APACHE CORPORATION. Daily Land - Orig Comp Report

Similar documents
APACHE CORPORATION. Daily Land - Orig Comp Report

Drilling & Completion Summary

02/01/2013: Surveying, Luchinni & Mertz, University Emilie #3R well to be drilled. DWC: $1, CTD: $1,500.00

8/28/13: Luchini and Mertz Land Surveying Company staked location. DC: $3,250 TDC: $3,250


3/25/15 University DC 1H Devonian Completion

Completion Data. License # Rig Release Date 5/31/ :00 5/9/ :30. End Date 6/9/ :00

ExL Petroleum, LP DAILY WELL COMPLETION REPORT DATE: DAY #

Daily Drilling Report

EP WELLS DAILY OPERATIONS REPORT Report 13 05/31/2017

Daily Drilling Report

CNL, CCL, GR, CBL. RDMO

View Details... Event. In Progress. Dev Completion - Cased. Hole 09/30/2013

DAILY DRILLING REPORT


APPROACH OPERATING LLC. RIG: Latshaw rig # 22 KB: 28

Elevation Resources LLC

APPROACH OPERATING LLC. RIG: Latshaw rig #22 KB: 28

Partner - Drilling. Well Name: Fcu State/Province Texas Ground/Corrected Ground Elevation (ft) Rig

Daily Drilling Report

DATE: 01/03/ DAILY COMPLETION REPORT

Gulftex Energy III LP DAILY COMPLETION REPORT

Daily Drilling Report

Athlon Energy Operating LLC

H. H. HOWELL, INC. Inland Ocean, Inc. Dirks #4 Wildcat Field Bee County, Texas

Daily Drilling Summary Report

DATE. # OF JSA's RIG SAFETY DAYS G.P.S. COORDINATES NO 0 57 N W SAFETY MEETING TOPICS

Current Depth. Proposed TD. Current Operation

Callon Petroleum Company Drilling Report

Current Depth. Proposed TD. Current Operation

19,683 8,

DAILY DRILLING REPORT DATE : 08/01/2012

PROSPECT. BLOCK 1 CONTRACT. BASIC ENERGY 43 LEGAL.. UNIVERSITY BLK 1 SEC 27 SURF LOC. 660' FNL & 660' FWL COUNTY.. ANDREWS AFE NO..

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

DAILY DRILLING REPORT

Daily Activity Report

bbls. Cum Gel Mixed (tons) Tool pusher: Miguel Madrid (575) Assumed Pump Eff. Pump No. 1 Pump No. 2 Slow Pump R/P

EP WELLS DAILY OPERATIONS REPORT Report 36 07/16/2017

Well Name: UNIVERSITY Surface Location: 1980 FNL, 1757 FWL - WARD, TX. API Code:

2013 Latin America Perforating Symposium. SLAP-23 Perforating Options Available Today in Horizontal Shale Oil and Gas Wells. Kerry Daly, Weatherford

1042 FNL, 1935 FEL - ECTOR, TX

MORNING DRILLING REPORT

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

MLC Opertating. Released rig at 700 AM on 7/23/2015. Rigging down rig. Breakdown of Operations

Drilling & Completion Summary - Ascending

MORNING DRILLING REPORT

Elevation Resources DAILY OPERATIONS. Feb MD: TVD: FOOTAGE: MW: 0.0 LB PTD: 17,368. RIG SUPERVISOR: Jimmy Nobles PBTD:

Completion Solutions Inc.

Thru Tubing Gun Systems. Expendable Strip /8 Carrier (ESC) /8 RDX - HMX x x x x

OPERATIONS SUMMARY REPORT

PRODUCTION HYDRAULIC PACKER FIELD TEST

Ballistics on Tractor Conveyance. Brian Schwanitz- VP Welltec. MENAPS 2011, Abu Dhabi

On May 28, 2015 Freeport-McMoRan filed with DOGGR a written notice of intention to plug and abandon Fourth Ave Well #4.

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Endeavor Energy Resources, LP. DAILY DRILLING REPORT

LEE NAK GUI TCP SERVICE COORDINATOR APPS

WIF Categorization Exercise. Svein Inge Rafoss, Leading advisor well integrity completion and intervention, Statoil

MOTION DECOUPLED HYDRAULIC DELIVERY SYSTEM (MDHDS) ASSEMBLY AND DEPLOYMENT PROCEDURES

McKissick 200mt. Stabbing board

DAILY DRILLING REPORT

General Information Daily Summary Information Daily Cost Information Rig Information UL 6-40 UNIT #105LS 1 1/4/ D-003 JUSTIN/GLEN

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Casing Drilling Technology Implementation In Petrom

FOR MORE DETAILS CONTACT: SPECIFICATIONS OF 1400 HP OR EQUIVALENT ELECTRICAL LAND RIG (NOTIONAL DRILLING CAPACITY OF 4700 MTRS)

DAILY DRILLING REPORT

Report No: Operator: 1 Measured Depth (ft): Vertical Depth (ft): Proposed TD (ft): Hole Made (ft) / Hrs: Average ROP (ft/hr): Daily Drilling Report SE

Rotary Snubbing Technology Option for Long Reach

ISOLATION/UNIVERSAL TOOLS

2/7-2IS OPEN HOLE WIRELINE LOGGING SUMMARY

Composite Plugs. Index

Ideco - H25 Information Document

DAILY DRILLING REPORT

Abandonment BAS-3. Frisia Zout B.V. 4 December 2013

Maersk Venturer. Ultra deepwater drilling and development. Deepwater Advanced

DAILY OPERATIONS REPORT Date:

H. H. HOWELL, INC. Inland Ocean, Inc. Technik #6 Burns Channel Prospect Lavaca County, Texas

Intervention Barriers

JTC ENERGY GROUP, LLC. Jarmon #1D

Comparative Analysis of Production Method with PCP Systems at Rubiales Oil Field (Colombia) SPE

Atlas Copco Oil and Gas Rigs. The Predator Advantage

Using Drilling Dynamics To Reduce Drilling costs

1 st Run in Russia Novatek (largest independent gas producer) TCE700 lands intermediate 7 casing on ERD well in Yarudeyskoye field

Pressure data were read from the FMT raw data log. They were then coded for test results, test and permeability qualities. A

5 WINCHES a Quantity, make and rating of winches 1) INGERSOLL RAND, Model # D6U, 4Ton. (Rigfloor) 2) INGERSOLL RAND, Model # K6UL, 5Ton.

LOC 400 Drilling Rig

EP WELLS DAILY OPERATIONS REPORT Report 1 01/25/2017

DSI THRU-TUBING INC. Bear Claw Composite Bridge & Frac Plug Systems. Proof in Performance

DAILY OPERATIONS PARTNER 30 HOUR REPORT Date:

GEOTHERMAL WELL DRILLING COSTING A CASE STUDY OF MENENGAI GEOTHERMAL FIELD

Reimpet International Corporation Ingersoll Rand 1500E Land Drilling Rig Technical Specifications

Wyoming EORI 2nd Annual Wyoming CO2 Conference 5/29/08

With its new PACE -B Series Rig, Nabors continues to advance industry standards in drilling technology and innovation.

