APACHE CORPORATION. Daily Land - Orig Comp Report

Similar documents
APACHE CORPORATION. Daily Land - Orig Comp Report

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

Drilling & Completion Summary


8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

3/25/15 University DC 1H Devonian Completion

Daily Drilling Report

Daily Drilling Report

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #


CNL, CCL, GR, CBL. RDMO

DAILY DRILLING REPORT

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Elevation Resources LLC

Daily Drilling Report

Daily Drilling Report

Gulftex Energy III LP DAILY COMPLETION REPORT

DATE: 01/03/ DAILY COMPLETION REPORT

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

19,683 8,

Current Depth. Proposed TD. Current Operation

Current Depth. Proposed TD. Current Operation

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

Daily Drilling Summary Report

Callon Petroleum Company Drilling Report

Athlon Energy Operating LLC

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

MORNING DRILLING REPORT

DAILY DRILLING REPORT DATE : 08/01/2012

Drilling & Completion Summary - Ascending

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

Completion Solutions Inc.

Daily Activity Report

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

DAILY DRILLING REPORT

1042 FNL, 1935 FEL - ECTOR, TX

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

MORNING DRILLING REPORT

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

PRODUCTION HYDRAULIC PACKER FIELD TEST

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

On May 28, 2015 Freeport-McMoRan filed with DOGGR a written notice of intention to plug and abandon Fourth Ave Well #4.

DAILY DRILLING REPORT

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

DAILY DRILLING REPORT

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x

Casing Drilling Technology Implementation In Petrom

OPERATIONS SUMMARY REPORT

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE

WIF Categorization Exercise. Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil

McKissick 200mt. Stabbing board

Rotary Snubbing Technology Option for Long Reach

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8" -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8" 12UNF Each 6

DSI THRU-TUBING INC. Bear Claw Composite Bridge & Frac Plug Systems. Proof in Performance

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Composite Plugs. Index

LEE NAK GUI TCP SERVICE COORDINATOR APPS

Atlas Copco Oil and Gas Rigs. The Predator Advantage

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

FRAC STACKS stingercanada.com

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

DAILY DRILLING REPORT

1 st Run in Russia Novatek (largest independent gas producer) TCE700 lands intermediate 7 casing on ERD well in Yarudeyskoye field

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

ISOLATION/UNIVERSAL TOOLS

SPE Improved Hydraulic Fracturing Perforation Efficiency Observed With Constant Entry Hole and Constant Penetration Perforation

Drilling & Down-hole Completion Tools

Abandonment BAS-3. Frisia Zout B.V. 4 December 2013

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

COMPREHENSIVE OVERVIEW

Intervention Barriers

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

JTC ENERGY GROUP, LLC. Jarmon #1D

HYDRAULIC WORKOVER SERVICES

LOC 400 Drilling Rig

GLOBAL DRILLING SOLUTIONS, INC STOCK LIST

TABLE OF CONTENT. Description

DAILY OPERATIONS REPORT Date:

Cloppenburg Germany Germany Tel.: +49 (0) Hohe Tannen 14

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

Plug & Abandonment Light Drilling Workover Well Intervention

COILED TUBING TOOLS SALE RENTAL - LEASE

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

AADE 01-NC-HO-54. Abstract

Ideco - H25 Information Document

2/7-2IS OPEN HOLE WIRELINE LOGGING SUMMARY

T-2 On-Off Tool. Available with all common wireline profiles, the stinger works with industrystandard blanking plugs, standing valves and regulators.

Field Overview. Central West Ecuadorian Basin Discovered in 1994 OOIP: 1,605 MBbls Maximum production rate: 65,200 bopd in year 2007 IPS-12-03

Transcription:

APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-19-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int % 1. Report No 1 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor JAMES LANHAM / BRIAN GRAY Engineer / Geologist TIM ORSAK Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: Status Comment Summary 24 HR Forecast 11-14-469-CP AFE Description: County RIG PHONE NO 432-242-6664 Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 15,7 15,7 4,948,3.32 RUNNING 5.5 PRODUCTION CASIN 6: SH SAFETY MEETING / RIG UP CASING TOOLS / RUN PRODUCTION CASING FINISH RUNNING CASING / CIRCULATE BOTTOMS UP / RIG UP AND CEMENT CASING / NIPPLE DOWN AND SET SLIPS. From To Duration Operation Description 11:3AM 12:PM.5 SAFETY MEETING WITH BUTCH'S CASING CREW. 12:PM 1:3PM 1.5 RIG UP CASING TOOLS 24 HR Operational Comments 1:3PM 12:AM 1.5 RUN 5.5 PRODUCTION CASING (: SHOE DEPTH =8,213'). CASING DETAILS ON NEXT REPORT. Remarks :-6: RUN 5.5 PRODUCTION CASING (6: SHOE DEPTH =12,998'). CASING DETAILS ON NEXT REPORT. Directional Information Initial Deviation Max Dev Max Dogleg 2,245 92.9 deg at 11,91 15.6 deg at 8,766 Casing / Tubing Information Objective Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE 13.38 48 H-4 552. 4 22. -2,119. Returns at Surface INTERMEDIATE 1 9.63 4 J-55 8,5.7 5,333.1 Company Name No of People Hours Today Cum / Event HORIZON MUD 1 24. 24. SDS 2 24. 24. BUTCH'S CASING DIVISON 5 6. 6. DDC.. ENVIORMENTAL DRILLING S 2 24. 24. PATTERSON-UTI DRILLING 11 137. 137. Personnel Total: 21 269. 269. BULKS Product QTY DIESEL, MUD 5,329. DIESEL, RIG FUEL 1,68. 1

APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 76 CEMENT AND CEMENTING SERVICES 17, 79 COMPANY LABOR 15, 717 CONTRACT LABOR 128, 45, 17, 15, 128, 719 CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 12,917 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 2, 13,617 13,617 721 CONTRACT SUPERVISION 5, 2,83 2,83 47,917 CONSULTANTS 186,383 731 EQUIPMENT RENTAL 4, 734 FORMATION STIMULATION 2,731, 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 4, 2,731, 15, 6, 1, 1, 6,5 247,5 Total Intangible Cost 4,43, 15,7 15,7 4,387,3 7132 OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 336, 15, 2, Total Tangible Cost 561, 561, Total: 4,964, 15,7 15,7 4,948,3 2

