapid Transit Project Manager Utah Transit Authority September 7, 2005

Develop ground transportation improvements to make the Airport a multi-modal regional

The Future of Transportation on the Caltrain Corridor

San Francisco to San Jose Preliminary Alternatives Analysis

TRI-VALLEY TRANSPORTATION COUNCIL STRATEGIC EXPENDITURE PLAN 2017 UPDATE. For the Tri-Valley Transportation Development Fee

Southern California - CHSRA

David Chow, P.E., AICP Director, IBI Group

Park-and-Ride Lot Master Plan

CONNECTING CALIFORNIA

Chapter 7. Transportation Capital Improvement Projects. Chapter 7

4 COSTS AND OPERATIONS

TRANSPORTATION & GOODS MOVEMENT COUNCIL MEETING May 1, :30 a.m.

Feasibility Study. Community Meeting March, North-South Commuter Rail Feasibility Study

REPORT CARD FOR CALIFORNIA S INFRASTRUCTURE WHAT YOU SHOULD KNOW ABOUT CALIFORNIA S TRANSIT FACILITIES

SAN FRANCISCO TO SAN JOSE PROJECT SECTION

California Regional Travel & Tourism Outlook. September 2016

I-405 and SR 522/NE 145th Bus Rapid Transit. Elected Leadership Groups Meeting November 30, 2018

Electric Multiple Unit Procurement Update

Firefighters warn of extreme fire danger in Fresno County foothills By Mark Grossi, staff writer The Fresno Bee, Sat.

FRESNO COUNTY SUBSECTION OF THE CALIFORNIA HIGH- SPEED TRAIN (HST)

4.1 Land Use. SECTION CONTENTS Land Use Transit Transportation Technology

GRAND JURY RELEASES REPORT ON MINIMUM STAFFING LEVELS FOR THE STOCKTON FIRE DEPARTMENT

Community Outreach Meetings

Unified Corridor Investment Study DRAFT Step 2 Scenario Analysis Report

Transit Access to the National Harbor

San Francisco Mobility, Access & Pricing Study

Community Meetings. January/February 2019

SERVICE DESIGN GUIDELINES

BART s Transbay Core Capacity Project

Agenda. Open House Presentation Question and Answer Break Out Groups Report Out & Close

Total Usage (kwh) Present Reading (kwh) (=)

Executive Summary. Treasure Valley High Capacity Transit Study Priority Corridor Phase 1 Alternatives Analysis October 13, 2009.

Capital Metro Plans & Projects Update NASWC July 27, capmetro.org

Key Findings. February 2009 Caltrain Annual Passenger Counts

Treasure Island Mobility Management Program

California Local Government Shopping Cart Ordinances. As of November 27, 2012

APPENDIX E: BIBLIOGRAPHY

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

Waco Rapid Transit Corridor (RTC) Feasibility Study

Chapter 9 Recommended Locally Preferred Alternative and Alternatives for Evaluation in Draft SEIS/SEIR

Peninsula Corridor Electrification Project Cost / Schedule Update

Total Usage (kwh) Present Reading (kwh) (=)

East Bay Bus Rapid Transit Project. Downtown Oakland to San Leandro International Blvd to East 14 th St

2019 New Transit Service Plan

Overview of Regional Commuter Rail Webinar: Phoenix, Arizona December 18, 2013

Downtown Transit Connector. Making Transit Work for Rhode Island

Connecting Cities, Connecting Regions, Connecting People

End-of-Year Performance Report FY Community Relations Committee December 5, 2018

Transit Access Study

SUBJECT: Shared Autonomous Vehicle project agreement between County Connection and Livermore Amador Valley Transportation Authority.

Connected Vehicle and Autonomous Vehicle (CV/AV) Mobility and Technology

Treasure Island Mobility Management Program

This letter provides SPUR s comments on the Draft Supplemental Environmental Impact Statement/ Subsequent Environmental Impact Report.

