Tank services Questionnaire

Similar documents
Integrated Tank Services

Tank Cleaning Screening Questionnaire

San Joaquin Valley Unified Air Pollution Control District Permit Services Division

FLUSHING OIL STORAGE TANK 1/2T-8501

Understanding the Colorado Annual Compliance Package. William Holman & Robert Schlegel Inspectors Division of Oil and Public Safety

April Process Industry Practices Vessels. PIP VEFTA100 Tank Miscellaneous Details

MATERIAL AND EQUIPMENT STANDARD FOR FAST DRYING SYNTHETIC PRIMER TO BE USED WITH HOT APPLIED COAL TAR OR BITUMEN (ASPHALT) ENAMEL ORIGINAL EDITION

Jet Fuel Quality Control Inspection Checklist INSPECTION SIGNATURES INSPECTION CHECKLIST

RULE 326. STORAGE OF REACTIVE ORGANIC COMPOUND LIQUIDS. (Adopted 12/14/1993, revised 1/18/2001)

Cargo Handling Sheet. Caradol SC Document date: 22 April 2013 Revision 3

FIXED CONE VALVE. The flow is guided by the inner vanes, in order to decrease the vortex and the vibration;

Pre-Installation Guide Performer

FRP VENTS. Fiberglass Reinforced Plastic Vents... No Exposed Metal Components. Distributed by Relevant Solutions relevantsolutions.

Imperial County Air Pollution Control District Rule 415

Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective 1/11/2017

Estimation Procedure for Following Vapor Pressure Changes

Tanksweep technology. Tankcleaning solutions

Product Manual (Revision G) Original Instructions. Auxiliary Devices for UG-40 Governors used in Marine Service.

Cargo Handling Sheet. Caradol SA Document date: 11 April 2013 Original document

Cargo Handling Sheet. Styrene. Document date: 21 November 2013 Revision 5

Material of construction. Inner shell material: Polyethylene. Available inlets: See chart. Operating parameters. Maximum operating pressure: 150 psi

Operation and Maintenance Manual. for Fiberglass Tanks

ST. VINCENT AND THE GRENADINES

First Responder Guide: CNG and LNG Vehicle Fuel Systems

Have you previously been a supplier member? Yes No If yes, most recent year:

50 HERTZ METRIC BLOWER

Pressure degassing systems

Bernzomatic NFPA. SECTION 1 : Chemical Product and Company Identification

OWS OPERATIONS & MAINTENANCE

WPS02 Waste powder conveying with BIG-BAG station

NORTH COUNTY FIRE AUTHORITY POLICY & PROCEDURE MANUAL OPERATIONS

PEI/RP Recommended Practices for the Inspection and Maintenance of UST Systems

HANDLING & INSTALLATION OPERATION & MAINTENANCE INSTRUCTIONS

Installation and Maintenance Manual CORRUGATED RIVETED GALVANIZED STEEL WATER STORAGE TANKS

AQUASTORE OPERATION and MAINTENANCE MANUAL

Operating instructions and spare parts list. Waste powder conveying from recovery container WPS01

EXECUTIVE SUMMARY Dredging Equipment DAMEN DOP PUMP

TRUNNION MOUNTED BALL VALVES API 6D & API 6A. Side_Entry Ball Valve SE type

SICCA SCC Type Series Booklet

Nurse Tank Inspection Report Instructions (DOT-SP Special Permit)

First Defense. Stormwater Treatment System. Operation and Maintenance Manual

Title V. Model General Permit Template. SERIES 18 Tanks. Template # SJV-TK

1. All aircraft fueling equipment shall have a Filter/Separator or a Full-Flow Fuel Monitor.

Cargo Handling Sheet. Caradol SP Document date: 19 March 2013 Revision 4

Greater Vancouver Regional District Gasoline Distribution Emission Regulation Bylaw No. 1085, 2008

ENGINEERING STANDARD FOR PROCESS DESIGN OF DOUBLE PIPE HEAT EXCHANGERS ORIGINAL EDITION JULY 1995

ZF 6HP26A 61 6HP26A 61. Automatic Transmission Spare Parts Catalog

Eastman plasticizers. Bulk storage guidelines. Storage equipment. Tank components and materials. Piping. Pumps. Valves. Gaskets

