OPTIONAL SERVICE BULLETIN OSB

Similar documents
OPTIONAL SERVICE BULLETIN OSB 40NG-007/1

OPTIONAL SERVICE BULLETIN OSB OSB 42NG-062

RECOMMENDED SERVICE BULLETIN NO. RSB /2

MANDATORY SERVICE BULLETIN NO. MSB

MANDATORY SERVICE BULLETIN MSB /2 supersedes MSB /1

MANDATORY SERVICE BULLETIN NO. MSB40-046/3 NO. MSBD4-046/3

MANDATORY SERVICE BULLETIN NO. MSB /1

SERVICE BULLETIN NO. MSB-AE50R-003

Mandatory Service Bulletin. No.. MSB--E4--014/2

SERVICE BULLETIN NO. OSB

MANDATORY SERVICE BULLETIN NO. MSB D4-045/9

SERVICE BULLETIN NO. MSB-AE50R-004

Airworthiness Directive Schedule

Airworthiness Directive Schedule

Service Bulletin No.: DAC Rev 0 Date Issued: 27 July 2018 Title: Installation of Diamond Flap Module and Microswitch Tray

Service Bulletin No.: DA C , Rev.0 Date Issued: October 8, 1998 Title: Type II Fuel System/Pump Retrofit Page: 1 of 13

Service Bulletin No.: DAC Rev 5 Date Issued: 26 November 2010 Title: Engine Fuel System Conversion from IO-240-B17B to IO-240-B3B

Service Bulletin No.: DA Rev. 1 Date Issued: July 13, 2010 Title: Replacement of Steel MLG Struts with Aluminum MLG Struts

Service Bulletin No.: D42L Rev 2 Date Issued: 05 October 2012 Title: ADF System Improvements Page: 1 of 16

Service Bulletin. ATA 52-10: Passenger and Crew Doors Door Latching Assembly Upgrade

SERVICE BULLETIN. No. SB-AG-54 Revision IR; 6/6/2011 S2R-T660 ELEVATOR PUSH-PULL TUBE END FITTING INSPECTION

Service Bulletin No.: DAC Rev 0 Date Issued: 29 June 2017 Title: Removal of OAT/Clock AA Battery Page: 1 of 5

Part A Describes the procedure for the replacement of the Mitchell type tachometer. These parts are supplied in Kit A as described below.

Notification of a Proposal to issue an Airworthiness Directive

SERVICE BULLETIN. No Compliance mandatory. Inspection/Repair of Main Landing Gear Mounting Attachment

P.68 VARIANTS. SERVICE BULLETIN No. 178

FAA approval has been obtained on technical data in this publication that affects airplane type design.

Service Bulletin No.: DAC Rev 2 Date Issued: Oct 04, 2016 Title: Installation of LED Anti-Collision and Position light Assembly

SERVICE INSTRUCTION OIL LEAKAGES IN THE AREA OF THE CYLINDER BARREL FOR ROTAX. SI-912 i-006 R1 SI R3 SI R3

SERVICE LETTER REVISION TRANSMITTAL

SERVICE BULLETIN. EFFECTIVITY SERIAL NUMBERS 680 (Citation Sovereign) thru (Citation Sovereign+) thru -0549

Airworthiness Directive Schedule

SERVICE BULLETIN FLIGHT CONTROLS - INSTALL FLAP INSPECTION ACCESS PANELS ON CERTAIN AERO CENTER PRODUCTS

CFM56-7B POWER PLANT REMOVAL & INSTALLATION

Airworthiness Directive

Service Bulletin No: Ref No: 49 Modification No: EC ATA Chapter: 32

SERVICE BULLETIN. No. SB-AG-49 August 1, 2008 SEAT SUPPORT BRACKET INSPECTION AND REPAIR

Technify Motors GmbH Tel: Platanenstrasse Sankt Egidien, Germany

Please replace any copy of SEB07-2 with the attached copy of SEB07-2 Revision 1 which is printed in its entirety.

