Termination Procedure for 723 Series SolderTacts Contacts for Coaxial Cable: D , D

Similar documents
Termination Procedure for Subminiature SolderTacts Contacts for Coaxial Cable: D & D D & D

CASS Interface System Parts Section 1

Termination Procedures for Triaxial Connectors D , D , and D

ET-PWR-END-KIT Installation Instructions (part #JSR00)

WRSS Wraparound Repair Sleeve Installation Instructions

HVS S 15kV Class

RG6 TLC F Hands-On. Materials Needed RG6 regular/dual coax cable Adjustable prep tool (stripper) (45-526) RG6 F TLC connector (85-168)

Assembly Instructions-C12 Amphenol Triax BNC, 180 Polarity

EMK-XP ElectroMelt Power Connection and End Seal Kit Installation Instructions

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

onlinecomponents.com

Power Connection Kit installation instructions

SUBMERSIBLE TRANSDUCER CABLE REPAIR

UES-LL End Termination Kit

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

Cold Shrink QS T Trifurcating Transition Splice Kit

ASSEMBLY, INSTALLATION, AND REMOVAL OF CONTACTS AND MODULES

C Power Connection Kit

FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)

3M Cold Shrink QT-III Silicone Rubber Three-Core Termination Kits

C A Heating Cable Gland Kit Installation Instructions

Solder Assembly Kit

FAKRA-Comliant SMB 50-Ohm Inline Connectors 27 JUN 11 Rev E

3M Cold Shrink Silicone Rubber Termination QT-III 7600-S-3G Series Three-Core Outdoor Termination

QUICKTERM TERMINATION KIT

JUL 17 Rev M

FAKRA Automated In-Line Connector System

Assembly Instruction. EL OCHITO BLUE CONTACTS SuperSpeed USB TYPE I: PIN /SKT CABLE:

Application Specification Circular Plastic Connector (CPC) Series 45 System 05 AUG 14 Rev D

Assembly Instruction EL OCHITO WHITE CONTACTS 1000BASE-T/10GBASE-T TYPE I: PIN /SKT CABLE: S/FTP

800 Pin Receiver and ITA Modules and Contacts 2

3M Cold Shrink QT-III Silicone Rubber 3/C Cabinet Mount Termination Kit

JBS-100-STB Single Entry Power Connection with Junction Box Installation Instructions

JBS-100-A, A6 SINGLE ENTRY POWER CONNECTION WITH JUNCTION BOX INSTALLATION INSTRUCTIONS

JBM-100-STB NEMA 4X-rated connection kit Installation Instructions

2M Series Contacts and Tools

HTP PTP/ PTJ Power Connection Kit for Pipes

AMPLIMITE* HDP- 20 and Economy

INSTALLATION INSTRUCTION PEM1121ENG ENGLISH

PMKG-JS POLYMATRIX SPLICE CONNECTION KIT INSTALLATION INSTRUCTIONS

ELE-3COP-359 Title - Braid termination using a Tinel Lock TM ring installed using a resistance heater.

MX Cable Connector Kit Manual Manual for Trimming the Cable and Connecting the Connector to an MX8031 Extension Cable

3M Cold Shrink Silicone Rubber Outdoor Termination Kit QT-III 7600-S-3W Series

Product Installation Instructions. Raychem Corporation Electrical Products 8000 Purfoy Road Fuquay-Varina, NC 27526

Amphenol. eries SJT. Series SJT. VG 96912, Series 1 PAN JN 1003

PRO-Tect Pipe Freeze Protection Self-Regulating Heating Cable Install Manual (PT-Series)

Wiring Assembly Instructions Section 5 P/N CASS P/N 1899AS RG316 P/N CASS P/N 1899AS RG316

PARAVION TECHNOLOGY, INC AIRWAY AVENUE FORT COLLINS, COLORADO 80524

1 GENERAL INFORMATION

RSK Connectors and Installation Tools

American Standard ProAx Triaxial Camera Connectors Installation Instructions

SRK02 Hard Wire Power Connection Kit. Installation, Operation and Maintenance Instructions

BBIT/BPTM 5-35kV Class. High Voltage, Heat-shrinkable Bus Insulation Tubing

6 Gauge Box Set IS0332

C A HEATING CABLE GLAND KIT INSTALLATION INSTRUCTIONS

Operating voltage up to 5 kvdc Operating current up to 4,5 A 2-6 High voltage contacts Quick and easy assembling Protection class IP68 acc.

QT-III Cold Shrink Silicone Rubber

PMKG-J2LP PolyMatrix Powered Splice Kit Installation Instructions

MONORAIL KITS INSTALLATION INSTRUCTIONS PENDANTS

SPC-P Smart Power Connection with Temperature Monitoring Transmitter Pipe Mounted Installation Instructions

Cabling Instructions NOνA Project Written By: Dale Mudd September 21 st, 2010

AutoMatrix Power Connection Kit. (1) This type 4X enclosure is intended for indoor or outdoor use primarily to. (2) May be required (see step 1).

