TYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT INSTRUCTION SHEET FOR DOORS 26 in [660 mm] TO 48 in [1219 mm] WIDE ONLY

Size: px
Start display at page:

Download "TYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT INSTRUCTION SHEET FOR DOORS 26 in [660 mm] TO 48 in [1219 mm] WIDE ONLY"

Transcription

1 TYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT INSTRUCTION SHEET FOR DOORS 26 in [660 mm] TO 48 in [1219 mm] WIDE ONLY (COMPLETE TYPE CC-W KIT ILLUSTRATED. FRAMING BY OTHERS) CATCH N CLOSE TM CROWDERFRAME SYSTEM CROWDERFRAME IS A COMPLETE POCKET DOOR KIT SYSTEM THAT INCLUDES ROLL FORMED STEEL UPRIGHTS TO BUILD THE POCKET FOR 2X4 WALL CONSTRUCTION THE COMPLETE CROWDERFRAME KIT PROVIDES EASIER AND QUICKER INSTALLATION THAN A TRADITIONAL POCKET BUILT ON SITE INTEGRATING OUR REVOLUTIONARY CATCH N CLOSE SYSTEM PREVENTS BOUNCING AND SLAMMING OF THE SLIDING DOOR CAN BE INSTALLED ON BOTH OPENING AND CLOSING ENDS S CYCLE TESTED UP TO 50,000 TIMES UP TO 150LBS DOORS USING THE CC-493 WITH CC-1 THIS INSTRUCTION SHEET IS SUITABLE FOR DOORS 26 in [660 mm] TO 48 in [1219 mm] WIDE AND 80 in [2032 mm] TO 96 in, 2455 mm HIGH FOR NARROWER DOORS, PLEASE REFER TO THE TYPE CC-NRW (NARROW) INSTRUCTION SHEET FOR DOUBLE DOOR KITS, PLEASE USE TWO SINGLE DOOR KITS WITH CPD-CC-JOINER KIT ACCORDINGLY. TYPE CC-W KITS COMPLETE WITH C-914 GUIDE CHANNEL AND CP-913 POCKET GUIDE SYSTEM: ELEVATION VIEW OF COMPLETE INSTALLATION (FOR DOORS 26 in [660 mm] TO 48 in [1219 mm] WIDE) RETRACTED SIDE CC-493 HANGER (WITH TRIGGER) ACTIVATED SIDE CP-493 HANGER (WITHOUT TRIGGER) NEW CP-008 CLIP 7 in [177.8 mm] (DOOR IN OPENED POSITION) ACTIVATED SIDE CC-493 HANGER (WITH TRIGGER) CP-493 HANGER (WITHOUT TRIGGER) RETRACTED SIDE NEW CP-008 CLIP SEE RIGHT (DOOR IN CLOSED POSITION) MINIMUM 4 1/4 in [108.0 mm] TO CENTER OF HANGER BOLT A PRODUCT OF K.N. CROWDER MFG. INC K.N. Crowder Mfg. Inc Burloak Drive Burlington, Ontario, Canada L7L 6B3 K.N. Crowder Inc. 210 Eighth Street South Lewiston, New York TOLL-FREE PHONE: KNC (1562) TOLL-FREE FAX: WEBSITE: customerservice@kncrowder.com

2 : IGHT TYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT DIMENSION DETAILS (WITH C-914/CP-913 GUIDE SYSTEM) SECTION VIEW 2X4 WOOD CONSTRUCTION BY OTHERS 3 5/8 in ([92.1 mm] ) 2 1/8 in [54.0 mm] CLEARANCE BETWEEN UPRIGHTS MINIMUM ROUGH OPENING HEIGHT FOR STANDARD KITS: 92 1/2 in [2350 mm] FOR EXTRA HEIGHT KITS: 104 1/2 in [2654 mm] SIDE VIEW STEEL UPRIGHTS 2 5/8 in [66.7 mm] CP-403 HEADER TRACK CP-430 DRYWALL SUPPORT CC-493 EASY CONNECT HANGER CC-X CATCH'N'CLOSE 3 in [76.2 mm] 1/2 in [12.7 mm] RECOMMENDED SET-BACK FOR C-914 GUIDE CHANNEL AT THE FRONT EDGE SEE STEP #13 CC-100 IN-TRACK STOP 1/2 in [12.7 mm] GUIDE CHANNEL EXTENDS BEYOND 2 5/8 in BACK END [66.7 mm] CP-913 GUIDE C-914 GUIDE CHANNEL : E: 3/8 in [9.5 mm] 1 3/8 in [34.9 mm] MINIMUM DOOR THICKNESS 1 3/4 in [44.5 mm] MAXIMUM DOOR THICKNESS SHOWN 1 in [25.4 mm] C-914 GUIDE CHANNEL CP-913 GUIDE 3/4 in [19.1 mm] STANDARD KIT DOOR HEIGHT RANGE: MIN 6'-8" (80 in) [2032 mm] 6'-10" (82 in) [2083 mm] 7'-0" (84 in) [2134 mm] MAX 2150 mm EXTRA HEIGHT KIT DOOR HEIGHT RANGE: MIN 7'-8" (92 in) [2337 mm] 7'-10" (94 in) [2388 mm] 8'-0" (96 in) [2438 mm] MAX 2455 mm 29/32 in [22.9 mm] MIN 3/8 in [9.5 mm] DIMENSION A 3 in [76.2 mm] DIMENSION B 3/8 in [9.5 mm] HANGER ADJUSTMENT RANGE: MIN 1 in [25.4 mm] MAX 1 3/8 in [34.9 mm] PLAN VIEW (DOOR IN OPENED POSITION) 1/2 in [12.7 mm] RECOMMENDED SET-BACK FOR C-914 GUIDE CHANNEL AT THE FRONT EDGE SEE STEP #13 1/2 in [12.7 mm] GUIDE CHANNEL EXTENDS BEYOND BACK END CP-913 GUIDE C-914 GUIDE CHANNEL PLAN VIEW (DOOR IN CLOSED POSITION) C-914 GUIDE CHANNEL CP-913 GUIDE DIMENSION A DIMENSION B DIMENSION A DIMENSION B PAGE 2

3 TYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT WITH FINISHING DIMENSION DETAILS NOTE: TO ILLUSTRATE THE CROWDERFRAME INSTALLATION PROCESS, TRIM DETAILS AND DIMENSIONS ARE SHOWN. SITE TRIM DETAILS AND DIMENSIONS MUST BE VERIFIED BY THE INSTALLER AND MAY REQUIRE ADJUSTMENT OF THE DIMENSIONS THAT FOLLOW. K.N. CROWDER CANNOT BE HELD RESPONSIBLE FOR ANY FINISHING DETAILS. DETAILS ARE BASED ON A 36 in [914 mm] WIDE X 84 in [2134 mm] HIGH DOOR USING THE TYPE CC-W CROWDERFRAME POCKET DOOR KIT. 2X4 WOOD CONSTRUCTION BY OTHERS THIS IS FOR THE FINISHING OF POCKET DOOR KITS ONLY. FOR MORE DIMENSION DETAILS, PLEASE SECTION REFER TO THE VIEW STANDARD POCKET DOOR KIT DETAILS ACCORDINGLY. (COMPLETE TYPE CC-W KIT ILLUSTRATED WITH FRAMING, DRYWALL & FINISHING BY OTHERS) 3 5/8 in ([92.1 mm] ) STEEL UPRIGHTS HORIZONTAL CASING/TRIM BY OTHERS 1/2 in [12.7 mm] DRYWALL NOTE: FOR DOUBLE DOOR KITS USING THE CPD-CC-JOINER KIT, PLEASE USE THIS SECTION DETAIL FOR REFERENCE. 1/4 in [6.4 mm] SET-BACK OF TRIM BY OTHERS 3/16 in [4.8 mm] GAP CLEARANCE (ASSUMING 1 3/4 in [44.5 mm] DOOR) GUIDE SYSTEM AS REQUIRED 1 1/4 in [31.8 mm] HEIGHT OF INSIDE TRIM TO HIDE HARDWARE 1 1/4 in [31.8 mm] WIDTH OF INSIDE TRIM FOR 1 3/4 in [44.5 mm] DOOR VERTICAL CASING/TRIM TO SUIT 84 in [ mm] APPROXIMATE FINISHED OPENING HEIGHT BASED ON FINISHING AS SHOWN (BASED ON 84 in [2134 mm] HIGH DOOR) NOTE: WHEN USING THE CATCH N CLOSE IN POCKET DOOR APPLICATIONS, IT IS RECOMMENDED TO USE EDGE PULLS FOR PULLING THE DOOR OUT OF THE POCKET. PLEASE SEE BELOW FOR SOME KNC EDGE PULL OPTIONS: C-91 EDGE PULL C-61 EDGE PULL C-21 EDGE PULL PAGE 3

