Current Depth. Proposed TD. Current Operation

Similar documents
Current Depth. Proposed TD. Current Operation

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

19,683 8,

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

Gulftex Energy III LP DAILY COMPLETION REPORT

DAILY DRILLING REPORT DATE : 08/01/2012

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

DAILY DRILLING REPORT


Callon Petroleum Company Drilling Report

Daily Drilling Summary Report

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

DAILY DRILLING REPORT

Drilling & Completion Summary

APACHE CORPORATION. Daily Land - Orig Comp Report

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

3/25/15 University DC 1H Devonian Completion

DAILY DRILLING REPORT

Daily Drilling Report

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Daily Drilling Report

APACHE CORPORATION. Daily Land - Orig Comp Report


Daily Activity Report

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

OPERATIONS SUMMARY REPORT

Daily Drilling Report

DAILY DRILLING REPORT

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

MORNING DRILLING REPORT

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

DAILY DRILLING REPORT

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

MORNING DRILLING REPORT

LOC 400 Drilling Rig

DATE: 01/03/ DAILY COMPLETION REPORT

Daily Drilling Report

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

CNL, CCL, GR, CBL. RDMO

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY DRILLING REPORT DATE : 04/20/2011

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

Elevation Resources LLC

1042 FNL, 1935 FEL - ECTOR, TX

Ideco - H25 Information Document

McKissick 200mt. Stabbing board

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Casing Drilling Technology Implementation In Petrom

DAILY OPERATIONS REPORT Date:

Athlon Energy Operating LLC

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

Drilling & Completion Summary - Ascending

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

Rotary Snubbing Technology Option for Long Reach

4.7 Formation Temperature

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

About Cobra Downhole Motors

Atlas Copco Oil and Gas Rigs. The Predator Advantage

About Cobra Downhole Motors

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

Plug & Abandonment Light Drilling Workover Well Intervention

DRILLING BARGE SS AMEQ CASPIAN SEA

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

PRODUCTION HYDRAULIC PACKER FIELD TEST

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

AADE 01-NC-HO-54. Abstract

Schede tecniche Corsair 300 PDB

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.

RENTAL TOOL SERVICES. Megaton Impact Tools

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

44. Bit record form Rig site daily drilling report form Office drilling report Computerized drilling information network

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Vibratory Downhole Tool Technologies with Application to Horizontal Drilling and Casing Installation

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

An Introduction to Dilution-Based Dual Gradient (DBDG) Drilling

VDD 200 Super Single Rig - Automated Pipehandling System

LEE NAK GUI TCP SERVICE COORDINATOR APPS

VDD 370 Super Single Rig - Automatic Pipehandling System

Daily Drilling Report

Completion Solutions Inc.

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

Drillmec HH-300 spec.

Re: Submission of Surveys for EXL Petroleum, UL Mustang 18 #283, in Martin County, Texas API #:

Fidmash. Coiled Tubing and Pressure Pumping Equipment

Transcription:

Report Date Day Rig Well Name AFE Number County Spud Date Days from Spud Current Operation Current Depth Proposed TD Avg RPM AVG WOB AVG ROP Last Survey Daily Drilling Cost 1/4/14 Rig Mo Patterson UTI 14175 Pecos Rig Up 9,5' $255,774 $255,774 $1,845,8 $255,774 $3,456,15 1/5/14 Rig Mo Patterson UTI 14175 Pecos Rig Up 9,5' $2,3 $275,84 $1,845,8 $275,84 $3,456,15 1/6/14 Rig Mo Patterson UTI 14175 Pecos Rig Up 9,5' $6,748 $282,552 $1,845,8 $282,552 $3,456,15 Cum Drilling Cost Dry Hole AFE All Costs Total AFE 1/7/14 Patterson UTI 14175 Pecos 1/6/214 23:3: PM Spud 9,5' $36,128 $318,68 $1,845,8 $318,68 $3,456,15 1/7/14 1 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 1 Drilling 158 9,5' 55 1 12 $36,128 $318,68 $1,845,8 $318,68 $3,456,15 1/8/14 2 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 2 Drilling 693 9,5' 95 31 25.5 $13,143 $421,823 $1,845,8 $421,823 $3,456,15 1/9/14 3 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 3 W.O.C 925 9,5' 95 35 26.6 $94,621 $516,444 $1,845,8 $516,444 $3,456,15 1/1/14 4 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 4 P.O.O.H 925 9,5'.6 $27,121 $543,565 $1,845,8 $543,565 $3,456,15 1/11/14 5 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 5 Drilling 2,21 9,5' 72 21 58.1 $43,323 $586,888 $1,845,8 $586,888 $3,456,15 1/12/14 6 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 6 Drilling 3,59 9,5' 6 3 64.3 $29,832 $616,72 $1,845,8 $616,72 $3,456,15 1/13/14 7 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 7 Drilling 5,16 9,5' 65 3 58.1 $31,56 $648,226 $1,845,8 $648,226 $3,456,15 1/14/14 8 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 8 Drilling 5,936 9,5' 65 3 41 $64,631 $712,857 $1,845,8 $712,857 $3,456,15 1/15/14 9 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 9 Reaming 5,976 9,5' 65 12 27 $3,37 $743,227 $1,845,8 $743,227 $3,456,15 1/16/14 1 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 1 TIH w/ vertical drilling assembly 6,396 9,5' 58 3 47 $56,451 $799,678 $1,845,8 $799,678 $3,456,15 1/17/14 11 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 11 Drilling @ 6493' 6,493 9,5' 48 17 25 $34,84 $833,761 $1,845,8 $833,761 $3,456,15 1/18/14 12 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 12 Circulating 7,155 9,5' 68 31 3 2.5 $56,654 $89,416 $1,845,8 $89,416 $3,456,15 1/19/14 13 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 13 Cement Operations 7,155 9,5' 2.5 $215,548 $1,15,963 $1,845,8 $1,15,963 $3,456,15 1/2/14 14 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 14 7,155 9,5' 2.5 $94,949 $1,2,912 $1,845,8 $1,2,912 $3,456,15 1/21/14 15 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 15 Drilling ahead 7,355 9,5' 65 28 4 1.1 $53,958 $1,254,87 $1,845,8 $1,254,87 $3,456,15 1/22/14 16 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 16 Drilling 8,444 9,5' 65 29 5 $34,84 $1,288,954 $1,845,8 $1,288,954 $3,456,15 1/23/14 17 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 17 Drilling 9,21 9,5' 6 3 35 $22,764 $1,491,718 $1,845,8 $1,491,718 $3,456,15 1/24/14 18 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 18 L/D Bit 9,517 9,5' 65 3 41.7 $85,366 $1,577,84 $1,845,8 $1,577,84 $3,456,15 1/25/14 19 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 19 L/D DP 9,515 9,5'.7 $92,517 $1,669,61 $1,845,8 $1,848,194 $3,456,15 1/26/14 2 Patterson UTI 14175 Pecos 1/6/214 23:3: PM 2 Rigging Down 9,5' $31,196 $1,7,797 $1,845,8 $1,884,4 $3,456,15

THREE RIVERS OPERATING COMPANY Estimated Costs and Authorization for Expenditure (AFE) Cost Center 242444 County Pecos Date 8/4/214 Well Name State TX AFE No 14175 Legal Desc 198' FEL & 198' FSL Depth 9,5' AFE Type D&C Field Wolfbone API# 4237139229 Budget Year 214 Objective Canyon,Bonespring,Lnrd, Wlfmp WI % 1% Est Start Date 9/25/214 Description D&C a 93' test of the Wolfbone trend area 835 836 Sub Acct Intangible Costs Dry Hole Completion Total 1 Legal & Title Opinion $15, $15, 11 Staking & Permitting $3,5 $3,5 12 Location Roads Damages $15, $9, $159, 13 Rig Mobilization $125, $125, 14 Rig Daywork / Footage $325, $42,5 $367,5 15 Rig Turnkey 16 Power & Fuel $72, $72, 17 Water & Water Well $1, $5, $15, 18 Mud Chemicals & Fluids $15, $15, 19 Mud Cuttings & Water Disposal $5, $15, $2, 11 Bits, Reamer, Stabilizers $65, $2,5 $67,5 111 Directional Tools & Service $175, $175, 112 Cement & Cementing Services $115, $5, $165, 113 Mud Logging $25, $25, 114 Open Hole Logging $11, $11, 115 Form Eval - Well Testing DST 116 Tubular Inspection $5, $5, 118 Cased Hole Logging, Perf & Svs $1, $1, 119 Frac Tanks 12 Csg Crews & Tools-Drive Hammer 2, $2, 121 Formation Evaluation $5, $5, 122 Formation Stimulatn Acid Frac $55, $55, 123 Transportation $1, $1, 124 Flowback Contractor $3, $3, 125 Kill Trucks $1, $1, 126 Equipment Rental $5, $1, $15, 127 Contract Labor & Serivces $1, $5, $15, 128 Wellsite Consultant $3, $1, $4, 129 Company Supervision & Labor $3, $3, 13 Overhead 131 Unanticipated MajExp Fishing 132 Environmental & Safety Costs $2,5 $2,5 133 Insurance $5, $5, 134 Other Specialized Services $8, $8, 135 Misc Supplies & Materials $5, $5, 199 Contingency $74,8 $44,35 $119,15 Intangible Subtotal $1,57,8 $931,35 $2,52,15

