Endeavor Energy Resources, LP. DAILY DRILLING REPORT

Similar documents
APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

Daily Drilling Summary Report

Gulftex Energy III LP DAILY COMPLETION REPORT

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

DAILY DRILLING REPORT DATE : 08/01/2012

19,683 8,

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250


Drilling & Completion Summary

OPERATIONS SUMMARY REPORT

DAILY DRILLING REPORT

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

Callon Petroleum Company Drilling Report

Daily Drilling Report

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

Spud meeting with Periscope Connect electric lines, r/u v-door install shak

Daily Activity Report

Daily Drilling Report

DAILY DRILLING REPORT


Daily Drilling Report

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

DAILY DRILLING REPORT

Daily Drilling Report

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

END OF WELL REPORT. UL G 9-46 Unit 2H. ANDREWS COUNTY, TX Trinidad 121 May 11, Report Prepared By:

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

MORNING DRILLING REPORT

Drilling & Completion Summary - Ascending

Current Depth. Proposed TD. Current Operation

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY DRILLING REPORT

DATE: 01/03/ DAILY COMPLETION REPORT

McKissick 200mt. Stabbing board

RIG 32. Rig 32. Page 1 of 13

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

LOC 400 Drilling Rig

Current Depth. Proposed TD. Current Operation

Ideco - H25 Information Document

DAILY DRILLING REPORT DATE : 04/20/2011

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

MORNING DRILLING REPORT

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

Drillmec HH-300 spec.

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

DAILY DRILLING REPORT

DAILY OPERATIONS REPORT Date:

About Cobra Downhole Motors

About Cobra Downhole Motors

INNORIG LAND DRILLING UNIT HUISMAN PRODUCT BROCHURE

Superintendent Rig Checklist

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 9E DEPTH CAPACITY: 4,500 METERS WITH 127 mm DRILL PIPE BI-FUEL A.

Plug & Abandonment Light Drilling Workover Well Intervention

Rotary Snubbing Technology Option for Long Reach

DRILLING MOTOR HANDBOOK

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

Casing Drilling- Recent Advances for Drilling Challenges. Allen Sinor Hughes Christensen- A Baker Hughes Company The Woodlands, Texas

Rig Equipment List. Substructure. NOV- Slingshot type (2 piece) Clearance: 20 with 18 of clearance. Capacity: 500,000# loading

3/25/15 University DC 1H Devonian Completion

APACHE CORPORATION. Daily Land - Orig Comp Report

Elevation Resources LLC

SCHEDULE 1. CONTRACTOR: JOMAX DRILLING (1988) LTD. RIG NUMBER: 1E DEPTH CAPACITY: 6,000 METERS WITH mm DRILL PIPE BI-FUEL

Using Drilling Dynamics To Reduce Drilling costs

APACHE CORPORATION. Daily Land - Orig Comp Report

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

VDD 370 Super Single Rig - Automatic Pipehandling System

VDD 200 Super Single Rig - Automated Pipehandling System

VDD 400 Offshore Super Single - Automated Pipehandling System

SCHEDULE 1 DATE: JANUARY 2015 DESCRIPTION OF RIG EQUIPMENT PROVIDED BY CONTRACTOR (ATTACHMENT TO EXHIBIT A)

PATTERSON-UTI DRILLING COMPANY MORNING REPORT HORIZONAL OIL

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

Rig 1 Sky top 4 Axle Carrier 6500 Drilling Depth

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

Smart Top Drive Automation Improves Drilling Performance and Prevents Downhole Tool Failures

SCORPION DC, LLC Rig 1 Sky Top 4 Axle Carrier 6500 Drilling Depth

Schede tecniche Corsair 300 PDB

Athlon Energy Operating LLC

DRILL PIPE CARE AND HANDLING Complete Group AVENUE Leduc AB T9E 0W1 +1 (780) CG.ENG.

GENERATOR # 1 & 2 GENERATOR # 3 GENERATOR # 4 Make: STAMFORD STAMFORD KATO Model: Power Rating (kw) 1,050 1,050 1,050 KVA 1,750 1,750 1,500

Mast Height ft (45.0 m) Free Working Height 98.4 ft (30.0 m) Mast Base 21.3 ft (6.5 m) x 24.6 ft (7.5 m)

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

CNL, CCL, GR, CBL. RDMO

Latest Advancements in DrillString Mechanics

CONSTRUCTION OF AN AUTONOMOUS LABORATORY SCALE-DRILLING RIG FOR TESTING AND CONTROL OF DRILLING SYSTEMS

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

Abandonment BAS-3. Frisia Zout B.V. 4 December 2013

CUSTOMER WELL NAME COUNTY, STATE

COMMITMENT TO EXCELLENCE

BASKETS/SLINGS CARRYING BLOW OUT PREVENTER RAMS

Transcription:

Rigging up SPUD 8// Robert Soliz COST: Drilling Completion Report # 66, 66, Rig Number: 575--8657 Cell Number: 86-777-48 6 6: Skid Rig Move in & R/U, Build New spool for flowline, Move solids control equipment around, Start DP Inspection /CSG HGS/SAND % O/W RATIO OIL % MBT PH/ES Caustic Starch Salt R (rot motor or min max) PF/MF CL (P) CA (P) Magnesium Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS PowerDriveX6 Filter Sub XO Wenzel Mtr @ * ABH 8 /8 NM Spiral Stabilizer UBHO NC (MWD) Flow Sleeve Sub Flex NC 4 / Reg 4 / Reg X 4 / IF 4 / IF 4 / IF x 4 / Reg 4 / Reg X 4 / IF 5 / 4 / IF Depth 88 5,5 4 / IF Weight 4 7 4 / IF P- 4 / IF 4 / IF DRILL PIPE 5. 4.76 9.5 4.5 IF 5 54 4,8 487. MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) SPR & PRESSURE 45/45 4/6 TEST SUB S&PSI 44/85 4/686 # Pump Proj To Proj To T D 5,5 665.58 9...8 847.44 Notes / Next 4 hrs: R/U Spud Drill Surface, Set 9 5/8 Csg

6 : 5.5 : 4:.5 4: : 6. : :. : :. : :.5 : 4:.5 4: :.5 : :.5 : 6: 4.5 Rigging up 8/4/ COST: SPUD Drilling 45,565,777 Completion Robert Soliz Report # Rig Number: 575--8657 Cell Number: 86-777-48 R/U, Build New spool for flowline, Move solids control equipment around, Continue DP Inspection Pre Spud inspection Build and instal ' section of flowline (work on topdrive encoder) Load and strap new BHA Pump through lines and check for leaks tighten middle spool & dresser sleeve on flow line Service Top Drive Center torque track over the hole and center conductor Wait on /4 bit breaker M/U # & BHA F/ T/ 9' Rig Repairs (Blew ST-8 hose) Change hose.5 /CSG /4 Ultera U59M 97 HGS/SAND % Caustic 7 x 4s 45 O/W RATIO R (rot motor or min max) 45 9 OIL % MBT PH/ES Starch Salt PF/MF CL (P) CA (P) Magnesium Corr Solids Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Shock sub 8" DCs IBS 8" DCs XO Sub HWDP.5.6.5 8..5 6 5/8 Reg 6 5/8 Reg 6.47 8..5.875.67 6 5/8 Reg 6 5/8 Reg 98.8 8..875 6 5/8 Reg Size.68 8. 6 5/8 Reg X 4 / IF Depth 6 87.84 5. 5. 4 / IF Weight Grade DRILL PIPE 5. 4.76 9.5 4.5 IF 569. MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) SPR & PRESSURE 45/45 4/6 TEST SUB S&PSI 44/85 4/686 # Pump Proj To Proj To T D Notes / Next 4 hrs: Repair ST-8s, Spud, Drill T/ 847' Run 9 5/8 Csg TVD Incl. Az. DLS. V.S.

6 6.5 6 4.5.5. 4. 4 5. 5 6.5 6 7. 7 8. 8 9.5 9.5.5.. 4 4. 4 6.5 847 77 Weld On Well Head 8/5/ COST: SPUD 8/4/ Drilling,579 5,56 Completion,4,4 Robert Soliz Report # Rig Number: 575--8657 Cell Number: 86-777-48 Rig Repairs (Blew ST-8 hose) Change hose Drlg F/-T/569 WLS @4'.9* Drlg F/569-T/847 CIRC. Wait On Gyro To Get Tools Ready To Run Gyro Run Gyro On Wireline TOOH F/847-T98 Rigup Laydown Machine & Safety Meeting Laydown 8" DC'S & BHA T/ Rigup Casing Crew Change Out Bails & Safety Meeting Run jts. 9 5/8 #4 LT & C Casing Circ. Casing Rigdown Casing Crew & Laydown Machine Rigup Schlumberger & Safety Meeting Cmt. Casing W/4sx "C"+.%S+.5%D Circ. 84Sx To / Tank Or bbls WOC Cutoff Conductor Pipe & 9 5/8 Casing Weld On Head HO 9.5 5 4/ /CSG /4 Ultera U59M 9//.486 97 NC 7./6.4 Caustic 7 x 4s HGS/SAND % / 5 45 O/W RATIO 9.9 5 R (rot motor or min max) 45 9 OIL % Starch 77 77 MBT Salt 5.5 5.5 PH/ES 9.. PF/MF./. CL (P) 7, CA (P) 68 Magnesium 46. Corr Solids 4.9 9.54 Ch. Seal (x/6ths) Dull Ch. Pulled No A X IN No TD Still Looks Real Good Torque FT/LBS Shock sub 8" DCs IBS 8" DCs XO Sub HWDP.5.6.5 8..5 6 5/8 Reg 6 5/8 Reg 6.47 8..5.875.67 6 5/8 Reg 6 5/8 Reg 98.8 8..875 6 5/8 Reg Size 9 5/8.68 8. 6 5/8 Reg X 4 / IF Depth 847 6 87.84 5. 5. 4 / IF Weight 4 Grade J55 DRILL PIPE 9 8.87 5. 4.76 9.5 4.5 IF -6. 847. MP 4 4 e-clock.9 5 Pressure (W/ max diff) S 75 75 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 69 69 SPR & PRESSURE TEST SUB S&PSI 44/85 4/686 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wqeld Head / Nippleup BOP / Test BOP / Pickup New BHA / TIH / Drill Cement / Drlg Vertical Hole

