BISCAYNE POINT ROW IMPROVEMENTS

Similar documents
METAL STUDS. TOTAL COST (Labor+ Material) UNIT COST (Labor+ Material) ITEM # DESCRIPTION QUANTITY UNIT TRADE COST GENERAL REQUIREMENTS

Health Science & Human Services Center 100% CONSTRUCTION DOCUMENTS RSA Project No September 1, 2017(REVISED 9/21/17)

ADDENDUM 3. C. Bidders are requested to attach a copy of this Addendum to the Project Manual in their possession.

Proposed Kitchen Plan Scale:1/2"=1'-0"

BID FORM PART A. Total Quantity 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ -

BID PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

UNLV Animal Care Facility. University of Nevada Las Vegas CAM 1513/PC ADDENDUM A August 5, 2016

SECTION HVAC CONTROL SYSTEM PART 1 GENERAL 1.01 SUMMARY. A. Section Includes:

DELETE first sentence of first paragraph that reads: REPLACE with the following:

MAINTENANCE CATAGORIES. Visual inspection, cleaning. Repair large scale cracks or settling, major repairs/ replacement. Hire Structural Engineer.

Electrical and Power Transmission Installers, Other CIP Task Grid. Secondary Competency Task List. Level 1 Level 2 Level 3

Total Proposed Security Cost

ATTACHMENT I BID SCHEDULE IFB NO , CHURCH FARMS EAST STORAGE TANK AND BOOSTER PUMP STATION

BUILDING PERMIT FEES

Product Data. Features/Benefits. 35K Bypass Terminal. 110 to 4400 cfm

Investment Portfolio. 48 Spiller Dr & 600 County Rd Westbrook, ME Property Highlights. Property Description. For Sale Industrial Buildings

UNLV Animal Care Facility. University of Nevada Las Vegas CAM 1513/PC ADDENDUM B August 19, 2016

Superintendent Project Manager -.15 days /wk Temp Water. Temp Water Temp Electricity. Temp Electricity Temp Office

CANTON COMMUNITY REQUEST FOR BOARD ACTION

San Antonio, Texas 78222

CITY OF LAREDO, SOUTH LAREDO WASTEWATER TREATMENT PLANT ADMINISTRATION BUILDING

WORKERS' COMPENSATION AND EMPLOYERS LIABILITY TENNESSEE NCCI CONTRACTING INDUSTRY GROUP As of March 1, 2013.

Palm Beach County Department of Environmental Resources Management Construction Contract Bid Evaluation Summary

Department of Finance Purchasing Department INVITATION TO BID

OPTEVA 923 IN LOBBY TELLER (ILT) PLAN mm (60") WIDE PLAN - STAND ALONE FRONT VIEW SIDE VIEW PAGE 1 OF 5 CALL NOTE:

4 FEET HIGH CHAIN LINK FENCE AND GATE. TO INCLUDE TOP RAIL AND ALL OTHER HARDWARE, POSTS, ETC. NOT INCLUDED BELOW.

Attachment 1. Freezer Cooler Replacement Project Project Cost Elements. Total Project Budget. Polar King ITB #14 B 113 AL

Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166

Ohio Department of Transportation Official Bid Tabulation Jolene M. Molitoris, Director

COUNTY OF BERKS Purchasing Department Berks County Services Center, 633 Court Street, Reading, PA Tel: Fax:

FOR SALE. Former Husqvarna Outdoor Products Manufacturing / Distribution Facility 240,670± Total SF - Three (3) Buildings - 16.