4 TYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT WITH FINISHING DIMENSION DETAILS (CONT D) NOTE: TO ILLUSTRATE THE CROWDERFRAME INSTALLATION PROCESS, TRIM DETAILS AND DIMENSIONS ARE SHOWN. SITE TRIM DETAILS AND DIMENSIONS MUST BE VERIFIED BY THE INSTALLER AND MAY REQUIRE ADJUSTMENT OF THE DIMENSIONS THAT FOLLOW. K.N. CROWDER CANNOT BE HELD RESPONSIBLE FOR ANY FINISHING DETAILS. DETAILS ARE BASED ON A 36 in [914 mm] WIDE X 84 in [2134 mm] HIGH DOOR USING THE TYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT. FOR DOUBLE DOOR KITS USING THE CPD-CC-JOINER KIT, PLEASE REFER TO THE CPD-CC-JOINER INSTRUCTION SHEET FOR A PLAN VIEW OF THE FINISHING DIMENSION DETAILS FOR DOUBLE DOOR FINISHING. PLAN VIEW SINGLE DOOR ROUGH OPENING WIDTH CALCULATION: (DOOR WIDTH X 2) + 3/8 in [9.5 mm] = RO WIDTH EXAMPLE: 36 in [914.4 mm] WIDE DOOR X 2 PLUS 3/8 in [9.5 mm] = 72 3/8 in [ mm] 3/4 in [19.1 mm] THICKNESS OF STRIKE FINISHING JAMB 34 1/16 in [865.3 mm] APPROXIMATE FINISHED OPENING WIDTH BASED ON FINISHING AS SHOWN (BASED ON 36 in [914 mm] WIDE DOOR) 1 1/4 in [31.8 mm] WIDTH OF INSIDE TRIM FOR 1 3/4 in [44.5 mm] DOOR VERTICAL CASING/TRIM BY OTHERS 37 1/16 in [941.3 mm] APPROXIMATE POCKET DEPTH BASED ON FINISHING AS SHOWN (BASED ON 36 in [914 mm] WIDE DOOR) 2 1/8 in [54.0 mm] CLEARANCE BETWEEN UPRIGHTS 1/2 in [12.7 mm] DRYWALL 4 5/8 in [117.5 mm] FINISHED THICKNESS OF WALL WITH 1/2 in DRYWALL AND THE WIDTH OF STRIKE FINISHING JAMB 1/2 in [12.7 mm] THICKNESS OF OUTSIDE POCKET TRIM 3/16 in [4.8 mm] GAP CLEARANCE (ASSUMING 1 3/4 in [44.5 mm] DOOR) 1/4 in [6.4 mm] SET-BACK OF TRIM BY OTHERS 3/4 in [19.1 mm] THICKNESS OF POCKET TRIM GUIDE SYSTEM AS REQUIRED PAGE 4

5 PARTS LIST FOR TYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT LEGEND: (X) = QUANTITY OF ITEM SUPPLIED IN KITS FOR DOORS FROM 26 in [660 mm] TO 36 in [914 mm] WIDE -EXW4 (X) = QUANTITY SUPPLIED IN EXTRA WIDTH KITS FOR DOORS FROM 37 in [940 mm] TO 48 in [1219 mm] WIDE. IF NOT PRESENT, QUANTITY IS AS PER (X) CP-402 HEADER BRACKET (2) CP-403 HEADER TRACK X (LENGTH OPTIONS LISTED BELOW) FOR TYPE CC-W FOR DOORS UP TO 36 in [914 mm] WIDE: (1) PIECE X 72 in [1829 mm] FOR TYPE CC-W-EXW4 FOR DOORS UP TO 48 in [1219 mm] WIDE: (1) PIECE X 96 in [2438 mm] CP-430 DRYWALL SUPPORT X (QUANTITY AND LENGTH OPTIONS LISTED BELOW) FOR TYPE CC-W FOR DOORS UP TO 36 in [914 mm] WIDE: (2) PIECES X 35 in [889 mm] C/W PRE-PUNCHED HOLES FOR TYPE CC-W-EXW4 FOR DOORS UP TO 48 in [1219 mm] WIDE: (2) PIECES X 46 15/16 in [1192 mm] C/W PRE-PUNCHED HOLES CP-2X4 FOOT BRACKET (2) -EXW4 (3) STEEL UPRIGHT (QUANTITY AND PART NUMBER OPTIONS LISTED BELOW) FOR TYPE CC-W FOR DOORS UP TO 36 in [914 mm] WIDE X 84 in [2134 mm]/2150mm HIGH: (4) CP-807 STEEL UPRIGHT (89 15/16 in [2284 mm] LONG) FOR TYPE CC-W-EXH8 FOR DOORS UP TO 36 in [914 mm] WIDE X 96 in [2438 mm]/2455mm HIGH: (4) CP-808 STEEL UPRIGHT (101 15/16 in [2589 mm] LONG) FOR TYPE CC-W-EXW4 FOR DOORS UP TO 48 in [1219 mm] WIDE X 84 in [2134 mm]/2150mm HIGH: (6) CP-807 STEEL UPRIGHT (89 15/16 in [2284 mm] LONG) FOR TYPE CC-W-EXW4H8 FOR DOORS UP TO 48 in [1219 mm] WIDE X 96 in [2438 mm]/2455mm HIGH: (6) CP-808 STEEL UPRIGHT (101 15/16 in [2589 mm] LONG) CC-400 HANGER BODY (1) (C/W WHEELS) CC-493 TOP PLATE (2) CP-400 HANGER BODY (1) (C/W WHEELS & NO TRIGGER) CC-493 SQUARE HEAD BOLT X 1-1/2 (2) CC-493 LOCK WASHER NUT (2) NEW CC-75 OR CC-1 CATCH N CLOSE CLOSING DEVICE (2) (SEE DETAILS IN INSTRUCTION STEPS) CC-100 CATCH N CLOSE IN-TRACK STOP (2) CP-008 CATCH N CLOSE CROWDERFRAME CLIP (1) CP-400 ADJUSTMENT WRENCH (1) CC-493 NYLON SPACER (2) 1/4 -#14 X 3/4 HEX TEK SCREW (8) -EXW4 (10) 5/16 EXTERNAL TOOTH LOCK WASHER (4) -EXW4 (6) #10 X 1-1/2 SELF DRILLING SCREW (5) #10 X 1-1/4 PAN HEAD SCREW (15) #8 X 1 SELF DRILLING SCREW (6) #8 X 3/4 PAN HEAD SCREW (8) -EXW4 (10) C-99 RUBBER DOME BUMPER (1) 3/16 SPACER WASHER (12) #6 X 1 FINE THREAD DRYWALL SCREW (25) -EXW4 (37) C-914 GUIDE CHANNEL X LENGTH (1) (LENGTH = DOOR WIDTH, EXAMPLE: 36 in [914 mm] DOOR= 36 in [914 mm] GUIDE CHANNEL) CP-913 POCKET GUIDE (1) #10 X 1-3/4 FLATHEAD SCREW (2) PAGE 5

