URD Mini Pillar Installation Guide. UDS Universal Pillar Installation Guide. Cable to LV Isolators, Crossarm and Cable Detail

Similar documents
Flowline Fuse Mounting and Service Termination

LIST OF EDD DESCRIPTION/ SPECIFICATION AS 19 TH OCTOBER 2016

DISTRIBUTION DESIGN CATALOGUE

D9-3. No. WIRING DIAGRAM CONNECTIONS FOR UNDERGROUND SELF CONTAINED METERS JRH JED krich95 LINE LINE ABCN SOURCE SOURCE GROUND GROUND STUD STUD SOURCE

Item Code Description Unit Qty Total

Pentahead bolts See note 2. Conduit run as specified. Company facility. Refer to drawing SS8.6-2 or SS8.6-3 STANDARD SERVICE INSTALLATION

TEMPORARY ELECTRIC WIRING FOR CARNIVALS, CONVENTIONS, EXHIBITIONS, FAIRS AND SIMILAR USES

AFTER GAZETTING (WORKING DOCUMENT FOR A 3 YEAR PERIOD) DATE PAGE PARAGRAPH DESCRIPTION ORIGINATOR APPROVED

Generator Fire Safety: Generator assemblies should be located outside the building.

SCHEDULE OF QUANTITY

UNDERGROUND SERVICE. Items to consider. There will be charges from ComEd if you convert from overhead to underground service.

ELECTRICIANS REGULATIONS EXAMINATION 23 November 2013 QUESTION AND ANSWER BOOKLET

NPS/003/010 - Technical Specification for 400V Assemblies (LVAC Boards) utilised in Major Substations

Method. Remote solenoids. QuickInstall Guide

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

(K),(M),(P)489TB/G Up to 42 kv

Tender Schedule. Sl. No. Particulars Quantity Unit Rate `

UNDERGROUND SERVICES - SECONDARY

(K),(M)430TB/G Up to 36 kv

Urgent Support to the Agriculture and Electricity Sector in the Gaza Strip

Tender Schedule for Electrical Works at Varagani Branch. Sl. No. Particulars Quantity Unit Rate Amount

RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS

Estimate For The Electrical Works At Pittakayagulla Branch Sl.N Particulars Quantity Unit Rate Amount

Pretest Module 24 Three-phase Service Entrance

IS94012-ENG - AFN February Revision 6 - Supersedes edition of 28 January and / or. 3 x Stress control mastic, type MFC (Hi-K)

9. Non-Residential Services (Commercial, Industrial, and Agricultural)

ELECTRICAL INSPECTOR EXAMINATION 14 November 2015 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours

For Conduit Inspections

Underground Distribution Construction Manual

Approved Contractor Construction e-guide Residential Commercial

STANDARD SPECIFICATION FOR. LIGHTING AND DC DISTRIBUTION PANELS WITH MCBs DOCUMENT NO: 44LK-5100/E.02/011

ype UP T Busplugs Low Voltage Switchboard Equipment

COMMERCIAL QUICK REFERENCE

INDIAN INSTITUTE OF TECHNOLOGY KANPUR

List of materials for 1Km. Of L.T line 1-Ph., 2-Wire AB cable (1 X 25+1X16) sq.mm using 8M X 200 KG. PSC Pole

SOUTHWEST LOUISIANA ELECTRIC MEMBERSHIP COORPORATION COMMERCIAL SERVICE REQUIREMENTS

Construction and Wiring Guidelines for Ergon Energy Substation Panels

Customer Requirements Downtown Secondary Network Service

ELECTRICAL INSPECTOR EXAMINATION 18 November 2017 QUESTION AND ANSWER BOOKLET Time Allowed: Three hours

D.A.T. Single-phase Voltage Regulator. --o-- Complying with EDF specifications HM-76/99/047/B, of 10/10/ o-- Doc. : DAT\GUI-J13-UK\S230

Max value Max life Range from. ($000) (Years) Pole Type

3.1 Overview of ATCO Electric s URD System Design

ABC Earthing Kits. ABC Earthing Kit. ABC/Bare Wire LV Earthing System H01

SECTION LOW VOLTAGE DISTRIBUTION EQUIPMENT

ELECTRICIANS REGULATIONS EXAMINATION 25 June 2011

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

BILL OF QUANTITY (BOQ) FOR ELECTRICAL WORKS BOGAPURAM BRANCH

KRONE KGH Series Fuse-Switch-Disconnectors. For Low Voltage ABC Systems or Open-wire Overhead Networks

HR25 Solo. Installation and User Instructions. Through the Wall Heat Recovery Ventilators

Name of work : Electrification of PG Block Second Floor in V.P.S.V Ayurveda college Kottakkal.