THREE RIVERS OPERATING COMPANY Estimated Costs and Authorization for Expenditure (AFE) Cost Center 242444 County Pecos Date 8/4/214 Well Name State TX AFE No 14175 Legal Desc 198' FEL & 198' FSL Depth 9,5' AFE Type D&C Field Wolfbone API# 4237139229 Budget Year 214 Objective Canyon,Bonespring,Lnrd, Wlfmp WI % 1% Est Start Date 9/25/214 Description D&C a 93' test of the Wolfbone trend area 838 839 8311 Sub Acct Tangible Costs Dry Hole Completion Facilities Total 2 Drive Pipe Conductor Casing 21 Surface Casing $65, 65, 22 Intermediate Casing $21, 21, 23 Liner Casing 24 Subs Flt Eqpt Centralizers Etc 5, 5, 25 Wellhead / Tree $1, 1, 26 Sub Surface Equipment $1, 1, 27 Production Casing $19, 19, 28 Tubing $6, 6, 29 Rods $5, 5, 21 Downhole Pumps $1, 1, 213 Pumping Unit & Jet Pumps 9, 9, 214 Engines & Motors 2, 2, 215 Sales Gathering Line 216 Separation Equipment 1, 1, 217 Oil Treating Heating Equipment 15, 15, 218 Gas Treating Dehy Equipment 219 Tanks Walkways & Stairs 6, 6, 22 Meters & Meter Runs 5, 5, 221 Electrical Equip Install 222 Flowlines 5, 5, 223 Piping & Valves 25, 25, 224 Surface Pumps 1,5 1,5 225 Automation Telemetry Equipment 6,5 6,5 226 Site - Roads Fences Gates Cattleguards 6, 6, 227 Installation Costs 5, 5, 132 Environmental & Safety Costs 135 Misc Supplies & Materials 5, 5, 199 Contingency Tangible Subtotal $275, $335, $344, $954, Total AFE Costs $1,845,8 $1,266,35 $344, $3,456,15 Company Interest Approved by Date Three Rivers Operating Company 1% Prepared by Drilling Prepared by Operations Operations Approved Engineering Approved Geology Approved Land Approved Management Approved Date Date Date Date Date Date Date Gross AFE Dry Hole $1,845,8 Net AFE Dry Hole $1,845,8 Gross AFE Completion & Facilities $1,61,35 Net AFE Completion & Facilities $1,61,35 Gross AFE Total $3,456,15 Net AFE Total $3,456,15

3ROCII MATERIAL TRANSFER Date: 1/6/214 MT # From Location: (Property Name) From AFE#: Hauled By: To Location: (Property Name) Fort Worth Pipe To AFE#: 14175 Remarks: Fort Worth Pipe (Malcom Hall) Truck Number 2473 New pipe CONDITION UNIT ITEM DESCRIPTION (A,B,C,D,E) JOINTS QUANTITY PRICE TOTAL 2 13-3/8" 54.5# J-55 LTC A 2 846.82 33.29 2819.64 Condition: A-New: B- Used/Premium C- New or used, but rquires re-work: STATE TAX D- New or used, sub-grade E- Junk COUNTY TAX TOTAL 2819.64 Issued By: Isaac Ramos Approved By: DATE: 1/6/214 DATE:

3ROCII MATERIAL TRANSFER Date: 1/6/214 MT # From Location: (Property Name) From AFE#: 14175 Three Rivers () To Location: (Property Name) To AFE#: Fort Worth Pipe Hauled By: Remarks: Fort Worth Pipe (Malcom Hall) Truck Number 2473 Hauled back excess pipe due to sufficient footage on location CONDITION UNIT ITEM DESCRIPTION (A,B,C,D,E) JOINTS QUANTITY PRICE TOTAL Casing 13-3/8" 54.5# J-55 LTC A 2 846.82 33.29 2819.64 Condition: A-New: B- Used/Premium C- New or used, but rquires re-work: STATE TAX D- New or used, sub-grade E- Junk COUNTY TAX TOTAL 2819.64 Issued By: Isaac Ramos Approved By: DATE: 1/6/214 DATE:

3ROCII Water & Disposal Tracker WELL AFE# 14175 Please contact any of the following people for water delivery or fluid disposal : BASIC J.J : or consult the on-call list sent weekly by JEFF SHAMBLIN BRINE RIG WATER HAULED IN DATE TIME DSM CALLING for SERVICE WATER VOLUME HAULED IN (BBLS) PERSON CONTACTED FOR WATER REQUEST, or whomever "on-call") CONTRACTOR DELIVERING WATER (Company Name) WATER SOURCE CONTRACTOR REPRESENTATIVE DELIVERING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. rig water, cementing, transfer from last well, etc...) RIG WATER DISPOSAL DATE TIME DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL (i.e Kent, Joe, Chris, Jon, or whomever "on-call") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) TOTAL WATER HAULED IN (BBLS) TOTAL COST OF WATER HAULED IN ($) TOTAL WATER DISPOSED (BBLS) TOTAL COST OF DISPOSAL ($). $. $

3ROCII Water & Disposal Tracker WELL AFE# 14175 FRESH WATER DATE TIME DSM CALLING BBLS PERSON CONTACTED FOR WATER REQUEST PUT NAME OF WHO YOU CALLED CONTRACTOR RIG WATER HAULED IN WATER SOURCE CONTRACTOR REPRESENTATIVE DELIVERING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. rig water, cementing, transfer from last well, etc...) 1/5/14 5:56pm Isaac Ramos 25 Rito Gomez Cinco Oilfield Service, LLC Frac Pit Joel Augustine 21761 $172.5 Reserve water 1/5/14 5:56pm Isaac Ramos 25 Rito Gomez Cinco Oilfield Service, LLC Frac Pit Eduardo Calderon 21762 $172.5 Reserve water 1/5/14 5:56pm Isaac Ramos 25 Rito Gomez Cinco Oilfield Service, LLC Frac Pit Alejandro Flores 21767 $172.5 Reserve water 1/5/14 5:56pm Isaac Ramos 25. Rito Gomez Cinco Oilfield Service, LLC Frac Pit Leon C Rogers 21764 $172.5 Reserve water 1/5/14 5:56pm Isaac Ramos 1. Rito Gomez Cinco Oilfield Service, LLC Frac Pit Leon C Rogers 21765 $69 Reserve water 1/5/14 5:56pm Isaac Ramos 875. Rito Gomez Cinco Oilfield Service, LLC Frac Pit Alejandro Flores 21768 $63.75 Reserve water 1/5/14 5:56pm Isaac Ramos 875. Rito Gomez Cinco Oilfield Service, LLC Frac Pit Eduardo Calderon 21763 $63.75 Reserve water 1/5/14 5:56pm Isaac Ramos 875. Rito Gomez Cinco Oilfield Service, LLC Frac Pit Joel Augustine 21766 $63.75 Reserve water WATER DISPOSAL DATE TIME DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL (i.e Kent, Joe, Chris, Jon, or whomever "on-call") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) ULED IN (BBLS) HAULED IN ($) 4375. SPOSED (BBLS) $3,191.25 F DISPOSAL ($). $