APPLICATION SPECIFICATION

Lakela nd H2 Low Speed Stator Coil Installation

channel damage the internal components and the weight may break the internal wiring or flexible strip.

Nuheat WEATHER-READY HEAT TRACE PIPE FREEZE PROTECTION SYSTEM. Self-Regulating Heating Cable Installation Guide. UV Resistant Polyolefin Outer Jacket

3D PRINTER. Pack 09. Anything you can imagine, you can make! 3D technology is now available for you at home! BUILD YOUR OWN

Cold Shrink QS2013-3T-WS Trifurcating Transition Splice Kit

PLP Compression Dead-end & Jumper Terminal for ACSR & ACSS Conductors

Around the cable. Stripping.... convincing solutions

Rear Vision System Liftgate Emblem Camera for Aftermarket Display Ford Flex (Kit part number )

APPLICATION SPECIFICATION

LMF / LMG RANGE ACCESSORIES CONTENTS

SMB LOCK Introduction Characteristics Straight plugs Right angle plugs SMB limited detent (SMB-A) Receptacles...

General characteristics and technical data Series MCS

3M Cold Shrink Splice Kit QS-III 5536A

MY F150 CrewCab 1. Tools Required E F G. Page 1 of 10 9L3J-19A014-AA Copyright Ford 2013 FoMoCo

Operating voltage up to 5 kvdc Operating current up to 4,5 A 2-6 high voltage contacts Quick and easy assembling Protection class IP68 acc.

SLIMFLEX LED Tape Lighting

Off Road Only (ORO) LiteSPOTs 8 Light Kit

Signal Mirror Installation Instructions

PLASTI-GRIP* Terminals and Splices

AB05 Series Miniature Bayonet Coupling Connectors

Application Techniques for Reflective Pressure-Sensitive Films

Raychem CSJA Safety Instructions. Safety Instructions. Customer Service. Kit Contents. Installation Instructions

SE400-M3-MMO-100/(U)SLQ-32A(V)3 WARNING. b. Engage swingbolts 3A11H9 with SRU front panel support hooks H1 and tighten nuts on swingbolts.

PARTS IDENTIFICATION AND ASSEMBLY INSTRUCTIONS

Voice/Data/ Video Tools

Application Note. Walthers/Proto 2000 E7A Tsunami Digital Sound Decoder Installation Notes

Rejuvenation Instructions

FOSC-100 B/H FOSC-100 B2/H

101B, 210X, ELM, 101X Frame Installation & Service Manual

NMNGMC MODULE LIGHTS


Installation Instructions

Inde-Pendants Family. 32L Cylinder with Ring Chicago Plenum Ceiling Types. Document No

FAKRA-Compliant SMB Gen-4 Connector System

INSTALLATION INSTRUCTIONS

354 CHAPTER EIGHT WATER PUMP

Transcription:

enlo Park, CA 94025 USA Print 12-Jun-03 1 of 11 Termination Procedure for 723 Series SolderTacts Contacts for Coaxial Cable: D-602-44, D-602-45 1. Scope This engineering standard contains the termination procedures, inspection requirements, and rework procedures for the SolderTacts contacts D-602-44 and D-602-45. 2. Reference 2.1 Raychem Specification Control Drawings D-602-44: Shielded Contact, pin, Coaxial cable (Inner socket/outer pin) D-602-45: Shielded Contact, Socket, Coaxial Cable, (Inner pin/outer socket) D-600-0018: Dielectric Barrier 2.2 Other Specifications Federal Standard QQ-S-571 2.3 Raychem Instructions AA-400 Super Heater Instructions AD-1319 Holding Fixture Instructions IR-1044 Two-Station Heater Instructions 2.4 Other Instructions Visual inspection standards: "Verification Photos" Video Tape: "SolderTacts Contacts Installation Procedures" 3. Application Equipment And Tools Heating Tool. Reflector Holding Fixture AA-400 Superheater (Portable, Compressed Air) #979663 ini SolderSleeve Reflector AD-1319 Holding Fixture with AT-1319-14 Adapter or AD-1480 Holding Fixture Steinel Hot Air Gun HL1802E-KIT-120 1 (includes nozzle) Two-Station ench-mounted, focused infraed) Steinel Nozzle 07460 - - et #2, 15 1 Steinel Hot Air Gun replaces CV-5300 heaters