6 SITE PREPARATION: ROUGH OPENING SIZE ROUGH OPENING HEIGHT (ROH) FROM FINISHED FLOOR FOR DOORS UP TO 84 in, 7-0, 2150 mm HIGH MUST BE AT LEAST 92 1/2 in [2350 mm] ROUGH OPENING HEIGHT (ROH) FROM FINISHED FLOOR FOR DOORS UP TO 96 in, 8-0, 2455 mm (-EXH8 KITS) HIGH MUST BE AT LEAST 104 1/2 in [2654 mm] FOR DOUBLE POCKET DOOR KITS, PLEASE REFER TO THE CPD-CC-JOINER INSTALLATION INSTRUCTIONS FOR ROUGH OPENING SIZE. CHART A: SINGLE DOOR ROUGH OPENING WIDTH (ROW) DOOR WIDTH ROUGH OPENING WIDTH (ROW) CP-403 TRACK LENGTH REQUIRED 26 in (2'-2") [661 mm] 52 3/8 in [1330 mm] 52 in [1321 mm] 28 in (2'-4") [711 mm] 56 3/8 in [1432 mm] 56 in [1422 mm] 30 in (2'-6") [762 mm] 60 3/8 in [1534 mm] 60 in [1524 mm] 32 in (2'-8") [813 mm] 64 3/8 in [1635 mm] 64 in [1626 mm] 34 in (2'-10") [864 mm] 68 3/8 in [1737 mm] 68 in [1727 mm] 36 in (3'-0") [914 mm] 72 3/8 in [1838 mm] 72 in [1829 mm] 38 in (3'-2") [965 mm] 76 3/8 in [1940 mm] 76 in [1930 mm] 40 in (3'-4") [1016 mm] 80 3/8 in [2042 mm] 80 in [2032 mm] 42 in (3'-6") [1067 mm] 84 3/8 in [2143 mm] 84 in [2134 mm] 44 in (3'-8") [1118 mm] 88 3/8 in [2245 mm] 88 in [2235 mm] 46 in (3'-10") [1169 mm] 92 3/8 in [2346 mm] 92 in [2337 mm] 48 in (4'-0") [1219 mm] 96 3/8 in [2448 mm] 96 in [2438 mm] ROH ROW INSTRUCTIONS FOR TYPE CC-W CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT STEP #1: ON ONE SIDE OF OPENING, SECURE ONE CP-402 HEADER BRACKET WITH #10 X 1-1/4 PAN HEAD SCREWS (3) TO THE JAMB AT THE HEADER HEIGHT REQUIRED (SEE ILLUSTRATION FOR DETAILS). SEE CHART B FOR HEADER HEIGHT DIMENSIONS BASED ON DOOR HEIGHT. HEADER BRACKET HEIGHT (FROM FINISHED STEP #2: ON OPPOSITE SIDE OF OPENING, SECURE SECOND CP-402 HEADER BRACKET WITH #10 X 1-1/4 PAN HEAD SCREWS (1) THROUGH THE OBLONG HOLE ON THE BRACKET TO THE JAMB AT THE HEADER HEIGHT REQUIRED (SEE ILLUSTRATION FOR DETAILS). IT IS RECOMMEND TO SECURE THIS BRACKET THROUGH THE MIDDLE OF THE OBLONG HOLE TO ALLOW FOR PLUMB ADJUSTMENT WHEN INSTALLING THE TRACK IN STEPS #6 & 7. HEADER BRACKET HEIGHT DIMENSIONS SHOWN BELOW FOR THE HEADER BRACKET HEIGHT IS TAKEN FROM THE FINISHED FLOOR. IF FINISHED FLOOR WILL BE INSTALLED AFTER THE POCKET DOOR KIT, PLEASE ADD THE FLOOR THICKNESS TO THE HEADER BRACKET HEIGHT. EXAMPLE: 84 in [2134 mm] HIGH DOOR WITH 3/4 in THICK FLOOR = 88 1/4 in [2140 mm] + 3/4 in [19.1 mm] = 89 in [2261 mm] NEW HEADER HEIGHT FROM THE SUB FLOOR (BELOW THE FINISHED. NOTE: S MUST BE SHIMMED UP TO THE LEVEL OF FINISHED FLOOR. SEE STEP #9 FOR DETAILS. CHART B: HEADER BRACKET HEIGHT DOOR HEIGHT HEADER BRACKET HEIGHT MEASUREMENT FROM FINISHED FLOOR 80 in (6'-8") [2032 mm] 84 1/4 in [2140 mm] 82 in (6'-10") [2083 mm] 86 1/4 in [2191 mm] 84 in (7'-0") [2134 mm] 88 1/4 in [2242 mm] mm 88 7/8 in [2257 mm] 92 in (7'-8") [2337 mm] 96 1/4 in [2445 mm] 94 in (7'-10") [2388 mm] 98 1/4 in [2496 mm] 96 in (8'-0") [2438 mm] 100 1/4 in [2546 mm] mm 100 7/8 in [2562 mm] STEP #3: CUT CP-403 ALUMINUM HEADER TO CORRECT SIZE IF REQUIRED. LENGTH IS EQUAL TO 2 X DOOR WIDTH. SEE COLUMN CP-403 TRACK LENGTH REQUIRED IN CHART A FOR LENGTHS BASED ON DOOR WIDTHS. {FOR DOUBLE DOOR KITS, PLEASE REFER TO STEPS #3 & CPD-1 IN THE CPD-CC-JOINER KIT INSTRUCTION SHEET BEFORE PROCEEDING} HEADER BRACKET HEIGHT (FROM FINISHED PAGE 6

7 STEP #4: ASSEMBLE THE CC-493 & CP-493 CATCH N CLOSE HANGERS AS SHOWN BELOW: FIG. 1 - THREAD CC-493 LOCK WASHER NUT ONTO CC-493 SQUARE HEAD BOLT X 1-1/2 WITH LOCK WASHER FACING BOLT HEAD. SLIDE CC-493 NYLON WASHER ONTO BOLT AND REST AGAINST LOCK WASHER NUT. (2 X REQUIRED) NOTE: NYLON WASHER MUST BE INSTALLED TO PREVENT DAMAGE TO CATCH N CLOSE CLOSING DEVICES. FIG. 2 - THREAD ASSEMBLY FROM FIG. 1 INTO CC-400 HANGER BODY FROM THE UNDERSIDE (SIDE OPPOSITE THE TRIGGER). FIG. 3 - COMPLETE CC-493 HANGER ASSEMBLY (1 X REQUIRED). FIG. 4 - THREAD ASSEMBLY FROM FIG. 1 INTO CP-400 HANGER BODY FROM THE UNDERSIDE (SIDE WITH SLOPED FACES). FIG. 5 - COMPLETE CP-493 HANGER ASSEMBLY (1 X REQUIRED). STEP #6: PLACE CP-403 HEADER TRACK COMPLETE WITH HANGERS AND STOPS ONTO THE TWO CP-402 HEADER BRACKETS PREVIOUSLY PLACED IN STEPS #1 & 2. SEE ILLUSTRATIONS BELOW FOR DETAILS. NOTE: ENSURE THE POCKET END OF THE TRACK IS PLACED ON THE POCKET END JAMB AND THE OPENING END OF THE TRACK IS PLACED ON THE OPENING END RESPECTIVELY. IF HANGERS ARE INCORRECTLY ORIENTATED CATCH N CLOSE WILL NOT WORK PROPERLY. THE TOP OF THE HEADER TRACK SHOULD SIT FLUSH WITH THE TOP OF THE HEADER BRACKETS. T FIG. 1 FIG. 2 TRIGGER HEADER BRACKET HEIGHT (FROM FINISHED FIG. 4 HEADER BRACKET HEIGHT (FROM FINISHED SLOPED FACE HEADER BRACKET HEADER BRACKET HEIGHT (FROM HEIGHT FINISHED (FROM FINISHED FIG. 3 (CC-493 HANGER) CHALK LINE FIG. 5 (CP-493 HANGER) CHALK LINE STEP #7: CHECK HEADER TRACK FOR LEVEL AND ADJUST WITH HEADER BRACKET THAT HAS ONE SCREW IN THE OBLONG HOLE UNTIL TRACK LEVEL IS ACHIEVED. SECURE THIS HEADER BRACKET WITH #10 X 1-1/4 PAN HEAD SCREWS (2) ON THE TWO OUTSIDE HOLES AS SHOWN BELOW. STEP #5: ON THE DOOR OPENING END OF TRACK, SLIDE THE CP-008 CLIP INTO THE UPPER TRACK SECTION IN THE DIRECTION AS SHOWN BELOW, SLIDE THE ONE CC-493 HANGER ASSEMBLY (FIG. 3 FROM STEP #4) AND ONE CP-493 HANGER ASSEMBLY (FIG. 5 FROM STEP #4) INTO THE TRACK AS SHOWN BELOW. NOTE: ONLY THE CC-493 HANGER IS EQUIPPED WITH A CATCH N CLOSE TRIGGER. WHEN INSTALLING, * CP-008 CLIP DIRECTION TRIGGER LOCATION NO TRIGGER LOCATION BUMPER LOCATIONS ILLUSTRATIONS RETRACTED SIDE (TO THE LEFT) SHOWS THE CORRECT POSITIONING OF THE CP-008 CLIP & STOPS IN THE TRACK. CC-493 HANGER (WITH TRIGGER) ACTIVATED SIDE RETRACTED SIDE (DOOR IN OPENED POSITION) THE TRIGGER MUST BE ORIENTED AS SHOWN IN THE ILLUSTRATION BELOW AT THE DOOR OPENING END OF THE TRACK. THE TRIGGER MUST BE * CLOSEST TO THE DOOR OPENING END OF THE TRACK. THE CP-493 HANGER DOES NOT HAVE A TRIGGER BUT IT MUST BE INSTALLED AT THE POCKET END OF THE TRACK. INSERT THE CC-100 CATCH N CLOSE IN-TRACK STOPS AT EACH END AFTER THE HANGERS HAVE BEEN PLACED INTO THE TRACK. NOTE: LEAVE THE STOP SCREWS LOOSE TO ALLOW THE STOPS TO SLIDE FREELY WITHIN THE TRACK. THE RUBBER BUMPERS OF EACH STOP SHOULD FACE INWARD (TOWARD THE MIDDLE OF THE TRACK ). DOOR OPENING END OF TRACK * POCKET END OF TRACK 7 in [177.8 mm] CC-493 HANGER (WITH TRIGGER) ACTIVATED SIDE CP-493 HANGER (WITHOUT TRIGGER) NEW CP-008 CLIP STEP #8: SECURE HEADER TRACK TO HEADER BRACKETS WITH 1/4 -#14 X 3/4 HEX TEX SCREWS (4) AS SHOWN BELOW. TWO SCREWS REQUIRED PER HEADER BRACKET. 7 in [177.8 mm] FRONT EDGE 7 in [177.8 mm] MARK CP-493 HANGER (WITHOUT TRIGGER)!!ATTENTION!! NEW CP-008 CLIP {FOR DOUBLE DOOR KITS, PLEASE REFER TO STEPS #CPD-2 & CPD-3 IN THE CPD-CC-JOINER KIT INSTRUCTION SHEET BEFORE PROCEEDING} ACTIV CC SEE R PREVIOUS MARKED CP-00 (DOOR IN A PRODUCT OPENED POSITION) OF K.N. CROWDER MFG. INC. PAGE 7