3ROCII Water & Disposal Tracker WELL AFE# 14175 WATER WELL METER WATER METER TRACKER SERIAL # NO METER ON PUMP DATE TIME METER START - METER END WATER VOLUME COST PER BBL PURPOSE (i.e. rig water, cementing, transfer from last well, WATER WELL RECEIVE WATER FROM WATER LINE SUPPLIER PERSON OPERATING METER TOTAL BBLS PUMPED PUMPED IN $.4 XBBLS etc...) 1/5/14 6:32pm 14647. University Lands Isaac Ramos 979 $391.6 Reserve Water 1/6/14 3:25pm 15629. University Lands Isaac Ramos 979 $391.6 Reserve Water 1/7/14 9:am 1665. University Lands Isaac Ramos 979 $391.6 Reserve Water 1/8/14 1:3am 17584. University Lands Isaac Ramos 979 $391.6 Reserve Water 1/9/14 1:3pm 18563. University Lands Isaac Ramos 979 $391.6 Reserve Water 1/1/14 2:15pm 19542. University Lands Isaac Ramos 979 $391.6 Reserve Water 1/11/14 1:25am 2521. University Lands Isaac Ramos 979 $391.6 Reserve Water 1/12/14 1:45am 215 University Lands Isaac Ramos 979 $391.6 Reserve Water 1/13/14 8:am 22479. University Lands Isaac Ramos 979 $391.6 Reserve Water 1/14/14 7:3am 23458. University Lands Isaac Ramos 979 $391.6 Reserve Water 1/15/14 6:pm 25421. University Lands Isaac Ramos 1963 $785.2 Reserve Water 1/16/14 6:pm 25421. University Lands Richard Nicholson 1/17/14 6:pm 25421. University Lands Richard Nicholson 1/18/14 3:pm 25421. University Lands Richard Nicholson 1/19/14 9:p.m. 2775. University Lands Richard Nicholson 1654. $661.6 Reserve Water 1/2/14 3:p.m. 2775. University Lands Richard Nicholson 1/24/14 11:am. 2775. University Lands Richard Nicholson 1/25/14 12:p.m. 28437. University Lands Richard Nicholson RIG WATER DISPOSAL DATE TIME DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL JJ or whomever "oncall") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) TOTAL WATER HAULED IN (BBLS) TOTAL COST OF WATER HAULED IN ($) TOTAL WATER DISPOSED (BBLS) TOTAL COST OF DISPOSAL ($). $5,362.8. $

3ROCII Water & Disposal Tracker WELL AFE# 14175 TRANSFER PITS WATER VOLUME DATE TIME TRUCKING CO HAULING HAULED IN INVOICE NUMBER FRESH WATER OR BRINE COMPANY REP TOTAL BBLS HAULED Estimated Cost ($) PURPOSE (i.e. rig water, cementing, transfer from last well, etc...) RIG WATER DISPOSAL DATE TIME DSM CALLING for SERVICE WATER VOLUME HAULED OUT (BBLS) PERSON CONTACTED FOR WATER DISPOSAL JJ or whomever "oncall") CONTRACTOR HAULING WATER OFF (Company Name) DISPOSAL (or treatment) FACILITY / WATER DESTINATION CONTRACTOR REPRESENTATIVE HAULING WATER (Person's Name) Manifest Number Estimated Cost ($) PURPOSE (i.e. grey water, pit full, spill, rain water, etc...) TOTAL WATER HAULED IN (BBLS) TOTAL COST OF WATER HAULED IN ($) TOTAL WATER DISPOSED (BBLS) TOTAL COST OF DISPOSAL ($). $. $

AFE# 14175 DATE: 1/1/14 CSG SET 952 Prod Csg Size, wt, grade Item # Centr. Top SHOE 1.2 1.2 9518.8 1 42.42 43.62 Centr. 9476.4 FC.8 44.42 9475.6 2 42.36 86.78 9433.2 3 42.4 129.18 Centr. 939.8 4 4.72 169.9 935.1 5 42.41 212.31 937.7 6 4.97 253.28 9266.7 7 4.34 293.62 Centr. 9226.4 8 4.68 334.3 9185.7 9 42.5 376.8 9143.2 1 42.37 419.17 91.8 11 42.41 461.58 Centr. 958.4 12 42.41 53.99 916. 13 42.43 546.42 8973.6 14 42.41 588.83 8931.2 15 42.41 631.24 Centr. 8888.8 16 41.23 672.47 8847.5 17 41.37 713.84 886.2 18 39.78 753.62 8766.4 19 42.42 796.4 Centr. 8724. 2 42.41 838.45 8681.6 21 42.43 88.88 8639.1 22 42.37 923.25 8596.8 23 42.37 965.62 Centr. 8554.4 24 4.38 16. 8514. 25 42.1 148.1 8472. 26 41.6 189.7 843.9 27 42.37 1131.44 Centr. 8388.6 28 42.43 1173.87 8346.1 29 42.35 1216.22 833.8 3 1216.22 833.8 31 41.6 1257.28 Centr. 8262.7 32 42.4 1299.68 822.3 33 38.21 1337.89 8182.1 34 42.4 138.29 8139.7 35 42.36 1422.65 Centr. 897.4 36 4.4 1463.5 857. 37 42.46 155.51 814.5 38 42.43 1547.94 7972.1 39 4.16 1588.1 Centr. 7931.9 4 4.66 1628.76 7891.2 41 41.9 1691.85 22 7828.2 42 4.92 1732.77 7787.2 43 41.3 1773.8 Centr. 7746.2 44 41.9 1814.89 775.1 45 42.43 1857.32 7662.7 46 42.39 1899.71 762.3 47 42.42 1942.13 Centr. 7577.9 48 42.38 1984.51 7535.5 49 42.41 226.92 7493.1 5 41.2 267.94 7452.1 51 42.44 211.38 Centr. 749.6 52 42.38 2152.76 7367.2 53 2152.76 7367.2 54 42.4 2195.16 7324.8 55 42.42 2237.58 Centr. 7282.4 56 2237.58 7282.4 57 42.38 2279.96 724. 58 2279.96 724. 59 39.4 2319.36 Centr. 72.6 6 2319.36 72.6 61 42.44 2361.8 7158.2 62 35.93 2397.73 7122.3 63 41.42 2439.15 Centr. 78.9 64 42.39 2481.54 738.5 65 42.41 2523.95 6996.1 66 42.37 2566.32 6953.7 67 42.34 268.66 Centr. 6911.3 68 42.33 265.99 6869. 69 42.4 2693.39 6826.6 7 41.2 2734.41 6785.6 71 41.5 2775.46 Centr. 6744.5 72 41.8 2816.54 673.5 73 38.41 2854.95 6665.1 74 42.36 2897.31 6622.7 75 4.74 2938.5 Centr. 6582. 76 41.39 2979.44 654.6 77 41.6 32.5 6499.5 78 4.66 361.16 6458.8 79 41.5 312.21 Centr. 6417.8 8 41.22 3143.43 6376.6 81 3143.43 6376.6 82 41.7 3184.5 6335.5 83 3184.5 Centr. 6335.5 84 42.38 3226.88 6293.1 85 4.65 3267.53 6252.5 86 42.38 339.91 621.1 87 43.37 3353.28 6166.7 88 42.41 3395.69 6124.3 89 41.5 3437.19 682.8 9 43.67 348.86 639.1 91 41.15 3522.1 5998. 92 42.19 3564.2 5955.8 93 42.43 366.63 5913.4 94 42.4 3649.3 5871. 95 42.41 3691.44 5828.6

AFE# 14175 DATE: 1/1/14 CSG SET 952 Prod Csg Size, wt, grade Item # Centr. Top 96 42.4 3733.84 5786.2 97 42.4 3776.24 5743.8 98 39.8 3816.4 574. 99 42.4 3858.44 5661.6 1 42.4 39.84 5619.2 11 42.4 3943.24 5576.8 12 42.45 3985.69 5534.3 13 42.4 428.9 5491.9 14 41.8 469.17 545.8 15 41.8 411.25 549.8 16 42.42 4152.67 5367.3 17 4.71 4193.38 5326.6 18 4.71 4234.9 5285.9 19 42.4 4276.49 5243.5 11 42.4 4318.89 521.1 111 41.32 436.21 5159.8 112 42.4 442.61 5117.4 113 42.37 4444.98 575. 114 4.38 4485.36 534.6 115 41.2 4526.38 4993.6 116 41.7 4567.45 4952.6 117 41.7 468.52 4911.5 118 42.45 465.97 4869. 119 4.74 4691.71 4828.3 12 4.9 4732.61 4787.4 121 41.6 4773.67 4746.3 122 4.66 4814.33 475.7 123 42.37 4856.7 4663.3 124 42.45 4899.15 462.9 125 42.44 4941.59 4578.4 126 41.9 4982.68 4537.3 127 41.5 523.73 4496.3 128 41.5 564.78 4455.2 129 42.36 517.14 4412.9 13 41.2 5148.16 4371.8 131 41.1 5189.26 433.7 132 41.2 523.28 4289.7 133 41.8 5293.33 21.97 4226.7 134 41.7 5334.4 4185.6 135 42.4 5376.8 4143.2 136 41.62 5418.42 411.6 137 4.71 5459.13 46.9 138 4.77 5499.9 42.1 139 4.72 554.62 3979.4 14 41.5 5581.67 3938.3 141 42.4 5624.7 3895.9 142 42.38 5666.45 3853.6 143 42.43 578.88 3811.1 144 42.38 5751.26 3768.7 145 42.39 5793.65 3726.4 146 42.37 5836.2 3684. 147 41.2 5877.4 3643. 148 38.66 5915.7 364.3 149 42.38 5958.8 3561.9 15 41.88 5999.96 352. 151 41.7 641.3 3479. 152 41.1 682.4 3438. 153 4.92 6122.96 3397. 154 41.7 6164.3 3356. 155 42.4 626.43 3313.6 156 41.1 6247.44 3272.6 157 41.6 6288.5 3231.5 158 6288.5 3231.5 159 42.35 633.85 3189.2 16 38.9 6369.75 315.3 161 41.2 641.77 319.2 162 41.11 6451.88 368.1 163 42.41 6494.29 325.7 164 42.4 6536.69 2983.3 165 42.4 6579.9 294.9 166 42.38 6621.47 2898.5 167 41.2 6662.49 2857.5 168 41.6 673.55 2816.5 169 4.42 6743.97 2776. 17 41.5 6785.2 2735. 171 41.12 6826.14 2693.9 172 42.46 6868.6 2651.4 173 42.4 6911. 269. 174 42.38 6953.38 2566.6 175 41.5 6994.43 2525.6 176 42.44 736.87 2483.1 177 4.66 777.53 2442.5 178 42.42 7119.95 24.1 179 41.8 7161.3 2359. 18 4.63 721.66 2318.3 181 41.8 7242.74 2277.3 182 42.41 7285.15 2234.9 183 41.6 7326.21 2193.8 184 4.65 7366.86 2153.1 185 42.38 749.24 211.8 186 41.7 745.31 269.7 187 4.68 749.99 229. 188 38.26 7529.25 199.8 189 4.6 7569.31 195.7 19 41.11 761.42 199.6 191 41.18 7651.6 1868.4 192 41. 7692.6 1827.4

