L I T H I U M B AT T E R Y

Similar documents
Lithium Power Cabinets

Lithium-Ion Phosphate Battery US2000(Version B) Product Manual

WF-5110R True Sine Wave Inverter

Contractors Guide Central Inverter System Installation

WF-5100 Series True Sine Wave Inverters

TOWER MAXI T SINGLE CONVERSION ON LINE UPS SYSTEMS

WF-5110R True Sine Wave Inverter

Lithium-Ion Phosphate Battery

Lithium-Iron Phosphate Battery US2000B Product Manual

Power Distribution System User s Manual. Model: PDS-100

Lithium-Ion Phosphate Battery Phantom-S Product Manual

POWER TROLLEY 8 INSTRUCTION MANUAL POWER TROLLEY 8. Model: SINE Instruction Manual for: Self-Contained Sinewave Mobile Power Backup System

Installing Power Components

General Precautions. Personnel Precautions

BYD Battery-Box Pro User Manual Battery-Box Pro 13.8

QUEENSLAND URBAN UTILITIES

Rechargeable Li-ion Battery US3000 Product Manual

Installing a Programmed Fronius SCERT in a Managed AC Coupled system

Off Grid Solar Inverter. LVS 50M User Manual

Inlet Controller TC5-ITA USER'S MANUAL. M rev. 02 K rev. 00

INSTALLATION INFORMATION

Solar Charge Controller

The 4HR-UPS 220V ac output is provided via a Pure Sine Wave inverter, allowing it to be backed up by 2x 12V standby batteries.

VC-4820 Programmable DC-DC Converter with Battery Charger function USER'S MANUAL

Plug Into the Current Future

Central Inverter SUNNY CENTRAL 500CP-JP / 500CP XT / 630CP XT / 720CP XT / 760CP XT / 800CP XT / 850CP XT / 900 CP XT

User Manual. NetGuard IMPORTANT. PSD 650/1200/1600 Line Interactive UPS Uninterruptible Power Supply System. UPS Monitoring Software

240V UPS Typical Installation Guide

Magellan Utility Scale Energy Storage

Ultra Sine Inverter (US) Generation 4 (G4) User Guide

mygrid Installation Notes

ST Charger. Industrial Battery Charger

BOOST POWER 1212 Product Description

USER MANUAL MPS 1-5KW SERIES

10 Year Limited Warranty

Dycon D1532SM. EN50131/PD6662 Grade 3, 12V 2A Power Supply. Technical Description Installation and Operating Manual DYCON POWER SOLUTIONS LTD

HousePower BMS. CleanPowerAuto LLC

Battery & Energy Meter Quick Guide

SCC-MPPT Solar Charge Controller

ENERGY SOLUTIONS RESIDENTIAL STORAGE BATTERY SYSTEM

USER MANUAL. IPS home inverters with UPS function. IPS home inverter manual

CONTAINER 1MWh. CONTAINER 1 MWh. Electrocell presents the INNOVA 1MWh on/off-grid energy storage system.

The Traveler Series: Adventurer

AME. Rectifier - Battery charger. Industrial applications: Key features:

Compact Energy Storage Module. Modular Systems, EPDS. Product overview

APPLICATION NOTES. Industrial Wall Control (IWC10) (English) (IWC10)

RU SERIES UPGRADE TempAssure Compatible

Power. On Your Terms.

L5000 Plus. Installation & Setup Guide

SCC-MPPT Solar Charge Controller

Power Inverter. User s Manual. Diamond Series CPD1200EILCD

The Power of Reliability INSTRUCTION MANUAL

CALL FOR A QUOTE (877)

SP PRO KACO Managed AC Coupling

The Traveler Series TM : Adventurer

PowerOhm Installation Manual for LG ATV Series Braking Modules

Plug Into the Current Future

Duo Battery Charge Controller

Maintenance Manual 13 AMPERE POWER SUPPLY 19A704647P1-P3. Mobile Communications LBI-31801C

Solar Hybrid Power Generating System CPS1200EOH12SC CPS2200EOH24SC CPS3000EOH24SC. User s Manual K01-C

Industrial Chargers and

AIS 5000 UPS kva 480 V. Installation Manual

DP140e. Installation & Operations Manual

Battery & Energy Meter Quick Guide

Eguana Evolve. Installation & Start-up Guide. Grid Support Utility Interactive Inverter & Integrated Lithium Battery. Model Evolve 0513U

Manual. EN Appendix. Lynx Ion BMS 400A / 1000A

Installation Manual. TS 48 Volt

SCC-MPPT Solar Charge Controller

HPP1 MK6-15A/20A R00 Owners Manual

MPPT Solar Integrated Inverters (500VA~2500VA) User Manual THE SOLAR TECH CO.,LTD. Solar Integrated Inverter Series 500VA~2500VA 13.

