Mounting Tools 2 Checking Clearances 3 Components 4-5 Mounting 6-21 Correct Method of Tensioning the Chain 22 Adjusting The Overall Dimension 23-24

Multiposition plate clamp. APPLICATIONS Lifting and revolving of plates, profiles, fabricated assemblies, steel frames...

OPERATIONS MANUAL LEVER CHAIN HOIST

Safelift Overhead Runway Beams & Rolling Beam Cranes

Translation of the Original operating instructions Lifting device Z 70 /...

Dhatec Document No.: DHA415-APS-PH

Automotive Lifting Equipment

HARFORD SAFELOCK MECHANICAL QUICK HITCH

Rev. 10/27/2015 CDL-2000, MANUAL

TABLE OF CONTENTS TRAILER INFORMATION... 3 COUPLING TO THE TOW VEHICLE... 4 LOADING THE TRAILER... 9 CHECKING THE TRAILER... 10

Swivel Lifting Rings - Double Swivel - Female metric - course and UNC

Swivel Lifting Rings - Double Swivel - Male metric - coarse and UNC

but this affects the load rating - please ask for more information. Please refer to our technical information pages when specifying and/or using.

EPA-EPC-EPF. Wire rope snatch blocks for material handling and man riding

ABACO MACHINES OPERATION MANUAL STONE/STEEL/GLASS/WOODS LIFTER (ASSGWL20) ABACO MACHINES (USA)

15,000kg HYDRAULIC BOTTLE JACK

International Crane Stakeholder Assembly. - Guidance - Lifting of Persons with Mobile Cranes

Operating Instructions Hoist Chains EN 818-7

ov-lifting_bolts_divider - Updated Lifting Bolts

Lifting Beams & Custom Engineered Lifting Devices

RF6 / RF10 / RF18 Installation Instructions

ELECTRIC LIFTER TROLLEY INSTRUCTION MANUAL

DEMOUNTABLE BODY INSPECTION PROCEDURE Follow Detailed Instructions Inside for Each Step

2,000 Lbs Heavy-Duty Engine Stand

Relay Retrofit Program for REX 521 Cutting Tool Safety Guide

Austin. Aluminium Sectional Doors

ov-lifting_bolts_divider - Updated Lifting Bolts

Lbs Kgs Ft M

VEHICLE POSITIONING JACK

SBRL-SERIES SPREADER BEAMS INSTRUCTION MANUAL

PRECISMECA - MONTAN Gesellschaft für Fördertechnik mbh. Documentation Operating Instructions. Rollers

CPCS renewal test factsheet

TRAILER PASSPORT. instruction manual maintenance warranty

Lifting Points Rotating Ball-bearing De-centered Weldable Screw-on

USER MANUAL. Automatic Lifting Magnet LI V1.2. Ixtur Oy, Varespellontie 6, FI-21500, KAARINA, FINLAND

Hakki Lift 381. The operator must always read and understand these instructions before operating the device!

FLATBED STRAW TRAILER

Instruction for use. POWERTEX Chain Block model PCB-S1

SERIES 637. Rated Loads: 3/4, 1-1/2, 3, 6 tons (750, 1500, 3000 and 6000kg.) OPERATING, MAINTENANCE & PARTS MANUAL MANUALLY LEVER OPERATED CHAIN HOIST

Slinger/signaller Note: It is recommended that you read the Supporting Information page before you read this factsheet.

SELECTION OF WELDING CONSUMABLES

Blocks. your reliable partner

Lineman s Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMST680-2

Installation, Usage & Maintenance Guide

Subframe design. More information on chassis frames is found in the document Chassis frames.

Dynamic Probing / Window Sampling Rig with folding mast on rubber chain crawler GTR790

EU DECLARATION CONFORMANCE

Tiger Lifting Home of the Tiger hoisting, winching and height safety ranges

COME.UP DV-15. Instruction manual.

INSTRUCTION MANUAL. Pacific Self-locking Beam Trolleys Pacific Adjustable Angle Clamps Pacific Top Girder Clamps

INSTRUCTION MANUAL MAGNA RAIL

DESCRIPTION, TECHNICAL SPECIFICATION, OPERATION, AND MAINTENANCE MANUAL FOR THE ISU-SYSTEM INNOVATIVER SATTELANHÄNGER UMSCHLAG

Yesterday s challenge Today s solution. User Manual. innova.uk.com

Provided by: Operating, Maintenance & Parts Manual

Thomson Engineering Design Ltd. Drag Clamp. Operator s Instructions. Original Document in English Language. Issue 2 March 2015

INSTRUCTION MANUAL CONTRX FORKLIFT JIBS JLT, PBJLT, CHJLT

XL by THIELE. Lifting Products Grade 100

ALULIFT Portable Aluminium Gantry Crane Operation & Maintenance Instructions

Before equipment use, please read this operation manual carefully. Serial Number: Date Purchased:

America s Largest Importer/Wholesaler of Wire Rope, Chain and Fittings!

