Installation Instructions
|
|
- Wesley Cannon
- 5 years ago
- Views:
Transcription
1 Tile Integrated Mounting System Installation Instructions This document describes basic installation procedures for Zep Solar s tile-integrated mounting system for use with Zep Compatible PV modules installed on tile roofs. The ZS Tile mounting solution for tile roofs completely eliminates the need for mounting rails and modification of eisting roof tiles. ZS Tile utilizes a replacement tile system that attaches directly to the rafter or framing member. Designed for ease and speed of installation, ZS Tile works with all Zep Compatible PV modules. ZS Tile is compatible with most common roof tile types where each tile interlocks with the surrounding tile. Flashings are offered for S tile, W tile, and flat tile. Notes Suitable for Landscape and Portrait orientations. (Drop-in direction is North-South only.) Roof sheathing required, 15/32 minimum thickness. Assumes a tile reveal between 13 and 14 inches. This is not a full installation manual. The installation of the replacement tile system is covered in detail. The remainder of the system installation is similar to that for ZS Comp or ZS Span. Please refer to the installation manuals and videos for those solutions for complete instructions. 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 1 of 20 Document # Rev C Date last eported: December 4, :29 AM
2 Components and Fasteners Tile Roof Attachment Kit Part No Mounting Platform Alignment Ridge EPDM backing Anti-Rotation Plate Lag Screw Plates Mounting Base Top Arm stud, used for attaching the Leveling Foot 5/16 threaded stud Mounting Holes Shipped Separately Part No Top Arm 5/16 4 Stainless steel 5/16 he nut Stainless steel 5/16 washer Stainless steel M10 25mm M10 70mm Lag Screws (2) Attaches Mounting Base to rafter. Note: additional deck screws (not included) may be required in some conditions. See Additional Items Required on page 8. Custom Flange Bolt (1) Attaches Anti-Rotation Plate and Tile Flashing to Mounting Base Custom Flange Bolt (1) Attaches Top Arm to Anti-Rotation Plate, Tile Flashing, and Mounting Base All fasteners use a 1/2 socket. Nut (1) Washer (1) Attaches Leveling Foot to Arm 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 2 of 20 Document # Rev C Date last eported: December 4, :29 AM
3 ZS TILE: TILE INTEGRATED MOUNTING SYSTEM INSTALL ATION Components and Fasteners, Continued Tile Flashings - S-Tile Landing Pad S-Tile Flashing, Type A Part No overall X dimension Suitable as a replacement for compatible concrete S-tiles /EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. Document # Rev C PAGE: 3 of 20 Date last eported: December 4, :29 AM
4 ZS TILE: TILE INTEGRATED MOUNTING SYSTEM INSTALL ATION Components and Fasteners, Continued Tile Flashings - W-Tile eposed X dimension W-Tile Flashing, Type A Part No Suitable as a replacement for compatible concrete W-tiles /EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. Document # Rev C PAGE: 4 of 20 Date last eported: December 4, :29 AM
5 Components and Fasteners, Continued Tile Flashings - Flat Tile Flat Tile Flashing, Type A Part No eposed X dimension 12.2 Suitable as a replacement for compatible concrete flat tiles 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 5 of 20 Document # Rev C Date last eported: December 4, :29 AM
6 Eploded Installation Diagram Leveling Foot attaches to Top Arm stud Top Arm attaches to Anti-Rotation Plate, Tile Flashing, and Mounting Base Top Arm stud Anti-Rotation Plate attaches to Tile Flashing and Mounting Base Roof sheathing Mounting Base attaches through roof sheathing to rafter Rafter 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 6 of 20 Document # Rev C Date last eported: December 4, :29 AM
7 Determining Tile Compatibility ZS Tile flashings are designed to be compatible with a range of roof tiles, with options for the most typical S, W, and Flat tiles found in the U.S. market. Zep Solar, Inc. has developed a series of tools and documents to aid in visual and measurable roof assessment. ZS Tile Process - A high-level presentation for project managers that outlines the tools and aids available to support each step of the sales and installation process, from visual assessment through final site inspection. ZS Tile Compatibility Guide for Sales - A presentation for front-line salespeople who may be responsible for identifying potentially compatible buildings from the street, without having access to the roof. ZS Tile Compatibility Guide for Auditors - A guide for site surveyors or designers who are responsible for making the final determination of tile compatibility. This guide contains detailed tile measurements, tile brands, and visual comparisons. Additional items are available to assist installers, system designers, and other project team members at various stages during the project. Please contact Zep Solar Support for a complete list of available resources. Note Zep Solar also offers an alternate solution, ZS Span, which works on tile roofs that may not be compatible with ZS Tile. 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 7 of 20 Document # Rev C Date last eported: December 4, :29 AM
8 Additional Items Required 3/16 or 7/32 drill bit 1/2 socket and socket wrench An additional 1/8 drill bit may be required for installation of modules in Portrait orientation. (Required when installing modules in Portrait orientation) Deck screws #10 1 1/2 sharp point Philips pancake head screw 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 8 of 20 Document # Rev C Date last eported: December 4, :29 AM
