CHANGING ROAD TRAFFIC NOISE PREVIOUS 10 YEARS. Author(s) Pham, Ngoc Dang; Pham, Ngoc. Citation Vietnamese Academy of Science and T P.399-P.

Similar documents
Development of Alternative Fuel for Public Transport in Ho Chi Minh City

Traffic Emission Inventory for Hanoi, Vietnam

EST Achievements, Progress and Future Strategies

CSE CONCLAVE. ENABLING CITY ACTION PLAN FOR CLEAN AIR India Habitat Centre, New Delhi April 19-20,

Cobenefit of Urban Railway Development Funded by Japanese ODA Loans

PROPOSED HELICOPTER LANDING PAD 85 MILL ROAD LARA

ENERGY SAVING IN TRANSPORTATION. Wang Xie-qing Research Institute of Petroleum Processing SINOPEC Dec Beijing, China

Sustainable Urban Traffic in Vietnam

Submission to Greater Cambridge City Deal

Attachment D Environmental Justice and Outreach

inter.noise 2000 The 29th International Congress and Exhibition on Noise Control Engineering August 2000, Nice, FRANCE

Madison BRT Transit Corridor Study Proposed BRT Operations Plans

Urban traffic situation and possible solutions for HANOI

TRAFFIC IMPACT ASSESSMENT PART OF AN ENVIRONMENTAL IMPACT ASSESSMENT FOR THE KEBRAFIELD ROODEPOORT COLLIERY IN THE PULLEN S HOPE AREA

Mississauga Bus Rapid Transit Preliminary Design Project

RESULTS FOR SEMESTER II THE ACADEMIC YEAR

November 14, 2016 Reference No

5. OPPORTUNITIES AND NEXT STEPS

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

TRAFFIC PARKING ANALYSIS

APPENDIX VMT Evaluation

Executive Summary. Draft Environmental Impact Statement/Environmental Impact Report ES-1

Networks of pedestrian's paths

BORAL CONCRETE GLENORIE

Transport Group Perspective Chris Blow Chair of The Guildford Society Transport Group 21st Jan 2015

Light rail, Is New Zealand Ready for Light Rail? What is Needed in Terms of Patronage, Density and Urban Form.

Welcome. Public Open House Schedule. Super 8 West Kelowna 1655 Westgate Rd, West Kelowna. West Kelowna. Wednesday, March 2, :00 p.m. 8:00 p.m.

Operations Center FAQs

WAKE TRANSIT PLAN Summer 2018

Valley Metro Overview. ITE/IMSA Spring Conference March 6, 2014

UC Santa Cruz TAPS 3-Year Fee & Fare Proposal, through

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

COMBUSTION OF LPG-AIR LEAN MIXTURE TitleSOLUTION FOR POLLUTION REDUCTION OF MOTORCYCLES IN VIETNAM

STH 60 Northern Reliever Route Feasibility Study Report

Appendix J Traffic Impact Study

IMAGE PROCESSING ANALYSIS OF MOTORCYCLE ORIENTED MIXED TRAFFIC FLOW IN VIETNAM

CTfastrak Expansion. Stakeholder Meeting #4 Manchester Town Hall June 3, 2016

Findings from the Limassol SUMP study

South Gloucestershire Challenge Fund and Cycle Ambition Fund

appendix 4: Parking Management Study, Phase II

FINDING AND ADOPTING APPROPRIATE MEASURES FOR CLIMATE-FRIENDLY URBAN TRANSPORT POLICY: THE CASE OF HANOI, VIETNAM

Re: Addendum No. 4 Transportation Overview 146 Mountshannon Drive Ottawa, Ontario

APPENDIX TR-1 PARKING AND QUEUING ASSESSMENT

WOLVERINE TO BHP JANSEN NEW TRANSMISSION LINE PROJECT FALL 2017

Developing a Toolbox for Calculating Motorcycle Emission and the Difference of CO2 from Motorcycle for Each Type of Road in Hanoi

APPENDIX D NOISE IMPACT ASSESSMENT

Renewable Energy Week in Vietnam 2016 Can Tho, and Ha Noi, Affordable and reliable power for all in Vietnam.

