DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

Similar documents
DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY OPERATIONS REPORT Date:


19,683 8,

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

Callon Petroleum Company Drilling Report

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

DAILY DRILLING REPORT DATE : 08/01/2012

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

Daily Drilling Report

Daily Drilling Summary Report

Daily Activity Report

DAILY DRILLING REPORT


END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

Daily Drilling Report

Daily Drilling Report

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

DAILY DRILLING REPORT

Daily Drilling Report

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

DAILY DRILLING REPORT

OPERATIONS SUMMARY REPORT

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

3/25/15 University DC 1H Devonian Completion

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation

Drilling & Completion Summary

DAILY DRILLING REPORT

DAILY DRILLING REPORT

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

DAILY DRILLING REPORT DATE : 04/20/2011

Drilling & Completion Summary - Ascending

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

CUSTOMER WELL NAME COUNTY, STATE

About Cobra Downhole Motors

About Cobra Downhole Motors

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

APACHE CORPORATION. Daily Land - Orig Comp Report

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

MORNING DRILLING REPORT

1042 FNL, 1935 FEL - ECTOR, TX

Rotary Snubbing Technology Option for Long Reach

DRILLING MOTOR HANDBOOK

APACHE CORPORATION. Daily Land - Orig Comp Report

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A

Successful New Technology Introduction and Applications of Rotary Steerable System.

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

The Well Commander Mitigate drilling hazards with the industry s most versatile drilling valve. Todd Gooding Business Development Manager

McKissick 200mt. Stabbing board

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

DATE: 01/03/ DAILY COMPLETION REPORT

SPE Distinguished Lecturer Program

Motor Handbook. 4th Edition Ver. 1.0a ALL RIGHTS RESERVED. Issue Date; December 23, 2013 Wenzel Downhole Tools

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

4.7 Formation Temperature

Section 1 - General Data. Mud. Hole Size (in) Interval (mmd BRT) Mud Type Mud Weight (SG) 9 7/ Seawater w/ hi-vis 1.

Ashmin HammR Drill Motor

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

Ideco - H25 Information Document

Gyrodata Incorporated

Gyrodata Incorporated

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

Daily Drilling Report

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

MORNING DRILLING REPORT

Latest Advancements in DrillString Mechanics

Athlon Energy Operating LLC

AADE 01-NC-HO-54. Abstract

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

SAGA PETROLEUM A.S RFT WELLSITE WORKSHEET. RKB-MSL: 18m RIG: WEST ALPHAk FORMATION PRESSURE SO<PSIA) SOXPSIA) HP(PSIA) NORMAL TEST ,1 5776,3

CNL, CCL, GR, CBL. RDMO

LEE NAK GUI TCP SERVICE COORDINATOR APPS

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

RENTAL TOOL SERVICES. Megaton Impact Tools

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

AADE 2009NTCE DYNAMIC BHA ANALYSIS PROGRAM AND OPERATION ROAD MAP OPTIMIZES HOLE ENLARGEMENT WHILE DRILLNG PERFORMANCE, MARS BASIN - GoM

Rotary Steerable Drilling Systems Enable Single Trip runs for Larger Hole Craig Sidwell, Greg Conran, Rob Utter Schlumberger Drilling & Measurements

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

RENTAL TOOL SERVICES. Megaton Impact Tools

POWR Series. Performance and Steerable Drilling Motors

Mitigating Bit-Related Stick-Slip With A Torsional Impact Hammer

Elevation Resources LLC

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:

AxeBlade. Ridged diamond element bit

CONSTRUCTION OF AN AUTONOMOUS LABORATORY SCALE-DRILLING RIG FOR TESTING AND CONTROL OF DRILLING SYSTEMS

Transcription:

OXY INC. 03102015 Report No: 1 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation: Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor 1: Supervisor 2: Engineer: @ 00 @ 0 ft Rig: 0 ft Progress: Rot Today: Avg ROP Today: H&P 615 0 ft hr 0.0 fthr Ref Datum: Ground Elev: AFE MDDays: AFE Number: Lithology: Original KB @2,994.00ft 2,969.00 ft 9,500.0 18.0 days 1195567#0102 DFS: Daily Cost: Cum Cost: AFE Cost: $6,636 $6,636 $2,000,000 RIGGING DOWN MISC. EQUIPMENT, PREPARING TO MOVE RIG PICK UP RIG AT 18:00, CONTINUE RIGGING DOWN EQUIPMENT AND PREP DERRICK FOR SCOPE DOWN, SCOPE DOWN DERRICK CONTINUE RIGGING DOWN EQUIPMENT AND MOVE RIG TO VAQUERO UL 3221 CASINGWELL CONTROL PERSONNEL CARLTON COOLEY CODY SIRMONS JANICE CHIU Geologist: Oxy Personnel: 2 Contractor Personnel: 11 Total on Site: 13 HOOKLOAD & TORQUE Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: MD Incl Azi HYDRAULICS Pump Rate: 0.0 Pump Press: 0 TVD SURVEY DATA (LAST 6) N-S E-W MUD GAS Avg Max Conn: Trip: Backgr: VS DLS Build BIT RECORD Size Manufacturer Model Serial No IADC Nozzles MD In MD Out I-O-D-L B-G-O-R - - - - Rot Cum Rot BIT OPERATING PARAMETERS TODAY Prog Cum Prog ROP Cum ROP WOB RPM minmax minmax TFA P Drop z Vel HHPSI Engineer: Sample From: Mud : Time MD: Density @ Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: VG Meter: Comments: MUD DATA - MBT: ph: Pm Pom: Pf Mf: Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss: Fluid Disch: Daily Mud Cost: Cum Mud Cost: 0.0 $0 $0 LAST OR CURRENT BHA Component OD ID Jts Length MUD PRODUCTS Product Number of Units Qty Used Units 3112015 9:58:46AM Page 1 of 2

OXY INC. 03102015 Report No: 1 From To OPERATIONS eration Details 18:00 22:00 4.00 01MIRU LOCMOV RD P CONTINUE RIGGING DOWN AND STAGING EQUIPMENT FOR LOAD OUT. DRESS OUT AND PREPARE TO LOWER DERRICK 22:00 23:00 1.00 01MIRU LOCMOV RD P CONDUCT PJSM WITH H&P SUPERINTENDENT AND OXY DSM WITH CREW ON LOWERING DERRICK AT NIGHT. LOWER DERRICK AND CATCH ON TRUCK. 23:00 0:00 1.00 01MIRU LOCMOV RD P CONTINUE DRESSING OUT DERRICK WHILE LOWERED AND ON CATCH TRUCK FOR SEPERATION TOMORROW Total Time 6.00 OPERATIONS - NEXT DAY From To eration Details Total Time Safety Incident? N Environ Incident? N Days since Last RI: Days since Last LTA: Incident Comments: NO INCIDENTS, ACCIDENTS, OR POLLUTION IN LAST 24 HOURS. Other Remarks: Weather Comments: Directions to Vaquero UL #3221 From Fort Stocton, Texas, (Interstate 10 & FM1053), go East on Interstate 10 for 12.4 miles (Exit #272), the go south on University Rd (2.2 miles), the road will jog left for.5 miles then turn back South and travel (3.4 miles), Turn right and go West (2.6 Miles), Turn right and follow the road north to location (400 ft) LIFE FLIGHT COORDINATES: LAT 30 47 57.36 LONG 102 41 35.92 NAD 27 FLIGHT FOR LIFE 800-242-6199 AIR FLIGHT 800-242-6199 OXY DSM TRAILER: 832-900-7870 UNSAFE ACTS: 1 SAFE ACTS: 0 UNSAFE EQUIPMENT: 1 SWA'S:0 NEAR MISSES: 0 JSA'S: 3 SAFETY MEETINGS: 3 LOTO'S: 0 PERMITS TO WORK : 0 POWER LINE CHECKLIST: 31015 PRE SPUDRIG INSPECTION: HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED EMPLOYEE NOT USING THREE POINT CONTACT WALKING UP STAIRS. STOPPED AND EXPLAINED HAZARDS NOT USING THREE POINT CONTACT. HE UNDERSTOOD AND JOB CONTINUED WITHOUT INCIDENT. 3112015 9:58:46AM Page 2 of 2