8 JAMB AT BACK OF POCKET STEP #9: USE A AGAINST THE BOTTOM STUDS OF THE WALL TO MARK THE LINES OF THE OPENING ON BOTH SIDES. LOCATE AND SECURE THE CP-2X4 FOOT BRACKETS (2) OR (3) FOR EXTRA WIDTH KITS AS PER THE LOCATION CHART C LISTED BELOW. SECURE THE S WITH #8 X 3/4 PAN HEAD SCREWS (2 PER ). NOTE: S HAVE A FRONT EDGE AND THIS EDGE SHOULD FACE THE OPENING AS SHOWN IN THE ILLUSTRATIONS BELOW. S ARE TO BE MOUNTED ON FINISHED FLOOR. IF FINISHED FLOOR IS NOT INSTALLED, PLEASE SHIM S THE THICKNESS OF THE FINISHED FLOOR. LOCATION DIMENSIONS ARE BASED ON STANDARD SET-UP AND WILL ACCOMMODATE THE FINISHING AS SHOWN ON PAGES 3 & 4 OF THIS INSTRUCTION SHEET. {FOR DOUBLE DOOR KITS, PLEASE REFER TO STEP #9 IN THE CPD-CC-JOINER KIT INSTRUCTION SHEET BEFORE PROCEEDING} {IF USING CP-TK-2X4 POCKET TRIM KIT, PLEASE REFER TO STEP #TK-1 IN THE CP-TK-2X4 POCKET TRIM KIT INSTRUCTION SHEET BEFORE PROCEEDING} CHART C: LOCATION DIMENSIONS A, B, C DOOR WIDTH DIMENSION A DIMENSION B DIMENSION C 26 in (2'-2") [661 mm] 26 3/4 in [680 mm] 13 1/2 in [343 mm] in (2'-4") [711 mm] 28 3/4 in [730 mm] 14 1/2 in [368 mm] in (2'-6") [762 mm] 30 3/4 in [781 mm] 16 1/2 in [419 mm] in (2'-8") [813 mm] 32 3/4 in [832 mm] 16 1/2 in [419 mm] in (2'-10") [864 mm] 34 3/4 in [883 mm] 18 1/2 in [470 mm] in (3'-0") [914 mm] 36 3/4 in [934 mm] 20 1/2 in [521 mm] ---- HEADER BRACKET HEIGHT (FROM FINISHED BELOW APPLY TO -EXW4 (EXTRA WIDTH) CROWDERFRAME POCKET DOOR KITS 38 in (3'-2") [965 mm] 38 3/4 in [984 mm] 25 1/2 in [648 mm] 12 1/2 in [318 mm] 40 in (3'-4") [1016 mm] 40 3/4 in [1035 mm] 27 1/2 in [699 mm] 14 1/2 in [368 mm] 42 in (3'-6") [1067 mm] 42 3/4 in [1086 mm] 28 1/2 in [724 mm] 14 1/2 in [368 mm] 44 in (3'-8") [1118 mm] 44 3/4 in [1137 mm] 30 1/2 in [775 mm] 16 1/2 in [419 mm] 46 in (3'-10") [1169 mm] 46 3/4 in [1188 mm] 31 1/2 in [800 mm] 16 1/2 in [419 mm] 48 in (4'-0") [1219 mm] 48 3/4 in [1238 mm] 32 1/2 in [826 mm] 16 1/2 in [419 mm] HEADER BRACKET HEIGHT (FROM FINISHED CHALK LINE MOU HALF UP T JAMB RO STD PLAN VIEW (FOR DOORS 26 in [660 mm] TO 36 in [914 mm] WIDE) OPENING END POCKET END FRONT END OF IS IDENTIFIED WITH 4 HOLES ALONG FRONT EDGE -EXW4 (EXTRA WIDTH) PLAN VIEW (FOR DOORS 37 in [940 mm] TO 48 in [1219 mm] WIDE) OPENING END POCKET END FRONT END OF IS IDENTIFIED WITH 4 HOLES ALONG FRONT EDGE DIMENSION A DIMENSION B DIMENSION A DIMENSION B DIMENSION C STEP #10: PLACE CP-913 GUIDE (1) ON CLOSEST TO THE OPENING END AND SECURE WITH #10 X 1-3/4 FLATHEAD SCREWS (2). NOTE: ENSURE THE ARROW ID ON THE CP-913 BASE IS FACING TOWARDS THE OPENING AS SHOWN BELOW. {IF USING CP-TK-2X4 POCKET TRIM KIT, PLEASE REFER TO STEP #TK-2 IN THE CP-TK-2X4 POCKET TRIM KIT INSTRUCTION SHEET BEFORE PROCEEDING} OPENING END POCKET END 1/2 in [12.7 SET BA REQUIR 1 in [25.4 mm] WIDE RECESSED IN DOOR BOTTOM OF DOOR ARROW ID ON CP-913 GUIDE TO POINT TOWARDS OPENING DIMENSION A 29/32 in [22.9 mm] HIGH RECESSED IN DOOR BACK EDGE OPENING END POCKET END PAGE 8 1/2 in [12.7 mm] SET BACK REQUIRED

9 HEADER BRACKET HEIGHT (FROM FINISHED STEP #11: POSITION STEEL UPRIGHTS (4) OR (6) FOR EXTRA WIDTH KITS, ON FOOT BRACKETS WITH LARGE OVAL CLEARANCE HOLES FACING OUT. THE UPRIGHTS ARE PUNCHED SYMMETRICALLY THEREFORE EITHER END CAN BE UP (OR DOWN). NOTE: THE ROLLED SEAM ON THE SIDE WALL OF THE UPRIGHT SHOULD FACE THE BACK OF THE POCKET - OTHERWISE IT WILL BE DIFFICULT TO SCREW OPENING TRIM TO THE UPRIGHT. STEP #13: PREPARE C-914 GUIDE CHANNEL SLOT IN THE BOTTOM OF THE DOOR 1 in [25.4 mm] WIDE IN CENTER, AND 29/32 in [23 mm] DEEP AND SET BACK 1/2 in [12.7 mm] FROM THE FRONT EDGE OF THE DOOR. IT IS RECOMMENDED TO MAKE THE SLOT AS ACCURATE AS POSSIBLE FOR SECURE FIT AND NEAT APPEARANCE. SEE BELOW: 1/2 in [12.7 mm] SET BACK REQUIRED 1 in [25.4 mm] WIDE RECESSED IN DOOR BOTTOM OF DOOR FRONT EDGE 29/32 in [22.9 mm] HIGH RECESSED IN DOOR BACK EDGE STEP #12: PLUMB UPRIGHTS VERTICALLY AND SECURE TO CP-403 HEADER TRACK WITH 1/4 -#14 X 3/4 HEX TEX SCREWS AND 5/16 EXTERNAL TOOTH LOCK WASHER (1 OF EACH REQUIRED FOR EACH UPRIGHT). NOTE: IMPACT DRIVER IS IDEAL FOR THIS STEP OR PRE-DRILL WITH 9/64 in DIAMETER DRILL BIT IF DESIRED. SCREW AND HOLE IN UPRIGHT SHOULD LINE UP WITH TOP GROOVE IN CP-403 HEADER TRACK AS SHOWN BELOW. CHALK LINE SCREW INTO TOP GROOVE OF CP-403 HEADER TRACK (AS SHOWN) STEP #14: LOCATE CENTER OF U SLOT (DASH LINE SHOWN BELOW) ON CC-493 TOP PLATE MINIMUM 4 1/4 in [108.0 mm] FROM EACH EDGE. MARK SCREW HOLE LOCATIONS AND PRE-DRILL 1/8 in [3.2 mm] DIAMETER HOLES AT LEAST 1 1/2 in [38.1 mm] DEEP. MOUNT CC-493 TOP PLATES ON DOOR AND SECURE WITH #10 X 1-1/4 PAN HEAD SCREWS (4 PER TOP PLATE). SEE ILLUSTRATION BELOW. NOTE: IT IS RECOMMENDED TO LOCATE THE TOP PLATES AS CLOSE TO THE DIMENSIONS SHOWN BELOW ESPECIALLY FOR NARROW DOORS. IF THE TOP PLATES ARE LOCATED FURTHER AWAY FROM THE EDGE, IT MAY BE PROBLEMATIC WHEN INSTALLING THE CATCH N CLOSE CLOSING DEVICES AND FOR THE COMPLETE SYSTEM TO OPEN AND CLOSE AS REQUIRED. CENTER OF SLOT CENTER OF SLOT MINIMUM 4 1/4 in [108 mm] MINIMUM 4 1/4 in [108 mm] STEP #15: CUT C-914 ALUMINUM GUIDE CHANNEL TO CORRECT LENGTH AS REQUIRED. DRILL HOLES IN C-914 GUIDE CHANNEL AND PRE-DRILL HOLES IN DOOR. LOCATE C-914 GUIDE CHANNEL IN SLOT AND SCREW CHANNEL INTO PLACE WITH #8 X 3/4 PAN HEAD SCREWS (4 SCREWS ARE PROVIDED IN KIT). FRONT EDGE GUIDE CHANNEL SHOULD PROTRUDE FROM BACK EDGE BY 1/2 in [12.7 mm] BACK EDGE PAGE 9