Low Emissions Towns and Cities Programme

ENERGY STORAGE SOLUTIONS FOR IMPROVING THE ENERGY EFFICIENCY OF PUBLIC TRANSPORT VEHICLES

ECONOMIC AND FINANCIAL ANALYSIS

Urban Transport systems in major cities in China. Sun Kechao Senior Engineer China Academy of Transportation Sciences, Beijing, China

The need for change of the transport mode in the great cities of Romania

BARRHAVEN FELLOWSHIP CRC 3058 JOCKVALE ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

Table of Contents INTRODUCTION... 3 PROJECT STUDY AREA Figure 1 Vicinity Map Study Area... 4 EXISTING CONDITIONS... 5 TRAFFIC OPERATIONS...

DRIVER SPEED COMPLIANCE WITHIN SCHOOL ZONES AND EFFECTS OF 40 PAINTED SPEED LIMIT ON DRIVER SPEED BEHAVIOURS Tony Radalj Main Roads Western Australia

Third Regional EST Forum

Optimized solution for Electric Transit Buses

Help shape your community investment in Wake Transit. Fiscal Year 2019 Draft Work Plan Summary

URBAN COMMUNITY AL FAYHAA. RESULTS of the MOBILITY PLAN

Ottawa LRT Stage 2. McKellar Park Information Session

RELEASED UNDER THE OFFICIAL INFORMATION ACT 1982

Goods Movement Plans. Summary of Needs Assessments. January 21, 2015 GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 6

Transportation Update. Binford Sloan, Director of Transportation, October 9, 2018 Presented to School Board

The impact of electric vehicle development on peak demand and the load curve under different scenarios of EV integration and recharging options

Revised Strategy for Downtown Parking

TfL Managing London s Roads. Glynn Barton, Head of RSM Outcomes Delivery, Transport for London. Copyright 2016 TRL Ltd

April 2010 April 2010 Presented by Alan Eirls

ONE YEAR ON: THE IMPACTS OF THE LONDON CONGESTION CHARGING SCHEME ON VEHICLE EMISSIONS

Downtown Lee s Summit Parking Study

Wyoming School Funding Model Recalibration: Transportation Reimbursement Model Study

Overview of Transit Funding and Planning in the PACTS Region

VIETNAM TRAFFIC SAFETY FOR 2 WHEELERS: CHALLENGES AND STRATEGIES. Trinh Thu Ha Deputy Chief Office National Traffic Safety Committee Vietnam

Regional Workshop on Transport Sector Inspection and Maintenance Policy in Asia

RE: 67/71 Marquette Avenue Redevelopment Transportation Overview

West Broadway Transit Study. Community Advisory Committee September 17, 2015

UCLA Lake Arrowhead Conference. October 18, 2010

UCLA Lake Arrowhead Conference. October 18, 2010

Three ULTra Case Studies examples of the performance of the system in three different environments

Available online at ScienceDirect. Procedia Technology 25 (2016 )

THE WAY WE MOVE LRT FOR EVERYONE

What We Heard Report - Metro Line NW LRT

UCLA Lake Arrowhead Conference. October 18, 2010

Transport rationalization in Vodafone

BUS SERVICES IN CHAMBERLAYNE ROAD NW10

TRAVEL DEMAND FORECASTS

STUDY ON EURO 5 SOUND LEVEL LIMITS OF L-CATEGORY VEHICLES

Construction Realty Co.