CyberTran International Inc. and ULRT. Neil Sinclair, Chairman Alameda Transportation Commission Technical Advisory Committee 10/4/2018

Michigan/Grand River Avenue Transportation Study TECHNICAL MEMORANDUM #18 PROJECTED CARBON DIOXIDE (CO 2 ) EMISSIONS

Ideas + Action for a Better City learn more at SPUR.org. tweet about this #DisruptiveTransportation

Community Meetings June 2018

Welcome and Agenda. Thank you for joining us! 6:00 pm Open House. 6:30 pm Welcome & Presentation. 7:00 pm Q&A. 7:15 pm Open House Resumes

CAPITOL CORRIDOR SERVICE PERFORMANCE

CENTRAL FLORIDA EXPRESSWAY AUTHORITY Master Plan Update Board Workshop #2

Staff Contact: Carlos de Melo, Community Development Director, (650)

FINAL REPORT FORM 1 (Formerly titled Project Monitoring Form 1 - Ridesharing ) Total Project Cost: $

Transcription:

ACEforward ACEforward BART Connectivity Alternatives Preliminary Forecasts and Costs Altamont Regional Rail Working Group July 13, 2016

ACEforward Project Goals Tri-Valley BART Connection Union City BART Connection 2

ACEforward Ridership Forecast Merced Extension July 2016 No-build ridership forecast to increase by more than 25% by 2025 The highest long-term annual ridership could be up to 5.15 million riders, an increase of more than 280% compared to today s usage 6,000,000 5,000,000 5.9 5.15 3 Annual Riders 4,000,000 3,000,000 2,000,000 1,000,000 0 2.25 1.33 2015 2020 2025 No Build (No Extension) 6 Daily Round Trips (Extend to Modesto) 10 Daily Round Trips (Extend to Merced)

Altamont Corridor Improvements Project Cost Section ($-MM 2014) Extension to Modesto San Joaquin County (1) $102.8 Stanislaus County $96.2 # of miles $ / mile ($-MM 2014) 9.7 9.1 $10.6 $10.6 5 th & 6 th Train (2) $202.0 5 th & 6 th Train Equipment $60.5 Station Improvements to Support 5 th & 6 th Train Parking Platform Extensions Extension to Merced Stanislaus County (3) Merced County $59.8 $14.4 $122.5 $227.2 12.6 25.9 $9.7 $8.8 7 th 10 th Train (4) $200.0 7 th 10 th Train Equipment $117.5 TOTAL $1202.9 4 1 Extension to Ripon 3 Extension to Turlock 2 Capacity and grade crossing improvements Stockton San Jose section 4 Capacity improvements Stockton San Jose section & maintenance facility expansion

5 Tri Valley and BART Connectivity

Existing Shuttle Connection Existing Shuttle Connections 4.56 million ACE - $1.20 billion Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 2 1:45 10 Tracy-Great America 0 1:10 10 6

2. BART Connection at Greenville BART Extension to Greenville Rd 5.15 million ACE - $1.20 billion BART - $3.27 billion (12.0 mi) Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 1 1:30 10 Tracy-Great America 0 1:10 10 7

3. BART Connection at Vasco BART Extension to Vasco Rd via Downtown Livermore 5.07 million ACE - $1.20 billion BART - $4.05 4.28 billion (10.0 mi) Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 1 1:33 10 Tracy-Great America 0 1:10 10 8

4. BART Connection at Downtown BART Extension to Vasco Rd w/ Downtown Livermore Intermodal 5.07 million ACE - $1.20 billion BART - $4.05 4.28 billion (10.0 mi) Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 1 1:33 10 Tracy-Great America 0 1:10 10 9

5a. ACE Extension to BART at Isabel 6 trains between Merced and Isabel, 4 Stockton San Jose BART Extension to Isabel / I-580 ACE Extension to Isabel / I-580 3.59 million (without Isabel extension) Additional Cost (with Isabel extension: aerial at-grade) Total ACE $0.75 billion $0.71 1.23 billion $1.46 1.98 BART $1.25 billion (5.0 mi) Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 1 1:33 6 Tracy-Great America 0 1:10 4 10

