LEE NAK GUI TCP SERVICE COORDINATOR APPS

Similar documents
Intervention Barriers

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

Special Features. u By-pass below upper slips to wash. debris when valve is opened. u By-pass is opened before upper slips.

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Drilling & Down-hole Completion Tools

COMPREHENSIVE OVERVIEW

Subsurface Flow Controls

CNL, CCL, GR, CBL. RDMO

Completion Solutions Inc.

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

Completion Tools Catalog

Delivering innovation through engineering

3/25/15 University DC 1H Devonian Completion

Thru-Tubing. Motors and standard tools

NeoProducts, LLC New Orleans, LA USA Ph:

Service Tools Catalog

HYDRAULIC WORKOVER SERVICES

Coil Tubing Intervention in MultiLateral Wells from a Semi-submersible

DATE: 01/03/ DAILY COMPLETION REPORT

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

An Overview of Horizontal Multi-Stage. Kenneth Stevens, Jim Hill Halliburton

Tubing-Casing Technologies STX , 4.5 INCH 13.5 PPF.

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

#10 Setting Tool Assembly Product Family No (10)

MagnusSeal Retrievable Seal Bore Packer Product No.: MSP 7500

Update on Tractor Conveyed Ballistics Including API RP-67 Revision

C BOP. TC Cooper Cameron, Cameron Division

Set, seal, and retrieve with confidence. Packers Catalog

Plug & Abandonment Light Drilling Workover Well Intervention

W I L D W E L L C O N T R O L COILED TUBING

COILED TUBING TOOLS SALE RENTAL - LEASE

Casing Scraper. Service Equipment. Features

REDA Coil. Coiled tubing-deployed ESP system

DAILY DRILLING REPORT

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

Field Overview. Central West Ecuadorian Basin Discovered in 1994 OOIP: 1,605 MBbls Maximum production rate: 65,200 bopd in year 2007 IPS-12-03

LOC 400 Drilling Rig

Nonexplosiveoilfield Products Global Sales & Service

Dynamic MDT Service Packer V-III Un-Loader Valve ANC Storm Valve

Actuators & Surface Safety Valves

ISOLATION/UNIVERSAL TOOLS

Gulftex Energy III LP DAILY COMPLETION REPORT

Restoring Functionality to Subsurface Safety Valves with Extreme Damaged Seal Bores. Graeme Allan, BP Well Intervention Engineer

Completion Systems & Mechanical Products


DOVER ARTIFICIAL LIF T FBU TMX RSR FIREBLADE WELDER PRO-ROD. Practical and Cost Effective Ar tificial Lif t Solutions

HM MT DRILLING RIG HUISMAN PRODUCT BROCHURE

Product Overview Last date of Revision:

2 1 /8 in Neyrfor TTT. Thru Tubing Turbodrill

Full Flow Reverse Circulation Junk Baskets. Manual B320

SERVICE TOOLS. Magnus MDT Service Packer V-III Un-Loader Valve MANC Storm Valve

Elevation Resources LLC

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

W E L L S I T E S E R V I C E S

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

McKissick 200mt. Stabbing board

Cloppenburg Germany Germany Tel.: +49 (0) Hohe Tannen 14

About Cobra Downhole Motors

About Cobra Downhole Motors

W I L D W E L L C O N T R O L WIRELINE OPERATIONS

Rotary Snubbing Technology Option for Long Reach

National Petroleum Technology Office U.S. DEPARTMENT OF ENERGY Tulsa, Oklahoma DOE/SW/ (OSTI ID: 5295) COILED TUBING SAFETY MANUAL

Downhole Electric Cutting Tool (DECT)

SAND CONTROL. enhanced. Save time and cost while improving reservoir producibility HALLIBURTON. Solving challenges.

Capillary Deliquification Safety System

Drilling & Completion Summary

TMK QUANTUM Infinity. Unlimited Stage Fracturing System COMPLETIONS

FRAC STACKS stingercanada.com

Express Series Multi Configuration Composite Body Bridge / Frac Plugs

We Know Downhole. PRODUCT CATALOG

CHINA VIGOR DRILLING OIL TOOLS AND EQUIPMENT CO., LTD.

