Simplex PowerStar Quick Start Guide. Adam Narup Simplex

Similar documents
Electra Load Bank Manual ELECTRA. Portable Load Bank. 11 June 2018 Simplex Service Page 1 of 20

LOAD BANK TECHNICAL MANUAL (LBD Series)

MICROSTAR + LOAD BANK SYSTEM TECHNICAL MANUAL

1000KW PORTABLE LOAD BANK

1500 KVA RESISTIVE/INDUCTIVE STATIONARY LOAD BANK

XS400 Load Bank. Read all instructions before using the load bank. Contents

110KW PORTABLE LOAD BANK

400KW PORTABLE LOAD BANK

Operations and Service Manual. XE400D-SB Load Bank

XS500 Load Bank. Read all instructions before using the load bank. Contents

X100P Load Bank. Read all instructions before using the load bank. Contents

ATLAS-MEGAWATT TRAILER LOAD BANK TECHNICAL MANUAL

SWIFT-E SWIFT-E+ 10KW-15KW LOAD BANK

XL1000 Load Bank. Read all instructions before using the load bank. Contents

NSGV PT-1000 PORTABLE WELDING STATION I, O & M MANUAL

POWER FACTOR CORRECTION MOTOR LOAD (ML) FIXED CAPACITOR

Operations and Service Manual. X30208 Load Bank

C1000 Series Automatic Cap Bank

NECO Pumping Systems

Department of Defense

LBD-Series. Radiator-Cooled Load Bank. Description

of Fire Pump Assemblies

LOAD BANK TECHNICAL MANUAL

LOAD BANK TECHNICAL MANUAL

PHASE PERFECT PHASE CONVERTERS OPERATION & INSTALLATION MANUAL PHASE TECHNOLOGIES, LLC

CONTROLLIX CORPORATION CONTROLLIX.COM LOW VOLTAGE AUTOMATIC SWITCH CAPACITOR BANK SPECIFICATIONS

SECTION AIR INTAKE SYSTEM

TM-1620 OPERATING INSTRUCTIONS AND OWNERS MANUAL

Installation Instructions Electric Heaters 5 20 kw

Troubleshoot Furnace (Troms)

Wiring diagrams on page 29 are for reference only. For detailed vehicle wiring refer to Navistar documents.

1332 TROUBLESHOOTING GUIDE. Remarks: If this function is not appropriate for the application, it can be eliminated by turning off DSWl, switch 3.

TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS

V. Design, Application, Maintenance & Operation Technical Requirements

PF Guard Power Factor Capacitor Bank Installation, Operation, and Maintenance Manual

Test Cabinet (Inspection Box) Instructions. for Testing Accessories on Manually and Electrically Operated EntelliGuard G Low Voltage Circuit Breakers

Installation Instructions Electric Heaters 5 20 kw

Technical Information and Diagnostic Guide

CALTRAP INSTALLATION AND OPERATIONS MANUAL

SECOND GENERATION Use this guide with unit serial number prefix beginning with BWF using Terra Power separator.

OutdoorXUPS-600AHV-8364

VLT SERIES. True Sine Wave AC Power Inverter. Owner s Manual. Owner s Manual D Rev.B

FLEETWOOD. American Coach POWER LOCKING INSTALLATION MANUAL MADE IN THE USA. Power Locking System PLRB Relay Controller PLRB-RC 3 Keyless Entry

SELECTRIC, INC. Selectric (PX) Full Voltage Type Motor Control Panel Installation And Operation Manual

PowerOhm Installation Manual for BM R Series Braking Modules

SELECTRIC, INC. Selectric (PA) Autotransformer Type Motor Control Panel Installation And Operation Manual

TD80 LEVEL GAUGING & OVERFILL PREVENTION SYSTEM PRODUCT MANUAL. TPM 001 Revision 0.1

Fire Pumps Inspection, testing and maintenance of fire pumps

INSTALLATION, OPERATION & MAINTENANCE INSTRATIONS

10KW-15KW PORTABLE LOAD BANK

POWER GENERATION SYSTEMS

PowerOhm Installation Manual for BM R Series Braking Modules

ITS-50R TRANSFER SWITCH OWNER S MANUAL

BOILER FEED SYSTEM OPERATION AND MAINTENANCE MANUAL

Installation Instructions

dv Sentry TM 208V 600V INSTALLATION GUIDE Quick Reference ❶ How to Install Pages 6 14 ❷ Startup/Troubleshooting Pages WARNING

Sofa Slideout Assembly OWNER'S MANUAL. Rev: Page 1 Sofa Slideout Owners Manual

OPERATING INSTRUCTIONS IC-2, 3,4,5,6 INTELLICUT SERVO CUTTER Version 5.1xx Created 11/2009