OXY INC 03132015 Report No: 4 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: Last Casing: Next Casing: Last BOP Press Test: Form TestEMW: Supervisor 1: Supervisor 2: Engineer: 00 @ 0 ft Rig: 0 ft Progress: 0 ft Rot Today: Avg ROP Today: RUSTLER@97.0 H&P 615 0 ft hr 0.0 fthr DRILLING AHEAD SURFACE HOLE @ 385' W NO RETURNS. CONTINUE RIGGING UP. STRAP AND DRIFT BHA. MU 13.5" SURFACE BHA #1. RR(33015) ROL(040115) SPUDDRILL SURFACE INTERVAL. RUN 10-34" CASING. CASINGWELL CONTROL PERSONNEL CARLTON COOLEY SHAWN EICKERT JANICE CHIU Geologist: MICHELLE WRY Oxy Personnel: 2 Contractor Personnel 16 Total on Site: 18 HOOKLOAD & TORQUE Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: MD Incl Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original KB @2,994.00ft 2,969.00 ft 9,500.0 18.0 days 1195567#0102 DFS: Daily Cost: Cum Cost: AFE Cost: $30,723 $259,422 $2,000,000 Lithology: SAND GYPSUM DOLOMITE Azi HYDRAULICS Pump Rate: 0.0 Pump Press: 0 TVD SURVEY DATA (LAST 6) N-S E-W MUD GAS Avg Max Conn: Trip: Backgr: VS DLS 0 0 0 0 0 Build BIT RECORD Size Manufacturer Model Serial No IADC Nozzles MD In MD Out I-O-D-L B-G-O-R - - - - Rot Cum Rot BIT OPERATING PARAMETERS TODAY Prog Cum Prog ROP Cum ROP WOB RPM minmax minmax TFA P Drop z Vel HHPSI MUD DATA - NOV Engineer: ROSS MEYER MBT: Sample From: SUCT ph: Mud : Time MD: Spud Mud 20:00.0 Pm Pom: Pf Mf: Density @ Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 8.50 0 62 31.00 3 0 0 0 0.0.0 0.15 0.0 99.0 0.60 Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter: 0@3 0@6 0@100 1@200 3@300 6@600 Comments: <div>-while RIGGING UP BUILD THICK PMIX W LCM & BUILD PIT SYSTEM FOR VIS & PH ADDING LIME & SODA 0.0 lbmbbl 12.5 0.55 0.4 0.5 2,500 200 0 0.05 1.00 0.03 0 ppm 0.0 0.0 $1,543 $2,343 LAST OR CURRENT BHA Component OD ID Jts Length MUD PRODUCTS Product Number of Units Qty Used Units Fiber Seal 1.00 each 11.00 Lime 1.00 each 8.00 Mica Fine 1.00 each 1 NOV Carb Fine 1.00 each 1 NOV Gel 1.00 each 5 Soda Ash 1.00 each 14.00 StarDrill AP 1.00 each 1.00 Transportation 1.00 each 1.00 3142015 9:50:27AM Page 1 of 3

OXY INC 03132015 Report No: 4 OPERATIONS From To eration Details 0:00 6:00 6.00 01MIRU LOCMOV RU P FILL MUD PITS. TEST STAND PIPE TO 1500 PSI. OK. UN-PIN ODS BOOM POLE. PERFORM OXY PRE SPUD WALK AROUND. SPOT RISERROTATING HEAD FOR WELDER. NOTE: NOTIFIED ISABEL WITH TRRC OF UP COMING SPUD, CASING RUN & CEMENT @ 10:00 HRS, 3132015, JOB #3527. 6:00 10:30 4.50 01MIRU LOCMOV RU P RIG UP PVC LINES TO SHAKER TROUGH. BUILD SPUD MUD IN PITS. CHANGE OUT TOP DRIVE DIES. INSTALL 4.5" SAVER SUB, STABBING GUIDE. 10:30 18:00 7.50 01MIRU LOCMOV RU P FABRICATE FLANGE & CONDUCTOR. JSA. NIPPLE UP CONDUCTOR AND WELD ON SAME. INSTALL FLOW LINE. FABRICATE FILL UP LINE AND INSTALL. RIG UP LINES TO SUPER CHOKE. 18:00 21:30 3.50 01MIRU LOCMOV RU P INSTALL FLARE LINE. INSTALL MWD TRANSDUCER SENSOR ON STAND PIPE. CENTER CONDUCTOR WITH TURN BUCKLES. INSTALL CELLAR PUMP HOSES AND RUN HOSES TO RESERVE PIT. INSTALL MOUSEHOLE. SPOT BHA ON OFF DRILLER SIDE OF WRANGLER. STRAP SURFACE BHA #1. OXY ACCEPTED RIG FOR DAYWORK: 3132015 21:00 HRS. 21:30 22:00 0.50 01MIRU SAFE PJSM P JSA. DISCUSS PICKING UP BHA WITH DIRECTIONAL, MWD, OXY DSM, H&P CREW. 22:00 0:00 2.00 01MIRU TRIP BHA P MAKE UP 13.5" SURFACE BHA AS FOLLOWS: SMITH 13 12 SDSi616 BIT 8" 78 4.0 18" UG 1.15 BEND (RPG: 0.166) 8.4' BIT TO BEND 8" SHOCK SUB 13.375 IBS EXTREME MWD HANGER SUB 8" NMDC CROSSOVER (6-58" REG X 6 58" NC56) CROSSOVER ( NC56 X 4-12" XH) (6 JTS) 6.5" DRILL COLLARS (12 JTS) HWDP Total Time 24.00 OPERATIONS - NEXT DAY From To eration Details 0:00 0:30 0.50 01MIRU LOCMOV RU P SURFACE TEST MWD WITH GPMS: 450, PUMP PRESSURE: 450 PSI. OK MAKE UP 13-12" BIT. TRIP IN HOLE AND TAG @ 115'. 0:30 1:00 0.50 14SUDR DRILL MTRVER P SPUD SURFACE HOLE AT 00:30 HRS DRILL 13 12" SURF HOLE F 115' T 175'. = 60' (AVE ROP: 120 FPH) GPM: 400, ON BTM PSI: 800, OFF BTM PSI: 450, ON BTM TORQ: 4-8 K, OFF BTM TORQ: 3 K., SRPM: 50, WOB: 4-6K. NOTICED FLOW STEADILY DECREASING. NO RETURNS AT 175'. 1:00 1:30 0.50 14SUDR CIRC CNDHOL P PUMPED (2) 25 PPB SWEEPS AROUND WITH NO SUCCESS. LCF BLEND, LCF FINE, MICA, CAL CARB. 1:30 6:00 4.50 14SUDR DRILL MTRVER P DRILL 13 12" SURF HOLE F 175' T 385' = 210'' (AVE ROP: 40 FPH) GPM: 450, ON BTM PSI: 800, OFF BTM PSI: 450, ON BTM TORQ: 4-10 K, OFF BTM TORQ: 3 K., SRPM: 70, MMRPM: 74 WOB: 15-18K. DRILLING AHEAD WITH NO RETURNS. OCCASSIONALY HAVING TO STOP TO BUILD VOLUME IN PITS. (12) TRUCKS IN ROUTE HAULING FRESH WATER. Total Time 6.00 Safety Incident? N Environ Incident? N Incident Comments: INCIDENT - ROLLED ANKLE. Days since Last RI: Days since Last LTA 423.50 Weather Comments: 423.50 3142015 9:50:27AM Page 2 of 3

OXY INC 03132015 Report No: 4 Other Remarks: VAQUERO UL #3221 From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (2.6 miles) turn right and follow road north to location (400 feet)! LIFE FLIGHT COORDINATES: LAT 30 47 57.36 LONG 102 41 35.92 NAD 27 FLIGHT FOR LIFE 888-624-3571 OXY DSM TRAILER: 832-900-7870 NOTIFICATIONS: NOTIFIED ISABEL WITH TRRC OF SPUD, CASING RUN & CEMENT (3132015 @ 10:00 HRS) JOB #3527 UNSAFE ACTS: 10 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA'S: 0 NEAR MISSES: 0 JSA'S: 20 SAFETY MEETINGS: 22 LOTO'S: 0 PERMITS TO WORK : 11 POWER LINE CHECKLIST: 31015 PRE SPUDRIG INSPECTION: 3132015 HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED CREW MEMBER WITHOUT RESPIRATOR ON WHILE MIXING CHEMICALS. STOPPED EMPLOYEE AND HAD HIM PUT ON HIS RESPIRATOR. TASK COMPLETED WITHOUT INCIDENT. 3142015 9:50:27AM Page 3 of 3