AFE# 14175 DATE: 1/1/14 CSG SET 952 Prod Csg Size, wt, grade Item # Centr. Top 193 41.6 7733.66 1786.3 194 39.1 7772.76 1747.2 195 42.4 7815.16 174.8 196 42.4 7857.56 1662.4 197 42.41 7899.97 162. 198 42.46 7942.43 1577.6 199 41.32 7983.75 1536.3 2 4.18 823.93 1496.1 21 42.39 866.32 1453.7 22 38.52 814.84 1415.2 23 42.38 8147.22 1372.8 24 42.38 8189.6 133.4 25 42.1 8231.7 1288.3 26 42.46 8274.16 1245.8 27 42.45 8316.61 123.4 28 42.43 8359.4 1161. 29 4.41 8399.45 112.6 21 8399.45 112.6 211 42.4 8441.85 178.2 212 42.39 8484.24 135.8 213 42.38 8526.62 993.4 214 42.39 8569.1 951. 215 42.21 8611.22 98.8 216 42.4 8653.62 866.4 217 41.8 8694.7 825.3 218 8694.7 825.3 219 41.2 8735.72 784.3 22 8735.72 784.3 221 4.71 8776.43 743.6 222 4.2 8816.45 73.6 223 42.4 8858.85 661.2 224 8858.85 661.2 225 42.37 891.22 618.8 226 42.41 8943.63 576.4 227 42.41 8986.4 534. 228 4.41 926.45 493.6 229 42.4 968.85 451.2 23 4.7 919.55 41.5 231 42.39 9151.94 368.1 232 42.41 9194.35 325.7 233 4.7 9235.5 285. 234 4.71 9275.76 244.2 235 42.22 9317.98 22. 236 4.73 9358.71 161.3 237 42.4 941.11 118.9 238 42.21 9443.32 76.7 239 41.6 9484.38 35.6 24 4.48 9524.86-4.9 241 42.36 9567.22-47.2 242 42.4 969.62-89.6 243 41.2 965.64-13.6 244 41.5 9691.69-171.7 245 41.6 9732.75-212.7 246 41.5 9773.8-253.8 247 4.75 9814.55-294.5 248 42.41 9856.96-337. 249 42.37 9899.33-379.3 25 42.37 9941.7-421.7 251 41.2 9982.72-462.7 252 42.36 125.8-55.1 253 4.74 165.82-545.8 254 43.66 119.48-589.5 255 43.68 1153.16-633.2 256 43.67 1196.83-676.8 257 4.58 1237.41-717.4 258 43.68 1281.9-761.1 259 4.51 1321.6-81.6 26 43.69 1365.29-845.3 261 1365.29-845.3 262 1365.29-845.3 263 1365.29-845.3 264 1365.29-845.3 265 1365.29-845.3 266 1365.29-845.3 267 1365.29-845.3 268 1365.29-845.3 269 1365.29-845.3 27 1365.29-845.3 271 1365.29-845.3 272 1365.29-845.3 273 1365.29-845.3 274 1365.29-845.3 275 1365.29-845.3 276 1365.29-845.3 277 1365.29-845.3 278 1365.29-845.3 279 1365.29-845.3 28 1365.29-845.3 1365.29-845.3

Well Name SPUD DATE: 1-6-214 23:3: Rig Release H or K Drilling Time 129 Intangible D GEN ACCT SUB ACCT D 835..1 Keep 835 1 D 835..11 Keep 835 11 D 835..12 Keep 835 12 D 835..13 Keep 835 13 D 835..14 Keep 835 14 D 835..15 Hide 835 15 D 835..16 Keep 835 16 D 835..17 Keep 835 17 D 835..18 Keep 835 18 D 835..19 Keep 835 19 D 835..11 Keep 835 11 D 835..111 Keep 835 111 D 835..112 Keep 835 112 D 835..113 Keep 835 113 D 835..114 Keep 835 114 D 835..115 Hide 835 115 D 835..116 Keep 835 116 D 835..118 Hide 835 118 D 835..119 Keep 835 119 D 835..12 Keep 835 12 D 835..121 Hide 835 121 D 835..122 Hide 835 122 D 835..123 Keep 835 123 D 835..124 Hide 835 124 D 835..125 Hide 835 125 D 835..126 Keep 835 126 D 835..127 Keep 835 127 D 835..128 Keep 835 128 D 835..129 Keep 835 129 D 835..13 Hide 835 13 D 835..131 Hide 835 131 D 835..132 Keep 835 132 D 835..133 Keep 835 133 D 835..134 Hide 835 134 D 835..135 Keep 835 135 D 835..199 Keep 835 199.. Hide D.. Keep D.. Tangible Drilling

D 838..2 Keep 838 2 D 838..21 Keep 838 21 D 838..22 Keep 838 22 D 838..23 Hide 838 23 D 838..24 Keep 838 24 D 838..25 Keep 838 25 D 838..26 Keep 838 26.. Hide D.. Keep C.. Intangible Completion C 836..1 Hide 836 1 C 836..11 Hide 836 11 C 836..12 Keep 836 12 C 836..13 Hide 836 13 C 836..14 Keep 836 14 C 836..15 Hide 836 15 C 836..16 Hide 836 16 C 836..17 Keep 836 17 C 836..18 Hide 836 18 C 836..19 Keep 836 19 C 836..11 Keep 836 11 C 836..111 Hide 836 111 C 836..112 Keep 836 112 C 836..116 Hide 836 116 C 836..118 Keep 836 118 C 836..119 Hide 836 119 C 836..12 Keep 836 12 C 836..121 Keep 836 121 C 836..122 Keep 836 122 C 836..123 Keep 836 123 C 836..124 Keep 836 124 C 836..125 Keep 836 125 C 836..126 Keep 836 126 C 836..127 Keep 836 127 C 836..128 Keep 836 128 C 836..129 Hide 836 129 C 836..13 Hide 836 13 C 836..131 Hide 836 131 C 836..132 Hide 836 132 C 836..133 Hide 836 133 C 836..134 Keep 836 134 C 836..135 Keep 836 135 C 836..199 Keep 836 199.. Hide C.. Keep C.. Tangible Completion C 839..24 Keep 839 24

C 839..25 Keep 839 25 C 839..26 Keep 839 26 C 839..27 Keep 839 27 C 839..28 Keep 839 28 C 839..29 Keep 839 29 C 839..21 Keep 839 21.. Hide C.. Keep F.. Production Equipment F 8311..213 Keep 8311 213 F 8311..214 Keep 8311 214 F 8311..215 Hide 8311 215 F 8311..216 Keep 8311 216 F 8311..217 Keep 8311 217 F 8311..218 Hide 8311 218 F 8311..219 Keep 8311 219 F 8311..22 Keep 8311 22 F 8311..221 Hide 8311 221 F 8311..222 Keep 8311 222 F 8311..223 Keep 8311 223 F 8311..224 Keep 8311 224 F 8311..225 Keep 8311 225 F 8311..226 Keep 8311 226 F 8311..227 Keep 8311 227 F 8311..132 Hide 8311 132 F 8311..135 Keep 8311 135 F 8311..199 Hide 8311 199.. Hide F.. Keep.. Totals.. Keep.. Keep.. Keep.. Keep