Vibrator Kit. Stainless Steel & Poly Hopper Spreaders with FLEET FLEX Electrical System

Operating Guide SBFV (PN16/25) ENGLISH Steel butterfly valve SBFV Page 2. Danfoss VI.IX.A1.02 1

PROFESSIONAL BOTTLE JACK

Operating Instructions Hoist Chains EN 818-7

WEIGHT CONTENTS SIZE DESCRIPTION WORKING LOAD LIMIT

INSPECTION AND MAINTENANCE CHECKLIST

Northern Sales & Distribution Centre

FORK SAFETY GUIDE. A fork inspection guide designed with safety in mind. ANSI/ITSDF B56.1

XN Electric Chain Hoists LIFTING WITH EFFICIENCY

Swing blocks for wire rope

2000-LB. ENGINE STAND

AIR-TO-AIR HEAT EXCHANGERS MODEL E INSTALLATION & MAINTENANCE

OPERATION SERVICE PARTS TUGIT2. Manually Operated Short Handle Lever Hoist A3140-XXX

THE ERGO-MATIC DRUM TRANSPORT POWER DRIVE SERIES MODEL PWPL 750 OWNERS MANUAL

Bolt-on Swivel Load Rings with Link - RUD VLBG with optional bolt lengths.

Technical Guide No. 7. Dimensioning of a Drive system

S TRUCTUR A L PR E- A N A LYSIS TA B LES

CPCS renewal test factsheet

>VLBG< Load Ring for bolting

QJY245DS~DA. Two Post Lift Installation & Adjustment Manual

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

CDL Series Pre-Trip Inspection AT-TC3TS T1-JA01. Pre-Trip Inspection Checklist

Instructions for: FOLDING ENGINE CRANE PREMIER 2 TONNE. MODEL No: SPC2000

TJ3X HEAVY DUTY TROLLEY JACK

Likorall. LOAD TESTING 12 Mechanical lowering load test (242) Maximum load rail system... DOCUMENTATION 14 Instructions / Instruction guide...

OWNER S MANUAL PRODUCT CODE: 2006T

HYDRAULIC PALLET TRUCK. MODEL No: PTE550 PART Nos OPERATION & MAINTENANCE INSTRUCTIONS

GPS Steering System Installation Manual

Heavy Duty Engine Cranes

Disclaimer: This brochure is for information only. The manufacturer reserves the right to modify specifications.

SERVICE MANUAL. Hollandia 300 Large

Montage- und Bedienungsanleitung Installation and Operating Instructions

VBK 2596/12E/RSF. Thickness and Width Gauge for Strip and Profile. Operating- & Service Instructions. (with lateral guide rollers)

Instructions for Use Plain Trolley ULK Geared Trolley UHK

Transcription:

USER MANUAL Lifting tool for load-bearing sheet www.ruukki.com

Contents DESCRIPTION AND INTENDED USE 3 CE-MARKING 3 LIFTING CAPACITY 4 PARTS 4 LOAD FEATURES 6 MAKING THE LIFT 6 PREPARING A LIFT 7 LIFTING THE LOAD 11 HAULING OF THE LOAD 13 HANDLING AND STORAGE 13 MAINTENANCE AND INSPECTIONS 13 USAGE LIMITATIONS 13 Contact information Technical support (information) tel. +358 (0)20 59127 fax +358 (0)20 592 7700 Installation service tel. +358 (0)20 59127 fax +358 (0)20 592 7878 Rautaruukki Oyj www.ruukki.com 2