SERVICE BULLETIN REVISION TRANSMITTAL

Airworthiness Directive

Airworthiness Directive

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Fax:

Airworthiness Directive

Service Bulletin No.: DAC Rev. 2 Date Issued: 28 January 2013 Title: Installation of backup Artificial Horizon Indicator

Service Bulletin No: Ref No: 165 Modification No: EC ATA Chapter: 21

SID SERVICE INFORMATION DIRECTIVE Compliance Will Enhance Safety, Maintenance or Economy of Operation TELEDYNE CONTINENTAL AIRCRAFT ENGINE

MODIFICATION KIT. Serial Numbers 300 (LC40-550FG) thru (LC42-550FG) thru (LC41-550FG) thru

Service Bulletin No.: DAC Rev 3 Date Issued: 12 May 2017 Title: Installation of Improved Indicating Systems

SERVICE BULLETIN. COMPLIANCE MANDATORY. This service bulletin must be accomplished at the next 100-hour or 12-month (annual-type) inspection.

P.O. Box 3149 Albany, GA Phone (229) Fax (229) March 7, 2006 FLAP CONTROL TORQUE SHAFT REPLACEMENT

Notification of a Proposal to issue an Airworthiness Directive

Single Engine. Service Bulletin TITLE ENGINE MOUNT BRACKET INSPECTION

1. SUBJECT: Replacement of the Low Point Drain Valve. 3. EFFECTIVITY: TH-28; Serial Number 3004 and 3006

Airworthiness Directive

SERVICE BULLETIN. The equivalent of this service bulletin has been incorporated on production airplanes and On.

Service Bulletin. ATA 27-00: Flight Controls Rudder-Aileron Interconnect Modification

Airworthiness Directive

This Service Bulletin is applicable only to airplanes equipped with placards that are written in English.

CIRRUS SR2X SB 2X R2. Service Bulletin. Issued: Revised: June 26, 2012 July 31, 2012

AVIAT AIRCRAFT INC. P.O. Box South Washington Afton, WY USA Fax:

SERVICE LETTER TITLE EXHAUST - TRANSMITTAL OF LYCOMING SERVICE BULLETIN NO 627C, EXHAUST SYSTEM INSPECTION SERIAL NUMBERS

Service Bulletin No: Ref No: 170 Modification No: EC ATA Chapter: 53

aileron rib inspection

Service Bulletin No.: DAC Date Issued: February 18, 2000 Title: Starting Vibrator Battery Installation Page: 1 of 6

Virus SW 100 Alert Service Bulletin

COMPLIANCE: As required by Kelly Aerospace Service Bulletin 033 (Attached)

ALERT SERVICE BULLETIN Checking of the cylinder head assy. (2/3) for ROTAX Engine Type 912 and 914 (Series)

DESCRIPTION This service document provides instructions to inspect the Pre-2014 LH yokes.

Service Bulletin No.: DAC Rev. 0 Date Issued: 25 August 2014 Title: Installation of a Heated Pitot Static Probe Page: 1 of 34 PRINT IN COLOUR

201F Fuel Pump Shaft Seal Leak

SERVICE LETTER Transmittal Sheet HC-SL

WARNING OPERATION OF AN ENGINE WITH A RESTRICTED OIL PASSAGE CAN CAUSE LOSS OF LUBRICATION AND SUBSEQUENT ENGINE FAILURE.

Service Bulletin No: Ref No: 331 Modification No: EC , EC ATA Chapter: 27

INSPECTION FOR CORRECT VENTING OF THE OIL SYSTEM FOR ROTAX ENGINE TYPE 912 AND 914 (SERIES) SB R1 SB R1 MANDATORY

SERVICE BULLETIN HC-SB Propeller - Counterweight Clamp Inspection

Service Bulletin No: Ref No: 105 Modification No: INSPECTION ATA Chapter: 32

Service Bulletin. SB-GA Issue 1. Subject: Horizontal Stabiliser Attachment Area Inspection and Reinforcement. Applicability: Amendments:

Ayres service bulletin Corporation

Issued: 21 April 2017 SUPERSEDED. Revision: This AD supersedes EASA AD dated 02 December 2016.