APACHE CORPORATION Page 1 of 4 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 12-2-214 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int % 1. Report No 2 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor JAMES LANHAM / BRIAN GRAY Engineer / Geologist TIM ORSAK Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: Status Comment Summary 24 HR Forecast 11-14-469-CP AFE Description: County RIG PHONE NO 432-242-6664 Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 15,7 429,922 445,622 4,518,378 8.98 RIGGING DOWN AND REPARING RIG TO W Objective TRIP IN HOLE WITH PRODUCTION CASING AND SET SHOE AT 15,875', CEMENT CASING, NIPPLE DOWN BOP, SET SLIPS AND INSTALL TA CAP. RIG RELEASED AT 23:59 HOURS ON 12-2-14. WALK RIG TO UNIVERSITY 244 4HU. From To Duration Operation Description 24 HR Operational Comments 12:AM 9:3AM 9.5 RUN 5 ½ CASING AS FOLLOWS; TEST FLOAT EQUIPMENT 1-FLOAT SHOE = 2.85 SET @ 15,875 1-#2 5 ½ HC-11 TXP BTC CSG JT = 42.23 1-FLOAT COLLAR = 1.33 SET @ 15,829.92 1-LATCH SUB = 1.2 SET @ 15,828.59 1-#2 5 ½ HC-11 TXP BTC CSG JT = 43.23 1-ORIO VALVE = 3.23 SET @ 15,784.34 67- #2 5 ½ HC-11 TXP BTC CSG, JTS, = 2,819.96 1-MARKER JT = 21.26 SET @ 12,961.15 72 - #2 5 ½ HC-11 TXP BTC CSG, JTS, = 2,998.64 1- MARKER JOINT = 21.37 SET @ 9,941.25 94- #2 5 ½ HC-11 BTC TXP CSG, JT, = 3,957.75 1- MARKER JOINT = 21.84 SET @ 5,962.13 14 - #2 5 ½ HC-P11 BTC TXP CSG, JT,=45, 5,99.1 TOTAL PIPE RAN = 15,879.33 SET @ 15,875 43' OFF BOTTOM WITH 4.33 STICK UP RAN 93 CENTRALIZERS / NOTIFIED T.R.C. WITH PRODUCTION CEMENT INFORMATION @ 14: ON 12-19-14 AND TALKED TO IVY WASHED LAST JOINT IN USING CRT TOOL AND GOT ALL THE WAY DOWN UNTIL ELEVATORS WERE JUST ABOVE SPIDERS (ABOUT 15,91' OR 1' OFF BOTTOM) WENT TO PICK UP TO GET OFF CRT AND COULD NOT GET BACK DOWN. MADE SEVERAL ATTEMPTS BOTH WITH AND WITHOUT PUMPS TO GET BACK TO BOTTOM BUT WAS LOOSING ABOUT 3'-5' ON EVERY STROKE AND PICK UP WAS INCREASING WITH EACH ATTEMPT FROM 26, ON FIRST T/ 33, ON LAST TRY.,ALSO TRIED TO ROTATE UP T/ 1, DRILL TORQUE (CASING MAKE UP TORQUE = 12,5) BUT COULD NOT ROTATE. DICESION WAS MADE TO LAY ONE JOINT DOWN (43' FROM T.D.) AND CEMENT. 9:3AM 1:3AM 1. CIRCULATE OVER ONE BOTTOMS UP 856 STROKES 1:3AM 11:AM.5 SAFETY MEETING WITH CREST 11:AM 12:PM 1. RIG UP CEMENT IRON 12:PM 4:PM 4. TEST LINES TO 6 PSI. PUMP 1 BBL GXT SPACER. PUMP FIRST STAGE LEAD W/ 525 SKS (225 BBLS) 5/5 POZ H AT 11.9 WT,2.4 YD, TAIL W/ 171 SKS (487 BBLS) CLASS H PLUS AT 13.2 WT, 1.63 YD. DISPLACE W/ 352 BBLS FW WITH BIOCIDE AT 7 BPM. FCP AT 3 BPM WAS 29 PSI. BUMP PLUG AT 15:38 HS 12/2/14 W/ 35 PSI GOOD CIRCULATION THOUGH OUT JOB, BUMPED PLUGFLOATS HELD GOT 46 BBL, / 76 SX TO SURFACE 4:PM 5:3PM 1.5 RIG DOWN CREST CEMENT IRON. 5:3PM 12:AM 6.5 NIPPLE DOWN BELL NIPPLE; RIG DOWN KATCH KAN; NIPPLE DOWN BOPS. RAISE BOP SET SLIPS WITH PRODUCTION CASING IN FULL TENSION. MAKE ROUGH CUT ON CASING, LAY DOWN CASING.MAKE FINAL CUT ON CASING. INSTALL TA CAP AND TORQUE UP. RELEASE RIG ON 12/2/14 23:59 HOURS. Remarks :-6: RIG DOWN AND PREPARE RIG TO WALK. Directional Information Initial Deviation Max Dev Max Dogleg 2,245 92.9 deg at 11,91 15.6 deg at 8,766 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE 13.38 48 H-4 552. 4 22. -2,119. Returns at Surface INTERMEDIATE 1 9.63 4 J-55 8,5.7 5,333.1 PRODUCTION 1 5.5 2 P 11, P-11 15,875.2 2,235 22. 5,97.21 Returns at Surface 1

APACHE CORPORATION Page 2 of 4 Daily Land - Orig Comp Report Company Name No of People Hours Today Cum / Event PATTERSON-UTI DRILLING 11 137. 274. SDS 2 24. 48. DDC.. BUTCH'S CASING DIVISON 3 3. 9. HORIZON MUD 1 24. 48. CREST PUMPING 8 48. 48. ENVIORMENTAL DRILLING S 2 24. 48. Personnel Total: 27 287. 556. BULKS Product QTY DIESEL, MUD. DIESEL, RIG FUEL. 2

APACHE CORPORATION Page 3 of 4 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 1,4 CRT TOOL 74 CASING CREW 1,2 CASING CREW 74 CASING CREW 45, 2,6 2,6 76 CEMENT AND CEMENTING SERVICES 1,275 FLOAT EQUIPMENT 76 CEMENT AND CEMENTING SERVICES 112,499 CEMENT 5.5 CASING 76 CEMENT AND CEMENTING SERVICES 17,945 ORIO VALVE AND TECH 76 CEMENT AND CEMENTING SERVICES 6,323 WELLHEAD SLIPS AND CAP 76 CEMENT AND CEMENTING SERVICES 17, 147,42 147,42 24,4 22,958 79 COMPANY LABOR 15, 15, 717 CONTRACT LABOR 3,23 NIPPLE DOWN BOP/NIPPLE UP CAP 717 CONTRACT LABOR 1,955 SET SLIPS AND CUT CASING 717 CONTRACT LABOR 128, 4,978 4,978 719 CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 24,8 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 2, 13,617 25,5 39,117 721 CONTRACT SUPERVISION 5, 2,83 4, 6,83 43,917 CONSULTANTS 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS -15,876 OBM DIESEL 725 DRILLING FLUIDS MUD ADDITIVES 725 DRILLING FLUIDS 731 EQUIPMENT RENTAL 455 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL 1 SAT PHONE & INTERNET 731 EQUIPMENT RENTAL 525 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 25 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 4 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 64 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 8 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 75 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 65 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 6 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 4,472 SOLIDS CONTROL 731 EQUIPMENT RENTAL 2 TRASH TRAILER 731 EQUIPMENT RENTAL 175 H2S MONITORING 731 EQUIPMENT RENTAL 6 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 228 OBM CONTAINMENT 731 EQUIPMENT RENTAL 125 ROTATING HEAD 731 EQUIPMENT RENTAL 8 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 75 CO MAN TRAILER 731 EQUIPMENT RENTAL 6 INTERCOMS 731 EQUIPMENT RENTAL 3 GENERATORS 731 EQUIPMENT RENTAL 175 TEXAS ENERGY INTERNET -15,876 731 EQUIPMENT RENTAL 4, 7,619 7,619 123,23 16,883 392,381 734 FORMATION STIMULATION 2,731, 2,731, 737 FUEL AND POWER -33,89 RIG DIESEL 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 15, 6, 1, 1, 6,5 247,5 Total Intangible Cost 4,43, 15,7 16,773 176,472 4,226,528 7132 OTHER SUBSURFACE EQUIPMENT 1, 1, 3

