District 2 Projects Scheduled for award during the period from 06/19/17 to 06/18/18 Sorted by PID

Similar documents
Local Market Update February 2013

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Transportation Improvement Program (TIP) Candidate Project List for Public Review

NORTHWEST OHIO HOUSING MARKET 2nd Quarter Contact Your Realtor To Find Out What s Happening In Your Neighborhood.

Local Market Update 2012 Year In Review

MUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1

ODOT District Two Monthly Construction Update

ODOT District Two Monthly Construction Update

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

CY 2013 and CY 2014 NOVA District Advertisement Schedule Design-Bid-Build

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Local Public Agency Obligated Projects SFY 2018

Middle Georgia Regional Investment List

Revised Evaluation Scores. System Preservation

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Public Works. Capital Projects FY

Rural Planning. Highway Projects - CULLMAN COUNTY

Williamson County Projects

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

800 Access Control, R/W Use Permits and Drive Design

DISTRICT/ATP 6 Data Input Worksheet Final STIP

Ohio's Transportation Stimulus Projects. County Project Description Stimulus Funds

April 2014: Capital Improvements Update. through $ 102,233,755 Available Funding through 2019 $ 149,764,558. Staff s Recommendation

2040 Metropolitan Transportation Plan -- Table XVII-1

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

EXCEPTION TO STANDARDS REPORT

ALIGN THE RAPID S TRANSIT IMPROVEMENT STUDY. Tech Memo #4: Phase 1 Project List. Prepared By:

2018 Transportation Improvement Program (TIP) Bridge Section Summary of Proposed Changes July 24, 2018

5. HORIZON YEAR TRANSPORTATION MASTER PLAN-COST ESTIMATES

SFY Call for Projects MPO Staff Recommendation All Projects Submitted for Funding Funds Available: $57,075,000

Highways: State Highways. Highways: Local Roads. Highways: Off State Hwy Sys/Off Fed Sys. Maintenance: State Highways

UNIFIED GOVERNMENT Proposed Capital Maintenance Improvement Program (CMIP) Capital Cash Project Summary 5/14/18 Fund/Departm ent New Annual

Lucas County Engineers Office Keith G. Earley, P.E., P.S., Lucas County Engineer

2016 PSRC REGIONAL & KING COUNTYWIDE EASTSIDE FUNDING AWARDS. Eastside Transportation Partnership September 9, 2016

FY Regional Surface Transportation Program (RSTP) Allocations *

Local Public Agency Obligated Projects SFY 2015

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Historical count data from Page 7-14

Capital Improvement Plan Review

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

LEGEND FULL DEPTH PAVEMENT 2" MILL AND OVERLAY CONCRETE PAVEMENT PAVERS EXIST. R/W ROW ROW EB/WB CONCRETE CURB -15.

SCHEDULE OF CAPITAL PROJECTS BY FUND

INDIANAPOLIS METROPOLITAN PLANNING ORGANIZATION Planning the transportation future for the Indianapolis region MEMORANDUM

Recommended Transportation. Capital Improvement Program

TRANSPORTATION IMPROVEMENT PROGRAM

Capital Improvement Program (CIPs) City of Industry FY 2017/18 Adopted Budget

TSPLOST 2018 Project Request $ 1,531,000 Estimated Annual Operating Impact $ 0

Clarksville Street Department. Fiscal Year 2018 Budget Presentation

STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION - TABULATION OF BIDS. Start Dt: 05/15/17 Comp. Dt: 08/04/17. Contract Time: Min: Max:

WICHITA AREA METROPOLITAN PLANNING ORGANIZATION

April 27, FHWA/FTA Approval of an Amendment to the Kansas STIP to include WAMPO s April 14, 2009 TIP Amendment 6

I-405 Sepulveda Pass Improvements Project

# of Projects STIP Total Other FHWA Target FHWA Total FHWA Target AC Total AC

CITY OF PORT TOWNSEND, WASHINGTON CAPITAL IMPROVEMENT PLAN

APPENDIX G. Greenhouse Gas and Climate Change Analysis

US 10 Corridor Performance

Kentucky Highway District 6

Clearlake Road (State Road 501) Project Development & Environment (PD&E) Study

Ohio Department of Transportation Official Bid Tabulation James G. Beasley, P.E., P.S., Director