For Experimental Aircraft Only: Glastar, Sportsman 2+2, and Similar with Lycoming O320 or O360 Parallel Valve Engines

SERVICE LETTER. Multi-engine TITLE NACELLES/PYLONS - NACELLE FITTING INSPECTION EFFECTIVITY

201F Fuel Pump Valve Housing Cap Screw Replacement

SERVICE INSTRUCTION PURGING OF LUBRICATION SYSTEM FOR ROTAX ENGINE TYPE 912 AND 914 (SERIES) SI SI Repeating symbols:

ATTACHMENT. Orders for the required parts listed below must be placed by using this form only. Service Station/Company Code: Company Name:

Airworthiness Directive

PILATUS AIRCRAFT LTD. CH-6371 STANS, SWITZERLAND SERVICE BULLETIN SERVICE BULLETIN NO: REF NO: 106 MODIFICATION NO: ATA CHAPTER: 28

1) Scheduled maintenance checks

Airworthiness Directive

SERVICE INFORMATION LETTER

SERVICE BULLETIN THIS BULLETIN IS FAA APPROVED FOR ENGINEERING DESIGN

FOR REVIEW SERVICE BULLETIN SB-AG-65. Installation of Click Bond Electrical Grounding Spacer Stud on the Header Tank. Revision IR 11/20/2017

SERVICE BULLETIN. To prevent the wing fuel boost pump wiring from chafing on the wing structure and/or fuel tube assemblies.

Airworthiness Directive

PROPELLERS - PROPELLER SLIP RING MOUNTING PLATE INSPECTION AND REPAIR

Single Engine. Service Bulletin TITLE ELEVATOR TRIM TAB ACTUATOR ASSEMBLY INSPECTION EFFECTIVITY. Group A airplanes: Serial Numbers

SERVICE LETTER SERIAL NUMBERS. 550/ thru -0505, thru -0733, thru -0969

TYPE CERTIFICATE DATA SHEET

SERVICE BULLETIN REVISION

SERVICE BULLETIN REVISION TRANSMITTAL

Transcription:

DAI OSB 42-131 Page 1 of 4 OPTIONAL SERVICE BULLETIN OSB 42-131 I TECHNICAL DETAILS I.1 Category Optional. I.2 Airplanes affected Type: DA 42, DA 42 M Serial numbers: 42.004 through 42.427 42.AC001 through 42.AC151 42.M001 through 42.M027 Only airplanes with a TAE 125-02-99 or TAE 125-02-114 engine with exhaust pipe DAI P/N D60-9078-06-01_01 / Technify P/N 52-7810-H0014 01 installed are affected. I.3 Date of effectivity I.4 Time of Compliance At owners discretion. Note: Exhaust pipes with DAI P/N D60-9078-06-01_01 / Technify P/N 52-7810-H0014 01 are no longer supplied. Compliance with this OSB may become necessary upon required replacement of such an exhaust pipe installed. I.5 Subject Re-installation of exhaust pipes with directly attached heat shield as a replacement for exhaust pipes without directly attached heat shield. Re-qualification of this exhaust pipes with directly attached heat shield previously removed. Repair of heat shield and heat shield attachment to base pipe. ATA-Code: 78-00 I.6 Reason Exhaust pipes with DAI P/N D60-9078-06-01_01 / Technify P/N 52-7810-H0014 01 provided not the desired durability and will be no longer supplied. This service bulletin describes the work necessary to re-install original design exhaust pipes attached heat shield (DAI P/N D60-9078-06-01 / Technify P/Ns 52-7810-H0001 02, 52-7810- H0001 03 or 52-7810-H0001 04) as a replacement including the installation of an additional exhaust bracket. In addition this service bulletin provides test methods to re-qualify original design exhaust pipes attached heat shield (DAI P/N D60-9078-06-01 / Technify P/Ns 52-7810-H0001 02, 52-