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School

Table Existing Traffic Conditions for Arterial Segments along Construction Access Route. Daily

STUDY ON THE OPPORTUNITY TO DEVELOP AN UNITARY TRANSPORT SYSTEM WITHIN PITESTI-MIOVENI AREA

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

TRAFFIC IMPACT STUDY VICDOM BROCK ROAD PIT EXPANSION

11 October 12, 2011 Public Hearing APPLICANT:

Frequent Service Network Proposal

2.0 Development Driveways. Movin Out June 2017

Report Addendum. Terry Keller, SDDOT. Noise Study Technical Report I-29 from Tea Interchange to Skunk Creek Sioux Falls, South Dakota

For personal use only

ANDERSON PROPERTY SITE ANALYSIS

Horseshoe Bay Terminal Open House

The Eastern Connector Study November, 2007 planning for the future

Transcription:

Title CHANGING ROAD TRAFFIC NOISE PREVIOUS 10 YEARS Author(s) Pham, Ngoc Dang; Pham, Ngoc IN HANO Hong Annual Report of FY 2006, The Core Citation between Japan Society for the Promo Vietnamese Academy of Science and T P.399-P.404 Issue 2007 Date Text Version publisher URL http://hdl.handle.net/11094/12957 DOI Rights Osaka University

CHANGING ROAD TRAFFIC NOISE IN HANOI OF PREVIOUS 10 YEARS Pham Ngoc Dang, Pham Ngoc Hong Centre for Environmental Engineering of Towns and Industrial Areas (CEETIA), Hanoi University of Civil Engineering, Hanoi, vietnam. Abstract Vietnam architectural specify is open, windows usually open from 250 to 300 days per year for ventilating, therefore road traffic noise impacts directly to community healtll. Urban noise pollution is mainly from road traffic activities. In Hanoi the number of vechicle increases rapidly. Total of registered motorbikes in Hanoi to 1995 is 450,000 units, to 1998: 768,000, to 2002: 1,250,000 and to 2005 is about 1,700,000 units. Based on the monitoring results during 10 previous years, the characters of road traffic noise levels in Hanoi are following: 1. There are two peak hours of vichicle flows during tlle day, the moming peak hour in winter and summer is same at 8-911, the afternoon peak hour is at 17-18h in winter and at 18-19 in summer. In peak hour the motorbike flow reaches 91% of total traffic flow. 2. The road traffic noise levels in the frequency range from 63hz to 4000hz (low, medium and high frequency) are sameness. With frequency lower than 63hz and higher than 4000hz the noise levels decreased. 3. Hourly average road traffic noise level changed from 65 to 81dB A, in the night time it is lower than 70 db A, in peak hour it is reached 78-81 db db A. During homing the noise levels can reach 90-100 db A. 4. After previous 10 years the vechicle number increased about 4 times, but average road traffic noise levels increased only 0.5-2.8 elba. Because road and vechicle quality in 2005 bester than in 1995. 5. Proposing some measures for decreasing road traffic noise levels in cities. Keywords: Horning, Noise level frequency spectrum, Number of motobikes, Road traffic noise levels, Traffic flow. 1. Introduction Vietnam architectural specify is open, windows usually open from 250 to 300 days per year for ventilating, therefore road traffic noise impacts directly to healthy of people lived next to two sides of streets (specially for shop sellers, traders, vendors and travelers). Road traffic noise is mainly from traffic activities. Transportation mean of Hanoi are increasing rapidly. Total number of regis ted motobikes in Hanoi to 1995 is 450 000; but 1998 is 768 000; 2000 is nearly 1 0000000; 2002 is 1 250 000; 2004 is 1 500000; and 2005 is about 1 700000. It means that during 10 years, the number of motobikes in Hanoi growths 3.8 times. The report presents the changing of vehicle flow and road traffic noise pollution in Hanoi during 10 previous years. A. The frequency spectrum of road traffic noise in Hanoi Impact of noise to human health depends very much on noise level and its frequency spectrum. In scientific theme KHCN 07.11 (1996-1998) [1], we have determined noise frequency spectrums at four Hanoi streets (Truong Chinh, Northern of Chuong Duong Bridge, Ba Trieu and Nguyen Trai). Measure results of average noise levels according to Yz octove frequency spectrum of the streets are presented in Figure 1. Frequency spectrum of road traffic noise in Moscow is showed to compare. Based on Figure 1, road traffic noise levels with frequency spectrums from 63 Hz to 4000 Hz in Hanoi change unsignificantly, but with frequency spectrums smaller than 63 Hz and larger 4000 Hz, they are reducing gradually. But road traffic noise levels in Moscow are decreasing gradually when frequency spectrums reduce from low to high. 399-