Sentinel Field Satellite Controller Metal Pedestal, Plastic Pedestal and Wall Mount Models Installation Instructions

Energy Australia Chamber Substation indoor switchgear. installation,operation and maintenance instructions version 1.

PERMANENT RESIDENTIAL UNDERGROUND SERVICE

Loadbreak Elbows. 3 Loadbreak Elbows. 200 Amp 5-15 kv Industrial pg Loadbreak Elbows. 200 Amp 25 kv Industrial pg. 254.

9/16/2010. Chapter , The McGraw-Hill Companies, Inc. TRANSMISSION SYSTEMS. 2010, The McGraw-Hill Companies, Inc.

NEC 2011 Code Changes

3 o/c 2 An area or temporary structure used for display, marketing or sales is defined as a a booth b a stand c an exhibition d a show.

LCD Annunciator Installation Instructions

Transmission & Distribution Glossary of Electrical Terms

ELECTRICIANS REGULATIONS EXAMINATION 30 June 2012 QUESTION AND ANSWER BOOKLET

Lucent Technologies Whippany Physical Design

OPTICAL FIBER CLOSURE

Earthing UNIT. Learning Objectives. Introduction. To understand purpose of Earthing. To learn system of earthing.

SENTRON Switching and Protection Devices Switch Disconnectors

cmi XLPE Cables PRODUCT CATALOGUE Electric Wire & Cables Complies to AS/NZ Standard cmi XLPE Cables

Cable arrangement 15 Preparation for cable installation. 15 Installation of the cables 16 Finishing of the cable installation. 17 Examples.

2013 JEAN MÜLLER Products

GUIDELINES ON ELECTRICAL SAFETY AT WORKPLACES

INSTALLATION INSTRUCTION

AMENDMENT ELECTRIC SERVICE MANUAL 2014

ELECTRICIAN S THEORY EXAMINATION 20 June 2015 QUESTION AND ANSWER BOOKLET

2018 Consultant s Handbook Division 26 Electrical 2413 Switchboards

CABLE TERMINALS

Underground Distribution Construction Manual

FOSC-400A4 INSTALLATION INSTRUCTION

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/8/12 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

ECS CONNECTION OF LARGE LV SERVICES TO SECONDARY DISTRIBUTION SUBSTATIONS

A. Submit manufacturer's literature and technical data before starting work.

SECTION VIII. (Sub-section 430) Wastewater Valves and Appurtenances. 1. General thru Gate Valves thru 430-3

Managing the renewables challenge in secondary distribution networks. Tim Spearing, Product Marketing Manager Lucy Electric, United Kingdom

Key features. DESIGNS: - Conservator type - Hermetically sealed

6-0. Product family. LV HRC strip-fuseways

320A Single Phase URD Meter Loop Installations

Set /

COOPER POWER SERIES. Screened Separable Connectors MN650023EN. Effective October 2016 Supersedes March 2012 (IS )

VITALink Taped Splice Pigtail Crimp

ADDENDUM No. 1 Prospective Bidders

P80074 (150 amp connectors) P80071 (300 amp connectors)

THREE PHASE WIRING SPECIFICATIONS

33kV Connection up to 90MVA

Fitting Instructions

Cold Shrink - Silicone Rubber QTII(X)4S-32H Series Cable Termination Instructions

XL Distribution enclosures WORKSHOP SPECIFICATIONS

Engineering Service Specifications. Commercial Single-Phase Current Transformer Metering Schemes

Cam-Lok. Single pole connectivity. The industry standard for reliable service under the most severe operating conditions.

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Cable-Tight Wire Management System

3M Cold Shrink Silicone Rubber Skirted Termination Kit QT-III 7672-S-8-TOW/WOT (RW)

Installing Ignition Coil relay

A. This Section includes Low Voltage Switchgear Work, as indicated on the drawings, and as specified herein.

Transcription:

Part 5 LV Underground Drawing Register Number U8 U9 Description URD Mini Pillar Installation Guide UDS Universal Pillar Installation Guide U10-1 UDS Universal Pillar Double Link Unit Drilling Detail U10-2 UDS Universal Pillar Double Link Unit Arrangement U15 Cable to LV Isolators, Crossarm and Cable Detail U16-1 Cable to LV Bare, Intermediate Direct Connection U16-2 Cable to LV Bare, Termination Direct Connection U17 U18 ABC Fused Connection to Cable 25 SQ. mm Cable to ABC Direct Connection U19-1 25 SQ. mm Cable to LV Bare Intermediate Direct Connection U19-2 25 SQ. mm 4 Core Cable to 1 Phase Open Aerial U19-3 Transformer Pole to Pillar on Customer s Property U19-4 25 SQ. mm Cable to LV Bare Termination Direct Connection U20 U21 Wall Mounted Box, 100 Amp Wall Mounted Box, 200 Amp U23-1 Unmetered Supply Cable Pit, Components Assembly U23-2 Unmetered Supply Mini Pillar Termination Details U24 LV Kiosk Type 1 U25 LV Kiosk Type 2 U26 LV Kiosk Type 3 U27 LV Cable to Fuse Switch U30-1 Below Ground Service Pit Installation Detail U30-2 Below Ground Service Pit Installation Detail Application Guideline Horizon Power Corporation

Number U35 Description Pillar Exclusion Zones Horizon Power Corporation

TERMINATIONS REAR VIEW TERMINATIONS FRONT VIEW RED SPOT FUSE STREET LIGHTING R W B N ROAD 2 25mm SERVICE CABLE 100 440 CABLE TO STREET LIGHT FUSEWAY ENCLOSED WITH 20-25mm DIAMETER ORANGE PVC CONDUIT WHEN OFF ALIGNMENT GL 300 BOLTED TO EARTH ROD SHEATH CUT TOP OF EARTH ROD FIT MASTIC LINED GLOVE TO ALL CABLES & HEATSHRINK ON NEUTRAL (STOCK FE0109 (1 KIT)) 2 25mm SERVICE CABLE EARTH CLAMP ABOVE SOIL LEVEL NOTES: 1. PILLAR TO BE CENTRED 500mm INSIDE BOUNDARY AND 500mm FROM EDGE. 2. FOR TERMINAL BLOCKS EXTRA NEUTRAL SEE R31 3. FOR WAVECON TERMINAL BLOCK AND STREET LIGHT FUSE SEE R32 4. FOR WORKING END SEE R33 5. FOR SPUDS SEE R35 URD MINI PILLAR INSTALLATION GUIDE U8

CONNECT TO NEUTRAL TERMINAL BLOCK 110 TOP BAR B W R 100 700 BEFORE CUTTING 400 P.V.C. TOP OF EARTH ROD LOWER BAR NEUTRAL SCREEN LUGS (ONE PER CABLE) BOLTED TO NEUTRAL BAR AND ATTACHED TO NEUTRAL LEAD FROM TERMINAL BLOCK SEE NOTE 3 TERMINAL BLOCK PVC POULTICE STREET MAINS TERMINAL LUGS VIEWED FROM PROPERTY TAIL LENGTHS 700 FROM SHEATH CUT SUPPLY TO CUSTOMER G.L. 300 200 SHEATH CUT TOP OF EARTH ROD 200 EARTH SPEAR LOCATED WITHIN PILLAR TO PROPERTY TO ROAD PILLAR STREET MAINS STREET MAINS THIRD CABLE IF REQUIRED (INTERCONNECTOR OR SERVICE CABLE TO LARGE LOAD) TO PROPERTY TO ROAD NOTES: 1. REFER TO DRAWING U8 FOR STREET LIGHT IN-LINE FUSE CARRIER INSTALLATION 2. PILLAR TO BE CENTRED 500mm INSIDE BOUNDARY AND 500mm FROM EDGE. 3. FIT MASTIC LINED GLOVE TO ALL CABLES & SHRINK ON NEUTRAL SCREENS & OVER PHASE LUGS UDS UNIVERSAL PILLAR INSTALLATION GUIDE U9

TERMINAL BLOCKS (REAR VIEW) B W R LINK 1 PHASE ONLY CONNECTION DIAGRAM LINKS (FRONT VIEW) 850 BEFORE CUTTING LINK 700 BEFORE CUTTING 400 CONNECT TO EARTH BAR SEE NOTE 2 DOUBLE LINK PILLAR KIT P.V.C. 100 TOP OF EARTH ROD PVC POULTICE REMOVABLE KEYED LINKS EARTH BAR STREET MAINS TERMINAL LUGS VIEWED FROM PROPERTY TAIL LENGTHS 850 FROM SHEATH CUT TAIL LENGTHS 700 FROM SHEATH CUT G.L. 300 200 SHEATH CUT EARTH SPEAR LOCATED WITHIN PILLAR TOP OF EARTH ROD 200 PILLAR TO PROPERTY TO ROAD SUPPLY TO STREET MAINS STREET LIGHTS TO PROPERTY THIRD CABLE IF REQUIRED (INTERCONNECTOR OR SERVICE CABLE TO LARGE LOAD) STREET MAINS TO RMU, TRANSFORMER OR CUSTOMER TO ROAD NOTES: 1. PILLAR TO BE CENTRED 500mm INSIDE BOUNDARY AND 500mm FROM EDGE. 2. FIT MASTIC LINED GLOVE TO ALL CABLES & SHRINK ON NEUTRAL SCREENS & OVER PHASE LUGS UDS UNIVERSAL PILLAR DOUBLE LINK UNIT DRILLING DETAIL U10-1