APACHE CORPORATION Page 4 of 4 Daily Land - Orig Comp Report 714 PRODUCTION CASING 336, 269,149 269,149 66,851 5.5 BTX-XP 11 #2 CASING 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 15, 2, Total Tangible Cost 561, 269,149 269,149 291,851 Total: 4,964, 15,7 429,922 445,622 4,518,378 4

APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 3HM DATE 3-24-215 Operator APACHE CORPORATION API GL 4238338873 2,649. TMD 15,918. PBTD RKB/RT 2,671. Working Int % 1. Report No 5 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor CHARLES GRAVES Engineer / Geologist MICHAEL LYON Field SPRABERRY (TREND AREA State County Event Code LCM Event Type LAND-ORIG COMP Objective RIG Name RIG PHONE NO RIG Fax No Tool Pusher AFE #: Status Comment Summary 24 HR Forecast 11-14-469-CP AFE Description: AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 533,354 4,14 537,368 4,426,632 1.83 WOF RU PETROPLEX. LOAD BS TO 15 PSI, TEST LINES TO 95 PSI, OPEN CSG, SICP.TEST CSG 7K/ 3MIN, LOST 35 PSI, GOOD TEST. BROUGHT PUMPS ONLINE TO 1 BPM,ORIO OPENED @ 95 PSI. FLUSHED CSG W/ 35 BBLS TFW ( CORROSION, BIOCIDE, SCALE) WOF From To Duration Operation Description 24 HR Operational Comments 4:3PM 6:3PM 2. MIRU PETROPLEX. LOAD BS TO 15 PSI. TEST LINES TO 95 PSI, OPEN CSG, SICP.TEST CSG 7K/ 3MIN, LOST 35 PSI, GOOD TEST. BROUGHT PUMPS ONLINE TO 1 BPM,ORIO OPENED @ 95 PSI. FLUSHED CSG W/ 35 BBLS TFW ( CORROSION, BIOCIDE, SCALE) Directional Information Initial Deviation Max Dev Max Dogleg 2,245 92.9 deg at 11,91 15.6 deg at 8,766 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE 13.38 48 H-4 552. 4 22. -2,119. Returns at Surface INTERMEDIATE 1 9.63 4 J-55 8,5.7 5,333.1 PRODUCTION 1 5.5 2 P 11, P-11 15,875.2 2,235 22. 5,97.21 Returns at Surface Company Name No of People Hours Today Cum / Event SDS 2 24. 12. PATTERSON-UTI DRILLING 11 137. 685. ENVIORMENTAL DRILLING S 2 24. 12. DDC.. HORIZON MUD 1 24. 12. Personnel Total: 16 29. 1,45. BULKS Product QTY. DIESEL, MUD. DIESEL, RIG FUEL. 1

APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 2,6 2,6 24,4 76 CEMENT AND CEMENTING SERVICES 17, 147,42 147,42 22,958 77 CHEMICALS (WSS) 1,5 BIO, SCALE, CORRISION 79 COMPANY LABOR 15, 15, 711 COMPANY SUPERVISION 5 CHARLES GRAVES 717 CONTRACT LABOR 128, 4,978 4,978 719 CONTRACT DRILLING-DAY/TURNKEY 2, 9,117 9,117 721 CONTRACT SUPERVISION 5, 15,383 15,383 123,23 19,883 34,617 722 DIRECTIONAL DRILLING 725 DRILLING FLUIDS -15,876-15,876 731 EQUIPMENT RENTAL 4, 27,752 5 27,82 372,198 FRAC TANK 734 FORMATION STIMULATION 2,731, 2,731, 737 FUEL AND POWER -33,89-33,89 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON 749 LOGGING 15, 6,5 6,5 765 SITE PREPARATION 6, 143,5 6, 767 SALT WATER DISPOSAL 1, 1, 774 TRUCKING AND HAULING 1, 7 7 99,3 WINCH TRUCK 776 TUBULAR INSPECTION/TESTING 6,5 6,5 777 WATER 247,5 247,5 7187 PUMP TRUCK SERVICE 8 1,264 2,64 PETROPLEX Total Intangible Cost 4,43, 264,25 4,14 268,219 4,134,781 7132 OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 269,149 269,149 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 66,851 15, 2, Total Tangible Cost 561, 269,149 269,149 291,851 Total: 4,964, 533,354 4,14 537,368 4,426,632 2

Page 1 of 1 Legal Well Name: UNIVERSITY 244 3HM API/UWI: 4238338873 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: 11-14-469-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/23/215 Report Number: 7 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 239.88 Job Day (days): 217. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $3,415 Cum Field Est To Date (Cost): $565,213 Current Status: 24 Hour Forecast: SUSPEND REPORTS UNTIL FRAC DATE SECURE 24 Hour Summary: INSTALL FRAC TREE/STACK Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : : 24. BOPS PP NU FRAC TREE / STACK Printed Date: 7/24/215 Printed Time: 9:46 AM

Page 1 of 1 Legal Well Name: UNIVERSITY 244 3HM API/UWI: 4238338873 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: 11-14-469-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/24/215 Report Number: 8 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 24.88 Job Day (days): 218. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $3,415 Cum Field Est To Date (Cost): $568,628 Current Status: 24 Hour Forecast: RIG UP FRAC AND MAINTENANCE EQUIPMENT 24 Hour Summary: RIG UP FRAC AND MAINTENANCE EQUIPMENT Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : : 24. RU_RD PP RIG UP FRAC AND MAINTENANCE EQUIPMENT Printed Date: 7/25/215 Printed Time: 9:45 AM

Page 1 of 1 Legal Well Name: UNIVERSITY 244 3HM API/UWI: 4238338873 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: 11-14-469-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/25/215 Report Number: 8 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 241.88 Job Day (days): 219. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $11,435 Cum Field Est To Date (Cost): $576,648 Current Status: 24 Hour Forecast: RIG UP FRAC AND MAINTENANCE EQUIPMENT 24 Hour Summary: RIG UP FRAC AND MAINTENANCE EQUIPMENT Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : : 24. RU_RD PP RIG UP FRAC AND MAINTENANCE EQUIPMENT Printed Date: 7/26/215 Printed Time: 9:45 AM

Page 1 of 1 Legal Well Name: UNIVERSITY 244 3HM API/UWI: 4238338873 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: 11-14-469-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/26/215 Report Number: 9 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 242.88 Job Day (days): 22. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $12,725 Cum Field Est To Date (Cost): $589,373 Current Status: 24 Hour Forecast: BEGIN STAGE FRAC 24 Hour Summary: RIG UP FRAC AND MAINTENANCE EQUIPMENT Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : : 24. RU_RD PP RIG UP AND MAINTENANCE EQUIPMENT Printed Date: 7/27/215 Printed Time: 9:45 AM