9 Installation Step 1. Mark Array Perimeter 1 Mark lower array perimeter 4 inches up from lower edge of first tile course to be pulled Array dimension = Module dimension + 1/2 inch per module 2 Chalk module spacing at East and West edges of array Module dimension + 1/2 2 modules + (2 1/2 ) 3 modules + (3 1/2 ) 3 4 Snap horizontal chalk lines Mark module vertical seams along lower edge of array, to help identify potential Interlock/Leveling Foot conflicts later on. 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 9 of 20 Document # Rev C Date last eported: December 4, :29 AM
10 Step 2. Choose Rafters 1 2 Pulled tile Identify first rafters within East and West edges of array and verify that these rafters are within allowable module cantilever. Maimum allowable module cantilever is 1/3 of the maimum allowable span. For modules in Portrait orientation, the cantilever cannot be greater than 1/2 the module s width. Pull tiles all the way up the outer columns. Verify rafter location at each tile pulled and mark rafter center on roof sheathing. Note: If a rafter drifts to a different tile going up the column, verify that rafter remains within module cantilever allowance all the way up. Shift array if needed. 3 Sample layout diagram Maimum span Rafters Staggered attachment points OK Work across the array and choose rafters based on the project s maimum allowable span. 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 10 of 20 Document # Rev C Date last eported: December 4, :29 AM
11 Step 3. Remove Tiles and Mark Rafter Centers Verify rafter position after removing tiles. Mark roof sheathing to indicate rafter centers. Which Tile to Pull? East or West Tile? Chalk line falls in the middle of a tile - pull that tile Pull tile closest to center of rafter Chalk line falls at lower edge of a tile - pull upper tile Chalk line falls within 1 of tile above - pull upper tile 1 or less 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 11 of 20 Document # Rev C Date last eported: December 4, :29 AM
12 Step 4. Install Mounting Bases Orient the Mounting Base to reach the nearest rafter 1 Vertical Position Mounting Platform Headlap Tile reveal 7.0 Measure from lower edge of tiles in same row Center of Mounting Platform on the Mounting Base must be positioned 7 up from down-roof edge of adjacent tiles. (not to scale) 2 Horizontal Position Landing Pad Place the Mounting Base in the approimate position. Place the Tile Flashing on top so it fits with the surrounding tiles. Adjust Mounting Base position. Holes in the Tile Flashing should align with the holes in the Mounting Base. Note: Zep Solar, Inc. is developing placement jigs to aid in Mounting Base placement. Please contact Zep Solar Support for more information. Mounting Platform 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 12 of 20 Document # Rev C Date last eported: December 4, :29 AM
13 Install Mounting Bases, Continued 3 Drill and Seal Drill closest to the chalk mark indicating rafter center. With the Mounting Base in position, drill the desired lag screw holes into the rafter. Lift the Mounting Base, remove debris, and add appropriately rated sealant. 4 Secure Mounting Base to Rafter Use Lag Screws provided or Zep Solar-approved equivalent. Important Note: Additional fasteners and battens are required for the Mounting Base when installing modules in Portrait orientation. Lag Screw minimum penetration into rafter is 2.5 (65mm). See Additional Notes on page 20 or contact Zep Solar Support for more information. 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 13 of 20 Document # Rev C Date last eported: December 4, :29 AM
14 Step 5. Attach Tile Flashings 1 Flashing Postion 2 Flashing should fit snugly. Water channels should match up with surrounding tiles on both sides, within acceptable range. Anti-Rotation Plate Use 25mm Custom Flange Bolt provided. Either hole OK - helps to avoid conflicts between Leveling Feet and Interlocks Water Channel Should Fit Both Sides Ideal fit W-Tile Flat Tile Acceptable fit is anywhere within range Flat Tile W-Tile Left Side Right Side 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 14 of 20 Document # Rev C Date last eported: December 4, :29 AM
15 Step 6. Install Top Arms Use 70mm Custom Flange Bolt provided. Horizontal Positioning Fleibility (For front row, ideal Top Arm position is lowest hole, just past Top Arm stud) 2.0 Align the Top Arm stud at or above chalk marks for module seam (0-2 range). Note: The most ideal position is eactly 2 above module seam. The Top Arm and the fastener for the Anti- Rotation Plate can go in either hole. (Shifting the Top Arm can help avoid conflicts between Interlocks and Leveling Feet.) Top Arm Stud Vertical Positioning For easier installation, Top Arm stud should be within 2 inches above the chalk line indicating the module seam. Allowable But Less Advised Top Arm stud can land below chalk line, but this makes the Leveling Foot more difficult to attach. (Typically, in the field of the array, the installer will attach the Key side of the Leveling Foot Rockit to the rear of the lower module first, before bolting the Leveling Foot to the Top Arm. If the Leveling Foot base is underneath the module, bolting it down requires reaching underneath the module.) 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 15 of 20 Document # Rev C Date last eported: December 4, :29 AM
