ANNUAL UST SYSTEM INSPECTION CHECKLIST

Similar documents
PEI/RP Recommended Practices for the Inspection and Maintenance of UST Systems

Underground Storage Tank Annual Compliance Inspection (Revised 1/2015)

North Carolina Department of Environment and Natural Resources Division of Waste Management Underground Storage Tank Section

Monthly Walkthrough Inspections

6. Tanks - Leak Detection. NCDENR Division of Waste Management Underground Storage Tank Section

New UST Installation Inspection Checklist

FINAL UNDERGROUND STORAGE TANK RULE CHANGES. Heather Peters UST Compliance and Technology Unit

Lorri Grainawi Steel Tank Institute. PA NISTM April 25, 2013 Harrisburg, PA

Understanding the Colorado Annual Compliance Package. William Holman & Robert Schlegel Inspectors Division of Oil and Public Safety

(Please type or use black ink)

CONTRACTOR S SELF-INSPECTION CHECKLIST for UST INSTALLATION REPLACEMENT UPGRADE RETROFIT REPAIR

7. UST Piping Corrosion Protection. NCDENR Division of Waste Management Underground Storage Tank Section

Underground Oil Storage Tanks Annual Inspection Report

Inspector's Initials: Tank Owner or Agent Signature: Title: Date:

County of Yolo UNDERGROUND STORAGE TANK PROGRAM INSTALLATION/MODIFICATION/REPAIR APPLICATION

UST Compliance Assistance Handbook

Overview of an Underground Storage Tank Inspection

NCDEQ Underground Storage Tank Section

General information about underground storage tank (UST) fueling systems in every day language.

P.O. Box 435 Saratoga Springs, NY 12866

Changes to Chapter , Florida Administrative Code Underground Storage Tank Systems (USTs) Effective 1/11/2017

This handbook is provided as a general guide. assistance/content/storage-tank-compliance

PEI/RP Recommended Practices for Installation of Bulk Storage Plants

Operational Compliance Closure/Release Response/Corrective Action at Underground Storage Tank Facilities

UST General Requirements Inspection Checklist

Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities

Mark S. Morgan, Regulatory Counsel

Operating And Maintaining Underground Storage Tank Systems UPDATED Practical Help And Checklists. Printed on Recycled Paper

Frequent Mishaps and Solutions with Regulated Underground Storage Tanks in Pennsylvania

BUREAU OF UNDERGROUND STORAGE TANK REGULATIONS RELEASE PREVENTION SECTION

DEFENDER SERIES. 5 Gallon, Double Walled, Field Replaceable Spill Container Model Series INSTALLATION, OPERATION, & MAINTENANCE

New Regs Get Ready for Containment Testing if You Haven t Done So Already!

OKLAHOMA CORPORATION COMMISSION PETROLEUM STORAGE TANK DIVISION THE ABC S OF AST S AN OVERVIEW OF ABOVEGROUND STORAGE TANK REQUIREMENTS

YOUR PETROLEUM STORAGE TANK FACILITY INSPECTION GUIDE

Compliance Strategies and Benefits. Brian Derge Tanknology Inc. December 6, 2012

FACTS ABOUT: MARYLAND CONTAINMENT SUMP TESTING PROTOCOL WHO CAN PERFORM THE TEST

How a UST Site May Become Contaminated -- Even When The Leak Detection is Passing

Application for Permit to Install Underground Storage Tanks (Petroleum or Hazardous Substances) 1. Owner Information 2. Installation Site Information

UNDERGROUND STORAGE TANK INSPECTION CHECKLIST

Management of Underground Storage Tanks

Changes to EPA s AST & UST Rules. Mott-Smith Consulting Group, LLC

UST Inspector Reference Handbook

CONTENTS. Foreword...iii. 1. Introduction...1

EPA UST Regulations Update May 22, 2018

OKLAHOMA CORPORATION COMMISSION PETROLEUM STORAGE TANK DIVISION THE ABC S OF UST S AN OVERVIEW OF UNDERGROUND STORAGE TANK REQUIREMENTS

Pennsylvania DEP: Maintaining UST Compliance and Regulation Updates. NISTM 8 th Annual Pennsylvania Storage Tank Conference May 18, 2017