Lifting tool manual Description and intended use The present lifting tool is meant for lifting Ruukki s loadbearing corrugated sheets. You can lift sheets one by one or lift several sheets in a bundle. Profile bundles must be separated with underlay rails, the height of which must be at least 70 mm allowing the lifting tool to be placed under the bundles. CE-marking The present lifting tool is CE-marked according to the Machinery Directive 2006/42/EU of the European Parliament and Council of Europe; a respective conformity certificate is drawn to verify this. The CE-marking plate is located on the leveller of the lifting tool and includes information as follows: The lifting tool consists of two separate sub-assemblies and a connecting lifting belt. The assemblies of the lifting tool are placed at both ends of the sheet load (Figure 1). The chain thread used for lifting is not a part of the lifting tool. Figure 1 Parts of the lifting tool without load and chain thread CE-marking Table 1 Manufacturer Innosteel Factory Oy Maximum allowed lifting load 1500 kg Model number 09201000 Production year 2009 CE-marking 3

Lifting capacity The maximum nominal working load limit WLL (=Working Load Limit) of the lifting tool is 1500 kg. Additionally, it must be considered, that the lifting tool is designed for lifting Ruukki s load-bearing corrugated sheets only. Overloading the lifting tool is strictly forbidden. Parts The lifting tool consists of two separate sub-assemblies, lifting belts and shackles. The beam hoist parts are described in drawings 2 5. Figure 2 Hook part of the lifting tool (1pc / end-assembly) 4

Lifting tool manual Leveller Beam Figure 3 The lifting part of the lifting tool with a beam part (1 pc / end-assembly) and leveller (2 pcs / end-assembly) Figure 4 Lifting shackle (3 pcs / end-assembly) Figure 5 Lifting belt (1 pc / end-assembly) 5

Load features The sheet bundle to be lifted should not be higher than 215 mm (figure 6). The number of sheets can vary depending on the different profiles and the strength of the material. The most important features of the bundle size are the nominal load capacity of 1500 kg and the maximum allowed height of the bundle of 215 mm. Only one sheet bundle can be lifted with the lifting tool at a time. Making the lift Before lifting, check visually that all of the lifting tool parts are in working order and mounted according to the instructions. The parts must be checked visually for wear, possible deformation or damages, which might reduce the safety of usage and lifting. Lifting belts used with the lifting tool must be of the same size in both ends so the load is balanced. All lifts and down hauling must be done by accelerating and cutting speed slowly. Any kind of twitches during a lift are to be avoided. Figure 6 Maximum allowed load height 6

Lifting tool manual Preparing a lift For starting a lift, the lifting tool parts should be placed beneath the sheet bundle according to figure 7. Figure 7 Placing the parts of the lifting tool beneath the load The hook-part of the lifting tool should be placed at the end of the sheet bundle, as close to the centre as possible. The positioning of the hook on the sheet bundle is described in figure 8. Figure 8 Placing the hook on the load 7

The beam part of the lifting tool must be placed beneath the sheet bundle so the bundle is in the middle of the beam. The beam can be placed beneath the bundle by bringing it down completely, moving it under the bundle and lifting it up to its place again (figure 9). Figure 9 Moving the entire beam under the load Or by detaching one or both slab parts, moving the beam under the bundle and mounting the beam part (figure 11). The end harnesses of the beam part show in which direction the beam must be placed under the load (figure 10). The part of end going over the beam s edge away from the load aka downwards Figure 10 The harnesses at the end of the beam show in which direction the beam must be located for lifting Phase 1 Phase 2 Phase 3 Figure 11 Placing the beam part under the load in parts 8

Lifting tool manual The levellers must be located as close as possible to the edges of the sheet bundle so the load is positioned firmly between the lifting points. Figure 12 The levellers must be pushed as close to the load as possible The shackles must be placed in their correct locations as shown on figures 13 and 14. Figure 13 Fastening of a lifting shackle to the hook Figure 14 Fastening of a lifting shackle to the leveller 9

After attaching the shackles, the ends of the lifting tool must be connected to each other with shackles and a lifting belt (figures 15, 16, 17). The lifting belt is threaded through the lifting shackles and the ends are attached to the lifting shackles of the levellers. Figure 15 Fixing the lifting belt to the lifting shackles Figure 16 The ends of the lifting belt are attached to the shackles of the leveller Figure 17 The other end of the mounted lifting tool together with the load seen from above 10

Lifting tool manual The beam part of the lifting tool must be moved towards the centre of the load so that the lifting belt is as tight as possible before lifting. Lifting the load When the parts of the lifting tool are correctly mounted on both sides of the load, lifting can be started with the chain threads according to figure 18. Figure 18 Mounting of the chain threads and lifting lines on the lifting tool The maximum allowed inclination of the chain threads is 60 degrees (figure 19). Inclination can be adjusted if necessary by adjusting the length of the lifting belts of the lifting tool towards the load and the chain thread length. β = maximum allowed inclination = 60 Figure 19 Maximum allowed inclination of the chain threads when lifting 11