THREE RIVERS OPERATING COMPANY II LLC. County Pecos DATE 1/5/214 1/6/214 AFE #: 14175 DAYS PLANNED WI % 1% ' ' AFE AMNT $3,456,15 ACTUAL ' ' INTANGIBLE DRILLING COSTS AFE AMNT EST. CUM. 1/5/214 1/6/214 Legal & Title Opinion $15, $15, $15, Staking & Permitting $3,5 $3,5 $3,5 Location Roads Damages $15, $15, $15, Rig Mobilization $125, $6, $6, Rig Daywork / Footage $325, $37,23 $13,76 $13,76 Rig Turnkey $ $ Power & Fuel $72, $72,837 $1,714 Water & Water Well $1, $38,751 Mud Chemicals & Fluids $15, $24,754 Mud Cuttings & Water Disposal $5, $ Bits, Reamer, Stabilizers $65, $52,983 Directional Tools & Service $175, $81, Cement & Cementing Services $115, $119,11 Mud Logging $25, $17,6 Open Hole Logging $11, $ Form Eval - Well Testing DST $ $ Tubular Inspection $5, $6,64 Cased Hole Logging, Perf & Svs $ $ Frac Tanks $ $6,6 $3 $3 Csg Crews & Tools-Drive Hammer $ $36,313 Formation Evaluation $ $ Formation Stimulatn Acid Frac $ $ Transportation $ $27,734 Flowback Contractor $ $ Kill Trucks $ $ Equipment Rental $5, $37,235 $3,47 Contract Labor & Serivces $1, $18,671 Wellsite Consultant $3, $55, $2,5 $2,5 Company Supervision & Labor $3, $ Overhead $ $ Unanticipated MajExp Fishing $ $ Environmental & Safety Costs $2,5 $ Insurance $5, $ Other Specialized Services $ $ Misc Supplies & Materials $ $9,376 Contingency $74,8 $9,313 RIG MOVE SUB-TOTAL INTANGIBLE DRILLING COSTS $1,57,8 $1,473,511 $255,774 $2,3 TANGIBLE DRILLING COSTS AFE AMNT EST. CUM. 1/5/214 1/6/214

Drive Pipe Conductor Casing $ $31,52 Surface Casing $65, $3,793 Intermediate Casing $21, $15,255 Liner Casing $ $ Subs Flt Eqpt Centralizers Etc $ $3,64 Wellhead / Tree $ $2,596 Sub Surface Equipment $ $8,535 SUB-TOTAL TANGIBLE DRILLING COSTS $275, $227,285 $ $ INTANGIBLE COMPLETION COSTS AFE AMNT EST. CUM. 1/5/214 1/6/214 Legal & Title Opinion $ $ Staking & Permitting $ $ Location Roads Damages $9, $ Rig Mobilization $ $ Completion Rig $42,5 $ Rig Turnkey $ $ Power & Fuel $ $ Water & Water Well $5, $ Mud Chemicals & Fluids $ $ Mud Cuttings & Water Disposal $15, $ Bits, Reamer, Stabilizers $2,5 $ Directional Tools & Service $ $ Cement & Cementing Services $5, $ Tubular Inspection $ $ Cased Hole Logging, Perf & Svs $1, $ Frac Tanks $ $ Csg Crews & Tools-Drive Hammer $2, $ Formation Evaluation $5, $ Formation Stimulatn Acid Frac $55, $ Transportation $1, $ Flowback Contractor $3, $ Kill Trucks $1, $ Equipment Rental $1, $ Contract Labor & Serivces $5, $ Wellsite Consultant $1, $ Company Supervision & Labor $ $ Overhead $ $ Unanticipated MajExp Fishing $ $ Environmental & Safety Costs $ $ Insurance $ $ Other Specialized Services $8, $ Misc Supplies & Materials $5, $ Contingency $44,35 $ SUB-TOTAL INTANGIBLE COMPLETION COSTS $931,35 $ $ $ TANGIBLE COMPLETION COSTS AFE AMNT EST. CUM. 1/5/214 1/6/214 Subs Flt Eqpt Centralizers Etc $5, $

Wellhead / Tree $1, $ Sub Surface Equipment $1, $4,65 Production Casing $19, $178,593 Tubing $6, $ Rods $5, $ Downhole Pumps $1, $ SUB-TOTAL TANGIBLE COMPLETION COSTS $335, $183,243 $ $ PRODUCTION EQUIPMENT AFE AMNT EST. CUM. 1/5/214 1/6/214 Pumping Unit & Jet Pumps $9, $ Engines & Motors $2, $ Sales Gathering Line $ $ Separation Equipment $1, $ Oil Treating Heating Equipment $15, $ Gas Treating Dehy Equipment $ $ Tanks Walkways & Stairs $6, $ Meters & Meter Runs $5, $ Electrical Equip Install $ $ Flowlines $5, $ Piping & Valves $25, $ Surface Pumps $1,5 $ Automation Telemetry Equipment $6,5 $ Site - Roads Fences Gates Cattleguards $6, $ Installation Costs $5, $ Environmental & Safety Costs $ $ Misc Supplies & Materials $5, $ Contingency $ $ SUB-TOTAL PRODUCTION EQUIPMENT $344, $ $ $ TOTALS AFE AMNT EST. CUM. 1/5/214 1/6/214 GRAND TOTAL $3,456,15 $1,884,4 $255,774 $2,3 Dry Hole Total $1,845,8 $1,7,797 $255,774 $2,3 Completion Total $1,266,35 $183,243 $ $ Facility Total $344, $ $ $

E & RIG UP TRACKING End Date Day 1 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214 1 2 3 4 5 ' ' ' 9,5' 9,5' 9,5' 9,5' 9,5' ' ' ' 158' 693' 925' 925' 2,21' 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214 $5,16 $1,75 $17,2 $17,2 $17,2 $17,2 $15,57 $26,5 $5,426 $7,675 $1,216 $4,196 $84 $7,6 $35 $35 $3,6 $31,529 $3,3 $1,2 $113 $187 $6 $3 $3 $8,66 $6,47 $772 $538 $897 $7,68 $1,7 $925 $1,88 $1,275 $1,65 $4,375 $938 $1,563 $2,5 $2,5 $2,5 $2,5 $3,938 $6,748 $ $ $36,128 $71,641 $62,627 $27,121 $43,323 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214

$31,52 $3,793 $1,2 $ $ $ $ $31,52 $31,993 $ $ 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214

1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214 1/7/214 1/8/214 1/9/214 1/7/214 1/8/214 1/9/214 1/1/214 1/11/214 $6,748 $ $ $36,128 $13,143 $94,621 $27,121 $43,323 $6,748 $ $ $36,128 $13,143 $94,621 $27,121 $43,323

1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214 6 7 8 9 1 11 12 13 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 3,59' 4,48' 5,936' 5,976' 6,396' 6,465' 7,155' 7,155' 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214 $17,2 $17,2 $17,2 $17,2 $17,2 $17,2 $17,2 $17,2 $21,79 $8,75 $8,342 $3,735 $5,257 $3,445 $11,814 $9 9 $5,168 $55 $11,5 $17, $8,5 $8,5 $8,5 $1,1 $1,1 $1,1 $1,1 $1,1 $1,1 $1,1 $1,1 $2,14 $3 $3 $3 $3 $3 $3 $3 $3 $15,97 $6,25 $829 $784 $1,7 $1,385 $1,385 $1,385 $1,385 $1,385 $1,385 $1,385 $1,385 $1, $3 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $634 $2,712 $2,864 $5,876 $2,761 $5,132 $3,99 $5,15 $5,7 $29,832 $31,56 $64,631 $3,37 $56,451 $34,84 $56,654 $62,697 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214

$15,255 $2,596 $ $ $ $ $ $ $ $152,851 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214

1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214 1/12/214 1/13/214 1/14/214 1/15/214 1/16/214 1/17/214 1/18/214 1/19/214 $29,832 $31,56 $64,631 $3,37 $56,451 $34,84 $56,654 $215,548 $29,832 $31,56 $64,631 $3,37 $56,451 $34,84 $56,654 $215,548

1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214 14 15 16 17 18 19 2 21 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 7,155' 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214 $17,2 $17,2 $17,2 $17,2 $17,2 $17,2 $17,2 $8,94 $1,797 $1,676 $1,676 $1,676 $6,326 $17,1 $43,444 $9,742 $22,515 $4,5 $8,5 $8,5 $8,5 $8,5 $5,11 $37,381 $1,1 $1,1 $1,1 $1,1 $1,1 $2,64 $1,2 $3 $3 $3 $3 $3 $3 $3 $11,737 $1,93 $1,385 $1,385 $1,385 $1,385 $1,385 $1,385 $1,385 $1,472 $3, $3 $5,299 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $2,5 $8,742 $7,856 $4,95 $3,99 $18,433 $7,761 $8,192 $2,836 $86,414 $53,958 $34,84 $22,764 $85,366 $9,113 $31,196 $ 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214

