Decision on the ISO Transmission Plan

Similar documents
SDG&E Valley-Rainbow Project

2019 & 2023 Final LCR Study Results San Diego-Imperial Valley non-bulk sub-areas

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

2020 & 2024 Draft LCR Study Results SDG&E Non-Bulk System. Frank Chen - Regional Transmission Engineer Lead Stakeholder Meeting March 14, 2019

SDG&E High Voltage DC WECC Path 46 Rating Increase Comprehensive Progress Report

2016 SDG&E Grid Assessment Results

Agenda. Draft ISO Transmission Plan Stakeholder Meeting. Tom Cuccia Sr. Stakeholder Engagement and Policy Specialist February 12, 2014

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

March 7, Subject: Southern California Edison 2011 Annual Progress Report

APPENDIX F: Project Need and Description

APPENDIX F: 2012 Request Window Submittals

Updates and Modifications to Report

Valley - Rainbow Interconnection Project Feasibility Study Report

for DRECP Alternatives

Updates and Modifications to Report

APPENDIX G: Contingencies on the ISO System that may Impact Adjacent Systems

Updates and Modifications to Report

Introduction and Overview

March 18, Subject: Imperial Irrigation District 2014 Annual Progress Report - Rev 1

ISO Transmission Plan February 2, 2015 APPENDIX H: Contingencies on the ISO System that may Impact Adjacent Systems

Decision on Merced Irrigation District Transition Agreement

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

TransWest Express Project

California Independent. System Operator. Market Overview and Design Construct

ATTACHMENT B - Table 1: LIST OF MANAGEMENT-APPROVED PROJECTS UNDER $50M

APS and Regional Transmission Systems Overview

Merger of the generator interconnection processes of Valley Electric and the ISO;

California Independent System Operator. Memorandum

Arizona Transmission Challenges

Planning Distributed Generation for Transmission Savings 1 By Kenneth Sahm White and Stephanie Wang 2 March 19, 2014

Transmission Planning & Engineering P.O. Box MS 3259 Phoenix, Arizona

California Energy Storage Policies. Carla Peterman Commissioner, California Public Utilities Commission December 2016

Reliability Must-Run Analysis th BTA Presentation. Bob Smith Manager Transmission Planning June 6, 2006

North Gila Generator Interconnection

TOLTEC POWER PARTNERSHIP TOLTEC POWER PROJECT INTERCONNECTION STUDY SYSTEM IMPACT STUDY

TransWest Express AC and DC Project Comprehensive Progress Report (CPR) 3,000 MW DC and 1,500 MW AC WECC Phase 1 Analysis

Pacific Gas and Electric Company s Revised 2016 Annual Progress

Supplement to ISO Transmission Plan. Harry Allen-Eldorado Project Description and Functional Specifications

2018 Annual Progress Report to WECC Pacific Gas and Electric Company

Full Network Model Scope for FNM DB59

Agenda Less than $50 Million Projects and Preliminary Economic Assessment Results

Overview of APS U.S.-JORDAN ELECTRIC POWER TRANSMISSION PARTNERSHIP EXECUTIVE EXCHANGE VISIT. Bob Smith

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Pacific Gas and Electric Company s Revised 2015 Annual Progress

TRANSMISSION CONTROL AGREEMENT APPENDIX A. Facilities and Entitlements

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

Wheeling Access Charges

U.S. System Summary: ARIZONA/SOUTHWEST

California s RPS Program: Progress Towards California s 33% RPS Goal and the Role of Concentrating Solar Power CSP Conference

Second Report of the Tehachapi Collaborative Study Group

Wheeler Ridge Junction Substation Project Description and Functional Specifications for Competitive Solicitation

HONORABLE CHAIRPERSON AND MEMBERS OF THE AZUSA UTILITY BOARD

Transportation Electrification: Reducing Emissions, Driving Innovation. August 2017

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

APPENDIX E: Project Need and Description

PREPARED DIRECT TESTIMONY

Southern California Edison

Energy Policy Implications: PJM Planning

Full Network Model Scope for FNM DB61

Southern California Edison Clean Energy Future

Tehachapi Renewable Transmission Project 3.1 OVERVIEW OF PROPOSED PROJECT

APPENDIX I: Description and Functional Specifications for Transmission Facilities Eligible for Competitive Solicitation

SCE Smart Grid. Creating a Cleaner, Smarter Energy Future. Metering, Billing / MDM America Conference. San Diego. March 9, 2010

Agenda Day 2 Preliminary Reliability Assessment Results

TransNet Dollars Keep San Diego Moving

Opening Transmission Planning Process Stakeholder Meeting Tom Cuccia Lead Stakeholder Engagement and Policy Specialist November 19-20, 2014