enlo Park, CA 94025 USA Print 12-Jun-03 2 of 11 4. General Information 4.1 Description The D-602-44 and D-602-45 contacts are designed for use in the following connectors having size 16 cavities: IL-C-28748 rectangular rack and panel connectors and Raychem RD-1 high-density circular connectors. These single-piece contacts solder to coaxial cable by means of preinstalled solder preforms in heat-shrinkable insulating sleeves. 4.2 Coaxial Cable Accommodation 4.2.1 D-602-44 and D-602-45 contacts will generally accommodate coaxial cable of the dimensions shown, when conventionally stripped. Construction and/or conductor plating other than tin or silver may inhibit solderability. Consult Raychem for further details. Figure 1 4.2.2 D-602-44 and D-602-45 contacts will accommodate coaxial cable of the dimensions shown, when the braid is folded back. Figure 2

enlo Park, CA 94025 USA Print 12-Jun-03 3 of 11 4.2.3 D-602-44 and D-602-45 contacts will accommodate RG-178B/U coaxial cable when the cable is prepared per paragraph 5.1.8. 5. Termination Procedures 5.1 Coaxial Cable Preparation 5.1.1 For cable conforming to Section 4.2.1: Strip the cable as shown below. For 28 thru 32 AWG center conductors see optional strip method (preferred) of paragraph 5.1.7. 5.1.2 For cable with braid diameter smaller than 0.066 inch (1.7 mm) and conforming to Section 4.2.2: Strip the cable as shown below. 5.1.3 Straighten the center conductor and make sure that stranded center conductor is twisted into its original lay. 5.1.4 Pretin stranded center conductors and unplated solid center conductors with Sn63 solder and RA flux per QQ-S-571. 5.1.5 ake sure that the shield braid is trimmed evenly, and that no loose strands are extended out across the exposed dielectric. 5.1.6 Smooth the braid ends flat against the dielectric of cable jacket.

enlo Park, CA 94025 USA Print 12-Jun-03 4 of 11 5.1.7 Optional ethod Preferred For Center Conductors 28 Thru 32 AWG.G 5.1.7.1 Strip the center conductor to.190 ±.015 (4,83 ± 0,38 mm) length in place of.090 ±.015 (2,29 ± 0,38 mm) length. 5.1.7.2 Pretin the center conductor to.190 ±.015 (4,83 ± 0,38 mm) length in place of.090 ±.015 (2,29 ± 0,38 mm) length. 5.1.7.3 Fold the center conductor back on itself to meet the.090 ±.015 (2,29 ± 0,38 mm) length. 5.1.8 RG-178B/U Coaxial Cable Preparation 5.1.8.1 Strip the cable per the dimensions shown in Figure 3. Then flare the braid to expose the inner conductor dielectric. 5.1.8.2 Install the dielectric barrier tube, D-600-0018 and smooth the braid back over the barrier tube per Figure 4A. 5.2 Inserting Cable Into Contact 5.2.1 Slip the contact carefully over the end of the prepared cable and gently push the contact onto the cable until it stops. Rotating the contact slightly during cable insertion will help prevent the braid from catching.

enlo Park, CA 94025 USA Print 12-Jun-03 5 of 11 5.2.2 Inspect for proper insertion (see Figure 5). The center conductor must be visible through one of the forward inspection windows. The distance from the rear of the contact body to the cable jacket insulation must be as shown on Figure 5. Figure 5 leading edge etc. 5.2.3 If the cable cannot be inserted as required, remove the contact from the cable and check for improper strip dimensions, splayed shield braid, or bent center conductor. 5.3 Heating Procedure: 5.3.1 Heating Procedure: Hot Air Heating Tools Either the AD-1319 holding fixture and adapter or the AD-1480 repair holding fixture must be used during termination to prevent damage to the contacts.

enlo Park, CA 94025 USA Print 12-Jun-03 6 of 11 G CAUTION The AD-1480 Tool is designed to be used during the replacement of contacts where access will not permit the use of the AD-1319 fixture. The AD-1480 Tool is not designed for use as a production tool. 5.3.1.1 If the AD-1319 holding fixture is to be used, install the AT-1319-14 adapter, insert a contact, and set up the dimensions as shown in Figure 6. ake sure that the contact is inserted in the appropriate end of the adapter. D-602-44 contacts (Inner socket/outer pin): D-602-45 contacts (Inner pin/outer socket): "P" end. "S" end. Figure 6

enlo Park, CA 94025 USA Print 12-Jun-03 7 of 11 Rev. G 5.3.1.2 Insert the contact/cable assembly into the appropriate end of the AT-1319-14 adapter or AD-1480 repair holding fixture as shown in Figure 7 or 8. Push contact in until it is stopped by the bottom of the fixture. D-602-44 contacts (Inner socket/outer pin): "P" end. D-602-45 contacts (Inner pin/outer socket): "S" end. AD-1319 Holding Fixture and AT-1319-14 Adapter with Contact/Cable Assembly Cable Contact AD-1480 Repair Holding Fixture with -Contact/Cable Assembly (Outer Pin Contact Shown for Reference) Figure 8 5.3.1.3 Clamp the coaxial cable in the AD-1319 holding fixture (if used). The cable must be fully inserted in the contact (see Section 5.2.2). The contact must be fully inserted in the adapter. The cable must be straight between the contact and the cable clamp.

