DESCRIPTION OF REQUIREMENTS FOR GENERATION SYSTEMS SEEKING TO PROVIDE SYSTEM RESTART SERVICES

Similar documents
List of exemptions from compliance with the Technical Rules granted by Western Power after 1 July 2007

Exemptions currently in force

Western Power s list of exemptions from compliance from Technical Rules granted after 1 July 2007.

Feasibility Study. Shaw Environmental, Inc. 12MW Landfill Gas Generation Interconnection. J.E.D. Solid Waste Management Facility. Holopaw Substation

Jemena Electricity Networks (Vic) Ltd

Generating unit functional document submission form

CIS-IEEE 2017 Conference Renewable Energy Session Renewable Energy s Impact of Power Systems

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

TRANSMISSION PLANNING CRITERIA

POWER SYSTEM INCIDENT REPORT: TRIP OF NO 1 AND 2 NEW OSBORNE 66 KV BUSBARS ON 26 SEPTEMBER 2010

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

100 MW Wind Generation Project

TECHNICAL SPECIFICATION FOR INDEPENDENT POWER PRODUCERS. NB Power Customer Service and Distribution. June 2008

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

Wang Bin & Michael Ho, TIIAE Power management system

Project #148. Generation Interconnection System Impact Study Report

Net Metering Interconnection Requirements. Customer Generation Capacity Not Exceeding 100 kw. Date: Version: 1

Guide. Services Document No: GD-1401 v1.0. Issue Date: Title: WIND ISLANDING. Previous Date: N/A. Author: Heather Andrew.

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

Modular Standardized Electrical and Control Solutions for Fast Track Projects

PJM Generator Interconnection R81 Emilie (Fords Mill) MW Impact Study Re-Study

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 25 kw to 10 MVA or less)

Seabrook Substation Reliability Improvement Project

Distributed Energy Resources

Interconnection Feasibility Study Report Request # GI Draft Report 600 MW Wind Generating Facility Missile Site 230 kv Substation, Colorado

Legal Name of the Customer (or, if an individual, individual's name): Name: Contact Person: Mailing Address: Physical Address: City: State: Zip Code:

POWER SYSTEM OPERATING INCIDENT REPORT TRIP OF B 220 KV BUSBAR AT GEORGE TOWN ON 27 NOVEMBER 2012.

Interconnection Feasibility Study Report GIP-226-FEAS-R3

PSNH INTERCONNECTION REQUEST

Impact of Islanding and Resynchroniza?on on Distribu?on Systems

Request for Payment Instructions Rule 21 Export Submittal Instructions

Interconnection Feasibility Study Report GIP-222-FEAS-R3

PID 274 Feasibility Study Report 13.7 MW Distribution Inter-Connection Buras Substation

The Role of Electricity Storage on the Grid each location requires different requirements

Interconnection System Impact Study Report Request # GI

2016 Annual Performance Report Energy Distributors

Power System Operating Incident Report Trip of Red Cliffs Horsham and Red Cliffs-Wemen Kerang 220 kv transmission lines on 15 January 2014

LEGISLATIVE COUNCIL Question on notice. Tuesday, 12 May Hon Robin Chappie to the Leader of the House representing the Minister for Energy.

Proposed New ISO Rules Section Version 2.0 Generating Unit Technical Requirements ( New ISO Rules Section Version 2.

Net Metering Interconnection Requirements

Essential Reliability Services From PV Plants

Margarett Jolly DG Manager, Consolidated Edison Company of New York, Inc

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

VOLUME III. Draft Power Purchase Agreement ADDENDUM - 2

Guideline for Parallel Grid Exit Point Connection 28/10/2010

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

Standby Power Systems

Service and Rehabilitation Electrical Power Systems

Power Conditioning of Microgrids and Co-Generation Systems

Generator Interconnection System Impact Study For

NORTH CAROLINA INTERCONNECTION REQUEST APPLICATION FORM. Utility: Duke Energy Progress

DEMONSTRATION OF ESSENTIAL RELIABILITY SERVICES BY A 300-MW SOLAR PV POWER PLANT

ABB POWER SYSTEMS CONSULTING

Standards, Procedures and Policies for Grid Connection

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

Accidental Islanding of Distribution Systems with Multiple Distributed Generation Units of Various Technologies

IFC Workshop on Distributed Generation, 13 February 2013, Moscow, Russia

NEWFOUNDLAND AND LABRADOR HYDRO GULL ISLAND TO SOLDIERS POND HVDC INTERCONNECTION DC SYSTEM STUDIES VOLUME 1

Grid Stability Analysis for High Penetration Solar Photovoltaics

Small Generator Interconnection Program Interconnection Technical Requirements

Ancillary Services & Essential Reliability Services

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

Interconnection Feasibility Study Report GIP-023-FEAS-R1. Generator Interconnection Request # MW Wind Generating Facility Inverness (L6549), NS