YOUR PETROLEUM STORAGE TANK FACILITY INSPECTION GUIDE

Test Date: 3/30/2018 Order Number: Dear Regulator, Enclosed are the results of recent testing performed at the following facility:

New Tank Installations. Peter Rollo

INTEGRITY TESTING OF CONTAINMENT SUMPS AND SPILL BUCKETS PEI RP1200

Changes to EPA s AST & UST Rules. Mott-Smith Consulting Group, LLC

Questions And Answers About The 2015 Underground Storage Tank Regulation As Of May 2017

Provide the following information: Site Address: City: Zip: Project Contact Name: Phone No.: ( ) ext.

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations

Petroleum Storage Tank Release Detection and Inventory Control

Operating And Maintaining Underground Storage Tank Systems. Practical Help And Checklists. Printed on Recycled Paper

Operating And Maintaining Underground Storage Tank Systems. Practical Help And Checklists. Printed on Recycled Paper

Form UST FP-290 Notification for Underground Storage Tanks Regulated Under 527 CMR 9.00

UNDERGROUND STORAGE TANK (UST) INSTALLATION & MAINTENANCE

Semiannual Report Of UST Performance Measures End Of Fiscal Year 2018 (October 1, 2017 September 30, 2018)

INSTALLATION INSTRUCTIONS B-375-D Fiberglass DoubleWall Spill Bucket

Underground Storage Tank. City of Burbank UST Owners & Operators

Compliance Strategies and Benefits

LOW LEVEL SUMP TESTING ORIGINS

THE KEY RELATIONSHIPS BETWEEN FIRE CODES, NEW YORK AST REGULATIONS AND SPCC PLANS

Dispenser Containment Manual. Product Manual * Publication Number: DCM-0001 * Issue Date: 05/27/09 Supercedes: 11/01/07

Release Detection Challenges for High Throughput Facilities

Phase-Two Water Detector

New UST Regulations. What follows are the changes to EPA s regulations that TMS believes impacts you, the owner/operator, the most.

DEFENDER SERIES BELOW GRADE DOUBLE WALL SPILL CONTAINER INSTALLATION GUIDE

Environment Canada (EC) Storage Tank System Identification Form

ADDENDUM NO. #1 ITB # FLORIDA A&M UNIVERSITY (FAMU) FUEL STORAGE TANK INSPECTIONS December 8, 2017

Syracuse University Petroleum Bulk Storage Tank Program Manual

BENNETT CNG DISPENSER MAINTENANCE SCHEDULE

NYSDEC PBS REGULATIONS Heating Oil Tanks

B2. Fueling Operations

EQUIPMENT PERFORMANCE SPILL PREVENTION AND PIPING KEVIN HENDERSON

Code Requirements for ASTs at Motor Vehicle-Dispensing Stations

2018 UST Regulation Revision Comment Worksheet

LEAK DETECTION INTERSTITIAL MONITORING

Notification for Underground Storage Tanks

NEIWPCC-Defender Spill Containment. Interstice Monitoring-Testing - Maintenance

DEFENDER SERIES. 5 Gallon, Single Walled, Field Replaceable Spill Container Fiberglass Model Series INSTALLATION, OPERATION, & MAINTENANCE

Leak Detection for Petroleum UST and Piping

RULE 448 GASOLINE TRANSFER INTO STATIONARY STORAGE CONTAINERS Adopted (Amended , , , , , ) INDEX

INSTALLATION INSTRUCTIONS

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

VEEDER-ROOT COMPANY. Product Knowledge Session. Understanding Line Leak Detection Methods / Test Type / Certifying

South Tacoma Groundwater Protection District Spill Prevention and Response Plan

Overview of Revisions to the Federal Underground Storage Tank (UST) Regulations. Storage Tank Advisory Committee Harrisburg, PA September 1, 2015

ECM environmental compliance monitoring, inc. 1

Preventing Leaks and Spills at Service Stations. A Guide for Facilities

Why Are You Here? Why Are You Here? The DENR Mission. South Dakota UST Operator Instructional Course Class A/B Operator. EPA/DENR Goals: Your Goals:

Environmental Regulations and Codes For Underground Tank Storage of Flammable & Combustible Liquids

Focus on the engineering & permitting requirements for installing a new fuel facility at the Port of Olympia;

NYSDEC CBS Compliance Requirements

Code Requirements on Aboveground Storage Tanks Dispensing Fuels At Motor Vehicle Fuel-Dispensing Stations

Background. AEM Tier 2 Worksheet Petroleum and Oil Product Storage. Glossary. Agricultural Water Quality Principle:

NEW JERSEY SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM. New Jersey Fuel Dispensing Facilities Compliance Calendar

SECTION FUEL-OIL DISTRIBUTION (APPLIES TO FUEL TANKS FOR GENERATORS)

Transcription:

APPENDIX A-3: SAMPLE FORM FOR ANNUAL UNDERGROUND STORAGE SYSTEM INSPECTION CHECKLIST Page 1 ANNUAL UST SYSTEM INSPECTION CHECKLIST Facility ID# Facility Name/Address Qualified Technician Signature Date If any problem is found, contact: Contact information: Monthly Inspections Complete monthly checklist and compare to previously completed monthly checklists 8.4.1 Monthly inspections reviewed and found adequate 8.4.2 ATG Manhole 8.8 Cap in good condition, seals tightly, hole sealed where probe wire goes through 8.8.1 Wire splices sealed and wire in good condition 8.8.2 Junction box has cover, not corroded; intrinsically safe wiring in good condition 8.8.3 ATG Manhole No exposed wires 8.8.4 Probe and floats in good condition, both floats present and move freely (mag probe) TEST DATE: 8.8.5 Verify functionality of ATG probe TEST DATE: 8.8.6 Manhole cover in good condition 8.8.7 Adequate clearance between ATG grade-level cover and below-grade components 8.8.8 Fill Area 8.9 Drop Tube Drop tube extends to within 6 inches of the tank bottom (if no flow diffuser present) 8.9.1 Vapor Recovery Adaptor Spill Containment Manhole Spill Containment Manhole Poppet of Stage I vapor recovery adaptor (also known as a dry break ) moves freely, seals tightly Single-walled spill containment manhole tightness tested within last 3 years Double-walled spill containment manhole tightness tested within last 3 years OR inspected monthly 8.9.2 TEST DATE: 8.9.3 TEST DATE: 8.9.4 Overfill Prevention 8.10 Drop Tube Shutoff (Flapper Valve) Drop tube shutoff valve passes inspection EVALUATION DATE: 8.10.1.1 For drop tube shutoff valves in diesel tanks, excessive corrosion not present 8.10.1.2 PEI RP 900 Annual Inspection Checklist Page of

APPENDIX A-3: SAMPLE FORM FOR ANNUAL UNDERGROUND STORAGE SYSTEM INSPECTION CHECKLIST Page 2 Ball float can be removed and inspected 8.10.2.1 Ball Float Valve Ball float valve passes inspection EVALUATION DATE: 8.10.2.2 For ball float valves in diesel tanks, excessive corrosion not present 8.10.2.3 Overfill Alarm Overfill alarm passes inspection EVALUATION DATE: 8.10.3.1 Leak Detection 8.11 ATG passes annual inspection EVALUATION DATE: 8.11.1.1 Console has no active warnings or alarms 8.11.1.2 ATG Console Electronic Leak Detection Monitor Line Tightness Testing Alarm history shows no recurring leak alarms 8.11.1.3 Verify in-tank leak detection tests are being completed (if used for leak detection) 8.11.1.4 Verify correct set-up parameters for electronic line leak detector (if present) VERIFICATION DATE: 8.11.1.5 Verify piping leak detection tests are being completed (if used for leak detection) 8.11.1.6 Leak monitoring console is operational and has no active warnings or alarms 8.11.2.1 If pressurized piping has been tested in the last year, review the results and verify that the test passed If suction piping has been tested within the last 3 years, review the results and verify that the test passed TEST DATE: 8.11.3.1 TEST DATE: 8.11.3.2 ELLD has conducted a 0.1 gph test in the last year TEST DATE: 8.11.3.3 Under Pump Check Valve (Suction Pump) Below-grade piping operates at less than atmospheric pressure 8.11.4.1 Below-grade piping slopes continuously back to the tank 8.11.4.2 There is only one check valve, and it is located as close as practicable to the suction pump 8.11.4.3 Tank Tightness Testing Statistical Inventory Reconciliation (SIR) Tank is 10 years old or less 8.11.5.1 If a tank test has been conducted within the last 5 years, review the results and verify that the test passed TEST DATE: 8.11.5.2 SIR results for the previous 12 months are "pass" 8.11.6.1 PEI RP 900 Annual Inspection Checklist Page of