OXY INC 03192015 Report No: 10 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 4615 ft Progress: 3813 ft Rot Today: Avg ROP Today: BRUSHY CANYON@4,570.0 CASINGWELL CONTROL Last Casing: 10.750in @ 842ft Next Casing: 7.625in @ 7,500ft Last BOP Press Test: 03162015 Form TestEMW: FIT 14.14 ppg Supervisor 1: Supervisor 2: Engineer: H&P 615 802 ft 15.00 hr 53.5 fthr DRILL 9 78" INTERVAL T 5,000'. TRIP BHA #2 DUE TO POOR ROP. CO BHA & TIH. DRILL F 3,813' T 4,615' (AVE ROP: 53 FPH) RR(040115) ROL(040315) DRILL 9 78" VERTICAL INTERVAL. PERSONNEL EDDIE BOND SHAWN EICKERT LINSAY EARLE Geologist: MICHELLE WRY Oxy Personnel: 2 Contractor Personnel 15 Total on Site: 17 Size Manufacturer HOOKLOAD & TORQUE 156.0 137.0 kip 142.0 kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original KB @2,994.00ft 2,969.00 ft 9,500.0 18.0 days 1195567#0102 DFS: Daily Cost: Cum Cost: AFE Cost: 5.97 $71,826 $939,085 $2,000,000 Lithology: 80% SAND, 10% SHALE, 10% LIMESTONE. 2,500.0 ft-lbf 6,000.0 ft-lbf HYDRAULICS 537.2 Pump Rate: Pump Press: 2765 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: 10 19 6 15 7 14 MD Incl Azi TVD N-S E-W VS DLS Build 4,534.0 0.09 335.87 4,533.91-6.8-5.9-6.8 0.05 4,251.0 0.09 235.73 4,250.91-6.9-5.7-6.9 0.06 3,969.0 0.09 92.89 3,968.91-6.8-5.7-6.8 0.03-0.03 3,660.0 0.18 110.64 3,659.92-6.6-6.4-6.6 0.04 0.03 3,375.0 0.09 71.43 3,374.92-6.5-7.0-6.5 3,091.0 0.09 72.90 3,090.92-6.6-7.5-6.6 0.06 Serial No BIT RECORD IADC 3 9.875 NATIONAL OILWELL N DSH716D-81 A201269 M324 7x14 3854 - - - - Nozzles MD In MD Out I-O-D-L B-G-O-R 2 9.875 BAKER DP607X 7154327 M323 5x15, 2x16 842 3854 4-8-RO-S X-1-CT-PR BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI 3 12.00 12.00 802 802 66.8 66.8 18.020.0 5050 1.052 226 163.8 0.9 2 3.00 51.50 41 3455 13.7 67.1 35.043.0 5070 1.256 157 137.3 0.6 MUD DATA - NOV Engineer: George Daily MBT: Sample From: SUCT ph: Mud : Time MD: Cut Brine 19:00 4,185.0 Pm Pom: Pf Mf: Density @ Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 9.30 95 90 3 4 7 3 3 4 1.0 1.77 7.20 0.0 92.8 5.40 Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter:?@6 11@300 15@600 Comments: <div>4283 ft at time of report and drlg ahead. Made bit trip this morning without any problems. Added 4 more drill collars to drillstring MUD PRODUCTS 0.0 lbmbbl 10.5 0.60 0.3 0.5 30,000 2,000 0.08 9.36 0.0 0.0 $1,703 $16,030 Product Number of Units Qty Used Units Barite 1.00 each 8 Caustic Soda 1.00 each 8.00 NOV Gel 1.00 each 4.00 Soap Stick 1.00 each 7 Soda Ash 1.00 each 9.00 StarDrill NP 110 1.00 each 1.00 LAST OR CURRENT BHA BHA No: 3 : 3 MD In: 3854 ft Purpose: DRILL 9 78" VERTICAL HOLE MD Out: Component OD ID Jts Length HWDP 4.500 2.750 24 728.73 DRILL COLLAR 6.500 3.250 15 455.28 CROSSOVER 6.813 2.250 1 3.47 NON-MAG SPIRAL DRILL COLLAR 6.688 3.250 1 29.90 STRING STABILIZER 6.875 2.813 1 6.61 NON-MAG SPIRAL DRILL COLLAR 6.688 3.250 1 29.78 MULESHOE SUB 6.750 3.250 1 3.32 FLOAT SUB 6.875 2.813 1 2.96 STRING STABILIZER 6.875 2.813 1 5.99 RSS (PUSH BIT) 6.625 5.500 1 26.14 CROSSOVER 6.813 2.250 1 2.50 FILTER SUB 6.500 3.250 1 3.02 STRING STABILIZER 6.813 2.500 1 6.98 Total Length: 1,318.76 ft Wt below Jars: 0.0 kip 3202015 9:17:35AM Page 1 of 3

OXY INC 03192015 Report No: 10 OPERATIONS From To eration Details 0:00 3:00 3.00 21INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 3,813' T 3,854'= 41' (AVE ROP: 14 FPH) GPM: 500550, OFFON BTM PSI: 2,320 2600, DIFF: 280, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 30-45K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-7K. PU 154K, SO: 140K, RTWT: 143K ROP SLOWING DESPITE VARYING DRILLING PARAMETERS. CALLED FS & ENGINEER. AGREED TO PULL BHA #2 DUE TO POOR ROP IN THE LOWER CAPITAN FORMATION (3,820' 75% DOLOMITE, 25% LIMESTONE). CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 12, VIS: 31 3:00 3:30 0.50 21INDR CIRC CNDHOL PT CIRCULATE 20 BBL HI VIS SWEEP WHILE BUILDING SLUG. FLOW CHECK WELL. DSM VERIFIED WELL STATIC PUMP SLUG 3:30 6:00 2.50 21INDR TRIP DRILL PT JSA. TOH F 3,854' - 1300'. CHECKED FOR FLOW @ TOP OF HWDP. WELL STATIC. CONTINUED TRIP OUT OF HOLE F 1300' T 130'. MONITOR DISPLACEMENT ON TRIP TANKS - WELL TAKING CORRECT FLUID FOR P[IPE DISPLACEMENT NO OVERPULL NOTED DURING TRIP OUT OF HOLE. 6:00 9:30 3.50 21INDR TRIP BHA PT HANDLE BHA - HOLD PJSM WITH RIG CREW, PATHFINDER DIRECTIONAL HANDS, & DSM ON LAYING OUT TOOLS BREAK & LAY OUT BIT #2 - CHECK POWER V TOOL - MAKE UP BIT # 3 - BREAK & LAY OUT MTR # 2 & MU MTR # 3 BIT #2 GRADED AS FOLLOWS: 4-8-RO-S-X-1-CT-PR MAKE UP 9 78" INTERMEDIATE BHA #3 AS FOLLOWS: 1. 9 78 NOV DSH716D-81 W 7 x 14'S FOR JETS TFA: 1.054 SN: A201289 (BIT #3, RUN #1) 2. POWER DRIVE 675 X6 CA 9 78" SLICK 3. 9 78" STABILIZER (18" UNDER GAUGE) 4. FILTER SUB 5. CROSSOVER 6. SLB 6.75" G3 78 5.0 MUD MOTOR (REVGAL: 0.28) 7. NM STABILIZER (18" UNDER GAUGE) 8. FLOAT SUB 9. MULE SHOE 10. NMDC 11. NM STABILIZER (14" UNDER GAUGE) 12. 6 34" NMDC 13. CROSS OVER 14. (15) 6 12" DC 15. (24) 4.5" HWDP ***NOTE*** SURFACE TEST MWDMTR @ 10 34" SHOE - GOOD TEST 9:30 11:00 1.50 21INDR TRIP DRILL PT TIH F SURFACE TO 3203' (***NOTE*** SURFACE TEST MWDMTR @ 10 34" SHOE - GOOD TEST) MONITOR WELL ON TRIP TANKS - GAIN PROPER MUD FOR PIPE DISPLACEMENT HOLE CONDITION: SLICK 11:00 11:30 0.50 21INDR SRFEQ RIGUP PT PULL TRIP NIPPLE & INSTALL ROTATING HEAD INSERT 11:30 12:00 0.50 21INDR TRIP DRILL PT FINISH TRIP IN F 3203' TO 3854' - HAD CORRECT GAIN FOR PIPE DISPLACEMENT - HOLE CONDITION - SLICK ***NOTE***FILL PIPE @ 5800' & WR F 5800' TO 5854' AS PRECAUTION - NO FILL NOTICED ON BOTTOM 12:00 18:00 6.00 21INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 3,854' T 4,140'= 286' (AVE ROP: 48 FPH) GPM: 530, OFFON BTM PSI: 2,280 2650, DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 18 TO 21 K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-7K. PU 162K, SO: 153K, RTWT: 157 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 12, VIS: 31 3202015 9:17:35AM Page 2 of 3

OXY INC 03192015 Report No: 10 From To eration Details 18:00 0:00 6.00 21INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 4,140'' T 4,615'= 475' (AVE ROP: 79 FPH) GPM: 530, OFFON BTM PSI: 2,350 2765, DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 18 TO 21 K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-7K. PU 177K, SO: 154K, RTWT: 167 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 12, VIS: 31 Total Time 24.00 - SURVEY DEPTH 4,534', INC: 0.09 DEG, AZM: 335.87, TVD: 4533.90' OPERATIONS - NEXT DAY From To eration Details 0:00 6:00 6.00 21INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 4,615'' T 5,000'= 385' (AVE ROP: 64 FPH) GPM: 530, OFFON BTM PSI: 2,350 2765, DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 20 TO 25 K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-9K. PU 177K, SO: 154K, RTWT: 167 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 12, VIS: 31 Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. Other Remarks: N Days since Last RI: Days since Last LTA - SURVEY DEPTH: 4,816', INC: 0.26 DEG, AZM: 213.64 TVD: 4,815' 429.50 Weather Comments: 429.50 VAQUERO UL #3221 From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (2.6 miles) turn right and follow road north to location (400 feet)! LIFE FLIGHT COORDINATES: LAT 30 47 57.36 LONG 102 41 35.92 NAD 27 FLIGHT FOR LIFE 888-624-3571 OXY DSM TRAILER: 832-900-7870 NOTIFICATIONS: NOTIFIED ISABEL WITH TRRC OF SPUD, CASING RUN & CEMENT (3132015 @ 10:00 HRS) JOB #3527 NOTIFIED BRENDA OPERATOR #13 WITH TRRC OF SURFACE CASING RUN & CEMENT (3142015 @ 08:00 HRS) JOB #3527 UNSAFE ACTS: 10 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA'S: 0 NEAR MISSES: 0 JSA'S: 19 SAFETY MEETINGS: 21 LOTO'S: 0 PERMITS TO WORK : 9 POWER LINE CHECKLIST: 31015 PRE SPUDRIG INSPECTION: 3132015 HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED THIRD PARTY INSIDE BUFFER ZONE WHILE PICKING UP DIRECTIONAL EQUIPMENT. STOPPED TUGGER OPERATIONS AND HAD THIRD PARTY CLEAR AREA AND DISCUSSED HAZARDS WITH EMPLOYEE LATER. PICKING UP BHA COMPLETED WITHOUT INCIDENT. 3202015 9:17:35AM Page 3 of 3