Cost Effective Solution for the Efficient Cleaning and Decontamination of a Coker Unit

MATERIALS AND EQUIPMENT STANDARD FOR COAL TAR ENAMEL (HOT APPLIED) ORIGINAL EDITION MAY 1993

PUBLIC WORKS AND SERVICES PETROLEUM PRODUCTS DIVISION STANDARD DETAILED DRAWINGS FOR NORTHERN FUEL STORAGE AND DISTRIBUTION FACILITIES

Cost Effective Solutions For The Efficient Decontamination

Farm & Residential Tanks Angle skids

WB produces >>> 1. TANK FITTING PRODUCTS 2. ALUMINUM DOME COVERS 3. INTERNAL FLOATING ROOF SYSTEMS 4. EXTERNAL FLOATING ROOF SEAL SYSTEMS

The timely use of chemistry and planning designed to improve client operating margins.

SOUTHEAST REGIONAL MAINTENANCE CENTER LOCAL STANDARD ITEM

Sampling kits and test suites

Submersible Mixer. Amamix. 60 Hz. Type Series Booklet

Nurse Tank Inspection Report Instructions

PIPELINE INSPECTION SURVEY QUESTIONNAIRE

An Overview of NSPS Subpart QQQ VOC Emissions from Petroleum Refinery Wastewater Systems

RULE 903 MERCURY Adopted (Amended ) INDEX

Relay Retrofit Program Cutting Tool Safety Guide

ROBOT INSPECTIONS. Asset Management

Stormwater Treatment System

Cargo Handling Sheet. Methyl Ethyl Ketone (MEK) Document date: 3 June 2015 Revision 3

Condensate Drain Valve AK 45. Original Installation Instructions English

D-023 PN 16 / 25. Combination Air Valve for Wastewater PATENTED. Description. Applications. Operation. Main Features

ALTITUDE KIT FOR 79CC GASOLINE INVERTER - Westinghouse Part No

Non-Pressure Applications

Operating instructions and spare parts list. LM01 Level sensor. Translation of the original operating instructions

ISO 9001 FM TAILOR MADE SOLUTIONS FOR HEAVY DUTY APPLICATIONS. Company profile

Underground Storage Tank Annual Compliance Inspection (Revised 1/2015)

Variable Area Flowmeter BROCHURE

GPC SERIES CROSSFLOW FRP COOLING TOWER

Product overview. Technical data

1106C-70TA. Series. Industrial Open Power Unit. Tier rpm. Basic technical data. Ratings

RULES FOR THE CONSTRUCTION AND CLASSIFICATION OF SHIPS IDENTIFIED BY THEIR MISSIONS CHAPTERS APPROACH

REGIONAL WATER RESOURCE AGENCY JOB DESCRIPTION

Pump Station. Ama-Porter CK Pump Station. Type Series Booklet

Pumping Video. Pumping. Section 2 Copyright

ECO 250 CUTTER SUCTION DREDGER

CHAPTER 4 - OIL SYSTEM

Crispin Valves Operating Guide. Crispin

Application cup for OptiFlex 2 GM03 manual powder gun

Dairy Transport Assurance Scheme

Cargo Handling Sheet. Caradol SC Document Date 2 Oct 2014 Original document

Inspector's Initials: Tank Owner or Agent Signature: Title: Date:

Septic Tanks. Effluent Screen Cleaning. Effluent Screens. Surveying Abbreviations. Installation Keys. Septic Tanks, Holding Tanks & Pump Tanks

C.A.S.E. Air Carrier Section Policies & Procedures

7. Evaporative Emission Control System

» Fermentation and storage tank base tank FS-MO stacking tank AS-MO

30 Years of Innovation

FuelEquipment.com FUELLING

Tensioning Winder 30. CS9160 Eco Solvent Printers

Boiler Feed Booster Pump YNK. Type Series Booklet

New UST Installation Inspection Checklist

ZF 6HP26X / 6HP28X 6HP26X 6HP28X. Automatic Transmission Spare Parts Catalog

C.A.S.E. AIR CARRIER SECTION POLICIES AND PROCEDURES

WB produces >>> 1. INTERNAL FLOATING ROOF SYSTEMS 2. ALUMINUM DOME COVERS 3. EXTERNAL FLOATING ROOF SEAL SYSTEMS FLOATING ROOF DRAIN SYSTEMS