6 9. 9 4.5 6 9 6.5 9...5. 6 4.5 847 Pickup BHA & DC'S TIH 8/6/ COST: SPUD 8/4/ Drilling 74,45,86 Completion,4 Robert Soliz Report # 4 Rig Number: 575--8657 Cell Number: 86-777-48 Cutoff 9 5/8 Casing Weld On Head Test Wellhead To psi Ok Nippleup BOP & Safety Meeting Rigup Tester & Safety Meeting Test BOP Rams & Choke Valves psi psi low Test Annular psi & psi low Test mud lines and floor valves psi & psi run accumilator function test Slip Cut Drlg Line & Service Rig & Topdrive Change Out Bails Move & Strap OD-ID BHA & DC'S Pickup BHA Tools & Orient MWD Tools Test MWD & Makeup Pickup DC'S F/Racks & TIH T/68 Note: New crew & driller on rig are pretty slow by not being used to topdrive and the rig taking a while to do anything HO 9.5 5 4/ /CSG 8 /4 Ultera U59M 9//.486 9788 NC 7./6.4 Caustic 847 4-6 &-8 HGS/SAND % / 5 5 O/W RATIO 9.9 R (rot motor or min max) 45 6 OIL % MBT PH/ES 9 Starch Salt PF/MF./. CL (P) CA (P) 7, 68 Magnesium 46. Corr Solids 4.9 9.54 Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Motor Wenzel-7/8 6. (.6rpg) w/8.5stab @.5* Motor 7/8 6.(.6rpg)@.5*..67 8.75 4 / Reg 4 / Reg X 4 / IF IBS 8.5" OD UBHO NC (MWD) 6.4.5.8 6.875 6.75 6.875.875.875.85 4 / IF 4 / IF 4 / IF Size 9 5/8 Flow Sleeve Sub.6 6.75.75 4 / IF NC.8 6.975.85 4 / IF Weight 4 IBS 8.5" OD 6.875.69 4 / IF X-O DC'S.59 78. 6.85.85.5 4 / IF X 4 /XH 4 / XH X-O HWDP 6.4 87.84 6.75 5..5 5. 4 / XH X 4 / IF 4 / IF DRILL PIPE 5. 4.76 9.5 4.5 IF 68.9 MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) SPR & PRESSURE TEST SUB S&PSI # Pump Proj To Proj To T D Notes / Next 4 hrs: TIH / Test Casing / Drlg Cement / Drlg Formation TVD Incl. Az. DLS. V.S.

6 6.5 6 7. 7 8.5 8 8.5 8 9.5 9...5 5. 5 6. 6 8. 8 9. 9.5.5. 847,97 Rotate/Drlg Pilot Hole 8.5 8/7/ COST: SPUD 8/4/ Drilling 4,797 4,658 Completion 8,557 9,6 Roy Reeser Report # 5 Rig Number: 575--8657 Cell Number: 575--8656 TIH T/68 Wash Down To 8 Circ. Bottoms Up Test Casing psi Test Good Drlg Cement F/8-T/847 Rotate Drlg F/847-T/95 Circ. MWD Trouble Shoot No Comm. To Comp In Top Doghouse Slide/Drlg F/95-T/947 Wob-5 Rpm- Spm-95 Gpm-467 Rop-4. Rotate Drlg F/947-T/4 Wob- Rot-55 Rpm- Spm- Gpm-56 Psi- Dill-55 Rop-. Service Rig & Topdrive Rotate Drlg F/,4-T/,69 Wob- Rot-55 Rpm- Spm- Gpm-56 Psi- Dill-55 Rop-4. Service Rig & Topdrive & Chjange Dies In Backup Wrench Rotate Drlg F/,69-T/,85 Wob- Rot-55 Rpm- Spm- Gpm-56 Psi- Dill-55 Rop-7. Conn & Survey Rotate Drlg F/,85-T/, Wob- Rot-55 Rpm- Spm- Gpm-56 Psi- Dill-55 Rop-98. Con't On Page Note: Nathan Is Back As Of Yesterday Evening 5 & XC 9.4 6 7/ /CSG 8 /4 Ultera U56M /4/.489 6 4 7.5/. Caustic 847 4-6 &-8 HGS/SAND % / 5 5 O/W RATIO 9.5 R (rot motor or min max) 45 6 OIL % Starch,97,97 MBT Salt 6. 6. PH/ES 9.8 9.8... PF/MF./.7 CL (P) CA (P) 75,,6 Magnesium.5 5 65 Corr Solids.9 9.54 5 Ch. Seal (x/6ths) Dull Ch. Pulled 5 Torque FT/LBS 6,5 Motor Wenzel-7/8 6. (.6rpg) w/8.5stab @.5* Motor 7/8 6.(.6rpg)@.5*..67 8.75 4 / Reg 4 / Reg X 4 / IF IBS 8.5" OD UBHO NC (MWD) 6.4.5.8 6.875 6.75 6.875.875.875.85 4 / IF 4 / IF 4 / IF Size 9 5/8 Flow Sleeve Sub.6 6.75.75 4 / IF NC.8 6.975.85 4 / IF Weight 4 IBS 8.5" OD 6.875.69 4 / IF X-O DC'S.59 78. 6.85.85.5 4 / IF X 4 /XH 4 / XH X-O HWDP 6.4 87.84 6.75 5..5 5. 4 / XH X 4 / IF 4 / IF DRILL PIPE 66,8.65 5. 4.76 9.5 4.5 IF.,764.94 MP 8 tie in 7.75.8 44.7.8-8.45 58,.7. 49..95 -. Pressure (W/ max diff),89 89.69.4 5.89.7-6.8 S,79 78.6.68 48.66.4 -. LINER,569 568.5.86 46.7.8-7.6 STROKE LENGTH,756 755.44.78 48.49.5 -.66 OUTPUT (gal/stk) 4.9 4.9,944 94.5.74 48.68.6.66 OUTPUT (G) 56,4.6.86 47.58. 8.95 SPR & PRESSURE,5 4.5. 5..7 4. TEST SUB S&PSI,49 48.8.7 4.7. 7.4 # Pump,55 54..8 8.5..8 Proj To,764 76.9. 44..44 7,5 669.46 9. 4.7 7.4 7.95 Proj To T D Notes / Next 4 hrs: Slide / Rotate Drlg Pilot Hole

6 7. 7 8. 8..5.5.5.5.5.5.5.5.5 6.5 5,85,86 TOOH 8/8/ COST: SPUD 8/4/ Drilling 67,759 48,47 4 Completion,8,4 Roy Reeser Report # 6 Rig Number: 575--8657 Cell Number: 575--8656 Rotate Drlg F/,764-T/4,77 Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-8.4 Service Rig & Topdrive Rotate Drlg F/4,77-T/5,4 Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-8. Conn & Survey Swap Pumps Rotate Drlg F/5,4-T/5,8 Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-88. Conn & Survey Swap Pumps Rotate Drlg F/5,8-T/5, Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-9. Conn & Survey Swap Pumps Rotate Drlg F/5,-T/5,48 Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-9. Conn & Survey Swap Pumps Rotate Drlg F/5,48-T/5,85 Wob- Rot-55 Rpm-8 Spm- Gpm-49 Psi-85 Diff-65 Rop-7.8 Pump & Circ. Sweep Out TOOH T/,444 For Steerable Assembly For Curve Lithology- 6% % Shale % Sand 65 9.75 4 9/8 /CSG 8 /4 Ultera U56M //.57 6 NC 9.9/4.96 Caustic 847 5,85 4-6 &-8 HGS/SAND % / 5 5 O/W RATIO 9. R (rot motor or min max) 45 6 OIL % Starch,86 5, MBT Salt 7.. PH/ES 8.5 5.6. 9.5 4.5 PF/MF./.6 CL (P) 85, 5.5.5 CA (P),68 7,86 7. 4,.5 Magnesium 94.4 5 65 Corr Solids.64 9.8 Tripping Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Motor Wenzel-7/8 6. (.6rpg) w/8.5stab @.5* (SN-65M648) Motor 7/8 6.(.6rpg)@.5*..67 8.75 4 / Reg 4 / Reg X 4 / IF IBS 8.5" OD UBHO NC (MWD) 6.4.5.8 6.875 6.75 6.875.875.875.85 4 / IF 4 / IF 4 / IF Size 9 5/8 Flow Sleeve Sub.6 6.75.75 4 / IF NC.8 6.975.85 4 / IF Weight 4 IBS 8.5" OD 6.875.69 4 / IF X-O DC'S.59 78. 6.85.85.5 4 / IF X 4 /XH 4 / XH X-O.4 6.75.5 4 / XH X 4 / IF HWDP 6 87.84 5. 5. 4 / IF 5,8 7 DRILL PIPE 65 5,8.6 5. 4.76 9.5 4.5 IF -4.55 5,85. MP,746 744.69.7 65.6. 4.9 85 4, 48.65.86 47.. 46.46 Pressure (W/ max diff) 6 4,9 47.64.8 5.65. 48.78 S 4,47 445.6.59 54.8. 5.9 LINER 4,598 4596.6.7 6.4.9 5.4 STROKE LENGTH 4,789 4787.6.45.7. 5.4 OUTPUT (gal/stk) 4.9 4.9 4,978 4976.6.7 6.. 55.5 OUTPUT (G) 56 5,68 569.66 4.54. 57.8 SPR & PRESSURE 5,58 558.58 44..8 58.9 TEST SUB S&PSI 5,547 5545.57.66 54.45. 6.74 # Pump 5,77 575.55.7 56.. 6.95 Proj To 5,85 5848.54.7 5.4. 64.5 7,5 669.7 9. 4. 7.44 7.5 Proj To T D Notes / Next 4 hrs: TOOH / Change BHA / TIH / Slide/Rotate Drlg Curve