Page 1 of 2 Legal Well Name: UNIVERSITY 244 3HM API/UWI: 4238338873 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: 11-14-469-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/27/215 Report Number: 1 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 243.88 Job Day (days): 221. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,1 Cum Field Est To Date (Cost): $68,473 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: BEGIN STAGE FRAC: FRAC STAGES 1 THRU 2 Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : 7:15 7.25 Stim, MIRU, MIRU RU_RD PP FINISH RIG UP AND MAINTENANCE 15 MIN SAFETY MEETING BEFORE START FRAC 7:15 12:45 5.5 Stim, STAGE 1, STIMULATION STIM PP FRAC STAGE 1: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 48 BBLS HCl, 543 BBLS Slickwater, 1258 BBLS Linear Gel, BBLS, 23734# 1 Mesh, 18978# 4/7, #, #, TOTAL PROP = 42712#, TOTAL LTR = 6736 BBLS. AVG PRES = 6486 PSI, MAX PRES = 7634, AVG RATE = 71.7 BPM, MAX RATE = 73.1 BPM, ISIP = 3846 PSI, FG =.8784 PSI/FT. 3 HRS LATE ON START DUE TO FRAC, RESTRAINTS & FUELING 12:45 18:22 5.63 Stim, STAGE 2, CHANGE-OVER PERF PP PERF STAGE 2: RU RENEGADE & LUBRICATOR. LOAD & TEST LUBRICATOR TO 7,75 PSI. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4 SPF. 2-1 FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 6 SPF.PUMP PLUG AND GUNS DN W/ 291 BBLS TFW @ 17.2 BPM @ 5,345 PSI. SET PLUG @ 15,583'. PERF'D MIDDLE WOLFCAMP @ 15,558' - 15,46'; 15,522' - 15,524'; 15,498' - 15,5'; 15,468' - 15,47'; 15,434' - 15,435'; 15,48' - 15,49'.TOTAL 48 HOLES. POOH RUNNING CCL LOG. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER SAFETY MEETING 18:22 18:34.2 Stim, STAGE 2, STIMULATION WOO PP CHANGE OVER TIME 18:34 21:26 2.86 Stim, STAGE 3, PERFORATE STIM PP FRAC STAGE 2: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4893 BBLS Slickwater, 137 BBLS Linear Gel, BBLS, 23846# 1 Mesh, 19176# 4/7, #, #, TOTAL PROP = 4322#, TOTAL LTR = 6578 BBLS. AVG PRES = 7474 PSI, MAX PRES = 9344, AVG RATE = 7.4 BPM, MAX RATE = 71.2 BPM, ISIP = 3741 PSI, FG =.8666 PSI/FT. Printed Date: 7/28/215 Printed Time: 9:46 AM

Page 2 of 2 Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details 21:26 23:55 2.48 Stim, STAGE 3, CHANGE-OVER PERF PP PERF STAGE 3: RU RENEGADE & LUBRICATOR. LOAD & TEST LUBRICATOR TO 7,75 PSI. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4 SPF. 2-1 FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 6 SPF.PUMP PLUG AND GUNS DN W/ 34 BBLS TFW @ 16.2 BPM @ 5,939 PSI. SET PLUG @ 15,37'. PERF'D MIDDLE WOLFCAMP @ 15,35' - 15,352'; 15,328' - 15,33'; 15,298' - 15,3'; 15,268' - 15,27'; 15,238' - 15,239'; 15,212' - 15,213'.TOTAL 48 HOLES. POOH RUNNING CCL LOG. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER SAFETY MEETING 23:55 :.8 Stim, STAGE 3, CHANGE-OVER WOO PP CHANGE OVER TIME, WAIT ON CACTUS TO TIGHTEN BONNET FLANGE ON FLOW CROSS Printed Date: 7/28/215 Printed Time: 9:46 AM

Page 1 of 2 Legal Well Name: UNIVERSITY 244 3HM API/UWI: 4238338873 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: 11-14-469-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/28/215 Report Number: 11 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 244.88 Job Day (days): 222. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $2,65 Cum Field Est To Date (Cost): $629,123 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC: FRAC STAGES 3 THRU 7 : 1:1 1.17 Stim, STAGE 3, STIMULATION WOO PN CONTINUE CHANGE OVER TIME, CACTUS TO FIX BONNET ON FLOW CROSS 1:1 3:25 2.25 Stim, STAGE 4, PERFORATE STIM PP FRAC STAGE 3: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4765 BBLS Slickwater, 1633 BBLS Linear Gel, BBLS, 23868# 1 Mesh, 18847# 4/7, #, #, TOTAL PROP = 42715#, TOTAL LTR = 6762 BBLS. AVG PRES = 565 PSI, MAX PRES = 721, AVG RATE = 71 BPM, MAX RATE = 72.5 BPM, ISIP = 3745 PSI, FG =.8676 PSI/FT. 3:25 5:3 2.8 Stim, STAGE 4, PERFORATE PERF PP PERF STAGE 4: RU RENEGADE & LUBRICATOR. LOAD & TEST LUBRICATOR TO 7,75 PSI. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4 SPF. 2-1 FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 6 SPF.PUMP PLUG AND GUNS DN W/ 318 BBLS TFW @ 17.7 BPM @ 4,859 PSI. SET PLUG @ 15,15183'. PERF'D MIDDLE WOLFCAMP @ 15,156' - 15,158'; 15,128' - 15,13'; 15,98' - 15,1'; 15,68' - 15,7'; 15,4' - 15,41'; 15,8' - 15,9'.TOTAL 48 HOLES. POOH RUNNING CCL LOG. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER 5:3 5:42.2 Stim, STAGE 4, CHANGE-OVER WOO PP CHANGE OVER TIME 5:42 7:3 1.8 Stim, STAGE 4, STIMULATION STIM PP FRAC STAGE 4: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4839 BBLS Slickwater, 1385 BBLS Linear Gel, BBLS, 23596# 1 Mesh, 18952# 4/7, #, #, TOTAL PROP = 42548#, TOTAL LTR = 6566 BBLS. AVG PRES = 6376 PSI, MAX PRES = 797, AVG RATE = 73.1 BPM, MAX RATE = 74.1 BPM, ISIP = 3898 PSI, FG =.8855 PSI/FT. 7:3 1:2 2.84 Stim, STAGE 5, CHANGE-OVER PERF PP PERF STAGE 5: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 312 BBLS TFW @ 18. BPM @ 4,26 PSI. SET PLUG @ 14,983'. PERF'D MIDDLE WOLFCAMP @ 14,958' - 14,96'; 14,926' - 14,928'; 14,894' - 14,896'; 14,862' - 14,864'; 14,826' - 14,827'; 14,798' - 14,799';14,766'- 14,767'; 14,734'- 14,735'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. SAFETY MEETING. 1:2 1:4.33 Stim, STAGE 5, STIMULATION WOO PP CHANGE OVER TIME. Printed Date: 7/29/215 Printed Time: 9:45 AM