APPENDIX A-3: SAMPLE FORM FOR ANNUAL UNDERGROUND STORAGE SYSTEM INSPECTION CHECKLIST Page 3 Continuous Soil Vapor Monitoring Continuous Groundwater Monitoring Sensing device tested TEST DATE: 8.11.7.1 Sensing device tested TEST DATE: 8.11.8.1 Corrosion Protection 8.12 Galvanic Cathodic Protection Impressed Current Cathodic Protection Verify that cathodic protection testing of all metallic components in contact with soil or water has been conducted within the past 3 years and the test passed TEST DATE: 8.12.1.1 Verify that cathodic protection testing has been conducted within the past 3 years and the test passed TEST DATE: 8.12.2.1 No exposed wires 8.12.2.2 Tank Lining Lining inspected as required and in good condition TEST DATE: 8.12.3.1 Miscellaneous Inspection Items 8.13 Tank Pad & Pavement Stage II Liquid Collection Points Concrete or asphalt over or near tanks is level, no significant cracks 8.13.1.1 Cap in good condition, fits tightly, little or no liquid in bottom 8.13.2.1 Verify that Stage I testing has been conducted and test results Stage I Testing TEST DATE: 8.13.3.1 are passing Verify that Stage II testing has been conducted and test Stage II Testing TEST DATE: 8.13.4.1 results are passing Site Diagram Site diagram accurately reflects the site conditions 8.13.5.1 Instructions: Mark each tank where no problem is observed with a checkmark: If certain equipment is not required and / or not present, mark checklist in the N/A column. If a defect is found, mark the checklist with an X, describe the problem in the DEFICIENCIES section, and notify the appropriate person. Refer to the section listed in the PEI/RP900 column for additional information. Refer to PEI RP500, Recommended Practices for Inspection and Maintenance of Motor Fuel Dispensing Equipment, for inspection procedures that apply to fuel dispensing equipment. PEI RP 900 Annual Inspection Checklist Page of

APPENDIX A-3: SAMPLE FORM FOR ANNUAL STP INSPECTION CHECKLIST Page 1 ID#: ANNUAL STP INSPECTION CHECKLIST Date: Submersible Turbine Pump (STP) Visible piping and fittings show no signs of leaking 8.6.1 Piping in good condition 8.6.2 Excessive corrosion not present 8.6.3 free of trash and debris 8.6.5 Junction box(es) have covers, not corroded; conduit and intrinsically safe wiring in good condition 8.6.8 All STP Flexible connectors not frayed, twisted, kinked or bent beyond manufacturer specifications 8.6.9 Mechanical line leak detector properly vented, vent tube not kinked or twisted, vent tube fittings intact and tightened Mechanical line leak detector passes 3.0 gallons per hour (gph) test 8.6.10 TEST DATE: 8.6.11 Electronic line leak detector (ELLD) passes 3.0 gph test TEST DATE: 8.6.12 ELLD passes 0.2 gph test TEST DATE: 8.6.13 STP: No Containment ELLD passes 0.1 gph test TEST DATE: 8.6.14 Manhole cover at grade in good condition, does not touch sump cover, all bolts present, handles and lift mechanism in good condition (as applicable) Submersible pump head, flex connector(s) and other metallic product piping are not in contact with soil or water or are cathodically protected Any water or product removed and disposed of properly 8.6.4 8.6.24 8.6.17 STP: In Containment is free of cracks, holes, bulges or other defects 8.6.6 Penetration fittings intact and secured 8.6.7 Piping interstitial space open to the STP sump (open double-walled piping system only) 8.6.20 Piping interstitial space closed to the STP sump (closed double-walled piping system only) 8.6.22 STP: In Containment lid, gasket and seals present and in good condition 8.6.23 Single-walled sump tested for integrity every 3 years TEST DATE: 8.6.18 PEI RP 900 Annual STP Inspection Checklist Page of