10 STEP #16: RAISE THE DOOR AND POSITION OVER THE GUIDE AND UNDER THE HANGERS IN THE TRACK. LIFT THE DOOR UP AND ENGAGE TOP PLATE SLOTS WITH THE CC-493 SQUARE HEAD BOLTS. ADJUST DOOR HEIGHT AND PLUMB BY DISENGAGING AND USING THE CP-400 ADJUSTMENT WRENCH. SEE ILLUSTRATIONS BELOW. NOTE: THE BACK HANGER MAY HAVE TO BE ENGAGED FIRST, THEN PLACE DOOR ON GUIDE AND SLIDE INTO POCKET (BETWEEN UPRIGHTS) AND THEN ENGAGE FRONT HANGER ACCORDINGLY. STEP #18: AFTER THE DOOR HAS BEEN INSTALLED, POSITION DOOR APPROXIMATELY 5-10 AWAY FROM THE FINAL POSITION AT ONE END (USING THE LEFT SIDE AS AN EXAMPLE TO SHOW THIS STEP). PUSH THE LOOSE LEFT SIDE CC-100 STOP (INSTALLED IN STEP #4) AGAINST THE HANGER BODY AS SHOWN BELOW: STEP #19: WITH THE CC-100 STOP LOOSE, SLIDE THE DOOR TO THE LEFT OF THE FINAL/DESIRED POSITION OF THE DOOR AS SHOWN BELOW. NOTE: ENSURE THAT STRIKE AND TRIM THICKNESS ARE TAKEN INTO CONSIDERATION FOR WHERE THE DOOR WILL BE IN THE FINAL POSITION. SEE PAGES 3 & 4 OF THIS INSTRUCTION SHEET FOR FINISHING. STEP #20: ONCE THE FINAL POSITION IS ACHIEVED, SLIDE THE DOOR AWAY FROM THE CC-100 STOP. LOCK THE STOP IN POSITION BY TIGHTENING THE TWO CAP SCREWS ON THE STOP WITH 3/16 ALLEN KEY (CC-100 IS SECURED BY FRICTION FIT). STEP #21: REPEAT STEPS #18 THRU #20 FOR OPPOSITE SIDE. NOTE: RE-CHECK FINAL DOOR POSITIONS AGAINST THE SECURED CC-100 STOPS BEFORE PROCEEDING TO STEP #22. RE-ADJUST IF REQUIRED. NOTE: ENSURE THAT STRIKE AND TRIM THICKNESS ARE TAKEN INTO CONSIDERATION FOR WHERE THE DOOR WILL BE IN THE FINAL POSITION. SEE PAGES 3 & 4 OF THIS INSTRUCTION SHEET FOR FINISHING. STEP #22: ON THE POCKET END FRAMING JAMB, MARK THE HALFWAY POINT FROM THE FLOOR TO THE UNDER SIDE OF THE TRACK. PUSH THE DOOR INTO THE OPENED POSITION (CLOSEST TO THE POCKET JAMB) AND MEASURE THE DISTANCE FROM THE BACK EDGE OF THE DOOR TO THE JAMB. ASSEMBLE A #10 X 1-1/4 PAN HEAD SCREW (1) WITH THE C-99 RUBBER DOME BUMPER (1) AND 3/16 SPACER WASHERS (QUANTITIES ARE AS REQUIRED TO FIT IN THE GAP PREVIOUSLY MEASURED) SECURE THIS ASSEMBLY TO THE POCKET JAMB TO ACT AS A SECONDARY STOP FOR THE DOOR IN THE OPENED POSITION.. JAMB AT BACK OF POCKET STEP #17: LOCK ADJUSTMENT BY TIGHTENING CC-493 LOCK WASHER NUT AGAINST CC-493 TOP PLATE WITH CP-400 ADJUSTMENT WRENCH. MOUNT HALFWAY UP THE JAMB PAGE 10

11 STEP #23: BEFORE INSTALLING THE CATCH N CLOSE DEVICE, PLEASE ENSURE IT IS IN THE RETRACTED POSITION. IF IT IS NOT IN THIS POSITION, SLIDE IT DOWN UNTIL IT LOCKS INTO THIS POSITION AS SHOWN BELOW. NOTE: THIS WILL REQUIRE SIGNIFICANT FINGER PRESSURE. RETRACTED POSITION ID END #A IMPORTANT CATCH N CLOSE CLOSING DEVICE NOTES: IF THE DOORS ARE 75LBS OR LESS, PLEASE ENSURE THE CC-75 CATCH N CLOSE CLOSING DEVICE IS BEING USED. STEP #26: THE DOOR POCKET END CATCH N CLOSE CLOSING DEVICE WILL BE INSTALLED USING THE CP-008 CATCH N CLOSE CROWDERFRAME CLIP. WITH THE DOOR IN THE FULLY OPENED POSITION (DOOR IS IN POCKET AREA WITH THE CP-493 HANGER HITTING THE CC-100 STOP THAT WAS PREVIOUSLY SECURED IN STEPS #18-20), MEASURE AND MARK 7 CCin [177.8 mm] FROM THE FRONT EDGE OF THE DOOR BACK INTO THE POCKET AREA. IDEALLY FIRST MARK THE UNDERSIDE OF THE RETRACTED TRACK SIDE WHERE THE FRONT EDGE OF THE DOOR IS POSITIONED. THEN MEASURE AND MARK THE 7 in [177.8 mm] LOCATION TO THE UNDERSIDE OF THE TRACK AS WELL. MOVE THE DOOR OUT OF THE POCKET (INTO CC-493 H THE CLOSED POSITION) AND MARK THE INSIDE OF THE TRACK IN RETRACTED SIDE ORDER TO LOCATE THE CP-008 CLIP IN THE FOLLOWING STEPS. SEE (DOOR IN OPENED P ILLUSTRATION BELOW FOR ASSISTANCE. FINAL STOP POSITION IN OPENED POSITION IF THE DOORS ARE MINIMUM 75LBS UP TO 150LBS, PLEASE ENSURE THE CC-1 CATCH N CLOSE CLOSING DEVICE IS BEING USED. STEP #24: AT THE DOOR OPENING END OF THE TRACK (CLOSEST TO THE STRIKE JAMB, WHERE THE DOOR WILL BE IN THE CLOSED POSITION) PLACE THE CATCH N CLOSE CLOSING DEVICE INTO THE TRACK WITH THE SOLID END (ID END #A SHOWN ABOVE) RESTING AGAINST THE UPPER BODY ON THE CC-100 STOP (ABOVE THE BUMPER) INSTALLED PREVIOUSLY. WHEN THE CATCH N CLOSE CLOSING DEVICE IS RESTING TIGHT AGAINST THE UPPER BODY OF THE CC-100 STOP, IT IS IN THE CORRECT POSITION AND WILL CLOSE THE DOOR TO THE DESIRED POSITION. SEE ILLUSTRATION BELOW: MARK THIS (DOOR IN OPENED POS LOCATION FRONT EDGE DOOR OPENING END ID END #A DOOR POCKET END STEP #27: SLIDE THE DOOR OUT OF THE WAY INTO THE FULLY CLOSED POSITION (DOOR IS OPENING AREA ENGAGED WITH THE CATCH N CLOSE DEVICE PREVIOUSLY INSTALLED IN STEPS #24 & 25). ONCE THE DOOR IS IN THIS POSITION, ENSURE THE CP-008 CLIP IS POSITIONED IN THE POCKET AREA AS ILLUSTRATED BELOW (SLIDE IN TRACK AS REQUIRED), THEN PLACE THE SECOND CATCH N CLOSE CLOSING INTO THE TRACK ABOVE THE CP-493 HANGER WITH ID END #A FACING THE BACK OF THE POCKET AND DEVICE IS IN THE RETRACTED POSITION. SEE ILLUSTRATIONS BELOW FOR ASSISTANCE. FINAL STOP POSITION IN OPENED POSITION DOOR OPENING END FRAMING JAMB (STRIKE JAMB END) MEASURE AND MARK 7 in [177.8 mm] FROM THE FRONT EDGE END VIEW ID END #A SIDE VIEW (TRACK SHOWN WITH CUTOUT) RETRACTED POSITION PREVIOUSLY MARKED STEP #25: SECURE CATCH N CLOSE CLOSING DEVICE TO TRACK WITH #10 X 1-1/2 SELF DRILLING SCREWS (2). NOTE: DO NOT USE IMPACT DRIVER TO SECURE CATCH N CLOSE CLOSING DEVICES TO THE TRACK. DO NOT OVERTIGHTEN SCREWS. TO EASE INSTALLATION, IT IS RECOMMENDED TO PRE-DRILL TRACK WITH 5/32 in DRILL BIT. IT IS RECOMMENDED TO SECURE THE FIRST SCREW (CLOSEST TO THE CC-100 STOP), TEST SYSTEM BY SLIDING THE DOOR TO ACTIVATE THE CATCH N CLOSE. IF IT IS IN THE CORRECT POSITION, SECURE WITH SECOND SCREW. EDGE 7 in [177.8 mm] REMOVE ANY DRILL FILLINGS FROM INSIDE THE TRACK AS THIS WILL N OPENED POSITION MARK AFFECT THE OPERATION OF THE SLIDING DOOR SYSTEM. FINAL STO IN OPENED RETRACTED POSITION ID END #A CP-008 CLIP CP-007 CLIP RE SECURE CP-007 CLIP CP-007 CLIP SECURE SECURE PAGE 11