5,97 Slide/Rotate Drlg Building Curve SPUD 8/9/ 8/4/ 4 Roy Reeser COST: Drilling Completion Report # 58,67, 7 466,484 5,64 Rig Number: 575--8657 Cell Number: 575--8656 6 7.5 TOOH T/,444 For Steerable Assembly For Curve 7.5 Laydwon DC'S & Old BHA 4 4. Move & Pickup New BHA Tools TIH 4 5. Service Rig & Topdrive 5 8. Rig Repairs Topdrive, ST-8, Adjust Brakes, High Drum Clutch Control Valves 8 9.5 TIH T/,79 Fill Pipe Every Stands Tag Bridge at,79 9.5 Fill Pipe & Wash Thru Bridge Twice Pull Up Thru It & Go Back In No Pump OK.5 TIH T/5,5 4. Wash & Ream To Bottom Log Well With MWD 6 4.5 Slide/Rotate Drlg F/5,85-T/5,97 Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-6 Diff-5- Rop- Lithology- 5% Shale % % Silt Note: Reason for hi vis on mud check in pits is derrick hand failed to dump the sweeps we pumped into / tank like I told them too don't know if driller even told him too as Charle let him go yesterday 74 9.6 8 /8 /CSG 8 /4 Ultera U56M 8 /4 Hughes VGD- /4/.4 6 55566 NC 8.9/. Caustic 847 5,85 4-6 &-8 5,85-8s HGS/SAND % / 5 5 45 O/W RATIO 9. R (rot motor or min max) 45 6 OIL % Starch,86 5, MBT Salt 7.. 4.5 4.5 PH/ES.5 8.5 5.6 7. 7.. 9.5 4.5 PF/MF./.6 CL (P) 86, 9 9 9 CA (P),64 8 Magnesium 7. Corr Solids.67 9.7 85k Ch. Seal (x/6ths) Dull Ch. Pulled 75k CT G X IN NO BHA 65k Had Chipped Cutter On Gage Row Torque FT/LBS 4,75 Motor Wenzel-7/8 6. (.6rpg) w/8.5stab @.8* (SN 65-M6-44) Motor 7/8 6.(.6rpg)@.8*..8 8.75 4 / Reg 4 / Reg X 4 / IF IBS 8.5" OD UBHO NC (MWD) 6.4.5.8 6.875 6.75 6.875.875.875.85 4 / IF 4 / IF 4 / IF Size 9 5/8 Flow Sleeve Sub.6 6.75.75 4 / IF Flex Monel.66 6.75.85 4 / IF Weight 4 HWDP 6 87.84 5. 5. 4 / IF 77 DRILL PIPE 8 5,68. 5. 4.76 9.5 4.5 IF 69-4.9 5,97. MP 4,9 47.64.8 5.65. 85 4,47 445.6.59 54.8. Pressure (W/ max diff) 6 4,598 4596.6.7 6.4.9 S 4,789 4787.6.45.7. LINER 4,978 4976.6.7 6.. STROKE LENGTH 5,68 569.66 4.54. OUTPUT (gal/stk) 4.9 4.9 5,58 558.58 44..8 OUTPUT (G) 56 5,547 5545.57.66 54.45. SPR & PRESSURE 5,77 575.55.7 56.. TEST SUB S&PSI 5,8 589.55.7 4.94.45 # Pump 5,885 588.47 5.9 4..67 Proj To 5,97 5969.5.45. 9.58 7,8 66. 9. 46.7 7. Proj To T D Notes / Next 4 hrs: Slide/Rotate Drlg Curve

6 5 9. 5 6. 6 9. 9 9.5 9 6.5 6,59 6 Slide/Rotate Drlg Building Curve 8// COST: SPUD 8/4/ Drilling 7,5 58,55 6 Completion 9 5,68 Roy Reeser Report # 8 Rig Number: 575--8657 Cell Number: 575--8656 Slide/Rotate Drlg F/5,97-T/6,56 Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-6 Diff-5- Rop-.6 Service Rig & Topdrive Slide/Rotate Drlg F/6,56-T/,65 Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-75 Diff-5- Rop-. Calibrate Depth Sensor With Canrig Slide/Rotate Drlg F/6,5-T/6,59 Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-75 Diff-5- Rop-. Lithology- 5% Shale % % Silt 8 9.5 9 //.494 /CSG 8 /4 Hughes VGD- / 55566 NC 8./. Caustic 5,85-8s HGS/SAND % / 45 O/W RATIO 9.8 R (rot motor or min max) OIL % Starch 6 74 MBT Salt.5 7. PH/ES 9.5 7.6 7.5. 4. 9. PF/MF./.8 CL (P) 9, 46 549 CA (P), 5 84 9 Magnesium 97. Corr Solids.48 9.65 8k Ch. Seal (x/6ths) Dull Ch. Pulled 75k 7k Torque FT/LBS 4, Motor Wenzel-7/8 6. (.6rpg) w/8.5stab @.8* (SN 65-M6-44) Motor 7/8 6.(.6rpg)@.8* IBS 8.5" OD UBHO NC (MWD) Flow Sleeve Sub Flex Monel HWDP..8 8.75 4 / Reg 4 / Reg X 4 / IF 6.4.5.8 6.875 6.75 6.875.875.875.85 4 / IF 4 / IF 4 / IF Size 9 5/8.6 6.75.75 4 / IF.66 6.75.85 4 / IF Weight 4 6 87.84 5. 5. 4 / IF DRILL PIPE 6,4.7 5. 4.76 9.5 4.5 IF 7 45 6,46 85-4.5 6,59. MP 5,948 5945.6.8 7.9.89 7.79 5 6, 65.9 7.79 7.7 8.9 8.5 Pressure (W/ max diff) 8 6,7 6. 6.8 9.5 97.8 S 6,4 69.5 7.8 4.5 9. 9.7 LINER 6,96 67.5.6 4.79 6.69 46.6 STROKE LENGTH 6,58 64.65 5.4 7.76 6.44 75.58 OUTPUT (gal/stk) 4.9 4.9 6, 675.9 9.94 6.65 7.4 7.8 OUTPUT (G) 56 6,85 6.64 45.4 7.7 4.45 SPR & PRESSURE 6,447 66.69 49. 4. 7.8 78.77 TEST SUB S&PSI 6,5 645. 5. 4.8.6. # Pump Proj To 6,59 645.8 57.58 4. 7.85 7 7,66 66. 9. 46. 5.7 85.67 Proj To T D Notes / Next 4 hrs: Slide/Rotate Drlg Curve

6 5.5..5.5 6 5.5 7, 6 Rotate/Drlg In Laterial 8// COST: SPUD 8/4/ Drilling 78,97 67,46 7 Completion, 6,985 Roy Reeser Report # 9 Rig Number: 575--8657 Cell Number: 575--8656 Slide/Rotate Drlg F/6,59-T/6,7 Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-75 Diff-5- Rop-5. Service Rig & Topdrive Slide/Rotate Drlg F/6,7-T/7, Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-75 Diff-5- Rop-4.6 SPR & Test Sub & BOP Drill Both Pumps Slide/Rotate Drlg F/7,-T/7, Wob--5 Rot- Rpm- Spm- Gpm-56 Psi-75 Diff-5- Rop-4.5 Lithology- 8% Shale % 45 9.5 / /CSG 8 /4 Hughes VGD- //.494 55566 NC 8./.8 Caustic 5,85-8s HGS/SAND % / 45 O/W RATIO 9.8 BTC 4 R (rot motor or min max) OIL % Starch 6,5 MBT Salt.5 49.5 PH/ES.5 7. 7.. 4. 57. PF/MF./.4 CL (P) 95, 86 CA (P),56 57 Magnesium 97. 4 Corr Solids.48 9.57 8k Ch. Seal (x/6ths) Dull Ch. Pulled 75k 7k Torque FT/LBS 8, Motor Wenzel-7/8 6. (.6rpg) w/8.5stab @.8* (SN 65-M6-44) Motor 7/8 6.(.6rpg)@.8* IBS 8.5" OD UBHO NC (MWD) Flow Sleeve Sub Flex Monel HWDP..8 8.75 4 / Reg 4 / Reg X 4 / IF 6.4.5.8 6.875 6.75 6.875.875.875.85 4 / IF 4 / IF 4 / IF Size 9 5/8.6 6.75.75 4 / IF.66 6.75.85 4 / IF Weight 4 6 87.84 5. 5. 4 / IF DRILL PIPE 9 6,.7 5. 4.76 9.5 4.5 IF 5 7,4 88 7,.58 MP 6,5 645. 5. 4.8.6. 5 6,575 644.7 56.8 4. 9.7 64.7 Pressure (W/ max diff) 8 6,68 6474.79 6.45 4. 8.64 49.97 S 6,7 65.47 64.94 4.7 5.75 459.4 LINER 6,765 659.68 66.4 44.8.5 59.6 STROKE LENGTH 6,88 655.4 7. 45.5 6.8 5 OUTPUT (gal/stk) 4.9 4.9 6,89 657. 74.49 44. 8.5 6.68 OUTPUT (G) 56 6,95 6586. 79.8 45.54 667.95 SPR & PRESSURE 45/7 4/59 7,7 6596.94 8. 45.9.58 74.8 TEST SUB S&PSI 4/78 4/6 7,8 665.8 8.74 45.5 5.7 779.66 # Pump Proj To 7, 66.4 9.5 44.7 4.4 887.97 Proj To T D,7 656.64 9.45 8.4. 74.9 Notes / Next 4 hrs: Circ. Sweep Out / TOOH / Change BHA / TIH / Rotate Drlg Laterial