OXY INC 03202015 Report No: 11 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 5104 ft Progress: 4615 ft Rot Today: Avg ROP Today: BRUSHY CANYON@4,570.0 CASINGWELL CONTROL Last Casing: 10.750in @ 842ft Next Casing: 7.625in @ 7,500ft Last BOP Press Test: 03162015 Form TestEMW: FIT 14.14 ppg Supervisor 1: Supervisor 2: Engineer: H&P 615 489 ft 8.50 hr 57.5 fthr DRILLING 9 78" INTERVAL @ 5,341'. DRILL 9 78" INTERVAL T 5,000'. TRIP FOR MOTOR. TIH & DRILL F 5,000' - 5,104'. RR(040115) ROL(040315) DRILL 9 78" VERTICAL INTERVAL. PERSONNEL EDDIE BOND SHAWN EICKERT LINSAY EARLE Geologist: MICHELLE WRY Oxy Personnel: 3 Contractor Personnel 15 Total on Site: 18 Size Manufacturer HOOKLOAD & TORQUE 177.0 154.0 kip 167.0 kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original KB @2,994.00ft 2,969.00 ft 9,500.0 18.0 days 1195567#0102 DFS: Daily Cost: Cum Cost: AFE Cost: 6.97 $58,026 $1,021,075 $2,000,000 Lithology: 70% SAND, 25% SHALE, 15% LIMESTONE @ 5,060'. 2,500.0 ft-lbf 7,500.0 ft-lbf HYDRAULICS 529.5 Pump Rate: Pump Press: 2245 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: 15 18 0 0 14 18 MD Incl Azi TVD N-S E-W VS DLS Build 4,816.0 0.26 213.64 4,815.91-7.1-6.4-7.1 0.11 0.06 4,534.0 0.09 335.87 4,533.91-6.8-5.9-6.8 0.05 4,251.0 0.09 235.73 4,250.91-6.9-5.7-6.9 0.06 3,969.0 0.09 92.89 3,968.91-6.8-5.7-6.8 0.03-0.03 3,660.0 0.18 110.64 3,659.92-6.6-6.4-6.6 0.04 0.03 3,375.0 0.09 71.43 3,374.92-6.5-7.0-6.5 Serial No BIT RECORD IADC 4 9.875 SMITH MSI713HUPX JJ9852 M323 2x13, 8x12 5032 - - - - Nozzles MD In MD Out 3 9.875 NATIONAL OILWELL N DSH716D-81 A201269 M324 7x14 3854 5032 4-4-JD-A I-O-D-L B-G-O-R X-1-CT-DTF BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI 4 1.00 1.00 72 72 72.0 72.0 10.020.0 4565 1.143 182 148.7 0.7 3 7.50 19.50 417 1219 55.6 62.5 18.024.0 5050 1.052 858 322.9 3.5 MUD DATA - NOV Engineer: George Daily MBT: Sample From: PIT ph: Mud : Time MD: Cut Brine 19:33 5,032.0 Pm Pom: Pf Mf: Density @ Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 9.20 0 90 29.00 4 5 3 3 3 1.0 1.90 6.50 0.0 93.5 4.60 Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter:?@6 9@300 13@600 Comments: <div>5032 ft and TIH at time of report. Made trip today to change out locked up mud motor. Tripped back in with a Smith Bit. No MUD PRODUCTS 0.0 lbmbbl 10.5 0.60 0.3 0.4 32,000 2,000 0.08 9.36 0.0 0.0 $1,004 $17,035 Product Number of Units Qty Used Units Lime 1.00 each 15.00 NOV Salt Gel 1.00 each 5 Soap Stick 1.00 each 2 StarDrill AP 1.00 each 5.00 LAST OR CURRENT BHA BHA No: 4 : 4 MD In: 5032 ft Purpose: DRILL 9 78" VERTICAL HOLE MD Out: Component OD ID Jts Length HWDP 4.500 2.750 24 728.73 DRILL COLLAR 6.500 3.250 15 455.28 CROSSOVER 6.813 2.250 1 3.47 NON-MAG SPIRAL DRILL COLLAR 6.688 3.250 1 29.90 STRING STABILIZER 6.875 2.813 1 6.61 NON-MAG SPIRAL DRILL COLLAR 6.688 3.250 1 29.78 MULESHOE SUB 6.750 3.250 1 3.32 FLOAT SUB 6.875 2.813 1 2.96 STRING STABILIZER 6.875 2.813 1 5.99 STEERABLE MOTOR 6.625 5.500 1 25.66 PDC BIT 9.875 3.000 1 0.90 Total Length: 1,292.60 ft Wt below Jars: 0.0 kip 3212015 9:57:45AM Page 1 of 4

OXY INC 03202015 Report No: 11 OPERATIONS From To eration Details 0:00 6:00 6.00 21INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 4,615' T 5,000'= 385' (AVE ROP: 64 FPH) GPM: 530, OFFON BTM PSI: 2,350 2765, DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 20 TO 25 K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-9K. PU 177K, SO: 154K, RTWT: 167 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 12, VIS: 31 - SURVEY DEPTH: 4,816', INC: 0.26 DEG, AZM: 213.64 TVD: 4,815' 6:00 7:30 1.50 21INDR DRILL RSS P DRILL 9 78" INTERMEDIATE HOLE F 5,000' T 5,032'= 32' (AVE ROP: 21 FPH) GPM: 530, OFFON BTM PSI: 2,350 2765, DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 20 TO 25 K, OFF BTM TORQ: 2.5K, ON BTM TORQ: 5-9K. PU 177K, SO: 154K, RTWT: 167 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 12, VIS: 30 - SURVEY DEPTH: 4,816', INC: 0.26 DEG, AZM: 213.64 TVD: 4,815' ***NOTE*** MOTOR STARTED SPIKING @ 5020' - AFTER SEVERAL SPIKES - MTR STALLED - HAD TO SLOW PUMP RATE TO 270 GPM WITH 3500 PSI OFF BOTTOM PRESSURE 7:30 8:30 1.00 21INDR CIRC CNDHOL PT ATTEMPT SEVERAL TIMES TO TAG BOTTOM W REDUCED PUMP RATE TO FREE MOTOR W NO SUCCESS CONTINUE CIRC WHILE CALLS MADE TO DE & FDS - DECESION MADE TO TRIP OUT 8:30 10:30 2.00 21INDR TRIP DRILL PT TRIP OUT OF HOLE FROM 5032' TO 1318' DUE TO MTR FAILURE MONITOR DISPLACEMENT ON TRIP TANKS - WELL TAKING CORRECT FLUID FOR PIPE DISPLACEMENT NO OVERPULL NOTED DURING TRIP OUT OF HOLE. 10:30 11:00 0.50 21INDR SRFEQ RIGUP PT PULL ROTATING HEAD INSERT & INSTALL TRIP NIPPLE 11:00 12:30 1.50 21INDR TRIP DRILL PT TRIP OUT FROM 1318' TO DIRECTIONAL TOOLS @ 134' MONITOR DISPLACEMENT ON TRIP TANKS - WELL TAKING CORRECT FLUID FOR PIPE DISPLACEMENT NO OVERPULL NOTED DURING TRIP OUT OF HOLE. 12:30 14:00 1.50 21INDR TRIP BHA PT HANDLE BHA - HOLD PJSM WITH RIG CREW, PATHFINDER DIRECTIONAL HANDS, & DSM ON LAYING OUT TOOLS BREAK & LAY OUT BIT #3,POWER V TOOL, MUD MTR & MWD PROBE BIT #3 GRADED AS FOLLOWS: 4-4-JD-A-X-1-CT-DTF ***NOTE***AFTER GETTING OUT, NOTICED POWER V-TOOL WAS DAMAGED AND MOTOR WAS LOCKED UP - TOOK 8 K FTLBS TO TURN MTR & DRAIN SAME, ALSO BIT HAD SIGNS OF JUNK DAMAGE 14:00 14:30 0.50 21INDR RIGMT SRVRIG PT SERVICE RIG & RELATED EQUIPMENT 14:30 15:30 1.00 21INDR WAIT OTH PT CALLS MADE TO DE, FDS AND DISCUSSED OPTIONS - DECESION MADE TO LAY OUT POWER V & TRIP IN W STERRABLE ASSEMBLY TO FINISH DRILLIN 9 78" INTERMEDIATE HOLE STRAP TOOLS & MAKE UP NEW MWD TOOL 15:30 16:00 0.50 21INDR SAFE PJSM PT HOLD PJSM WITH RIG CREW, PATHFINDER DIRMWD HANDS, & DSM ON PICKING UP BHA # 4 3212015 9:57:45AM Page 2 of 4