Page 2 of 2 1:4 13:8 2.47 Stim, STAGE 6, PERFORATE STIM PP FRAC STAGE 5: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 5718 BBLS Slickwater, 1759 BBLS Linear Gel, BBLS, 28438# 1 Mesh, 28178# 4/7, #, #, TOTAL PROP = 56616#, TOTAL LTR = 7813 BBLS. AVG PRES = 6419 PSI, MAX PRES = 6989, AVG RATE = 8.5 BPM, MAX RATE = 82.1 BPM, ISIP = 4234 PSI, FG =.9248 PSI/FT. 13:8 15:33 2.42 Stim, STAGE 6, CHANGE-OVER PERF PP PERF STAGE 6: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 273 BBLS TFW @ 17.7 BPM @ 4,68 PSI. SET PLUG @ 14,712'. PERF'D MIDDLE WOLFCAMP @ 14,684' - 14,686'; 14,654' - 14,656'; 14,624' - 14,626'; 14,594' - 14,596'; 14,564' - 14,565'; 14,532' - 14,533'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 15:33 15:39.1 Stim, STAGE 6, STIMULATION WOO PP CHANGE OVER TIME. 15:39 17:3 1.85 Stim, STAGE 7, PERFORATE STIM PP Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 475 BBLS Slickwater, 1994 BBLS Linear Gel, BBLS, 23754# 1 Mesh, 198# 4/7, #, #, TOTAL PROP = 42834#, TOTAL LTR = 6366 BBLS. AVG PRES = 638 PSI, MAX PRES = 744, AVG RATE = 7.4 BPM, MAX RATE = 72.1 BPM, ISIP = 4349 PSI, FG =.9383 PSI/FT. 17:3 19:3 2. Stim, STAGE 7, CHANGE-OVER PERF PP PERF STAGE 7: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 254 BBLS TFW @ 17.5 BPM @ 4,279 PSI. SET PLUG @ 14,59'. PERF'D MIDDLE WOLFCAMP @ 14,484' - 14,486'; 14,452' - 14,454'; 14,424' - 14,426'; 14,394' - 14,396'; 14,364' - 14,365'; 14,338' - 14,339'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 19:3 19:53.38 Stim, STAGE 7, STIMULATION WOO PP CHANGE OVER TIME 19:53 21:45 1.87 Stim, STAGE 8, PERFORATE STIM PP Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4741 BBLS Slickwater, 1322 BBLS Linear Gel, BBLS, 2364# 1 Mesh, 1898# 4/7, #, #, TOTAL PROP = 4262#, TOTAL LTR = 6341 BBLS. AVG PRES = 621 PSI, MAX PRES = 6647, AVG RATE = 7.36 BPM, MAX RATE = 71.3 BPM, ISIP = 415 PSI, FG =.8995 PSI/FT. 21:45 23:45 2. Stim, STAGE 8, CHANGE-OVER PERF PP PERF STAGE 8: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 251 BBLS TFW @ 17.6 BPM @ 4,138 PSI. SET PLUG @ 14,39'. PERF'D MIDDLE WOLFCAMP @ 14,284' - 14,286'; 14,252' - 14,254'; 14,22' - 14,222'; 14,188' - 14,19'; 14,156' - 14,157'; 14,12' - 14,121'; 14,92' - 14,93'; 14,6' - 14,61'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 23:45 23:52.12 Stim, STAGE 8, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 7/29/215 Printed Time: 9:45 AM

Page 1 of 2 Legal Well Name: UNIVERSITY 244 3HM API/UWI: 4238338873 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: 11-14-469-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/29/215 Report Number: 12 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 245.88 Job Day (days): 223. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $22,449 Cum Field Est To Date (Cost): $651,572 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC 8 THRU 11 : 1:52 1.88 Stim, STAGE 8, STIMULATION STIM PP Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 566 BBLS Slickwater, 1767 BBLS Linear Gel, BBLS, 28662# 1 Mesh, 28646# 4/7, #, #, TOTAL PROP = 5738#, TOTAL LTR = 772 BBLS. AVG PRES = 6385.5 PSI, MAX PRES = 6911, AVG RATE = 8.6 BPM, MAX RATE = 82.3 BPM, ISIP = 3937 PSI, FG =.895 PSI/FT. 1:52 3:57 2.8 Stim, STAGE 9, CHANGE-OVER PERF PP PERF STAGE 9: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 212 BBLS TFW @ 17.6 BPM @ 4,191 PSI. SET PLUG @ 14,34'. PERF'D MIDDLE WOLFCAMP @ 14,1' - 14,12'; 13,98' - 13,982'; 13,95' - 13,952'; 13,92' - 13,89'; 13,892' - 13,891'; 13,86' - 13,861'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 3:57 4:12.25 Stim, STAGE 9, STIMULATION WOO PP CHANGE OVER TIME 4:12 5:55 1.72 Stim, STAGE 1, PERFORATE STIM PP FRAC STAGE 9: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 451 BBLS Slickwater, 1458 BBLS Linear Gel, BBLS, 23919# 1 Mesh, 18832# 4/7, #, #, TOTAL PROP = 42751#, TOTAL LTR = 6195 BBLS. AVG PRES = 679 PSI, MAX PRES = 6687, AVG RATE = 72.1 BPM, MAX RATE = 73.6 BPM, ISIP = 429 PSI, FG =.913 PSI/FT. 5:55 7:57 2.3 Stim, STAGE 1, CHANGE-OVER PERF PP PERF STAGE 1: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 195 BBLS TFW @ 17. BPM @ 4,15 PSI. SET PLUG @ 13,84'. PERF'D MIDDLE WOLFCAMP @ 13,81' - 13,812'; 13,78' - 13,782'; 13,75' - 13,752'; 13,72' - 13,722'; 13,69' - 13,691'; 13,664' - 13,665'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. SAFETY MEETING: 7:42-7:57 7:57 8:15.3 Stim, STAGE 1, STIMULATION WOO PP CHANGE OVER TIME. 8:15 1:43 2.46 Stim, STAGE 11, PERFORATE STIM PP FRAC STAGE 1: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 5212 BBLS Slickwater, 1213 BBLS Linear Gel, BBLS, 23898# 1 Mesh, 18988# 4/7, #, #, TOTAL PROP = 42886#, TOTAL LTR = 6644 BBLS. AVG PRES = 5964 PSI, MAX PRES = 6596, AVG RATE = 69.4 BPM, MAX RATE = 7.7 BPM, ISIP = 41 PSI, FG =.8992 PSI/FT. Printed Date: 7/3/215 Printed Time: 9:46 AM

Page 2 of 2 1:43 19:25 8.7 Stim, STAGE 11, CHANGE-OVER PERF PN GREASE FRAC VALVES: ( 1:43-11:17 ). RENEGADE DN GREASE PUMP: ( 11:17-17:32) PERF STAGE 11: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 253 BBLS TFW @ 18.4 BPM @ 4,331 PSI. SET PLUG @ 13,635'. PERF'D MIDDLE WOLFCAMP @ 13,61' - 13,612'; 13,578' - 13,58'; 13,546' - 13,548'; 13,514' - 13,516'; 13,482' - 13,483'; 13,45' - 13,451'; 13,418'- 13,419'; 13,386-13,387'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 19:25 19:5.42 Stim, STAGE 11, STIMULATION WOO PP CHANGE OVER TIME 19:5 21:52 2.3 Stim, STAGE 12, PERFORATE STIM PP FRAC STAGE 11:Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 5569 BBLS Slickwater, 1934 BBLS Linear Gel, BBLS, 2881# 1 Mesh, 27952# 4/7, #, #, TOTAL PROP = 56762#, TOTAL LTR = 7794 BBLS. AVG PRES = 6298 PSI, MAX PRES = 6745, AVG RATE = 8.1 BPM, MAX RATE = 82 BPM, ISIP = 3955 PSI, FG =.8928 PSI/FT. 21:52 23:36 1.73 Stim, STAGE 12, PERFORATE PERF PP PERF STAGE 12: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 224 BBLS TFW @ 17.1 BPM @ 4,422 PSI. SET PLUG @ 13,364'. PERF'D MIDDLE WOLFCAMP @ 13,336' - 13,338'; 13,34' - 13,36'; 13,266' - 13,268'; 13,24' - 13,242'; 13,28' - 13,29'; 13,176' - 13,177'; 13,146'- 13,147'; 13,112-13,113'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 23:36 :.4 Stim, STAGE 12, CHANGE-OVER WOO PP CHANGE OVER TIME Printed Date: 7/3/215 Printed Time: 9:46 AM