MPD Manifold 4-1/ psi with Integrated Control System

DRILLING MOTOR HANDBOOK

Oiltools main product lines

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

Initial Running Guidelines

Coiled Tubing Tool EXTERNAL SLIP CONNECTOR. Feature. Specification Tool O.D. inch. Coiled Tubing O.D. inch. Tool I.D. inch. Conn.

The CIG is designed to fit any size of API rod insert pump.

PRODUCT LINE. CPS Oil & Gas Equipments Private Limited. Liner Hanger System. Gas Lift Equipment. Cementing and Casing Accessories

ADDRESSABLE DISCONNECT TOOL MODEL DE MANUAL

SECTION VIII: TEST TOOLS and CHECK VALVES

REMEMBER... SAFETY FIRST, EVERY TIME

Downhole Tools Worldwide.

TAM-J. Highest reliability multiple-set inflatable packer system available. Element sizes for 2-3/8 tubing through 30 casing

WLTC Retrievable Bridge Plug

Composite Plugs. Index

Technical Description and Specifications of the VibraEnforcer Systems for Freeing Stuck Pipe in Drilling Operations

Owen Oil Tools. orating Guns MAN-ERHSC. Glossary

1 st Run in Russia Novatek (largest independent gas producer) TCE700 lands intermediate 7 casing on ERD well in Yarudeyskoye field

SAPEX OIL TOOLS LTD. DOWNHOLE COMPLETIONS PACKERS & COMPLETION EQUIPMENT WORKOVER & COMPLETION SERVICE TOOLS PRODUCTS, APPLICATIONS & SPECIFICATIONS

Snap Sampler Deployment Guide

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation

5. STRUCTURAL INTEGRITY 5.1 STRUCTURAL STRENGTH AND DISTORTION TESTS - STRUCTURAL SHAKEDOWN TEST 5.1-I. DISCUSSION

Such as scratching, scoring, excessive packing wear, stuffing box damage... Have you ever wondered if there was any way to guide a polished rod?

Transcription:

Live Well Deployment System LEE NAK GUI TCP SERVICE COORDINATOR

Challenges Monobore completion High angle wells Long perforation intervals Underbalanced perforating (static or dynamic) Well control barriers Retrieve the gun assemblies without killing a producing zone 2

Live Well Deployment System 2 Gate Valves Isolate well pressure while retrieving guns from the lubricator or deploying guns into the well. Deployment BOP Quad BOP for deploying and reverse deploying of Deployment Gun Connectors Deployment Gun Connectors Connect gun sections together and provide pressure seal Gate valves Deployment BOP 3

Deployment Gun Connectors Benefits: Can be used to perforate new or existing wells. Can deploy and retrieve gun assemblies without killing a producing zone. Utilizes standard BOP and can be designed to accommodate different BOP configuration. Allow rigless perforating. Could be retrieve or deploy using CT, wireline or slickline if limited by lubricator height. SPRING HOUSING OPERATING SPRING COLLET RETAINER HOUSING RELEASE PADS SHAPED CHARGE SHEAR SCREWS COLLET FINGERS STINGER ASSEMBLY SEAL AREA DET. CORD FIRING PIN SEALED INITIATOR 4

Job Design Criteria Depth Correlation: Use of e-coil, memory GR/CCL, or Casing Collar Locator Optimize total shots by deploying 2 or 3 guns in a single module to reduce the number of deployment gun connectors. Long gross perforation interval load test with the deployment BOP rams to ensure it would hold the guns. Complexity of the job sequences Develop deployment and reverse deployment matrix and establish line of communication. Shaped charge and firing head selection. Optimum underbalance based on perforation simulation programs. Sour gas in the lubricator during reverse deployment Ensure personnel is trained with H2S and ensure H2S monitoring device is available at wellsite. Contingency plan to wash out the deployment connectors (sand trapped within the releasing pad) or initiate the secondary shearable system if primary release rams fail. Contingency fishing procedure. 5