enlo Park, CA 94025 USA Print 12-Jun-03 8 of 11 5.3.1.4 Applying heat with hot air heating tool Attach the appropriate reflector to the heating tool (see Section 3 for reflector selection) Turn the heating tool on and allow to warm up. (see instructions for tool used) Using one of the required holding fixtures, position the contact in the hot air stream within the reflector. For optimum heating, position the contact as shown in Figure 9 or 10. Center the forward inspection window in the reflector. Position the forward inspection window toward the hot air stream such that the inner solder preform is still visible during termination.

enlo Park, CA 94025 USA Print 12-Jun-03 9 of 11 Continue to direct hot air around the contact until the small solder preform in the forward inspection window has melted and flowed. The large solder preform in the rear inspection window should have melted and flowed by this time if it has not, direct hot air around the rear inspection window until it does. Be sure to allow the solder to solidify before removing the contact from the holding fixture or disturbing the cable position. 5.3.1.5 After the termination has cooled at least 15 seconds, remove it from the holding fixture. 5.3.1.6 Inspect the completed termination according to Section 6 of this standard. 5.3.2 Heating Procedure: IR-1044 Two-Station Heater 5.3.2.1 Set up the IR-1044 heater according to Section 2 of the IR-1044 instructions. 5.3.2.2 Heat the contacts according to Section 3 of the IR-1044 instructions. 5.3.2.3 Inspect the completed termination according to Section 6 of this engineering standard. 5.3.2.4 The IR-1044 may require readjustment when a cable change is made. 6. Inspection 6.1 Assembly Inspection. Inspect the completed termination for correct assembly according to the following criteria: 6.1.1 If the distance from the rear end of the contact body to the cable jacket does not meet the requirements of 5.2.2 improper strip lengths and/or improper cable insertion is indicated. 6.1.2 The center conductor must be visible through one of the forward inspection windows. 6.1.3 The shield braid must be visible through the rear inspection windows. 6.2 Heating Inspection. Visually inspect the completed termination for proper heating according to the following criteria: 6.2.1 The small solder preform in the forward inspection window must be melted and flowed G so that: H Preform shows no trace of its original form (underheated condition).

enlo Park, CA 94025 USA Print 12-Jun-03 10 of 11 A trace of solder band which is wetted to the substrate is acceptable. Solder fillet is visible between center conductor and inner contact soldering surface. Insufficient visible solder indicates overheated condition. 6.2.2 The large solder preform in the rear inspection window must be melted and flowed, so that: H Preform shows no trace of its original form (underheated condition) Trace of solder band which is wetted to the substrate is acceptable. Solder fillet is visible between braid and contact body. Insufficient visible solder indicates overheated condition. 6.2.3 The insulating sleeve must be shrunk over the area of braid visible between the cable jacket and the contact. Insulating sleeve may remain flared at end. 6.2.4 The insulating sleeve must not be darkened so as to obscure the solder joints or hinder inspection (overheated condition). 6.2.5 The coaxial cable jacket must not show signs of damage or overheating outside of the insulating sleeve. 6.3 Visual inspection standards ("Verification Photos") are available from Raychem. 7. Repair and Rework 7.1 Underheated Terminations Reheat underheated areas as directed in Section 5.3 and reinspect per Section 6. Avoid reheating areas that have been properly heated. 7.2 Overheated or Improperly Assembled Terminations 7.2.1 Remove the contact from the cable as directed in Section 7.3.

enlo Park, CA 94025 USA Print 12-Jun-03 11 of 11 7.2.2 Check the cable for damage and incorrect stripping. If the cable is damaged, cut off the damaged portion and restrip per Section 5.1. If stripping is incorrect, restrip as required (Section 5.1.) 7.2.3 Install a new contact (Sections 5.2 and 5.3). 7.3 Removing Contacts From Cable CAUTION Safety glasses must be used during this operation. 7.3.1 Use a sharp knife or razor blade to score the insulating sleeve full length on opposite sides of the contact. CAUTION Avoid cutting into wire insulation. 7.3.2 Hot air heating tools. Holding the contact with pliers, heat the contact until the solder melts, and quickly pull the heated contact off the cable. 7.3.3 IR-1044 Heating Tool. Heat the contact the same as for termination, but without closing the wire clamp. As soon as the heating lamp goes out, pull the cable out of the contact.