Lithium-Ion Phosphate Energy Storage System PowerCube-X1 Operation Manual

Uninterruptible Power Supply ERA LCD 0.65 ERA LCD 0.85 ERA LCD 1.1. User s manual

Genie Smart Cabinet - UPS Powered Distribution Unit User Manual

ECCII to ECCIII Upgrade Kit

Custom Power Solar Radian Battery Energy Storage System

Installation Guide Smart-UPS On-Line SRT1000/1500 UXI-NCLI, SRT1000/1500 UXI-LI, Tower/Rack-Mount

DC AC POWER INVERTER. LIV 10 / LIV 20 / LIV 30 User Manual

Emergency lighting units PC COMBO

CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS

Magellan Stand Alone Power System (1P) Magellan Renewables Range

Installation and Commissioning of Auxiliary Power Unit

User Manual Digital Energy Uninterruptible Power Supply ML Series UPS VA GE Digital Energy Power Quality

Customer Training Catalog Training Proposal. Training Description for Network Energy COMMERCIAL IN CONFIDENCE 1

Sola/Hevi-Duty S3K Series Mini-Tower UPS

Art. No. EC-315. Art. No. EC-330. Art. No. EC-340 SWITCH-MODE BATTTERY CHARGER CONTENTS IMPORTANT SAFETY PRECAUTIONS... 2

Magellan Stand Alone Power System (3P) Magellan Renewables Range

SENS DC PowerCab 120 Installation, Operation, & Maintenance Manual

Installation Manual TS HV 70

Operating Manual / / REV F

GEatom306KHF-5U Three-phase Grid-Tied Battery Inverter. Version 1.1. Global Mainstream Dynamic Energy Technology Ltd. 1

Bunya Solar. Renewable Energy Systems. Remote area power supply system manual

T Series (N6052T) Solar Battery Hybrid System. Installation Manual Version 1.1

StorEdge Solar and Energy Storage System Review

CHANGE YOUR ENERGY CHARGE YOUR LIFE

EPS/ELA-Series User Manual EPS/ELA 250W

Eguana Evolve. Installation & Start-up Guide. Grid Support Utility Interactive Inverter & Integrated Lithium Battery.

80V 300Ah Lithium-ion Battery Pack Data Sheet

Operating Manual

Energy Storage System for Home

Transcription:

VERSION 1.5 L I T H I U M B AT T E R Y ENERGY SOLUTION I N C O R P O R A T I N G Installation Guide LG CHEM MODEL NO. EM48126P3S ABB DC DISTRIBUTION BOARDS

Contents 3. Notices 4. Before You Begin 7. Bill of Materials 8. Warnings 9. Cautions 12. Battery Specifications 13. DB Specifications 14. Weights & Dimensions 15. Battery Details 16. Battery Electrical Schematics 18. Installation Process 49. Battery Status Lights 50. Battery Fault Scale 51. Select Alerts 52. Full List of Alerts 53. Completing Installation 54. Battery Warranty 55. Picking Lists 2

Notices About This Manual This manual describes how to install LG Chem EM048126P3S series lithium rack mounted battery modules into a supplied Cabinet and wire them to a supplied DC Distribution Board. Read this manual all the way through before you attempt installation and follow the instructions throughout the installation process. If you are uncertain about any of the requirements, recommendations, or safety procedures described in this manual, contact your supplier immediately for advice and clarification. The information included in this manual is accurate at the time of publication. However the product specifications are subject to change without prior notice. In addition the illustrations in this manual are meant to help explain system configuration concepts and installation instructions. The illustrated items may differ from the actual items at the installation location 3