April 2012 TRANSMISSION IMPACTS IN THE DRECP

Full Network Model Scope for FNM DB2016Q1

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Appendix D Black Hills Project Summary

Re: Comments on the 12/7/09 Dynamic Transfer Stakeholder Meeting

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Pacific Gas and Electric Company TM

Illinois State Report

Essential Reliability Services From PV Plants

Transmission Planning using Production Cost Simulation & Power Flow Analysis

Q51 Generation Interconnection

California s Energy Storage Summit California Energy Storage Association and Association of California Water Agencies

Four Corners Queue Transmission Interconnection Study

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

Transmission Coordination and Planning Committee 2014 Q4 Stakeholder Meeting. December 18, 2014

Agenda Day 2 Preliminary Reliability Assessment Results

CPUC TRANSMISSION PROJECTS AND CONCEPTS-- SCE TERRITORY Third Quarter 2011

San Francisco to San Jose Preliminary Alternatives Analysis

Arizona Energy Consortium Conference

Elbert County 500 MW Generation Addition Interconnection Feasibility Study Report OASIS POSTING # GI

Single Family Detached

Agenda Day 2. Tom Cuccia Lead Stakeholder Engagement and Policy Specialist

California and the Western Grid: Transmission Challenges

U.S. System Summary: CALIFORNIA

APPENDIX E: Project Need and Description

100 MW Wind Generation Project

TRANSMISSION PROJECTS MODELED IN PHASE IIA DELIVERABILITY STUDY BASECASE

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

4 COSTS AND OPERATIONS

CPUC TRANSMISSION PROJECTS AND CONCEPTS-- SCE TERRITORY First Quarter 2011 CAPACITY/ VOLTAGE LEVEL

Single Family Detached

Status of PNM s Completed Transmission Construction Projects 11/30/2017

Electric Generation Workpapers Jeff Huang SDG&E/SoCalGas 2013 TCAP

Transcription:

Decision on the 2013-2014 ISO Transmission Plan Neil Millar Executive Director, Infrastructure Development Board of Governors Meeting General Session March 19-20, 2014

Approving the plan means approving determinations and recommendations contained in the plan, including: Nine projects each of which is over $50 million 6 new transmission reliability projects 2 policy driven projects 1 economically driven project Five new transmission reliability projects less $50 million. Page 2

2013/2014 Transmission Planning Process April 2013 Four Consultation Windows March 2014 October 2014 Coordination of Conceptual Statewide Plan ISO Board Approval of Transmission Plan Phase 3 Phase 1 Development of ISO unified planning assumptions and study plan State and Federal policy requirements and directives Demand forecasts, energy efficiency, demand response Renewable and conventional generation additions and retirements Phase 2 Technical Studies and Board Approval Reliability analysis Renewable delivery analysis Economic analysis Central California Study Publish comprehensive transmission plan Request for bids, receive proposals, evaluate, and award to successful applicant to build identified reliability, policy and economic transmission projects. Input from stakeholders Continued regional and sub-regional coordination Slide 3

Summary of Needed Reliability Driven Transmission Projects Service Territory Number of Projects Cost ($ Million) Pacific Gas & Electric (PG&E) Southern California Edison Co. (SCE) San Diego Gas & Electric Co. (SDG&E) Valley Electric Association (VEA) 14 $486.4 2 $626.0 11 $584.0 1 0.1 Total 28 $1,696.5 Slide 4

PG&E has identified a reliability risk for supply to the San Francisco Peninsula. The loss of a major substation impacting supply to the entire San Francisco peninsula The ISO is expediting a risk analysis with PG&E to establish the need for reinforcement A stakeholder process will be conducted to review the need and identify alternatives Depending on outcome of analysis and stakeholder process Management may pursue an amendment to the plan at a later Board meeting Upgrades to the TransBay Cable previously approved will provide partial relief in the interim Page 5

The needs in the Southern California area are a major focus of the plan, building on previous approvals: Converted Huntington Beach Units 3&4 to Synchronous Condensers (2013) Reconfigured Barre-Ellis 230kV lines from two to four circuits (2013) Installed 320 MVAR of shunt capacitors in Orange County (2013) New 11-mile 230 kv line from Sycamore to Penasquitos (2017) 930 MVAR Dynamic Reactive Support: 480 MVAR at SONGS Mesa (4Q 2017) 450 MVAR at Talega Substation (2015) Page Slide 6

