BLASTRAC EBE Rigging System Floating Roof

Similar documents
OPERATING MANUAL EBE-900VMB VERSION 1.1

Operating Instructions EBE 350 VH

Safelift Overhead Runway Beams & Rolling Beam Cranes

PROCEDURE. Operative Date: 22/12/2016 Department: HSEC. Revision: Author: D Steel CONTENTS

Operating Instructions EBE 350 E

General Instructions and Inspection Instructions for Crane

Operating Instructions 1-8DPS30 220V-SP

Reliance Industries, LLC. Installation, Operation, Inspection and Maintenance Instructions for the Slider Traveling Beam Anchor Clamp

ELECTRIC HOIST MODEL NO: CH2500B, CH4000B OPERATION & MAINTENANCE INSTRUCTIONS PART NO: , LS1010

OPERATIONAL INSTRUCTION OVERVIEW MAINTENANCE CHECKLIST

Operating Instructions 1-10DS Global

Type 3379 Pneumatic Actuator. Mounting and Operating Instructions EB 8315 EN

Instructions for Fitting, Operating and Maintenance Canopy Door RE / (St.: )

OPERATING & INSTRUCTION MANUAL

INSTRUCTION MANUAL CONTRX FORKLIFT JIBS JLT, PBJLT, CHJLT

TOOL BOX TALK - SAFE USE OF LIFTING EQUIPMENT

Hand winch with worm gear Type WH 7 S in accordance with DIN EN 13157

Operation of Fork Lift Trucks

ELECTRIC HOIST MODEL NO: CH2500B, CH4000B OPERATION & MAINTENANCE INSTRUCTIONS PART NO: ,

Backsaver Crane Catalogue. (P) (F)

RINK Model 1622 Series number:

Operating Instructions. TM Girder Clamps

DWHOIST. Drywall Hoist Assembly & Operating Instructions

Cranes and Derricks. Objectives. Construction Safety Lecture 18

OPERATING MANUAL 1-8DM VERSION 1.1

دبي لحلول االستشعار. Active Load Brochure Load Cells

OPERATION AND MAINTENANCE MANUAL FOR RELEASE MECHANISM

Patriot Portable Material Hoist 850/1000/2000. Operator s Manual

1/2-TON MANUAL CHAIN HOIST

REDEXIM-BLEC BOX-GRADER 1800 / LASER- GRADER Serial number: User Manual and Parts Book. Original manual

corso beam clamps operating and maintenance instructions Beam Clamps: 1 ton 2 ton 3 ton 5 ton 10 ton equipment in accordance with CE directives

Contents. Sliding Door Gear Product information 155. Roller-Guided Sliding Door Gear. Page

Status: Issue 08 Date: 18/10/17 Reference: Lifting Operations and Lifting Equipment Regulations 1998 Regulation 9

OPERATING INSTRUCTIONS (Translation) Hoisting crane

ov-lifting_bolts_divider - Updated Lifting Bolts

OVERHEAD & GANTRY CRANE / RIGGING

OPERATION & MAINTENANCE for Lamella plate separators OPERATION & MAINTENANCE QUICK GUIDE For models HB50 / HB20 / HB10

By David Rettke Maintenance Specialist WALTER M. HIGGINS III GENERATION STATION PRIMM NEVADA

Installation and Operating Instructions for EAS -NC clutch Type 45_. _. _ Sizes 02 and 03

Rev. 10/27/2015 CDL-2000, MANUAL

Provided by: Operating, Maintenance & Parts Manual

CRANE OPERATION INSTRUCTION AND GUIDELINES

MAINTENANCE WORK INSTRUCTION. Mech OFF Replace Head Pulley CVXXX

Lifting device for standard removable versions

Instruction Manual. Pressure Manhole Covers - HLSD IM70871-EN

Timing belt replacement intervals

Operating Instructions

4600 SERIES 3 RINGER SERIES 2. Manitowoc Cranes, Inc. Manitowoc, Wisconsin U.S.A.

QUICK-ACTING JAW CHANGE SYSTEM

Construction Machine HS 8130 HD. enus HS

Northern Sales & Distribution Centre

HYTECH ENGINEERING & SERVICES

Offshore cranes for sale November 2017

Mounting and Operating Instructions EB 8091 EN. Pneumatic Control Valve Type and Type Type with 120 cm 2 actuator