Interconnection Feasibility Study Report GIP-IR373-FEAS-R1

Elia Ancillary Services: Black-Start

SP Distribution plc. and XXX

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

Distributed Energy Resources

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan

POWER SYSTEM OPERATING INCIDENT REPORT TRIPS OF YALLOURN W POWER STATION UNITS W1 AND W3 ON 14 NOVEMBER 2012

Connection of Power Generating Modules to DNO Distribution Networks in accordance with EREC G99

Emerald Reactive Support Alternative Solution Expressions of interest

Guidelines for connection of generators:

Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kva to 10 MVA or less)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX TRANSMISSION/GENERATION FEASIBILITY STUDY SHORT CIRCUIT ANALYSIS

MULTIPLE LINE OUTAGES IN THE MOUNT ENGLAND TARONG AREA IN QUEENSLAND, 13 FEBRUARY 2017

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

Interconnection Feasibility Study Report GIP-084-FEAS-R2

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

Generator Interconnection Facilities Study For SCE&G Two Combustion Turbine Generators at Hagood

Case 13-M Edic to New Scotland 345 kv Transmission Line and Hurley Avenue PARs Project (ED-NS/HA) Article VII Filing ED-NS/HA

Fifteenth National Power Systems Conference (NPSC), IIT Bombay, December 2008

Maryland Level 2, Level 3 & Level 4 Interconnection Request Application Form (Greater than 10 kw to 10 MW or less)

Dead bus synchronizing. Applications

Project #94. Generation Interconnection System Impact Study Report Revision

Welcome to the IDEA Webinar Series

Connection Engineering Study Report for AUC Application: AESO Project # 1674

Unified requirements for systems with voltages above 1 kv up to 15 kv

CONNECTION ASSESSMENT & APPROVAL PROCESS. Cardinal Substation Modification of 115kV Substation

Unit Protection System for Pumped-Storage Power Stations

Cabo Verde s new Renewable-Energy-Friendly Grid Code

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

PES Cook Islands KEMA Grid Study Final Report

North Oregon Coast Area Study. Adam Lint

Lloyd s Register Type Approval System Test Specification Number GT04

Modeling and Simulation of Battery Energy Storage Systems for Grid Frequency Regulation. X. XU, M. BISHOP, D. OIKARINEN S&C Electric Company USA

Transcription:

SYSTEM RESTART SERVICES DESCRIPTION OF REQUIREMENTS FOR GENERATION SYSTEMS SEEKING TO PROVIDE SYSTEM RESTART SERVICES System Management January 2015

INTRODUCTION System Management acting as the segregated business unit of Western Power, is responsible for operating the South West interconnected system (SWIS) in a secure and reliable manner pursuant to the Wholesale Electricity Market (WEM) Rules established under Part 9 of the Electricity Industry Act 2004. System Management s responsibilities include determining the requirements for and procurement of System Restart Ancillary Services (System Restart Services) pursuant to clause 3.11 of the WEM Rules. System Restart Services as defined by the WEM Rules, is the ability of a generation system (Black Start Generator or generation system involving a Trip to House Load scheme) to start without requiring energy to be supplied from a Network to assist in the re-energisation of the SWIS in the event of system shutdown. The generation system must be a Registered Facility with the Independent Market Operator pursuant to the requirements of the WEM Rules. The purpose of this document is to specify the requirements for generation systems seeking to provide System Restart Services. SM considers open cycle gas turbines, both industrial (Frame) and aero derivative types, to be the most suitable generating units for providing black start capability to the SWIS. The use of Trip To House Load (TTHL) schemes are also feasible. As each is custom designed a detailed description of how the scheme will operate and be tested should be submitted. DEFINITIONS A System Restart Service is the service provided by a Black Start Generator when used to assist with re-energisation of the SWIS in the event of a system shutdown. A System Restart Service Facility: is a generating unit that has the ability to start and close its output circuit breaker onto a dead bus without energy being supplied to it from other generating units within 30 minutes, unless on an approved outage, and supply an islanded power system controlling both its frequency and voltage. Note a black start unit may comprise of one or more generators located at the same site. is a generating facility that will automatically island form the rest of the SWIS during a system shutdown and has the ability to close its output circuit breaker onto a dead bus without energy being supplied to it from