OXY INC 03202015 Report No: 11 From To eration Details 16:00 19:30 3.50 21INDR TRIP BHA PT MAKE UP 9 78" INTERMEDIATE BHA #4 AS FOLLOWS: 1. 9 78 SMITH MS713HUPX W 8 x 12'S & 2 x 13'S FOR JETS TFA: 1.143 SN: JJ9852 (BIT #4, RUN #1) 2. SLB 6.75" G3 78 5.0 MUD MOTOR (REVGAL: 0.28) 3. 9 78" STABILIZER (18" UNDER GAUGE) 4. FILTER SUB 5. CROSSOVER 6. SLB 6.75" G3 78 5.0 MUD MOTOR (REVGAL: 0.28) 7. NM STABILIZER (18" UNDER GAUGE) 8. FLOAT SUB 9. MULE SHOE 10. NMDC 11. NM STABILIZER (14" UNDER GAUGE) 12. 6 34" NMDC 13. CROSS OVER 14. (15) 6 12" DC 15. (24) 4.5" HWDP ***NOTE*** SURFACE TEST MWDMTR - GOOD TEST 19:30 21:00 1.50 21INDR TRIP DRILL PT PJSM. TIH F SURFACE TO 3,650' (***NOTE*** TEST MWDMTR @ 10 34" SHOE - GOOD TEST) 21:00 21:30 0.50 21INDR SRFEQ RIGUP PT INSTALL ROTATING HEAD. 21:30 22:00 0.50 21INDR TRIP DRILL PT PJSM. TIH F 3,650' TO 4,999' MONITOR WELL ON TRIP TANKS - GAIN PROPER MUD FOR PIPE DISPLACEMENT HOLE CONDITION: SLICK MONITOR WELL ON TRIP TANKS - GAIN PROPER MUD FOR PIPE DISPLACEMENT HOLE CONDITION: SLICK 22:00 23:00 1.00 21INDR CIRC CNDHOL PT WASH TO BOTTOM F 4,999' - 5,032'. TAG BOTTOM AND PICK UP AND CIRCULATE W 550 GPM, SURFACE RPM: 50. SCHLUMBERGER MWD REPROGRAMMED MWD TOOL. 23:00 0:00 1.00 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 5,032' T 5,104'= 72' (AVE ROP: 72 FPH) GPM: 530-550, OFFON BTM PSI:1,885 2,400, DIFF: 415, SRPM: 45-65 + MRPM: 154 = BRPM 204, WOB: 10 TO 25 K, OFF BTM TORQ: 3K, ON BTM TORQ: 6-9K. NOTE: SLB MWD RECORDING HIGH TO SEVERE DOWNHOLE VIBRATIONS. SLB OFFSET FIELD DATA SHOWS HIGH VIBRATIONS IN AREA. CALLED OXY ENGINEERING. ADJUSTED WOB (10-20K), SRPM (45-60), FLOW RATE (530-550). FOUND LOWEST DOWNHOLE VIBRATIONS WITH WOB: 16K, SRPM: 50, FLOW RATE: 530 GPM'S. PU 177K, SO: 168K, RTWT: 166 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 11, VIS: 30 Total Time 24.00 - SURVEY DEPTH: 4,816', INC: 0.26 DEG, AZM: 213.64 TVD: 4,815' 3212015 9:57:45AM Page 3 of 4

OXY INC 03202015 Report No: 11 OPERATIONS - NEXT DAY From To eration Details 0:00 2:30 2.50 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 5,104' T 5,249'= 145' (AVE ROP: 58 FPH) GPM: 530, OFFON BTM PSI:1695 2,245, DIFF: 4-550, SRPM: 50 + MRPM: 148 = BRPM 198, WOB: 18 K, OFF BTM TORQ: 3K, ON BTM TORQ: 6-9K. ATTEMPT TO TAKE SURVEY. ABLE TO OBTAIN PU 178K, SO: 168K, RTWT: 167 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 11, VIS: 30 2:30 4:00 1.50 21INDR DRILL MTRVER PT NPT MWD - UNABLE TO OBTAIN RAW SURVEY DATA AS PER OXY REQUIREMENTS. MWD TOOL BECAME PROGRAMMED INTO AUTO CALCULATE MODE VS OXY RAW SURVEY MODE. MWD TROUBLESHOOTING WITH SCHLUMBERGER CONTROL CENTER AND UNABLE TO RE PROGRAM TOOL FROM SURFACE. CALLED OXY ENGINEERING AND DECIDED TO DRILL AHEAD WHILE SCHLUMBERGER CONTINUES TO TRY TO TROUBLESHOOT THE ISSUE. 4:00 6:00 2.00 21INDR DRILL MTRVER PT DRILL 9 78" INTERMEDIATE HOLE F 5,249' T 5,341'= 92' (AVE ROP: 46 FPH) GPM: 530, OFFON BTM PSI:1695 2,245, DIFF: 4-550, SRPM: 50 + MRPM: 148 = BRPM 198, WOB: 18 K, OFF BTM TORQ: 3K, ON BTM TORQ: 6-9K. PU 178K, SO: 168K, RTWT: 167 K Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. Other Remarks: N Days since Last RI: Days since Last LTA CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.3 PPG, PH: 11, VIS: 30 430.50 Weather Comments: 430.50 VAQUERO UL #3221 From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (2.6 miles) turn right and follow road north to location (400 feet)! LIFE FLIGHT COORDINATES: LAT 30 47 57.36 LONG 102 41 35.92 NAD 27 FLIGHT FOR LIFE 888-624-3571 OXY DSM TRAILER: 832-900-7870 NOTIFICATIONS: NOTIFIED ISABEL WITH TRRC OF SPUD, CASING RUN & CEMENT (3132015 @ 10:00 HRS) JOB #3527 NOTIFIED BRENDA OPERATOR #13 WITH TRRC OF SURFACE CASING RUN & CEMENT (3142015 @ 08:00 HRS) JOB #3527 UNSAFE ACTS: 10 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA'S: 0 NEAR MISSES: 0 JSA'S: 19 SAFETY MEETINGS: 21 LOTO'S: 1 PERMITS TO WORK : 6 POWER LINE CHECKLIST: 31015 PRE SPUDRIG INSPECTION: 3132015 HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: OBSERVED TUGGER OPERATOR PREPARING TO OPERATE TUGGER AND PIPE WRANGLER. STOPPED HIM AND MADE HIM AWARE OF SIMOPS WITH THESE TWO PIECES OF EQUIPMENT. HE AGREED. 2ND EMPLOYEE HELPED RUNNING THE HOIST. THE BHA WAS PICKED UP WITHOUTH INCIDENT. 3212015 9:57:45AM Page 4 of 4

OXY INC 03222015 Report No: 13 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 6637 ft Progress: 5924 ft Rot Today: Avg ROP Today: LEONARD@6,370.0 CASINGWELL CONTROL Last Casing: 10.750in @ 842ft Next Casing: 7.625in @ 7,500ft Last BOP Press Test: 03162015 Form TestEMW: FIT 14.14 ppg Supervisor 1: Supervisor 2: Engineer: H&P 615 713 ft 23.50 hr 30.3 fthr LD BHA #4 (BIT & MOTOR). DRILL 9 78" INTERVAL F 5,924' T 6,637'. RR(040115) ROL(040315) DRILL 9 78" VERTICAL INTERVAL. PERSONNEL EDDIE BOND SHAWN EICKERT JANICE CHIU Geologist: MICHELLE WRY Oxy Personnel: 3 Contractor Personnel 17 Total on Site: 20 Size Manufacturer HOOKLOAD & TORQUE 197.0 189.0 kip 197.0 kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original KB @2,994.00ft 2,969.00 ft 9,500.0 18.0 days 1195567#0102 DFS: Daily Cost: Cum Cost: AFE Cost: 8.97 $43,663 $1,114,213 $2,000,000 Lithology: MIDDLE LEONARD: 80% SHALE, 20% SAND. 3,700.0 ft-lbf 7,800.0 ft-lbf HYDRAULICS 529.5 Pump Rate: Pump Press: 2355 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: 14 17 0 0 9 13 MD Incl Azi TVD N-S E-W VS DLS Build 6,418.0 1.06 311.51 6,417.36-33.9-16.8-33.9 0.89-0.25 6,136.0 1.76 186.56 6,135.41-31.3-14.4-31.3 1.28-1.19 6,040.0 2.90 197.91 6,039.49-27.6-13.5-27.6 0.76-0.67 5,947.0 3.52 203.97 5,946.63-22.7-11.6-22.7 0.84 0.84 5,663.0 1.14 205.54 5,662.89-12.2-6.8-12.2 0.39 0.28 5,382.0 0.35 131.02 5,381.91-9.1-6.3-9.1 0.11 0.06 Serial No BIT RECORD IADC 4 9.875 SMITH MSI713HUPX JJ9852 M323 2x13, 8x12 5032 - - - - Nozzles MD In MD Out I-O-D-L B-G-O-R BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI 4 23.50 46.00 713 1605 30.3 34.9 21.040.0 050 1.143 184 148.7 0.7 MUD DATA - NOV Engineer: George Daily MBT: Sample From: SUCT ph: Mud : Time MD: Cut Brine 19:24 6,115.0 Pm Pom: Pf Mf: Density @ Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 9.20 91 90 3 4 7 3 4 4 1.0 2.14 6.50 0.0 93.5 4.40 Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter:?@6 11@300 15@600 Comments: <div>6464 ft at time of report and drlg ahead. The last 24 hrs we have beed been drlg with WOB of 18k to 21k. We have up'ed the MUD PRODUCTS 0.0 lbmbbl 10.0 0.60 0.3 0.5 36,000 2,000 Product Number of Units Qty Used Units Lime 1.00 each 7.00 NOV Salt Gel 1.00 each 35.00 Soap Stick 1.00 each 1 Soda Ash 1.00 each 2.00 StarDrill NP 110 1.00 each 5.00 LAST OR CURRENT BHA BHA No: 4 : 4 MD In: 5032 ft Purpose: DRILL 9 78" VERTICAL HOLE MD Out: Component OD ID Jts Length HWDP 4.500 2.750 24 728.73 DRILL COLLAR 6.500 3.250 15 455.28 CROSSOVER 6.813 2.250 1 3.47 0.08 NON-MAG SPIRAL DRILL COLLAR STRING STABILIZER 6.688 6.875 3.250 2.813 1 1 29.90 6.61 NON-MAG SPIRAL DRILL COLLAR 6.688 3.250 1 29.78 9.35 MULESHOE SUB 6.750 3.250 1 3.32 FLOAT SUB 6.875 2.813 1 2.96 STRING STABILIZER 6.875 2.813 1 5.99 0.0 0.0 STEERABLE MOTOR PDC BIT 6.625 9.875 5.500 3.000 1 1 25.66 0.90 $999 $19,404 Total Length: 1,292.60 ft Wt below Jars: 0.0 kip 3232015 9:51:48AM Page 1 of 3