Plug & Abandonment Light Drilling Workover Well Intervention

QQUALITY SERVICE QUALITY PRODUCTS QUALITY PERSONNEL

High Energy Gas Fracturing Test

Vendor Item UOM Qty. Needle Valve Type MFL - 1-1/8" -12 UNF 15 K WP Each 15. Pressure Guage 1-1/8" 12UNF Each 6

SPE Improved Hydraulic Fracturing Perforation Efficiency Observed With Constant Entry Hole and Constant Penetration Perforation

RIG 32. Rig 32. Page 1 of 13

Field Overview. Central West Ecuadorian Basin Discovered in 1994 OOIP: 1,605 MBbls Maximum production rate: 65,200 bopd in year 2007 IPS-12-03

FRAC STACKS stingercanada.com

Transcription:

APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-2-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 1 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor DAVID GRAHAM / LOREN ALFORD Engineer / Geologist BRAD MCDANIEL Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: 11-14-472-CP AFE Description: County RIG PHONE NO 432-848-4555 Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 1,442 1,442 4,953,558.21 Status RUN 5 1/2" CASING AT 4434' Comment Summary 24 HR Forecast Objective PERPARE RIG FLOOR TO RIG UP CASING CREW, SAFETY MEETING AND RIG UP BUTCH'S CASING CREW, MAKE UP FLOAT EQUIPMENT AND TIH 5 1/2" CASING TO 593' CONTINUE TO TIH 5 1/2" CASING, CIRCULATE, WAIT ON CEMENT CREW From To Duration Operation Description 24 HR Operational Comments 6:3PM 7:3PM 1. RIG DOWN ELEVATORS, REMOVE ROTATING HEAD AND INSTALL TRIP NIPPLE, TAKE OIL BASE TRAYS OFF OF RIG FLOOR 7:3PM 1:PM 2.5 PJSM, RIG UP BUTCH'S CASING CREW, HYDRAULIC COUPLING BENT, HAD TO CHANGE OUT, FIRST SET OF TONGS TO RIG FLOOR WOULD NOT WORK, CHANGED OUT THEN HAD TO THAW OUT TO MAKE WORK 1:PM 12:AM 2. RUN 5 ½ CASING AS FOLLOWS TEST FLOAT EQUIPMENT 1-FLOAT SHOE = 1.5 1- #2 5 ½ P-11 TXP BTC CSG JT = 43.25 1-FLOAT COLLAR = 1.25 1-LATCH COLLAR = 1. 1-#2 5 ½ P-11 TXP BTC CSG JT = 43.26 1-ORIO VALVE = 3.45 18 - #2 5 ½ P-11 TXP BTC CSG JTS TO 593' Remarks : - 6: CONTINUE TO RUN 5 1/2" CASING FROM 593' TO 4434' Directional Information Initial Deviation Max Dev Max Dogleg 1,493 92.7 deg at 14,667 15.7 deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE 13.38 48 H-4 559. 4 22. 537. Returns at Surface INTERMEDIATE 1 9.63 48 J-55 7,539. 2,27 7,515.48 PRODUCTION 1 5.5 2 P 11, P-11 15,621.96 8,211.81 Company Name No of People Hours Today Cum / Event HORIZON MUD 1 24. 24. SDS 2 48. 48. BUTCH'S CASING DIVISON 4 48. 48. PATTERSON-UTI DRILLING 1 24. 24. CREST PUMPING 6.. PATTERSON-UTI DRILLING 1 12. 12. ENVIORMENTAL DRILLING S 2 48. 48. Personnel Total: 26 312. 312. BULKS Product QTY DIESEL, MUD 452. DIESEL, RIG FUEL 5,13. 1

APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 76 CEMENT AND CEMENTING SERVICES 17, 79 COMPANY LABOR 15, 717 CONTRACT LABOR 128, 45, 17, 15, 128, 719 CONTRACT DRILLING-DAY/TURNKEY 5,74 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 161 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 2, 5,865 5,865 721 CONTRACT SUPERVISION 5, 92 92 49,8 CONSULTANTS 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS 2,182 MUD ADDITIVES 731 EQUIPMENT RENTAL 927 SOLIDS CONTROL 731 EQUIPMENT RENTAL 35 H2S MONITORING 731 EQUIPMENT RENTAL 17 CO MAN TRAILER 731 EQUIPMENT RENTAL 9 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL ROTATING HEAD 731 EQUIPMENT RENTAL 17 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 69 GENERATORS 731 EQUIPMENT RENTAL 9 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 18 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 18 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 92 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 4 TEXAS ENERGY INTERNET 731 EQUIPMENT RENTAL 14 INTERCOMS 731 EQUIPMENT RENTAL 14 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 15 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 5 TRASH TRAILER 731 EQUIPMENT RENTAL 75 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 6 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 14 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 4, 1,475 1,475 194,135 398,525 734 FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 15, 6, 1, 1, 6,5 247,5 Total Intangible Cost 4,43, 1,442 1,442 4,392,558 7132 OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 336, 15, 2, Total Tangible Cost 561, 561, Total: 4,964, 1,442 1,442 4,953,558 2

APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-3-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 2 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor DAVID GRAHAM / LOREN ALFORD Engineer / Geologist BRAD MCDANIEL Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: Status Comment Summary 24 HR Forecast 11-14-472-CP AFE Description: County RIG PHONE NO 432-848-4555 Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 1,442 61,737 72,179 4,891,821 1.45 CEMENTING PRODUCTION CASING RUN 5 1/2" CASING F/ 593' TO 7421', SAFETY STAND DOWN PER PATTERSON, RUN 5 1/2" CASING FROM 7421' TO 15,622' Objective CIRCULATE, RIG DOWN CASING CREW, SAFETY MEETING AND RIG UP CREST, CEMENT CASING, RIG DOWN, NIPPLE DOWN AND SET SLIPS, CLEAN PITS AND RELEASE RIG From To Duration Operation Description 12:AM 11:3AM 11.5 RUN 5 1/2 PRODUCTION CASING F/ 593' TO 7421' 11:3AM 12:PM.5 INSTALL AIR SPIDER SLIPS 24 HR Operational Comments 12:PM 1:PM 1. SHUT DOWN OPERATIONS ( PER PATTERSON UTI AREA MANAGER ) DUE TO ICE FALLING FROM DERRICK 1:PM 12:AM 11. RUN 5 ½ CASING AS FOLLOWS; TEST FLOAT EQUIPMENT 1-FLOAT SHOE = 1.5 SET @ 15,62 1-#2 5 ½ HC-11 TXP BTC CSG JT = 43.25 1-FLOAT COLLAR = 1.25 SET @ 15,576. 1-LATCH SUB = 1. SET @ 15,575. 1-#2 5 ½ HC-11 TXP BTC CSG JT = 43.26 1-ORIO VALVE = 3.45 SET @ 15,528.2 6- #2 5 ½ HC-11 TXP BTC CSG, JTS, = 2,526.38 1-MARKER JT = 17.72 SET @ 12,984.1 71 - #2 5 ½ HC-11 TXP BTC CSG, JTS, = 2,978.83 1- MARKER JOINT = 21.4 SET @ 9,983.54 117- #2 5 ½ HC-11 BTC TXP CSG, JT, = 4953.54 1- MARKER JOINT = 21.93 SET @ 58.4 118 - #2 5 ½ HC-P11 BTC TXP CSG, JT,= 4978.25 TOTAL PIPE RAN = 15,629.76 SET @ 15,622.' OFF BOTTOM WITH 7.76 STICK UP RAN 9 CENTRALIZERS / NOTIFIED T.R.C. WITH PRODUCTION CEMENT INFORMATION @ 1:45 ON 1/3/15 AND TALKED TO FELICIA Remarks : - 1: CIRCULATE AND RIG DOWN BUTCH'S CASING CREW 1: - 3: CONTINUE TO CIRCULATE, CREST RIGGING UP 3: - 6: PJSM, TEST LINES AND CEMENT 5 1/2" 2# CASING Directional Information Initial Deviation Max Dev Max Dogleg 1,493 92.7 deg at 14,667 15.7 deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE 13.38 48 H-4 559. 4 22. 537. Returns at Surface INTERMEDIATE 1 9.63 48 J-55 7,539. 2,27 7,515.48 PRODUCTION 1 5.5 2 P 11, P-11 15,621.96 8,138.65 Company Name No of People Hours Today Cum / Event BUTCH'S CASING DIVISON 4 48. 96. PATTERSON-UTI DRILLING 1 12. 24. HORIZON MUD 1 24. 48. SDS 2 48. 96. ENVIORMENTAL DRILLING S 2 48. 96. PATTERSON-UTI DRILLING 1 24. 48. Personnel Total: 2 312. 624. BULKS Product QTY DIESEL, MUD. DIESEL, RIG FUEL 4,359. 1

APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 11,8 11,8 33,2 CASING CREW RAN 15,622' 5 1/2" CAS 76 CEMENT AND CEMENTING SERVICES 17, 79 COMPANY LABOR 15, 717 CONTRACT LABOR 128, 17, 15, 128, 719 CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 24,8 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 2, 5,865 25,5 31,365 721 CONTRACT SUPERVISION 5, 92 4, 4,92 45,8 CONSULTANTS 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS 2,182 1,14 3,197 MUD ADDITIVES 731 EQUIPMENT RENTAL 3 GENERATORS 731 EQUIPMENT RENTAL 15 ROTATING HEAD 731 EQUIPMENT RENTAL 8 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 325 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 39 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL 25 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 65 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 4 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 2 TRASH TRAILER 731 EQUIPMENT RENTAL 75 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 4,32 SOLIDS CONTROL 731 EQUIPMENT RENTAL 6 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 12,425 CRT AND HAND 731 EQUIPMENT RENTAL 15 H2S MONITORING 731 EQUIPMENT RENTAL 6 INTERCOMS 731 EQUIPMENT RENTAL 6 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 8 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 175 TEXAS ENERGY INTERNET 731 EQUIPMENT RENTAL 4 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 75 CO MAN TRAILER 731 EQUIPMENT RENTAL 4, 1,475 18,987 2,462 168,635 379,538 734 FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 15, 6, 1, 774 TRUCKING AND HAULING 1, 435 435 99,565 BACKHAUL AGITATOR AND NORTRAC 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 6,5 247,5 Total Intangible Cost 4,43, 1,442 61,737 72,179 4,33,821 7132 OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 336, 15, 2, Total Tangible Cost 561, 561, Total: 4,964, 1,442 61,737 72,179 4,891,821 2

APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-4-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 3 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor DAVID GRAHAM / LOREN ALFORD Engineer / Geologist BRAD MCDANIEL Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: Comment Summary 24 HR Forecast 11-14-472-CP AFE Description: County RIG PHONE NO 432-848-4555 Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 72,179 37,77 19,256 4,854,744 2.2 From To Duration Operation Description 24 HR Operational Comments 12:AM 1:AM 1. : - 1: CIRCULATE AND RIG DOWN BUTCH'S CASING CREW Objective 1:AM 3:AM 2. HELD SAFETY MEETING WITH RIG AND CREST PERSONNEL, SPOT TRUCKS AND RIG UP TO CEMENT WHILE CIRCULATING CASING 3:AM 7:AM 4. RU CREST CMT HEAD.TEST LINES TO 5 PSI. PUMP 1 BBL, 11. PPG GXT SPACER. PUMP LEAD W/ 47 SKS ( 139 BBLS) 5/5 POZ H AT 11.9 WT, 2.41 YLD,TAIL W/ 174 SKS ( 495 BBLS) CLASS H PLUS AT 13.2 WT, 1.6 YLD.DISPLACE W/ 345 BBLS FW AT 6 BPM. FCP AT 3 BPM WAS 31 PSI. BUMP PLUG AT 6:42, 1/4/215 W/ 36 PSI. GOOD CIRCULATION AND FLOATS HELD. DID NOT GET ANY OF THE GXT SPACER TO SURFACE. CREST CALCULATED TOC @ 245' USING LIFT PRESSURE 7:AM 8:AM 1. RIG DOWN AND LOAD OUT CEMENTING EQUIPMENT 8:AM NIPPLE DOWN AND LIFT STACK Directional Information Initial Deviation Max Dev Max Dogleg 1,493 92.7 deg at 14,667 15.7 deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE 13.38 48 H-4 559. 4 22. 537. Returns at Surface INTERMEDIATE 1 9.63 48 J-55 7,539. 2,27 7,515.48 PRODUCTION 1 5.5 2 P 11, P-11 15,621.96 8,138.65 Company Name No of People Hours Today Cum / Event PATTERSON-UTI DRILLING 1 12. 36. PATTERSON-UTI DRILLING 1 24. 72. SDS 2 48. 144. BUTCH'S CASING DIVISON 4 48. 144. ENVIORMENTAL DRILLING S 2 48. 144. HORIZON MUD 1 24. 72. Personnel Total: 2 312. 936. BULKS Product QTY. DIESEL, MUD. DIESEL, RIG FUEL 4,359. 1

APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 11,8 11,8 76 CEMENT AND CEMENTING SERVICES 17, 79 COMPANY LABOR 15, 717 CONTRACT LABOR 128, 33,2 17, 15, 128, 719 CONTRACT DRILLING-DAY/TURNKEY 24,8 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 2, 31,365 25,5 56,865 721 CONTRACT SUPERVISION 5, 4,92 4, 8,92 41,8 CONSULTANTS 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS 3,197 1,14 4,211 MUD ADDITIVES 731 EQUIPMENT RENTAL 75 CO MAN TRAILER 731 EQUIPMENT RENTAL 65 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 2 TRASH TRAILER 731 EQUIPMENT RENTAL 4 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 39 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL 75 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 8 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 6 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 6 INTERCOMS 731 EQUIPMENT RENTAL 4,32 SOLIDS CONTROL 731 EQUIPMENT RENTAL 3 GENERATORS 731 EQUIPMENT RENTAL 6 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 4 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 8 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 175 TEXAS ENERGY INTERNET 731 EQUIPMENT RENTAL 15 ROTATING HEAD 731 EQUIPMENT RENTAL 25 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 325 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 15 H2S MONITORING 731 EQUIPMENT RENTAL 4, 2,462 6,562 27,25 143,135 372,975 734 FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, 435 435 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 15, 6, 1, 99,565 6,5 247,5 Total Intangible Cost 4,43, 72,179 37,77 19,256 4,293,744 7132 OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 336, 15, 2, Total Tangible Cost 561, 561, Total: 4,964, 72,179 37,77 19,256 4,854,744 2

APACHE CORPORATION Page 1 of 3 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-4-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 3 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor DAVID GRAHAM / LOREN ALFORD Engineer / Geologist BRAD MCDANIEL Field State SPRABERRY (TREND AREA RIG Name PATTERSON 31 / AFE #: Status Comment Summary 24 HR Forecast 11-14-472-CP AFE Description: County RIG PHONE NO 432-848-4555 Event Code LCM Event Type LAND-ORIG COMP RIG Fax No Tool Pusher CD KEMP AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 72,179 448,814 52,993 4,443,7 1.5 RIGGING DOWN, PREPARING RIG TO MOV Objective CIRCULATE AND RIG DOWN CASING CREW, CONTINUE CIRCULATING AND RIG UP CREST, CEMENT CASING, RIG DOWN CREST, NIPPLE DOWN AND SET SLIPS, INSTALL TA CAP, CLEAN PITS AND RIG DOWN, RELEASE PATTERSON 31 1/4/215 AT 23:59 RIG DOWN, PREPARE RIG TO MOVE TO WM SCHROCK 34 1 HC From To Duration Operation Description 12:AM 1:AM 1. CIRCULATE AND RIG DOWN BUTCH'S CASING CREW 24 HR Operational Comments 1:AM 3:AM 2. HELD SAFETY MEETING WITH RIG AND CREST PERSONNEL, SPOT TRUCKS AND RIG UP TO CEMENT WHILE CIRCULATING CASING 3:AM 7:AM 4. RU CREST CMT HEAD.TEST LINES TO 5 PSI. PUMP 1 BBL, 11. PPG GXT SPACER. PUMP LEAD W/ 47 SKS ( 139 BBLS) 5/5 POZ H AT 11.9 WT, 2.41 YLD,TAIL W/ 174 SKS ( 495 BBLS) CLASS H PLUS AT 13.2 WT, 1.6 YLD.DISPLACE W/ 345 BBLS FW AT 6 BPM. FCP AT 3 BPM WAS 31 PSI. BUMP PLUG AT 6:42, 1/4/215 W/ 36 PSI. GOOD CIRCULATION AND FLOATS HELD. DID NOT GET ANY OF THE GXT SPACER TO SURFACE 7:AM 8:AM 1. RIG DOWN AND LOAD OUT CEMENTING EQUIPMENT 8:AM 2:PM 6. NIPPLE DOWN AND LIFT STACK, SET SLIPS @ 1K, CUTOFF AND LAY DOWN CASING. INSTALL AND TEST TA CAP. REMOVE DSA, MOVE AND SECURE STACK 2:PM 12:AM 1. CLEAN MUD TANKS AND RIG, PREPARE FOR 5 MILE RIG MOVE, RIG DOWN, LAY DOWN TOP DRIVE AND TRACK, RELEASE PATTERSON 31 1/4/215 AT 23:59 11:59PM 11:59PM. RELEASE PATTERSON 31 1/4/215 AT 23:59 Remarks : - 6: CLEANING SOLIDS CONTROL EQUIPMENT AND RIG, PREPARE RIG TO MOVE TO WM SCHROCK 34 1 HC Directional Information Initial Deviation Max Dev Max Dogleg 1,493 92.7 deg at 14,667 15.7 deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE 13.38 48 H-4 559. 4 22. 537. Returns at Surface INTERMEDIATE 1 9.63 48 J-55 7,539. 2,27 7,515.48 PRODUCTION 1 5.5 2 P 11, P-11 15,621.96 8,138.65 Company Name No of People Hours Today Cum / Event PATTERSON-UTI DRILLING 1 12. 36. PATTERSON-UTI DRILLING 1 24. 72. SDS 2 48. 144. BUTCH'S CASING DIVISON 4 48. 144. ENVIORMENTAL DRILLING S 2 48. 144. HORIZON MUD 1 24. 72. Personnel Total: 2 312. 936. BULKS Product QTY DIESEL, MUD. DIESEL, RIG FUEL 3,75. 1