APPENDIX A-3: SAMPLE FORM FOR ANNUAL STP INSPECTION CHECKLIST Page 2 STP: In Containment If not continuously monitored or inspected annually, double-walled sump tightness tested every 3 years TEST DATE: 8.6.19 PEI RP 900 Annual STP Inspection Checklist Page of

APPENDIX A-3: SAMPLE FORM FOR ANNUAL DISPENSER INSPECTION CHECKLIST ID#: ANNUAL DISPENSER INSPECTION CHECKLIST Date: Category Description PEI/RP900 N/A Disp 1 Disp 2 Disp 3 Disp 4 Initial Fuel Dispenser Inspection 8.5 All Dispensers All dispenser components are clean and dry 8.5.1 If dispenser sump is present, sump is dry 8.5.2 Fuel Dispenser Inspection 8.6 Visible piping and fittings show no signs of leaking 8.6.1 Piping in good condition 8.6.2 Dispenser containment sump free of trash and debris 8.6.5 All Dispensers Junction box(es) have covers, not corroded; conduit and intrinsically safe wiring in good condition 8.6.8 Flexible connectors not frayed, twisted, kinked or bent beyond manufacturer specifications 8.6.9 Dispensers Without s Shear valves operate freely and close completely TEST DATE: 8.6.15 Stage II piping functional or else capped and sealed at an elevation lower than the fuel dispenser island Flex connectors and other metallic product piping are not in contact with soil or water or are cathodically protected Any water or product removed and disposed of properly 8.6.4 8.6.16 8.6.17 Dispensers With s Dispensers With s Dispensers With s free of cracks, holes, bulges, or other defects 8.6.6 Penetration fittings intact and secured 8.6.7 Piping interstitial space open to the dispenser sump or dispenser pan (open double-walled piping system only) 8.6.21 Piping interstitial space closed to the dispenser sump (closed double-walled piping system only) 8.6.22 Single-walled sump tested for integrity every 3 years TEST DATE: 8.6.18 If not continuously monitored or inspected annually, doublewalled sump tightness tested every 3 years TEST DATE: 8.6.19 PEI RP 900 Annual Dispenser Inspection Checklist Page of

APPENDIX A-3: SAMPLE FORM FOR ANNUAL LEAK DEVICE INSPECTION CHECKLIST ID#: ANNUAL LEAK DETECTION DEVICE INSPECTION CHECKLIST Date: Leak Detection Device. Describe location (e.g., interstitial, STP, fill, dispenser) on this row: 8.7 Liquid Sensor Sensor tested and functional TEST DATE: 8.7.1 Sensor properly mounted at the bottom of the containment sump or pan (containment sump or pan sensor only) Sensor properly mounted at the bottom of double-walled tank (double-walled tank sensor only) 8.7.4 8.7.3 Discriminating Sensor Sensor tested and functional TEST DATE: 8.7.1 Sensor properly mounted at the bottom of the containment sump or pan (containment sump or pan sensor only) Sensor properly mounted at the bottom of double-walled tank (double-walled tank sensor only) 8.7.4 8.7.3 Hydrostatic Sensor Sensor tested and functional TEST DATE: 8.7.1 Hydrostatic sensor properly positioned 8.7.5 Vacuum/Pressure Sensor Visually Monitored Dispenser Pan Float Mechanism Sensor tested and functional TEST DATE: 8.7.1 Alarm sounds when pressure or vacuum is released TEST DATE: 8.7.2 Entire interstitial space under pressure or vacuum (closed double-walled piping system only) TEST DATE: 8.7.7 Leak detection device is within recommended limits 8.7.6 Sensor tested and functional TEST DATE: 8.7.1 Dispenser pan float mechanism free to move and properly adjusted TEST DATE: 8.7.8 PEI RP 900 Annual Leak Detection Device Inspection Checklist Page of