12 NEW CP-008 CLIP CC-493 HANGER (WITH TRIGGER) RETRACTED SIDE NEW CP-008 CLIP STEP #28: SLIDE THE CP-008 CLIP IN THE TRACK TO POSITION IT SO THAT THE SEE RIGHT BACK END OF THE CP-008 CLIP LINES UP WITH THE 7 in [177.8 mm] MARK MADE IN STEP # 26. LOOSELY SECURE THE CP-008 CLIP WITH #10 X 1-1/2 SELF DRILLING SCREW (1) THROUGH THE MIDDLE CP-493 OF THE HANGER OBLONG (WITHOUT TRIGGER) HOLE IN ORDER TO ALLOW FOR ADJUSTMENT PREVIOUSLY ACTIVATED SIDE WHEN TESTING IN THE NEXT STEP. SEE ILLUSTRATIONS MARKED BELOW FOR ASSISTANCE. PREVIOUSLY MARKED NEW CP-008 CLIP MINIMUM 4 1/4 in [108.0 mm] TO CENTER OF HANGER BOLT (DOOR IN CLOSED POSITION) SUPPORT. TWO EQUAL CP-493 HANGER LENGTH (WITHOUT PIECES TRIGGER) ARE REQUIRED FOR RETRACTED SIDE CC-493 HANGER (WITH TRIGGER) INSTALLATION. NEW CP-008 CLIP SEE RIGHT (DOOR IN CLOSED POSITION) STEP #31: MEASURE AND CUT CP-430 DRYWALL SUPPORTS IF REQUIRED TO FIT IN OPENING BETWEEN HEADER BRACKET AND FIRST UPRIGHT. IF PRE-PUNCHED HOLES ARE CUT OFF, RE-DRILL WITH 11/64 in DRILL BIT FOR A TOTAL OF 3 HOLES PER PIECE OF CP-430 DRYWALL {FOR DOUBLE DOOR KITS, PLEASE REFER TO STEP #CPD-4 IN THE CPD-CC-JOINER KIT INSTRUCTION SHEET BEFORE PROCEEDING} MINIMUM 4 1/4 in [108.0 mm] TO CENTER OF HANGER BOLT FRONT EDGE 7 in [177.8 mm] MARK FRONT EDGE 7 in [177.8 mm] MARK CP-008 CLIP PREVIOUSLY MARKED CP-008 CLIP STEP #32: SNAP THE CP-430 DRYWALL SUPPORTS ONTO THE CP-403 HEADER TRACK AS SHOWN BELOW WITH THE STEP IN THE DRYWALL SUPPORT FACING DOWN TOWARDS THE FLOOR. ONCE SNAPPED ON, SECURE WITH #8 X 1 SELF DRILLING SCREWS (6, 3 PER SIDE). {FOR DOUBLE DOOR KITS, PLEASE REFER TO STEP #CPD-5 IN THE CPD-CC-JOINER KIT INSTRUCTION SHEET BEFORE PROCEEDING} STEP #29: CAREFULLY SLIDE THE DOOR BACK INTO THE FULLY PREVIOUSLY OPENED POSITION (DOOR IS POSITIONED IN THE POCKET ACCORDINGLY) MARKED WHILE ENSURING THE FRONT CATCH N CLOSE EDGE CLOSING DEVICE INSTALLED IN STEP #28 ENGAGES WITH THE 7 in CC-493 [177.8 mm] HANGER AT THE FRONT END MARK OF THE DOOR. ONCE IN THE FULLY OPENED POSITION, CHECK TO ENSURE THE CATCH N CLOSE IS HOLDING THE DOOR IN ITS FINAL POSITION. IF NOT, ADJUST BY PUSHING THE CATCH N CLOSE WITHIN THE TRACK (THE AMOUNT SECUREOF PLAY AVAILABLE IS DETERMINED BY THE OBLONG HOLE ON THE CP-008 CLIP. THE CC-100 STOP CP-008 IN THE CLIP POCKET MAY NEED TO BE ADJUSTED ACCORDINGLY. NOTE: ENSURE THAT TRIM THICKNESS FRONT SECURE EDGE IS TAKEN INTO CONSIDERATION FOR 7 in [177.8 mm] WHERE THE DOOR WILL BE IN THE FINAL POSITION. SEE MARK PAGES 3 & 4 OF THIS INSTRUCTION SHEET FOR FINISHING. ONCE THE DOOR IS IN ITS FINAL POSITION, SECURE THE CATCH N CLOSE CLOSING DEVICE WITH #10 X 1-1/2 SELF-DRILLING SCREW (1) ON THE END OPPOSITE THE CP-008 CLIP. THIS SHOULD BE WITHIN THE DOOR OPENING END. SECURE CP-008 CLIP SECURE SECURE STEP #30: TEST THE OPENING AND CLOSING OF THE DOOR TO ENSURE THE CATCH N CLOSE IS POSITIONING THE DOOR IN THE DESIRED POSITIONS. SLIDE THE DOOR TO THE FULLY CLOSED POSITION AND SECURE THE CP-008 CLIP FULLY BY TIGHTENING THE SCREW IN THE OBLONG HOLE AND SECURE WITH ONE MORE #10 X 1-1/2 SELF DRILLING SCREW (1). SECURE SECURE STEP #33: FINISH PROJECT WITH FINISHING REQUIREMENTS SUCH AS DRYWALL, TRIM, DOOR JAMBS, ETC (ALL BY OTHERS). REFER TO PAGE 3 & 4 FOR FINISHING DETAILS. NOTE: IT IS RECOMMENDED TO MAKE ONE SIDE OF THE TRIM EASILY REMOVABLE FOR FUTURE ACCESS FOR MAINTENANCE PURPOSES. IMPORTANT DRYWALL INSTALLATION NOTES: USE 1 in [25.4 mm] LONG DRYWALL SCREWS ONLY (PROVIDED) WHEN SECURING DRYWALL TO UPRIGHTS. LONGER SCREWS WILL PENETRATE INSIDE FACE OF STEEL UPRIGHT AND DAMAGE DOOR. FASTEN DRYWALL TO BOTTOM OF STEEL UPRIGHTS WORKING UP TO THE TOP. PAGE 12

13 TROUBLESHOOTING: ISSUE: DOOR IS NOT ENGAGING THE CLOSING DEVICE. SOLUTION: A) ENSURE HANGERS ARE CORRECTLY ORIENTED. SEE STEPS #4 & 5. B) ENSURE THE CATCH N CLOSE IS IN THE RETRACTED POSITION PRIOR TO SLIDING THE DOOR CLOSED/OPEN. SEE STEP #23. ISSUE: CHATTER/NOISE WHEN DOOR IS SLIDING. SOLUTION: ENSURE THERE ARE NO ALUMINUM SHAVINGS WITHIN THE TRACK. SHAVINGS CAN BECOME EMBEDDED IN NYLON TIRES AND CAUSE NOISY OPERATION. ISSUE: REPLACING THE CATCH N CLOSE DEVICE. SOLUTION: THE CATCH N CLOSE TRACK AND HARDWARE SYSTEM HAS BEEN DESIGNED FOR EASY INSTALLATION. SIMPLY REMOVE THE TWO SCREWS THAT HOLD THE CATCH N CLOSE IN PLACE AND REPLACE THE DEVICE WITH A NEW ONE IF FAILURE OCCURS. ISSUE: REPLACING CATCH N CLOSE DEVICE INSTALLED WITH CP-008 CLIP. (ONLY APPLIES TO KITS FOR DOORS 26 in [660 mm] TO 48 in [1219 mm] WIDE) SOLUTION: IN THE CASE OF THE POCKET END CATCH N CLOSE, IF THE CP-008 CLIP IS USED, IT IS DESIGNED TO ALLOW YOU TO SWITCH THE CATCH N CLOSE WITHOUT NEEDING TO CUT A HOLE IN THE WALL OR TAKING THE SYSTEM DOWN. REMOVE THE FINISHING TRIM FROM ONE SIDE OF THE OPENING, DISENGAGE THE DOOR FROM THE HANGERS AND REMOVE THE DOOR. REMOVE THE FIRST SCREW VISIBLE IN THE OPENING ON THIS CATCH N CLOSE CLOSING DEVICE, SIMPLY SLIDE THE DEVICE OUT FROM THE CP-008 CLIP AND REPLACE ACCORDINGLY. REASSEMBLE POCKET DOOR AND TRIM AFTERWARDS. OPTIONAL PRODUCTS: PLEASE VISIT OUR WEBSITE FOR OTHER OPTIONAL PRODUCT SUCH AS DOOR LOCKS & PULLS AND MORE. NOTES: PAGE 13

14 HOW IT ALL COMES TOGETHER (BASED ON KIT FOR DOORS 26 in [660 mm] TO 48 in [1219 mm] WIDE) CC-493 EASY CONNECT CATCH N CLOSE HANGER CATCH N CLOSE CLOSING DEVICES NEW CP-008 CATCH N CLOSE CROWDERFRAME CLIP (1) CP-493 EASY CONNECT POCKET HANGER SECURING STEEL UPRIGHTS HEADER BRACKET & CP-403 HEADER TRACK CP-402 HEADER BRACKETS CC-100 CATCH N CLOSE IN-TRACK STOPS JAMB AT BACK OF POCKET MOUNT HALFWAY UP THE JAMB C-99 RUBBER DOME BUMPER & SPACER WASHERS OPENING END POCKET END 1/2 in [12.7 mm] SET BACK REQUIRED, STEEL UPRIGHTS & CP-913 GUIDE 1 in [25.4 mm] WIDE RECESSED IN DOOR BOTTOM OF DOOR FRONT EDGE FRONT OF DO CP-2X4 FOOT BRACKETS ARROW ID ON CP-913 GUIDE TO POINT TOWARDS OPENING DIMENSION A 29/32 in [22.9 mm] HIGH RECESSED IN DOOR BACK EDGE GUIDE CHANNEL SHOULD PROTRUDE FROM BACK EDGE BY 1/2 in [12.7 mm] ROH ROW BACK EDGE JAMB AT BACK OF POCKET C-914 GUIDE CHANNEL RECESSED IN BOTTOM MOUNT HALFWAY UP THE JAMB SNAP AND SECURE CP-430 DRYWALL SUPPORTS PAGE 14

RETRACTED SIDE MINIMUM. 4 1/4 in. [108.0 mm] CP-493 HANGER (WITHOUT TRIGGER) RETRACTED SIDE CP-007 CLIP ACTIVATED SIDE MINIMUM. [108.