TOP OF SECURITY BOLT TO BE FLUSH WITH PILLAR SURFACE C L SECURITY BOLT 255 500 APPROX G.L. 25mm2 Gn/y FRONT ELEVATION PVC Cu A 345 SECTION A-A SIDE ELEVATION A TOP VIEW (WITH COVER REMOVED) 20 INDICATING ARROW TO BE 20 WIDE RAISED 1.5mm. (IN 1 POSITION ONLY ON LID) LOGO : 40 x 25 25 GROUND LEVEL INDICATOR LINE SECURITY BOLTC L DANGER ELECTRIC CABLES WARNING : DO NOT BURY ABOVE THIS LINE 10 VIEW SHOWING COVER INDICATION ARROW LOGO & 25mm LETTERING TO BE RAISED OR INDENTED 2mm. 10 HIGH LETTERING TO BE RAISED OR INDENTED 1.5mm INDICATING ARROW TO BE LOCATED IN 2 POSITIONS 180 DEG APART ON BASE SECTION ONLY & AT 90 DEG TO SECURITY BOLTS CL UDS UNIVERSAL PILLAR DOUBLE LINK UNIT ARRANGEMENT U10-2

PG CLAMP AND SPLICE R3 N B W R R1 700 ROADSIDE ABC TAPS 150 ABC TO CABLE TERMINATION (R7) CABLE CLEAT AND FITTINGS (R7) CABLE GUARD NOTE: 1. ALL HOLES 18 DIAMETER U.O.N. CABLE TO LV ISOLATORS CROSSARM AND CABLE DETAIL U15

PG CLAMP AND SPLICE R3 N B W R 500 ROADSIDE R1 ABC TAPS 150 ABC TO CABLE TERMINATION (R7) CABLE CLEAT AND FITTINGS (R7) CABLE GUARD NOTE: 1. ALL HOLES 18 DIAMETER U.O.N. REVISION DATE CABLE TO LV BARE INTERMEDIATE DIRECT CONNECTION U16-1

PG CLAMP AND SPLICE N R3 B W R 500 ROADSIDE R1 ABC TAPS 150 ABC TO CABLE TERMINATION CABLE CLEAT AND FITTINGS (R7) CABLE GUARD (R7) NOTE: 1. ALL HOLES 18 DIAMETER U.O.N. REVISION DATE CABLE TO LV BARE TERMINATION DIRECT CONNECTION U16-2

TOP OF POLE (LV ONLY POLE) 230 R8-3 R1 4 CORE BUNDLED ABC NEUTRAL CONNECTION (R1) 14 DIAMETER HOLE R8 (R1) 14 DIAMETER HOLES 150 ABC TO CABLE TERMINATION (R7) CABLE CLEAT AND FITTINGS R7 5000 500 (R7) CABLE GUARD AND FITTINGS NOTE: 1. ALL HOLES 18 DIAMETER U.O.N. REVISION DATE ABC FUSED CONNECTION TO CABLE U17

ABC IPC 500 HEAT SHRINK OVER CORES HEAT SHRINK GLOVE 150 (R7) CONDUIT SADDLE (R7) CONDUIT UNDER CABLE GUARD FIXING DETAILS (R7) CABLE GUARD NOTE: 1. ALL HOLES 18 DIAMETER U.O.N. 25 SQ. mm CABLE TO ABC DIRECT CONNECTION U18

COPPER OR BI-METAL PG CLAMP R3 N B W R ROADSIDE R1 500 HEAT SHRINK OVER CORES HEAT SHRINK GLOVE (R7) CONDUIT SADDLE 150 (R7) CONDUIT UNDER CABLE GUARD FIXING DETAILS (R7) CABLE GUARD REVISION DATE 25sqmm CABLE TO LV BARE INTERMEDIATE DIRECT CONNECTION U19-1

COPPER OR BI-METAL PG CLAMP ROADSIDE N R HEAT SHRINK OVER CORES HELD TOGETHER WITH CABLE TIES BLACK AND BLUE CORES R1 RED AND WHITE CORES 500 HEAT SHRINK GLOVE 150 (R7) CONDUIT SADDLE (R7) CONDUIT UNDER CABLE GUARD FIXING DETAILS (R7) CABLE GUARD 25sqmm 4 CORE CABLE TO 1 PHASE OPEN AERIAL U19-2