16 Install Top Arms, Continued Avoid NO NO Do not install Top Arm horizontally (design prevents this) Top Arm should not touch tile edge above 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 16 of 20 Document # Rev C Date last eported: December 4, :29 AM
17 Step 7. Install Front-Row Leveling Feet 1 Install Outer Leveling Feet Use 5/16 Nut and Washer provided. Chalk line indicating module seam 2 String Line 3 Align Middle Leveling Feet Use Leveling Foot stud to align the middle Leveling Feet to the string line. 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 17 of 20 Document # Rev C Date last eported: December 4, :29 AM
18 Front-Row Leveling Feet, Continued 4 Level Rockits to String Line Rockit Spin the Rockit to raise or lower. Key side Tongue side Before After Leveling Foot Fleible Positioning 360 degrees Slot range Eception: If the Arm is etended all the way up or all the way down, the Leveling Foot cannot be at an angle greater than 90 degrees. NO NO 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 18 of 20 Document # Rev C Date last eported: December 4, :29 AM
19 From this point onwards, the installation sequence for ZS Tile is similar to that for ZS Comp. Proceed at will, young Jedi. Please refer to the ZS Comp Installation Manual and/or the Zep Solar installation videos for more information. 2013/EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 19 of 20 Document # Rev C Date last eported: December 4, :29 AM
20 Additional Notes Design Setback Recommendations for ZS Tile Minimum recommended buffers are as follows: 18 from eave (no closer than 2nd tile course) Ridge Obstacle from center of un-mortared ridge cap (no closer than 2nd tile course) from center of mortared ridge cap (no closer than 3rd tile course) 12 from rooftop obstructions (i.e., 1 tile width) from hips, valleys, and roof edges, more if these areas are mortared Do not lay out modules directly over non-removable tiles. 18 Observe local fire code setbacks where required. Special Requirements for Portrait Installation When installing modules in Portrait orientation, the Mounting Base requires either an additional pre-drilled batten placed up-roof from the Mounting Base attached with deck screws, or additional deck screws attached to the opposite end of the lag screws. Both of these are in addition to the usual Lag Screws. Roof sheathing minimum thickness of 15/32 required. Please contact Zep Solar Support for further information. Portrait orientation #10 1 1/2 sharp point Philips pancake head deck screw Pre-drilled batten /8 (Use 1/8 drill bit for pre-drilling the batten) Mounting Base Option 1 Option /EN Zep Solar, Inc. Zep Solar reserves the right to make specifications changes without any prior notice. All rights reserved. PAGE: 20 of 20 Document # Rev C Date last eported: December 4, :29 AM
YGE-Z 60 Cell Series PV Modules
YGE-Z 60 Cell Series PV Modules Installation Supplement Yingli Solar Based on Zep Solar Document No. 800-1444-001 Rev F File Generated April 9, 2014 Notices This manual contains important installation
More information3.0 RAIL-FREE RACKING. Utilizes EcoFasten Solar s patented technology
3.0 RAIL-FREE RACKING Utilizes EcoFasten Solar s patented technology Document Date: 05.08.2018 Contents Pg. 1... Assets of Design Features System Components Pg. 2... Rock-It 3.0 Mount Assembly Rock-It
More information4.0 RAIL-FREE RACKING. Utilizes EcoFasten Solar s patented technology
4.0 RAIL-FREE RACKING Utilizes EcoFasten Solar s patented technology Document Date: 3.2.2018 Contents Pg. 1 Assets of Design Features System Components Pg. 2 Rock-It 4.0 Mount Assembly Rock-It 4.0 Coupling
More informationpanelclaw.com Polar Bear III for 10 Degree
panelclaw.com Polar Bear III for 10 Degree Installation Manual Document Number 9910024 Rev A March 2014 Revision History Rev ECO # Date Description of Changes Approved By 01 TBD 02-FEB-14 Initial Draft
More information2.0 RAIL FREE SOLAR ROOF MOUNT. Utilizes EcoFasten Solar s patented technology
2.0 RAIL FREE SOLAR ROOF MOUNT Utilizes EcoFasten Solar s patented technology Document date 3.6.2017 Contents Pg. 1 Assets of Design Features System Components Pg. 2 Rock-It 2.0 Mount Assembly Rock-It
More informationInstallation Manual. Polar Bear III HD 5 Degree. Document Number Rev D March panelclaw.com
Polar Bear III HD 5 Degree Installation Manual Document Number 9910034 Rev D March 2016 System Fire Class Rating: Class A for low slope roofs with Type I & Type II Modules Mechanical Load Rating: See Appendix
More informationMULTI-POLE MOUNT - G2 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev D SP PCN
MULTI-POLE MOUNT - G2 ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev D SP3287-2 PCN 042412-1 The Multi-Pole Mount - G2 A few words about the product The Multi-Pole Mount -
More informationSTREAMLINED SOLAR CHECKLIST Owner Name:
STREAMLINED SOLAR CHECKLIST Owner Name: Address: DEPARTMENT OF PUBLIC WORKS AND PLANNING ALAN WEAVER, DIRECTOR This checklist must be completed by the contractor or an authorized agent of the contractor
More informationASSEMBLY INSTRUCTIONS FOR SUNLINK PV MODULE ROOF MOUNT SYSTEM
ASSEMBLY INSTRUCTIONS FOR SUNLINK PV MODULE ROOF MOUNT SYSTEM TABLE OF CONTENTS Notices and safety Page 2 General procedure notes Page 4 Installation materials and tools Page 5 Part diagrams Page 5 Elevation
More informationPRODUCTS FOR PV SOLAR MOUNTING APPLICATIONS ROOF MOUNT SYSTEMS...3. GROUND and pole MOUNT SYSTEMS...5. L Feet...9. Corrugated/IBR Roof Mounts...