Transcription:

Tank services Questionnaire 1 CLIENT INFORMATION Company name www. Plant name Street address Zip postal code State/Provence City Country Main contact filled in this document Inspection department contact filled in this document checked this document Engineering department contact filled in this document checked this document Other contact filled in this document checked this document Purchasing department contact recieves invoice(s) 1.1 TYPE OF ON-LINE SERVICE Sludge profiling Tank desludging Tank inspection Type of desludging Type of inspection online tank desludging (sludge reduction) robotic floor only offline tank desludging (tank cleaning) full API 653 inspection

Page 2 of 7 2 General tank information 2.1 TANK INFORMATION/PRODUCT Tank ID Tank age Diameter Height Tank construction material Build as API BS Din other Product API Gravity Density kg/m 3 Viscosity at operation temp. Storage temperature C Max product temperature C Estimated amount sludge m 3 Sludge sample available? Sludge type (e.g. wax, solids) Roof type IFR fixed cone dome EFR double deck single deck pontoon Floor type flat cone up cone down sloped Cone up/down height m Heating If coil bayonet Mixers If, number of mixers Tank insulation If, type Cathodic protection If, type Epoxy or FRP lining If, when was it installed? Double/Second Bottom If, type Double shell If, type Number of shell manways 2.2 TANK SHELL Manway size and type inch API BS Din ANSI other Orientation of the manways horizontal vertical other Are the shell manways free from obstacles, internal and external (e.g. ladders, pipes, railing) If, specify Connections with sump

Page 3 of 7 2.3 TANK ROOF AND LADDER Type of ladder circular vertical Railing on the roof Number of roof manways Roof manway size and type inch API BS Din ANSI other Manway stud bolt condition Are the roof manways free from obstacles, internal and external (e.g. ladders, pipes, railing) If, specify Roof leg size (EFR) inch Number of roof legs Other connection on the roof 2.4 OPERATIONAL RESTRICTIONS Are there any special work permit / visa required? If, specify Are there any special PPE required other than the standard hard hat safety boots S3 gloves ear protection Do we need to place equipment (e.g. pumps) in a containment (drip tray) safety glasses antistatic coverall other Are there any site operational constraints we need to consider for the project planning? If, specify Date last cleaning 2.5 TANK HISTORY Date last inspection Please attach previous report.

3 Sludge profiling Page 4 of 7 Please fill in this chapter when you are interested in online tank sludge profiling: For the sludge profiling we need to insert the profiler through an opening in the roof (leg hole, manway, vent, etc.) With a fixed roof tank we need the product level high eugh, so that the profiler is fully submerged. For a floating roof tank we prefer that the roof is in the maximum position (less than 1 meter below the tank shell) because of the confined space regulations. Prior to the profiling the water layer must be drained, heating and mixers must be shut off during profiling. Can the roof be in the maximum position during the profiling (external floating roof) for profiling? Can the distance between product level and roof be less than 4.5 m (fixed roof) Is breathing apparatus required for roof entry? Is the temperature in the tank homogeneous? Is it possible to shut off the heating and mixers? Plot of tank level and temperature available during operations Are there any other activities in the area? If, please describe When was the roof for the last inspected? What is the wall thickness of the tank roof during the last roof inspection? Please describe the site regulations about roof entry Please attach previous report. Additional information