db A 100.,-~--~~ ~~ ~ -~- ~-~ ~-~ ~~~~ ~ ~~~~~~~-~~~-~~~.. ~.. ~.. ~.-~-.~.. ~, 80 - - - - - - -7~~ - - - -1Sl- - - - - -!iii- - - - - - 'iii- - - - - -...m- - - - - - - - - - - - - - - - - - - - - - - - - ~.A t.~-9p 60 - -v:-- -:-------t- -----j ------J. ----- -:- ------:- -----~- -- I I : : : : : Mr---~; I I I : I t I I I; I I I : I f I I I 40 - - -,- - - - - - -I- - - - - - - i - - - - - - ~ - - - - - -, - - - - - - -,- - - - - - -,- - - - - - - r - - - - - -, - - - 20 I I I : I I I I t...:...... ~... r... i... i"... -:... :-... ~... ~..... : : I : I I I I t I! :: I O+-~--.-~--.-~--.-~--.-~--.-~--.-~--.-~--.---~ 31.5 63 125 250 500 1000 2000 4000 8000 Frequency (Hz) -+- Frequency spectrum of road traffic noi se i n Hanoi Frequency spectrum of road traffic noi se in M os:;ow Figure 1: Frequency spectrum of road traffic noise levels B. The change of road traffic noise levels in some streets in Hanoi from, 1996 to 2005 The noise measurement results in Hanoi Environmental Monitoring Program from 1996 to 2005 are presented in Table 1 and Figure 2. Table 1: Road traffic noise levels in Hanoi from 1996 to 2005 (db A ) Streets 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 1. National road 5 (Cau Chui) 75,6 75,1 75,5 76,3 76,9 79,5 79,5 79,7 78,1 78,4 2. National road 1A (South Bus Station) 75,7 75,7 75,6 75,5 75,7 76,2 77,4 77,6 76,8 77,2 3. Tran Hung Dao street 72,4 72,1 72,5 72,2 71,7 72,6 72,5 72,8 71,8 72,9 Source: Annual Environmental Monitoring Report ofceetia (The showed values are average of 6 measuring times during a year (one time per two month), and during 7 AM to 7PM for each measurement}. 1800~-- -- ~--~ ----- - - -~- ----- ------ -- ----~--- --- -------404 ~L, 1600 1400 1200 1000 800 600 400 200 o Source: -1.264.~ 1p?!.~ 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 I El Noise level (dba) I!!I Vehicle flow (automobile and motobile) x10 (unit/hour), Annual Environmental Monitoring Report ofceetia. Figure 2: The change of daily average of roads traffic noise levels and vehicle flows at National road la in the Southern of Hanoi from 1996 to 2005-400-

Discussions: 1. Based on Table 1, the road traffic noise levels at National road 5 and 1A (main roads entry Hanoi) have increased year by year, from 2-3 dba after 10 years. But road traffic noise at Tran Hung Dao street (the old street in center of Hanoi) has changed un-significantly. 2. Monitoring results of daily average noise levels and traffic flow in the rush hours at 1A road (next to South Bus Station of Hanoi) from 1996 to 2005 are presented in Figure 2. It shows that the rush hour traffic flow in 2005 is 4.7 times higher 1996 (16 472 compares to 3 513) but road traffic noise level increased only 1.5 db A (from 75.7 db A to 77.2 db A ). According to theory, when traffic flow increases 2 times, road traffic noise level will increases 3 dba. It is explained that la road has been improved: road surface is better and wider and number of new vehicles increases but number of old vehicles decreases. 3. Road traffic noise levels at major traffic routes of Hanoi are above 70 db A at day time (from 71.1 db A to 79.7 db A ) but under 70 db A at night time. C. The hourly change of vehicle flow and noise level The US-AEP funded to CEETIA to carry out monitoring of traffic air pollution during 2004-2005, included traffic flow and noise at Giai Phong street (a monitoring point is 200 meter at north of Giap Bat railway station). Monitoring is continuously 24/24hours during 2 weeks in the Winter (November 2004) and 2 weeks in the Summer (June 2005). The results in November 2004 are presented in Figure 3. The results in June 2005 are presented in Figure 4 and 5. db A 90 " / \ : \, V " r-.. ~ i\" \ t/ ) 1'", I so.ii< 1\ ~":~~~./ /'!\.. 75 70 " 60 " 1 ~." P--.- Figure 3: Comparison of noise levels of sunny working day, rainy working day and sunny weekend day (in November 2004) -401