Less than half of the gas-fired generation retiring in the LA Basin / San Diego area is being replaced with new gas generation despite 3,000 MW of projected net load growth* and SONGS retirement. 10000 9000 8000 7000 6000 5000 4000 3000 2000 1000 0 2011 2022 Maximum residual need Incremental Transmission Benefits Additional Achievable Energy Efficiency Other Preferred Resources and Storage Nuclear (SONGS) New Gas Resources New Gas Generation Walnut Creek 500 El Segundo Energy Center 550 Track 1 SCE - LA Basin Request 1200 Track 4 SCE - LA Basin (gas) 200 Track 1 SDG&E (Pio Pico/Escondido) 308 Track 4 SDG&E Request 550 Total 3308 Gas Retirements (2011-2022) Encina 946 El Segundo #3 335 El Segundo #4 335 Alamitos 2011 Huntington Beach 904 Redondo 1342 Etiwanda 640 Long Beach 260 Cabrillo Power II 188 Total 6961 * The 2012 net load forecast growth in the LA Basin and San Diego already relies on approximately 2400 MW of incremental energy efficiency from approved programs and standards. Slide 7

Transmission options evaluated in the Transmission Plan were grouped by similar characteristics: Group I - Transmission upgrades optimizing use of existing transmission lines without new rights of way. [Recommending 3 projects for approval] Group II - Transmission lines strengthening LA/San Diego connection optimizing use of corridors into the combined area. [Recommending further study as potential reliability solution] Group III - New transmission into the greater LA Basin/San Diego area. [Recommending further study as potential reliability and policy solution] Page 8

Group I: Transmission Upgrades Optimizing Use of Existing Transmission Lines (3) Mesa Loop-In (4) Huntington Beach or electrically Alberhill Alamitos equivalent reactive support (to be reevaluated in future planning cycle) (1) Install additional 450 Suncrest MVAR at San Luis Rey Substation. Imperial Valley (2) Imperial Valley Flow Controller Page 9 Page 9

Summary of Costs and Benefits of Group I Transmission Upgrades recommended for approval: No. Transmission Upgrade Option Proposed In- Service Date Estimated Cost ($ Million) Local Resources Reduction Benefits (MW) 1 Additional 450 MVAR of dynamic reactive support at San Luis Rey (i.e., two 225 MVAR synchronous condensers) June 2018 ~$80 M -100 to -200 2 Imperial Valley Flow Controller (Back to back HVDC convertor or Phase Shifting transformer) June 2018 $55 - $300 M -400 to -840 3 Mesa Loop-In Project December 2020 $464 - $614 M -300 to -640 TOTAL $599 - $994 M -800 to -1680 Page 10

Group II: New Transmission Lines Strengthening LA Basin and San Diego Connection (1) TE-VS-new Case Springs 500kV line: $700 $750 million, 1100-1500 MW impact depending on options, can complement Mesa Loop In adding additional 200 to 400 MW impact. (3) Valley Inland 500kV AC (or DC): Alamitos (2) HDVC submarine cable from Alamitos to four termination options: Encina, SONGS, Penasquitos and Bay Blvd. (South Bay) $700 - $800 million, 1200 MW impact. Also, complementary with Mesa Loop In, adding 550 MW incremental impact. Alberhill Proposed Case Springs Valley Options range from $1.6 to $4 billion, impact of 1200 MW to 1400 MW depending on design, complementary with Mesa Loop In adding 300 to 600 Proposed MW incremental impact Inland Suncrest Imperial Valley Page 11 Page 11

Group III: New Transmission into the Greater LA Basin/San Diego Area Alamitos Proposed Imperial Valley San Diego area (500kV AC or Inland Suncrest DC) Line a number of options range from $0.9 to $5.7 billion, delivering 1300 to 1400 MW incremental impact. Complementary with Imperial Valley Mesa Loop In adding approximately 600 MW additional impact. Page 12 Page 12

Six reliability projects over $50 million are recommended for Board approval. Mesa Loop-in Looping the Vincent-Mira Loma 500 kv transmission line into the existing Mesa Substation, and upgrading the substation to include a 500 kv bus. Install Dynamic Reactive Support at San Luis Rey 230 kv Substation Adding synchronous condensers at the San Luis Rey Substation to provide voltage support to the transmission system in the San Onofre area. Imperial Valley Flow Controller Installing a phase shifter or back-to-back HVDC flow control device on path to CFE. ----------------------------------------------------------------------------------------------------- Artesian 230 kv substation and loop-in Upgrading the existing Artesian substation to 230 kv to provide a new source into the 69 kv system. Midway-Kern PP #2 230 kv line Reconductoring and unbundling the existing Midway-Kern PP 230 kv line into two circuits and looping one of the new circuits into the Bakersfield substation. Wheeler Ridge Junction Station Building a new 230/115 kv substation at Wheeler Ridge Junction and converting the existing Wheeler Ridge- Lamont 115 kv to 230 kv operation. Slide 13