DAI OSB 42-131 Page 2 of 4 7810-H0001 03 or 52-7810-H0001 04), that have been removed because of having more than 1500 flight hours time since new (TSN) or unknown TSN. In addition this service bulletin provides repair methods for original design exhaust pipes attached heat shield Technify P/Ns 52-7810-H0001 03 and 52-7810-H0001 04, that have a failed heat shield attachment. Note: Compliance with this OSB on one engine only is considered acceptable. I.7 Concurrent Documents None. I.8 Approval The technical information or instructions contained in this document relate to the Design Change Advisory No. MÄM 42-943/a, which has been approved under the authority of EASA Design Organization Approval ref. EASA.21J.052. The technical content of this document has been approved under the authority of DOA ref. EASA.21J.052. I.9 Accomplishments / Instructions Comply with WI-MSB 42-131, latest effective issue. I.10 Mass (Weight) and CG The change in mass and CG is negligible. II II.1 PLANNING INFORMATION Material and Availability See WI-MSB 42-131, latest effective issue. Materials including drawings are available from Diamond Aircraft Industries. II.2 Special Tools None. II.3 Labour Effort Re-Installation of Exhaust Pipe: approx. 1 hour II.4 Credit None. II.5 Reference Documents DA 42 Series Airplane Maintenance Manual, Doc. No. 7.02.01, latest effective issue.

DAI OSB 42-131 Page 3 of 4 III REMARKS 1. All work must be done by a certified aircraft service station or a certified aircraft maintenance mechanic. 2. All work, particular that which is not especially described in this Service Bulletin, must be done in accordance with the referenced Maintenance Manual. 3. Completion of all work must be recorded in the log book. 4. In case of doubt contact Diamond Aircraft Industries GmbH.

DAI OSB 42-131 Page 4 of 4 EXECUTION REPORT TO SERVICE BULLETIN OSB 42-131 AIRPLANE INFORMATION Airplane Serial Number Airplane Registration Airplane Operator Hours of operation of airplane No. of landings Hours of operation-engine Typical operation of airplane private, club, training, other Exhaust installation carried out on O LH Engine O RH Engine O both Engines Date, Name, Sign Please fax the completed form to Fax No. +43-2622-26700-1369 or e-mail to executionreports@diamond-air.at

Page 1 of 18 WORK INSTRUCTION I GENERAL INFORMATION I.1 Subject Re-installation of exhaust pipes with directly attached heat shield as a replacement for exhaust pipes without directly attached heat shield. Re-qualification of this exhaust pipes with directly attached heat shield previously removed. Repair of heat shield and heat shield attachment to base pipe. I.2 Reference Documents DA 42 Series Airplane Maintenance Manual, Doc. No. 7.02.01, latest effective issue. Design Change Notice: OÄM 42-315 Alternative Exhaust Clamp Sheet I.3 Remarks a) All work must be done by a certified aircraft service station or a certified aircraft maintenance mechanic. b) All work, in particular if not described in this work instruction, must be done in accordance with the referenced maintenance manual. c) For conversion factors between SI units and US/Imperial units refer to AMM Chapter 02. d) In case of doubt, contact Diamond Aircraft Industries GmbH. II DRAWINGS, SPECIAL TOOLS & MATERIALS II.1 Drawings A01-VR00735-00-0201 II.2 Special Tools No required special tools.