4 Desludging Tank services Questionnaire Page 5 of 7 4.1 ONLINE TANK DESLUDGING (SLUDGE REDUCTION) Please fill in this chapter when you are interested in online tank desludging. When the sludge levels are above the manways or if it is t possible to land the roof safely we use our online tank desludging equipment to reduce the sludge level and reclaim the tank capacity. We create a connection to the tank with the cold cutting method through the manway cover and insert a steerable jet cann for recirculation of the product. The kinetic energy is used to break up the sludge. Depending on the product and sludge type we need to add temperature and/or a demulsifier. The demulsifier will t change the quality of the oil. What is the reason for the tank desludging? Is the area around the manways clear of obstacles? If there are heating coils installed? If, are they still working Are there any concerns for using a demulsifier (chemical) to speed up the desludging process? Additional information Please also fill in the chapter 6: Availability of utilities/ facilities (page 6). 4.2 OFFLINE TANK DESLUDGING (TANK CLEANING) Please fill in this chapter when you are interested in offline tank desludging. When a tank needs to be cleaned for maintenance purposes we can use several different cleaning systems depending on the product, the sludge levels, cleaning requirements and the tank size. Please describe the reason for the cleaning and the required conditions after the cleaning so we can select the best system for the offline tank desludging (tank cleaning). When the tank needs to be degassed to hot work conditions we use forced ventilation to remove the gas phase of the product from the tank, the gasses can be released at a safe area (+4m) or incinerated by a mobile incinerator. What is the reason for the tank cleaning? What are the required conditions after the cleaning? VOC ppm % LEL % Is the tank already empty? If, is the tank purged with nitrogen? Should we expect hard scaling/rust in the tank? What is the expected quantity of product that has remained in the tank? m 3 If, who is responsible for emptying the tank client A.Hak Is there a waste water treatment facility at the site? Is the waste water treatment capable of handling all the cleaning water? What is the maximum VOC level the waste water treatment can handle? ppm Can a cutter stock be used to break up the sludge? What is the preferred cutter stock? Degassing: remaining gasses released at safe area or mobile incinerator? safe area incinerator Additional information Cutter stock A.Hak Please also fill in the chapter 6: Availability of utilities/ facilities (page 6).

5 Tank bottom inspection Tank services Questionnaire Page 6 of 7 5.1 ROBOTIC FLOOR INSPECTION AND FULL API INSPECTION Please fill in this chapter when you are interested in online tank inspection. We can perform a full API tank inspection or a tank bottom inspection only while the tank is still online. All information is crucial to determine if your required inspection is possible. What inspection do you want us to perform? full API tank inspection tank bottom inspection What is the reason for the inspection? What is the anticipated product level at the time of the inspection? m Are special manway closures required to keep vapor from escaping the tank? Are special manway closures required to keep air from entering the tank? Additional information 6 Available utilities / facilities Please fill in the chapter when you are interested in the online tank desludging, offline tank desludging, robotic floor inspection and full API inspection. Check the Yes box when the utility or facility is available for A.Hak to use during the project. Water (fire hydrant) Type of connection Size of connection Pressure Distance from tank Electricity Nitrogen Type of connection Size of connection Pressure Distance from tank Steam Type of source Type of connection generator fixed connection Type of connection Size of connection Pressure Capacity ampere/kva Distance from tank Distance from tank Compressed air Type of source Type of connection Size of connection Pressure Distance from tank Supplied by Lighting client A.Hak Sanitation client A.Hak Locker room client A.Hak Canteen client A.Hak Breathing apparatus client A.Hak Decontamination facilities client A.Hak Crane client A.Hak Vacuum truck client A.Hak

7 Addi tional comments Page 7 of 7 SITE DOCUMENTS Obtain the following documents from the site for the tanks to be serviced whenever possible. Site safety procedures Site training requirements MSDS sheets for all materials in the tanks to be serviced Tank drawings (locations of manholes, legs, vent, gauge hatches, bottom plate details, etc.) Photos of the tank and location Previous inspection report available Please include all information to the greatest extent possible. Accurate surveys will allow us to better respond to your needs promptly and more accurately Contact informatiron +31(0) 345 57 92 11 tanks@a-hak-is.com Prepared by Checked by Approved by Revision Date A.Hak Industrial Services B.V. Steeven 2-6 4196 HG Tricht P.O. Box 151 4190 CD Geldermalsen The Netherlands T +31 (0)345 57 92 11 F +31 (0)345 57 93 79 tanks@a-hak-is.com www.a-hak-is.com This document is confidential. The copyright is vested by A.Hak Industrial Services B.V., Tricht, The Netherlands. All rights reserved. Neither the whole r any part of this document may be disclosed by any third party or reproduced, stored in any retrieval system or transmitted in any form or by any means (electronic, reprographic, recorded or otherwise) without the prior written consent of the copyright owner.