Five reliability projects less than $50 million are recommended for Board approval. Greater Bay area: New Spring substation near Morgan Hill San Diego area: Bernardo-Rancho Carmel-Poway 69 kv lines upgrade replacing Sycamore-Bernardo 69 kv project Miramar-Mesa Rim 69 kv system reconfiguration 2nd Escondido-San Marcos 69 kv Line Voltage Support at Miguel 500/230 kv Substation Slide 14

Two policy driven substation-related solutions have been identified and recommended for Board approval. 300 Mvar dynamic reactive support at Suncrest, and a Lugo-Mohave series capacitor and related terminal upgrades A deficiency in renewable generation deliverability from Imperial Valley due to the early retirement of SONGS was identified and will require further assessment in the 2014/2015 planning process. Slide 15

Imperial Valley Deliverability Issue In 2011, the ISO targeted achieving 1400 MW incremental import capacity from IID CPUC directed utilities to consider up to this amount deliverable in procurement, and incorporated this into renewables portfolios Prior plans indicated approved transmission upgrades could, once completed, accommodate up to 1700 MW (total) from Imperial Valley This year s plan identified that, due to SONGS retirement, no new deliverability beyond existing levels would be available in the long term Mitigations proposed in this plan provide up to 1000 MW of additional renewable deliverability from this area in the long term The ISO will determine the additional reinforcements to achieve the targeted levels in the 2014/2015 plan Page 16

Five economic studies were performed in this plan: 1 Midway Path 26 Whirlwind Windhub Antelope PDCI 2 McCullough Las Vegas McCullough Harry Allen 3 Crystal Eldorado Mojave Mead Cedar Mtn Moenkopi Navajo Four Corners Rinaldi Station E Vincent Sylmar Rancho Vista Serrano Mira Loma Los Angeles Aberhills Valley Legend Penasquitos Existing Newly built, under construction or approved Proposed Congested line 500 kv 230 kv Miguel Suncrest San Diego Adelanto Victorville Devers Mexico Mirage Ramon Lugo Ocotillo ECO Julian Hinds Redbluff Imperial Valley California Colorado River 5 Blythe Arizona Path 49 (EOR) 4 Hassayampa Hoodoo Wash North Gila Perkins Sun Valley Delany Palo Verde Rudd Jojoba Yavapai Morgan Westwing Phoenix Kyrene Dugas Pinnacle Peak Note: The dark-colored facilities are in the ISO-controlled grid The light-colored facilities belong to other control areas

The Delaney-Colorado River 500 kv transmission line is recommended for Board approval. Benefit to cost ratio averaging 1.02 Annual production simulation benefits in the range of $21 to $30 million Annual capacity benefits in the range of $9 million to $30 million Present value of annual revenue requirement ranging from $442 million to $560 million. Other benefits include: Assist in achieving targeted import capability from Imperial Irrigation District Reliability benefits Page 18

The Harry Allen-Eldorado transmission line requires further evaluation. The analysis in this plan indicated favorable benefit to cost ratios, however, further analysis is needed to: reflect the November 2013 announcement of NV Energy s intention to join the energy imbalance market address data correction in neighboring system identified through Delaney-Colorado River analysis Depending on outcome of analysis, Management may bring forward a recommendation to approve this project as an amendment to the 2013/2014 plan later this year. Slide 19

Eligibility for competitive solicitation process: Reliability-driven: Estrella 230/70 kv substation* Wheeler Ridge Junction 230/115 kv substation* Spring 230/70 kv substation* Miguel reactive support Imperial Valley flow controller (if back to back HVDC) Policy-driven: Suncrest 300 Mvar dynamic reactive support Economically driven: Delaney-Colorado River 500 kv transmission line * Only the 230 kv facilities including the 230/70 kv transformers are eligible for competitive solicitation; the 70 kv facilities are not. Slide 20

The high voltage transmission access charge has been projected based on the recommended plan: 16 14 12 10 8 6 Mar-13 Mar -14-12% Mar -14-11% 4 2 0 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 Note existing returns are maintained for existing PTO rate base; the impact of 11% and 12% return on equity have been tested for new transmission capital. Slide 21

Stakeholder feedback: Concerns about specific projects, methods of analysis, and basis for moving forward Southern California Group II projects Mesa Loop-in Delaney-Colorado River Harry Allen-Eldorado San Francisco Peninsula and transparency of ISO planning process Analysis about preferred resources and their role Structure of plan and articulation of issues Page 22

Management recommends the Board approve the 2013-14 ISO Transmission Plan The 2013-2014 ISO Transmission Plan Continues to pursue low emissions strategies in addressing reliability needs of the ISO controlled grid Enables the state s 33% RPS goals Provides for prudent and economic development of the transmission system Next steps Initiate ISO competitive solicitation process Continue analysis of potential amendments to this plan: Harry Allen Eldorado San Francisco Peninsula Slide 23