$2,44 $8,535 $8,535 $ $ $ $ $2,44 $ $ 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214

$178,593 $4,65 $ $ $ $ $ $178,593 $4,65 $ 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214 1/2/214 1/21/214 1/22/214 1/23/214 1/24/214 1/25/214 1/26/214 1/27/214 $94,949 $53,958 $34,84 $22,764 $85,366 $271,11 $35,846 $ $94,949 $53,958 $34,84 $22,764 $85,366 $92,517 $31,196 $ $ $ $ $ $ $178,593 $4,65 $

1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214 22 23 24 25 26 27 28 29 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214

1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214

1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214 1/28/214 1/29/214 1/3/214 1/31/214 11/1/214 11/2/214 11/3/214 11/4/214

11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214 3 31 32 33 34 35 36 37 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214

11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214

11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214 11/5/214 11/6/214 11/7/214 11/8/214 11/9/214 11/1/214 11/11/214 11/12/214

11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214 38 39 4 41 42 43 44 45 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 9,5' 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214

11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214

11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214 11/13/214 11/14/214 11/15/214 11/16/214 11/17/214 11/18/214 11/19/214 11/2/214

11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional 46 47 48 49 5 Costs 9,5' 9,5' 9,5' 9,5' 9,5' 1' 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional DRILLING COMMENTS $ $ $ $ $ $ 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional DRILLING COMMENTS

$ $ $ $ $ $ 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional COMPLETION COMMENTS $ $ $ $ $ $ 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional COMPLETION COMMENTS

$ $ $ $ $ $ 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional COMPLETION COMMENTS $ $ $ $ $ $ 11/21/214 11/22/214 11/23/214 11/24/214 11/25/214 Additional COMMENTS $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212 1 2 3 4 5 6 7 8 12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212 12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212

12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212 12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212

12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212 12/5/212 12/6/212 12/7/212 12/8/212 12/9/212 12/1/212 12/11/212 12/12/212

12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212 9 1 11 12 13 14 15 16 12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212 12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212

12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212 12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212

12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212 12/13/212 12/14/212 12/15/212 12/16/212 12/17/212 12/18/212 12/19/212 12/2/212

12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212 17 18 19 2 21 22 23 24 12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212 12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212

12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212 12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212

12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212 12/21/212 12/22/212 12/23/212 12/24/212 12/25/212 12/26/212 12/27/212 12/28/212

12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213 25 26 27 28 29 3 31 32 12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213 12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213

12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213 12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213

12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213 12/29/212 12/3/212 12/31/212 1/1/213 1/2/213 1/3/213 1/4/213 1/5/213

1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213 33 34 35 36 37 38 39 4 1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213 1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213

1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213 1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213

1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213 1/6/213 1/7/213 1/8/213 1/9/213 1/1/213 1/11/213 1/12/213 1/13/213

1/14/213 1/15/213 Additional 41 42 Costs 1' COMPLETION COMMENTS 1/14/213 1/15/213 Additional COMPLETION COMMENTS 1/14/213 1/15/213 Additional COMPLETION COMMENTS

1/14/213 1/15/213 Additional COMPLETION COMMENTS $ $ $ 1/14/213 1/15/213 Additional COMPLETION COMMENTS

$ $ $ 1/14/213 1/15/213 Additional COMPLETION COMMENTS $ $ $ 1/14/213 1/15/213 Additional COMMENTS $ $ $ $ $ $ $ $ $

Depth (ft) Depth (ft) Drilling Days vs Depth Depth vs Cumulative Cost 5 Well Name 5 Well Name Planned Depth vs Days Actual Depth vs Days Cumulative Planned Cost vs Depth (1,5) (1,5) Cumulative Cost Spud Date - (3,5) (3,5) (5,5) (5,5) (7,5) (7,5) (9,5) (9,5) (11,5) 1 2 3 4 5 6 7 8 9 1 11 12 13 14 15 16 17 18 19 2 21 22 23 24 25 26 27 28 29 3 31 32 33 34 35 36 Days (11,5) - $2, $4, $6, $8, $1,, $1,2, $1,4, $1,6, $1,8, $2,, Cumulative Cost

WELL NAME: OPERATIONS: CONTRACTOR: MIRU COSTS: THREE RIVERS OPERATING II RIG MOVE & RIG UP REPORT AFE # : 14175 AFE 9,5' AFE DAYS 2 LAST BOP TEST COUNTY: STATE: DATE (Start of DAY: Pecos Texas Rig Move): 1/4/14 1 (MD): (TVD): PROGRESS: Rig Up SUPV: AFE Dry Hole AFE Dry Hole $: (COB) Patterson UTI rig:47 Isaac Ramos $: $1,57,8 $1,845,8 MOVE DAY 1 MOVE DAY 2 MOVE DAY 3 MOVE DAY 4 MOVE DAY 5 CUM MIRU Cost $255,774 Cost $2,3 Cost $6,748 Cost $ Cost $ COST: $282,552 TIME START END HRS RIG MOVE- RIG UP- DAY 1 6: 6:3.5 Working on preparing derrick to lay over. 6:3 7:.5 First Trans Pecos truck arrived on location at 6:3, Held pre tour safety meeting with trucking company. 7: 19: 12. Move in tubulars, rig components and set in working pits and substructure. Last truck shut down at 19:hrs due to day light. 19: 6: 11. Morning tour digged ditches around working pits and sub and rigged up working pits. 9% MOVED, 2% RIGGED UP, 1 % ON OLD LOCATION 24. TIME START END HRS RIG MOVE- RIG UP- DAY 2 6: 6:3.5 Digging and cleaning ditches. 6:3 7:.5 Held pre-job safety meeting with Patterson and Trans Pecos Personnal. Trucks arrived at 6:3am on location. 7: 6: 23. Move in; Rig up with rig crews and trucks, derrick on sub structure at 11: am, smashed drilling line while lifting derrick. Raised A-legs and string up blocks, and slip and cut drlg line. Set in an back yard and rigging up. Raised derrick at 15:3 hrs. and continued to rig up with rig crews. Released trucks at 15:hrs. 1% moved, 85 % rigged up Estimated spud in at 15:hrs / 1-6-214 Date 1/5/14 Water meter= 14647 24. TIME START END HRS 6: 15: 9. RIG MOVE- RIG UP- DAY 3 Rig up rig floor;install mouse hole and rat hole and picked up swivel and kelly and torqued up and set back. Install rotary chain, Pick up and rig up ST-8 and continue rigging up rig floor. Date 1/6/14 Water meter= 15629 9.