S 1 Index PRODUCTS FOR PV SOLAR MOUNTING APPLICATIONS ROOF MOUNT SYSTEMS...3 GROUND and pole MOUNT SYSTEMS...5 Power Rail Module Mounting System...6 Power Rail Extrusions...7 Power Rail Commercial Extrusions...7
More informationM Installation Guide. PRECISION Manifold Series. Introduction. A. Assemble Manifold Components
Page 1 Introduction The M-8200 Precision Manifolds are designed for use in Hydronic radiant panel heating and cooling applications. They are available in various sizes, configurations, and options with
More informationInstallation Instructions Table of Contents
Installation Instructions Table of Contents Pre- Installation of Garage Storage Lift 2 Layout the Garage Storage Lift 3 Installing the strut Channels 3 Install the Drive Assembly 5 Install the Drive Shaft
More informationMaterials List: Tools List:
Materials List: Anchor assembly Automated power supply Automated power supply hardware packet Automation bracket assembly Automation bracket assembly hardware packet Automation winch assembly Cable Cable
More informationSolar collector racking system CALEFFI NAS100 series ACCREDITED Function Product range NAS100 NAS100 NAS100 NAS100
Solar collector racking system NS100 series CCREITE ISO 9001 FM 21654 ISO 9001 No. 0003 CLEFFI 01281/14 N Replaces 01281/13 N The collectors must be mounted to two horizontal NS100 series four slot rails.
More informationManifold Isolation Valves
300 N. Opdyke Rd. Introduction The Stainless Manifolds are designed for use in Hydronic radiant panel heating and cooling applications. They are available in various sizes, configurations, and options
More informationInstallation Instructions
UNIVERSAL 20K Industry Standard Rail Universal Mounting Kit #2720 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note, in order
More informationTM INSTALLATION GUIDE TM 1
1 Table of Contents Table of Contents Main Components Bolt Torque Table 3 Grounding Path Diagram... 4 Handling Instructions 5 Tool Requirement 6 Component List. 7 Planning a Layout. 8 Pan, Belt, and Bracket
More informationRETRACTED SIDE MINIMUM. 4 1/4 in. [108.0 mm] CP-493 HANGER (WITHOUT TRIGGER) RETRACTED SIDE CP-007 CLIP ACTIVATED SIDE MINIMUM. [108.
TYPE CC-NRB CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT INSTRUCTION SHEET FOR NARROW DOORS 18 in [457 mm] TO LESS THAN 26 in [660 mm] WIDE ONLY ACTIVATED SIDE CC-493 HANGER (WITH TRIGGER) SEE RIGHT (COMPLETE
More informationLightSpeed Mount. Rail-free Solar Mounting System for Composite and Tile Roofs. Installation Manual
LightSpeed Mount Rail-free Solar Mounting System for omposite and Tile s Installation Manual 5004849 Pegasus Solar Inc. 100 West Ohio Ave., Richmond, A 94804 408.638.9655 www.pegasussolar.com 2 Table of
More informationMASTER PRICE LIST & CATALOG
MASTER PRICE LIST & CATALOG Effective April 1, 2014 - June 30, 2014 PV Mounting System 2703 PAGES 5-8 SnapNrack Residential PV Mounting Systems www.snapnrack.com 775 Fiero Lane, Suite 200 San Luis Obispo,
More informationM-8100EP. Installation Guide ENGINEERED PLASTIC MANIFOLD SERIES. Introduction. A. Assemble Manifold Components
Introduction The Pro Manifolds with Integrated adaptor are designed for use in Hydronic radiant panel heating and cooling applications. They are available in various sizes, configurations, and options
More informationDown and Out Motor Mount Assembly & Installation Directions
Down and Out Motor Mount Assembly & Installation Directions Mounting the Down and Out Motor Mount correctly takes a lot of thought and a lot of planning. Please read the directions thoroughly and plan
More informationTYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT INSTRUCTION SHEET FOR DOORS 26 in [660 mm] TO 48 in [1219 mm] WIDE ONLY
TYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT INSTRUCTION SHEET FOR DOORS 26 in [660 mm] TO 48 in [1219 mm] WIDE ONLY (COMPLETE TYPE CC-W KIT ILLUSTRATED. FRAMING BY OTHERS) CATCH N CLOSE TM CROWDERFRAME
More informationNISSAN #2744. Gross Trailer Weight (Maximum)...16,000 lbs. Vertical Load Weight (Max. Pin Weight)...4,000 lbs. SYSTEM TOW CAPACITY
NISSAN 16K Industry Standard Rail Custom Mounting Kit #2744 Gross Trailer Weight (Maximum)...16,000 lbs. Vertical Load Weight (Max. Pin Weight)...4,000 lbs. SYSTEM TOW CAPACITY Please note, in order to
More informationDC Series Installation Manual (# )
DC Series Installation Manual (# 101630) Page 1 of 33 In this booklet you will find: TOWER INSTALLATION... 3 U-Bolt Style mount... 4 Side Frame Style mount... 4 PIVOT INSTALLATION... 5 External Pivot Installation:
More informationInstallation Instructions Vanishing Lid Bracket
-800-447-88 www.coverpools.com Installation Instructions Vanishing Lid WARNING FOR YOUR SAFETY This product must be installed and serviced by a contractor who is licensed and qualified in pool equipment
More informationWall Mount Installation Manual
SOLARSHEAT 1000G/ G/1500G-GS Wall Mount Installation Manual By Your Solar Home, Inc. Version 1.0 August 0, 008 All building, plumbing, electrical and safety codes supersede the instructions in this manual.