OXY INC 03222015 Report No: 13 OPERATIONS From To eration Details 0:00 6:00 6.00 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 5,924' T0 6,099'= 175' (AVE ROP: 31 FPH) GPM: 530, OFFON BTM PSI: 1,790 2,250, DIFF: 460, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 21 K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7.3K. PU 193K, SO: 183K, RTWT: 189 K SLIDE: 6,005' - 6,030' TOOLFACE: 25 MAG (2.5 HRS) SLIDE FTG = 25' @ 10 FPH = 14% FTG & 42% TIME CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30 - SURVEY DEPTH: 5,947', INC: 3.52 DEG, AZM: 203.97 TVD: 5,947.42', VS: 33' 6:00 12:00 6.00 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,099' T 6,234'= 135' (AVE ROP: 23 FPH) GPM: 530, OFFON BTM PSI: 1,790 2,250, DIFF: 460, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 21 K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7.3K. PU 193K, SO: 183K, RTWT: 189 K SLIDE: 6,099' - 6,119' TOOLFACE: 25 MAG (1.5 hrs); 6,193' TO 6,218' (2 HRS) SLIDE FTG = 45' @ 13 FPH = 33% FTG & 58% TIME CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30 - SURVEY DEPTH: 6,136', INC: 1.76 DEG, AZM: 186.54 TVD: 6,135.42', VS: 33' 12:00 17:30 5.50 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,234' T 6,382'= 148' (AVE ROP: 27 FPH) GPM: 530, OFFON BTM PSI: 1,850 2,250, DIFF: 400, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 21-24 K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7.3K. PU 198K, SO: 188K, RTWT: 194 K 17:30 18:00 0.50 21INDR RIGMT SRVRIG P RIG SERVICE CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30' 18:00 0:00 6.00 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,382' T 6637'= 255'' (AVE ROP: 42 FPH) GPM: 530, OFFON BTM PSI: 1,810 2,350, DIFF: 4-540, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 24-40 K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7.3K. PU 197K, SO: 188K, RTWT: 194 K INSTRUCTED TO INCREASE WOB F 21K TO 30-40K TO INCREASE ROP. Total Time 24.00 CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30' 3232015 9:51:48AM Page 2 of 3

OXY INC 03222015 Report No: 13 OPERATIONS - NEXT DAY From To eration Details 0:00 1:00 1.00 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,637' T 6,661'= 24'' (AVE ROP: 24 FPH) GPM: 530, OFFON BTM PSI: 1,810 2,350, DIFF: 4-540, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 24-40 K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7-9.8K. PU 197K, SO: 188K, RTWT: 194 K DRILLING AHEAD IN THE MIDDLE LEONARD WITH GOOD DIFFERENTIAL AND VARYING WOB F 30-40K TO OPTIMIZE ROP. ROP SLOWLY BEGAN TO TAPER OFF TO 0 FPH @ 6,661'. ATTEMPTED TO PICK UP AND RESTART BIT BUT UNABLE TO GET BACK TO BOTTOM (1' OFF BOTTOM) BEFORE THE BIT WOULD START TAKING WEIGHT. MAX DIFFERENTIAL ABLE TO OBTAIN WAS 60-180 PSI. CALLED ENGINEER & FS. DECISION MADE TO TRIP BHA. CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30' 1:00 2:00 1.00 21INDR CIRC CNDHOL P CIRCULATE 20 BBL HI VIS SWEEP AROUND. BUILD SLUG WHILE CIRCULATING. JSA WITH RIG CREW AND REVIEWED TRIPPING OPERATIONS, WORKING AT HEIGHTS AND LOOK UP TO LIVE. PERFORMED FLOW CHECK. NO FLOW. 2:00 4:00 2.00 21INDR TRIP DRILL P TRIP OUT OF THE HOLE WITH BHA #4 F 6,661' - 1,300'. MONITOR RETURNS ON TRIP TANKS. FLOW CHECK @ HWDP (1,373'). NO FLOW. CONTINUE TOH F 1,374' T 130'. 4:00 6:00 2.00 21INDR P HANDLE BHA #4 - HOLD PJSM WITH RIG CREW, PATHFINDER DIRECTIONAL HANDS, & Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. Other Remarks: N Days since Last RI: Days since Last LTA DSM ON LAYING OUT TOOLS BREAK & LAY OUT BIT #4,, MUD MTR & MWD PROBE. 432.50 Weather Comments: 432.50 VAQUERO UL #3221 From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (2.6 miles) turn right and follow road north to location (400 feet)! LIFE FLIGHT COORDINATES: LAT 30 47 57.36 LONG 102 41 35.92 NAD 27 FLIGHT FOR LIFE 888-624-3571 OXY DSM TRAILER: 832-900-7870 NOTIFICATIONS: NOTIFIED ISABEL WITH TRRC OF SPUD, CASING RUN & CEMENT (3132015 @ 10:00 HRS) JOB #3527 NOTIFIED BRENDA OPERATOR #13 WITH TRRC OF SURFACE CASING RUN & CEMENT (3142015 @ 08:00 HRS) JOB #3527 UNSAFE ACTS: 10 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA'S: 0 NEAR MISSES: 0 JSA'S: 16 SAFETY MEETINGS: 17 LOTO'S: 0 PERMITS TO WORK : 5 POWER LINE CHECKLIST: 31015 PRE SPUDRIG INSPECTION: 3132015 HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: REMOVED TRIP TANK LID TO OBSERVE FLOW FOR FLOW CHECK. COMPLETED FLOW CHECK AND DERRICKHAND WALKED OFF. STOPPED HIM AND HAD HIM COVER THE TRIP TANK TO MITIGATE THE HAZARD. CONTINUED TASK WITHOUT INCIDENT. 3232015 9:51:48AM Page 3 of 3

OXY INC 03232015 Report No: 14 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 7136 ft Progress: 6637 ft Rot Today: Avg ROP Today: 3RD BONE SPRING@6,957.0 CASINGWELL CONTROL Last Casing: 10.750in @ 842ft Next Casing: 7.625in @ 7,500ft Last BOP Press Test: 03162015 Form TestEMW: FIT 14.14 ppg Supervisor 1: Supervisor 2: Engineer: H&P 615 499 ft 1 hr 49.9 fthr DRILL 9 78" INTERMEDIATE INTERVAL TO TD. (7,521') DRILL T 6,661'. TOH TO CHANGE OUT BHA #4. MU 9 78" BHA #5. TIH & DRILL T 7,136'. RR(040115) ROL(040315) DRILL 9 78" VERTICAL INTERVAL. PERSONNEL EDDIE BOND SHAWN EICKERT JANICE CHIU Geologist: MICHELLE WRY Oxy Personnel: 3 Contractor Personnel 17 Total on Site: 20 Size Manufacturer HOOKLOAD & TORQUE 197.0 189.0 kip 197.0 kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original KB @2,994.00ft 2,969.00 ft 9,500.0 18.0 days 1195567#0102 DFS: Daily Cost: Cum Cost: AFE Cost: 9.97 $72,116 $1,188,293 $2,000,000 Lithology: 45% SHALE, 55% LIMESTONE 3,700.0 ft-lbf 7,800.0 ft-lbf HYDRAULICS 529.5 Pump Rate: Pump Press: 2445 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: 14 15 0 0 12 16 MD Incl Azi TVD N-S E-W VS DLS Build 6,984.0 2.81 58.95 6,983.12-26.1-5.9-26.1 0.49 0.47 6,701.0 1.49 70.52 6,700.32-31.0-15.3-31.0 0.78 0.15 6,418.0 1.06 311.51 6,417.36-33.9-16.8-33.9 0.89-0.25 6,136.0 1.76 186.56 6,135.41-31.3-14.4-31.3 1.28-1.19 6,040.0 2.90 197.91 6,039.49-27.6-13.5-27.6 0.76-0.67 5,947.0 3.52 203.97 5,946.63-22.7-11.6-22.7 0.84 0.84 Serial No BIT RECORD IADC 1 9.875 ULTERRA DRILLING T U716M 26449 M323 4x15, 3x14 6661 - - - - Nozzles MD In MD Out I-O-D-L B-G-O-R 4 9.875 SMITH MSI713HUPX JJ9852 M323 2x13, 8x12 5032 6621 8-2-CR-N X-1-WT-PR BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI 1 9.00 9.00 499 499 55.4 55.4 20.030.0 4045 1.141 184 148.9 0.7 4 1.00 47.00 24 1629 24.0 34.7 21.040.0 3550 1.143 184 148.7 0.7 MUD DATA - NOV FluidControl Engineer: George Daily MBT: Sample From: PIT ph: Mud : Time MD: Cut Brine 19:41 6,660.0 Pm Pom: Pf Mf: Density @ Temp: Rheology Temp: 9.30 0 90 Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: 3 5 6 4 4 5 1.0 2.25 7.20 0.0 92.8 Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 5.00 VG Meter:?@6 11@300 16@600 Comments: MUD PRODUCTS Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: <div>6946 ft at time of report and drlg ahead. 6660 ft this morning made trip for new bit. Changed out bit and mud motor. No problem 0.0 lbmbbl 10.5 0.90 0.4 0.7 38,000 2,000 Product Number of Units Qty Used Units Barite 1.00 each 0.55 NOV Salt Gel 1.00 each 5 Soap Stick 1.00 each 1 StarDrill NP 110 1.00 each 1.00 LAST OR CURRENT BHA BHA No: 5 : 1 MD In: 6661 ft Purpose: DRILL 9 78" VERTICAL INTERVAL MD Out: Component OD ID Jts Length HWDP 4.500 2.750 24 728.73 DRILL COLLAR 6.500 3.250 15 454.67 CROSSOVER 6.813 2.250 1 3.47 0.13 NON-MAG SPIRAL DRILL COLLAR STRING STABILIZER 6.688 6.875 3.250 2.813 1 1 29.90 6.61 NON-MAG SPIRAL DRILL COLLAR 6.688 3.250 1 29.78 9.36 MULESHOE SUB 6.750 3.250 1 3.32 FLOAT SUB 6.875 2.813 1 2.96 STRING STABILIZER 6.875 2.813 1 5.99 0.0 0.0 STEERABLE MOTOR PDC BIT 6.625 9.875 5.500 3.000 1 1 25.70 1.12 $731 $20,357 Total Length: 1,292.25 ft Wt below Jars: 0.0 kip 3242015 9:27:32AM Page 1 of 3