APACHE CORPORATION Page 2 of 3 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 11,8 11,8 33,2 76 CEMENT AND CEMENTING SERVICES 88,458 CEMENT PROD CASING 76 CEMENT AND CEMENTING SERVICES 9,543 PROD FLOAT EQUIPMENT 76 CEMENT AND CEMENTING SERVICES 17, 98,2 98,2 71,998 79 COMPANY LABOR 15, 15, 717 CONTRACT LABOR 1,66 NIPPLE DOWN CREW 717 CONTRACT LABOR 1,768 CASING SLIP TECH 717 CONTRACT LABOR 128, 3,428 3,428 719 CONTRACT DRILLING-DAY/TURNKEY 24,8 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 2, 31,365 25,5 56,865 721 CONTRACT SUPERVISION 5, 4,92 4, 8,92 41,8 CONSULTANTS 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS 3,197 2,49 5,65 MUD ADDITIVES 731 EQUIPMENT RENTAL 75 CO MAN TRAILER 731 EQUIPMENT RENTAL 65 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 2 TRASH TRAILER 731 EQUIPMENT RENTAL 4 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 39 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL 75 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 8 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 6 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 6 INTERCOMS 731 EQUIPMENT RENTAL 4,32 SOLIDS CONTROL 731 EQUIPMENT RENTAL 3 GENERATORS 731 EQUIPMENT RENTAL 6 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 4 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 8 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 175 TEXAS ENERGY INTERNET 731 EQUIPMENT RENTAL 15 ROTATING HEAD 731 EQUIPMENT RENTAL 25 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 325 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 15 H2S MONITORING 731 EQUIPMENT RENTAL 4, 2,462 6,562 27,25 124,573 143,135 372,975 734 FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, 435 435 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 15, 6, 1, 99,565 6,5 247,5 Total Intangible Cost 4,43, 72,179 139,9 212,79 4,19,921 7132 OTHER SUBSURFACE EQUIPMENT 1, 1, 714 PRODUCTION CASING 29,569 15,622' 5.5" CASING 714 PRODUCTION CASING 18,345 ORIO VALVE AND TECH 714 PRODUCTION CASING 336, 38,914 38,914 27,86 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 15, 2, Total Tangible Cost 561, 38,914 38,914 252,86 2

APACHE CORPORATION Page 3 of 3 Daily Land - Orig Comp Report Total: 4,964, 72,179 448,814 52,993 4,443,7 3

APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 1-22-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 4 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor RICK MADDOX / MICHEAL VERNER Engineer / Geologist MICHAEL LYON Field SPRABERRY (TREND AREA State County Event Code LCM Event Type LAND-ORIG COMP Objective RIG Name RIG PHONE NO RIG Fax No Tool Pusher AFE #: Status 11-14-472-CP AFE Description: AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 52,993 47,271 568,264 4,395,736 11.45 RCBL Comment Summary 24 HR Forecast 24 HR Operational Comments From To Duration Operation Description 12:AM 12:AM 24. MIRU RENEGADE WIRELINE AND GERONIMO KILL TRK. RIH WITH 4.65" G.R. TAGGED @ 8226'' RIH WITH CBL START LOG @ 8226' TO SURFACE. MARKER JOINTS FOUND@ 58.49-53.42'. RDMO ALL SERVICES. Directional Information Initial Deviation Max Dev Max Dogleg 1,493 92.7 deg at 14,667 15.7 deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE 13.38 48 H-4 559. 4 22. 537. Returns at Surface INTERMEDIATE 1 9.63 48 J-55 7,539. 2,27 7,515.48 PRODUCTION 1 5.5 2 P 11, P-11 15,621.96 8,138.65 Company Name No of People Hours Today Cum / Event PATTERSON-UTI DRILLING 1 12. 48. SDS 2 48. 192. ENVIORMENTAL DRILLING S 2 48. 192. PATTERSON-UTI DRILLING 1 24. 96. HORIZON MUD 1 24. 96. BUTCH'S CASING DIVISON 4 48. 192. Personnel Total: 2 312. 1,248. BULKS Product QTY. DIESEL, MUD. DIESEL, RIG FUEL 3,75. 1

APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 11,8 11,8 76 CEMENT AND CEMENTING SERVICES 17, 98,2 98,2 79 COMPANY LABOR 15, 717 CONTRACT LABOR 128, 3,428 3,428 33,2 71,998 15, 124,573 719 CONTRACT DRILLING-DAY/TURNKEY 7 OBM PAY 719 CONTRACT DRILLING-DAY/TURNKEY 24,8 RIG 719 CONTRACT DRILLING-DAY/TURNKEY 2, 56,865 25,5 82,365 721 CONTRACT SUPERVISION 4, CONSULTANTS 721 CONTRACT SUPERVISION 1,3 MICHEAL VERNER 721 CONTRACT SUPERVISION 5, 8,92 5,3 14,22 722 DIRECTIONAL DRILLING DIRECTIONAL DRILLERS/TOOLS 725 DRILLING FLUIDS 5,65 2,49 8,14 MUD ADDITIVES 731 EQUIPMENT RENTAL 15 H2S MONITORING 731 EQUIPMENT RENTAL 15 ROTATING HEAD 731 EQUIPMENT RENTAL 4,32 SOLIDS CONTROL 731 EQUIPMENT RENTAL 8 WATER AND SEWER SYSTEM 731 EQUIPMENT RENTAL 65 DSA FOR BOP STACK 731 EQUIPMENT RENTAL 8 FLAT BOTTOM FRAC TANKS 731 EQUIPMENT RENTAL 75 DIRECTIONAL TRAILER 731 EQUIPMENT RENTAL 75 CO MAN TRAILER 731 EQUIPMENT RENTAL 25 OUTDOOR BATHROOM 731 EQUIPMENT RENTAL 39 7 ROUND BOTTOM FRACS 731 EQUIPMENT RENTAL 3 GENERATORS 731 EQUIPMENT RENTAL 6 INTERCOMS 731 EQUIPMENT RENTAL 4 4 BBL PREMIX TANK 731 EQUIPMENT RENTAL 4 DSA FOR B-SECTION 731 EQUIPMENT RENTAL 2 TRASH TRAILER 731 EQUIPMENT RENTAL 6 SOLIDS CONTROL TRAILER 731 EQUIPMENT RENTAL 175 TEXAS ENERGY INTERNET 731 EQUIPMENT RENTAL 6 MUD ENGINEER HOUSE 731 EQUIPMENT RENTAL 325 TRANSFER PUMPS/ HOSES 731 EQUIPMENT RENTAL 4, 27,25 6,562 33,587 117,635 35,78 366,413 734 FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON MUD LOGGER 749 LOGGING 15, 7,5 7,5 142,5 WIRELINE SERVICES 765 SITE PREPARATION 6, 767 SALT WATER DISPOSAL 1, 774 TRUCKING AND HAULING 1, 435 435 776 TUBULAR INSPECTION/TESTING 6,5 777 WATER 247,5 6, 1, 99,565 6,5 247,5 7187 PUMP TRUCK SERVICE BACKSIDE PUMP Total Intangible Cost 4,43, 212,79 47,271 259,35 4,143,65 7132 OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 38,914 38,914 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 27,86 15, 2, Total Tangible Cost 561, 38,914 38,914 252,86 Total: 4,964, 52,993 47,271 568,264 4,395,736 2