Page 1 of 3 Legal Well Name: UNIVERSITY 244 3HM API/UWI: 4238338873 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: 11-14-469-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/3/215 Report Number: 13 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 246.88 Job Day (days): 224. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,18 Cum Field Est To Date (Cost): $67,752 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC 12 THRU 18 : :3.5 Stim, STAGE 12, CHANGE-OVER WOO PP CHANGE OVER TIME :3 2:1 1.97 Stim, STAGE 13, PERFORATE STIM PP STAGE 12: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 5433 BBLS Slickwater, 294 BBLS Linear Gel, BBLS, 28464# 1 Mesh, 28417# 4/7, #, #, TOTAL PROP = 56881#, TOTAL LTR = 7775 BBLS. AVG PRES = 644 PSI, MAX PRES = 7444, AVG RATE = 79.8 BPM, MAX RATE = 81.1 BPM, ISIP = 3734 PSI, FG =.8672 PSI/FT. 2:1 3:5 1.82 Stim, STAGE 13, CHANGE-OVER PERF PP PERF STAGE 13: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 25 BBLS TFW @ 17.3 BPM @ 3,919 PSI. SET PLUG @ 13,87'. PERF'D MIDDLE WOLFCAMP @ 13,56' - 13,58'; 13,32' - 13,34'; 13,2' - 13,4'; 12,969' - 12,971'; 13,942' - 12,943'; 12,914' - 12,915'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 3:5 3:59.15 Stim, STAGE 13, STIMULATION WOO PP CHANGE OVER TIME 3:59 5:46 1.78 Stim, STAGE 14, PERFORATE STIM PP STAGE 13: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4463 BBLS Slickwater, 1477 BBLS Linear Gel, BBLS, 2378# 1 Mesh, 18938# 4/7, #, #, TOTAL PROP = 42646#, TOTAL LTR = 6169 BBLS. AVG PRES = 6359 PSI, MAX PRES = 7518, AVG RATE = 71 BPM, MAX RATE = 71.9 BPM, ISIP = 41 PSI, FG =.8994 PSI/FT. 5:46 7:41 1.92 Stim, STAGE 14, CHANGE-OVER PERF PP PERF STAGE 14: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 24 BBLS TFW @ 17. BPM @ 41 PSI. SET PLUG @ 12,887'. PERF'D MIDDLE WOLFCAMP @ 12,86' - 12,862'; 12,83' - 12,832'; 12,798' - 12,8'; 12,766' - 12,768'; 12,732' - 12,733'; 12,74' - 12,75'; 12,67'- 12,671'; 12,638'- 12,639'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. SAFETY MEETING: 7:27-7:41 7:41 7:53.2 Stim, STAGE 14, STIMULATION WOO PP CHANGE OVER TIME. Printed Date: 7/31/215 Printed Time: 9:46 AM

Page 2 of 3 7:53 9:54 2.1 Stim, STAGE 14, STIMULATION STIM PP FRAC STAGE 14: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4721 BBLS Slickwater, 1234 BBLS Linear Gel, BBLS, 23548# 1 Mesh, 19138# 4/7, #, #, TOTAL PROP = 42686#, TOTAL LTR = 6183 BBLS. AVG PRES = 5945 PSI, MAX PRES = 698, AVG RATE = 66.1 BPM, MAX RATE = 72.6 BPM, ISIP = 4141 PSI, FG =.9147 PSI/FT. 9:54 11:33 1.65 Stim, STAGE 15, PERFORATE PERF PP PERF STAGE 15: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 186 BBLS TFW @ 17. BPM @ 4287 PSI. SET PLUG @ 12,611'. PERF'D MIDDLE WOLFCAMP @ 12,588' - 12,59'; 12,556' - 12,558'; 12,524' - 12,526'; 12,496' - 12,498'; 12,462' - 12,463'; 12,428' - 12,429'; 12,396'- 12,397'; 12,364'- 12,365'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 11:33 11:45.2 Stim, STAGE 15, CHANGE-OVER WOO PP CHANGE OVER TIME. 11:45 14:1 2.42 Stim, STAGE 16, PERFORATE STIM PP FRAC STAGE 15: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 5627 BBLS Slickwater, 1696 BBLS Linear Gel, BBLS, 28628# 1 Mesh, 284# 4/7, #, #, TOTAL PROP = 5728#, TOTAL LTR = 7533 BBLS. AVG PRES = 6265 PSI, MAX PRES = 6764, AVG RATE = 79 BPM, MAX RATE = 8.8 BPM, ISIP = 3991 PSI, FG =.8976 PSI/FT. 14:1 15:39 1.48 Stim, STAGE 16, PERFORATE PERF PP PERF STAGE 16: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 149 BBLS TFW @ 17. BPM @ 3988 PSI. SET PLUG @ 12,34'. PERF'D MIDDLE WOLFCAMP @ 12,314' - 12,316'; 12,284' - 12,286'; 12,25' - 12,252'; 12,224' - 12,226'; 12,194' - 12,195'; 12,164' - 12,165'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 15:39 15:56.29 Stim, STAGE 16, STIMULATION WOO PP CHANGE OVER TIME 15:56 17:42 1.77 Stim, STAGE 17, PERFORATE STIM PP FRAC STAGE 16: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 431 BBLS Slickwater, 1534 BBLS Linear Gel, BBLS, 2381# 1 Mesh, 18842# 4/7, #, #, TOTAL PROP = 42652#, TOTAL LTR = 68 BBLS. AVG PRES = 5932 PSI, MAX PRES = 6568, AVG RATE = 69.6 BPM, MAX RATE = 7.9 BPM, ISIP = 3781 PSI, FG =.8735 PSI/FT. 17:42 19:12 1.5 Stim, STAGE 17, CHANGE-OVER PERF PP PERF STAGE 17: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 157 BBLS TFW @ 18.1 BPM @ 4 PSI. SET PLUG @ 12,142'. PERF'D MIDDLE WOLFCAMP @ 12,114' - 12,116'; 12,82' - 12,84'; 12,48' - 12,5'; 12,18' - 12,2'; 11,986-11,987'; 11,954' - 11,955'; 11,922'- 11,923'; 11,892'- 11,893'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 19:12 19:31.32 Stim, STAGE 17, STIMULATION WOO PP CHANGE OVER TIME 19:31 21:22 1.85 Stim, STAGE 18, PERFORATE STIM PP STAGE 17. Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4377 BBLS Slickwater, 1625 BBLS Linear Gel, BBLS, 2388# 1 Mesh, 18796# 4/7, #, #, TOTAL PROP = 42676#, TOTAL LTR = 6183 BBLS. AVG PRES = 6398 PSI, MAX PRES = 7331, AVG RATE = 7.9 BPM, MAX RATE = 72.1 BPM, ISIP = 3727 PSI, FG =.8672 PSI/FT. Printed Date: 7/31/215 Printed Time: 9:46 AM