More informationEZ SunBeam Ground Mount System. with Self-grounding Hardware UL2703 Compliant. Pub. D10034-V003 Copyright of 28
EZ SunBeam with Self-grounding Hardware UL2703 Compliant Pub. D10034-V003 Copyright 2016 1 of 28 Please read carefully before installing Product is tested to and recognized to UL 2703 standards for safety
More informationPOWER XPRESS TM. Assembly Instructions. step-by-step assembly and installation. Version 2, Rev A SP PCN
POWER XPRESS TM Assembly Instructions step-by-step assembly and installation Version 2, Rev A SP3285-5 PCN 022417-1 POWER XPRESS TM Ratings The POWER XPRESS TM conforms to ANSI/ UL UL2703 (2015) Standard
More informationCENTRAL VACUUM SYSTEMS
CENTRAL VACUUM SYSTEMS INSTALLATION INSTRUCTIONS Review this manual before installing the central vacuum system Dynovac Industries 1 800 226 1221 1 403 346 4877 #1, 6841 52 Avenue Red Deer, Alberta T4N
More informationSimply a better way BIG FOOT SYSTEMS. Rooftop building services support systems.
Simply a better way BIG FOOT SYSTEMS Rooftop building services support systems Simply a better way ABOUT US Big Foot Systems are the largest rooftop free-standing frame manufacturer in the world. Launched
More informationPOWER RAIL TM P8. Assembly Instructions. step-by-step assembly and installation. Version 2, Rev A SP PCN
POWER RAIL TM P8 Assembly Instructions step-by-step assembly and installation Version 2, Rev A SP3412-2 PCN 021317-1 Power Rail TM P8 Ratings The Power Rail P8 conforms to ANSI/UL UL2703 (2015) Standard
More informationFor RBI Solar Ground Mount only
Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For RBI Solar Ground Mount only Please read carefully before installing. WEEB-UMC WEEBL-6.7 WEEB Bonding Jumper-6.7 Products
More informationSchletter. Solar Mounting Systems
Schletter Solar Mounting Systems Component Overview October 2016 Design, order, and purchase systems on-line! Ideally suited for projects of 50 kw or smaller in size, PV Powersite offers system configuration
More informationInstallation Instructions
Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill Short & Long Bed All Megacabs 9464/9474 HIDE-A-GOOSE HITCH INSTALLATION WARNING: Under no circumstances do we
More informationUniRac. 28 MOUNTING STRUCTURES Roof Mounts. SolarMount
28 MOUNTING STRUCTURES Roof Mounts SolarMount s SolarMount is a fast, easy, safe way to install a PV array in virtually any roof or ground installation. Bottom mounting clips and tilt legs supplement traditional
More informationHYDRAULIC LANDING GEAR REPLACEMENT
Purpose This kit outlines the procedure to replace existing square hydraulic landing gear jacks, including square and round hydraulic, pin-less jacks. Square landing gear is no longer available. Required
More informationInstallation Instructions
DODGE 20K Industry Standard Rail Custom Mounting Kit #2740 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note, in order to
More informationPOLY TIP-DOWN WINDSHIELD KIT
POLY TIP-DOWN WINDSHIELD KIT P/N 2883261 APPLICATION Verify accessory fitment at Polaris.com. BEFORE YOU BEGIN Read these instructions and check to be sure all parts and tools are accounted for. Please
More informationMULTI-POLE MOUNT LARGE GROUND MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation
MULTI-POLE MOUNT Assembly Instructions LARGE GROUND MOUNT Assembly Instructions step-by-step assembly and installation PCN 081711-2 The Large Ground Mount A few words about the product The Large Ground
More informationFor AEE SnapNRack Only Please read carefully before installing.
Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For AEE SnapNRack Only Please read carefully before installing. WEEB-PMC WEEB Bonding Jumper-6.7 WEEBL-6.7 assembly Products
More informationInstallation Instructions
Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill, Reciprocating saw WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers
More information6-1/2 FT. x 6-1/2 FT. NON-PENETRATING MAST MOUNT
4096-349 March 27, 2012 REVISION J ASSEMBLY MANUAL 6-1/2 FT. x 6-1/2 FT. NON-PENETRATING MAST MOUNT General Dynamics 1500 PRODELIN DRIVE NEWTON, NC 28658 INSTALLATION INSTRUCTIONS J Revised tool list,
More informationMULTI-POLE MOUNT MULTI-POLE MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation
MULTI-POLE MOUNT Assembly Instructions MULTI-POLE MOUNT Assembly Instructions step-by-step assembly and installation PCN 062411-2 The Multi-Pole Mount A few words about the product The Multi-Pole Mount
More informationInstallation Instructions
DODGE 24K Industry Standard Rail Heavy Duty Custom Mounting Kit #2230 Gross Trailer Weight (Maximum)...24,000 lbs. Vertical Load Weight (Max. Pin Weight)...6,000 lbs. SYSTEM TOW CAPACITY Please note, in
More informationInstallation Instructions
Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers recommended vehicle
More informationSOLAR WORLD, INC. INSTALLATION MANUAL
SOLAR WORLD, INC. INSTALLATION MANUAL Read this manual before beginning installation of solar system INSIDE THIS MANUAL Section 1 illustrates the kits and components used for installation of the solar
More information5th Wheel Electric Leveling System
LEVELING SYSTEM MADE IN USA MADE IN U.S.A. R V PR ODUC T S NORCO INDUSTRIES, INC. 5th Wheel Electric Leveling System 20300513 TABLE OF CONTENTS...2 STANDARD PROCEDURES & AUTOMATED FUNCTIONS...3 UNIT DETACHMENT
More informationAssembly & Installa on Guide RB031-3: TRIPLE CROSSBAR KIT
PLEASE READ INSTRUCTIONS FULLY PRIOR TO INSTALLATION OF CROSSBAR KIT This instruction is to illustrate the recommended installation method for our Crossbar Kit, any deviation from this will be the sole
More informationPRODUCT EVALUATION Effective Date: July 1, 2014 RC-20
TEXAS DEPARTMENT OF INSURANCE Engineering Services Program / M03-3A 333 Guadalupe Street P.O. Box 149104 Austin, Texas 78714-9104 Phone No. (512) 322-2212 Fax No. (512) 463-6693 PRODUCT EVALUATION Effective
More informationES-6500V ES-6500P ES-6500W 915 W.