AMCA International. Guide for Commissioning and Periodic Performance Testing of Fire, Smoke and Other Life Safety Related Dampers

Keycodes Inspection Agency PO Box 391 Bethlehem, Pennsylvania

CODE ANALYSIS BUILDING AREA STORIES 2 BUILDING HEIGHT 25'

OPTEVA 378 ENHANCED CASH RECYCLER TERMINAL FRONT LOAD LOBBY UNIT PLAN VIEW FRONT VIEW SIDE VIEW

REPLACEMENT PARTS MANUAL

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

REAR +/- 94' 20' 10' 10'-4" 9'-6" 10'-3" 10' 20' 13'-2" Private Office 25. Private Office 23 Private Office 24 7'-1" Open Space 3 14'-7"

PRICED BILL OF QUANTITIES Package : Air conditionning. Manhours (h) Unit (tariff) Discount Total Unit. Total. Material cost

TENDER 2019 OR 2020, ONE AND A HALF TON EXTENDED DOUBLE CAB/CHASSIS, 4X4, DUMP BODY TRUCK

Michigan State University Construction Standards SECONDARY UNIT SUBSTATIONS PAGE

Architect s Guide for Detailing & Specifying Access Floor Air Plenums

Building Integrity Property Services

Elvoron Home Elevator

CITY OF ALAMO HEIGHTS WATER, STREET AND SIDEWALK CAPITAL IMPROVEMENT PROJECTS

James N Thorp Elementary School

Florham Park, NJ USA Call (ASCO) for sales or service

Phase 1 Remodeling for New State s Attorney Office Facility Will County Court Annex 57 N. Ottawa St & 57 W. Jefferson St.

Table of Contents Categorized Listing

78' 1" 56' 6" 07-A1.1-SITE (30% of Scale); Ebbert; Projects 10 v1.0; 3/24/ :41 PM

BID PRICES/ BILL OF QUANTITIES ENVELOPE "B"

TENDER 2018 OR 2019, ONE AND A HALF TON CAB/CHASSIS, 4X4, DUMP BODY TRUCK

flexible spaces all the right places... fogg.com Brookpark Rd. Extension North Olmsted, Ohio

WALL MOUNTED PACKAGE AIR CONDITIONER REPLACEMENT PARTS MANUAL W30A1, W36A1. Models: Contents. General Notes. Important.

WALL MOUNTED PACKAGE HEAT PUMPS REPLACEMENT PARTS MANUAL. General Notes. Contents. Important MODEL: WH381 WH431 WH491

SCHEDULE E: TRAINING AIDS

ELVORON HR DESIGN AND PLANNING GUIDE

Industrial Generator Set Accessories

Industrial Generator Set Accessories

HAMPTON INN AND SUITES

Roof and Wall Specialties and Accessories

BASE BID N. SHARY ROAD MISSION TX78572

METRO Magnolia Transit Center - Bid Tab

M-1.0 FILE NAME: CAFE BIZOU CLIENT: CATHERINE MCKENNA PROJECT: PROJECT NO. REV DESCRIPTION DATE PLAN CHECK

SECTION DUCTWORK ACCESSORIES

REPLACEMENT PARTS MANUAL

Models: W30A2, W36A2. Contents. Control Panel. Blower Assembly. Bard Manufacturing Company, Inc. Bryan, Ohio 43506

VERTIV XTE 401 SERIES. Ordering Guide

Boulder Valley SD Fiber Optic Network Estimates

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

Models: WL302, WL372. Contents. Control Panel. Blower Assembly. Bard Manufacturing Company, Inc. Bryan, Ohio 43506

ELECTRICAL REPAIR GUIDE

SECTION HVAC POWER VENTILATORS

P2000 RAIL CAR AUXILIARY INVERTERS

ELVORON HOME ELEVATOR

Ohio Department of Transportation Official Bid Tabulation Jerry Wray, Director

WALL MOUNTED PACKAGE HEAT PUMPS REPLACEMENT PARTS MANUAL. Models: S38H1 W38H1 S43H1 W43H1 S49H1 W49H1 S61H1 W61H1. General Notes. Contents.