Page 2 of 18 II.3 Material A. Material for Re-Installation of Exhaust Pipe with Directly Attached Heat Shield Note: Material is for installation on one engine only. Quantity Part Number Description 1 DAI P/N D60-9078-06-01 / Technify P/Ns 52-7810-H0001 02, 52-7810-H0001 03 or 52-7810-H0001 04 Exhaust Pipe 1 D60-7806-00-01 Exhaust Clamp 1 (pos. 4) 1 D60-7806-00-02 Exhaust Clamp 2 (pos. 5) 1 D60-7806-00-03 Exhaust Sheet (pos. 6) 2 DIN 912-M5x20-A2 Hexagon Socket Head Screw (pos. 7) 2 LN 9338-M5 K-Nut M5 (pos. 9) 4 DIN 125-A5.3-A2 Washer A2 (pos. 11) 1 LN 9037-06016 Hexagon Screw (pos. 8) 1 LN 9338-M6 K-Nut M6 (pos. 10) 4 BN 806-12x6,2x0,6 Spring Washer (pos. 12) 1 DIN 9021-B10.5-ZP Washer (pos.13) Material is available from Diamond Aircraft Industries.

Page 3 of 18 B. Material for Re-Qualification of Exhaust Pipes Material for Air-Pressure Test: Quantity Part Number Description 1 VR00735-00-02 01*) Adaptor incl. pressure connection and o-ring 1 VR00735-00-01 01**) Pressure Pad 3 NM-0000-02355 01**) Hexagon Screws M8x40 3 NM-0000-01294 01**) Hexagon Nuts M8 6 NM-0000-00040 01**) Washers M8 Material including drawing is available from Technify Motors GmbH. *) Adaptor may also be produced locally by a maintenance shop in accordance with the attached drawing A01-VR00735-00-0201 and standard grade fittings and o-rings **) Standard DIN Hardware available may be used for the test. Material for Hot-Water Test ***): Quantity Part Number Description 1 D60-9078-06-01ST01 Cap 1 D60-9078-06-01ST02 Rubber 3 DIN 933-M8x30-A2 Bolt 3 DIN 934-M8-A2 Nut 3 DIN 125-M8 Washer Material is available from Diamond Aircraft Industries. ***) Cap an Rubber may also be produced locally by a maintenance shop. Standard DIN Hardware available may be used for the test. For the Cap use 3 mm thick stainless steel sheet metal. For the Rubber use 2 mm thick rubber mat of EPDM, FKM, Viton or equivalent. Dimensions:

Page 4 of 18 III INSTRUCTIONS III.1 Re-Installation of Exhaust Pipes with Directly Attached Heat Shield 1 Remove engine cowlings in accordance with (i.a.w.) AMM section 71-10. 2 Remove Exhaust Pipe DAI P/N D60-9078-06-01_01 / Technify P/N 52-7810-H0014 01, previously installed under OSB 42-122, i.a.w. AMM Section 78-00. Make sure that the intermediate flange of the engine is installed correctly to the forward engine shock mount. Align a ruler with the straight part of the bottom side of the intermediate flange as shown in the picture below. The distance between screw (pos. 3) and the ruler must be 13mm. 3 intermediate flange pos. 3 4 Install Exhaust Pipe with directly attached heat shield DAI P/N D60-9078-06-01 / Technify P/Ns 52-7810-H0001 02, 52-7810-H0001 03 or 52-7810-H0001 04 i.a.w. AMM Section 78-00. 5 Remove the screw (pos. 3) from the front shock engine mount.

Page 5 of 18 Install the exhaust clamp i.a.w. the pictures without tightening the bolts. 5 4 12 10 8,12 6 13 3 6 7 11 9

Page 6 of 18 Make sure that exhaust clamp 1 (pos.4) and exhaust sheet (pos. 6) are arranged as shown in the following pictures: pos. 6 pos. 4 correct installation 7 Note: The correct order of arrangement is: hexagon screw (pos. 8) spring washer (pos. 12) exhaust sheet (pos. 6) 2 x spring washer (pos. 12 ) exhaust clamp (pos 4) spring washer (pos 12) K-nut M6 (pos 10) 8 Tighten Hexagon Screw (pos. 8) until the spring washer pre-tension is 1.5 mm between the metal sheets. 9 Tighten Hexagon Socket Head Screws (pos. 7) equally on both sides with 5 NM (3.7 lbf.ft.).