6 8.5 8... 4. 4 5. 5 6. 6 7. 7 8.5 8.5 4.5 4.5 6 5.5 7,55 47 Rotate/Drlg In Laterial 8// COST: SPUD 8/4/ Drilling 85,9 7,854 8 Completion,794,779 Roy Reeser Report # Rig Number: 575--8657 Cell Number: 575--8656 Circ. Sweep Around & Build Slug Pump Slug Work Pipe TOOH T/9 Had Drag On Stand & 5-k No Other Drag On Trip Out Change Out Bolt & Hinge Pin On Clamp On Rotating Head Bowl & Change Mousehole To ft Laydown Old BHA Pickup & Makeup New BHA TIH Service Rig & Topdrive TIH T/,7 Slip & Cut Drlg Line Test MWD & Motor TIH T/6558 Tagged @,5 Wash Then Tagged @5,9 Then Tagged @ 6,56 Wash & Ream To Bottom F/6,558-T/7, Service Rig & Topdrive Rotate Drlg F/7,-T/7,55 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-6. Note: Kept Rop at 8 to make sure that we were getting the turn we needed to direction corrected at 5:Am Speed up to 5ft/hr Lithology- 9% Shale %.5 4 9.55 9 / /CSG 8 /4 Hughes VGD- 8 / Ulterra U59M //.497 55566 978 NC 8.5/.6 Caustic 7 5,85 7, -8s 7, 7-s HGS/SAND % / 45 5 5 O/W RATIO 9.5 BTC R (rot motor or min max) OIL % Starch 6,5 47 47 MBT Salt.5 49.5 5.5 5.5 PH/ES 9.5 7. 7. 6. 6. 4. 57..5.5 PF/MF./. CL (P) CA (P) 9,,48 Magnesium. 4 8 Corr Solids.6 9.6 9 Ch. Seal (x/6ths) Dull Ch. Pulled 75 5 BT M & G E IN LT BHA 6 Middle & Outers Lost Lots Teeth Torque FT/LBS 65-7 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-56)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab)..7 8.5 6.75 4 / Reg 4 / Reg X 4 / IF Filter Sub X-O Double Pin..76 6.65 6.48.5.75 4 / IF 4 / IF X 4 / Reg Motor Wenzel 7/8 6.(.6rpg). 6.75 4 / Reg X 4 / IF IBS 8 /4" 5.56 8. 4 / IF UBHO.5 6.75.875 4 / IF Weight 4 NC (MWD).8 6.875.85 4 / IF Flow Sleeve Sub Flex Monel.6.66 6.75 6.75.75.875 4 / IF 4 / IF 7 58 7,7 DRILL PIPE 7 7,478.9 5. 4.76 9.5 4 / IF 79-5.9 7,55. MP 7,8 665.8 8.74 45.5 5.7 779.66 7, 668.5 86.67 44.7 9.5 87.85 Pressure (W/ max diff) 9 7,4 669.9 88.9 44.66 5.55 85. S 5 7,74 66.8 88.66 44.5.5 86. LINER 7,7 66.4 89.4 44.4.8 97.56 STROKE LENGTH 7, 66. 9. 46.95.7.97 OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To 7,55 668.5 9.4 55.5.9 4.6 Proj To T D,74 6559.57 9.49 8.. 74.8 Notes / Next 4 hrs: Rotate Drlg Laterial

7,55,89 Rotate/Drlg In Laterial 8// COST: SPUD 8/4/ Drilling 5,9 87,847 9 Completion 4,75 4,954 Roy Reeser Report # Rig Number: 575--8657 Cell Number: 575--8656 6 8. Rotate Drlg F/7,55-T/7,79 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-. 8 8.5 Repairs To Shaker Slide Nov Hand Broke Off With Track Hoe 8. Rotate Drlg F/7,79-T/8,7 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-6.7.5 Conn & Survey Swap Pumps.5 Rotate Drlg F/8,7-T/8,66 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-88.. Conn & Survey Trouble Shoot Tool Not Getting In Sync 4.5 Rotate Drlg F/8,66-T/8,6 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-9. 4 5. Service Rig & Topdrive 5 7.5 Rotate Drlg F/8,6-T/8,79 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-5. 7 8. Circ. Bottoms Up & Survey 8.5 TOOH T/5,85 For Pump Motor Repairs Motor Knocking & No Oil Pressure Normal drag out of laterial & curve 6. Wait On Mechanic For Pump Motor Repairs Pump Motor Is Going To Have To Be Replaced Waiting On Pump Motor Lithology- 9% Shale % 4 9.6 9 / /CSG 8 /4 Ulterra U59M //.4 978 NC 8.9/. 7, 7-s HGS/SAND % / 5 O/W RATIO 9. BTC R (rot motor or min max) 45 6 OIL % Starch,89,56 MBT Salt 8.5 4. PH/ES 9 9.9 9.7.5 4. PF/MF./.4 CL (P) CA (P),,4 Magnesium 4. 4 8 Corr Solids. 9.69 Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-56)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab)..7 8.5 6.75 4 / Reg 4 / Reg X 4 / IF Filter Sub X-O Double Pin..76 6.65 6.48.5.75 4 / IF 4 / IF X 4 / Reg Motor Wenzel 7/8 6.(.6rpg). 6.75 4 / Reg X 4 / IF IBS 8 /4" 5.56 8. 4 / IF UBHO.5 6.75.875 4 / IF Weight 4 NC (MWD).8 6.875.85 4 / IF Flow Sleeve Sub Flex Monel.6.66 6.75 6.75.75.875 5.5 4 / IF 4 / IF 544 688 8,67 56 DRILL PIPE 7 8,64.7 5. 4.76 9.5 4 / IF. 8,79.44 MP 7, 66. 9. 46.95.7.97 7,5 668.49 9.6 5.8. 76.96 Pressure (W/ max diff) 9 7,7 666. 9.6 58..4 58.4 S 5 7,9 664. 9.86 64.88 4.89 544. LINER 8,9 66.7 9.69 7.97 4. 7.47 STROKE LENGTH 8,8 66.7 9.5 79.75. 9.98 OUTPUT (gal/stk) 4.9 4.9 8,47 6598. 9.55 8.6.75 9.6 OUTPUT (G) 56 8,659 6596. 9.8 86.7.6 94. SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To 8,79 6595.79 9.8 85..6 7. Proj To T D,76 656.4 9.8 7.7 74. Notes / Next 4 hrs: TOOH T/Casing / Change out pump# / TIH / Rotate Drlg Laterial

6 9. 9.5.. 4.5 4 5 5. 5 6. 8,85 Rotate/Drlg In Laterial 8/4/ COST: SPUD 8/4/ Drilling 74,59 88,48 Completion,58 7,46 Roy Reeser Report # Rig Number: 575--8657 Cell Number: 575--8656 Wait On Pump Motor Repairs Pump Motor Is Going To Have To Be Replaced Waiting On Pump Motor Replace Motor & Run Out TIH T/7 Tag Start Trying to ream down packed off losing fluid pull up out to 7,777 got back full returns Reaming back to bottom F7,777-T/7,97 Circ. & Change Backup Wrench Dies & Service Rig & Topdrive Reaming back to bottom F7,97-T/8,79 Rotate Drlg F/8,79-T/8,85 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-5. Lithology-9% Shale % 45 4 9.55 9 / /CSG 8 /4 Ulterra U59M //.497 978 NC 7, 8.5/.5 4 7-s HGS/SAND % / 5 O/W RATIO 9.5 BTC R (rot motor or min max) 45 6 OIL % Starch,647 MBT Salt. 5. PH/ES 9. 9.8.5 5 PF/MF./. CL (P) CA (P) 95,,5 6 Magnesium 4. 4 8 Corr Solids.5 9.58 Ch. Seal (x/6ths) Dull Ch. Pulled 8 6 Torque FT/LBS 75-8 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-56)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab)..7 8.5 6.75 4 / Reg 4 / Reg X 4 / IF Filter Sub X-O Double Pin..76 6.65 6.48.5.75 4 / IF 4 / IF X 4 / Reg Motor Wenzel 7/8 6.(.6rpg). 6.75 4 / Reg X 4 / IF IBS 8 /4" 5.56 8. 4 / IF UBHO.5 6.75.875 4 / IF Weight 4 NC (MWD).8 6.875.85 4 / IF Flow Sleeve Sub Flex Monel.6.66 6.75 6.75.75.875 5.5 4 / IF 4 / IF 9 75 DRILL PIPE 79 8,8.8 5. 4.76 9.5 4 / IF -78.55 8,85. MP 8,659 6596. 9.8 86.7.6 94. Pressure (W/ max diff) 9 S 5 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To 8,85 6595.69 9. 8..48 48. Proj To T D,758 658.7 9.8 79.8.5 74.94 Notes / Next 4 hrs: Rotate Drlg Laterial

6 6.5 6 7.5 7 7.5 7 9. 9 6 6 7. 7 8.5 8 9.5 9 4 5. 4.. 6. 9,9,7 Rotate/Drlg In Laterial 8/5/ COST: SPUD 8/4/ Drilling 96,979 979,47 Completion 87 7,849 Roy Reeser Report # Rig Number: 575--8657 Cell Number: 575--8656 Rotate Drlg F/8,85-T/8,98 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-56. Conn. & Survey & Downlink Rotate Drlg F/8,98-T/9, Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-9. Trouble Shoot MWD No Surveys Rotate Drlg F/9,-T/9,877 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-.4 Service Rig & Topdrive Trouble Shoot MWD No Surveys Rotate Drlg F/9,877-T/9,9 Wob--5 Rot-6 Rpm-4 Spm-5 Gpm-56 Psi- Diff-5-8 Rop-86. Pump Slug TOOH T/4 For MWD Tool Change Out MWD Tool, Motor & Filter Sub Screen On BHA TIH T/97 Test MWD With Both Pumps TIH T/6,85 Fill Pipe Every Stands Lithology- 95% Shale 5% 5 RR #4 9. 9 / /CSG 8 /4 Ulterra U59M //.484 978 NC 6.8/.6 7, 7-s HGS/SAND % / 5 O/W RATIO 9. BTC R (rot motor or min max) 45 6 OIL % Starch,7,77 MBT Salt 8.. PH/ES 9.5.8 8.. 69.5 PF/MF./.4 CL (P) CA (P) 8,,84 9 Magnesium. 4 8 Corr Solids.6 9.4 Tripping Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab)..7 8.5 6.75 4 / Reg 4 / Reg X 4 / IF Filter Sub X-O Double Pin..76 6.65 6.48.5.75 4 / IF 4 / IF X 4 / Reg Motor Wenzel 7/8 6.(.6rpg). 6.75 4 / Reg X 4 / IF IBS 8 /4" 5.56 8. 4 / IF UBHO.5 6.75.875 4 / IF Weight 4 NC (MWD).8 6.875.85 4 / IF Flow Sleeve Sub Flex Monel.6.66 6.75 6.75.75.875 5.5 4 / IF 4 / IF 85 74 9,58 49 DRILL PIPE 9,847.4 5. 4.76 9.5 4 / IF -5.7 9,9. MP 8,659 6596. 9.8 86.7.6 94. 8,848 6595.45 9.4 9.74.69 475.69 Pressure (W/ max diff) 9 9,7 659.69 9.7 87.9 4.77 656.4 S 5 9,7 659.6 9.7 8.6.65 84.75 LINER 9,47 6589.64 9.48 77.94. 9.84 STROKE LENGTH 9,67 6588.6 9.55 7.8.6 9.64 OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To 9,9 9585.4 9.4 75.. 5.5 Proj To T D,77 65 9.5 8. 74.55 Notes / Next 4 hrs: Rotate Drlg Laterial