APPENDIX A-3: SAMPLE FORM FOR ANNUAL FILL CONTAINMENT SUMP INSPECTION CHECKLIST ID#: ANNUAL FILL CONTAINMENT SUMP INSPECTION CHECKLIST Date: Fill 8.6 Any water or product removed and disposed of properly 8.6.4 Visible piping and fittings show no signs of leaking 8.6.1 Piping in good condition 8.6.2 Excessive corrosion not present 8.6.3 free of trash and debris 8.6.5 Fill Containment is free of cracks, holes, bulges or other defects 8.6.6 Penetration fittings intact and secured 8.6.7 Junction box(es) have covers, not corroded; conduit and intrinsically safe wiring in good condition Flexible connectors not frayed, twisted, kinked or bent beyond manufacturer specifications 8.6.9 8.6.8 Piping interstitial space open to the fill sump (open double-walled piping system only) 8.6.20 Piping interstitial space closed to the fill sump (closed double-walled piping system only) 8.6.22 Fill Fill lid, gasket and seals present and in good condition 8.6.23 Manhole cover at grade in good condition, does not touch sump cover, all bolts present, handles and lift mechanism in good condition (as applicable) 8.6.24 Single-walled sump tested for integrity every 3 years TEST DATE: 8.6.18 If not continuously monitored or inspected annually, double-walled sump tightness tested every 3 years TEST DATE: 8.6.19 PEI RP 900 Annual Fill Inspection Checklist Page of

APPENDIX A-3: SAMPLE FORM FOR ANNUAL TRANSITION SUMP INSPECTION CHECKLIST ID#: ANNUAL TRANSITION SUMP INSPECTION CHECKLIST Date: Transition 8.6 Any water or product removed and disposed of properly 8.6.4 Visible piping and fittings show no signs of leaking 8.6.1 Piping in good condition 8.6.2 free of trash and debris 8.6.5 is free of cracks, holes, bulges, or other defects 8.6.6 Transition Penetration fittings intact and secured 8.6.7 Junction box(es) have covers, not corroded; conduit and intrinsically safe wiring in good condition 8.6.8 Flexible connectors not frayed, twisted, kinked or bent beyond manufacturer specifications 8.6.9 Piping interstitial space open to the transition sump (open double-walled piping system only) 8.6.20 Piping interstitial space closed to the transition sump (closed double-walled piping system only) 8.6.22 lid, gasket and seals present and in good condition 8.6.23 Transition Transition Manhole cover at grade in good condition, does not touch sump cover, all bolts present, handles and lift mechanism in good condition (as applicable) 8.6.24 Single-walled sump tested for integrity every 3 years TEST DATE: 8.6.18 If not continuously monitored or inspected annually, double-walled sump tightness tested every 3 years TEST DATE: 8.6.19 PEI RP 900 Annual Transition Inspection Checklist Page of

APPENDIX A-3: SAMPLE FORM "OTHER" SUMP INSPECTION CHECKLIST ID#: ANNUAL OTHER SUMP INSPECTION CHECKLIST Date: Other. Describe location or function (e.g., suction piping, tank manhole) on this row: 8.6 Any water or product removed and disposed of properly 8.6.4 Visible piping and fittings show no signs of leaking 8.6.1 Piping in good condition 8.6.2 free of trash and debris 8.6.5 is free of cracks, holes, bulges, or other defects 8.6.6 Other Penetration fittings intact and secured 8.6.7 Junction box(es) have covers, not corroded; conduit and intrinsically safe wiring in good condition 8.6.8 Flexible connectors not frayed, twisted, kinked or bent beyond manufacturer specifications 8.6.9 Piping interstitial space open to the sump (open double-walled piping system only) 8.6.20 Piping interstitial space closed to the sump (closed double-walled piping system only) 8.6.22 lid, gasket and seals present and in good condition 8.6.23 Other Other Manhole cover at grade in good condition, does not touch sump cover, all bolts present, handles and lift mechanism in good condition (as applicable) 8.6.24 Single-walled sump tested for integrity every 3 years TEST DATE: 8.6.18 If not continuously monitored or inspected annually, double-walled sump tightness tested every 3 years TEST DATE: 8.6.19 PEI RP 900 Annual Other Inspection Checklist Page of