APACHE CORPORATION Page 1 of 2 Daily Land - Orig Comp Report WELL NAME UNIVERSITY 244 4HU DATE 3-24-215 Operator APACHE CORPORATION API 4238338892 GL TMD 15,622. PBTD RKB/RT 22. Working Int % 1. Report No 5 Region District License PERMIAN SE DISTRICT - TX CZ Well Supervisor CHARLES GRAVES Engineer / Geologist MICHAEL LYON Field SPRABERRY (TREND AREA State County Event Code LCM Event Type LAND-ORIG COMP Objective RIG Name RIG PHONE NO RIG Fax No Tool Pusher AFE #: Status Comment Summary 24 HR Forecast 11-14-472-CP AFE Description: AFE Costs Previous Day Cum Daily Costs Cumulative Cost AFE Remaining AFE % 4,964, 568,64 4,14 572,78 4,391,922 11.52 WOF MIRU PETROPLEX. LOAD BS TO 15 PSI. TEST LINES TO 95 PSI, OPEN CSG, SICP.TEST CSG 7K/ 3MIN, LOST 7 PSI, GOOD TEST. BROUGHT PUMPS ONLINE TO 1 BPM,ORIO OPENED @ 91 PSI. FLUSHED CSG W/ 349 BBLS TFW. WOF From To Duration Operation Description 24 HR Operational Comments 2:3PM 4:3PM 2. MIRU PETROPLEX. LOAD BS TO 15 PSI. TEST LINES TO 95 PSI, OPEN CSG, SICP.TEST CSG 7K/ 3MIN, LOST 7 PSI, GOOD TEST. BROUGHT PUMPS ONLINE TO 1 BPM,ORIO OPENED @ 91 PSI. FLUSHED CSG W/ 349 BBLS TFW ( BIOCIDE, CORROSION, SCALE). HAD TO DROP RATE TO 7 BPM DUE TO PRESSURE. Directional Information Initial Deviation Max Dev Max Dogleg 1,493 92.7 deg at 14,667 15.7 deg at 8,2 Casing / Tubing Information Description Size Weight Grade Depth Sacks CMT Top Packer / SN TOC Method SURFACE 13.38 48 H-4 559. 4 22. 537. Returns at Surface INTERMEDIATE 1 9.63 48 J-55 7,539. 2,27 7,515.48 PRODUCTION 1 5.5 2 P 11, P-11 15,621.96 8,138.65 Company Name No of People Hours Today Cum / Event SDS 2 48. 24. PATTERSON-UTI DRILLING 1 24. 12. PATTERSON-UTI DRILLING 1 12. 6. ENVIORMENTAL DRILLING S 2 48. 24. BUTCH'S CASING DIVISON 4 48. 24. HORIZON MUD 1 24. 12. Personnel Total: 2 312. 1,56. BULKS Product QTY. DIESEL, MUD. DIESEL, RIG FUEL 3,75. 1

APACHE CORPORATION Page 2 of 2 Daily Land - Orig Comp Report Daily Cost Detail Account Code Description AFE Amount Previous Daily Cost Cumulative Available Description 74 CASING CREW 45, 11,8 11,8 33,2 76 CEMENT AND CEMENTING SERVICES 17, 98,2 98,2 71,998 77 CHEMICALS (WSS) 1,5 BIO SCALE CORROSION 79 COMPANY LABOR 15, 15, 711 COMPANY SUPERVISION 5 CHARLES GRAVES 717 CONTRACT LABOR 128, 3,428 3,428 719 CONTRACT DRILLING-DAY/TURNKEY 2, 82,365 82,365 721 CONTRACT SUPERVISION 5, 14,22 14,22 124,573 117,635 35,78 722 DIRECTIONAL DRILLING 725 DRILLING FLUIDS 8,14 8,14 731 EQUIPMENT RENTAL 4, 33,587 5 33,637 366,363 FRACK TANK 734 FORMATION STIMULATION 2,731, 2,731, 739 ENGR/ GEOLOGICAL-CONTRACTORS/CON 749 LOGGING 15, 6,5 6,5 765 SITE PREPARATION 6, 143,5 6, 767 SALT WATER DISPOSAL 1, 1, 774 TRUCKING AND HAULING 1, 435 7 1,135 98,865 WINCH TRUCK 776 TUBULAR INSPECTION/TESTING 6,5 6,5 777 WATER 247,5 247,5 7187 PUMP TRUCK SERVICE 8 1,264 2,64 PETROPLEX Total Intangible Cost 4,43, 259,15 4,14 263,164 4,139,836 7132 OTHER SUBSURFACE EQUIPMENT 1, 714 PRODUCTION CASING 336, 38,914 38,914 7153 TUBING 15, 7156 WELLHEAD ASSEMBLY 2, 1, 27,86 15, 2, Total Tangible Cost 561, 38,914 38,914 252,86 Total: 4,964, 568,64 4,14 572,78 4,391,922 2

Page 1 of 1 Legal Well Name: UNIVERSITY 244 4HU API/UWI: 4238338892 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SW District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: 11-14-472-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 7/23/215 Report Number: 7 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 25.27 Job Day (days): 23. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $3,425 Cum Field Est To Date (Cost): $62,733 Current Status: 24 Hour Forecast: SUSPEND REPORTS UNTIL FRAC DATE SECRURE 24 Hour Summary: INSTALL FRAC TREE Start Time End Time Dur (hr) Phase Op Code Op Type Operation Details : : 24. BOPS PP NU FRAC STACK Printed Date: 7/24/215 Printed Time: 9:46 AM

Page 1 of 1 Legal Well Name: UNIVERSITY 244 4HU API/UWI: 4238338892 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: 11-14-472-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/3/215 Report Number: 9 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 261.27 Job Day (days): 214. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,18 Cum Field Est To Date (Cost): $625,28 Current Status: 24 Hour Forecast: MIRU FRAC EQUIPMENT 24 Hour Summary: MIRU FRAC EQUIPMENT : : 24. Stim, MIRU, MIRU RU_RD PP MIRU FRAC EQUIPMENT, PUMP MAINTENANCE Printed Date: 8/4/215 Printed Time: 9:46 AM

Page 1 of 1 Legal Well Name: UNIVERSITY 244 4HU API/UWI: 4238338892 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: 11-14-472-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/4/215 Report Number: 1 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 262.27 Job Day (days): 215. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,18 Cum Field Est To Date (Cost): $644,28 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: MIRU FRAC EQIPMENT, STAGE FRAC 1 : 6:58 6.97 Stim, STAGE 1, STIMULATION RU_RD PP FINISH PUMP MAINTENANCE, PRESSURE TEST LINES. PREPARE TO FRAC SAFETY MEETING: (6:3-6:45). 6:58 9:22 2.4 Stim, STAGE 4, PERFORATE STIM PP FRAC STAGE 1: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 48 BBLS HCl, 4831 BBLS Slickwater, 1214 BBLS Linear Gel, BBLS Crosslink, 23998# 1 Mesh, 1984# 4/7, #, #, TOTAL PROP = 4382#, TOTAL LTR = 693 BBLS. AVG PRES = 632 PSI, MAX PRES = 777, AVG RATE = 7.6 BPM, MAX RATE = 71.8 BPM, ISIP = 3266 PSI, FG =.8332 PSI/FT. 9:22 : 14.63 Stim, STAGE 4, PERFORATE PERF PP PERF STAGE 2: RU RENEGADEWIRELINE & 1K LUBE. PRESSURE TEST LUBE TO 85#. RIH W/ BOSS HOG 1k 438-251-1 COMPOSITE FRAC PLUG TO 14,42' @ 14.3 BPM W/ 328 BBLS TFW. UNABLE TO GET DOWN TO 15,328'. POOH W/ WIRELINE. FLUSHED WELL W/ 569 BBLS TFW. RIH W/ PLUG ON 2ND RUN TO 14,61' @ 12.5 BPM W/ 297 BBLS TFW. UNABLE TO GET DOWN. LINE SPEED FLUCTUATED FROM 43-22 FPM @12,75' TO 14, 61'. POOH W/ WIRELINE. SKIP STAGE 2 & 3, SHOOT STAGE 4 PERF STAGE 4: RU RENEGADE & 1K LUBE, RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/296 BBLS TFW @14.6 BPM @ 45 PSI, SET PLUG @ 14,82', PERF'D UPPER WOLFCAMP @ 14,795' - 14,797', 14,755-14,757', 14,719-14,721', 14,677' - 14,679', 14,654' - 14,655', 14,616' - 14,617'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2." OD 1.8 SG BALL SEALER, POOH PULLING COLLAR LOG Printed Date: 8/5/215 Printed Time: 9:47 AM