other generating units within 30 minutes, unless on an approved outage, and supply an islanded power system controlling both its frequency and voltage. REQUIREMENTS Black Start Units (BSU) must meet the following requirements. Each BSU should have a nominal power output of not less than 50 MW at the same location to enable starting and loading of the nearest large gas turbine, typically a 100-160MW gas turbine with a minimum loading of 25 MW. The black start machine will face a sudden reduction in load and must remain in stable operation upon synchronisation of the next large fast start machine. The next large fast start machines are dependent on the subnetwork South Metro next machine is Kwinana HEGT, minimum is 25 MW North Metro next machine is Pinjar Frame 9, minimum is 25 MW South Country next machine is Alinta Wagerup GT, minimum is 20 MW Sufficient on site or uninterruptible fuel reserve should be available to run each Black Start Unit for a minimum of 12 hours during a system black out at the nominal power output. The ability to provide at least three sequential black starts, to allow for possible tripping of the Transmission/Distribution System(s) during the reinstatement period and possible tripping of the Black Start Generator during the black start starting sequence itself. A mitigation plan is required for common mode failure in critical starting equipment that renders black start units inoperable. For example, install an emergency hook up for a mobile generator to replace a failed diesel starting generator. Permission from the environmental authority to waiver air pollution restrictions for extended operation of a Black Start Unit at reduced load levels during a black start event or test. Stable operation at low loads at 0 MW. Stable operation upon o block loading a network feeder of 10MW and o the start up of a power station auxiliary motor and its associated mechanical load of 5MW. Each Black Start Unit must be able to operate in isochronous governor mode to automatically regulate frequency. When not operating in isochronous mode each Black Start Unit must operate during re-energisation of the SWIS in droop governor mode with governor response enabled, at a minimum response value of 4% droop. The control systems of each Black Start Unit must be capable of setting generator output at fixed MW values, and of setting generator terminal voltage to regulate at fixed voltage values.

Each Black Start Unit must be capable of operating in a voltage range between 95% and 105% of its rated terminal voltage. Generators connected at 330kV must be capable of energising a 330kV line section and 330/132kV 490MVA transformer to enable load connection. This should be achieved by allowing generator excitation to commence whilst its generator circuit breaker is closed. In South Country these transformers are located at Kemerton and Muja. Each Black Start Unit must be capable of absorbing reactive power from the SWIS while operating within the stable under excitation area of its generator capability curve (leading VARs). Due to the reactive power restrictions in the Eastern Goldfields those generator located at Kalgoorlie are not suitable for System Restart. Similar restrictions may apply for parts of the network in the country at the end of long radial lines such as Geraldton, Albany and Merredin. The ability to restart the system can only be determined through steady state and transient analysis engineering studies. Of each Black Start Unit that is not manned 24/7, SM may require remote control from its System Operations Control Centre (SOCC) in a system shutdown event for the purpose of system re-energisation. Each black start facility must maintain an SM approved emergency communication system with SOCC. Each black start facility must maintain an SM approved emergency communications plan for mobilisation of its operating personnel to meet a 30 minute time response. The facility must submit a testing plan to demonstrate the ability to start and energise part of the network and would require testing every 6 months. Has the ability to perform this function at least 90% of the time accounting for planned and unplanned outages. Trip to House Load Units (TTHLU) must meet the following requirements Permission from the environmental authority to waiver air pollution restrictions for extended operation of a TTHLU at reduced load levels during a black start event or test. Stable operation at low loads at 0 MW export. Stable operation upon o block loading a network feeder of 10MW and o the start up of a power station auxiliary motor and its associated mechanical load of 5MW. Each TTHLU must be able to operate in isochronous governor mode to automatically regulate frequency. When not operating in isochronous mode each TTHLU must operate during re-energisation of the SWIS in droop governor mode with governor response enabled, at a minimum response value of 4% droop.

The control systems of each TTHLU must be capable of setting generator output at fixed MW values, and of setting generator terminal voltage to regulate at fixed voltage values. Each TTHLU must be capable of operating in a voltage range between 95% and 105% of its rated terminal voltage. TTHLU connected at 330kV must be capable of energising a 330kV line section and 330/132kV 490MVA transformer to enable load connection. This should be achieved by allowing generator excitation to commence whilst its generator circuit breaker is closed. In South Country these transformers are located at Kemerton and Muja. Each TTHLU must be capable of absorbing reactive power from the SWIS while operating within the stable under excitation area of its generator capability curve (leading VARs). Due to the reactive power restrictions in the Eastern Goldfields those generator located at Kalgoorlie are not suitable for System Restart. Similar restrictions may apply for parts of the network in the country at the end of long radial lines such as Geraldton, Albany and Merredin. The ability to restart the system can only be determined through steady state and transient analysis engineering studies. Of each TTHLU that is not manned 24/7, SM may require remote control from its System Operations Control Centre (SOCC) in a system shutdown event for the purpose of system re-energisation. Each TTHLU must maintain an SM approved emergency communication system with SOCC. Each TTHLU must maintain an SM approved emergency communications plan for mobilisation of its operating personnel to meet a 30 minute time response. The TTHLU must submit a testing plan to demonstrate the ability to start and energise part of the network and would require testing every 6 months. Has the ability to perform this function at least 90% of the time accounting for planned and unplanned outages. RELATED INFORMATION System Restart Standard: Sets benchmarks to assist System Management in the procurement of System Restart Services to meet the requirements of the WEM rules. (See http://www.westernpower.com.au/documents/system-managementstandard-system_restart_services.pdf). Further related information can be found on the System Management System Restart Services page on the Western Power website (See http://www.westernpower.com.au/electricity-retailers-generators-systemrestart-services-srs-.html)

For further information please contact: Brendan Clarke Principal Engineer Power System and Market Planning Ph: (08) 9427 940 Email: brendan.clarke@westernpower.com.au