Sample Bottom Hole Assy Set up 6

Deployment System Rig-up below RKB Deployment BOP s Pipe/Slip Rams Shear Rams Stripper Release Rams Locator Rams Gate Valves Riser above to suit BHA. 7

Deploy in Gun Assemblies Deploy in 1 st Gun Section (s) Install BHA section (s) in riser Pressure test/equalise. Open Gate Valves RIH w/ Gun BHA below Locator Rams Close Locator Rams P/U & tag Locator Rams with 5,000lbs overpull above the P/U weight Close Pipe/Slip Rams to hold BHA Bleed off riser pressure Open Locator Rams Overpull 10,000lbs above the P/U weight to confirm Pipe/Slip rams are holding the string. Function Release Rams Pick up upper BHA Close Gate Valves to isolate Install next BHA section (s) in riser 8

Deploy in Gun Assemblies - Cont Deploy in subsequent Gun Section (s) Install BHA section (s) in riser. Pressure test/equalise. Open Gate Valves RIH w/ Gun BHA to latch set down weight 4000lbs below the RIH weight. Pull/Push test to confirm position Open Pipe/Slip Rams RIH w/ Gun BHA below Locator Rams Close Locator Rams P/U & tag Locator Rams with 5,000lbs overpull above the P/U weight Close Pipe/Slip Rams Bleed off riser pressure Open Locator Rams Overpull 10,000lbs above the P/U weight to confirm Pipe/Slip rams are holding the string. Function Release Rams Pick up upper BHA Close Gate Valves to isolate 9

Deploy out Firing Head BHA Section Deploy out Firing Head BHA Section. POOH w/ Gun BHA below Locator Rams Close Locator Rams P/U & tag Locator Rams with 5,000lbs overpull above the P/U weight Close Pipe/Slip Rams Bleed off riser pressure Open Locator Rams Overpull 10,000lbs above the P/U weight to confirm Pipe/Slip rams are holding the string. Function Release Rams Pick up upper BHA Close Gate Valves to isolate Remove Firing Head BHA from riser 10

Deploy out Gun Assemblies Deploy out Gun section (s). Pressure test/equalise. Open Gate Valves RIH w/ Running BHA to latch set down weight 4000lbs below the RIH weight. Overpull 10,000lbs above the P/U weight to confirm Pipe/Slip rams are holding the string. Open Pipe/Slip Rams POOH w/ Gun BHA below Locator Rams Close Locator Rams P/U & tag Locator Rams with 5,000lbs overpull above the P/U weight Close Pipe/Slip Rams Bleed off riser pressure Open Locator Rams Overpull 10,000lbs above the P/U weight to confirm Pipe/Slip rams are holding the string. Function Release Rams Pick up upper BHA Close Gate Valves to isolate Remove Gun BHA from riser 11