QUOTE For a 2017 Fire Department Conventional Truck Chassis-Water Tender With PTO Pump

TRANSPORTATION ENGINEERING SERVICES: Street Project Management

B E C K E R & F R O N D O R F Construction Cost Consulting Project Management

MSD OF WAYNE TOWNSHIP SUSTAINABILITY PROJECTS

Request for Bids Medium Duty Truck Cab & Chassis, and Equipment

RIVERSIDE 300 RIVERSIDE DR. AUSTIN, TEXAS REVISION TABLE OF CONTENTS WIFI/ FITNESS DECORATIVE LIGHTING PLAN

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

CITY OF TACOMA ENVIRONMENTAL SERVICES DEPARTMENT

Fee Schedule for Whitehall Township

Sound Application Guide: Description and Ratings

CHAPTER V RESIDENTIAL WIRING

MAINTENANCE EVALUATION CHECKLIST ELECTRIC ELEVATORS

Creating An Accessible World ELVORON CPL.

REPLACEMENT PARTS MANUAL


APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

50 Hanover Road, Florham Park, New Jersey USA For sales or service call (ASCO)

RAMP DOORS ACCESS DOORS

SARTELL PUBLIC SAFETY CAMPUS November 20 21, 2018

Town of Marystown. Tender For. One New 4x4 Two (2) Door Cab Chassis (19,500 KG GVWR) With 12Ft Flat Deck

BID SPECIFICATIONS 2018 TERMINAL BUILDING STANDBY GENERATOR PROJECT

WALL MOUNTED PACKAGE HEAT PUMPS REPLACEMENT PARTS MANUAL. Models: SH381 SH431 SH491. Contents. General Notes. Important

Technical Information

Transcription:

NEIGHBORHOOD & PROJECT NAME FUNDING SOURCE NO. 1 BISCAYNE POINT NEIGHBORHOOD BISCAYNE POINT ROW IMPROVEMENTS BISCAYNE POINT AREA STREETSCAPE G.O. BONDS IMPROVEMENTS WATER & SEWER BISCAYNE POINT WATER LINE REPLACEMENTS 2000 BONDS STORMWATER BISCAYNE BEACH DRAINAGE IMPROVEMENTS 2000 BONDS S FOR NEIGHBORHOOD NO. 1 BISCAYNE POINT ROW IMPROVEMENTS

CONSTRUCTION BUDGET CONTINGENCY BUDGET BUDGET LEVEL A/E CONSTRUCT @ 60% DESIGN COMPLETION $3,155,856 $350,651 $152,108 $16,901 $0 $0 $3,307,964 $367,552 $0 G.O. BONDS WATER & SEWER 2000 BONDS STORMWATER 2000 BONDS S BID CONSTRUCTION CO CHANGE ORDERS TO DATE

TION COST ESTIMATES @ 90% DESIGN @ 100% DESIGN COMPLETION COMPLETION OST SUMMARY (TO DATE) COST STATUS

BID BREAKDOWN The following unit quantity breakdown is provided FOR INFORMATIONAL PURPOSES ONLY. Bidders shall rely on their own quantity take-offs in the development of their lump sum prices. Cost component of award will be based on the LUMP SUM BASE BID AMOUNT plus Allowances, plus none, any or all Alternates which may be selected at the City's sole discretion and based on funding availability. Bidders must fully complete the Unit Price Bid Breakdown Form to include quantities, units of measure, unit pricing, and totals. Should any bidder fail to fully complete this form, the City will request that the omitted information be provided within five (5) calendar days upon request from the City. Failure to provide the City with the omitted information within five (5) calendar days after the bidder has received the request from the City may result in your bid being deemed non-responsive and disqualified from further consideration. THE CITY WILL NOT ACCEPT ANY REVISION TO THE BASE LUMP SUM, DIVISIONS, LINE ITEM S, ADD ALTERNATES, OR GRAND BID, AFTER THE DEADLINE FOR RECEIPT OF BIDS. PROJECT: Multipurpose Municipal Parking Facility Tenant Build-Out: ITB 40-08/09 SUMMARY Price DIVISION 1 - GENERAL CONDITIONS DIVISION 2 - SITEWORK Not Applicable N/A DIVISION 3 - CONCRETE DIVISION 4 - MASONRY DIVISION 5 - METALS DIVISION 6 - WOOD & PLASTICS DIVISION 7 - THERMAL AND MOISTURE PROTECTION DIVISION 8 - DOORS AND WINDOWS DIVISION 9 - FINISHES DIVISION 10 - SPECIALTIES DIVISION 11 - EQUIPMENT Not Applicable N/A DIVISION 12 - FURNISHINGS Not Applicable N/A DIVISION 13 - SPECIAL CONSTRUCTION DIVISION 14 - CONVEYING Not Applicable N/A DIVISION 15 - MECHANICAL DIVISION 16 - ELECTRICAL LUMP SUM BASE BID AMOUNT: $0.00 ALLOWANCES: Consideration of Indemnification (Base Bid) $25.00 ALLOWANCES $25.00 GRAND BID ( LUMP SUM BASE BID + ALLOWANCES $25.00 X:\28\73\doc_1134681.xls PAGE 1 of 6