I-225 Rail Line. 13 th Avenue Station Information Meeting. July 25, 2013

BINGHAMTON METROPOLITAN TRANSPORTATION STUDY

Richmond Area MPO Regional Priority Transportation Projects

Brent Spence Bridge Design Exceptions - Alternative I

Perry City 1200 West Walking/ Biking Path Project Type Pedestrian/ Bike

City of University Place

Caltrans Shopp Lump Sum Projects and Backup List

Mid-East RPO P5.0 Scores: Division Needs Local Input Point Assignment - TAC Amended on October 8, 2018

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

Guam Transportation Program Project Updates. Joanne M.S. Brown Director Carl Dominguez Deputy Director February 6, 2012

SOUTHERN GATEWAY. Transportation and Trinity River Project Committee 11 May 2015

Project Application. General Information ODOT PID. Primary County (3 char abrv) ODOT District

City of Marina. Regional Roundabout Study Utilizing Caltrans Intersection Control Evaluation Section 4: Transportation Agency for Monterey County

6-YEAR CAPITAL IMPROVEMENT PROGRAM

PUBLIC WORKS DEPARTMENT DECEMBER 2017 UPDATE DESIGN & CONSTRUCTION DIVISION

City of Palm Coast 5 Year Capital Improvement Plan

THORNTON ROAD WIDENING PROJECT NO. PW1428 B I D D I N G S C H E D U L E

HURON COUNTY ENGINEER S OFFICE

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

Middle Georgia Transportation Executive Committee. September 27, 2017

Current Corridor Characteristics. MN 62 Corridor Performance

CAPITAL IMPROVEMENT PROGRAM

Pennsylvania Turnpike Commission 03/30/ YEAR CAPITAL PLANNING PROCESS

I-4 Beyond the Ultimate. Florida Transportation Builders Association January 18, 2019

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

Population Trends. US 12 Corridor Performance

CTA Blue Line Study Area

Chapter 4 COLLISION REDUCTION PROGRAM

Columbia County Road Department. Department Presentation June, 2013 By David Hill

Transportation Analysis. Pedestrian Pathways. Sterling District. County Project Manager: Suheili Pérez-Jiménez. Prepared by: J2 Engineers, Inc.

APPENDIX A Basis of Design and Design Criteria Memorandum

TRANSPORTATION PLANNING PERFORMANCE MEASUREMENT USING GIS

YELM HWY AND MERIDIAN RD INTERSECTION IMPROVEMENTS PROJECT CONTEXT

2007/ /2012 MARION COUNTY TRANSPORTATION IMPROVEMENT PROGRAM

Three Year Engineering Factors, SFY 2017 Report: Overhead Costs per Total Construction Costs

IMPROVEMENT CONCEPTS

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

Delaware County Engineer s Office

Transcription:

83312 85266 WOO Buck/Lime City Inters WOO Buck/Lime City Inters LUC SR 25 07.82 Bridge Improve the intersection of Buck Rd and Lime City Rd in Wood. Based on the preferred alternative of the PDP process, this project could be a signalized intersection with dedicated turn lanes or rounabouts. The option with 2 roundabouts was selecte Improve the intersection of Buck Rd and Lime City Rd in Wood. Based on the preferred alternative of the PDP process, this project could be a signalized intersection with dedicated turn lanes or rounabouts. The option with 2 roundabouts was selecte Raise existing bridge profile and move abutments to increase both vertical and horizontal clearances over the RR track, redeck bridge, repair wingwall, paint structural steel, perform Bridge was split out from PID 23593. See PID CWOOCR00009**C TWOOTR00068**C SLUCSR00025**C 7.390 0.460 7.820 7.680 0.740 8.040 2,970,000.00 9,981,000.00 92088 WOO/LUC SR 64 12.03/0.0 A district allocation funded project to replace the existing Waterville bridge (SR-64) over the Maumee River with a new wider bridge; perform Improvement of intersection of SR-64/River Rd is funded with MPO CMAQ funds (See cancelle SWOOSR00064**C 12.130 12.210 11/27/17 22,277,500.00 WOO/LUC SR 64 12.03/0.0 A district allocation funded project to replace the existing Waterville bridge (SR-64) over the Maumee River with a new wider bridge; perform Improvement of intersection of SR-64/River Rd is funded with MPO CMAQ funds (See cancelle SLUCSR00064**C 0.030 11/27/17 95686 LUC Bancroft St Reconst A TMACOG funded project to rehabilitate the pavementon Bancroft St from Secor Rd to Parkside Blvd; Perform necessary related FIELD REVIEW conducted on 6/2/15. CLUCCR00022**C 13.270 14.670 08/11/17 10,351,000.00 95765 SA 412/590 4.70/0.00 Res A district allocation funded project to resurface SR-412 from SR-51 to TR-274 and resurface SR 590 from the county line to US 6; perform SSASR00412**C 4.700 7.150 2,395,000.00 SA 412/590 4.70/0.00 Res A district allocation funded project to resurface SR-412 from SR-51 to TR-274 and resurface SR 590 from the county line to US 6; perform SSASR00590**C 6.550 SA 412/590 4.70/0.00 Res A district allocation funded project to resurface SR-412 from SR-51 to TR-274 and resurface SR 590 from the county line to US 6; perform SSASR00412**C 7.150 8.720 95769 SA US 6 23.43 Resurf A district allocation funded project to resurface US-6 from CR-232 to Erie Line; perform SSAUS00006**C 23.440 25.390 04/16/18 4,946,000.00 SA US 6 23.43 Resurf A district allocation funded project to resurface US-6 from CR-232 to Erie Line; perform SSAUS00006**C 25.390 32.430 04/16/18 95816 LUC SR 25/25D 10.17/0.00 An urban paving funded project to resurface Erie (B) (SR-25) from Lafayette to Cherry (SR-120) and on Michigan/Spielbusch (SB) (SR-25D) from Cherry (SR-120) to Madison; perform SLUCSR00025**C 8.940 9.800 2,062,500.00 Page 1