OXY INC 03232015 Report No: 14 OPERATIONS From To eration Details 0:00 1:00 1.00 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,637' T 6,661'= 24' (AVE ROP: 24 FPH) GPM: 530, OFFON BTM PSI: 1,810 2,350, DIFF: 4-540, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 24-40 K, OFF BTM TORQ: 3.2K, ON BTM TORQ: 7-9.8K. PU 197K, SO: 188K, RTWT: 194 K DRILLING AHEAD IN THE MIDDLE LEONARD WITH GOOD DIFFERENTIAL AND VARYING WOB F 30-40K TO OPTIMIZE ROP. ROP SLOWLY BEGAN TO TAPER OFF TO 0 FPH @ 6,661'. ATTEMPTED TO PICK UP AND RESTART BIT BUT UNABLE TO GET BACK TO BOTTOM (1' OFF BOTTOM) BEFORE THE BIT WOULD START TAKING WEIGHT. MAX DIFFERENTIAL ABLE TO OBTAIN WAS 60-180 PSI. CALLED ENGINEER & FS. DECISION MADE TO TRIP BHA. CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30' 1:00 2:00 1.00 21INDR CIRC CNDHOL PT CIRCULATE 20 BBL HI VIS SWEEP AROUND. BUILD SLUG WHILE CIRCULATING. JSA WITH RIG CREW AND REVIEWED TRIPPING OPERATIONS, WORKING AT HEIGHTS AND LOOK UP TO LIVE. PERFORMED FLOW CHECK. NO FLOW. 2:00 4:00 2.00 21INDR TRIP DRILL PT TRIP OUT OF THE HOLE WITH BHA #4 F 6,661' - 1,300'. MONITOR RETURNS ON TRIP TANKS. FLOW CHECK @ HWDP (1,373'). NO FLOW. CONTINUE TOH F 1,374' T 130'. 4:00 6:00 2.00 21INDR TRIP BHA PT HANDLE BHA #4 - HOLD PJSM WITH RIG CREW, PATHFINDER DIRECTIONAL HANDS, & DSM ON LAYING OUT TOOLS BREAK & LAY OUT BIT #4, MUD MTR & MWD PROBE BIT # 4 GRADED AS FOLLOWS: 8-2-CR-N-X-116-WT-PR 6:00 6:30 0.50 21INDR SAFE PJSM PT PJSM WITH RIG CREW, PATHFINDER HANDS & DSM ON HANDLING DIRECTIONAL TOOLS 6:30 7:30 1.00 21INDR TRIP BHA PT FINISH HANDLE BHA-LAY DOWN MUD MTR # 4 - CHANGE OUT BATTERY ON MWD RIG CREW CLEAN RIG FLOOR & PREP TO TRIP IN PJSM WITH RIG CREW, DIRECTIONAL, & DSM ON PICK UP BHABIT # 5 7:30 10:00 2.50 21INDR TRIP BHA PT MAKE UP 9 78" INTERMEDIATE BHA #5 AS FOLLOWS: 1. 9 78 ULTERA U716M W 3 x 14'S & 4 x 15'S FOR JETS TFA: 1.138 SN: 26449 (BIT #5, RUN #1) 2. SLB 6.75" G2 78 5.0 MUD MOTOR (REVGAL: 0.28) ORIENT & SCRIBE MTR W MWD - WITNESSED BY DSM 3. 9 58" STABILIZER (14" UNDER GAUGE) 4. FLOAT SUB 5. MULESHOE 6. NMDC W MWD 11. 9 58" NM STABILIZER (14" UNDER GAUGE) 12. 6 34" NMDC 13. CROSS OVER 14. (15) 6 12" DC 15. (24) 4.5" HWDP ***NOTE*** SURFACE TEST MWDMTR W NO BIT- GOOD TEST 10:00 13:00 3.00 21INDR TRIP DRILL PT TRIP IN FROM DIRECTIONAL TOOLS TO 6006' MONITOR WELL ON TRIP TANK - HAD CORRECT MUD GAIN FOR PIPE DISPLACEMENT HOLE CONDITION: SLICK TOOK CHECK SHOTS WITH MWD @ 842', 2014', 4024', & 6002' - ALL CHECK GOOD 13:00 13:30 0.50 21INDR SRFEQ RIGUP PT REVIEW JSA'S - REMOVE TRIP NIPPLE & INSTALL ROTATING HEAD 13:30 14:00 0.50 21INDR TRIP DRILL PT FINISH TRIP IN F 6006' TO 6571' HAD CORRECT MUD GAIN & HOLE SLICK 14:00 14:30 0.50 21INDR REAM PRRM PT FILL PIPE & TAKE LAST CHECK SHOT W MWD WASHREAM FROM 6571' TO 6660' AS PRECATION DRILL CONE LEFT FROM CORED BIT W 1 TO 2 K ON BIT 3242015 9:27:32AM Page 2 of 3

OXY INC 03232015 Report No: 14 From To eration Details 14:30 17:30 3.00 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,661' T 6,790'= 129' (AVE ROP: 43 FPH) GPM: 530, OFFON BTM PSI: 1,860 2,350, DIFF: 490, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 20-30 K, OFF BTM TORQ: 3.7K, ON BTM TORQ: 9.0K. PU 207K, SO: 195K, RTWT: 204 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30 17:30 18:00 0.50 21INDR RIGMT SRVRIG P RIG SERVICE. - SURVEY DEPTH: 6,701', INC: 1.49 DEG, AZM: 70.52 TVD: 6700' 18:00 0:00 6.00 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 6,790' T 7,136'= 346' (AVE ROP: 58 FPH) GPM: 530, OFFON BTM PSI: 1,910 2,445, DIFF: 535, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 26 K, OFF BTM TORQ: 3.7K, ON BTM TORQ: 9.9K. PU 209K, SO: 200K, RTWT: 203 K PERFORM DRILL OFF TEST IN NEW FORMATION "LOWER LEONARD". FOUND WOB: 26K, SRPM: 45 TO PRODUCE LOWEST CONSISTENT MSE RESULTS. CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10, VIS: 30 Total Time 24.00 - SURVEY DEPTH: 6,984', INC: 2.81 DEG, AZM: 58.95 TVD: 6,983' OPERATIONS - NEXT DAY From To eration Details 0:00 6:00 6.00 21INDR DRILL P DRILL 9 78" INTERMEDIATE HOLE F 7,136' T 7,521' TD= 385' (AVE ROP: 64 FPH) GPM: 530, OFFON BTM PSI: 1,910 2,445, DIFF: 535, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 26 K, OFF BTM TORQ: 3.7K, ON BTM TORQ: 9.9K. PU 209K, SO: 200K, RTWT: 203 K Total Time 6.00 Safety Incident? N Environ Incident? Incident Comments: No incidents reported last 24 hours. Other Remarks: N Days since Last RI: Days since Last LTA CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10.5, VIS: 30 433.50 Weather Comments: 433.50 VAQUERO UL #3221 From Fort Stockton, Texas (Interstate 10 & FM 1053) go east on Interstate 10 for 12.4 miles (Exit #272), then go south on University Road (2.2 Miles) the road will jog left for (5 tenths) of a mile then turn back south and go (3.4 miles) turn right and go West (2.6 miles) turn right and follow road north to location (400 feet)! LIFE FLIGHT COORDINATES: LAT 30 47 57.36 LONG 102 41 35.92 NAD 27 FLIGHT FOR LIFE 888-624-3571 OXY DSM TRAILER: 832-900-7870 NOTIFICATIONS: NOTIFIED ISABEL WITH TRRC OF SPUD, CASING RUN & CEMENT (3132015 @ 10:00 HRS) JOB #3527 NOTIFIED BRENDA OPERATOR #13 WITH TRRC OF SURFACE CASING RUN & CEMENT (3142015 @ 08:00 HRS) JOB #3527 UNSAFE ACTS: 10 SAFE ACTS: 0 UNSAFE EQUIPMENT: 0 SWA'S: 0 NEAR MISSES: 0 JSA'S: 20 SAFETY MEETINGS: 22 LOTO'S: 1 PERMITS TO WORK : 9 POWER LINE CHECKLIST: 31015 PRE SPUDRIG INSPECTION: 3132015 HAZARD ID'S: 0 EP2 OBSERVATIONS: 0 BEST STOP CARD: CREW MEMBER WAS IN HAMMER SWING PLANE WHILE MAKING UP A HOSE. STOPPED JOB AND MADE CREW MEMBER AWARE AND TO MOVE. JOB FINISHED WITHOUT INCIDENT. 3242015 9:27:32AM Page 3 of 3