INSTALLATION MANUAL E-Series MODELS ES-6500V ES-6500P ES-6500W R HydroHoist Marine Group, Inc. 915 W. Blue Starr Dr. Claremore, OK 74017 1-800-825-3379 Pub. May, 2014 Publication May 2014 HydroHoist Marine
More informationInstallation Instructions
Equipment Required: Installation Instructions Fastener Kit: F Wrenches: 8mm, 13mm, 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw, File WARNING: Under no circumstances do we recommend
More informationSolarSheat Wall Installation Manual
SolarSheat Wall Installation Manual Version 1.5 April 23, 2013 Copyright 2013 Your Solar Home, All Rights Reserved SolarSheat products must be installed in accordance to all local building, plumbing, electrical,
More informationINSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL
Photovoltaic (PV) Residential Page 1 of 10 Revision Date: 07/18/2018 INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL INSPECTION CODE: 703 SCOPE: RESIDENTIAL APPLICABLE CODES: 2016 CBC, CRC, CPC,
More informationINSTALLATION MANUAL. Melink Corporation (513) Revision
INSTALLATION MANUAL Revision 130711 Table of Contents Step Installation Contractor Page 1 Install System Controller Electrical 4 2 Install Variable Frequency Drive Electrical 6 3 Install Touchpad Mechanical
More informationBIG FOOT SYSTEMS ANCILLARIES. Rooftop building services support systems. Simply a better way. +44 (0)
BIG FOOT SYSTEMS ANCILLARIES Rooftop building services support systems +44 (0)1323 844 355 enquiry@bigfootsupport.com Simply a better way @bigfootsystems 1 AIR CONDITIONING ANCILLARIES RANGE CONTENTS intro
More informationCity of Manhattan Beach Community Development
City of Manhattan Beach Community Development Phone: (310) 802-5500 FAX: (310) 802-5501 TDD: (310) 546-3501 Photovoltaic Solar Panel Plan Check Guidelines Updated: 12-20-16 ORDINANCE NO. 15-0022 MBMC 9.06
More informationTensioned Cable System (TCS) Mounting Kits GUIDE
PRELIMINARY Tensioned Cable System (TCS) Mounting Kits GUIDE For Selecting Solar Panel Mounting Kits (TCS-R1-###) (TCS-R2-##x#) (TCS-G1-#-##) REV Draft 2/27/11 Technical Support: (360) 301-5133 www.olympicenergysystems.com
More informationInstallation Instructions
Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16, 10mm, 18mm Drill Bits: 1/4 Other Tools: Drill, Reciprocating saw 9465/9475 HIDE-A-GOOSE HITCH INSTALLATION All Fasteners Typical, Both Sides WARNING:
More informationInstallation Instructions
Equipment Required: Fastener Kit: F Wrenches: 15/16, 10 mm Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw 9464/9474 HIDE-A-GOOSE HITCH INSTALLATION All Fasteners Typical, Both Sides WARNING: Under
More informationInstallation Instructions
DODGE 20K Industry Standard Rail Custom Mounting Kit #2742 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note, in order to
More informationSolarSheat Wall Installation Manual
SolarSheat Wall Installation Manual Version 3.2 December 15, 2015 Copyright 2015 Your Solar Home, All Rights Reserved SolarSheat products must be installed in accordance to all local building, plumbing,
More informationInstallation Instructions
Equipment Required: Installation Instructions Fastener Kit: F Wrenches: 8mm, 13mm, 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw, File WARNING: Under no circumstances do we recommend
More informationINSTALLATION MANUAL Model
VAN SOLUTIONS FOR THE WAY YOU WORK INSTALLATION MANUAL Model 2291-3-01 ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT. CAUTION Be
More informationWasher, Electrical Equipment Bond. WEEB Patent Pending INSTALLATION INSTRUCTIONS. For Professional Solar only
Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For Professional Solar only Please read carefully before installing. WEEB-PMC WEEBL-6.7 assembly WEEB Bonding Jumper - 6.7
More informationInstallation Instructions
Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers recommended vehicle
More informationTechnical Installation Manual
Lighting Step and Aisle Safety Lighting Technical Installation Manual 1 Contents Page 3 Tools required 4 Installation detail & planning 5 Adhesives, silicone & crimps 6 General cinema layout 7 Basic wiring
More informationInstallation Instructions
Equipment Required: Fastener Kit: F Wrenches: 15/16, 15/16 Crowfoot Adaptor Drill Bits: 1/4 Other Tools: Drill, Reciprocating saw Optional, Raise Bed: 18mm socket, 15 extension As an option you can loosen
More informationInstallation Instructions
Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill Installation Instructions Short & Long Bed All Megacabs 9464/9474 HIDE-A-GOOSE HITCH INSTALLATION WARNING: Under
More informationInstallation Instructions X-Force UTV Lift (000 Series) Capacity 2,275 lbs (1,035 kg)
Installation Instructions X-Force UTV Lift (000 Series) Capacity 2,275 lbs (1,035 kg) Read entire manual before assembling, installing, operating, or servicing this equipment. LP20640 IN20793 September
More informationUniversal Mounting Kit #0820
Universal Mounting Kit #0820 #1200 Super 5 th (16K) #0800 Super 5 th (20.5K) Gross Trailer Weight (Maximum) Vertical Load Weight (Max. Pin Weight) 16,000 lbs. 4,000 lbs. Gross Trailer Weight (Maximum)
More informationThermoLite 110W-330W Solar Panel Installation Instructions
ThermoLite 110W-330W Solar Panel Installation Instructions INSTALL APPLICATIONS SUPPORTED BY THIS GUIDE: 1. Trailer Roof Top Mounted 2. Bus Roof Top Mounted 3. Tractor Fairing Mounted 40W and 110W Replacement
More informationInstallation Instructions
FORD 20K Industry Standard Rail Custom Mounting Kit #2738 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note, in order to determine
More informationInstallation Manual for VHM-25 Series Arms Channel Mount
3875 Cypress Drive Petaluma, CA 94954 800.228.2555 707.773.1100 Fax 707.773.1180 www.gcx.com Installation Manual for VHM25 Series Arms Channel Mount Install Time: 1015 minutes The purpose of this manual
More informationOV-1 STANDING SEAM OVERVIEW. Temple Architectural Products 638 Moore Rd Avon Lake, OH 44012
STANDING SEAM OVERVIEW SW-2 CB-2 CB-1 R-1 RK-1 V-1 SW-1 RK-1 H-1 VR-1 P-1 HW-1 PB-1 DE-2 DE-1 RK-3 DE-2 SP-1 OV-1 DRIP EDGE - 1 6" WIDE HIGH TEMP UNDERLAYMENT STRIP PRE-NOTCHED PANEL END STANDING SEAM
More informationSPECIAL INSTALLATION INSTRUCTIONS
SPECIAL INSTALLATION INSTRUCTIONS WARN 4X FLARES FRONT AND REAR '98 TOYOTA HILUX DUAL-CAB As you read these instructions, you will see NOTES, CAUTIONS and WARNINGS. Each message has a specific purpose.
More informationINTERIOR LED LIGHTING KIT
INTERIOR LED LIGHTING KIT P/N 2880549 APPLICATION SLINGSHOT BEFORE YOU BEGIN Read these instructions thoroughly and make sure all parts and tools are accounted for. Please retain these installation instructions
More informationWARNING TAKE NOTE OF THE FOLLOWING: THIS PRODUCT MUST BE INSTALLED EXACTLY AS PER THESE INSTRUCTIONS USING ONLY THE HARDWARE SUPPLIED.
ARB WINCH/NONWINCH BUMPER TO SUIT TOYOTA HJ100 IFS PRODUCT No. 3913140 5100050 Top Tube Kit 5100160 Buffer Kit With hole (required when fitting Top Tube) 5100170 Buffer Kit With no hole Fitting Kit No.
More informationMOR/ryde Drive Axle Suspension System
MOR/ryde Drive Axle Suspension System (Double Eye Leaf Spring) RL Installation Instructions MOR/ryde International 1966 Moyer Avenue Elkhart, IN 46516 574-293-1851 www.morryde.com RL153-003 Rev.1 MOR/ryde
More informationPOWER RAIL P4 ASSEMBLY INSTRUCTIONS. step-by-step assembly and installation. Version 1, Rev A PCN
TM POWER RAIL P4 ASSEMBLY INSTRUCTIONS step-by-step assembly and installation Version 1, Rev A PCN 080814-1 TM Power Rail P4 WARNING: Follow the procedures and precautions in these instructions carefully.
More information10 X 10 NPMM Installation
May 20, 2016 Revision E ASSEMBLY MANUAL Installation General Dynamics SATCOM Technologies 1700 Cable Drive NE Conover NC 28613 USA Phone 770-689-2040 www.gdsatcom.com 10' x 10' NPMM INSTALLATION INSTRUCTIONS
More informationComponents, Mounting Systems, In-roof PV Solutions FATH Solar About us Page 3
Important matters Brochure Content Components, Mounting Systems, In-roof PV Solutions FATH About us Page 3 S1 System S1: Half as Complex and Twice as Safe Page 4 S1: Pivotal Advantage for all Standard
More informationDiscount-Equipment.com
REQUIRED TOOLS LS Series Remix Shaft Installation Instructions /8", /6", /2" Allen Wrenches Snap Ring Pliers (Light Duty) /" Combination Wrench Loctite #22 Blue /" Socket w/ /8" Ratchet Electric Drill
More informationPump Gas Instructions for Polaris And 800 Models. Important Information before Installing This System:
Pump Gas Instructions for Polaris 600 700 And 800 Models Important Information before Installing This System: Before you begin your turbo install, read through these instructions to determine if you are
More informationBe sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application.