95816 LUC SR 25/25D 10.17/0.00 An urban paving funded project to resurface Erie (B) (SR-25) from Lafayette to Cherry (SR-120) and on Michigan/Spielbusch (SB) (SR-25D) from Cherry (SR-120) to Madison; perform SLUCSR00025*DC 0.520 95817 LUC SR 51 3.50 Urban Pav An Urban Paving project to resurface Monroe/Summit (SR-51) from Lafayette to Collingwood; perform UPDATE: Included PID 103789 with this PID, Upgrade pedestrian markings, install back plates and upgrade signing at the intersection o SLUCSR00051**C 3.500 4.840 1,858,000.00 95818 LUC SR 65 3.66 Urban Pav An urban Paving project to resurface Summit St (SR-65) from Lafayette to Lagrange; perform FIELD REVIEW REQUIRED. SLUCSR00065**C 3.660 4.490 1,250,000.00 95864 WIL US 127 15.74 Culvert Reline existing culvert (60"x56'); perform necessary related Work update: After field review and scope meeting it was agreed to replace pipe and re-grade slopes SWILUS00127**C 15.740 15.750 120,000.00 97012 WOO SR 579 0.00 Resurf/B Resurface SR-579; perform UPDATE (12/1/14): added bridge (SF 8706905 --PID 92748) to this project as requested. SWOOSR00579**C 0.400 1,350,000.00 WOO SR 579 0.00 Resurf/B Resurface SR-579; perform UPDATE (12/1/14): added bridge (SF 8706905 --PID 92748) to this project as requested. SWOOSR00579**C 0.400 2.410 97374 98955 SA CIT Bellevue SA CIT Bellevue SA CIT Bellevue SA CIT Bellevue LUC McCord Resurf of the CIT; perform HS waiver will of the CIT; perform HS waiver will of the CIT; perform HS waiver will of the CIT; perform HS waiver will Mill existing pavement, perform spot full depth repairs; reconstruct failed catch basins; place 2 course asphalt overlay; sidewalk repair/addition; perform FIELD REVIEW REQUIRED SSAUS00020**C CSACR00177**C TSATR00177A*C TSATR00177B*C CLUCCR00073**C 31.460 4.910 1.500 33.640 5.100 0.170 0.060 2.490 05/01/18 1,066,279.90 807,000.00 98997 LUC Ottawa River Rd Resur Resurface Ottawa River Rd in the City of Toledo; perform necessary related work; swmall project designated by TMACOG. FIELD REVIEW REQUIRED. CLUCCR00516**C 1.130 06/01/18 650,000.00 99564 99662 WOO SR 65 22.43 Urban P LUC SR 184 0.35 Resurf/St Resurface SR-65 in Rossford; perform Resurface and repair/replace storm sewer; project will likely need RW and utility coordination; perform necessary related SWOOSR00065**C SLUCSR00184**C 22.430 0.360 24.530 1.870 04/20/18 1,594,000.00 2,400,000.00 99869 LUC SR 120 11.96 Central/ A CMAQ funded project to imnprove the intersection by adding turn lanes; perform SLUCSR00120**C 12.070 12.220 05/01/18 1,310,000.00 Page 2