2 2 LV CABLE ( 25mm - 185mm ) R7 1000 G.L. 150 MINI/UNI PILLAR 750 500 SEE NOTES 1 & 2 (R7) CABLE SADDLE/CLAMP FITTING DETAILS (R7) CONDUIT UNDER CABLE GUARD FIXING DETAILS (R7) CABLE GUARD NOTES: 1. TRANSFORMERS 63kVA & SMALLER, FLOW LINE FUSE'S TO BE INSTALLED. 2. TRANSFORMERS ABOVE 63kVA, FUSING TO BE INSTALLED IN THE PILLAR. 3. CUSTOMER'S SPD TO GRADE WITH UPSTREAM PROTECTION (FUSE CURVE FOR UPSTREAM PROTECTION AVAILABLE ON REQUEST). REVISION DATE TRANSFORMER POLE TO PILLAR ON CUSTOMER PROPERTY U19-3

COPPER OR BI-METAL PG CLAMP N R3 B W R ROADSIDE 500 HEAT SHRINK OVER CORES HEAT SHRINK GLOVE 150 (R7) CONDUIT SADDLE (R7) CONDUIT UNDER CABLE GUARD FIXING DETAILS (R7) CABLE GUARD REVISION DATE 25sqmm CABLE TO LV BARE TERMINATION DIRECT CONNECTION U19-4

300 175 N 370 NOTES: 1. CUTOUT BOX ENCLOSURE MUST HAVE AN APPROVED HORIZON POWER LABEL. 2. MOUNTING HEIGHT MUST COMPLY WITH HORIZON POWER DESIGN REQUIREMENTS. WALL MOUNTED BOX 100 AMP U20

300 175 N 600 NOTES: 1. CUTOUT BOX ENCLOSURE MUST HAVE AN APPROVED HORIZON POWER LABEL. 2. MOUNTING HEIGHT MUST COMPLY WITH HORIZON POWER DESIGN REQUIREMENTS. WALL MOUNTED BOX 200 AMP U21

HEATSHRINK SLEEVE MASTIC FILLED GLOVE DANGER ELECTRICITY POWER CUSTOMER SUPPLY SEE NOTE 1 ABRADE SHEATH END 1.6M CABLE LAID INTO PIT WITH 1M OF SHEATHING FROM CABLE END ADAPTOR (PLAIN TO SCREWED) 25 DIA. CLIPSAL CAT NO 263/25 OR SIMILAR. RIGID/CORRUGATED PVC CONDUIT ORANGE 25O/DIA. WHEN NOT IN ALLOTED ALIGNMENT GLAND, CLIPSAL, 25 DIA. CAT No 279C25 OR SIMILAR 1 HOLE 27 DIA. ON CENTRE LINE 155 130 CUSTOMER SIDE 60 30 PVC CORRUGATED CONDUIT 25 DIAMETER MAIN POWER FUSE LABEL 1 HEATSHRINK OVER CONDUCTOR HEATSHRINK OVER CONDUCTORS POWER SUPPLY ISOLATING POINT 30A FUSE LABEL 1 RED BLACK DOUBLE INSULATED CUSTOMER CABLE FIT NEUTRAL CONNECTOR IN CENTRE OF GEL WRAP SEAL AND SNAP SHUT CONNECTOR (2 SCREW) CLIPSAL CAT. No 563L2 OR SIMILAR. WIRING ARRANGEMENT NOTES: 1. LID LIFTER AVAILABLE, RAMSET PART No. RCU013 2. HEATSHRINK NOT REQUIRED FOR CABLE MEETING REQUIREMENTS FOR DOUBLE INSULATION (REINFORCED INSULATION) REVISION DATE UNMETERED SUPPLY CABLE PIT COMPONENTS ASSEMBLY U23-1

UMS/STREET LIGHT SUPPLY UMS/STREET LIGHT NEUTRAL TERMINAL BLOCKS R W B N COVER MOUNTING BOARD TO ROAD CROSSING 25mm 2 SERVICE FROM TEE JOINT FROM TEE JOINT VIEW FROM STREET TO ROAD EARTH CROSSING (TO EARTH ROD) SUPPLY FOR UMS/STREET LIGHT FUSE UMS/STREET LIGHT FUSE WHERE REQUIRED 87 RED SPOT FUSE CONNECTION LINK 37 WARNING UNMETERED SUPPLY ATTACH LABEL RED LABEL DETAIL STOCK No. C20307 RED LETTERING ON WHITE BACKGROUND TO UMS/STREET LIGHT SUPPLY VIEW FROM SIDE UNMETERED SUPPLY MINI PILLAR TERMINATION DETAILS U23-2