Before You Begin Safety Equipment Diagrams in this document related to one system size or the other will be marked as follows 4

Before You Begin Installation Prerequisites 5

Before You Begin Installation Prerequisites Ensure you have the appropriate inverter communications interface / circuit board For Selectronic SP Pro 48V inverters use Selectronic Part Number 005298 LG Chem Rack Lithium Battery Communications Kit 6

Bill Of Materials Component 5 Battery System 10 Battery System LG Chem EM048126P3Sx 6.5kWh lithium battery modules 3-5 based on order 5-10 based on order Communication Cable: Inter-battery 1 per Battery less 1 i.e. 3 cables for 4 batteries Communication Cable: First Battery to DB9 Female 1 per System DC cables (red & black) 1 pair per Battery Cable Glands 16mm for data 1 Cable Glands 28mm for fan controller power 1 Cable Glands 35mm for DC cable to inverter 2 Cable Glands 63mm for DC cables from batteries 1 2 70mm 2 cable lugs 2 Temperature control unit for fans with four nuts & bolts 1 Rack Mount Cabinet 22RU to hold up to 5 batteries 37RU to hold up to 10 batteries Set of four levelling feet for Cabinet 1 Cabinet shelves 5 10 Nuts & bolts for shelves (4 per shelf) 20 40 Nuts & bolts for securing modules (4 per module) 20 40 DC Distribution Board For 5 batteries For 10 batteries Installation manual (this document) 1 7

Warnings Read the LG Chem battery installation manual for a complete list of warnings and response to emergency situations including fire and damaged batteries. Risk of shock-high DC current. Hazardous weight of each battery module. 8

Cautions Read the LG Chem battery installation manual for information on battery handling and personal protective equipment to be worn. Installation is to be in a dry, clean environment do not expose to moisture or dust. The installation location should be secured against vermin including rodents, reptiles and all types of insects. 9

Cautions cont. Ensure that the floor of the installation location is flat, level and suitably rated for the weight of the battery Cabinet, which with 10 batteries weighs approximately 500kg. Do not move Cabinet with batteries installed set the Cabinet in its final location before battery installation. Only use leveling feet if necessary. Install batteries from the bottom shelf up. 10

Cautions cont. It is strongly advised that the SP Pro be connected to the internet for remote access to assist with any warranty claim on the batteries. Note: a complete download of the battery logging data from the SP Pro inverter is required for any battery warranty claim. 11

Battery Specifications Parameter EM48126P3S Battery available operating temperature 10 C ~ 45 C Battery optimal operating temperature 15 C ~ 30 C Humidity 5 to 95% (non-condensing) Nominal Capacity 126Ah Nominal Energy 6.5kWh Nominal Voltage 51.8Vdc Operating Voltage 42 ~ 58.8Vdc Maximum Charge/Discharge Current 63A Round Trip Efficiency 95%+ Maximum Short Circuit Current 1,897A Fuse Blowing Time 3.2 msec 12

Distribution Board Specifications 5 Battery Cabinet 10 Battery Cabinet ABB Circuit Breakers 5 x S802C-C80 80A MCB 10 x S802C-C80 80A MCB ABB Distribution Blocks DBL400 DBL400 ABB Main Isolators Tmax XT 250A MCCB Tmax XT 250A MCCB Escutcheon Standard Standard 13

Weights & Dimensions 5 Battery Cabinet 10 Battery Cabinet Cabinet (mm) 600 (W) x 1100 (H) x 800 (D) 600 (W) x 1750 (H) x 800 (D) Cabinet (kg) 71kg 120kg Battery Module (mm) 483 (W) x 110 (H) x 586.6 (D) Battery Module (kg) 44kg Distribution Board (mm) 600 (W) x 900 (H) x 225 (D) 600 (W) x 1100 (H) x 225 (D) Distribution Board (kg) 50kg 60kg 14

Battery Details 1. Status indicators 2. RJ48 port (intra-rack) 3. RJ48 port (inverter) 4. Positive connector 5. Power Terminal Compartment 6. Negative connector 7. On/Off button 8. Dry contact 9. Handle (not rated for 44kg) 15

