TubeTrace Tubing Bundles

Similar documents
FLX TM Self-Regulating Winterization/Freeze Protection INSTALLATION PROCEDURES

Electric Heat Tracing INSTALLATION PROCEDURES

WarmTrace TM HSX Hot Water Temperature Maintenance INSTALLATION PROCEDURES

Terminator DP/FAK-4 and FAK-4L for In-Line Splice of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

Terminator DP/FAK-2 and FAK-2L. Elbow Splice Kit for Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

FAK-7HTS High Temperature Tubing Bundle End Seal Kit INSTALLATION PROCEDURES

Terminator DP/FAK-4LHT Kit for In-Line Splice of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

Terminator DP/FAK-5 and FAK-5L

Terminator DP/FAK-5LHT Kit for Tee Splice of Electrically Heated TubeTrace Bundles INSTALLATION PROCEDURES

Electric Heat Tracing INSTALLATION PROCEDURES

MIQ MINERAL INSULATED HEATING CABLE INSTALLATION INSTRUCTIONS

Terminator ZP/FAK-4L Kit Electrically Heated TubeTrace Bundles

Terminator. DP Power Connection Kit INSTALLATION PROCEDURES

Terminator ZP/FAK-1 Kit Electrically Heated TubeTrace Bundles

PETK Power and End Termination Kit

PETK Power and End Termination Kit

Terminator ZP/FAK-5 and 5L

TracePlus. VIL-6 End of Circuit Light Kit INSTALLATION PROCEDURES. VIL-6-H for BSX, HTSX, KSX, HPT, FP VIL-6-V for RSX, TSX, VSX

SCTK INSTALLATION PROCEDURES. Splice Connection Termination Kit. SCTK-1 for BSX, RSX, VSX SCTK-2 for KSX, HTSX SCTK-3 for HPT, FP

TracePlus. PCA Power Connection Kit INSTALLATION PROCEDURES. PCA-H for BSX, HTSX, KSX, HPT, FP PCA-V for RSX, TSX, VSX

Terminator TM DL Lighted Power Connection/End Termination Kit INSTALLATION PROCEDURES. For Power Connection or End Termination Applications

Specification for Heated Instrument Tubing in Process Applications* (March 29, 2007)

Nuheat WEATHER-READY HEAT TRACE PIPE FREEZE PROTECTION SYSTEM. Self-Regulating Heating Cable Installation Guide. UV Resistant Polyolefin Outer Jacket

PETK Power and End Termination Kit

PROVEX Installation Guide. Version 1.0

PRO-Tect Pipe Freeze Protection Self-Regulating Heating Cable Install Manual (PT-Series)

ATV/UTV WINCH INSTRUCTION BOOK 3000 LBS

Installation Instructions Table of Contents

STACKPAK INSTRUCTIONS

ThermoLite 40W Solar Panel Installation Instructions

SCTK Splice Connection Termination Kit

Power Connection Kit installation instructions

ZP-XP Power Connection Kit. Terminator. The Heat Tracing Specialists INSTALLATION PROCEDURES

RT FlexiPanel TM Tank and Vessel Heating Panel

ThermoLite 36W Solar Panel Installation Guide

Power Connection Kit Installation Instructions. Terminator DP-M for use with TEK and HTEK series constant watt heating cables

Trimline Car and Sling

HWAT System INSTALLATION AND OPERATION MANUAL FOR HOT WATER TEMPERATURE MAINTENANCE SYSTEMS FOR THERMALLY INSULATED PIPES

CAT-1 Series 3. Installation Guide. The Valley Group, Inc. 871 Ethan Allen Hwy. Suite 104 Ridgefield, CT 06877

ECO# 1801 REVISION# 000 ES DATE

Specialty Tools & Ergonomic Equipment Catalog

accqpulse Velocity Profiler Sensor Installation Guide

TOYOTA RAV TRAILER WIRE HARNESS Preparation

ThermoLite 110W-330W Solar Panel Installation Instructions

600 SERIES STANDARD DUTY STRAIGHT TRACK INSTALLATION INSTRUCTIONS

Selection Guide. Freeze Protection Heating Cable. Thermwire - Wrap. Thermwire - Wrap Pre-Assembled. Thermwire - Comp. Thermwire - Melt.