OXY INC 03242015 Report No: 15 Wellbore Top MD: Today's MD: Prev MD: PBMD: Current Formation Current s: 24-Hr Summary: 24-Hr Forecast: 00 @ 0 ft Rig: 7521 ft Progress: 7136 ft Rot Today: Avg ROP Today: 3RD BONE SPRING@6,957.0 CASINGWELL CONTROL Last Casing: 10.750in @ 842ft Next Casing: 7.625in @ 7,500ft Last BOP Press Test: 03162015 Form TestEMW: FIT 14.14 ppg Supervisor 1: Supervisor 2: Engineer: H&P 615 385 ft 6.00 hr 64.2 fthr Ref Datum: Ground Elev: AFE MDDays: AFE Number: Original KB @2,994.00ft 2,969.00 ft 9,500.0 18.0 days 1195567#0102 DFS: Daily Cost: Cum Cost: AFE Cost: 10.97 $97,666 $1,277,110 $2,000,000 Lithology: 30% SHALE & 70% LIMESTONE @ 7,521'. RIH W 7 58" CASING T 2,400'. DRILL 9 78" INTERMEDIATE TO TD (7,521'). TOH LAYING DOWN DP, DC'S, BHA. PULL WEAR BUSHING. RR(040115) ROL(040315) RU CASING CREW. RIH W 7" & 7 58" CASING. CEMENT SAME. PSI TEST CSG. MU BHA #6. PERSONNEL EDDIE BOND SHAWN EICKERT JANICE CHIU Geologist: MICHELLE WRY Oxy Personnel: 2 Contractor Personnel 17 Total on Site: 19 Size Manufacturer HOOKLOAD & TORQUE 214.0 200.0 kip 216.0 kip Str Wt UpDn: Str Wt Rot: Torq Off Btm: Torq On Btm: Model 3,500.0 ft-lbf 9,900.0 ft-lbf HYDRAULICS 529.5 Pump Rate: Pump Press: 2450 SURVEY DATA (LAST 6) MUD GAS Avg Max Conn: Trip: Backgr: 42 55 40 49 0 0 MD Incl Azi TVD N-S E-W VS DLS Build 7,455.0 2.90 346.53 7,453.43-4.6-1.6-4.6 0.56-0.29 7,362.0 3.17 355.02 7,360.56-9.4-0.8-9.4 0.63-0.47 7,268.0 3.61 1.70 7,266.73-15.0-0.7-15.0 1.11 0.28 6,984.0 2.81 58.95 6,983.11-27.5-6.9-27.5 0.49 0.47 6,701.0 1.49 70.52 6,700.31-32.3-16.3-32.3 0.78 0.15 6,418.0 1.06 311.51 6,417.35-35.3-17.8-35.3 0.89-0.25 Serial No BIT RECORD IADC 5 9.875 ULTERRA DRILLING T U716M 26449 M323 4x15, 3x14 6661 7521 1-1-CT-S X-I-NO-TD Nozzles MD In MD Out I-O-D-L B-G-O-R 4 9.875 SMITH MSI713HUPX JJ9852 M323 2x13, 8x12 5032 6621 8-2-CR-N X-1-WT-PR BIT OPERATING PARAMETERS TODAY Rot Cum Rot Prog Cum Prog ROP Cum ROP WOB minmax RPM minmax TFA P Drop z Vel HHPSI 5 6.00 15.00 385 884 64.2 58.9 20.030.0 4045 1.141 184 148.9 0.7 MUD DATA - NOV Engineer: George Daily MBT: Sample From: PIT ph: Mud : Time MD: Cut Brine 18:54 7,521.0 Pm Pom: Pf Mf: Density @ Temp: Rheology Temp: Viscosity: PV YP: Gels 10s10m30m: API WL: HTHP WL: Cake API HTHP: Solids Sol Corr: Oil Water: Oil Water % for OWR: Sand: Water Added: Oil Added: LGS: 9.35 0 90 3 4 5 3 3 3 1.0 2.48 7.50 0.0 92.5 5.00 Chlorides: Ca++ K+: CaCl2: Cl- in water phase: Lime: ES: ECD: n K: Carbonate: Bicarbonate: Form Loss Cum Loss Fluid Disch: Daily Mud Cost: Cum Mud Cost: VG Meter:?@6 9@300 13@600 Comments: <div>td the intermediate section @ 7521 ft. At TD we ran 2 high vis sweeps and circ bottoms up to ensure clean hole. TOOH laying MUD PRODUCTS 0.0 lbmbbl 10.5 0.80 0.4 0.7 42,000 2,000 0.11 0.0 0.0 $587 $20,943 Product Number of Units Qty Used Units Lime 1.00 each 2.00 NOV Salt Gel 1.00 each 5 Soda Ash 1.00 each 3.00 StarDrill NP 110 1.00 each 1.00 LAST OR CURRENT BHA BHA No: 5 : 5 MD In: 6661 ft Purpose: DRILL 9 78" VERTICAL INTERVAL MD Out: 7521 ft Component OD ID Jts Length HWDP 4.500 2.750 24 728.73 DRILL COLLAR 6.500 3.250 15 454.67 CROSSOVER 6.813 2.250 1 3.47 NON-MAG SPIRAL DRILL COLLAR 6.688 3.250 1 29.90 STRING STABILIZER 6.875 2.813 1 6.61 NON-MAG SPIRAL DRILL COLLAR 6.688 3.250 1 29.78 MULESHOE SUB 6.750 3.250 1 3.32 FLOAT SUB 6.875 2.813 1 2.96 STRING STABILIZER 6.875 2.813 1 5.99 STEERABLE MOTOR 6.625 5.500 1 25.70 PDC BIT 9.875 3.000 1 1.12 Total Length: 1,292.25 ft Wt below Jars: 0.0 kip 3252015 9:57:06AM Page 1 of 4

OXY INC 03242015 Report No: 15 OPERATIONS From To eration Details 0:00 6:00 6.00 21INDR DRILL MTRVER P DRILL 9 78" INTERMEDIATE HOLE F 7,136' T 7,521' TD= 385' (AVE ROP: 64 FPH) GPM: 530, OFFON BTM PSI: 1,910 2,445, DIFF: 535, SRPM: 50 + MRPM: 154 = BRPM 204, WOB: 26 K, OFF BTM TORQ: 3.7K, ON BTM TORQ: 9.9K. PU 209K, SO: 200K, RTWT: 203 K CIRCULATING INNER BRINE RESERVE PIT CURRENT MW 9.2 PPG, PH: 10.5, VIS: 30 CLOSE IN SYSTEM TO MUD PITS @ 05:30 HRS 6:00 7:00 1.00 21INDR CIRC CNDHOL P CIRCCOND WELL FOR RUNNING INTERMEDIATE CSG - CIRC HI VIS SWEEP W NUT 7:00 7:30 0.50 21INDR WLCNTL CHKFLOW P CHECK FOR FLOW - WELL STATIC PLUG FOR HOLE CALIPER SURFACE TO SURFACE CALCULATED = 7231 STKS SWEEP @ SHAKERS = 9550 STKS WASH OUT 32 % 7:30 8:00 0.50 21INDR CIRC CNDHOL P CIRCCOND WELL FOR RUNNING INTERMEDIATE CSG - 2ND BTMS UP PUMP SLUG 8:00 8:30 0.50 21INDR TRIP DRILL P TRIP OUT FROM 7521' TO 6571' RACKING BACK PIPE IN DERRICK WELL TAKING PROPER FILL FOR PIPE DISPLACEMENT HOLE CONDITION: SLICK 8:30 14:00 5.50 21INDR TRIP PULD P CONTINUE TRIPPING OUT FROM 6571' TO 2355' LAYING DOWN 4 12" DRILL PIPE WELL TAKING PROPER FILL HOLE CONDITION: SLICK NOTE: CSG CREW ARRIVED ON LOCATION *NOTIFIED TRRC OF CASING & CEMENTING OF INTERMEDIATE CASING. SPOKE WITH ROSA @ 08:30 HRS. 14:00 14:30 0.50 21INDR SRFEQ RIGUP P REVIEW JSA'S - REMOVE ROTATING HEAD & INSTALL TRIP NIPPLE 14:30 15:30 1.00 21INDR TRIP PULD P CONTINUE TRIPPING OUT FROM 2355' TO 1292 LAYING DOWN 4 12" DRILL PIPE WELL TAKING PROPER FILL & HOLE SLICK 15:30 16:00 0.50 21INDR TRIP DRILL P TRIP IN HOLE FROM 1292' TO 2235' WITH STANDS FROM DERRICK HAD PROPER MUD GAIN FOR PIPE DISPLACEMENT AND CAPACITY 16:00 21:00 5.00 21INDR TRIP PULD P CONTINUE TRIPPING OUT FROM 2235' TO 108' LAYING DOWN 4 12" DRILL PIPE, 4 12" HWDP, & 6 12" DCS. NOTE: PIPE TIGHT. HAD TO WARM BOXES UP WITH HAMMER. WELL TAKING PROPER FILL HOLE CONDITION: SLICK 21:00 23:00 2.00 21INDR TRIP DRILL P HANDLE BHA #5 - HOLD PJSM WITH RIG CREW, PATHFINDER DIRECTIONAL HANDS, & DSM ON LAYING OUT TOOLS BREAK & LAY OUT BIT #5, MUD MTR & MWD PROBE. NO SQUAT IN MOTOR. BIT # 5 GRADED AS FOLLOWS: 1-1-CT-S-X-I-NO-TD 23:00 23:30 0.50 21INDR TRIP BHA P CLEAN RIG FLOOR. LAY DOWN ALL 4.5" HANDLING TOOLS OFF FLOOR. 23:30 0:00 0.50 21INDR SRFEQ RIGUP P PULL WEAR BUSHING. Total Time 24.00 3252015 9:57:06AM Page 2 of 4