Battery Electrical Schematic 16

Battery Electrical Schematic 17

Installation Process 1. Confirm installation location meets the requirement to be dry, clean and ideally temperature controlled plus has been secured against vermin. 2. Install leveling feet if necessary to ensure that the Cabinet is completely level. 18

Installation Process cont. 3. Ensure that the wall the Distribution Board is being affixed to is suitable load rated. 4. Measure out locations for installation of the Cabinet and Distribution Board. Align top of Distribution Board to top of Cabinet. 19

Align top of Distribution Board to top of Cabinet. 20

Align top of Distribution Board to top of Cabinet. 21

Installation Process cont. 5. Position the Cabinet in its final position hard up against the wall. 6. Remove both side panels from Cabinet. 7. Lie the Distribution Board on its back and remove the escutcheon, gland plate and internal pan. 22

Installation Process cont. 8. Mount the Distribution Board on the wall in its final position up against right hand side of the Cabinet. 9. Drill out 63mm gland(s) for DC cables from inside the Distribution Board right through to the inside of the Cabinet. The DC cables must be routed through the backright side of the Cabinet into the Distribution Board due to the length of the DC cables. 23

Drill 1 x 63mm hole from inside the Distribution Board through and into the Cabinet. 24

Drill 2 x 63mm holes from inside the Distribution Board through and into the Cabinet. 25

Installation Process cont. 10.Drill out glands for the communication cable and the power cable to the Fan Controller. These cables may be routed through the back or sides of the Cabinet. 11.Vacuum out any metal shavings in the base of the Cabinet. 26

Installation Process cont. 12.Install all cable glands. The 63mm DC cable gland(s) should go right through from the inside of the Cabinet to the inside of the Distribution Board. 13.Install shelves and fan controller into the Cabinet in the positions shown. 27

Shelf positions: 6, 17, 28, 39, 50 Fan controller: 61, 62 28

Shelf positions: 6, 16, 26, 36, 46, 56, 66, 76, 86, 96 Fan controller: 106, 108 29

Installation Process cont. 14.Run power cable for fan controller out of cabinet through gland. 30

Installation Process cont. 15.Re-install pan into Distribution Board. 16.Wire the DC cables for each battery to the circuit breakers in the Distribution Board. Ensure polarities match 31

Installation Process cont. 17.Route each battery s pair of DC cables through the 63mm cable glands into the Cabinet. Tag each cable 300mm back from the battery connector for later identification. 18.Leave all DC battery cables hanging out the right side of the Cabinet prior to final connection. 32

Installation Process cont. 19.Install batteries one at a time starting from the bottom shelf. Warning two people required to lift each battery Warning do not carry the battery only by the handle, it is not rated to carry the full weight of the battery 33

Installation Process cont. 20.Secure each battery with four module mounting bolts to the front mounting bars. 34

Installation Process cont. 21.Measure the voltage of each battery. Remove terminal compartment cover. Measure voltage at the terminal blocks with a volt meter. If voltage is lower than 42V do not use the battery module. Replace cover. 35

Installation Process cont. 22.Install the communications cables between the batteries. Starting at the top, insert one end of the intrarack communication cable into the lower RJ48 port of the module and then insert other end into the upper RJ48 port of the module below. Leave the lower RJ48 port of the bottom-most battery unconnected. 36

Intra-battery Communications cables. 37

Installation Process cont. 23.Connect LG Chem RJ45 to DB 9 communications cable from top-most battery to the inverter through the cable gland. For SP Pro inverters this means connecting via the Selectronic LG Chem Stand Alone Battery Communications Kit (part no. 005298) 38

Communications cable to inverter. 39

Installation Process cont. 24.Connect each DC cable pair to a battery module positive first, then negative. 24.Cable tie the DC cables to the internal uprights of the Cabinet. 40

Comms cables link from battery to battery. DC cables run in parallel. 41

Comms cables link from battery to battery. DC cables run in parallel. 42

Installation Process cont. 26.Crimp & heat-shrink 70mm 2 lugs onto 70mm 2 DC cable ready for termination in main isolator. 27.Install 70mm 2 DC cable from the top of the main isolator at the top of the Distribution Board through to the inverter. Install glands into the Distribution Board gland plate if required. Install gland plate into the Distribution Board. Reinstate escutcheon in Distribution Board. 43