PN: 6410T0022 Rev. 8/18/2014 Revision D Albany RR300 Stainless Mechanical Install & Owner s Manual

INSTALLATION and MAINTENANCE INSTRUCTIONS SHO SERIES ELECTRIC CABLE REELS

Installation Instructions

Terminator DL-S for use with BSX *, HTSX, KSX self-regulating, HPT power-limiting, and FP constant watt heating cables

P Original Series Cargo Van Lift Mounting Instructions Fullsize Ford Van present. Preparing the Gate

In-Line / T-Splice Kit Installation Instructions. Terminator DS-L for use with RSX, TSX, VSX self-regulating heating cables

C A HEATING CABLE GLAND KIT INSTALLATION INSTRUCTIONS

Lbs Kgs Ft M

Power-Limiting Cables

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

ACI Hoist & Crane. Festoon System. 689 S.W. 7th Terrace Dania, FL (954) Fax (954) Toll Free A-HOIST ( )

RUN/BRAKE/TURN AUXILIARY LIGHTS J

Installation Instructions Electric Heaters 5 20 kw

XL-Trace System. Installation and Operation manual for pipe freeze protection and flow maintenance

TOYOTA VENZA 2009 TRAILER WIRE HARNESS Procedure

Installation Instructions CONSTANT WATT (CW) AND SELF-REGULATING (SR) PIPE TRACING CABLES

THE SB01 SPLICE ENCLOSURE NOW INCLUDES A LID GASKET THAT DOES NOT REQUIRE RTV APPLICATION.

INSTALLATION INSTRUCTIONS

QUICKTERM TERMINATION KIT

WARNING WARNING CAUTION. Warnings and Cautions MOVING PARTS ENTANGLEMENT HAZARD MOVING PARTS ENTANGLEMENT HAZARD CHEMICAL AND FIRE HAZARD

8400 Series Fiber Distribution System

TRAILER WINCH MODELS ST315 AND ST712. General Safety (Continued) Description. Unpacking. General Safety Information.

Power Connection Kit Installation Instructions. Terminator ZP-M for use with TEK and HTEK series constant watt heating cables

WARNING WARNING WARNING. Warnings and Cautions MOVING PARTS ENTANGLEMENT HAZARD CHEMICAL AND FIRE HAZARD FALLING OR CRUSHING HAZARD

INSTALLATION INSTRUCTIONS HAND OPERATED MODELS 140 AND 140-R BI-PART OPERATION

US208S Scooter Carrier - US208P Power Chair Carrier 210 Lift N Go 130 Swing Away Installation Guide & Owners Manual

Ecoflex potable PEX plus pre-insulated pipe system Installation guide

C Power Connection Kit

3M Cold Shrink Silicone Rubber Termination QT-III 7600-S-3G Series Three-Core Outdoor Termination

C A Heating Cable Gland Kit Installation Instructions

82-01 Chevy S-10/ GMC Sonoma Front Kit Part No B

Owner s Manual. Type AGS. Aquatape Gauging System

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

Installation Instructions Mineral Insulated (M.I.)

100A Series Low Power FM Antenna

Nanometrics Solar Power System

MODEL SIT -6E PAVEMENT-MOUNTED SNOW AND ICE SENSOR

TOYOTA SIENNA TRAILER WIRE HARNESS Preparation

SPC-P Smart Power Connection with Temperature Monitoring Transmitter Pipe Mounted Installation Instructions

KWSL2000RM ! CAUTION!! READ AND UNDERSTAND THIS MANUAL BEFORE INSTALLATION AND OPERATION OF THIS PRODUCT. DO NOT RETURN THIS PRODUCT TO SELLER.