DIVISION 1- GENERAL CONDITIONS G.C. OVERHEAD 1 EA $0.00 G.C. PROFIT 1 EA $0.00 BOND 1 EA $0.00 GENERAL LIABILITY 1 EA $0.00 BUILDERS RISK INSURANCE 1 EA $0.00 DIVISION 1 - GENERAL CONDITIONS : $0.00 DIVISION 2 - SITE WORK NA DIVISION 2 - SITE WORK : $0.00 DIVISION 3 - CONCRETE 3.1 Cored Holes 4" < EA DIVISION 3 - CONCRETE : $0.00 DIVISION 4 - MASONRY 4.1 8" CMU SF 4.2 4" CMU SF 4.3 8" Deep Bond Beam LF 4.4 8" Deep Precast Lintel LF 4.5 8" x 8" Tie Columns LF 4.6 Remainder EA DIVISION 4 - MASONRY : $0.00 DIVISION 5 - METALS 5.1 5.2 5.3 Type "A" Wall Type "M" Wall Miscellaneous Metals SF SF EA 5.4 Remainder EA DIVISION 5 - METALS : $0.00 X:\28\73\doc_1134681.xls PAGE 2 of 6

DIVISION 6 - WOOD AND PLASTICS 6.01 Cabinetry room 107 LF 6.02 Cabinetry room 108 LF 6.03 Cabinetry room 111 LF 6.04 Cabinetry room 124 LF 6.05 Cabinetry room 201 LF 6.06 Cabinetry room 202 LF 6.07 Cabinetry room 216 LF 6.08 Cabinetry room 222 LF 6.09 Cabinetry room 301 LF 6.10 Cabinetry room 302 LF 6.11 Cabinetry room 303 LF 6.12 Cabinetry room 313 LF 6.13 Cabinetry room 314 LF 6.14 Cabinetry room 402 LF 6.15 Cabinetry room 405 LF 6.16 Cabinetry room 407 LF 6.17 Cabinetry room 501 LF 6.18 Cabinetry room 504 LF 6.19 Cabinetry room 509 LF 6.20 Cabinetry room 518 LF 6.21 Cabinetry room 522A LF 6.22 Cabinetry miscellaneous EA 6.23 Wood Base LF 6.24 Finish Millwork EA 6.25 Remainder EA DIVISION 6 - WOOD AND PLASTICS : $0.00 DIVISION 7 - THERMAL AND MOISTURE PROTECTION 7.1 Caulking LF 7.2 Remainder EA DIVISION 7 - THERMAL AND MOISTURE PROTECTION : $0.00 X:\28\73\doc_1134681.xls PAGE 3 of 6