ADVANCED PID TROUBLESHOOTING

User s Manual. ACS550-CC Packaged Drive with Bypass Supplement for ACS550-01/U1 Drives User s Manual

1-3 MANUAL STARTERS EXERCISE OBJECTIVE. Examine and describe the operation of manual motor starters. DISCUSSION

Table Summary of Sprinkler System Inspection, Testing, and Maintenance. Reference. Inspection , ,

MODEL SCA Installation and Operation Manual Important:

TC Series Cooling Systems

INSTRUCTION MANUAL. Type SWF. Sine Wave Filters 480 Volts, 60Hz. Page 1 of 14. April 15, 2010: updated capacitor UL File number)

PBA Series Prelube Controls

SUREFIRE 512 STOVE SENTRY INSTRUCTION MANUAL

PRECISION UK Ltd DUPLEX AGSS PLANT

Liebert CSU3000 DISCONTINUED PRODUCT. CSI Mainframe Cooling Systems. CT(Three Module) Model 20, 30 & 37 ton Mainframe Chiller

McCANNA Actuation Systems B

TECHNICAL SPECIFICATION FOR A 10 TO 50 KVA THREE PHASE, UNINTERRUPTIBLE POWER SYSTEM WaveRider III

INSTALLATION and OPERATION BALL DISPENSER MODEL NOS: BD-001 THRU BD-004, BD-010, BD-011

CHAPTER 22 AUTOPILOT

Units with pedestal and busbars on the short side (+H360, flat mounting)

ACE Variable Frequency Drive System

PROJ. NO SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

User s Manual. ACS550-CC Packaged Drive with Bypass Supplement for ACS550-01/U1 Drives User s Manual

Lubrication & Maintenance Schedule

1. Take the cover off the relay, taking care to not shake or jar the relay or other relays around it.

The Power of Reliability INSTRUCTION MANUAL

Installation and Operations Manual

Advantage Fan 36" and 48"

Third Generation NITE Phoenix

INSTRUCTION MANUAL AND PARTS LIST FOR 3E CANNED MOTOR PUMPS

Operations & Maintenance Manual DFH-1000 DUCTLESS FUME HOOD

Exercise 1-3. Manual Starters EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Direct-on-line (DOL) starters. Reversing starters

Troubleshooting Guide

AIR CLEANERS. Model MX 6000 OWNER S MANUAL CAUTION. Read complete instructions before operating. Please file for future reference.

2015 EDITION SUBMERSIBLE MOTORS AIM MANUAL. APPLICATION INSTALLATION MAINTENANCE 60 Hz, Single-Phase and Three-Phase Motors. franklinwater.

Exercise 1-5. Current Protection Devices EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Circuit breakers

TABLE OF CONTENTS. Understanding the Troubleshooting Instructions...2 Signal Light...2 Harness Connections...2 Inspection...2

EEQ SERIES COMPACT FLUORESCENT EMERGENCY FACTORY SEALED LIGHTING FIXTURES

GUIDE TO MAINTENANCE PRACTICES FOR DISTRIBUTION NETWORKS IN THE DISTRIBUTION SECTOR OF THE NAMIBIAN ELECTRICITY SUPPLY INDUSTRY

Cooling System. Table of Contents

Table 6-1. Problems and solutions with pump operations. No Fluid Delivery

WPS-104 Heater Installation Instructions For 500EFI, 700 XP, & Crew Applications

Pressure Makeup Jockey Pump Controller

AIR COOLED CHILLERS WATER COOLED CHILLERS

Specifications of MAXON VALUPAK burners for 50 Hz operation

Copeland Screw TM Compressors

Transcription:

Adam Narup Simplex

DESCRIPTION Simplex Load Banks are precision test instruments specifically designed to apply a discrete, selectable resistive electrical load to a power source while measuring the response of the generator to the applied load. They also provide a means for routine maintenance exercise to assure long term reliability and readiness of the standby generator. Exercise Load Banks eliminate the detrimental effects of unloaded operation of diesel engine generators. This fully self-contained Load Bank includes test instrumentation, cooling system, rugged load elements, load-application control devices and automatic system protection devices. The resistive load elements in this Load Bank are cooled by a horizontal forced air system. The load system is connected to the test source via the load cables. This Load Bank is equipped with automatic safety systems which de-energize all load steps when conditions are present which could damage the Load Bank or present a safety hazard to the operator. A Cooling Failure deenergizes any load applied when cooling of the load elements becomes inadequate due to fan failure or high exhaust temperature. PRIMARY INSPECTION Preventative visual inspections of the shipping crate and Load Bank is advised. Physical or electrical problems due to handling and vibration may occur. Never apply power to a Load Bank before performing this procedure. The following five point inspection is recommended before installation, and as part of the 50 hr. / 6 month maintenance schedule or as a Load Bank is relocated: 1. If crate shows any signs of damage examine the Load Bank in the corresponding areas for signs of initial problems. 2. Check the entire outside of the cabinet for any visual damage which could cause internal electrical or mechanical problems due to reduced clearance. 3. Inspect all relays and control modules. Make sure all components are secure in their bases and safety bails are in place. Spot check electrical connections for tightness. If any loose connections are found inspect and tighten all remaining connections. 4. Examine all accessible internal electrical components such as fuses, contactors and relays. Check lugged wires at these components. 5. Visually inspect element chamber for foreign objects, broken ceramic insulators, mechanical damage.