100102 SA Fremont SRTS Infra A SRTS funded project to add school zone beacons, sinage upgrade with speed feedback, sidewalks, crosswalk...perform necessry related work CSACR00706**C 1.200 04/02/18 289,129.00 100195 LUC SR 2/25/120 20.12 Urb An urban paving project to resurface avarre Ave (SR-2) and Cherry St (SR-120) in Toledo; perform SLUCSR00002**C 20.120 21.010 05/22/18 1,525,000.00 LUC SR 2/25/120 20.12 Urb An urban paving project to resurface avarre Ave (SR-2) and Cherry St (SR-120) in Toledo; perform SLUCSR00025**C 9.800 10.010 05/22/18 LUC SR 2/25/120 20.12 Urb An urban paving project to resurface avarre Ave (SR-2) and Cherry St (SR-120) in Toledo; perform SLUCSR00120**C 18.740 18.970 05/22/18 100789 D02 PM F2018 A pavement marking maintenance contract; perform necessary related 09/04/17 2,200,000.00 100790 D02 RPM F2018 A raised pavement markers (RPM) maintenance contract; perform 08/21/17 220,000.00 100991 LUC SR 120 13.00 Access Access management improvements of various intersections on Central Ave in Toledo; perform SLUCSR00120**C 13.000 13.500 05/30/18 944,000.00 100995 LUC US 24 15.07 Turn Lane Modifying turning lanes on AWT at Monclova Rd. in Maumee. Perform SLUCUS00024**C 15.070 15.570 321,500.00 101003 WOO SR 199 29.10 Carron Replace intersection at Carronade Road Extension with a modern roundabout. Carronade Rd. extension to a T-intersection with SR 199 to be completed by the City of Perrysburg prior to the beginning of this project. SWOOSR00199**C 29.100 29.600 07/24/17 1,000,000.00 101093 OTT SR2/53 Deck Sealing Deck sealing of various bridges in Ottawa ; perform 10/30/17 628,671.00 101124 D02 SIG F2018 Freeway systematic sign replacement at various locations throughout District 2; perform SLUCIR00075**C 11.860 500,000.00 101147 D02 TSG F2018 A district allocation funded project to maintain/upgrade existing traffic signals distric wide; perform SWOOSR00051**C 4.220 4.230 01/22/18 250,000.00 D02 TSG F2018 A district allocation funded project to maintain/upgrade existing traffic signals distric wide; perform SWOOSR00051**C 4.390 4.400 01/22/18 101211 FUL/HE 66/108 0.00/17.66 Resurfacing existing FUL-SR66 and HE-SR108; perform 1.340 633,000.00 FUL/HE 66/108 0.00/17.66 Resurfacing existing FUL-SR66 and HE-SR108; perform SHESR00108**C 17.660 18.830 FUL/HE 66/108 0.00/17.66 Resurfacing existing FUL-SR66 and HE-SR108; perform SHESR00108**C 18.830 22.720 101221 101240 WOO SR 199 18.70 Resurf WOO SR 199 18.70 Resurf OTT/SA 590 4.02/6.55 Re Resurfacing SR 199 from slm 18.70 to 29.10 Resurfacing SR 199 from slm 18.70 to 29.10 Chip seal SR 590 in Ottawa from 4.02 to 10.07 and in Sandusky from 6.55 to 10.06; perform SWOOSR00199**C SWOOSR00199**C SSASR00590**C 18.700 27.960 6.550 27.960 29.100 10.070 664,000.00 581,000.00 OTT/SA 590 4.02/6.55 Re Chip seal SR 590 in Ottawa from 4.02 to 10.07 and in Sandusky from 6.55 to 10.06; perform SOTTSR00590**C 4.020 10.060 101272 FUL US 20 10.76 Resurfaci Resurfacing US 20 in Fulton from slm 10.76-13.54; perform SFULUS00020**C 10.800 13.540 787,500.00 101281 SE SR 18 23.06 Resurfaci Resurfacing State Route 18 in Seneca ; perform SSESR00018**C 23.050 29.940 2,431,200.00 Page 3