Veh.lhour 18000~--------------------- -----------------.-.----r~~~~~~~~~~~~~, 16000 14000 12000 10000 8000 6000 4000 2000 Figure 4: Evaluation of average vehicle flow by hours (vehiclelhour) in three days for monitoring noise level in June 2005 ct A 80,- ---- -- ---------- ~--------~---~---- ~-----------------------.--~--------, 78 ;.~~~;:AYf... ;... : ~ \ : 76 lit & \ i 74 11 : '%-~. +.~~!;... <... V f jff, i... For Trade and Service Sectors i 72... ~f... II'CVN (6-22h) : 70 elba II /. rrcvn (22-6h) : 50 elba 70+!, + + / + + +... +...,...;... +...;...,.../. + +,, + ; 1... j... +.., 68 +.,...,... +... +... + : Figure 5: Comparison of noise level LAeq (dba) evaluated by hour in Sunday and two working days (June 2005) Discussions : 1. On the vehicle flow: Giai Phong road is a south entry gate and a major traffic route of Hanoi so its traffic flow is really large. Based on the monitoring results, there are some comments as below: + The daily vehicle flow in November 2004 (Winter) is 148 623 motorbikes and 20 919 autobikes per day, and June 2005 (Summer) is 159 303 motorbikes and 22 529 autobikes per day. It means that the vehicle. flow in Summer is larger than in Winter 7.2%. -402-

+ The changing of hour vehicle flow has two peak hours: at 8-9AM for both Winter and Summer, and 17-18PM for Winter and 18-19PM for Summer. The vehicle flow at peak hour is 14 000-16 900 vehicles/hour, in which motorbike rate is 91.8%; car rate is 4.9%; light truck rate is 1.4% and heavy truck rate is l.9%. The vehicle flow is minimum at 1-2AM, with motorbike rate is 72.8%; car rate is 10.2%, light truck rate is 4.6% and heavy truck rate is 12.4%. + Vehicle flow at working day is larger than weekend day 10-11%. Rate of motorbikes in working day is also larger than weekend day (average working day is 88.4% and weekend day is 86.9%). 2. On the road traffic noise level: Based on data in Figure 3 and 5, some evaluations are below: + The hourly average road traffic noise levels in Summer and Winter are similar and changing from 64.6 dba to 80.6 dba. The average noise level at peak hour is 78 to 81 dba. The average noise levels are minimum during lam to 4AM and changing from 64.6 to 72 dba. During homing (from buses or heavy trucks), noise levels can reach 90-100 dba. + Comparison noise levels of working day and weekend day: noise levels at day time of working day are higher than weekend day from 1-2 dba, but at night time from lam to 4AM, the difference of working day and weekend day's noise levels is un significantly. The noise levels of rainy day are lower than sunny day from 4-6 dba (due to vehicle flow is smaller). + Noise levels during night time (from 23PM to 5AM) are over permitted standard TCCP - 50 dba. D. Forecast of road traffic noise level in Hanoi to the year of 2010 Road traffic noise level is unstable (depend so much on time). In order to evaluate road traffic noise level comply with Vietnamese standard, it has to apply integrated equivalent noise level (LAtd) in monitoring and forecasting. Forecast method of average equivalent noise level for vehicle flow, based on Guideline R362, CH-025 305-67, Standard roct 19358-74 offormer Soviet Union, and standard JTC 005-1996 of China is below: In which: LAtd - average equivalent noise level of vehicle flow (forecasting); LAT - specific average equivalent noise level at 12m high and 7.5m far from center of vehicle line in standard condition: vehicles move straight on smooth road with vehicle flow include 60% of buses and trucks with average speed 40km per hour; L:&j - total of adjustment noise levels for different cases in different standard conditions. Forecast results Data in Table 2 forecasts road traffic noise levels of three major roads in Hanoi up to 2010 follow scenario of7-12% annual vehicle growth. No Road Table 2: Forecast of road traffic lloise level ill Halloi to the year of 2010 [lj Width of Width of Rate of Width of road left right Vehicle flow Ltd heavy surface (m) pavement pavement (veh/hour) (dba) trucks (m) (m) 1 National road 5 2x(7,5+ 10,5) 2.5 2.5 5630 12% 80,5 2 National road 1 2x(7,5+ 10,5) - 4 15388 5% 81,3 ".) Tran Hung Dao 16 7 7 6667 2% 77,0 Comparison with noise levels in 2005, forecasted noise levels in 2010 of above roads increases from 2-4 dba. (1) 403-