WELL NAME: OPERATIONS: CONTRACTOR: PSI: DRILLING MECHANICS PICK UP WEIGHT SLACK OFF WEIGHT ROTATING WEIGHT TORQUE ON BOTTOM TORQUE OFF BOTTOM BIT NO TIME START END HRS FROM TO 15: 17: 2. 17: 18: 1. 18: 22: 4. 22: 23: 1. 23: 23:3.5 839 THREE RIVERS OPERATING II DAILY DRILLING REPORT AFE # : 14175 AFE 9,5' AFE DAYS 3 Spud Date 1/6/214 23:3: PM LAST BOP TEST COUNTY: STATE: DATE: DAY: Pecos Texas 1/7/14 Drilling Patterson UTI rig:47 SPM: 14 25 25 25 N/A N/A PLAN 95 (MD): SUPV: TOTAL GPM: BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES 1 158 (TVD): 158 Isaac Ramos AFE Dry Hole $: $1,57,8 DAILY COST: 588 $36,128 CASING STRINGS PROGRESS: AFE Dry Hole $: (COB) CUM DRLG COST: ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft 13 3/8 54.5 J-55 STC - - - MUD MIXED TIME DISTRIBUTION MW 8.4 GEL 45 RU/RD Cum Mud $7,675 TOTAL (Daily/cum) 15 15 1 WOB ROP (M lbs) (fph) Test True Shot survey tool 23:3 6: 6.5 8 158 Spud in and Drill from 8' to 158' (78') 55 1 12 78 $1,845,8 $318,68 SIZE 17 1/2 VIS 34 SALTGEL DRLG 6.5 6.5 MFG Ulterra PV LIME REAM/WASH TYPE TCI YP CAUSTIC SURVEY SER. NO GTX-C19 GELS SODA ASH TRIP NOZZLES 3X18 ph 7. BARITE RIG SERVICE TFA.746 WL N/C PAPER 6 CIRC & COND OUT 158 HP/HT RUN CSG/CMT IN GC WOC FOOTAGE 158 CL NU/TST BOP HOURS 6.5 Ca RIG REPAIR 1 1 FT/HR 24 Sand LOG hp/dia inch Solids FISHING/STUCK IMP FORCE DC Anlr Vel DP Anlr Vel Oil % CORE DST KICK BIT # DULL CONDITION: LOST CIRC. ICS OCS DC LOC B/S G ODR RP Day Mud $7,675 MISC C/O, WELD HEAD 7.5 7.5 ACTIVITY Weld on conductor and install flow line and turn buckles. Begin day work at 3: pm 1-6-14 Mix spud mud and Load pipe rack strap and caliper 8" and 6" and make up BHA #1. Wait on Bit sub, Bit sub on location was stamped 6 5/8" box and was not correct called Air Drilling Solution to send out another bit sub. Bit sub arrived at 1:pm and made up bit. Re spool drilling line due to loose wraps on drum. RPM water meter= 1665 15. DAILY AVG 55 1 12 SHOWS/FLARE REPORT BHA SURVEYS DESCRIPTION LENGTH DEVIATION Bit Ulterra 17.5 GTX-C9 Bit Sub 6-5/8B X 7-5/8B 1.5 3.96 WASTE DISPOSAL SITE: 8" Shock Sub 12.97 DAILY YDS SOLID - 1 BBLS LIQUID 1 17-1/2" 3-Pnt Reamer 9.1 WELL CUM SOLID - 1 CUM LIQUID 1 True Shot survey tool 1-8" Drill Collar 17.7 31.7 TOTAL DRILLED GAS GAS Units DC SIZE Background Gas: 8" Connection gas: Trip Gas: Max Gas: DP SIZE 4.5 AZIMUTH ACCIDENTS NONE Start Received End Consumed FUEL (gals) 3445 5 7248 1197 BHA LENGTH DRILL PIPE WEIGHT OF BHA WEIGHT OF BHA (below jars) 76.3 81.7 Pump #1 Pump #2 SLOW PUMP RATES PSI SPM PUMP MAKE LINER STROKE SPM % EFF GPM BPM TBPM 1 Emsco 6 12 7 95 293 7 13.9 2 Emsco 6 12 7 95 293 7

WELL NAME: OPERATIONS: CONTRACTOR: PSI: 1145 DRILLING MECHANICS AFE # : 14175 AFE 9,5' AFE DAYS 4 Spud Date 1/6/214 23:3: PM LAST BOP TEST COUNTY: STATE: DATE: Day Pecos Texas 1/8/14 Drilling Patterson UTI rig:47 SPM: 15 THREE RIVERS OPERATING II DAILY DRILLING REPORT (MD): SUPV: TOTAL GPM: 693 (TVD): 693 Isaac Ramos AFE Dry Hole $: $1,57,8 DAILY COST: 63 $13,143 CASING STRINGS PROGRESS: PICK UP WEIGHT 7 PLAN ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft SLACK OFF WEIGHT 72 95 13.375 54.5 J-55 STC - $ ROTATING WEIGHT 7 - $ TORQUE ON BOTTOM - $ TORQUE OFF BOTTOM - $ BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES MUD MIXED TIME DISTRIBUTION BIT NO 1 MW 9.1 GEL 1 RU/RD AFE Dry Hole $: (COB) CUM DRLG COST: SIZE 17.5 VIS 32 SALTGEL DRLG 21 MFG Ulterra PV 2 LIME REAM/WASH TYPE TCI YP 4 CAUSTIC SURVEY SER. NO GTX-C19 GELS 2,4 SODA ASH TRIP NOZZLES 3X18 ph 9. BARITE RIG SERVICE TFA WL N/C paper 4 CIRC & COND OUT IN FOOTAGE 693 693 HP/HT GC CL 45 RUN CSG/CMT WOC NU/TST BOP HOURS 27.5 Ca 12 RIG REPAIR 3 FT/HR hp/dia inch 25 #DIV/! Sand Solids 1 LOG FISHING/STUCK IMP FORCE Oil % CORE DC Anlr Vel DST DP Anlr Vel KICK BIT # DULL CONDITION: LOST CIRC. ICS OCS DC LOC B/S G ODR RP Day Mud $1,216 MISC Cum Mud $8,891 TOTAL (Daily/cum) 24 TIME WOB ROP ACTIVITY RPM START END HRS FROM TO (M lbs) (fph) 6: 1: 4. 158 217 Drill from 158' to 217' (59) rop 14.8, wob 25, gpm 63, rpm 95, spm 75/75, spp 647 psi 95 3 15 1: 11: 1. 217 217 Lay down kelly and change out swivel packing due to broken grease zert. 11: 12: 1. 217 217 Repair cracked weld on flow line (re weld). 12: 19:3 7.5 217 372 Drill from 217' to 372' (155) rop 2.6, wob 25, gpm 63, rpm 95, spm 75/75, spp 169 psi.. 95 3 21 19:3 2:.5 372 372 Attempted to drill Pason not tracking work on drill o-matic. 2: 21: 1. 372 42 Drill from 372' to 42' (3) rop 3, wob 3, gpm 63, rpm 95, spm 75/75, spp 1145 psi.. 95 3 3 21: 21:3.5 42 42 Pason showing zero weight on bit, checked weight indicator, depleted pumped up. 21:3 6: 8.5 42 693 Drill from 42' to 693 (291) rop 34.2, wob 35, gpm 63, rpm 95, spm 75/75, spp 1145 psi.. 95 35 34 535 $1,845,8 $421,823 2 water meter= 17584 24. DAILY AVG 95 31 24.91299 SHOWS/FLARE REPORT BHA SURVEYS DESCRIPTION LENGTH DEVIATION AZIMUTH Bit Ulterra 17.5 GTX-C9 1.5 156.4 Bit Sub 6-5/8B X 7-5/8B 3.96 357.3 WASTE DISPOSAL SITE: 8" Shock Sub 12.97 62.5 DAILY YDS SOLID - 1 BBLS LIQUID 1 17-1/2" 3-Pnt Reamer 9.1 WELL CUM SOLID - 1 CUM LIQUID 1 True Shot survey tool 17.7 1-8" Drill Collar 31.7 TOTAL DRILLED GAS 17-1/2" 3-Pnt Reamer 9.12 GAS Units DC SIZE 4-8"Dc's 116.78 Background Gas: 6"-8" X-O 3.8 Connection gas: 15-6" Dc's 458.26 Trip Gas: DP SIZE Max Gas: 4.5" ACCIDENTS FUEL (gals) Start 7248 BHA LENGTH 663.54 SLOW PUMP RATES Received DRILL PIPE 29.46 PSI SPM End 6288 WEIGHT OF BHA 53 Pump #1 Consumed 96 WEIGHT OF BHA (below jars) Pump #2 PUMP MAKE LINER STROKE SPM % EFF GPM BPM TBPM 1 Emsco 6 12 75 95 315 7 15 2 Emsco 6 12 75 95 315 7