5 NOVEMBER 2010 COYOTE Dome 9.5 x 28 Be sure to read and completely understand this procedure before applying product. Be sure to select the proper PREFORMED product before application. 1. 7. 2. 4. 10.
More informationRollstar Shade Installation Instructions
Rollstar Shade Installation Instructions All Lifting Systems Inside or Outside Mount Thank you for purchasing your new Rollstar shade. It has been custom-made from the highest quality materials to the
More informationUniversal Side of Pole Mount
Page 1 of 8 Universal Side of Pole Mount (Two panels shown, punched channel for a variety of module types.) A. TOP CHANNEL B. BOTTOM CHANNEL C. PANEL RAILS: MAY EITHER BE ALUMINUM ANGLE WITH HOLES PUNCHED
More informationMF 9520 / 9540 / 9560, Challenger 540C / 560C
Ag Leader Combine Installation Note: Indented items indicate parts included in an assembly listed above Part Name/Description Part Number 9520 Quantity by Model 9540 540C Parts Kit 2001312-69 1 1 1 Drill
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS Accessory FABRIC FRONT DOORS P/N 0SR90-HL4-211A (BLACK) P/N 0SR90-HL4-221A (CAMO) Application SXS1000M3/M3P/M5P/M5D Honda Dealer: Please give a copy of these instructions to your
More informationWH/WK JEEP GRAND CHEROKEE 2005 ON WARNING
Part Number: 3450130 F/KIT: 6172092 Product Description: Suited to vehicle/s: COMBINATION BULL BAR WH/WK JEEP GRAND CHEROKEE 2005 ON WARNING REGARDING VEHICLES EQUIPPED WITH SRS AIRBAG; When installed
More informationInstallation Instructions
Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16, 13mm Drill Bits: 1/4, some older models a 1/2 Other Tools: Drill, Saber Saw 5/8 Fasteners From Hitch Fastener Kit Installation Instructions GOOSENECK
More informationGP Lam LVL. Grade Thickness Depth , , , , , 149, 169, 189, 249 (209and 229 by special order) 2.
GP Lam LVL Grade Thickness Depth 2.0E 1 3 49, 3 1 29 7 1 49, 9 1 49, 9 1 29, 11 1 49, 11 7 89, 149, 169, 189, 249 (209and 229 by special order) 1.5E 1 3 49 7 1 49, 9 1 49, 9 1 29, 11 1 49, 11 7 89, 149,
More informationSpruce Line photovoltaic modules
Design Guide ELECTRICAL EQUIPMENT CHECK WITH YOUR INSTALLER Evergreen Solar Spruce Line photovoltaic (PV, solar electric) modules are designed to produce DC electrical energy from light. This manual contains
More informationGP Lam LVL. Grade Thickness Depth , 9 1 4, 9 1 2, , , 14, 16, 18, 24 (20 and 22 by special order) 2.
GP Lam LVL GP Lam LVL Introduction.....................32 Bearing Details...................34 Handling and Installation..........35 Floor Beams.....................35 Window, Patio Door and Garage Door
More informationAutomatic Roof Hatch Opener
Automatic Roof Hatch Opener Installation Guide REQUIRED TOOLS (These tools are required to complete the installation) Cordless Drill 1/8 1/4 Drill Bits 1/8 Pin Punch #2 Philips Bit Rachet Sharpie Hammer
More informationInstallation Instructions
Equipment Required: Fastener Kit: F Wrenches: 15/16, 10 mm Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw 9464/9474 HIDE-A-GOOSE HITCH All Fasteners Typical, Both Sides WARNING: Under no circumstances
More informationSENECA SHAKE TILES ECOSTAR GOLD STAR ROOF SYSTEM
42 Edgewood Drive Holland, NY 14080 www.ecostarllc.com SENECA SHAKE TILES ECOSTAR GOLD STAR ROOF SYSTEM Part 1 GENERAL PAGE 1.01 Description 2 1.02 Quality Assurance 2 1.03 Submittals 3 1.04 Product Delivery,
More informationLEVELe ELEVATOR INTERIORS WITH LIGHTPLANE INSTALLATION INSTRUCTIONS. STANDARD LEVELe COMPONENTS CEILING COMPONENTS LIGHTPLANE COMPONENTS TOOLS NEEDED
TOOLS NEEDED SUCTION CUP(S) IMPACT DRILL CRESCENT WRENCH #8-18 SQUARE / PHILIPS COMBO DRIVE BIT SQUARE MASKING TAPE PENCIL DRILL BIT EXTENDER 3/8" DRILL BIT TAPE MEASURE CENTER PUNCH LEVEL BRUSH INCLUDED
More informationInstallation Instructions
Installation Instructions Transverse K04 Tools Required Jack and jack stands Drain pan for coolant and oil 3" and 6" extensions Channel locks 7mm, 8mm, 10mm, 11mm, 12mm, 13mm, and 16mm sockets Oxygen sensor
More informationGP Lam LVL. (20!and 22! by special order) 13 4! 31 2! 1.5E. Lengths: up to 60 feet. Referenced dimensions are nominal and used for design purposes.
GP Lam LVL Grade 2.0E 1.5E Thickness Depth 13 4!, 31 2! 7 4!, 9 4!, 9 2!, 11 4!, 117 8!, 14!, 16!, 18!, 24! (20!and 22! by special order) 13 4! 7 1 4!, 9 1 4!, 9 1 2!, 111 4!, 117 8!, 14!, 16! 31 2! 45
More information