5b. ACE Extension to BART at Isabel 6 trains Merced Isabel San Jose, 4 Stockton San Jose BART Extension to Isabel / I-580 ACE Extension to Isabel / I-580 4.55 million (without Isabel extension) Additional Cost (with Isabel extension: aerial at-grade) Total ACE $1.20 billion $0.71 1.23 billion $1.91 2.43 BART $1.25 billion (5.0 mi) 11 Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 1 1:33 6 Tracy-Great America 0 backtrack 1:10 1:40 4 6

6. BART Connection via DMU to Isabel BART Extension to Isabel / I-580 DMU Shuttle between Greenville and Isabel / I-580 4.89 million ACE DMU BART $1.20 billion $0.63 billion $1.25 billion (5.0 mi) 12 Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 2 1:35 10 Tracy-Great America 0 1:10 10

Breakdown - ACE Extension to Isabel / DMU (millions, 7.3 miles, single track) Aerial At-Grade DMU Aerial Guideway $501 $197 $141 I-580 Overcrossings $0 $206 $0 I-580 Roadway $97 $688 $267 Track $37 $37 $36 Civil Work $0 $0 $0 Right-of-Way $0 $24 $23 Stations $78 $78 $94 Rolling Stock $0 $0 $72 Total $713 $1,230 $632 13 Cost per mile $98 $168 $87

7a. ACE Extension to BART at Dublin/Pleasanton 6 trains between Merced and Dublin/Pleasanton, 4 Stockton San Jose ACE Extension to Dublin/Pleasanton BART 3.36 million (without Dublin- Pleasanton extension) Additional Cost (with Dublin/P. extension: aerial at-grade) Total ACE $0.75 billion $1.14 2.38 billion $1.89 3.13 BART 14 Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 1 1:31 6 Tracy-Great America 0 1:10 4

7b. ACE Extension to BART at Dublin/Pleasanton 6 trains Merced Dublin/Pleasanton San Jose, 4 Stockton San Jose ACE Extension to Dublin/Pleasanton BART 4.10 million (without Dublin- Pleasanton extension) Additional Cost (with Dublin/P. extension: aerial at-grade) Total ACE $1.20 billion $1.14 2.38 billion $2.34 3.58 BART 15 Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 1 1:31 6 Tracy-Great America 0 backtrack 1:10 1:48 4 6

8. BART Connection via DMU to Dublin/Pleasanton DMU Shuttle between Greenville and Dublin/Pleasanton BART 4.89 million ACE DMU BART $1.20 billion $1.08 billion Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 2 1:33 10 Tracy-Great America 0 1:10 10 16

Breakdown - ACE to Dublin/Pleasanton / DMU (millions, 12.8 miles, single track) Aerial At-Grade DMU Aerial Guideway $914 $169 $116 I-580 Overcrossings $0 $664 $0 I-580 Roadway $133 $1,405 $540 Track $66 $66 $67 Civil Work $0 $0 $0 Right-of-Way $0 $46 $43 Stations $31 $31 $242 Rolling Stock $0 $0 $72 Total $1,145 $2,381 $1,080 17 Cost per mile $89 $186 $84

9. Shuttle Connection at Isabel BART BART Extension & Bus Connection 4.56 million ACE - $1.20 billion BART - $1.25 billion (5.0 mi) Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 2 1:45 10 Tracy-Great America 0 1:10 10 18