6 6.5 6 9. 9.5.5 6 4.5 6 6.5 6 4 7.5 4 6 6. 9,9 Washing & Reaming To Bottom Lithology- 95% Shale 5% 8/6/ COST: SPUD 8/4/ Drilling 9,6,7,9 Completion 5,957 5,86 Roy Reeser Report # 4 Rig Number: 575--8657 Cell Number: 575--8656 TIH T/6,66 Fill Pipe Every Stands Tag Bridge Work Tight Hole TOOH Pipe Back Out To 5,8 Circ. Start Up TOOH T/5,7 Circ. Up Raised Strokes To 8 Packed Off TOOH T/5,9 Circ.& Condition speed pump up to 7stks packed off pickup stand to 5,44 Wash & Ream F/5,44-T/5,8 / 8psi @ 7stks 4rot Note: Have raised mud weight F/9. T/9.6 Vis To 6 WL-8. Still have to ream real slow to prevent packing off and have to pickup and start over stiil adding salt as we ream down to maintain 9.6 mud wt and try to raise it a little more 5 RR #4 9.6 6 7/6 /CSG 8 /4 Ulterra U59M //.4 978 8 7, 8.9/.97 5 4 7-s HGS/SAND % / 5 O/W RATIO 9. BTC R (rot motor or min max) 45 6 OIL % Starch 6,77 MBT Salt. PH/ES 9.5 8. PF/MF./.4 CL (P) CA (P) 9,, 45 6 Magnesium 49. 4 8 Corr Solids.86 9.8 75 Ch. Seal (x/6ths) Dull Ch. Pulled 5 45 Torque FT/LBS 5- Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab) Filter Sub X-O Double Pin Motor Wenzel 7/8 6.(.6rpg) IBS 8 /4" UBHO NC (MWD) Flow Sleeve Sub Flex Monel DRILL PIPE..7 8.5 6.75 4 / Reg 4 / Reg X 4 / IF..76 6.65 6.48.5.75 4 / IF 4 / IF X 4 / Reg. 6.75 4 / Reg X 4 / IF 5.56 8. 4 / IF.5 6.75.875 4 / IF Weight 4.8 6.875.85 4 / IF.6.66 6.75 6.75.75.875 5.5 4 / IF 4 / IF 5. 4.76 9.5 4 / IF 74 9,58 49 4.66 MP 8 Pressure (W/ max diff) S 7 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 59 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wash & Ream To Bottom / Rotate Drlg Laterial 9,67 6588.6 9.55 7.8.6 9.64

6 5 9.5 5 6. 6.5 4.5.5.5 6.5 9,9 TOOH 8/7/ COST: SPUD 8/4/ Drilling 74,8,44, Completion 9,45 6, Roy Reeser Report # 5 Rig Number: 575--8657 Cell Number: 575--8656 Wash & Ream F/5,8-T/6,87 6psi 5stks Raised Strokes as we increased Rop ft/hr Service Rig & Topdrive Wash & Ream F/6,87-T/6,66 6psi 5stks Raised Strokes as we increased Rop 5ft/hr Packed Off work pipe back out T/5,4 TOOH T/5,7 Build & Pump Slug TOOH T/,7 Had Drag All The Way From 5,7- To,7 7 5 RR #4 9.85 5 5/8 /CSG 8 /4 Ulterra U59M //.5 978 8 7, 5.6/.5 7-s HGS/SAND % / 5 O/W RATIO 89.4 BTC 5 R (rot motor or min max) 45 6 OIL % Starch,77 MBT Salt. PH/ES 9.5 8. PF/MF TR/.4 CL (P) CA (P) 74,, 8 Magnesium 46. 4 8 Corr Solids.45.9 Tripping Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6 W/ 8 /4(Stab) Filter Sub X-O Double Pin Motor Wenzel 7/8 6.(.6rpg) IBS 8 /4" UBHO NC (MWD) Flow Sleeve Sub Flex Monel DRILL PIPE..7 8.5 6.75 4 / Reg 4 / Reg X 4 / IF..76 6.65 6.48.5.75 4 / IF 4 / IF X 4 / Reg. 6.75 4 / Reg X 4 / IF 5.56 8. 4 / IF.5 6.75.875 4 / IF Weight 4.8 6.875.85 4 / IF.6.66 6.75 6.75.75.875 5.5 4 / IF 4 / IF 5. 4.76 9.5 4 / IF 4.66 MP 9,67 6588.6 9.55 7.8.6 9.64 8 Pressure (W/ max diff) S 7 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 59 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: TOOH / Change Out BHA / TIH / Wash & Ream Back To Bottom Of Curve

6 7. 7..5. 5 7. 5 6.5 9,9 Washing & Reaming Hole Clean 8/8/ COST: SPUD 8/4/ Drilling 6,,4,55 4 Completion 8 6,59 Roy Reeser Report # 6 Rig Number: 575--8657 Cell Number: 575--8656 TOOH T/ Had Drag All The Way From 5,7- To,7 Laydow Flex Monel & MWD Tool Stand Back Rest BHA Pickup New BHA TIH T/954 Slip & Cut Drlg Line And Service Rig & Topdrive TIH T/,95 Wash & Ream F/,44-T/,4 6psi 5stks 7rotary Tag @,44 Added Texzan Raise Vis-4 Circ. Service Rig & Topdrive Note: Started Raising Vis @ 4:am 6 9.9 5/7 /CSG 8 /4 STC FDS 57 //.56 PF677 8 9,9 /.8 -&-4 HGS/SAND % / 5 O/W RATIO 89 BTC R (rot motor or min max) 6 75 OIL % MBT PH/ES 9 Starch Salt PF/MF./. CL (P) CA (P) 6,,8 Magnesium 7. 4 8 Corr Solids.75.9 5 Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS,9 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Sub..58 6..75 4 / Reg 4 / Reg X 4 / XH X-O DRILL PIPE.7 95.4 5..75 4.76 9.5 4 / XH X 4 / IF 4 / IF RT TOOL 4.8 65.75 4 / IF Weight 4 DRILL PIPE 96,8. 5. 4.76 9.5 4 / IF,4.6 MP 8 Pressure (W/ max diff) S 7 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 59 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wash & Reaming Hole Clean 9,67 6588.6 9.55 7.8.6 9.64

6 6:. 6: 7:. 7: :. : :. : :.5 : 4:.5 4: 4: 4. 4: 4:.5 4: 6:.5 9,9 Washing & Reaming Hole Clean 8/9/ COST: SPUD 8/4/ Drilling 79,7,8,8 5 Completion 6,957 9,496 Robert Soliz Report # 7 Rig Number: 575--8657 Cell Number: 86-777-48 Wash & Ream F/,4 T/,9 6psi 5stks 7rotary Added Texzan Raise Vis-7 (hard fill) Service Rig & Top Drive Wash & Ream F/,9 T/,4 6psi 5stks 7rotary (Fell thru no more reall big rocks coming over shaker) Change out Rotating head Rubber Wash & Ream F/,4 T/,48 6psi 5stks 7rotary Attempt to run a stand out of the derrick but still stacking out @,454 Wash & Ream F/,454 T/,67 6psi 5stks 7rotary (soft fill) Service Top Drive Wash & Ream F/,67 T/,7 6psi 5stks 7rotary (soft fill) 4:5 5 6. 7 6/8 /CSG 4 8 8 /4 STC FDS 57 6/ PF677 6 9,9 /.5/. -&-4 HGS/SAND % / 5 O/W RATIO 87.5 BTC R (rot motor or min max) 6 75 OIL % MBT PH/ES 9.5 Starch Salt PF/MF./.4 CL (P) CA (P) 64,,44 Magnesium. 4 8 Corr Solids.. 8 Ch. Seal (x/6ths) Dull Ch. Pulled 5 9 Torque FT/LBS,9 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Sub..58 6..75 4 / Reg 4 / Reg X 4 / XH X-O DRILL PIPE.7 95.4 5..75 4.76 9.5 4 / XH X 4 / IF 4 / IF RT TOOL 4.8 65.75 4 / IF Weight 4 DRILL PIPE 5,595.67 5. 4.76 9.5 4 / IF,7.7 MP 6 Pressure (W/ max diff) S 7 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 59 54 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wash & Reaming Hole Clean 9,67 6588.6 9.55 7.8.6 9.64

6 7:. 7: 8:. 8: 8:.5 8: :.5 : :. : :.5 : 4:.5 4: 7:. 7: : 4. : : 6. : :.5 : 6:.5 9,9 Washing & Reaming Hole Clean 8// COST: SPUD 8/4/ Drilling 6,477,47, 6 Completion,6,6 Robert Soliz Report # 8 Rig Number: 575--8657 Cell Number: 86-777-48 Wash & Ream F/,7 T/,795 6psi 5stks 7rotary (fell thru attempt to run pipe from derrick) T.I.H. F/,795 T/ 6,54 (Tag start washing and reaming) Wash & Ream F/ 6,54 T/ 6,59 bit packing off P/U and circulate Circulate and add pp bbl of Soletex (shale stabilizer) and circulate around Wash & Ream F/ 6,59 T/ 6,67 6psi 5stks 7rotary T.I.H. F/ 6,67 T/ 7,9 (tag start washing and reaming) Wash & Ream F/ 7,9 T/ 7,4 6psi 5stks 7rotary (soft fill) Circulate and condition @ 7,4 T.O.H. F/ 7,4 T/,945 ( Tight Hole F/ 4,6 T/,5 had to pull 5 over to keep it moving, never got sticky just tight) Wash and Ream F/,945 T/,7 6psi 5stks 6rpms Service Top Drive Wash and Ream F/,7 T/ 4, 6psi 5stks 6rpms (hole is a little tight but seems to be cleanning up quickly shakers are not as bad as they have been) 5: 5 6 6 4/ /CSG 46 6 8 /4 STC FDS 57 8/7 PF677 7 /.6/.94 9,9 -&-4 HGS/SAND % / 5 O/W RATIO 88.4 BTC R (rot motor or min max) 6 75 OIL % MBT PH/ES 9 Starch Salt PF/MF./. CL (P) 6, CA (P),48 Magnesium 7. Sol Tex 7 4 8 Corr Solids.94.5 5 Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS 9- Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Sub X-O DRILL PIPE RT TOOL..58 6..75 4 / Reg 4 / Reg X 4 / XH.7 95.4 5..75 4.76 9.5 4 / XH X 4 / IF 4 / IF 4.8 65.75 4 / IF Weight 4 DRILL PIPE 9,974.96 5. 4.76 9.5 4 / IF -8. 4,.46 MP 9,67 6 Pressure (W/ max diff) S 7 5 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 59 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wash & Reaming Hole Clean, Trip out P/U Latteral BHA 6588.6 9.55 7.8.6 9.64