Page 3 of 3 21:22 22:52 1.5 Stim, STAGE 18, PERFORATE PERF PP PERF STAGE 18: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 127 BBLS TFW @ 17.6 BPM @ 4 PSI. SET PLUG @ 11,865'. PERF'D MIDDLE WOLFCAMP @ 11,838' - 11,84'; 11,81' - 11,812'; 11,78' - 11,782'; 11,75' - 11,752'; 11,722' - 11,723'; 11,69' - 11,691'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 22:52 22:58.1 Stim, STAGE 18, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 7/31/215 Printed Time: 9:46 AM

Page 1 of 3 Legal Well Name: UNIVERSITY 244 3HM API/UWI: 4238338873 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: 11-14-469-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/31/215 Report Number: 14 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 247.88 Job Day (days): 225. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $2,28 Cum Field Est To Date (Cost): $691,32 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE 19 THRU 23 : :45.75 Stim, STAGE 18, STIMULATION STIM PP STAGE 18; Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4377 BBLS Slickwater, 1625 BBLS Linear Gel, BBLS, 2388# 1 Mesh, 18796# 4/7, #, #, TOTAL PROP = 42676#, TOTAL LTR = 6183 BBLS. AVG PRES = 6398 PSI, MAX PRES = 7331, AVG RATE = 7.9 BPM, MAX RATE = 72.1 BPM, ISIP = 3727 PSI, FG =.8672 PSI/FT. :45 2:21 1.6 Stim, STAGE 19, PERFORATE PERF PP PERF STAGE 19: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 161 BBLS TFW @ 18. BPM @ 428 PSI. SET PLUG @ 11,665'. PERF'D MIDDLE WOLFCAMP @ 11,64' - 11,642'; 11,68' - 11,61'; 11,576' - 11,578'; 11,542' - 11,544'; 11,512-11,513'; 11,48' - 11,481'; 11,448'- 11,449'; 11,414'- 11,415'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 2:21 2:39.3 Stim, STAGE 19, CHANGE-OVER WOO PP CHANGE OVER TIME 2:39 4:36 1.95 Stim, STAGE 19, STIMULATION STIM PP STAGE 19. Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4377 BBLS Slickwater, 1625 BBLS Linear Gel, BBLS, 2388# 1 Mesh, 18796# 4/7, #, #, TOTAL PROP = 42676#, TOTAL LTR = 6183 BBLS. AVG PRES = 6398 PSI, MAX PRES = 7331, AVG RATE = 7.9 BPM, MAX RATE = 72.1 BPM, ISIP = 3727 PSI, FG =.8672 PSI/FT. 4:36 6:1 1.58 Stim, STAGE 2, CHANGE-OVER PERF PP PERF STAGE 2: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 94 BBLS TFW @ 17.4 BPM @ 3972 PSI. SET PLUG @ 11,391'. PERF'D MIDDLE WOLFCAMP @ 11,366' - 11,368'; 11,34' - 11,342'; 11,36' - 11,38'; 11,276' - 11,278'; 11,242-11,243'; 11,216' - 11,217'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 6:1 6:27.28 Stim, STAGE 2, STIMULATION WOO PP CHANGE OVER TIME 6:27 9:31 3.7 Stim, STAGE 21, PERFORATE STIM PN STAGE FRAC 2: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4677 BBLS Slickwater, 1226 BBLS Linear Gel, BBLS, 2392# 1 Mesh, 19174# 4/7, #, #, TOTAL PROP = 4376#, TOTAL LTR = 621 BBLS. AVG PRES = 5683 PSI, MAX PRES = 628, AVG RATE = 71.3 BPM, MAX RATE = 72.3 BPM, ISIP = 465 PSI, FG =.969 PSI/FT. UNIVERSAL CHANGE OUT BLEED OFF VALVE: DOWN TIME :52. ( 6:27-7:19 ). Printed Date: 8/1/215 Printed Time: 9:46 AM

Page 2 of 3 9:31 11:45 2.23 Stim, STAGE 21, CHANGE-OVER PERF PP PERF STAGE 21: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 113 BBLS TFW @ 16. BPM @ 3924 PSI. SET PLUG @ 11,191'. PERF'D MIDDLE WOLFCAMP @ 11,161' - 11,163'; 11,136' - 11,138'; 11,16' - 11,18'; 11,76' - 11,78'; 11,5-11,51'; 11,16' - 11,17'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER GREASE FRAC VALVES: ( 9:31-1: ). SAFETY MEETING: ( 11:3-11:45 ). 11:45 12:3.3 Stim, STAGE 21, STIMULATION WOO PP CHANGE OVER TIME 12:3 13:55 1.86 Stim, STAGE 22, PERFORATE STIM PP FRAC STAGE 21: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4713 BBLS Slickwater, 1175 BBLS Linear Gel, BBLS, 23248# 1 Mesh, 19198# 4/7, #, #, TOTAL PROP = 42446#, TOTAL LTR = 625 BBLS. AVG PRES = 6141 PSI, MAX PRES = 729, AVG RATE = 69.2 BPM, MAX RATE = 71.3 BPM, ISIP = 3994 PSI, FG =.8991 PSI/FT. 13:55 15:28 1.55 Stim, STAGE 22, CHANGE-OVER PERF PP PERF STAGE 22: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 12 BBLS TFW @ 16.5 BPM @ 413 PSI. SET PLUG @ 1,991'. PERF'D MIDDLE WOLFCAMP @ 1,966' - 1,968'; 1,936' - 1,938'; 1,96' - 1,98'; 1,879' - 1,881'; 1,846' - 1,847'; 1,816' - 1,817'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 15:28 15:43.25 Stim, STAGE 22, STIMULATION WOO PP CHANGE OVER TIME 15:43 17:31 1.8 Stim, STAGE 23, PERFORATE STIM PP STAGE FRAC 22: Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4453 BBLS Slickwater, 143 BBLS Linear Gel, BBLS, 2434# 1 Mesh, 1954# 4/7, #, #, TOTAL PROP = 4388#, TOTAL LTR = 69 BBLS. AVG PRES = 6248 PSI, MAX PRES = 7331, AVG RATE = 68.7 BPM, MAX RATE = 7.2 BPM, ISIP = 3869 PSI, FG =.8842 PSI/FT. 17:31 19:5 1.57 Stim, STAGE 23, PERFORATE PERF PP PERF STAGE 23: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 98 BBLS TFW @ 16.9 BPM @ 393 PSI. SET PLUG @ 1,796'. PERF'D MIDDLE WOLFCAMP @ 1,766' - 1,768'; 1,736' - 1,738'; 1,74' - 1,76'; 1,676' - 1,678'; 1,646' - 1,647'; 1,616' - 1,617'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 19:5 19:23.3 Stim, STAGE 23, CHANGE-OVER WOO PP CHANGE OVER TIME 19:23 21:8 1.75 Stim, STAGE 24, PERFORATE STIM PP STAGE 23. Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 433 BBLS Slickwater, 1394 BBLS Linear Gel, BBLS, 23958# 1 Mesh, 1832# 4/7, #, #, TOTAL PROP = 4199#, TOTAL LTR = 5846 BBLS. AVG PRES = 5976 PSI, MAX PRES = 671, AVG RATE = 7.7 BPM, MAX RATE = 72.1 BPM, ISIP = 3923 PSI, FG =.894 PSI/FT. 21:8 22:53 1.75 Stim, STAGE 24, CHANGE-OVER PERF PP PERF STAGE 24: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 58 BBLS TFW @ 15.8 BPM @ 3782 PSI. SET PLUG @ 1,591'. PERF'D MIDDLE WOLFCAMP @ 1,566' - 1,568'; 1,532' - 1,534'; 1,56' - 1,58'; 1,476' - 1,478'; 1,446' - 1,447'; 1,416' - 1,417'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. Printed Date: 8/1/215 Printed Time: 9:46 AM