BARE 70MM EARTH GRID SEE NOTE 3 EARTH SPEAR (2 OFF) IN EACH DIAGRAM 750 EARTH BAR RECESS FOR PILLAR SEE NOTE 4 750 750 FRONT 750 750 FRONT 600 EARTH STAKE @ LESS THAN 10 OHM. CABLE EASEMENT BARE 70MM Cu EARTH GRID - 1 OHM MAX. PLAN VIEW OF KIOSK FREESTANDING PLAN VIEW OF KIOSK IN RECESS 810 TO EARTH GRID 1400 R W GROUND LINE GROUND LINE B U BOLT CABLE CLAMPS CONCRETE SLABS (500 x 200 x 25) FRONT VIEW OF KIOSK BUSBAR DETAILS NOTES: 1. KIOSK NOT SUPPLIED WITH BUSBARS 2. REFER TO DCS REFERENCE R24 FOR KIOSK GENERAL ARRANGEMENT. 3. INSTALL EARTH GRID AROUND / IN FRONT OF KIOSK AT 750mm AND A DEPTH OF 150mm, EARTH GRID TO BE CONNECTED AT EARTH BAR. 4. THE CUSTOMER IS RESPONSIBLE FOR THE FEEDER PILLAR RECESS IN THE WALL AND WHEN REQUIRED THE INSTALLATION OF THE FEEDER PILLAR LV KIOSK TYPE 1 U24

LV KIOSK TYPE 2 - DISTRICT SUBSTATION SEE NOTE 2 400 DEEP 1300 1m DEEP TRENCH FLOOR OF SUBSTATION FGL 1025 1600 CONCRETE SLABS (500 x 200 x 25 THICK) IN 2HR FIRE RATED SUBSTATION FREESTANDING MD METER CABLE TERMINATION COVER 315/500/630/1000kVA TRANSFORMERS 1600A TRANSFORMER DISCONNECT 1600A 400/630A FUSEWAYS 1600A CUSTOMER DISCONNECT 1600A CUSTOMER DISCONNECT CABLE TERMINATION COVER NOTES: 1. REFER TO DCS REFERENCE R24 FOR KIOSK GENERAL ARRANGEMENT. 2. DRILL 4-HOLES 12 DIAMETER THRU REINFORCED SECTIONS. KIOSK BOLTED TO SUBSTATION WALL ABOVE THE TRENCH WITH 4 x 10mm RAWLNUTS AND 4 x 10mm BOLTS x 75 LONG. 3. APPROX MAXIMUM WEIGHT WITH 5 FUSEWAYS AND 2 DISCONNECTORS IS 240kg LV KIOSK TYPE 2 U25

LV KIOSK TYPE 3 - DISTRICT SUBSTATION SEE NOTE 2 400 DEEP 2200 1m DEEP TRENCH FLOOR OF SUBSTATION FGL 1025 1600 IN 2HR FIRE RATED SUBSTATION CONCRETE SLABS (500 x 200 x 25 THICK) FREESTANDING MD METER CABLE TERMINATION COVER 2000A CUSTOMER DISCONNECT 2 x 1000kVA TRANSFORMERS 1600A TRANSFORMER DISCONNECT 1600A TRANSFORMER DISCONNECT 1600A TRANSFORMER DISCONNECT UP TO 4-400/630A FUSE - UNITS 2000A CUSTOMER DISCONNECT UP TO 4-400/630A FUSE - UNITS CABLE TERMINATION COVER NOTES: 1. REFER TO DCS REFERENCE R24 FOR KIOSK GENERAL ARRANGEMENT. 2. DRILL 6-HOLES 12 DIAMETER THRU REINFORCED POINTS AS SHOWN. KIOSK BOLTED TO SUBSTATION WALL ABOVE THE TRENCH WITH 6 x 10mm RAWLNUTS AND 6 x 10mm BOLTS x 75 LONG. 3. APPROX MAXIMUM WEIGHT WITH 5 FUSEWAYS AND 2 DISCONNECTORS IS 350kg LV KIOSK TYPE 3 U26