6 8:. 8: 8:.5 8: 9:.5 9: :. : :.5 : :.5 : 4:. 4: 7:. 7: 8:. 8: 9:. 9: :. : :.5 : :.5 : 4:. 4: :. : :. : 6:. 9,9 Washing & Reaming Hole Clean 8// COST: SPUD 8/4/ Drilling,9,446,8 7 Completion,767,79 Robert Soliz Report # 9 Rig Number: 575--8657 Cell Number: 86-777-48 Wash & Ream F/4, T/ 4,7 6psi 5stks 7rotary (fell thru attempt to run pipe from derrick) T.I.H. F/ 4,7 T/ 4,746 (Tag start washing and reaming) Wash & Ream F/4,746 T/ 4,84 6psi 5stks 7rotary (fell thru attempt to run pipe from derrick) T.I.H. F/ 4,84 T/ 6,54 (Tag start washing and reaming) Wash & Ream F/ 6,54 T/ 6,67 6psi 5stks 7rotary T.I.H. F/ 6,67 T/ 7,4 Circulate and condition @ 7,4 T.O.H. F/ 7,4 T/ (All Good No Tight Spots) Service Rig & Top Drive M/U Latteral BHA & # 7 T.I.H. 9 stands and Test MWD Service Top Drive T.I.H. F/ 988 T/,9 Tag Wash & Ream F/,9 T/,7 8psi 5stks 7rotary T.I.H. F/,7 T/ 6,9 Tag Packed off Worked pipe out of tight spot and started to wash and ream Wash & Ream F/ 6,9 T/ 6,465 9psi 5stks 7rotary 5:5 45 7 RR #4. 46 /7 /CSG 48 8 / Ultera U59M /6 978 8 /./.7 7, 7 x s HGS/SAND % / 5 O/W RATIO 87.7 BTC R (rot motor or min max) 45 6 OIL % Starch,77 MBT Salt. PH/ES 9 8. PF/MF./.5 CL (P) CA (P) 6,,6 4 Magnesium 7. Sol Tex 7 4 8 Corr Solids.7.89 7 Ch. Seal (x/6ths) Dull Ch. Pulled 65 6 NO A IN NO TD 6 Torque FT/LBS -5 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6W/ 8 /4 Stab Filter Sub XO Double pin Motor Wenzel 7/8 6. (.6 rpg) IBS 8 /4 UBHO NC (MWD) Flow sleeve Flex Monel DRILL PIPE..7 8.5 6.75 4 / Reg 4 / Reg X 4 / IF,..76 6.65 6.48.5.75 4 / IF 4 / IF x 4 / Reg. 6.75 4 / Reg X 4 / IF 5.56 8. 4 / IF.5 6.75.875 4 / IF Weight 4.8 6.875.85 4 / IF.6.66 6.75 6.75.75.875 5.5 4 / IF 4 / IF 9 5. 4.76 9.5 4 / IF 4.66 MP 6 Pressure (W/ max diff) S 7 5 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 59 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D Notes / Next 4 hrs: Wash & Reaming Hole Clean, Resume Drilling Latteral TVD Incl. Az. DLS. V.S.

6 4: 8. 4: 7:. 7: 8:. 8: : 8.5 : :.5 : 6:.,88,898 Drilling Lattteral 9// COST: SPUD 8/4/ Drilling 6,89,59,9 8 Completion,86 7,85 Robert Soliz Report # Rig Number: 575--8657 Cell Number: 86-777-48 T.I.H. Wash & Ream F/ 6,465 T/ 9,9,,88 5 stks 7rpms Rotary Drill F/ 9,9 T/,5 WOB 5, 5 stks, 56 G, r6 +4 mtr,,95psi + 45 Diff,,9 -, Service Rig & Top Drive Rotary Drill F/,5 /,488 WOB 5, 5 stks, 56 G, r6 +4 mtr,,95psi + 45 Diff,,9 -, Service Top Drive Rotary Drill F/,488 T/,88 WOB 5, 5 stks, 56 G, r6 +4 mtr,,psi + 45 Diff,,9-6, Also updated the motor circulating hrs from yesterday Lythology: % Shale 5:5 57 7 RR #4. 45 / /CSG 456 8 / Ultera U59M 7/ 978 /./.66 7, 7 x s HGS/SAND % / 5 O/W RATIO 87.7 BTC R (rot motor or min max) 45 6 OIL % Starch,898 4,65 MBT Salt 4.5 7.5 PH/ES 9.5.9..5 9. PF/MF TR/.5 CL (P) CA (P) 6,,6 9,898 4.5 4,65 7.5 Magnesium 49. Sol Tex 5 45 Corr Solids.66.77 75 Ch. Seal (x/6ths) Dull Ch. Pulled 7 68 Torque FT/LBS -6 Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6W/ 8 /4 Stab..7 8.5 6.75 4 / Reg 4 / Reg X 4 / IF, Filter Sub XO Double pin..76 6.65 6.48.5.75 4 / IF 4 / IF x 4 / Reg Motor Wenzel 7/8 6. (.6 rpg). 6.75 4 / Reg X 4 / IF IBS 8 /4 5.56 8. 4 / IF UBHO.5 6.75.875 4 / IF Weight 4 NC (MWD).8 6.875.85 4 / IF Flow sleeve Flex Monel.6.66 6.75 6.75.75.875 5.5 4 / IF 4 / IF 495 85,5 67 DRILL PIPE 7,744.5 5. 4.76 9.5 4 / IF -5.7,88. MP,747 6579. 9.65 78.4.65 455.6,84 6579.9 9. 8.8. 4449.5 Pressure (W/ max diff) 78,96 6578.9 9.4 8.. 454.9 S 5,9 6578.49 9.8 85.5.7 464.5 LINER,5 6578.8 9. 85.8.7 477.79 STROKE LENGTH,9 6577.74 9. 84.55.78 489.75 OUTPUT (gal/stk) 4.9 4.9,4 6577.48 9. 8.9.7 49.8 OUTPUT (G) 56,48 6577.8 9.7 8.7. 55.6 SPR & PRESSURE 45/7 4/59,54 6576.78 9. 8..9 5. TEST SUB S&PSI 4/78 4/6,598 6576.7 9.8 8.89.7 59.64 # Pump,69 6575.86 9.4 8.9.7 586. Proj To,96 6574.6 9.8 8..4 555.5 Proj To T D,77 656.86 9.4 8.. 74.44 Notes / Next 4 hrs: TD Latteral Circulate 7 Bottoms up

,78,96 T.O.H. SPUD 9// 8/4/ 9 Robert Soliz COST: Drilling Completion Report # 7,5,49,58,79 8,677 Rig Number: 575--8657 Cell Number: 86-777-48 6 7:. Rotary Drill F/,88 T/,47 WOB 5, 5 stks, 56 G, r6 +4 mtr,,55psi + 59 Diff,,9-8, 7: 8:. Service Rig & Top Drive 8: :. Rotary Drill F/,47 T/,756 WOB 5, 5 stks, 56 G, r6 +4 mtr,,58psi + 6 Diff,,9-8, : :.5 Service Top Drive : :. Rig Repairs retorque saver sub clamps on I-BOP : :.5 Rotary Drill F/,756 T/,78 WOB 5, 5 stks, 56 G, r6 +4 mtr,,58psi + 6 Diff,,9-8, : 4: 6. Circulate 6 bottoms up and condition mud 4: 5:.5 Spot bbl Lube pill and work into latteral 5: 6:.5 Start out of the hole Lythology: % Shale.55 57 7 RR #4. 46 46/ /CSG 456 8 / Ultera U59M 5/9 978 9 /.6/.95 7, 7 x s HGS/SAND % / 5 O/W RATIO 87.4 BTC R (rot motor or min max) 45 6 OIL % Starch 48,96 6,577 MBT Salt.5 5. PH/ES 9.5 45.4 9.. 5. PF/MF TR/.4 CL (P) CA (P) 66,,6,96.5 6,578 5. Magnesium 49. Sol Tex 5 6 Corr Solids.77.89 Ch. Seal (x/6ths) Dull Ch. Pulled 9 75 Torque FT/LBS 8, Motor Spec Wenzel 7/8 6. (.6rpg) SN(65-M6-76)With 8 /4Stab Btm Power Drive X-6W/ 8 /4 Stab..7 8.5 6.75 4 / Reg 4 / Reg X 4 / IF, Filter Sub XO Double pin..76 6.65 6.48.5.75 4 / IF 4 / IF x 4 / Reg Motor Wenzel 7/8 6. (.6 rpg). 6.75 4 / Reg X 4 / IF IBS 8 /4 5.56 8. 4 / IF UBHO.5 6.75.875 4 / IF Weight 4 NC (MWD).8 6.875.85 4 / IF Flow sleeve Flex Monel.6.66 6.75 6.75.75.875 5.5 4 / IF 4 / IF 75,49 58 DRILL PIPE 4,67.9 5. 4.76 9.5 4 / IF -6.,78.59 MP,86 6568.9 9.4 8.6.7 696.4 58, 6568.7 9.45 8.7.6 6487.59 Pressure (W/ max diff) 8, 6567.77 9.8 8.96.86 658. S 5,8 6567.4 9.4 8.47.57 6674. LINER, 6566.75 9.48 8.8.4 6767.44 STROKE LENGTH,96 6566.7 9.4 8.. 687 OUTPUT (gal/stk) 4.9 4.9,9 6565.54 9. 8.68.67 695.65 OUTPUT (G) 56,485 6564.88 9.48 8.5.5 747.8 SPR & PRESSURE 45/7 4/59,58 6564.6 9.5 79.84.7 74.5 TEST SUB S&PSI 4/78 4/6,676 656.9 9.8 79.67. 77.7 # Pump,7 65 9.4 79.98.6 76. Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: T.O.H. T/ Top of Curve L/D DP