E. Solutions for decreasing road traffic noise in the cities 1. Prevention of noise from generation sources + Transportation register stations carry out checking and forbidding vehicles not met the noise standards (according to TCVN 5949 1999: Acoustic) + Improving transportation system to meet urban transportation standards, expanding transportation intersections and arranging transportation routs properly to reduce traffic jams, therefore to reduce road traffic noise levels + Based on real situation of Hanoi, some regulations to mitigate road traffic noise level could be applied, such as NO HORNING from 11PM to 6AM for all vehicles run inside city, NO HORNING in some areas of Hanoi, even NO VEHICLES in these areas 2. Prevention of noise transmittance + Planting green trees at both sides of road (using big and thick leaf canopy trees to reduce noise) + Building noise prevented walls in areas request quiet such as hospitals, schools. These walls should be coated by acoustic absorbed mortar. 3. Proper urban planning + When doing urban planning, it is necessary to consider to noise prevention. Public buildings are located next to roads to prevent noise for back ones request quiet like residences, offices, institutes, schools, hospitals,... Major transportation routes, rail ways, air ports need to be isolated from residential areas. Conclusion Based on the monitoring data of road traffic noise level of Hanoi during 10 previous years (1996-2005) implemented by CEETIA, there are some conclusions as following: + Vehicle flow of Hanoi growths very rapidly, increases 4 times during 10 years with motorbike ratio nearly 91 %. It makes road traffic noise level in Hanoi increases from 0.5 to 2.8 dba. + Road traffic noise levels with frequency spectrums from 63 Hz to 4000 Hz change insignificantly, but less than 63 Hz and above 4000 Hz gradually reduce. + Change of vehicle flow and noise levels has two peak hours in the morning and in the afternoon: at 8-9 AM in the summer and winter and at 17-18PM in the winter and 18-19PM in the summer. + Change of hourly average noise levels are from 64 dba to 81 dba, from 78 dba to 81 dba at peak hours, and peak from 90 dba to 100 dba at horning moments. + Road traffic noise levels not depends very much on vehicle flow but so much on road quality and ratio of new or old vehicles. + Forecasting road traffic noise levels up to 2010 will increase from 2 to 4 dba compare with 2005. + The report has suggested some solutions to mitigate road traffic noise for Vietnamese cities. References 1. Technological Scientific Theme KHCN 07.11 (presided by Pham Ngoc Dang): "Research and forecast change of environment impacted by developing urban and industrial zones up to 2010, 2020, suggest solutions for environmental protection for Hanoi and set up project on environmental improvement for one industrial area", Hanoi - 1998. 2. Pham Ngoc Dang, Le Trinh, Nguyen Quynh Huong - Assessment of change and forecast of environment for two major economic zones in Northern and Southern of Vietnam. Publisher of Construction, Hanoi - 2004. 3. CEETIA: "Report on monitoring of air pollution from traffic for Hanoi by mobile monitoring station". Funded by US-AEP. Presided by Pham Ngoc Dang. Hanoi - July 2005. 4. Annual Environmental Monitoring Report ofceetia (Regional Environmental Monitoring Station). -404-