Page 7 of 18 10 Check if the Hexagon Screw (pos. 3) can be installed without applying side force to the exhaust pipe. If the Hexagom Screw (pos. 3) cannot be installed without applying side force to the exhaust pipe: - Loosen the exhaust assembly at the manifold an re-align the exhaust pipe with the lower cowling installed in order to keep the pipe centered in the lower cowling cut-out and with adequate clearance to surrounding components. Re-install the exhaust assembly i.a.w. AMM, section 78-00. - If necessary loosen Hexagon Socket Head Screws (pos. 7), re-align exhaust pipe clamp and tighten Hexagon Socket Head Screws (pos. 7) i.a.w. item 6. Check if the Hexagon Screw (pos. 3) can be installed without applying side force to the exhaust pipe. If the Hexagon Screw (pos. 3) cannot be installed without applying side force to the exhaust pipe: - Modify the exhaust pipe bracket by re-working the hole for Hexagon Screw (pos. 3) as shown in the picture below so that the Hexagon Screw (pos. 3) can be installed without applying a side force to the exhaust pipe. Do not remove more material than is needed for tension free installation. 11 smoothen the edges

Page 8 of 18 12 13 In case it is not possible to install the exhaust clamp without adequate clearance between exhaust pipe and cowling / surrounding components and without applying tension to the exhaust pipe, install an alternative exhaust sheet i.a.w. DAI OÄM 42-315. Note: The alternative exhaust sheet and corresponding installation instruction (OÄM 42-315) may be obtained through Diamond Aircraft Industries Austria (support@diamond-air.at). After verification that the Hexagon Screw (pos. 3) can be installed without applying tension to the exhaust pipe and that there is adequate clearance between exhaust pipe and lower cowling cut-out / surrounding components, secure Hexagon Screw (pos. 3) with Loctite 272 and torque i.a.w. Technify Motors Repair Manual RM-02-02, Section 71-20.01. Examine heat shielding in the engine compartment. Ensure: - Installation is compliant with installation requirements in WI-OSB-42-122, Revision 3 or later - No damage or wear to heat shielding Note: Heat Shield Installation Requirements: - Heat shield at the front shock mount: heat shield 14 - Heat protection patch to upper cowling:

Page 9 of 18 - Heat protection patch to the air inlet duct of the lower cowling 5 mm 5 mm - Small heat protection patch to lower cowling: 5 mm

Page 10 of 18 - All patches view: - Edge sealing of heat protection patches: heat protection patch Dow Corning 732 cowling composite material

Page 11 of 18 heat protection patch Dow Corning 732 cowling composite material - Heat protection shield to the coolant tube: Note: For detailed installation Procedures refer to in WI-OSB-42-122, Revision 3 or later. 15 Clean working areas, check for foreign objects. 16 Install engine cowlings i.a.w. AMM section 71-10. - Make sure sufficient clearance of the exhaust pipe is provided. 17 Do an engine test i.a.w. AMM section 71-00. 18 Do a post engine test inspection: - Remove engine cowlings in accordance with (i.a.w.) AMM section 71-10. - Examine exhaust pipe and cowlings. Ensure no signs of contact and verify sufficient positive clearance of exhaust pipe. In case of contact, re-align exhaust pipe routing. - Install engine cowlings i.a.w. AMM section 71-10. 19 Make all necessary entries in the airplane logs.