Summary of Tri-Valley ACE-BART Connection Options ACE Ridership (millions) ACE Cost (billions) DMU Cost (billions) BART Cost (billions) Existing Shuttle Connection 4.56 $1.20 BART Connection at Greenville 5.15 $1.20 $3.27 BART Connection at Vasco 5.07 $1.20 $4.05 4.28 BART Connection at Downtown 5.07 $1.20 $4.05 4.28 ACE Extension to Isabel BART - 6 trains Merced Isabel, 4 Stockton San Jose - 6 Merced Isabel San Jose, 4 Stockton - SJ 3.59 4.55 $1.46-1.98 $1.91-2.43 $1.25 BART Connection via DMU to Isabel 4.89 $1.20 $0.63 $1.25 ACE Extension to Dublin/Pleasanton BART - 6 trains Merced Dublin/P., 4 Stockton San Jose - 6 trains Merced D/P San Jose, 4 Stockton - SJ 3.36 4.10 $1.89-3.13 $2.34-3.58 BART Connection via DMU to Dublin/Pleasanton 4.89 $1.20 $1.08 19 Shuttle Connection at BART Isabel 4.56 $1.20 $1.25

ACEforward Altamont Pass Stockton Existing and Potential Alignments with Alameda County-Owned Former SPRR

ACE Extension to BART at Union City 6 trains between Merced and Union City, 4 Stockton San Jose 3.34 million (without Union City Extension) Additional Cost (with Union City Extension) Total $1.20 billion $0.02 billion $1.22 Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 1 1:53 6 Tracy-Great America 0 1:10 4 21

ACE Extension to BART at Union City 6 trains Merced Union City San Jose, 4 Stockton San Jose 4.16 million (without Union City Extension) Additional Cost (with Union City Extension) Total $1.20 billion $0.02 billion $1.22 Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 1 1:53 6 Tracy-Great America 0 backtrack 1:10 1:32 4 6 22

BART Connection via DMU to Union City 4.66 million ACE DMU $1.20 billion $0.10 billion Trip # Transfers Travel Time # Daily Round Trips Tracy-San Francisco 2 2:02 10 Tracy-Great America 0 1:10 10 23

Summary of Tri-Valley and Union City ACE-BART Connection Options Existing Shuttle Connection Shuttle Connection at Isabel BART* ACE Ridership (millions) ACE Cost (billions) DMU Cost (billions) BART Cost (billions) 4.56 $1.20 $1.25* BART Connection at Greenville 5.15 $1.20 $3.27 BART Connection at Vasco or Downtown 5.07 $1.20 $4.05 4.28 ACE Extension to Isabel BART - 6 trains Merced Isabel, 4 Stockton San Jose - 6 Merced Isabel San Jose, 4 Stockton - SJ 3.59 4.55 $1.46-1.98 $1.91-2.43 $1.25 BART Connection via DMU to Isabel 4.89 $1.20 $0.63 $1.25 ACE Extension to Dublin/Pleasanton BART - 6 trains Merced Dublin/P., 4 Stockton San Jose - 6 trains Merced D/P San Jose, 4 Stockton - SJ 3.36 4.10 $1.89-3.13 $2.34-3.58 BART Connection via DMU to Dublin/Pleasanton 4.89 $1.20 $1.08 ACE Extension to Union City BART - 6 trains Merced Union City, 4 Stockton SJ - 6 trains Merced Union City SJ, 4 Stockton - SJ 3.34 4.16 $1.22 $1.22 24 BART Connection via DMU to Union City 4.66 $1.20 $0.10

Summary of Stockton-only Alternatives ACE Ridership (millions) ACE Cost (billions) DMU Cost (billions) BART Cost (billions) Existing Shuttle Connection 3.31 $0.66 BART Connection at Greenville 3.74 $0.66 $3.27 ACE Extension to Isabel BART - 6 trains Stockton Isabel, 4 Stockton SJ - 6 trains Stockton Isabel SJ, 4 Stockton - SJ 2.46 2.96 $1.40-1.92 $1.46-1.98 $1.25 BART Connection via DMU to Isabel 3.45 $0.66 $0.70 $1.25 ACE Extension to Union City BART - 6 trains Stockton Union City, 4 Stockton SJ - 6 trains Stockton UC SJ, 4 Stockton - SJ 2.40 2.88 $0.68 BART Connection via DMU to Union City 3.34 $0.66 $0.08 Shuttle Connection at BART Isabel 3.31 $0.66 24