101281 SE SR 18 23.06 Resurfaci Resurfacing State Route 18 in Seneca ; perform SSESR00018**C 29.940 30.500 101344 WIL SR 66 0.00/0.63 Pav/Br The project will replace the slab deck, abutments, and install rock channel protection. With a Limited Review (SF 8602107); perform UPDATE (9-14-16): Will add the resurfacing of WIL-SR66-0.00 (PID 103439) as part 2 to this project 1,181,000.00 101556 LUC SR2 18.62 Dehumidify Install a dehumidification system for the existing cable with new round wire wrap at sections previously opened, new elastomeric wrap over the entire length of the cables and acoustic monitoring system; perform See PID 80551 for re 7,900,000.00 101872 D02 Pile Encas/Slopes F1 A project to perform pile encasements and slope repairs on various bridges in D-2; perform Update (1-7-16): added LUC-231.75 (SF 4800451) for deck edge repl, approach slabs, WS which was deleted from PID 92364. LUC-2-31.75 (SF480 12/11/17 552,000.00 102035 SA SR53 6.02 sgnl Sfty Safety funded project to upgrade signal heads and support; modify signal timing; provide protected/permissive phasing for left turns from EB US-6 to B and SB SR-53; perform SSAUS00006**C 12.990 13.000 02/26/18 330,000.00 102155 LUC Chessie Circle Conne Construct a bike path along the northeast side of University Hills Blvd; perform This project will connect the Chessie Circle Trail from Douglas Rd to Bancroft-Promenade Trail. CLUCCR00502**C 1.030 1.050 06/08/18 485,500.00 102156 LUC SRTS Toledo Infra Sid Construct sidewalks, paint pedestrian crossings, and signal improvements for pedestrian crossings at various locations in the City of Toledo; perform CLUCCR00022**C 9.540 11.910 08/18/17 238,800.00 102249 SA CR 175 0.00 Resurfaci Resurface CR175 in Sandusky. Perform mill and fill with pavement repairs as needed. CSACR00175**C 10.630 08/18/17 1,540,000.00 102253 HE ustrial Dr Reconst Reconstruct ustrial Dr. in the City of apoleon; perform CHECR00503**C 0.790 04/20/18 1,961,000.00 102763 HE SR 281 0.00 Resurf Resurface SR 281 in Henry from the Defiance county line to SR 108 and perform SHESR00281**C 5.710 02/26/18 1,013,000.00 102801 Resurface SR 66 in Fulton from SR 2 to US 20A and from CR J to US 20; Perform all 3.970 4.970 1,651,000.00 Resurface SR 66 in Fulton from SR 2 to US 20A and from CR J to US 20; Perform all 13.230 13.730 Resurface SR 66 in Fulton from SR 2 to US 20A and from CR J to US 20; Perform all 8.730 13.230 Resurface SR 66 in Fulton from SR 2 to US 20A and from CR J to US 20; Perform all 4.970 5.970 102802 FUL 108/109 6.77/14.88 res Resurface SR 108 from US 20A to US 20 and on SR 109 from US 20 to State line in Fulton ; Perform all necessary related SFULSR00108**C 6.770 13.390 2,433,810.00 Page 4