WELL NAME: OPERATIONS: CONTRACTOR: PSI: 1437 DRILLING MECHANICS AFE # : 14175 AFE 9,5' AFE DAYS 5 Spud Date 1/6/214 23:3: PM LAST BOP TEST COUNTY: STATE: DATE: Day Pecos Texas 1/9/14 (MD): SUPV: TOTAL GPM: 925 (TVD): 925 Isaac Ramos AFE Dry Hole $: $1,57,8 DAILY COST: 63 $94,621 BIT NO 1 MW 9.3 GEL 1 RU/RD SIZE 17.5 VIS 34 SALTGEL DRLG 1 MFG Ulterra PV LIME REAM/WASH TYPE TCI YP CAUSTIC SURVEY SER. NO GTX-C19 GELS SODA ASH TRIP 3 NOZZLES 3X18 ph 9. BARITE RIG SERVICE 1 TFA.746 WL PAPER 3 CIRC & COND 1 OUT 925 HP/HT RUN CSG/CMT 7 IN GC WOC 1.5 FOOTAGE HOURS 925 37.5 CL Ca NU/TST BOP RIG REPAIR.5 FT/HR hp/dia inch IMP FORCE 25 #DIV/! Sand Solids Oil % LOG FISHING/STUCK CORE DC Anlr Vel DST DP Anlr Vel KICK BIT # 1 DULL CONDITION: LOST CIRC. ICS OCS DC LOC B/S G ODR RP Day Mud $ MISC 4 1 BT M 6 1 NO TD Cum Mud $8,891 TOTAL (Daily/cum) 24 17:3 18:.5 925 925 18: 2: 2. 925 925 2: 21: 1. 925 925 21: 22: 1. 925 925 22: 1: 3. 925 925 1: 1:3.5 925 925 1:3 2:3 1. 925 925 2:3 4: 1.5 925 925 4: 4:3.5 925 925 4:3 6: 1.5 925 925 W.O.C Patterson UTI rig:47 SPM: 15 THREE RIVERS OPERATING II DAILY DRILLING REPORT CASING STRINGS PROGRESS: Updated TRRC Audrey Operator #2 at 5:44am/ 1-9-214 water meter= 18563 24. DAILY AVG 95 35 25.733333 SHOWS/FLARE REPORT BHA SURVEYS DESCRIPTION LENGTH DEVIATION AZIMUTH Bit Ulterra 17.5 GTX-C9 1.5 156.4 Bit Sub 6-5/8B X 7-5/8B 3.96 357.3 WASTE DISPOSAL SITE: 8" Shock Sub 12.97 62.5 DAILY YDS SOLID - BBLS LIQUID 17-1/2" 3-Pnt Reamer 9.1 877.6 WELL CUM SOLID - CUM LIQUID True Shot survey tool 17.7 1-8" Drill Collar 31.7 TOTAL DRILLED GAS 17-1/2" 3-Pnt Reamer 9.12 GAS Units DC SIZE 4-8"Dc's 116.78 Background Gas: 6"-8" X-O 3.8 Connection gas: 18-6" Dc's 548.21 Trip Gas: DP SIZE Max Gas: 4.5" ACCIDENTS FUEL (gals) Start 6288 BHA LENGTH 753.49 SLOW PUMP RATES NO Received DRILL PIPE 171.51 PSI SPM End 5329 WEIGHT OF BHA 65 Pump #1 Consumed 959 WEIGHT OF BHA (below jars) Pump #2 PUMP MAKE LINER STROKE SPM % EFF GPM BPM TBPM 1 Emsco 6 12 75 95 315 7 15 2 Emsco 6 12 75 95 315 7 AFE Dry Hole $: (COB) CUM DRLG COST: 232 $1,845,8 $516,444 PICK UP WEIGHT 86 PLAN ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft SLACK OFF WEIGHT 8 95 925 13.375 54.5 J-55 STC - $33.29 ROTATING WEIGHT 84 72 8 5/8 32 J-55 LTC - $2.7 TORQUE ON BOTTOM - $ TORQUE OFF BOTTOM - $ BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES MUD MIXED TIME DISTRIBUTION TIME WOB ROP ACTIVITY RPM START END HRS FROM TO (M lbs) (fph) 6: 8:3 2.5 693 77 Drill from 693' to 77' 95 35 31 8:3 9:3 1. 77 77 Rig service: Grease traveling blocks, checked crown-o-matic, brake linkage 9:3 1:.5 77 77 Adjust linkage and brake band rollers. 1: 17:3 7.5 77 925 Drill from 77' to 925' TD at 5:3 PM/ 1-8-214 95 35 21 Circulate: Pumped viscous sweep and circulated hole clean. Trip: P.O.O.H to run 13 3/8" surface casing. Lay down bha: Break bit and laydown reamers, shock sub, true shot, bit. Rig up Permian casing crew and lay down truck and held pre-job safety meeting. Run 22 jts of 13-3/8" 54.5# J-55 STC and landed at 925 ft. and Rig down casing crew. Circulate bottoms up. Rig up cementers while circulating hole at a reduced pump rate. Cmt: Test lines to 3 psi, 2 bbl gel spacer, Lead cmt: 49 sx, 12.9#, 1.85 Yield, 9.69 gal/sx Tail cmt: 335 sx, 14.8#, 1.35 Yield, 6.26 gal/ sx. Shut down and drop plug at and displaced with 137 bbls fresh water, last 1 bbls circulating pressure 275 psi at 3 bpm. Landed plug and pressured up to 85 psi. at 3:5 am/ 1-9-214. Circulated 87 bbls (264 sx) into reserve. 1% returns during cmt job, released pressure and received back 1 bbl floats held. Rig down Halliburton cementers. W.O.C 3

WELL NAME: AFE # : Spud Date 14175 1/6/214 23:3: PM AFE 9,5' AFE DAYS LAST BOP TEST 6 1/9/14 COUNTY: STATE: DATE: Day Pecos Texas 1/1/14 OPERATIONS: (MD): PROGRESS: P.O.O.H 925 (TVD): 925 CONTRACTOR: SUPV: AFE Dry Hole AFE Dry Hole $: (COB) Patterson UTI rig:47 Isaac Ramos $: $1,57,8 PSI: SPM: TOTAL GPM: DAILY COST: CUM DRLG COST: $27,121 DRILLING MECHANICS BIT NO 2 MW 8.4 GEL RU/RD SIZE 11 VIS 28 SALTGEL DRLG MFG Ulterra PV LIME REAM/WASH TYPE 813M YP CAUSTIC SURVEY SER. NO 2645 GELS SODA ASH TRIP 5 NOZZLES 8X16 ph 7. BARITE RIG SERVICE TFA OUT 1.57 925 WL HP/HT CIRC & COND RUN CSG/CMT IN 925 GC WOC 2.5 FOOTAGE CL 15 NU/TST BOP 11.5 HOURS Ca 32 RIG REPAIR FT/HR hp/dia inch IMP FORCE #DIV/! #DIV/! Sand Solids Oil % LOG FISHING/STUCK CORE DC Anlr Vel DST DP Anlr Vel KICK BIT # DULL CONDITION: LOST CIRC. ICS OCS DC LOC B/S G ODR RP Day Mud $4,196 MISC 5 TIME START END HRS FROM TO 6: 8:3 2.5 925 925 8:3 12: 3.5 925 925 12: 2: 8. 925 925 2: 2:3.5 925 925 2:3 23: 2.5 925 925 23: 1: 2. 925 925 1: 3: 2. 925 925 3: 3:3.5 925 925 3:3 5: 1.5 925 925 5: 6: 1. 925 925 THREE RIVERS OPERATING II DAILY DRILLING REPORT CASING STRINGS Cum Mud $13,87 TOTAL (Daily/cum) 24 $1,845,8 $543,565 PICK UP WEIGHT PLAN ACTUAL TOL SIZE WT GRADE THRD LOT/FIT $/ft SLACK OFF WEIGHT 95 925 13.375 54.5 J-55 STC - $33.29 ROTATING WEIGHT 72 8.625 32 J-55 LTC - $2.7 TORQUE ON BOTTOM - $ TORQUE OFF BOTTOM - $ BIT RECORD PRESENT BIT PREVIOUS BIT MUD PROPERTIES MUD MIXED TIME DISTRIBUTION ACTIVITY W.O.C Cut off conductor and rough cut csg, remove cut off and made final cut and installed and weld on 13-5/8" 3M X 13-3/8" SOW and test to 5 psi (good). N/U B.O.P Test B.O.P and casing 25 psi low and 1 psi high. Finish N/U panic lines and fabricate 6" line from manifold to gas seperator. Strap and caliper BHA #2 and P/U Pheonix 8" mtr.16 rev/gal.. bend, true shot damaged on face on pin end, lay down and run 1- stand and 1-jt. Of drill pipe, test mtr ok. T.I.H with BHA #2 tag cmt at 883'. Test B.O.P pipe rams 25 psi low and 1 psi high. Drill cmt and float equipment from 883' to 925'. P.O.O.H to pick up up True Shot Survey tool. RPM 4 WOB ROP (M lbs) (fph) water meter= 19542 24. DAILY AVG SHOWS/FLARE REPORT BHA SURVEYS DESCRIPTION LENGTH DEVIATION AZIMUTH Ulterra 11" 813M 1.5 156.4 Mud mtr.16,. 28.27 357.3 WASTE DISPOSAL SITE: 8" Shock Sub 12.97 62.5 DAILY YDS SOLID - 1 BBLS LIQUID 1 11"-1/16 3-PNT REAMER 7.59 877.6 WELL CUM SOLID - 1 CUM LIQUID 1 True Shot survey tool 1-8" Drill Collar 31.7 TOTAL DRILLED GAS 11"-1/16 3-PNT REAMER 7.21 GAS Units DC SIZE 4-8"Dc's 9.12 Background Gas: 6"-8" X-O 3.8 Connection gas: 21-6" DC'S 642.16 Trip Gas: DP SIZE Max Gas: 4.5 ACCIDENTS FUEL (gals) Start 5329 BHA LENGTH 742.97 SLOW PUMP RATES Received DRILL PIPE 182.3 PSI SPM End 529 WEIGHT OF BHA Pump #1 Consumed 3 WEIGHT OF BHA (below jars) Pump #2 PUMP MAKE LINER STROKE SPM % EFF GPM BPM TBPM 1 Emsco 6 12 95 2 Emsco 6 12 95