Page 1 of 2 Legal Well Name: UNIVERSITY 244 4HU API/UWI: 4238338892 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: 11-14-472-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/5/215 Report Number: 11 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 263.27 Job Day (days): 216. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,82 Cum Field Est To Date (Cost): $664,28 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC: FRAC STAGES 4 THRU 8 : 3: 3. Stim, STAGE 4, PERFORATE PERF PP CONT POOH W/ WIRELINE 3: 3:12.2 Stim, STAGE 4, CHANGE-OVER WOO PP CHANGE OVER TIME 3:12 5:5 1.89 Stim, STAGE 5, PERFORATE STIM PP FRAC STAGE 4: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4417 BBLS Slickwater, 1792 BBLS Linear Gel, BBLS Crosslink, 2351# 1 Mesh, 19184# 4/7, #, #, TOTAL PROP = 42694#, TOTAL LTR = 6233 BBLS. AVG PRES = 6656 PSI, MAX PRES = 6656, AVG RATE = 7.9 BPM, MAX RATE = 72 BPM, ISIP = 335 PSI, FG =.856 PSI/FT. 5:5 7:3 2.42 Stim, STAGE 5, CHANGE-OVER PERF PP PERF STAGE 5: RU RENEGADE & 1K LUBE, RIH W/ WEATHERFORD 1K 55-FS-12-35-TB FRACSHIELD COMPOSITE FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/331 BBLS TFW @17. BPM @ 363 PSI, SET PLUG @ 14,584', PERF'D UPPER WOLFCAMP @ 14,555' - 14,557', 14,523' - 14,525', 14,493-14,495', 14,459' - 14,461', 14,427' - 14,428', 14,395' - 14,396; 14,363' - 14,364'; 14,331' - 14,332'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2." OD 1.8 SG BALL SEALER, SAFETY MEETING: 7:15-7:3 7:3 7:41.18 Stim, STAGE 5, STIMULATION WOO PP CHANGE OVER TIME 7:41 1:1 2.48 Stim, STAGE 6, PERFORATE STIM PP FRAC STAGE 5: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 567 BBLS Slickwater, 1848 BBLS Linear Gel, BBLS Crosslink, 28538# 1 Mesh, 2872# 4/7, #, #, TOTAL PROP = 5724#, TOTAL LTR = 7873 BBLS. AVG PRES = 5696 PSI, MAX PRES = 622, AVG RATE = 79.6 BPM, MAX RATE = 81 BPM, ISIP = 3691 PSI, FG =.8855 PSI/FT. 1:1 13:1 3. Stim, STAGE 6, CHANGE-OVER PERF PN PERF STAGE 6: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/231 BBLS TFW @14. BPM @ 3439 PSI, SET PLUG @ 14,36', PERF'D UPPER WOLFCAMP @ 14,281' - 14,283', 14,251' - 14,253', 14,221' - 14,223', 14,194' - 14,196', 14,161' - 14,162', 14,131' - 14,132'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, RENEGADE REPLACING O RINGS ON LUBE 1:4-11:4. 13:1 13:18.14 Stim, STAGE 6, STIMULATION WOO PP CHANGE OVER TIME. Printed Date: 8/6/215 Printed Time: 9:45 AM

Page 2 of 2 13:18 15:12 1.89 Stim, STAGE 6, STIMULATION STIM PP FRAC STAGE 6 - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4653 BBLS Slickwater, 136 BBLS Linear Gel, BBLS Crosslink, 2397# 1 Mesh, 1919# 4/7, #, #, TOTAL PROP = 4316#, TOTAL LTR = 6268 BBLS. AVG PRES = 5565 PSI, MAX PRES = 622, AVG RATE = 71.5 BPM, MAX RATE = 73.8 BPM, ISIP = 3654 PSI, FG =.881 PSI/FT. 15:12 17:3 1.85 Stim, STAGE 7, PERFORATE PERF PP PERF STAGE 7: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/233 BBLS TFW @14. BPM @ 3844 PSI, SET PLUG @ 14,114', PERF'D UPPER WOLFCAMP @ 14,81' - 14,83', 14,49' - 14,51', 14,17' - 14,19', 13,985' - 13,987', 13,953' - 13,954', 13,921' - 13,922'; 13,889' - 13,89'; 13,86' - 13,861'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, 17:3 17:13.17 Stim, STAGE 7, STIMULATION WOO PP CHANGE OVER TIME 17:13 19:11 1.97 Stim, STAGE 7, STIMULATION STIM PP FRAC STAGE 7. - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 5375 BBLS Slickwater, 1895 BBLS Linear Gel, BBLS Crosslink, 2864# 1 Mesh, 28534# 4/7, #, #, TOTAL PROP = 57138#, TOTAL LTR = 7527 BBLS. AVG PRES = 6249 PSI, MAX PRES = 7118, AVG RATE = 79.6 BPM, MAX RATE = 8.5 BPM, ISIP = 3692 PSI, FG =.8855 PSI/FT. 19:11 21:5 1.9 Stim, STAGE 8, CHANGE-OVER PERF PP PERF STAGE 8: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/199 BBLS TFW @17.4 BPM @ 3415 PSI, SET PLUG @ 13,832', PERF'D UPPER WOLFCAMP @ 13,87' - 13,89', 13,782' - 13,784', 13,747' - 13,749', 13,719' - 13,721', 13,686' - 13,687', 13,657' - 13,658'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING 21:5 21:15.17 Stim, STAGE 8, STIMULATION WOO PP CHANGE OVER TIME 21:15 23:6 1.85 Stim, STAGE 9, PERFORATE STIM PP FRAC STAGE 8: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4429 BBLS Slickwater, 149 BBLS Linear Gel, BBLS Crosslink, 2393# 1 Mesh, 19124# 4/7, #, #, TOTAL PROP = 4354#, TOTAL LTR = 6142 BBLS. AVG PRES = 5845 PSI, MAX PRES = 671, AVG RATE = 71.1 BPM, MAX RATE = 72.3 BPM, ISIP = 3639 PSI, FG =.8789 PSI/FT. Printed Date: 8/6/215 Printed Time: 9:45 AM

Page 1 of 2 Legal Well Name: UNIVERSITY 244 4HU API/UWI: 4238338892 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: 11-14-472-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/6/215 Report Number: 12 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 264.27 Job Day (days): 217. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $26,34 Cum Field Est To Date (Cost): $69,368 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC: FRAC STAGES 9 THRU 13 : :45.75 Stim, STAGE 9, PERFORATE PERF PP PERF STAGE 9: CONT POOH W/ WIRELINE :45 :58.22 Stim, STAGE 9, STIMULATION WOO PP CHANGE OVER TIME :58 2:45 1.78 Stim, STAGE 9, STIMULATION STIM PP FRAC STAGE 9: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 443 BBLS Slickwater, 1432 BBLS Linear Gel, BBLS Crosslink, 23778# 1 Mesh, 1986# 4/7, #, #, TOTAL PROP = 42864#, TOTAL LTR = 652 BBLS. AVG PRES = 6181 PSI, MAX PRES = 7313, AVG RATE = 69.9 BPM, MAX RATE = 7.9 BPM, ISIP = 348 PSI, FG =.855 PSI/FT 2:45 4:35 1.84 Stim, STAGE 1, CHANGE-OVER PERF PP PERF STAGE 1: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/195 BBLS TFW @15.5 BPM @ 372 PSI, SET PLUG @ 13,432', PERF'D UPPER WOLFCAMP @ 13,47' - 13,49', 13,377' - 13,379', 13,352' - 13,354', 13,317' - 13,319', 13,287' - 13,288', 13,257' - 13,258'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING 4:35 4:49.23 Stim, STAGE 1, STIMULATION WOO PP CHANGE OVER TIME 4:49 7:1 2.2 Stim, STAGE 11, PERFORATE STIM PP FRAC STAGE 1: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4712 BBLS Slickwater, 1219 BBLS Linear Gel, BBLS Crosslink, 23732# 1 Mesh, 19168# 4/7, #, #, TOTAL PROP = 429#, TOTAL LTR = 615 BBLS. AVG PRES = 5435 PSI, MAX PRES = 8346, AVG RATE = 69.1 BPM, MAX RATE = 69.8 BPM, ISIP = 3445 PSI, FG =.8552 PSI/FT. 7:1 9:1 2.15 Stim, STAGE 11, CHANGE-OVER PERF PP PERF STAGE 11: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/187 BBLS TFW @15.4 BPM @ 3744 PSI, SET PLUG @ 13,232', PERF'D UPPER WOLFCAMP @ 13,27' - 13,29', 13,174' - 13,176', 13,147' - 13,149', 13,117' - 13,119', 13,87' - 13,88', 13,57' - 13,58'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING 8:55-9:1. 9:1 9:18.13 Stim, STAGE 11, CHANGE-OVER WOO PP CHANGE OVER TIME Printed Date: 8/7/215 Printed Time: 9:46 AM