102802 FUL 108/109 6.77/14.88 res Resurface SR 108 from US 20A to US 20 and on SR 109 from US 20 to State line in Fulton ; Perform all necessary related SFULSR00109**C 14.880 18.000 102808 Resurface US20 in LUC: ear King Rd to Plainview; On US20 related ; Update added US 20 & Thompson Rd signal SLUCUS00020**C 8.000 8.860 2,850,000.00 Resurface US20 in LUC: ear King Rd to Plainview; On US20 related ; Update added US 20 & Thompson Rd signal SWOOUS00020**C 2.430 4.630 Resurface US20 in LUC: ear King Rd to Plainview; On US20 related ; Update added US 20 & Thompson Rd signal SLUCUS00020**C 8.860 9.490 Resurface US20 in LUC: ear King Rd to Plainview; On US20 related ; Update added US 20 & Thompson Rd signal SWOOSR00025**C 20.320 20.820 102817 SE SR 19/101 9.57/1.64 Resurfacing State Route 19 and SR 101 in Seneca ; perform SSESR00019**C 9.580 15.180 1,962,100.00 SE SR 19/101 9.57/1.64 Resurfacing State Route 19 and SR 101 in Seneca ; perform SSESR00101**C 1.640 2.330 SE SR 19/101 9.57/1.64 Resurfacing State Route 19 and SR 101 in Seneca ; perform SSESR00101**C 2.330 5.620 102819 SE US 224 11.08/28.26 Microsurface SR 224 from.02 West of Tiffin East Corp to.13m East of SR 100 add US 224 in Attica; perform necessary related SSEUS00224**C 11.080 14.890 07/24/17 512,484.14 SE US 224 11.08/28.26 Microsurface SR 224 from.02 West of Tiffin East Corp to.13m East of SR 100 add US 224 in Attica; perform necessary related SSEUS00224**C 28.260 29.540 07/24/17 102827 WIL 6/191 3.03/9.87 A district allocation funded project to resurface US-6 From SR 49 to.4m east of SR 2 and SR 191 in West Unity; perform SWILUS00006**C 3.030 3.340 4,109,000.00 WIL 6/191 3.03/9.87 A district allocation funded project to resurface US-6 From SR 49 to.4m east of SR 2 and SR 191 in West Unity; perform SWILSR00191**C 9.870 10.880 WIL 6/191 3.03/9.87 A district allocation funded project to resurface US-6 From SR 49 to.4m east of SR 2 and SR 191 in West Unity; perform SWILUS00006**C 3.340 13.880 103373 D02 GR HS District-wide project to remove all A end anchors on the HS system. 01/22/18 747,000.00 Page 5

103414 D02 GR F2018 A district wide guardrail maintenance contract; perform 08/07/17 500,000.00 104016 SE 18 14.61 TAP Ped & Bi Improve sidewalks on SR 18 ( Market St & Perry St) between Rock Creek & Circular St SSESR00018**C 14.610 14.760 06/08/18 812,500.00 104021 LUC TR 185 0.00 FLAP Resurface TR185 (Veler) in Jerusalem Township, Lucas ; perform TLUCTR00185**C 0.390 08/21/17 90,000.00 104107 104109 D02 LG F2018 D02 Landscape F2018 Lighting maintenance contract A district wide landscaping contract; perform necessary related 09/18/17 375,000.00 225,000.00 104110 LUC/OTT 65/163 F2018 O A contract to operate the Craig and Port Clinton lift bridges; perform 09/18/17 438,000.00 104114 104115 LUC/OTT 280/65/163 F18 LUC VGCS F18 Maint An electrical maintenance contract for 3 bridges. A maintenance contract of the VGCS bridge; perform 09/04/17 11/13/17 175,000.00 500,000.00 104273 LUC Overland Trail This.9 mile project would replacement the pavement on the old Ottawa Park trail. The project begins at Bancroft St and runs to Monroe St along Ottawa Pky & Southcove Blvd. CLUCCR00521**C 1.760 2.300 05/01/18 563,500.00 104438 LUC CR 1572 8.69 Main St Full-depth reconstruction of Main Street including storm sewer replacement. Remove and replacesidewalks on both sides including widening on the east side to be a 10 wide multi-path to better connect the Sylvania River Trail with Downtown Sylvania. Vehi CLUCCR01572**C 8.690 8.780 05/25/18 695,300.00 104478 OTT TR 16 (Balduf) FLAP A FLAP funded project to reconstruct TR-16 (Balduf) in Erie Township; perform TOTTTR00016**C 0.480 08/11/17 180,000.00 104752 WOO SR 64 0.89 PHB Install a marked crosswalk with pedestrian hybrid beacon (PHB), lighting and two-stage Z crossing median refuge island at Founders Hall and at the Stroh Center SWOOSR00064**C 0.890 1.860 09/04/17 379,416.00 105020 FUL/WOO 64/235 1.71/10.0 Microsurface SR 235 from Maplewood to Euler Rd in Wood county and SR 64 from Swanton Corp to US-20 in Fulton county.; Microsurfacing is to correct low skid numbers. SFULSR00064**C 1.760 7.380 07/03/17 430,000.00 FUL/WOO 64/235 1.71/10.0 Microsurface SR 235 from Maplewood to Euler Rd in Wood county and SR 64 from Swanton Corp to US-20 in Fulton county.; Microsurfacing is to correct low skid numbers. SWOOSR00235**C 1 13.000 07/03/17 105068 FUL Wilson St Bridge Repl Full replacement of Wilson Street bridge over Bad Creek in Delta Ohio 08/15/17 507,600.00 62 $115,701,290 Page 6