KIT No , and 80590

Zeon Control Pack Relocation Kit 78 Cable Length

Wire Management Products Index

SPACESAVER EC-300 A ELECTRICS

2000 lb WINCH. Instruction and Operation Manual

Introduction to Heat Trace Cable Systems

READ AND SAVE THESE INSTRUCTIONS. Centrifugal Downblast Exhaust Fan Belt Driven for Roof & Wall Mounting

HVS S 15kV Class

Accessories. Introduction. Cable Hangers LINE PRODUCTS TRANSMISSION

IMPORTANT INFORMATION BEFORE USING YOUR 12V ELECTRIC WINCH

OSP Fiber Optic Cable

Wire Mesh Grip Families

DESIGN GUIDE FOR STEAM TRACING APPLICATIONS. THERMON The Heat Tracing Specialists

Fiber Connector Shelf (CCS)

Transcription:

for Custom CEMS and Analytical Umbilicals English Units

Receiving, Storing and Handling... 1. Inspect materials for damage incurred during shipping. Report damages to carrier for settlement. 2. Identify the TubeTrace tubing bundle type to ensure the proper material and quantity has been received. Boxes and reels are marked on the outside with part number, length, product description, weight and customer purchase order number. Compare information on box or reel with packing slip and purchase order to verify receipt of correct shipment. 3. The heating cable should be tested to ensure electrical integrity with at least a 500 Vdc megohmmeter (megger) between the heating cable bus wires and the heating cable metallic braid. IEEE 515 recommends that the test voltage for polymer insulated heating cables be 2500 Vdc. Minimum resistance should be 20 megohms. (Record 1 on Field Test Report) Connect the positive lead of the megger to the cable bus wires and the negative lead to the metallic braid. TubeTrace Tubing Bundle Layout... 1. Determine lengths and number of fittings prior to uncoiling TubeTrace tubing bundle since repeated uncoiling and re-coiling may work harden the tubing or damage the bundle. 2. Position reel such that TubeTrace tubing bundle may be pulled from the reel toward the least accessible end point allowing installation to begin at the end-point working back toward the reel. 3. To uncoil and straighten TubeTrace tubing bundles anchor the loose end of the tubing on a flat surface and roll the hand coil or shipping reel. If additional straightening is needed, apply moderate tension to the tubing bundles. 4. Wooden spools of TubeTrace tubing bundles containing long lengths of tubing can be placed on a pay-off tray as shown in illustration A. To pay-off TubeTrace tubing bundles, place the reel containing the tubing bundle on one tray allowing the tubing to freely unspool from the bottom of the reel. 5. Straighten TubeTrace tubing bundle by utilizing a counterspool located in front of the reel containing the tubing (see illustration A). The counterspool should be located at a distance of 2-1/2 times the diameter of the TubeTrace tubing bundle s shipping reel. Include a vertical offset of 8 to 10 (200 to 250mm) between the reel elevations. 4. The ends of TubeTrace tubing bundles are factory-sealed to prevent dirt, moisture and insect intrusion. As a preventive measure, keep ends sealed until final connections are made. Cut ends may be temporarily sealed with plastic wrap and tape. 5. Cardboard boxes and wooden reels of product should be stored indoors away from water and or driving rain. However, wooden reels may be stored outdoors using protective covering. 6. TubeTrace tubing bundles are shipped with the end of the tubing strapped to the side of wooden reel. Use caution when releasing the end of tubing from reel as it may be under tension and may uncoil when released. 8-10 (200-250mm) Illustration A: Tubing Payout Diameter D 2-1/2 X Diameter D Installation Checklist... Identify markings on tubing bundle to locate probe and analyzer ends prior to installation. Use a counter spool to uncoil and straighten bundle. Allow long radius, sweeping bends. Allow condensation slope as required. Maintain recommended support centers. Secure bundle runs individually. Do not overtighten support clamps. Follow minimum bend radius as specified. Maintain gap between heat tracing and sensor. Seal splices with approved kit. Insure all connections are tight and sealed. Seal all exposed ends with RTV sealant. 1 Tube Bundle Reel Jack Stand Counter Spool