6 : 4.5 : :. : :. : 5:. 5: 6:. 6: 8:.5 8: :. : :.5 : :.5 : 4:. 4: :.5 : 5: 4.5 5: 6:.,78 Wash & Ream 9// COST: SPUD 8/4/ Drilling 48,59,6,48 Completion,9 4,69 Robert Soliz Report # Rig Number: 575--8657 Cell Number: 86-777-48 T.O.H. F/,78 T/ 5,87 Safety Meeeting and R/U Laydown Machine L/D DP F/ 5,87 T/ 4, Work Stuck pipe Rig Repairs retorque saver sub clamps on I-BOP and change dies in back up wrench T.O.H. F/ 4, T/,65 Work Tight Spot F/,65 T/,445 & T.O.H. T/ 4' L/D Directional BHA & load out Service Top Drive Slip and Cut Drill Line Rig Repairs Change out Crown O Matic M/U Clean out BHA & T.I.H. T/,9 Wash & Ream F/,9 T/,4 S 7, 7rpm, 7 psi Lythology: % Shale.55 57 7 RR #4 8 RR #6. 4 / /CSG 456 8 / Ultera U59M 8 /4 STC FDS 57 /7 978 PF677 /.4/.97 85 7,,78 7 x s,78 - & -4 HGS/SAND % / 5 5 O/W RATIO 87.6 BTC R (rot motor or min max) 45 6 65 75 OIL % Starch,96 6,577 MBT Salt.5 5. PH/ES 9 6 45.4 9.. 5. PF/MF TR/.5 CL (P) CA (P) 65,,,96.5 6,578 5. Magnesium. Sol Tex 5 6 Corr Solids.86.66 Ch. Seal (x/6ths) Dull Ch. Pulled RR4 WT A IN NO TD 5 Torque FT/LBS, Sub XO DP RT-Tool..58 6..75 4 / Reg 4 / Reg X 4 / XH.7 95.4 5..75 4.76 9.5 4 / XH X 4 / IF 4 / IF 4.8 65.75 4 / IF Weight 4 DRILL PIPE 5,8.6 5. 4.76 9.5 4 / IF 75,49 58,4.66 MP Pressure (W/ max diff) 7 S 7 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: Wash and Ream hole T/ 7,4 EOC, T.O.H. T/ 5,86 L/D DP

6 8:. 8: 9:. 9: :. : :. : 8: 5. 8: 5:.5 5: 6:.5,78 Wash & Ream 9/4/ COST: SPUD 8/4/ Drilling 5,,68,4 Completion,56 54,45 Robert Soliz Report # Rig Number: 575--8657 Cell Number: 86-777-48 Wash & Ream F/,4 T/ 4,76 S 7, 7rpm, 7 psi T.I.H. F/ 4,76 T/ 5,48 Work Stuck pipe T.O.H. F/ 5,48 T/,945 Pulled Tight about 7 over the entire way up, free @,945 Circulate and condition mud to a 7 vis.+ Wash and Ream F/,945 T/,4 7 S, 7rpm, 948 psi at kelly down slow rps to and circulate until shaker is clean Service Top Drive Lythology: % Shale 8:5 68 8 RR #6.5 79 /8 /CSG 474 8 /4 STC FDS 57 5/ PF677 6 /.5/.86,78 - & -4 HGS/SAND % / 5 O/W RATIO 87.5 BTC R (rot motor or min max) 65 75 OIL % MBT PH/ES 9.5 Starch Salt 6 PF/MF./.4 CL (P) CA (P) 64,,4 44 9 Magnesium. Sol Tex 4 Corr Solids.86.9 4 Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS, Sub..58 6..75 4 / Reg 4 / Reg X 4 / XH XO DP.7 95.4 5..75 4.76 9.5 4 / XH X 4 / IF 4 / IF RT-Tool 4.8 65.75 4 / IF Weight 4 DRILL PIPE 6,49.68 5. 4.76 9.5 4 / IF 75,49 58 -.,4.8 MP Pressure (W/ max diff) 948 S 5 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: Wash and Ream hole T/ 7,4 EOC, T.O.H. T/ 5,86 L/D DP

6 : 5.5 : :. : 5:.5 5: 6:. 6: 6:.5 6: 8:. 8: : : :.5 : :. : :.5 : 6:.,78 Wash & Ream 9/5/ COST: SPUD 8/4/ Drilling 9,78,7, Completion,64 64,749 Robert Soliz Report # 4 Rig Number: 575--8657 Cell Number: 86-777-48 Wash & Ream F/,4 T/ 4,8 S 5, 7rpm, 75 psi Service Rig & Top Drive Wash & Ream F/ 4,8 T/ 4,66 S 5, 7rpm, 8 psi T.I.H. F/ 4,66 T/ 5,5 Wash & Ream F/ 5,5 T/ 5,9 S 5, 7rpm, 8 psi T.I.H. F/ 5,9 T/ 6,477 Wash & Ream F/ 6,477 T/ 7,5 S 5, 7rpm, 8 psi Service Top Drive Rig Repairs work on pumps Broken spring on one trash under a valve on the other Wash & Ream F/ 7,5 T/ 7,4 S 5, 7rpm, 4 psi Circulate and condition mud watch shakers to see when they clean up then circulate one more bottoms up Lythology: % Shale 7: 68 8 RR #6. 66 7/7 /CSG 474 8 /4 STC FDS 57 6/5 PF677 9 /.8/.,78 - & -4 HGS/SAND % / 5 O/W RATIO 87. BTC R (rot motor or min max) 65 75 OIL % MBT PH/ES 9 Starch Salt PF/MF TR/.5 zdsh 6 CL (P) CA (P) 66,, 4 Magnesium 46. Sol Tex Corr Solids.9 Ch. Seal (x/6ths) Dull Ch. Pulled 75 5 Torque FT/LBS 5,5 Sub XO DP RT-Tool..58 6..75 4 / Reg 4 / Reg X 4 / XH.7 95.4 5..75 4.76 9.5 4 / XH X 4 / IF 4 / IF 4.8 65.75 4 / IF Weight 4 DRILL PIPE 8 7,97.7 5. 4.76 9.5 4 / IF 75,49 58 7,4. MP Pressure (W/ max diff) 4 S 5 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: Cirulate hole clean Trip to TOC L/D DP

6 : 6. : :. : 8: 5. 8: 5:.5 5: 6:.5,78 Circulate & Condition 9/6/ COST: SPUD 8/4/ Drilling 4,58,76,8 Completion 4,58 78,86 Robert Soliz Report # 5 Rig Number: 575--8657 Cell Number: 86-777-48 Circulate & Condition mud. wt 7 vis wait on shakers to clean up Service Rig & Top Drive Circulate & Condition mud. wt 7 vis (add gals. Of diesel & pp bbl gilsonite) wait on shakers to clean up Circulate 7 vis. wt mud checking shakers every hr. finger nail size rocks Service Top Drive Lythology: % Shale 4: 8 8 RR #6.5 7 7/4 /CSG 496 4 8 /4 STC FDS 57 8/9 PF677 7 / /.9 95,78 - & -4 HGS/SAND % / 5 O/W RATIO 84.8 BTC R (rot motor or min max) 65 75 OIL % Starch MBT PH/ES 9 Sure Guage Drum Sure Guage 5 Gal PF/MF./.5 zdsh 7 CL (P) CA (P) 67,,8 8 Magnesium 8. Sol Tex 8 Corr Solids.98. Ch. Seal (x/6ths) Dull Ch. Pulled 75 5 Torque FT/LBS 5,5 Sub..58 6..75 4 / Reg 4 / Reg X 4 / XH XO DP.7 95.4 5..75 4.76 9.5 4 / XH X 4 / IF 4 / IF RT-Tool 4.8 65.75 4 / IF Weight 4 DRILL PIPE 8 7,97.7 5. 4.76 9.5 4 / IF 75,49 58 7,4. MP Pressure (W/ max diff) 55 S 5 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 56 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: Cirulate hole clean T.O.H. Run 5 / Csg

6 : 6. : :. : 8: 5. 8: 5:.5 5: 6:.5,78 Circulate & Condition 9/7/ COST: SPUD 8/4/ Drilling 5,88,84,6 4 Completion 7,4 86,6 Robert Soliz Report # 6 Rig Number: 575--8657 Cell Number: 86-777-48 Circulate & Condition mud. wt 7 vis wait on shakers to clean up Service Rig & Top Drive Circulate & Condition mud. wt 7 vis Pump high vis sweeps vis ( add sks f gel) Circulate 8 vis. wt cut pump out put to 9 spm check shaker after first bottoms up shakers are clean, pump bbl of mud to frac tanks and add 5 bbl of brine vis only came down to 7 but wt cmae down to 9.8 wait on desco or more brine Service Top Drive Lythology: % Shale 9:5 9 8 RR #6.5 85 /54 /CSG 46 98 8 /4 STC FDS 57 /7 PF677 6 / /.5 9,78 - & -4 HGS/SAND % / 5 O/W RATIO 85 BTC R (rot motor or min max) 65 75 OIL % Starch 7 MBT PH/ES 4 9 Sure Guage Drum Sure Guage 5 Gal PF/MF./.6 zdsh CL (P) CA (P) 64,, Magnesium 97. Sol Tex Corr Solids.5. Ch. Seal (x/6ths) Dull Ch. Pulled 75 5 Torque FT/LBS 5,5 Sub XO DP RT-Tool..58 6..75 4 / Reg 4 / Reg X 4 / XH.7 95.4 5..75 4.76 9.5 4 / XH X 4 / IF 4 / IF 4.8 65.75 4 / IF Weight 4 DRILL PIPE 8 7,97.7 5. 4.76 9.5 4 / IF 75,49 58 7,4. MP Pressure (W/ max diff) S 9 LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 44 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: Cirulate hole clean T.O.H. Run 5 / Csg