8.2 3'-0" Wood Door & HM Frame UL rated EA 8.3 6'-0" HM Door (2-leaf) & HM Frame UL rated EA 8.4 Door Harware SET 8.5 Glazed Panels SF 8.6 Remainder EA DIVISION 8 - DOORS AND WINDOWS : $0.00 DIVISION 9 - FINISHES 9.01 Sealed Concrete SF 9.02 Gypsum Wallboard Ceiling SF 9.03 Suspended Acoustical Ceiling SF 9.04 Painting SF 9.05 Vinyl Floor Tile SF 9.06 Vinyl base LF 9.07 Porcelin Floor Tile SF 9.08 Porcelin Base LF 9.09 Porcelin Wall Tile SF 9.10 Glass Wall Tile SF 9.11 Wall Covering SY 9.12 Carpet SY 9.13 Cementatious Board SF 9.14 Gypsum Wallboard SF 9.15 Remainder EA DIVISION 9 - FINISHES : $0.00 DIVISION 10 - SPECIALTIES 10.1 10.2 10.3 Toilet accessories Pull Down Projection Screens\ Folding Accoustic Door EA EA EA 10.4 Remainder EA DIVISION 10 - SPECIALTIES : $0.00 DIVISION 11 - EQUIPMENT NA DIVISION 11 - EQUIPMENT : $0.00 X:\28\73\doc_1134681.xls PAGE 4 of 6

DIVISION 12 - FURNISHINGS NA DIVISION 12 - FURNISHINGS : $0.00 DIVISION 13 - SPECIAL CONSTRUCTION 13.1 Horn Strobe EA 13.2 Addressable Horn Strobe EA 13.3 Addressable Strobe EA 13.4 Pull Station EA 13.5 Addressable Smoke Detector EA 13.5 Sprinkler Heads EA 13.6 Fire Supression Piping LF 13.7 Emergency Exit Sign EA 13.8 ABC Fire Extinguisher C/W Cabinet EA 13.9 Cable/Wire LF 13.1 Remainder EA DIVISION 13 - SPECIAL CONSTRUCTION : $0.00 DIVISION 14 - CONVEYING NA DIVISION 14 - CONVEYING : $0.00 DIVISION 15 - MECHANICAL 15.01 Ceiling Diffuser EA 15.02 Flexible Boot EA 15.03 Fixed Blade Grill EA 15.04 VAV EA 15.05 Ductwork 8" < LF 15.06 Ductwork 10" > LF 15.07 Manual Damper EA 15.08 Thermostat EA 15.09 Exhaust Fan EA 15.10 Water Heater EA 15.11 Hi- Low Water fountains EA 15.12 HVAC Testing & Balancing EA 15.13 Remainder EA DIVISION 15 - MECHANICAL : $0.00 X:\28\73\doc_1134681.xls PAGE 5 of 6

DIVISION 16 - ELECTRICAL 16.01 Duplex Receptacle EA 16.02 Duplex Receptacle Floor Mounted EA 16.03 Single Pole Switch EA 16.04 Three Wqy Switch EA 16.05 Single Pole Swith On Dimmer EA 16.06 Daylight Sensor Switch EA 16.07 Occupancy Sensor Switch EA 16.08 Dedicated Duplex Receptacle EA 16.09 Dedicated Duplex Receptacle Floor Mounted EA 16.10 GFCI Recetacles EA 16.11 Telephone Jack EA 16.12 Data Outlet (By City IT Dept.) EA 16.13 Data Outlet Floor Mounted (By City IT Dept.) EA 16.14 5" down Light EA 16.15 Sconce EA 16.16 Flourescent 2 x 4 EA 16.17 Surface Mounted Fluescent EA 16.18 Flouescent Strip EA 16.19 Trough Light Fixture EA 16.20 Square Down Light EA 16.21 Data Cable (By City IT Dept.) LF 16.22 Power Cable LF 16.23 Card Reader EA 16.24 Breaker 20A < EA 16.25 Panel EA 16.26 EMT Conduit LF 16.27 Bell South Outlet (By City IT Dept.) EA 16.28 Remainder EA DIVISION 16 - ELECTRICAL : $0.00 LUMP SUM BASE BID: $0.00 X:\28\73\doc_1134681.xls PAGE 6 of 6