Installation Methods... Horizontal Runs 1. TubeTrace tubing bundles may be installed in cable trays or by using individual strut channel. 2. Tubing bundle should be secured with clamps or cable ties every 5 to 6 feet (1.5-1.8m) for horizontal runs. Do not deform bundle jacket while securing tubing bundle to supports. 3. Tubing bundle run should include a snaking effect in tray to allow for expansion and contraction of tubing bundle. Provide 1 foot (300mm) of slack for every 100 feet (30m) of tubing bundle. 4. Do not overlap tubing bundles in cable tray. Install cable tray covers where foot traffic is expected to prevent stepping on bundle. 5. TubeTrace heated tubing bundles must maintain a 1 inch (25mm) per 20' (6m) slope toward the analyzer. Illustration B: Typical Tube Bundle Installation Vertical Runs 1. TubeTrace tubing bundles may be installed in cable trays or using individual strut channel. 2. Secure bundle with clamps or cable ties every 10 to 15 (3 to 4.5m) on vertical runs. Do not deform bundle jacket while securing tubing bundle to supports. 3. Allow expansion loop in tray every 100 feet (30m) to allow for expansion and contraction of tubing bundle. Provide 1 foot (300mm) of slack for every 100 feet (30m) of tubing bundle run. 4. If the vertical run is offset around the stack, pull sufficient tubing bundle up the stack to make the offset, secure bundle on the vertical run before routing the bundle around the stack. Take extra precaution to not damage the internal components of bundle. Stage multiple Kellems* grips on vertical runs to reduce pulling tension on the bundle. * Kellems is a trade name of Hubbell Killark Plastic Cable Tie Standard Cable Tray Strut Channel Strut Clamps Perforated Angle Iron Support Plastic Cable Tie or Stainless Steel Banding Illustration C: Typical Installation 1/2 (13mm) Minimum Standard Cable Tray 2

Bending Procedure... Thermon tubing bundles should be installed so there is no strain on any fittings after the installation is complete. The cross-sectional area of the tubing bundle should not be flattened, kinked or wrinkled. Refer to Table 1 for the minimum acceptable bend radius for each type of Thermon tubing bundle. Use a properly sized Thermon mechanical tubing bender to assure constant radius bends where possible. For bend radius greater than 10 inch, use wooden reel or spool as shown below. The Cross-Sectional Area of TubeTrace Tubing Bundle Should Not Be Flattened, Kinked or Wrinkled. OK Tubing Bundle Mechanical Tube Bender Wooden Reel or Spool Nominal Bundle O.D. inch (mm) Table 1: Bend Radius Minimum Bend Radius inch (mm) Nominal Weight lbs/ft (kg/m) Electrical Traced Bundles 1.3 (33) 6 (152) 0.32 (2.3) 1.4 (36) 7 (178) 0.5 (3.6) 1.5 (38) 7 (178) 0.6 (4.3) 1.7 (43) 8 (203) 0.7 (5.0) 1.8 (46) 9 (228) 0.8 (5.8) 1.9 (48) 10 (254) 0.9 (6.5) 2.1 (53) 11 (279) 0.95 (6.9) 2.2 (56) 12 (305) 1.00 (7.2) 2.3 (58) 12 (305) 1.10 (7.9) 3.0 (76) 16 (406) 1.75 (12.6) 3.5 (89) 20 (508) 2.10 (15.1) 3.1 (79) 16 (406) 1.85 (13.3) Steam Traced Bundles 1.5 (38) 7 (178) 0.5 (3.6) 1.6 (41) 7 (178) 0.6 (4.3) 1.7 (43) 7 (178) 0.6 (4.3) 1.8 (46) 8 (203) 0.7 (5.0) 1.9 (48) 9 (228) 0.8 (5.8) 2.0 (51) 11 (279) 0.9 (6.5) 2.1 (53) 11 (279) 0.8 (5.8) Slope 3 Typical CEMS Installation