RETRACTED SIDE MINIMUM. 4 1/4 in. [108.0 mm] CP-493 HANGER (WITHOUT TRIGGER) RETRACTED SIDE CP-007 CLIP ACTIVATED SIDE MINIMUM. [108. TYPE CC-NRB CATCH N CLOSE CROWDERFRAME POCKET DOOR KIT INSTRUCTION SHEET FOR NARROW DOORS 18 in [457 mm] TO LESS THAN 26 in [660 mm] WIDE ONLY ACTIVATED SIDE CC-493 HANGER (WITH TRIGGER) SEE RIGHT (COMPLETE

More information

CP-TK-2X4 POCKET TRIM KIT INSTRUCTION SHEET

CP-TK-2X4 POCKET TRIM KIT INSTRUCTION SHEET CP-TK-2X4 POCKET TRIM KIT INSTRUCTION SHEET (COMPLETE TYPE CC-W KIT WITH CP-TK-2X4 TRIM KIT ILLUSTRATED) POCKET TRIM KIT POCKET TRIM KIT (CP-TK) SAVES ON INSTALLATION TIME, EASY TO INSTALL AND MAKES EASY

More information

CCD-493 KIT SERIES INSTRUCTION SHEET

CCD-493 KIT SERIES INSTRUCTION SHEET (COMPLETE CCD-493-W KIT ILLUSTRTED. CUT-OUTS IN TRCK TO EXPOSE COMPONENTS) CCD-493 KIT SERIES INSTRUCTION SHEET CROWDERTRCK S CTCH N CLOSE TM SYSTEM PREVENTS BOUNCING ND SLMMING OF SLIDING S. CN BE INSTLLED

More information

CC-410 KIT SERIES INSTRUCTION SHEET

CC-410 KIT SERIES INSTRUCTION SHEET (COMPLETE CC-410-W KIT ILLUSTRTED. CUT-OUTS IN TRCK & FSCI TO EXPOSE COMPONENTS) CC-410 KIT SERIES INSTRUCTION SHEET CROWDERTRCK S CTCH N CLOSE TM SYSTEM PREVENTS BOUNCING ND SLMG OF SLIDING DOORS. CN

More information

CCS-810 KIT SERIES INSTRUCTION SHEET

CCS-810 KIT SERIES INSTRUCTION SHEET (COMPLETE KIT ILLUSTRTED. CUT-OUTS IN TRCK & FSCI TO EXPOSE COMPONENTS) CCS-810 KIT SERIES INSTRUCTION SHEET CROWDERTRCK S CTCH N CLOSE TM SYSTEM PREVENTS BOUNCING ND SLMMING OF SLIDING DOORS. CN BE INSTLLED

More information

A B C D E F. Tools Required (supplied by others)

A B C D E F. Tools Required (supplied by others) Page 1 of 17 Parts List Below Deck Automatic Retractable Security Cover Kit (1) Tube End Bearing Plate (A) (1) Rope Reel and Cover Drum Motor Assembly (B) (1) Cover Drum (1) Pulley Support Channel (2)

More information

IMPORTANT: PLEASE RETAIN THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE

IMPORTANT: PLEASE RETAIN THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE IMPORTANT: PLEASE RETAIN THIS INSTRUCTION MANUAL FOR FUTURE REFERENCE 2009 Toyota RAV-4 Stainless Steel Mesh Grilles L 30 G8P Fine Mesh Part #30-002-09 Quantity Description Part No. Upper Mesh Grille (includes):

More information

Installation Instructions

Installation Instructions Equipment Required: Installation Instructions Fastener Kit: F Wrenches: 8mm, 13mm, 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw, File WARNING: Under no circumstances do we recommend

More information

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market 1 888-323-8755 www.nwlifts.com JEEVES Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market This manual will cover the installation procedure step-by-step. The installation of this dumbwaiter

More information

Ford AOD-4R70W-AODE Cable Operated Shifter Installation Instructions

Ford AOD-4R70W-AODE Cable Operated Shifter Installation Instructions Ford AOD-4R70W-AODE Cable Operated Shifter Installation Instructions Building American Quality With A Lifetime Warranty! TOLL FREE 1-877-469-7440 tech@lokar.com www.lokar.com Ford AOD-4R70W-AODE Cable

More information

Installation Instructions

Installation Instructions Equipment Required: Installation Instructions Fastener Kit: F Wrenches: 8mm, 13mm, 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw, File WARNING: Under no circumstances do we recommend

More information

Automatic Roof Hatch Opener

Automatic Roof Hatch Opener Automatic Roof Hatch Opener Installation Guide REQUIRED TOOLS (These tools are required to complete the installation) Cordless Drill 1/8 1/4 Drill Bits 1/8 Pin Punch #2 Philips Bit Rachet Sharpie Hammer

More information

Premium Dry Freight (Plywood) Door Installation REFERENCE FIGURE 1

Premium Dry Freight (Plywood) Door Installation REFERENCE FIGURE 1 Premium Dry Freight (Plywood) Door Installation A Premium door can be identified as usually having a two-spring balancer, 2 diameter (nominal) rollers, and end hinges with removable covers. If your Whiting

More information

Required tools General hand tools 21/64" drill bit Torque wrench Threadlocker Center punch

Required tools General hand tools 21/64 drill bit Torque wrench Threadlocker Center punch Slipper Spring Kit (part numbers 2560, 2570 and 2580) Item Qty Part number Description 1... 8... 350054-50...3/8-16 x 1" grade 8 self-tapping screw 2... 4... 350084-00...7/16-14 x 4" grade 5 3... 6...

More information

Cabinet Free Universal Assist Lifter Instructions

Cabinet Free Universal Assist Lifter Instructions PART LIST 1 @ Left Undermount Bracket 1 @ Right Undermount Bracket 2 @ 1-5/16 Pivot Arm 2 @ 1-1/8 Bent Arms w/ Foams 2 @ M8 Bolt 1 @ 1-5/16 Coupler 2 @ Gas Shocks w/ Sliding Cylinder Mount 2 @ 3-1/4 x

More information

Installation Instructions

Installation Instructions Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers recommended vehicle

More information

2. With the rear door open remove pull-style clip from the passenger side just below the door latch.

2. With the rear door open remove pull-style clip from the passenger side just below the door latch. LoD Offroad FJ Cruiser Rear Bumper with Tire Carrier Installation Instructions 1. Begin with removing factory spare from the rear door. 2. With the rear door open remove pull-style clip from the passenger

More information

DORMA INTERIOR. DORMA PURE FAMELESS SLIDING Glass Wall Systems

DORMA INTERIOR. DORMA PURE FAMELESS SLIDING Glass Wall Systems TABLE OF CONTENTS Overview Intended use Structure requirements and fittings Requirements for glass panel Safety instructions Symbols used - safety/ installation Maintenance, care, repair Disposal 3 Overall

More information

LIGHT DUTY ROLL UP DOOR

LIGHT DUTY ROLL UP DOOR 1-800-225-6729 LIGHT DUTY ROLL UP DOOR CAUTION Use proper lifting equipment and correct lifting procedures to avoid damage or injury. MODEL 150C installation guide A rolling door is a large heavy object

More information

One- Touch Installation Instructions

One- Touch Installation Instructions One- Touch Installation Instructions 1 1 Height Adjustable Pivot w/ screws 9 Upper Work Surface 2 Rail Mount Knobs 10 Back Cover 3 Transformer 11 Center Pivot w/ screws 4 Support Legs 12 Left Monitor Arm

More information

The H-MAC Heavy Metal Articulating Chassis Construction Guide

The H-MAC Heavy Metal Articulating Chassis Construction Guide The H-MAC Heavy Metal Articulating Chassis Construction Guide The Heavy Metal Chassis is constructed with two identical drive modules built using 10 mechanical sub-assemblies. The drive modules are integrated

More information

Ford AOD-4R70W-AODE Cable Operated Shifter Installation Instructions

Ford AOD-4R70W-AODE Cable Operated Shifter Installation Instructions Ford AOD-4R70W-AODE Cable Operated Shifter Installation Instructions Building American Quality With A Lifetime Warranty! TOLL FREE 1-877-469-7440 tech@lokar.com www.lokar.com Ford AOD-4R70W-AODE Cable

More information

Installation Instructions

Installation Instructions Installation Instructions CUSTOM QUICK INSTALL MOUNTING KIT 2011 & UP Ford Super Duty F-250/F-350/F-50 2011 & UP Part Number: 50073 WARNING: Under no circumstances do we recommend exceeding the towing

More information

DC Series Installation Manual (# )

DC Series Installation Manual (# ) DC Series Installation Manual (# 101630) Page 1 of 33 In this booklet you will find: TOWER INSTALLATION... 3 U-Bolt Style mount... 4 Side Frame Style mount... 4 PIVOT INSTALLATION... 5 External Pivot Installation:

More information

WARNING indicates a potentially hazardous situation which, if not avoided, could result in property damage, serious personal injury or even death.