Lifting points and angles are described on figure 20. The maximum allowed inclination of the chain thread is 60 degrees and the minimum allowed inclination is 10 degrees. The second determining factor of the lifting points is the lengthwise division of the load towards the parts of the lifting tool. The maximum distance of the lifting part from the load determined by the length of the lifting belts is one third of the length of the load. The distance between the lifting parts must be at least one third of the load length. Maximum lifting length of profile. Table 2 Profiili Lmax /mm tmin T45-30L-905 15.000 0.6mm T70-57L-846 15.000 0.6mm T70-57L-1058 15.000 0.6mm T120-63L-695 18.300 0.7mm T130-75L-930 18.300 0.7mm T153-40L-840 18.300 0.7mm Lmax = maximum profile length tmin = minimum material thickness steel type S350GD+Z Figure 20 Lifting points and angles of the lifting tool Before starting the lift, make sure that all parts are fixed according to the instructions and that the shackles are tightly closed. When all parts of the lifting tool are positioned and the chain thread mounted, the whole mounting will look like shown on figure 21. Figure 21 Mounted lifting tool with load and chain threads 12

Lifting tool manual It is advised to mainly lift profile sheets of the same length with the lifting tool. It is also possible to lift the same type profile sheets of different lengths when positioning the shorter sheets between the longer ones. This means that the top and bottom sheets are the longest sheets and of identical measures. If the shortest sheets are clearly shorter than the longest ones, the balance of the whole load must be considered. The short sheets must be placed so that the load is divided evenly over the total length of the load. It is also possible to lift shorter sheets of the same profile in the bundle, but in such cases the shorter sheets must be tied to the load with, for instance, load belts so they will not drop due to wind or inclination during hauling. Hauling of the load The load must always be hauled onto the bottom beams and a solid surface so the lifting tool can be removed from beneath the load. This is done by cutting the speed slowly and gently. If necessary, the load can also be hauled onto an inclined surface with a maximum inclination of 25 degrees (figure 22). If there is a clear difference in length of the profile sheets in the bundle, the load cannot be hauled onto an inclined surface. Lowering different-sized profile sheets onto an inclined surface may result in the shorter sheets slipping, dropping and damaging the other sheets. Handling and storage The usage of broken or damaged lifting tool parts is strictly forbidden and they must be replaced. The lifting tool parts must be handled carefully so unnecessary blows are avoided. Under no circumstances should the parts be used for other purposes than the intended. The lifting tool parts must all be stored in the same location with no exposure to chemicals, solvents, ultraviolet radiation, temperatures exceeding 70 C or weather alterations. Maintenance and inspections The lifting tool parts must be kept clean so possible cracks, breaks and deformations of the parts can be detected. Before each lift it must be visually checked that the parts are not worn, deformed or otherwise damaged in a way that may reduce the working and lifting safety. Usage of damaged or broken parts for lifting is strictly forbidden. Repairing of damaged parts, for instance, by welding is also forbidden the damaged parts must be replaced with new respective parts. Usage limitations Standing below the lifted load is strictly forbidden. The lifting tool can not be used for lifting persons. The lifting tool can be used within the temperature range of -40 - +40 C. However, the individual temperature requirements of the used lifting belt must be observed and followed precisely. There should be no excessive parts on the lifted load during lifting as the equipment is meant only for lifting load-bearing corrugated sheets. The lifting tool must be taken out of use if: The marking of maximum allowed load is unreadable or missing The lifting tool has been overloaded A part of the lifting tool is deformed, cracked or broken The lifting belt must be replaced with an identical one if: The marking of maximum allowed load is unreadable or missing The lifting belt has been overloaded There is a knot on the belt There are excessive friction damages on the belt or the belt is generally worn and dirty There are friction or cutting damages on the belt Figure 22 The load can also be hauled onto an inclined surface. Maximum allowed inclination α= 25 13

Ruukki is a metal expert you can rely on from start to finish, when you need materials, components, systems or total solutions. We are continuously developing our operating model and product range to meet your needs. CFI.001EN/01.2011/PR Rautaruukki Corporation U Suolakivenkatu 1, FI-00810 Helsinki, Finland S +358 20 5911 w www.ruukki.com Copyright 2010 Rautaruukki Corporation. All rights reserved. Ruukki, Rautaruukki, More With Metals and Ruukki s product names are trademarks or registered trademarks of Rautaruukki Corporation.