Page 12 of 18 III.2 Re-Qualification of Exhaust Pipes DAI P/N D60-9078-06-01 / Technify P/Ns 52-7810-H0001 02, 52-7810-H0001 03 or 52-7810-H0001 04 Note: Either Procedure 1 or 2 may be used for re-qualification of an exhaust pipe. Note: Re-qualified exhaust pipes are considered having a TSN of 1500 FH. Procedure 1: Air-Pressure Test Examine Exhaust Pipe visually. - Clean exhaust pipe. - Ensure no visible cracks on inner pipe where visually accessible. - Ensure no visible cracks on heat shield. - Ensure heat shield is firmly attached to the inner pipe. 1 Note: On Exhaust pipes Technify P/Ns 52-7810-H0001 03 or 52-7810-H0001 04 the heat shield is welded to the exhaust pipe at the marked points. If a single welding point is cracked the heat shield is considered to be loose. This defects may be weld-repaired. Refer to Section III.3. Mount the adapter (VR00735-00-02 01 incl. pressure connection and o-ring) with the exhaust pipe, therefore use 3x M8x40 hexagon screws (NM-0000-02355 01), 3x M8 hexagon nuts (NM-0000-01294 01) and 6x washers (NM-0000-00040 01). 2

Page 13 of 18 Position the pressure pad (VR00735-00-01 01) in the internal exhaust pipe and connect the hand compressed air pump to the adapter and fill pressure pad with app. 1 bar. 3 Apply 0.5 to 0.7 bar to the exhaust system with a compressed air pump. 4 5 If no immediate pressure loss is detected the test is passed and the exhaust pipe is serviceable.

Page 14 of 18 Procedure 2: Hot Water Test CAUTION: When handling with hot water, use adequate safety equipment and precautions to protect yourself and co-workers from any harm when getting in contact with hot water or heated materials. Examine Exhaust Pipe visually. - Clean exhaust pipe. - Ensure no visible cracks on inner pipe where visually accessible. - Ensure no visible cracks on heat shield. - Ensure heat shield is firmly attached to the inner pipe. 1 Note: On Exhaust pipes Technify P/Ns 52-7810-H0001 03 or 52-7810-H0001 04 the heat shield is welded to the exhaust pipe at the marked points. If a single welding point is cracked the heat shield is considered to be loose. This defects may be weld-repaired. Refer to Section III.3. Install the cap with rubber on the exhaust flange and support installation in a vice i.a.w. picture below. 2 Cap, Rubber Washer, Nut, Bolt

Page 15 of 18 Use a funnel to fill the center pipe of the exhaust with exactly 1 liter of hot water (approx. 70 C). Be very careful to not spill any water. In case of spillage, remove water thoroughly and immediately. 3 center pipe

Page 16 of 18 Leave the water in the exhaust for a period of ten minutes. Then check for leakages. - Check for signs of water in the area of the manifold. 4 - Discard water and remove the cap and rubber. Use caution, the water may still be hot. - Let the exhaust dry. Compressed air may be used to accelerate drying. 5 If there are no visible leaks or water coming out underneath the heat shield were detected, the exhaust is serviceable.

Page 17 of 18 III.3 Repair of Heat Shields of DAI P/N D60-9078-06-01 / Technify P/Ns 52-7810- H0001 03 and 52-7810-H0001 04 Note: If the heat shield is loose a one time repair as follows is permitted. 1 Prepare exhaust pipe for welding: - Drill the cracked welding point of the heat shield with a diameter of approximately 6 mm. Do not thrill thru the inner exhaust pipe. Ref. picture below. If the welding point at the elbow is cracked do also drill this welding point and centre the heat shield as shown in the picture below.

Page 18 of 18 2 Welding: - Weld the heat shield at the drill holes to fix the heat shield to the exhaust pipe using MAG welding/gas metal arc welding (reference number 135 according to DIN EN ISO 4063). Use 1.4316/AISI 308L filler material. Note: The staff must be qualified according to ISO 24394, AWS D17.1, HB5299.1 or an equivalent national aircraft/aerospace welding approval accepted by the responsible authority. Note: No re-welding of the manifold joint is allowed.