Pulling Procedures... 1. The pulling line should be connected to the tube bundle using an appropriate sized Kellems grip for your application. Do not use a damaged grip for pulling bundle. Pulling tension should not exceed 50 pounds, with a minimum pulling line of 5/8 (15mm). Illustration D: Pulling Detail U-Bolt Catalog Number Standard Kellems Double Eye Grips Diameter inches Breaking Strength lbs. Pulling Eye Length inches Mesh Grip Length inches 022-01-005 1.00-1.24 1610 5 14 022-01-006 1.25-1.49 1610 5 15 022-01-007 1.50-1.74 1610 5 17 022-01-008 1.75-1.99 2150 6 19 022-01-009 2.00-2.49 3260 6 21 022-01-0010 2.50-2.99 3260 6 23 022-01-0011 3.00-3.49 4900 8 25 022-01-012 3.50-3.99 4900 8 27 2. Position tubing bundle reel at the top or base of the stack in line with cable tray to reduce overall friction on pulling run. Pulling should allow someone at the end to stop the reel from turning when the pulling force is stopped. 3. Extreme pulling tension may tend to flatten the tubes and damage heat tracing as they round corners, etc. Observe the minimum bending radius of the tubing bundle during pulling operation. (Refer to Table 1 Bend Radius) 4. For rounding corners, a pulley or roller may be utilized while passing over sharp edges that might damage the bundle. Both the pulleys and rollers can be rented at many electrical supply houses. 5. Kellems grips are required for permanently securing the bundle to the stack every 35 feet. NOTE: Kellems grips used for bundle installation will also be used to permanently attach bundle to support structure. 6. After determining the total number of Kellems grips required for permanent installation, slide grips required over bundle as shown on Illustration D. Use duct tape to prevent Kellems grips from slipping during bundle installation. 7. Attach pull rope to the pulling eye in the Kellems grip. Do not connect any type of hook, clamp or attachment hardware to any other part of the grip. 8. Secure pulling rope to first Kellems grip leaving sufficient line for additional grips as required. See pulling detail illustration. Do not exceed spacing of 35 feet between grips. Pull Rope U-Bolt 35' Kellems Grip UV Resistant Plastic Cable Ties 4

Tubing Bundle Attachment Methods... 1. For ease on installation and maintenance, route multiple runs of TubeTrace tubing bundles symmetrically utilizing the most accessible path possible. Routing should take advantage of existing cable trays, angles, channels, struts and I-beams for support. Maintain a 3 (76mm) minimum clearance between lines. Do not secure bundles to each other. 2. After pulling bundle into position, insure sufficient bundle is available to make final connections. Secure top Kellems grip to support structure, with additional Kellems grips located every 35 feet (10.7m). 3. Allow expansion loop in tray every 100 feet (30m) for expansion and contraction of TubeTrace tubing bundle. Provide 1 foot (300mm) of slack for every 100 feet (30m) of tubing bundle. 4. Secure TubeTrace tubing bundles to support structure every 5 to 6 (1.5 to 1.8m) on horizontal straight runs and every 10 to 15 (3 to 4.5m) on vertical runs. Provide additional support within 18 (450mm) of any connection point or transition fitting and within 6 to 10 (150 to 250mm) of any bends. 5. Cable trays and channel struts provide optimal support for multiple passes of TubeTrace tubing bundle. Secure bundle to cable tray using UV resistant plastic cable ties, or preferably stainless steel bundle clamps or standard conduit straps for channel strut attachment (see Table 2 for clamp sizing). Use caution when securing bundle to structure. Do not deform or crush the thermal insulation and outer jacket. 6. As an option, angle iron may be used to support TubeTrace tubing bundles on long vertical and horizontal runs. Angle iron should be sized approximately 1/2 (12mm) larger than the tubing O.D. Place the angle over the bundle to prevent moisture buildup. Secure bundle to the angle using UV resistant cable ties or stainless steel banding. Illustration E: Typical Vertical Attachment Kellems Grip Strut Clamp Angle Iron, Channel I-Beam Channel Strut or Cable Tray UV Resistant Plastic Cable Ties Table 2: Strut Clamp Selection Nominal Bundle O.D. Strut Clamp Size 1 (25mm) 1-1/4 (32mm) 1-1/4 (32mm) 1-1/2 (38mm) 1-5/8 (41mm) 2 (51mm) 2-5/8 (67mm) 2-1/2 (64mm) 3-3/8 (86mm) 3 (76mm) 3-5/8 (92mm) 3-1/2 (89mm) TubeTrace Tubing Bundle 7. Before making power connection, the heat trace should be tested to ensure electrical integrity with at least a 500 Vdc megohmmeter (megger) between the heat trace bus wires and the metallic braid. IEEE 515 recommends that the test voltage for polymer insulated heat trace be 2500 Vdc. Minimum resistance should be 20 megohms. (Record 2 on Field Test Report) After the power connection is completed, temporarily energize heat trace so that the energized test values can be recorded. (Record 3 on Field Test Report) 5 Secure Bundle with Kellems Grip Located Every 35 feet (10.7m)