,78 Wash & Ream SPUD 9/8/ 8/4/ 5 Robert Soliz COST: Drilling Completion Report # 48,954 4,844 7,86,6 9,6 Rig Number: 575--8657 Cell Number: 86-777-48 6 : 6. Circulate & Condition mud. wt 7 vis 9 spm wait on shakers are clean, lower vis to 5 started getting rocks over raise vis T/6 : :. Service Rig & Top Drive : 5:.5 Circulate & Condition mud. wt 6 vis wait on shakers to clean up & build Pipe Slug 5: 8:. Circulate & condition hole W/. wt 6 vis 9 spm shakers clean pump pipe slug T.O.H. F/ 7, T/ 6,4@ 5 mins a stand 8: 9:.5 Work stuck pipe back down F/ 6,4 T/ 6,7 and establish circulation, circulate and build another pipe slug 9: 9:.5 T.O.H. F/ 6,7 T/ 5,845 9: :.5 Pump Pipe slug @ 5,845 : :. T.O.H. F/ 5,845 T/,85 @ 5 mins a stand (very tight hole F/ 4,56 T/,654) : :.5 Service Top Drive : :.5 Circulate & condition mud T/. wt 75 vis : :.5 T.I.H. F/,85 T/,8 Tag : 6:.5 Wash and Ream F/,8 T/,84 spm, psi 7rpm we have washed to,4 but the hole continues to fall in on us wt.+ Vis 75 Lythology: % Shale 4: 9 8 RR #6.5 6 8/7 /CSG 46 98 8 /4 STC FDS 57 /9 PF677 5 /.5/.86 6,78 - & -4 HGS/SAND % / 5 O/W RATIO 86. Desco R (rot motor or min max) 65 75 OIL % MBT PH/ES 9.5 Starch Sure Guage Drum Sure Guage 5 Gal 5 PF/MF./.5 zdsh CL (P) CA (P) 64,,4 Magnesium. Sol Tex Corr Solids.64. Ch. Seal (x/6ths) Dull Ch. Pulled 75 5 Torque FT/LBS 5,5 Sub..58 6..75 4 / Reg 4 / Reg X 4 / XH XO DP.7 95.4 5..75 4.76 9.5 4 / XH X 4 / IF 4 / IF RT-Tool 4.8 65.75 4 / IF Weight 4 DRILL PIPE 8 7,97.7 5. 4.76 9.5 4 / IF 75,49 58 7,4. MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 49 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: Wash & Ream to the EOC, Cirulate hole clean T.O.H. Run 5 / Csg

6 4: 8.5 4: 5:.5 5: 6:.5 6: 8:. 8: :. : :.5 : :.5 : 6:,78 Circulate & Condition 9/9/ COST: SPUD 8/4/ Drilling 5,5,878,6 6 Completion 4,48 5,54 Robert Soliz Report # 8 Rig Number: 575--8657 Cell Number: 86-777-48 Wash & ream F/,48 T/ 4,84 spm, psi 7rpm Service Rig & Top Drive T.I.H. F/ 4,84 T/ 5,94 stuck Work Stuck Pipe F/ 5,94 T/ 5,88 Circulate and condition hole with vis mud. wt. T.O.H. F/ 5,88 T/,945 pull tight F/ 4,84 T/ 4,95 Service Top Drive Wash & Ream F/,945 T/,795 spm,4 psi 7 rpm (maintaning vis) Lythology: % Shale 6: 9 8 RR #6. 6 /54 /CSG 46 98 8 /4 STC FDS 57 8/45 PF677 6 /.8/.9 78 6,78 - & -4 HGS/SAND % / 5 O/W RATIO 8 Desco R (rot motor or min max) 65 75 OIL % Starch MBT PH/ES 5 9.5 Sure Guage Drum Sure Guage 5 Gal 6 PF/MF./.6 zdsh CL (P) 67, CA (P),4 7 Magnesium 7. Sol Tex 4 Corr Solids.9.5 Ch. Seal (x/6ths) Dull Ch. Pulled 5 Torque FT/LBS 4,6 Sub XO DP RT-Tool..58 6..75 4 / Reg 4 / Reg X 4 / XH.7 95.4 5..75 4.76 9.5 4 / XH X 4 / IF 4 / IF 4.8 65.75 4 / IF Weight 4 DRILL PIPE,688.54 5. 4.76 9.5 4 / IF 75,49 58,795.4 MP Pressure (W/ max diff) 4 S LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 49 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: Cirulate hole clean T.O.H. Run 5 / Csg

6 : 6. : :. : :.5 : 5:.5 5: 6:. 6: 7:. 7: : 5. : : 5. : :.5 : 6:.5,78 Remove Beals 9// COST: SPUD 8/4/ Drilling 4,97,955,5 7 Completion,957 9,497 Robert Soliz Report # 9 Rig Number: 575--8657 Cell Number: 86-777-48 Wash & ream F/,795 T/ 6,67 spm, psi 7rpm Circulate and condition hole with vis mud. wt. Service Rig & Top Drive Wash & ream F/ 6,67 T/ 6,67 spm, psi 7rpm Circulate and condition hole with vis mud. wt. Wash & ream F/ 6,67 T/ 7,4 spm, psi 7rpm Circulate and condition hole with vis mud. wt. mix ppbl of desco just before pumping pipe slug T.O.H. F/ 7,4 T/ only pulled tight in one spot @ 6,8 Service Top Drive Pull Wear Bushing, change out pipe rams and loosen Beals There will be no thread rep on location F/ Patriot so I will be acting thread rep Lythology: % Shale 9:4 55. 96 9/8 /CSG 45 /9 HGS/SAND % O/W RATIO OIL % MBT PH/ES 8 /.8/.5 / 8 5 9.5 Desco Starch Sure Guage 5 Gal 5 R (rot motor or min max) PF/MF./.6 zdsh CL (P) CA (P) 65,,4 4 7 Magnesium 7. Sol Tex Corr Solids.5.7 Ch. Seal (x/6ths) Dull Ch. Pulled 5 Torque FT/LBS 4,6 Sub XO DP RT-Tool Weight 4 DRILL PIPE 75,49 58. MP Pressure (W/ max diff) 4 S LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) 49 SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: R/U CRT, Csg Crew & Torque Turn Run 5 / Csg

6 8:.5 8: 9:. 9: 5: 5.5 5: 8:. 8: :.5 : :.5 : : 4. : :. : :.5 : :. : 6:.5,78 Run 5 / Csg 9// COST: SPUD 8/4/ Drilling,645,988,46 8 Completion 5,89 4,886 Robert Soliz Report # Rig Number: 575--8657 Cell Number: 86-777-48 Change Rams & Beals R/U Csg Crew M/U Shoe & Run 5 / Csg test float after jts, F/ T/, Wash & ream Csg F/, T/,4 6 spm 5 psi 5rpm Torque, T/,5 Run 5 / Csg F/,4 T/ 4,9 Circulate hole clean and watch returns over shakers Run 5 / Csg F/ 4,9 T/ 8, Circulate hole clean and watch returns over shakers Run 5 / Csg F/ 8, T/ 8,48' Service Rig & Top Drive Run 5 / Csg F/ 8,48 T/ 9,8 Lateral is in really good condition Lythology: % Shale 4: 55.5 77 7/ /CSG 45 /8 HGS/SAND % O/W RATIO OIL % MBT PH/ES /.5/.86 / 87.5 5 9. Desco Starch Sure Guage 5 Gal 5 4 4 R (rot motor or min max) PF/MF./.7 zdsh CL (P) CA (P) 64,,6 Magnesium. Sol Tex Corr Solids..49 Ch. Seal (x/6ths) Dull Ch. Pulled 5 Torque FT/LBS 4,6 Sub XO DP RT-Tool Weight 4 DRILL PIPE 75,49 58. MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: Run 5 / Csg, Circulate & Condition mud, Pump Cement, Set Csg Slips

6 7. 7 7.5 7 9.5 9 4. 6. 6 7. 7 8. 8 5.5. 6 5.5,78 Laydown BOP 9// COST: SPUD 8/4/ Drilling 548,84,59,7 9 Completion,57 8,4 Roy Reeser Report # Rig Number: 575--8657 Cell Number: 575--8656 Adjust Brakes & Service Rig Attempt to break circ. Laydown 9 Joints Casing To,5 Run 5 / Csg F/,5 T/,78 Got returns back on fillup and washing thru tight spot @,6 Circ. Casing Rigdown Cosi Casing Crew & Laydown Machine Fix bbl mud to pump in front of cement Rigdown CRT Tool Rigup Schlumberger & safety meeting Circ. Casing Pump bbls mud from premix pit Cement Casing W/Lead 89sx 5:5Poz H+lb/sk D4+.5lb/sk D+47lb/sk D+.% D+.5% D+4lb/sk D5+.7% D8+.% D46+4% D54 Tail sx H+. D65+.% D8+4lb/sk D5+% D+.5% D7+.% D46+4% D54 Circ bbls or sx Cement to / tank Rigdown Schlumberger Nipple Down BOP Set Slips Cutoff Casing Change Rams Bop Back To 5" Laydown BOP Cap Wellhead Note: Set 55, On Slips 5 9.8 4 8/ /CSG /5/.5 HGS/SAND % O/W RATIO OIL % MBT PH/ES 8 /./. / 89 89.7 8 Desco Starch Sure Guage 5 Gal 8 R (rot motor or min max) PF/MF./. zdsh CL (P) CA (P) 6,, Magnesium 4. Sol Tex Corr Solids. 9.8 Ch. Seal (x/6ths) Dull Ch. Pulled Torque FT/LBS 5 /,778 Weight 4 7 P 88 866. MP Pressure (W/ max diff) S LINER STROKE LENGTH OUTPUT (gal/stk) 4.9 4.9 OUTPUT (G) SPR & PRESSURE 45/7 4/59 TEST SUB S&PSI 4/78 4/6 # Pump Proj To Proj To T D,78 656.78 9.4 79.98. 74.6 Notes / Next 4 hrs: Finish Capping well / Rigup Laydown Machine / Laydown Dp From Derrick / Clean Pits With T-Rex / Rig Down Nov Close Loop