TERMINATION PROCEDURE 1. POSITION THE CABLE TO SUIT THE CORRECT CIRCUIT ON THE LV DISTRIBUTION BOARD. 2. MARK SHEATH, CUT 600mm BELOW BOTTOM OF FUSE UNIT. 3. REMOVE SHEATH ABOVE THIS MARK. 4. BRING OUT NEUTRAL WIRES AND FORM INTO ONE CORE AT THE BACK OF THE CABLE. 5. ABRADE CABLE SHEATH FOR APPROXIMATELY 100mm. 6. FIT HEATSHRINK GLOVE, PULL WELL DOWN INTO CRUTCH AREA AND HEATSHRINK STARTING FROM CENTRE. 7. FIT BLACK HEATSHRINK OVER NEUTRAL FOR REQUIRED LENGTH AND HEATSHRINK. N HEAT SHRINK W R B 400 B W R REAR OF CUBICLE 8. SHAPE NEUTRAL CORE TO SUIT CONNECTION TO NEUTRAL BAR, CUT AND CRIMP APPROPRIATE SIZE LUG. COVER EXPOSED LUG WITH HEATSHRINK. 9. BOLT NEUTRAL TO NEUTRAL BAR. 10. SET PHASE CORES TO FINAL TERMINATING POSITIONS, STARTING WITH RED PHASE AT THE BACK OF THE UNIT TO BLUE AT THE FRONT. 11. FIT AND CRIMP SECTOR LUGS TO PHASE CORES. STRIP 4 WAY GLOVE 12. FIT 100mm LENGTH OF HEATSHRINK OVER EACH LUG TO SEAL LUG AND CORE. 13. APPLY JOINTING COMPOUND TO PALMS OF LUGS AND CONNECTIONS. 14. ENSURE PHASING IS CORRECT, THEN BOLT LUGS TO CONNECTORS USING BOLTS PROVIDED. 15. LABEL CIRCUIT. SAFETY INSTRUCTION THE CABLE TO BE WORKED ON MUST BE DEAD AND THE REMOTE END MUST BE TERMINATED OR MADE OFF BEFORE WORK COMMENCES AT THE FUSE SWITCH. SUBSTATION REFERENCE LV CABLE TO FUSE SWITCH U27

RECESSED LIFTING BOLT WITH FLUSH MOUNTED CAP IN CONRETE LID CENTRE FINISHED G.L. INSULATED DISC UNDER LID CONCRETE COLLAR MAYBE EXTENDED TO FINISHED G.L. PRE STRIPPED HEATSHRINK CORES INTO CONNECTOR THRU GEL SEE NOTE 6 8mm "ALLEN KEY SCREW CAP CORE ENTRY EARTH ELECTRODE TO BE INSTALLED BELOW LOWER NECK OF PIT SHEATH MASTIC FILLED GLOVE STOCK No CC0846 13mm DIAMETER EARTH ROD STOCK No CE0300 HEATSHRINK SLEEVE NOTES: 8mm "ALLEN" KEY DRIVE TERMINAL SCREW. THE TERMINAL CAPS MUST BE LOCKED IN PLACE TO FULLY SEAL. THIS DRAWING IS VALID ONLY WHEN READ IN-CONJUNCTION WITH DRAWING U30-2 1. CORE LENGTH SHOULD BE LIMITED TO 500mm TO AVOID OVER CROWDING. 2. APPLY HEATSHRINK FULL LENGTH OVER CORES. 3. FIT GLOVE OVER CORES & CABLE THEN SHRINK TO FIT. 4. STRIP HEATSHRINK & INSULATION FROM CORES TO REQUIRED CONNECTION LENGTH (SEE CONNECTOR). 5. HEATSHRINK NOT REQUIRED FOR CABLES MEETING REQUIREMENTS FOR DOUBLE INSULATION (REINFORCED INSULATION). 6. CONCRETE COLLAR MAYBE REQUIRED FOR EXCESSIVE LOAD USAGE OR POOR SOIL/SAND COMPOSITION. DESCRIPTION COLOUR CODE RED WHITE BLUE BLACK 2 Finger glove HP stock Raychem part no. N/A N/A N/A FE0032 302K333-23/239(S20) 4 Finger glove HP stock Raychem part no. FE0031 502K033-53/239(S15) FE0106 Heatshrink tubing HP stock 6mm2 Raychem part no. RNF100 3/8'' Rd FE0107 RNF100 3/8'' Wh FE0108 RNF100 3/8'' Bl FE0105 RNF100 3/8'' Bk FE0102 Heatshrink tubing HP stock 10-25mm2 Raychem part no. RNF100 1/2'' Rd FE0103 RNF100 1/2'' Wh FE0104 RNF100 1/2'' Bl FE0071 RNF100 1/2'' Bk STOCK No HL0360 BELOW GROUND SERVICE PIT INSTALLATION DETAIL U30-1