Installation Process cont. 28.Turn on the top most battery via the On/Off button. This designates the top battery as the master and activates not only the master module but also the slave modules. 44

Installation Process cont. All of the battery modules are sequentially assigned IDs by the master module. If the top module s On/Off button is pressed, the module becomes the master module and also the first module. 45

Battery Status Lights 46

Installation Process cont. 29.Position Fan Controller temperature sensor above top-most battery module. 30.Power on Fan Controller and set for 25 C. 47

Installation Process cont. 31.Remove the nub screws from the base of the Cabinet s right side panel. 32.Reinstate both Cabinet side panels. 33.Retain all left over parts (bolts, etc.) for future upgrades. 48

Battery Status Lights 49

Battery Fault Scale Warning: When a battery module is likely to become unstable, it goes into a warning state. This state is cleared when the module recovers its normal condition. Fault 1: When a battery module is likely to become faulty, it goes into a low level fault state, This state may require an appropriate measure to be cleared. Fault 2: When a battery module falls outside prescribed limits, it goes into a high level fault state. The battery module in this state is not used anymore. Inspection by LG Chem required. 50

Select Alerts Too low module voltage Too high battery temperature Lost communications between battery modules 51

List of Alerts See LG Chem Service Manual for complete list of alerts including: Cell overvoltage Cell undervoltage Too low module voltage Too large voltage difference between cells Over-charged current Over-discharged current Over-charged power Over-discharged power Too high battery temperature Too low battery temperature Too large temperature difference inside battery module Lost communication between battery modules Lost communication with the inverter Too low SOC Too high SOC 52

Completing Installation Refer to LG Chem installation guide* for: Commissioning Deactivating Troubleshooting LG Chem Documentation: https://1drv.ms/f/s!ajpepd6os3w3qdybi4gzu0jipwdr 20171201 - Standalone G2_installation_manual_Final.pdf * 170104_Standalone_Specification_V1.1.pdf 20171201 - Standalone G2_service_manual_Final.pdf JH3 Cell_SDS_LG Chem_AU_R1.1.pdf 53

LG Chem Battery Warranty Refer to Warranty Document for complete details of coverage Note: a complete download of the battery logging data from the SP Pro inverter is required for any warranty claim 54

Picking List 5 Battery System Component 5 Battery System Picked LG Chem EM048126P3Sx 6.5kWh lithium battery modules 3-5 based on order Communication Cable: Inter-battery 1 per Battery less 1 Communication Cable: First Battery to DB9 Female 1 per System DC cables (red & black) 1 pair per Battery Cable Glands 16mm for data 1 Cable Glands 28mm for fan controller power 1 Cable Glands 35mm for DC cable to inverter 2 Cable Glands 63mm for DC cables from batteries 1 70mm2 cable lugs 2 Temperature control unit for fans with four nuts & bolts 1 Rack Mount Cabinet 22RU to hold up to 5 batteries Set of four levelling feet for Cabinet 1 Cabinet shelves 5 Nuts & bolts for shelves (4 per shelf) 20 Nuts & bolts for securing modules (4 per module) 20 DC Distribution Board For 5 batteries Installation manual (this document) 1 Selectronic LG Chem Stand Alone Battery Comms Kit (part no. 005298) 1 55

Picking List 10 Battery System Component 10 Battery System Picked LG Chem EM048126P3Sx 6.5kWh lithium battery modules 5-10 based on order Communication Cable: Inter-battery 1 per Battery less 1 Communication Cable: First Battery to DB9 Female 1 per System DC cables (red & black) 1 pair per Battery Cable Glands 16mm for data 1 Cable Glands 28mm for fan controller power 1 Cable Glands 35mm for DC cable to inverter 2 Cable Glands 63mm for DC cables from batteries 2 70mm2 cable lugs 2 Temperature control unit for fans with four nuts & bolts 1 Rack Mount Cabinet 37RU to hold up to 10 batteries Set of four levelling feet for Cabinet 1 Cabinet shelves 10 Nuts & bolts for shelves (4 per shelf) 40 Nuts & bolts for securing modules (4 per module) 40 DC Distribution Board For 10 batteries Installation manual (this document) 1 Selectronic LG Chem Stand Alone Battery Comms Kit (part no. 005298) 1 56