LOAD BANK LOCATION The load elements in this Load Bank are cooled by a horizontal forced air system which discharges through the front of the cabinet. Location of the Load Bank is of prime importance and is one of the most critical factors involved in safe operation. The Load Bank must be positioned and installed according to large airflow requirements. Never point the exhaust at a nearby surface or object which may be adversely affected by high temperature. Never operate the Load Bank in a confined space without regard for adequate intake of air and provision for exit of high temperature exhaust. Consider that the Load Bank and a nearby generator set may have to compete for cooling air. Never bounce hot exhaust air off nearby objects and allow it to re-circulate through the cooling system. Never operate the Load Bank in proximity to a sprinkler system. MAINTENANCE The Load Bank has been designed to require minimum maintenance. All components have been chosen for a long, reliable life. Two basic intervals of maintenance are required: each operation and every 50 hours or 6 months (which-ever comes first). EACH OPERATION The air intake screens and louvers, fan and cooling chamber, and exhaust openings must be checked for any obstructions or foreign objects. Due to the high volume of air circulated, paper and other items can be drawn into the air intakes. During Load Bank operation insure that air is exiting from the exhaust vent. The load branches should be checked for blown fuses or opened

load resistors. To check the fuses or load resistors, operate the Load Bank from a balanced 3-phase source and check the three line currents. The three current readings should be essentially the same. If a sizeable difference is noted one or more load fuses or load resistors may have malfunctioned. EVERY 50 HOURS OR 6 MONTHS Check the tightness of the electrical connections. The expansion and contraction caused by Load Bank operation may result in loose connections. The vibrations caused by the cooling fan may also loosen electrical connections. If the Load Bank is transported over the road, the electrical connections should be checked for tightness at a shorter-than-normal time interval. See Primary Inspection. FAILURE SUBSYSTEM Excessive intake/exhaust temperatures, any reduction in cooling air flow, or a Loss of Communication from either the hand held controller or the controlling load bank is indicated by the illumination of the Failure indicator on the hand held remote control. Any of the above conditions will result in the Load Bank entering a failure state. The Failure indicator on the hand held controller will illuminate and the load de-energizes. All load steps are locked out until the problem is corrected. Until the failure is investigated/corrected and the control system is reset the load cannot be reapplied.

Generator Connection Diagram Control Connection Diagram

OPERATION 1. Confirm the test source is properly grounded and ground the Load Bank to its own independent ground. 2. Confirm the Control Power, Master Load and all load step switches are in the Off position. 3. See Control Section Drawing: a. Using appropriate cables, connect the load source to the Cam-Type Connectors on the Load Bank. b. Place the Fan/Control Power Plug into a 120V, 15A maximum external receptacle. 4. Place the Control Power Switch located on the remote control in the On position. 5. Visually observe correct fan operation and investigate any unusual fan related noises. 6. Check air intake for obstructions and confirm positive air flow. 7. Verify the Normal indicator is shown before proceeding. 8. Start-up generator or bring other test source on line. 9. Adjust power source voltage and frequency. Individual Unit Control 10. Select the desired load steps by placing them in the On position. 11. Place the Master Load switch in the On position. This simultaneously applies all of the selected load steps. Trim is achieved by flipping the load steps On and Off while the Master Load is in the On position. 12. Adjust source voltage and load. Monitor as needed.

Multiple Unit Control Metering Screen The Metering Screen is accessed by pressing the F5 function key. Return to Main Control Screen by again, pressing the F5 button. 10. Select the desired load steps by pressing the Load Entry button and enter the desired load. 11. Place the Master Load switch in the On position. This simultaneously applies the entered load. Trim is achieved by pressing the Load Entry button and entering a new value as the Master Load is in the On position. 12. Adjust source voltage and load. Monitor as needed. SHUTDOWN 1. De-energize the load. 2. Run the cooling fan for 5 minutes to assure a thorough cool down of all load elements (optional). 3. Place the Control Power switch in the Off position.