TubeTrace Tubing Bundle Field Test Procedure 1. Verify that bundle is properly secured to the support structure without causing deformation to insulation and outer jacket. 2. Thoroughly inspect the TubeTrace tubing bundle to ensure all bends are free of kinks and wrinkles and that flattening has not occurred. Refer to the Bending Procedures. 3. Visually inspect bundle for any damage incurred during shipment. Tubing bundle with electric heat trace should be tested to ensure electrical integrity with at least a 500 Vdc megohmmeter (megger) between the heat trace bus wires and the metallic braid. IEEE 515 recommends that the test voltage for polymer insulated heat trace be 2500 Vdc and 1000 Vdc for MI. Minimum resistance should be 20 megohms. (Record 1 on Field Test Report.) A. Connect the positive lead of the megger to the bus wires. B. Connect the negative lead of the megger to the metallic braid. C. Energize the megger and record the reading. Readings between 20 megohms and infinity are acceptable. Readings below 20 megohms may mean the electrical insulation has been damaged on polymer insulated heat trace. Recheck the heat trace for physical damage between the braid and the heating element; small cuts or scuffmarks on the outer jacket will not affect the megger reading unless there was actual penetration through the braid and dielectric insulation jacket. 4. Clean the tubing before connection. After all connections have been completed, test the circuit for leaks by subjecting to pressure equal to or greater than which is to be used in the system, or preferably with suitable hydrostatic tests. Repair any steam and/or process leaks and retest the system. 5. Properly terminate all heat tracers with appropriate heat trace termination kit. 6. Once the installation is complete, recheck the heat trace with at least a 500 Vdc megohmmeter (megger) between the heat trace bus wires and the metallic braid as outlined above. IEEE 515 recommends that the test voltage for polymer insulated heat trace be 2500 Vdc and 1000 Vdc for MI. Minimum resistance should be 20 megohms. (Record 2 on Field Test Report.) 7. Properly terminate and seal all open ends of each bundle using the appropriate FAK Bundle Accessory Kit. 8. After the power connection is completed, record the panel location and circuit breaker information. Ensure all junction boxes, temperature controllers, cable glands, etc. are properly secured. Set the temperature controller (if applicable) to the manual setting and apply rated voltage to the heat tracing circuit(s) for 5 minutes. Record the ambient temperature, measure and record the circuit(s) voltage at the heat trace connection and electrical current. (Record 3 on Field Test Report.) NOTE: To ensure the warranty is maintained through the life of the installation, the testing outlined on this sheet must be completed on the installed heat trace, and the test results recorded and mailed/faxed to: Thermon Customer Service 100 Thermon Drive San Marcos, Texas 78666 Fax: 512-754-2420 6

TubeTrace Tubing Bundle Field Test Report (Make additional copies as required for each circuit.) Customer: Contractor: Address: Address: Phone No: Project Reference: Record 1: Prior to Installation Bundle Model #: Reel Length (indicate ft or m): Reel Number: Insulation Resistance (M-Ohms): Tested By: Witnessed By: Record 2: After Installation is Complete Insulation Resistance (M-Ohms): Heated Length* (indicate ft or m): Circuit of Heater Number: Tested By: Witnessed By: * Note, tubes may extend beyond tube bundle length. Record 3: Commissioning / Energized Test Values Electrical Control Panel Number: Circuit Breaker Number: Connected Voltage (Vac): Ambient Temperature (deg. F or C): Recorded Amps (After 5 Min.): Tested By: Witnessed By: Phone No. THERMON... The Heat Tracing Specialists 100 Thermon Dr. PO Box 609 San Marcos, TX 78667-0609 Phone: 512-396-5801 Facsimile: 512-396-3627 1-800-820-HEAT www.thermon.com In Canada call 1-800-563-8461 Specifications and information are subject to change without notice. Form 50035-0411 8 For the Thermon office nearest you visit us at... www.thermon.com