APPLICATION GUIDELINE THE BELOW GROUND SERVICE PIT HAS BEEN DEVELOPED FOR USE IN AREAS IN WHICH A MINI-PILLAR LOCATION IS NOT DESIRABLE AND SHALL BE UNDERTAKEN WITHIN THE FOLLOWING GUIDELINE. FURTHER DETAILS ARE AVAILABLE FROM DMS# 2074582 BELOW GROUND SERVICE PITS MAY BE INSTALLED UNDER THE FOLLOWING CONDITIONS THE PIT SHALL BE LOCATED IN AN AREA SUCH THAT THE FINISHED GROUND LEVEL IS AT THE SAME HEIGHT AS THE TOP OF THE CONCRETE LID, AND FINISHED GROUND LEVEL SHALL BE OF FIXED INFRA, i.e. CONCRETE, PAVING OR OTHER WHERE THE PIT CANNOT BE BURIED, AND THIS INFRA SHALL COVER A MINIMUM OF 1m SQUARE, AND THE PIT SHALL BE ACCESSIBLE FROM THE ROADWAY BOUNDARY NOTES: 1. DUST CAPS MUST BE LEFT ON ANY UNUSED CONNECTOR CABLE ENTRY TO AVOID GEL CONTAMINATION. 2. DOUBLE INSULATION IS TO BE MAINTAINED INTO CONNECTOR GEL 3. STRIP INSULATION/HEATSHRINK FROM CORE END. SEE CONNECTOR FOR STRIP LENGTH. 4. WIPE CLEAN THE STRIPPED CORE AND ENSURE IT IS NOT CONTAMINATED WITH SAND, GREASE, etc. 5. INSERT THE STRIPPED CORE GENTLY THRU THE GEL AND HOLD IT FULLY HOME AGAINST THE TERMINAL BLOCK WHILE TIGHTENING THE CLAMPING BOLT WITH A 8mm ALLEN KEY DRIVE. THE RECOMMENDED TORQUE SETTINGS ARE LISTED BELOW IF TORQUE WRENCHES ARE USED. 4 TO 15sqmm CONDUCTOR ---- 14.1 TO 19.8Nm TORQUE 21.1 TO 53.5sqmm CONDUCTOR ---- 25.4 TO 31.1Nm TORQUE 67.4 TO 180sqmm CONDUCTOR ---- 31.1 TO 39.5Nm TORQUE 6. UPON TIGHTENING THE CLAMPING BOLT, GIVE THE CORE A SWIFT TUG TO ENSURE THAT IT DOES NOT COME LOOSE/OUT OF THE TERMINAL BLOCK 7. AFTER CLAMPING CABLE THE CLAMP CAP MUST BE LOCKED IN PLACE TO FULLY SEAL 8. WHEN DISCONNECTING CABLE FROM CONNECTOR REMOVE SLOWLY TO ALLOW GEL TO RE-SEAL ITSELF BEHIND THE CABLE AS IT IS REMOVED. 9. TEMPORARY DISCONNECTION - COVER CABLE PORT WITH BLUE CAP OR TAPE TO AVOID GEL CONTAMINATION. MARK PORT WITH ONE SCRIBE FOR EACH DISCONNECTION. REPLACE CONNECTOR AFTER 3 DISCONNECTS FOR ANY ONE PORT. 10. PERMANENT DISCONNECTION - DO NOT REMOVE CABLE FROM PORT. CUT CABLE TO LEAVE APPROX 50mm PROTRUDING OUT OF GELPORT THEN CAP WITH HEATSHRINK. CAUTION WHEN APPLYING HEATSHRINK TO AVOID DAMAGE TO GEL AREA. BELOW GROUND SERVICE PIT INSTALLATION DETAIL U30-2

STORMWATER EXCLUSION ZONE R600mm 500 EXCLUSION ZONE R500mm PROPERTY BOUNDARY PILLAR EXCLUSION ZONES 1000 500 PROPERTY BOUNDARY 1000 EXCLUSION ZONE PROPERTY BOUNDARY EXCLUSION ZONE FOR FENCES (FOR BOTH MINI-PILLARS AND UNI-PILLARS) NOTES: 1. 2. 3. RADIUS SHALL BE MEASURED FROM CENTRE POINT OF PILLAR. SAME ZONES APPLY TO BOTH UNI-PILLARS AND MINI-PILLARS. WHERE THERE IS A FRONT RETAINING WALL LESS THAN 1.1m IN HEIGHT, REFER TO ADDENDUM 1 OF THE UTILITY SERVICE PROVIDERS CODE OF PRACTICE. PILLAR EXCLUSION ZONES A 24/08/15 U35