Page 2 of 2 9:18 11:1 1.87 Stim, STAGE 12, PERFORATE STIM PP FRAC STAGE 11: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4718 BBLS Slickwater, 122 BBLS Linear Gel, BBLS Crosslink, 2354# 1 Mesh, 1893# 4/7, #, #, TOTAL PROP = 42434#, TOTAL LTR = 6131 BBLS. AVG PRES = 5217 PSI, MAX PRES = 5853, AVG RATE = 69.2 BPM, MAX RATE = 71.3 BPM, ISIP = 3455 PSI, FG =.8567 PSI/FT. 11:1 13:1 2. Stim, STAGE 12, CHANGE-OVER PERF PP PERF STAGE 12: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/166 BBLS TFW @15. BPM @ 3641 PSI, SET PLUG @ 13,32', PERF'D UPPER WOLFCAMP @ 13,11' - 13,13', 12,975' - 12,977', 12,943' - 12,945', 12,911' - 12,913', 12,879' - 12,88', 12,847' - 12,848'; 12,812' - 12,813'; 12,783' - 12,784'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, 13:1 13:14.7 Stim, STAGE 12, STIMULATION WOO PP CHANGE OVER TIME. 13:14 15:15 2.1 Stim, STAGE 12, STIMULATION STIM PP FRAC STAGE 12 - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 5465 BBLS Slickwater, 1937 BBLS Linear Gel, BBLS Crosslink, 28568# 1 Mesh, 28692# 4/7, #, #, TOTAL PROP = 5726#, TOTAL LTR = 7592 BBLS. AVG PRES = 5646 PSI, MAX PRES = 6141, AVG RATE = 81.2 BPM, MAX RATE = 82.7 BPM, ISIP = 3621 PSI, FG =.8771 PSI/FT. 15:15 17:35 2.34 Stim, STAGE 13, CHANGE-OVER PERF PP PERF STAGE 13: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/175 BBLS TFW @15.7 BPM @ 3295 PSI, SET PLUG @ 12,758', PERF'D UPPER WOLFCAMP @ 12,735' - 12,737', 12,73' - 12,75', 12,673' - 12,675', 12,64' - 12,642', 12,613' - 12,614', 12,583' - 12,584'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, GREASE FRAC VALVES 17:-17:35 17:35 18:5.5 Stim, STAGE 13, STIMULATION WOO PP CHANGE OVER TIME 18:5 2:6 2.2 STIM PP FRAC STAGE 13 - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4383 BBLS Slickwater, 13 BBLS Linear Gel, BBLS Crosslink, 2372# 1 Mesh, 1966# 4/7, #, #, TOTAL PROP = 42768#, TOTAL LTR = 5881 BBLS. AVG PRES = 591 PSI, MAX PRES = 6957, AVG RATE = 69.2 BPM, MAX RATE = 7.6 BPM, ISIP = 343 PSI, FG =.853 PSI/FT. :3 MIN DT DUE TO BLENDER SLURRY RATE ISSUE 2:6 22:5 1.98 Stim, STAGE 14, CHANGE-OVER PERF PP PERF STAGE 14: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/152 BBLS TFW @15.7 BPM @ 347 PSI, SET PLUG @ 12,556', PERF'D UPPER WOLFCAMP @ 12,533' - 12,535', 12,51' - 12,53', 12,469' - 12,471', 12,433' - 12,435', 12,45' - 12,46', 12,373' - 12,374', 12,341' - 12,342', 12,39' - 12,31'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING-21:5-22:5 22:5 22:1.8 Stim, STAGE 14, STIMULATION WOO PP CHANGE OVER TIME 22:1 : 1.83 Stim, STAGE 14, STIMULATION STIM PP FRAC STAGE 14: INFO CONT'D ON NEXT DAYS REPORT Printed Date: 8/7/215 Printed Time: 9:46 AM

Page 1 of 3 Legal Well Name: UNIVERSITY 244 4HU API/UWI: 4238338892 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: 11-14-472-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/7/215 Report Number: 13 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 265.27 Job Day (days): 218. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $25,44 Cum Field Est To Date (Cost): $71,38 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC: FRAC STAGES 14 THRU 19 : :12.2 Stim, STAGE 14, STIMULATION STIM PP FRAC STAGE 14: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 55 BBLS Slickwater, 1439 BBLS Linear Gel, BBLS Crosslink, 23546# 1 Mesh, 19176# 4/7, #, #, TOTAL PROP = 42722#, TOTAL LTR = 663 BBLS. AVG PRES = 5122 PSI, MAX PRES = 665, AVG RATE = 7.6 BPM, MAX RATE = 78.5 BPM, ISIP = 3587 PSI, FG =.8729 PSI/FT. :12 6:1 5.97 PERF PP PERF STAGE 15: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/16 BBLS TFW @15.7 BPM @ 358 PSI, SET PLUG @ 12,286', PERF'D UPPER WOLFCAMP @ 12,259' - 12,261', 12,229' - 12,231', 12,199' - 12,21', 12,169' - 12,171', 12,139' - 12,14', 12,112' - 12,113'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, DOWN DUE TO HORSE HEAD WHEEL SPLIT IN HALF ON PERFORATOR. 2:-5:45 6:1 6:21.18 Stim, STAGE 15, CHANGE-OVER WOO PP CHANGE OVER TIME 6:21 8:32 2.19 Stim, STAGE 16, PERFORATE STIM PP FRAC STAGE 15: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4541 BBLS Slickwater, 1299 BBLS Linear Gel, BBLS Crosslink, 237# 1 Mesh, 1916# 4/7, #, #, TOTAL PROP = 4286#, TOTAL LTR = 624 BBLS. AVG PRES = 528 PSI, MAX PRES = 768, AVG RATE = 7.6 BPM, MAX RATE = 71.8 BPM, ISIP = 3621 PSI, FG =.8767 PSI/FT. 8:32 1:32 2. Stim, STAGE 16, CHANGE-OVER PERF PP PERF STAGE 16: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/145 BBLS TFW @15.4 BPM @ 3526 PSI, SET PLUG @ 12,84', PERF'D UPPER WOLFCAMP @ 12,58' - 12,6', 12,27' - 12,29', 11,995' - 11,997', 11,963' - 11,965', 11,931' - 11,932', 11,899' - 11,9'; 11,867' - 11,868'; 11,835' - 11,836'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING 1:25-1:32 1:32 1:41.15 Stim, STAGE 16, STIMULATION WOO PP CHANGE OVER TIME Printed Date: 8/8/215 Printed Time: 9:45 AM