Deployment Matrix DEPLOY FIRING HEAD AND LOCATOR GUN OUT OF LIVE WELL STE P EVENT DESCRIPTION TIME Commen ts 1 POOH and tag stripper. Zero depth counter 2 CT to clean and check depth counter 3 RIH meters to position locator gun across locator rams (NOTE depth and weight) 4 Close locator rams and confirm 5 POOH to tag locator rams, tag @ mts +/- (NOTE DEPTH & WEIGHT) 6 Overpull 5,000 lbs above P/U weight 7 Close Pipe/ Slip ram with 1000 psi, confirm indicator pins travel 8 Increase Pipe/ Slip ram pressure to 2000 psi 9 Close manual locks on Pipe/ Slip ram. NOTE: Count Turns 10 Set down 4000 lbs below RIH weight 11 Open locator rams and confirm 12 Overpull 10,000 lbs above P/U weight to confirm Pipe/Slip ram holding string. 13 Set down to neutral weight 14 Bleed off pressure in riser and coil to +/- 0 psi -as per CT Supervisor instructions - monitor inflow for 10 min 15 Overpull 10,000 lbs above P/U weight to confirm still latching prior to functioning release rams 16 Set down 4000 lbs below RIH weight 17 Confirm 0 psi above Pipe/Slip rams 18 Close release rams using accumulator pressure (AUDIBLE INDICATION WHEN RELEASE) 19 Open release rams 20 POOH slowly to confirm release 21 Tag strippers 22 Close gate valves and confirm indicator pins Lower gate 1 st Upper Gate 2nd 23 Confirm 0 psi in the riser 24 Conduct H2S test and confirm 0 ppm 25 Break QTS 26 Pick up on main blocks to create 'work window' 27 RIH to position gun connection at QTS 28 Install support plate across grooved tandem and hang off the locator gun 29 Set down and break connection between the locator gun and firing head 30 Retract the blocks off center 31 Lay down firing head from MHA 32 Confirm that the firing head has detonated 33 Make up retrieval BHA to MHA and pull up into the riser 34 Install lifting cap on the locator gun and lay it out with the tugger line 35 Position blocks over the riser 36 Make up QTS 37 Pressure test QTS to 5000 psi 12 DEPLOY GUN SECTIONSS OUT OF LIVE WELL STEP EVENT DESCRIPTION #1 TIME #2 TIME #3 TIME 1 POOH and tag stripper, zero depth counter 2 OPEN gate valves and confirm indicator pins, Upper 1 st and Lower 2nd 3 RIH to latch onto guns, Tag @ +/- (NOTE DEPTH) 4 Set down 4000 lbs below RIH weight - audible indication when latched 5 Overpull 10,000 lbs above P/U weight to confirm latching 6 Set down to neutral weight 7 Confirm WHP is still at Zero PSI (If WHP noted pressure up riser and CT to equalize pressure) 8 Open manual locks on pipe/slip rams and count turns 9 Open pipe/slip rams 10 POOH mts. NOTE pick up weight 11 Close locator rams and confirm 12 Pick up to tag locator rams, tag @ mts +/- (NOTE DEPTH & WEIGHT) 13 Overpull 5,000 lbs above P/U weight 14 Close pipe slip rams with 1000 psi, confirm indicator pins travel 15 Increase pipe slip ram pressure to 2000 psi 16 Close manual locks on pipe/slip rams. NOTE: COUNT Turns 17 Set down 4000 lbs below RIH weight 18 Open locator rams and confirm 19 Overpull 10,000 lbs above P/U weight to confirm Pipe/Slip ram holding string. 20 Set down to neutral weight 21 Bleed off pressure in riser and coil as per CT supervisor instructions to 0 psi - monitor inflow for 10 min 22 Overpull 10,000 lbs above P/U weight to confirm still latching prior to functioning release rams 23 Set down 4000 lbs below RIH weight 24 Confirm 0 psi above Pipe/Slip rams 25 Close release rams using accumulator pressure (audible indication when release) 26 Open release rams, confirm 27 POOH slowly to confirm release 28 POOH and tag strippers 29 Close gate valves and confirm indicator pins Lower gate 1 st Upper Gate 2nd 30 Confirm 0 psi in the riser 31 Conduct H2S test to confirm 0 ppm 32 Break QTS 33 Pick up on blocks to create a working window 34 Lower BHA to position gun connection at QTS 35 Land off gun assemblies on support plate 36 Break out retrieving BHA from gun section 37 Retract injector head to allow access to guns 38 Install lifting cap and lay down gun section with tugger line 39 Redress retrieving BHA and pick up into the riser 40 Lower injector and reconnect QTS 41 Pressure test QTS to 5000 psi

Summary Coil Tubing Conveyed Perforating with Live Well Deployment System enables: Single perforation run with static or dynamic underbalance across the whole perforation intervals. Optimize production by preventing formation damage due to plugged perforation tunnels from the kill fluid. Avoid multiple wireline perforation runs especially in monobore wells. 13

Thank You