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 10. Lifting Operation

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Mounting and operating instructions EB EN. Differential Pressure and Temperature Regulator with Flow Limiter Type 2479/2430 K

SwingLift GB100 GAS BOTTLE CRANE

Uncontrolled When Printed Document comes into force 06/12/2014 Supersedes GERT8000-T10 Iss 3 on 06/12/2014

ROUGH TERRAIN CRANE TR-500M

ROUGH TERRAIN CRANE GR-160N

STANDARDS PRESENTATION Attachment No. 1 TO Page 1 of 6 CALIFORNIA OCCUPATIONAL SAFETY AND HEALTH STANDARDS BOARD

Heavy lift crane barge

INSTRUCTION MANUAL. Pacific Self-locking Beam Trolleys Pacific Adjustable Angle Clamps Pacific Top Girder Clamps

Series 1300 Hydraulic Crane 30 Ton Load Ratings

Power Transmission. Installation and Operating Instructions for Brake Caliper DV / DH 020 FKM. E e.

Element C7.2 Lifting Work Equipment

Technical test - Theory. No. Question Answers Max. Mark

Series 1400 Hydraulic Crane 33 Ton Load Ratings

1ZSC ABH en, Rev. 1. Motor-drive mechanisms, types BUE and BUL2 Maintenance guide

ROUGH TERRAIN CRANE TR-250M

Series 1400A Hydraulic Crane 33 Ton

Offshore cranes for sale April 2017

WARNING. Electric Recovery Winch. General Safety Precautions

ROUGH TERRAIN CRANE TR-160M

ROUGH TERRAIN CRANE TR-500M

INSTRUCTION MANUAL MAGNA RAIL

ROUGH TERRAIN CRANE GR-500N

CPCS renewal test factsheet

3. Cover the hood with padding and fold the stock windshield frame down onto the hood.

Installation and operating instructions. BPW Landing gear. BPW-BA-SV e

MR150 Man Rider Winch

ROUGH TERRAIN CRANE TR-250M

CAVE Safety cover for inspection pits. Light-weight covers, easy and quick to protect open vehicle pits.

OWNERS GUIDE 12V / 24V DC ELECTRIC WINCH. 12,000lb (6124kg) TWO SPEED VERY IMPORTANT

ROUGH TERRAIN CRANE GR-250N

Mounting and operating instructions EB 8093 EN. Series 240 Pneumatic Control Valve for Cryogenic Temperatures. Type and

Instructions for Fitting, Operating and Maintenance

Newport News Shipbuilding Contractor Environmental, Health and Safety Resource Manual Cranes

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

Engine and A4LDE Automatic Transmission Remove and Install ( ) Remove

Star Swivel-Arm Hoist Installation and Operating Instructions

Slinger/signaller Note: It is recommended that you read the Supporting Information page before you read this factsheet.

And the Labour Law for the Private Sector promulgated by And Legislative Decree No.(36) of 2012, particularly Article (166) thereof,

MovoZ Z3 Installation and service manual. TOLLO LINEAR AB SWEDEN DW110421gb-0352-edition2

Title: Lifting Operations Involving Crane or Gantry Offshore

Series 1300A Hydraulic Crane 30 Ton Load Ratings

GUIDANCE IN-SERVICE INSPECTION PROCEDURES

BPW Stützvorrichtungen BPW Landing Gear. BPW Bergische Achsen MONTAGE- UND BEDIENUNGSANLEITUNG INSTALLATION AND OPERATING INSTRUCTIONS

original operating manual Operating manual Translation of the Item-No.: ,

Transcription:

BLASTRAC EBE Rigging System Floating Roof RIGGING SYSTEM FOR PROCESSING VERTICAL STEEL STORAGE TANK SURFACES The BLASTRAC EBE Floating Roof rigging systems are especially developed for the BLASTRAC EBE 350 Vertical machine. This machine is designed to suspend with a winch rigging system and works in an up or down pattern to clean and profile vertical steel external shell tank surfaces. The rigging system is operated and controlled from a mobile control station. TECHNOLOGY The Rigging Systems that USF EBE supplies are made with high grade components, all the necessary certification are include in this system and it is made out of several components, the benefit of this is that the building uptime is extremely short. This because the system is so developed that it consists of 5 major components, 1. The drive frame which arrange the movements during the blasting to the left and right, 2. Winch unit which is controlling the travel speed for blasting down and the movements going upwards, 3. Side support arm gives you a constant distance from tank shell and middle point of the machine, 4. Hoist arm and pulley frame that controls the winch cable, 5. Turnbuckle that is an extra safety point. All the major components are build up together, the winch system which is a separate system is mounted on top of the Floating Roof rigging system. The winch systems that USF EBE provide are exchangeable for use on all the other manufactured rigging systems. A U.S. Filter Company

COMMON WARNINGS AND DIRECTIONS: All certificates and tests are according to Dutch law and regulations. Certified according to Dutch law: Load test at 125% of S.W.L. (Save Work Load) Hoisting points at 125% of death weight (approx. 650 Kg) See our certificates in this manual Irrespective of the following information, the local safety regulations are valid in any case for the operation of the machine. All safety and hazard notices at or on the machine must be kept complete and legible! The machine may only be used for an EBE 350 VH. It s not allowed to use the winch for any other purposes! Changes, add-ons or conversions to the machine which might impair safety must not be undertaken without the manufacturers permission! Make sure that only authorized personnel operate or work on the machine. Personnel being trained or made acquainted with the equipment may only be deployed on the machine under constant supervision of an experienced person! Check the machine visually for any damage and defects at least once a day! The electrical equipment for the plant must be inspected regularly. Please note in particular the specified recurring inspections according EN60204-1. Work on electrical equipment or operating materials may only be undertaken by a skilled electrician or by trained persons under the guidance and supervision of a skilled electrician as well as in accordance with the electrical engineering regulations. Only operate the machine when all safety devices and related safety equipment, e.g. detachable safety devices, emergency stops are present and operational! Secure the work area around the machine in public areas. Never walk under a load that is lifted!

MAJOR COMPONENTS The Floating Roof Rigging System consists of the following 4 major components: MOUNTFRAME AND STIFFENINGPLATES DRIVE FRAME WINCH FRAME HOIST ARM

PREPARATIONS 1. Attach WINCH FRAME to MOUNT FRAME; 2. Attach HOIST ARM to MOUNT FRAME; 3. Pull through WINCH CABLE and connect CABLE HOOK. 1. 2. 3.

HOISTING - DRIVE FRAME 1. Hoist the DRIVE FRAME above the wall of the floating roof tank; 2. Turn the Turnbuckle anti-clockwise, the wheels move outside; 3. Lower the DRIVE FRAME and fix the hinging wall wheels. 1. 2. 3.

HOISTING - WINCH ASSEMBLY 1. Hoist the WINCH ASSEMBLY a little bit above the DRIVE FRAME; 2. Lower the WINCH ASSEMBLY, fix the bolts and lock the HOIST ARM. 1. 2.

Limit Switch Settings Floating Roof Rigging 1. Switch on the power of the Winch Unit. 2. Release the cable until the distance from the centre of the winch drum to the lifting block is 6 mtr. 1. 3. Change the settings of limit switch A by loosening the two bolts and sliding the limit switch left or right to the position that will stop the winch from lifting (when cable length is 6 mtr). 4. Change the other 3 limit switches According to Figure 2. 2. A. Start/Stop winch cable B. End/Stop winch cable (± 20 mtr cable) C. Slow/Start D. Slow/End

OPERATION Remote Control Box of the FLOATING ROOF RIGGING SYSTEM. - WINCH UP - WINCH DOWN - RIGGING DRIVE RIGHT - RIGGING DRIVE LEFT - BLASTING SPEED BLAST MACHINE - 0 = FIXED BLASTING SPEED (0.5 or 16 mtr/min) - 1 = ADJUSTABLE BLASTING SPEED (0.5-16 mtr/min) - RESET ON - EMERGENCY STOP