Page 2 of 3 1:41 12:42 2.1 Stim, STAGE 16, STIMULATION STIM PP FRAC STAGE 16: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 5282 BBLS Slickwater, 286 BBLS Linear Gel, BBLS, 28852# 1 Mesh, 28762# 4/7, #, #, TOTAL PROP = 57614#, TOTAL LTR = 7537 BBLS. AVG PRES = 5478 PSI, MAX PRES = 613, AVG RATE = 79.4 BPM, MAX RATE = 8.6 BPM, ISIP = 3662 PSI, FG =.8815 PSI/FT. 12:42 14:18 1.6 Stim, STAGE 17, PERFORATE PERF PP PERF STAGE 17: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/143 BBLS TFW @15.4 BPM @ 3322 PSI, SET PLUG @ 11,816', PERF'D UPPER WOLFCAMP @ 11,785' - 11,787', 11,753' - 11,755', 11,725' - 11,727', 11,689' - 11,691', 11,657' - 11,658', 11,625' - 11,626'; 11,598' - 11,599'; 11,561' - 11,562'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, 14:18 14:25.12 Stim, STAGE 17, STIMULATION WOO PP CHANGE OVER TIME 14:25 16:31 2.1 Stim, STAGE 18, PERFORATE STIM PP FRAC STAGE 17 - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 5311 BBLS Slickwater, 1995 BBLS Linear Gel, BBLS, 28716# 1 Mesh, 2888# 4/7, #, #, TOTAL PROP = 57524#, TOTAL LTR = 7473 BBLS. AVG PRES = 5392 PSI, MAX PRES = 5856, AVG RATE = 79.2 BPM, MAX RATE = 8.5 BPM, ISIP = 3559 PSI, FG =.8692 PSI/FT 16:31 18:6 1.58 Stim, STAGE 18, PERFORATE PERF PP PERF STAGE 18: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 4-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6,4 SPF. PUMP PLUG AND GUNS DN W/13 BBLS TFW @15.1 BPM @ 3382 PSI, SET PLUG @ 11,536', PERF'D UPPER WOLFCAMP @ 11,512' - 11,514', 11,479' - 11,481', 11,447' - 11,449', 11,415' - 11,417', 11,386' - 11,387', 11,351' - 11,352'; 11,319' - 11,32'; 11,287' - 11,288'. TOTAL 56 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, 18:6 18:16.17 Stim, STAGE 18, STIMULATION WOO PP CHANGE OVER TIME 18:16 2:16 2. Stim, STAGE 19, PERFORATE STIM PP FRAC STAGE 18 - Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 5615 BBLS Slickwater, 1795 BBLS Linear Gel, BBLS, 28426# 1 Mesh, 28658# 4/7, #, #, TOTAL PROP = 5784#, TOTAL LTR = 7564 BBLS. AVG PRES = 5354 PSI, MAX PRES = 6789, AVG RATE = 79.4 BPM, MAX RATE = 81.8 BPM, ISIP = 3269 PSI, FG =.8339 PSI/FT. 2:16 22: 1.73 Stim, STAGE 19, PERFORATE PERF PP PERF STAGE 19: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/18 BBLS TFW @15.2 BPM @ 319 PSI, SET PLUG @ 11,264', PERF'D UPPER WOLFCAMP @ 11,237' - 11,239', 11,26' - 11,28', 11,177' - 11,179', 11,147' - 11,149', 11,117' - 11,118', 11,88' - 11,89'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING: 21:45-22: 22: 22:6.1 Stim, STAGE 19, CHANGE-OVER WOO PP CHANGE OVER TIME Printed Date: 8/8/215 Printed Time: 9:45 AM

Page 3 of 3 22:6 23:53 1.79 Stim, STAGE 2, PERFORATE STIM PP FRAC STAGE 19: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4543 BBLS Slickwater, 134 BBLS Linear Gel, BBLS, 2371# 1 Mesh, 19156# 4/7, #, #, TOTAL PROP = 42866#, TOTAL LTR = 5979 BBLS. AVG PRES = 4952.3 PSI, MAX PRES = 6893, AVG RATE = 69.5 BPM, MAX RATE = 7.4 BPM, ISIP = 3517 PSI, FG =.8643 PSI/FT. Printed Date: 8/8/215 Printed Time: 9:45 AM

Page 1 of 2 Legal Well Name: UNIVERSITY 244 4HU API/UWI: 4238338892 Operator: APACHE CORPORATION Working Interest (%): Rig: PATTERSON 31, 12/23/214 3: District: SE District Location Note: SEC 24, BLK 58, 25' FNL & 188' FWL, UNIVERSITY LAND Field Name: SPRABERRY (TREND AREA) State/Province: TEXAS County: REAGAN Target Depth (ftkb): 15,65 Target Formation: Spud Date: 11/15/214 AFE Number: 11-14-472-CP Supplemental AFE Number: AFE Description: Total AFE + Supp Amount (Cost): $4,964, Report Start Date: 8/8/215 Report Number: 14 End Depth (ftkb): End Depth (TVD) (ftkb): Days From Spud (days): 266.27 Job Day (days): 219. Depth Progress (ft): Rotating Time (hr): Last Mud Check Density (lb/gal): Daily Field Est Total (Cost): $19,94 Cum Field Est To Date (Cost): $73,248 Current Status: 24 Hour Forecast: STAGE FRAC 24 Hour Summary: STAGE FRAC: FRAC STAGES 2 THRU 21 : 1:3 1.5 Stim, STAGE 2, PERFORATE PERF PP PERF STAGE 2: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/15 BBLS TFW @15.3 BPM @ 347 PSI, SET PLUG @ 11,62', PERF'D UPPER WOLFCAMP @ 11,37' - 11,39', 11,8' - 11,1', 1,977' - 1,979', 1,947' - 1,949', 1,917' - 1,918', 1,892' - 1,893'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING: 21:45-22: 1:3 1:41.19 Stim, STAGE 2, STIMULATION WOO PP CHANGE OVER TIME 1:41 3:54 2.22 Stim, STAGE 21, PERFORATE STIM PP FRAC STAGE 2: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4543 BBLS Slickwater, 134 BBLS Linear Gel, BBLS, 2371# 1 Mesh, 19156# 4/7, #, #, TOTAL PROP = 42866#, TOTAL LTR = 5979 BBLS. AVG PRES = 4952.3 PSI, MAX PRES = 6893, AVG RATE = 69.5 BPM, MAX RATE = 7.4 BPM, ISIP = 3517 PSI, FG =.8643 PSI/FT. Printed Date: 8/9/215 Printed Time: 9:45 AM

Page 2 of 2 3:54 5:35 1.68 Stim, STAGE 21, CHANGE-OVER PERF PP PERF STAGE 21: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/18 BBLS TFW @15.6 BPM @ 3451 PSI, SET PLUG @ 1,862', PERF'D UPPER WOLFCAMP @ 1,837' - 1,839', 1,812' - 1,814', 1,777' - 1,779', 1,747' - 1,749', 1,715' - 1,716', 1,687' - 1,688'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING: 21:45-22: 5:35 19:35 14. WOO PP CHANGE OVER TIME-APACHE EQUIPMENT FAILURE AT WATER PIT. 19:35 21:25 1.83 Stim, STAGE 22, PERFORATE STIM PP FRAC STAGE 21: Universal TO FRAC Wolfcamp (Upper) FORMATION. RAN 24 BBLS HCl, 4543 BBLS Slickwater, 134 BBLS Linear Gel, BBLS, 2371# 1 Mesh, 19156# 4/7, #, #, TOTAL PROP = 42866#, TOTAL LTR = 5979 BBLS. AVG PRES = 4952.3 PSI, MAX PRES = 6893, AVG RATE = 69.5 BPM, MAX RATE = 7.4 BPM, ISIP = 3517 PSI, FG =.8643 PSI/FT. 21:25 23:25 2. Stim, STAGE 22, PERFORATE PERF PP PERF STAGE 22: RU RENEGADE & 1K LUBE, RIH W/ BOSS HOG BH-438-251-1 COMPOSITE BALL DROP FRAC PLUG, 4-2FT & 2-1FT 3-1/8" TITAN SDP 3323-232T, 22.7 GM, 6 DEG PHASING,.45 ENTRY HOLE, CSG GUNS 5,4,6 SPF. PUMP PLUG AND GUNS DN W/91 BBLS TFW @13.5 BPM @ 394 PSI, SET PLUG @ 1,662', PERF'D UPPER WOLFCAMP @ 1,632' - 1,634', 1,67' - 1,69', 1,577' - 1,579', 1,547' - 1,549', 1,517' - 1,518', 1,487' - 1,488'. TOTAL 48 HOLES, ALL SHOTS FIRED, DROP 2.13" OD 3.5 SG BALL SEALER, SAFETY MEETING: 23:1-23:25 23:25 23:37.2 Stim, STAGE 22, STIMULATION WOO PP CHANGE OVER TIME 23:37 :.38 Stim, STAGE 22, STIMULATION STIM PP BEGIN STAGE FRAC ON STAGE 22 Printed Date: 8/9/215 Printed Time: 9:45 AM