Page 3 of 3 22:53 23:.12 Stim, STAGE 24, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 8/1/215 Printed Time: 9:46 AM

Page 1 of 3 Legal Well Name: UNIVERSITY 244 3HM API/UWI: 4238338873 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 11/26/214 3: District: SE District Location Note: SEC 24, BLK 58, UL, 25' FNL & 179' FWL Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 16, Target Formation: MIDDLE WOLFCAMP Spud Date: 11/26/214 AFE Number: 11-14-469-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/1/215 Report Number: 15 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 248.88 Job Day (days): 226. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,6 Cum Field Est To Date (Cost): $71,632 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC 24 THRU 29 : :48.8 Stim, STAGE 24, STIMULATION STIM PP STAGE 24. Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 439 BBLS Slickwater, 1447 BBLS Linear Gel, BBLS, 23972# 1 Mesh, 19524# 4/7, #, #, TOTAL PROP = 43496#, TOTAL LTR = 5927 BBLS. AVG PRES = 6112 PSI, MAX PRES = 6852, AVG RATE = 7.7 BPM, MAX RATE = 72.1 BPM, ISIP = 395 PSI, FG =.8884 PSI/FT :48 2:3 1.7 Stim, STAGE 25, PERFORATE PERF PP PERF STAGE 25: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/ 85 BBLS TFW @ 15.1 BPM @ 395 PSI. SET PLUG @ 1,391'. PERF'D MIDDLE WOLFCAMP @ 1,364' - 1,366'; 1,334' - 1,336'; 1,32' - 1,34'; 1,27' - 1,272'; 1,234' - 1,235'; 1,26' - 1,27'; 1,174' - 1,175'; 1,142' - 1,143'. TOTAL 56 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 2:3 2:37.13 Stim, STAGE 25, STIMULATION WOO PP CHANGE OVER TIME 2:37 5:12 2.58 Stim, STAGE 26, PERFORATE STIM PP STAGE 25. Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 439 BBLS Slickwater, 1447 BBLS Linear Gel, BBLS, 23972# 1 Mesh, 19524# 4/7, #, #, TOTAL PROP = 43496#, TOTAL LTR = 5927 BBLS. AVG PRES = 6112 PSI, MAX PRES = 6852, AVG RATE = 7.7 BPM, MAX RATE = 72.1 BPM, ISIP = 395 PSI, FG =.8884 PSI/FT. 5:12 6:47 1.58 Stim, STAGE 26, CHANGE-OVER PERF PP PERF STAGE 26: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 76 BBLS TFW @ 15.6 BPM @ 36 PSI. SET PLUG @ 1,18'. PERF'D MIDDLE WOLFCAMP @ 1,88' - 1,9'; 1,62' - 1,64'; 1,28' - 1,3'; 1,2' - 1,4'; 9,972' - 9,973'; 9,942' - 9,943'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 6:47 7:12.42 Stim, STAGE 26, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 8/2/215 Printed Time: 9:45 AM

Page 2 of 3 7:12 8:57 1.74 Stim, STAGE 26, STIMULATION STIM PP STAGE 26 - Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4413 BBLS Slickwater, 1438 BBLS Linear Gel, BBLS, 23712# 1 Mesh, 18996# 4/7, #, #, TOTAL PROP = 4278#, TOTAL LTR = 5951 BBLS. AVG PRES = 5631 PSI, MAX PRES = 69, AVG RATE = 69.2 BPM, MAX RATE = 7.8 BPM, ISIP = 3763 PSI, FG =.8718 PSI/FT. 8:57 1:42 1.76 Stim, STAGE 27, CHANGE-OVER PERF PP PERF STAGE 27: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 6 BBLS TFW @ 17. BPM @ 3659 PSI. SET PLUG @ 9,917'. PERF'D MIDDLE WOLFCAMP @ 9,892' - 9,894'; 9,862' - 9,864'; 9,832' - 9,834'; 9,796' - 9,798'; 9,772' - 9,773'; 9,742' - 9,743'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. SAFETY MEETING: (1:29-1:42 ). 1:42 11:.3 Stim, STAGE 27, STIMULATION WOO PP CHANGE OVER TIME 11: 13: 2. Stim, STAGE 28, PERFORATE STIM PP STAGE 27 - Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4681 BBLS Slickwater, 1884 BBLS Linear Gel, BBLS, 23686# 1 Mesh, 19162# 4/7, #, #, TOTAL PROP = 42848#, TOTAL LTR = 6649 BBLS. AVG PRES = 513 PSI, MAX PRES = 6437, AVG RATE = 66.8 BPM, MAX RATE = 69.9 BPM, ISIP = 3929 PSI, FG =.8912 PSI/FT. 13: 14:38 1.63 Stim, STAGE 28, CHANGE-OVER PERF PP PERF STAGE 28: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 52 BBLS TFW @ 17. BPM @ 3527 PSI. SET PLUG @ 9,724'. PERF'D MIDDLE WOLFCAMP @ 9,692' - 9,694'; 9,662' - 9,664'; 9,634' - 9,636'; 9,62' - 9,64'; 9,572' - 9,573'; 9,538' - 9,539'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 14:38 14:53.25 Stim, STAGE 28, STIMULATION WOO PP CHANGE OVER TIME 14:53 16:41 1.8 Stim, STAGE 29, PERFORATE STIM PP STAGE 28 - Universal TO FRAC Wolfcamp (Middle) FORMATION. RAN 24 BBLS HCl, 4499 BBLS Slickwater, 132 BBLS Linear Gel, BBLS, 2361# 1 Mesh, 18984# 4/7, #, #, TOTAL PROP = 42594#, TOTAL LTR = 5895 BBLS. AVG PRES = 5735 PSI, MAX PRES = 639, AVG RATE = 68.7 BPM, MAX RATE = 7.2 BPM, ISIP = 3929 PSI, FG =.8912 PSI/FT. 16:41 18:18 1.62 Stim, STAGE 29, CHANGE-OVER PERF PP PERF STAGE 29: RU RENEGADE & 1K LUBE. RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2 FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 gm, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/ 58 BBLS TFW @ 16.4 BPM @ 3826 PSI. SET PLUG @ 9,517'. PERF'D MIDDLE WOLFCAMP @ 9,492' - 9,494'; 9,462' - 9,464'; 9,432' - 9,434'; 9,42' - 9,44'; 9,368' - 9,369'; 9,342' - 9,343'. TOTAL 48 HOLES. ALL SHOTS FIRED. DROP 2." OD 1.8 SG BALL SEALER. 18:18 18:3.2 Stim, STAGE 29, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 8/2/215 Printed Time: 9:45 AM