WARNING indicates a potentially hazardous situation which, if not avoided, could result in property damage, serious personal injury or even death. Comfort Ride Third axle slipper leaf spring system (part numbers 2560-50, 2570-50 and 2580-50) and shock absorber system (part numbers 2450-50, 2460-50 and 2470-50) Installation Instructions All specifications

More information

INSTALLATION & OWNER S MANUAL

INSTALLATION & OWNER S MANUAL Rev. B, p. 1 of 25 INSTALLATION & OWNER S MANUAL POLARIS RANGER RCS (for models XP or HD) (for model years 2009-) cab without doors kit (p/n 1POLRCWD) cab with doors kit (p/n 1POLRC) doors only kit (p/n

More information

Installation Guide. Stowe Cargo Management System. Table of Contents

Installation Guide. Stowe Cargo Management System. Table of Contents Installation Guide Stowe Cargo Management System Table of Contents 1. Pre-Installation (Page 2) a. Notes, Installation Kit contents & Tools needed 2. How to Install the Stowe Cargo Management System (Pages

More information

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT. PRODUCT REGISTRATION WARNING

ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS BEFORE ASSEMBLING, INSTALLING OR USING THIS PRODUCT. PRODUCT REGISTRATION WARNING VAN STORAGE SOLUTIONS FOR THE WAY YOU WORK TM INSTALLATION MANUAL SLIDING LADDER RACK Model 250 ATTENTION: PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS AND S BEFORE ASSEMBLING, INSTALLING OR USING THIS

More information

Driver Side Support Bracket pictured in "no-tow hook" direction. Reverse direction for tow hook equipped vehicles

Driver Side Support Bracket pictured in no-tow hook direction. Reverse direction for tow hook equipped vehicles PARTS LIST: 1 Bull Bar 2 10-1.5mm x 35mm Hex Bolts 2 Tube Brackets (Bull Bar) passenger or driver side 2 10mm Lock Washers 2 Upper Frame Brackets (models w/o tow hooks only) 4 10mm x 27mm OD x 3mm Flat

More information

A B C D E F. b.tools Required (supplied by others) 3/16" Drill Bit 3/8" Wrench Phillips Head Screwdriver

A B C D E F. b.tools Required (supplied by others) 3/16 Drill Bit 3/8 Wrench Phillips Head Screwdriver Page 1 of 13 5E.1 Parts List a. Below Deck Automatic Retractable Security Cover Kit (1) Tube End Bearing Plate (A) (1) Rope Reel with Motor Attached (B) (1) Rope Reel Cover (C) (1) Cover Drum (1) Cover

More information

M Damper Mount Linkage Kit Installation. Item Description Quantity Item Description Quantity Nuts 2

M Damper Mount Linkage Kit Installation. Item Description Quantity Item Description Quantity Nuts 2 FANs 268.1, 1628.3 Installation Bulletin M9000-150 Issue Date 0796 M9000-150 Damper Mount Linkage Kit Installation 21 18 19 20 2 22 17 2 4 3 2 15.5 393.7 1 17 16 15 11 13 12 8 9 10 2 5 Note: Damper mount

More information

FULL HEIGHT ALUMINUM TURNSTILE DOUBLE UNIT AT-FAL SERIES I N STALLATION AND O P E RATING I N STRUCTIONS

FULL HEIGHT ALUMINUM TURNSTILE DOUBLE UNIT AT-FAL SERIES I N STALLATION AND O P E RATING I N STRUCTIONS FULL HEIGHT ALUMINUM TURNSTILE DOUBLE UNIT AT-FAL SERIES I N STALLATION AND O P E RATING I N STRUCTIONS CONTENTS 1. SITE PREPARATION 2. EXPLODED VIEW DRAWING 3. UNPACKING 4. SPECIFICATIONS 5. INSTALLATION

More information

Assembly and Modular Table Power System Installation Instructions for Train Tables

Assembly and Modular Table Power System Installation Instructions for Train Tables Assembly and Modular Table Power System Installation Instructions for Train Tables Table of Contents Topic Attach Stretcher to Legs Attach Base To Table Top Attach Modesty Panel to Assembly Page 2 3 4

More information

The steering column is of a modular construction and features easy to service electrical switches.

The steering column is of a modular construction and features easy to service electrical switches. file://c:\tso\tsocache\vdtom_5368\svk~us~en~file=svkb4a01.htm~gen~ref.htm Page 1 of 3 Section 11-04A: Steering Column, Ranger DESCRIPTION AND OPERATION 1997 Ranger Workshop Manual Steering Column NOTE:

More information

versatile 4C mailbox suites

versatile 4C mailbox suites INSTALLATION MANUAL versatile 4C mailbox suites (ALL TYPES - FRONT LOADING, REAR LOADING, PARCEL ONLY AND TRASH / RECYCLING BIN) TABLE OF CONTENTS DESCRIPTION PAGE GENERAL INFORMATION AND ADVISORIES 2

More information

Installation Guide Current Ford F-250 & Ford F-350 Super Duty. Product Code: 109 & 119

Installation Guide Current Ford F-250 & Ford F-350 Super Duty. Product Code: 109 & 119 Installation Guide 2008 - Current Ford F-250 & Ford F-350 Super Duty Product Code: 109 & 119 September 1, 2012 Tools Needed Components Included 3/8" Drill P2 Tip #2 Philips Screwdriver 1/2" Drill Bit Hinged

More information

Stowe Cargo Management System

Stowe Cargo Management System Installation Guide Stowe Cargo Management System Table of Contents 1. Pre-Installation (Page 2) a. Notes, Installation Kit contents & Tools needed 2. How to Install the Stowe Cargo Management System (Pages

More information

INSTALLATION INSTRUCTIONS RATTLER STEEL RUNNING BOARDS FORD TRANSIT VAN (FULL SIZE)

INSTALLATION INSTRUCTIONS RATTLER STEEL RUNNING BOARDS FORD TRANSIT VAN (FULL SIZE) INSTALLATION INSTRUCTIONS PARTS LIST: 1 32-inch Steel Running Board 1 8-1.25mm x 35mm Hex Bolt 1 96-inch Steel Running Board 13 8-1.25mm x 25mm Hex Bolt 5 Passenger Side/Driver Side Mounting Brackets 20

More information

EVO-3029B JL Rear Bolt-on Coilover Kit NV2514

EVO-3029B JL Rear Bolt-on Coilover Kit NV2514 EVO Manufacturing EVO-3029B JL Rear Bolt-on Coilover Kit NV2514 READ BEFORE INSTALLATION: Caution: This kit requires drilling and cutting of both metal and plastic. Wheel backspacing adjustments may be

More information

AL625 & AL625HD INSTALLATION & OWNER S MANUAL

AL625 & AL625HD INSTALLATION & OWNER S MANUAL AL625 & AL625HD INSTALLATION & OWNER S MANUAL These instructions are provided to assist you in the installation of the AL625. If you require further assistance, our trained staff is ready to provide you

More information

Q15P. Mitsubishi MQ Triton Dual Cab

Q15P. Mitsubishi MQ Triton Dual Cab Mitsubishi MQ Triton Dual Cab Page 1 of 12 Fitting Instructions Part Number Mitsubishi MQ Triton Dual Cab 2015+ To suit Sports Bars Check contents of kit before commencing fitment and report any discrepancies

More information

Installation Instructions

Installation Instructions Equipment Required: Fastener Kit: F Wrenches: 15/16, 10 mm Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw 9464/9474 HIDE-A-GOOSE HITCH All Fasteners Typical, Both Sides WARNING: Under no circumstances

More information

2015+ Mustang S550 AlumaLift System Installation instructions for FR3Z-16796/7-BL

2015+ Mustang S550 AlumaLift System Installation instructions for FR3Z-16796/7-BL 2015+ ustang S550 Alumaift System nstallation instructions for FR3Z-16796/7-B Thank you for choosing this Drake uscle Cars product for your vehicle. Please read these instructions carefully. ake sure you

More information

Installation Instructions

Installation Instructions Equipment Required: Installation Instructions Fastener Kit: F Wrenches: 8mm, 13mm, 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw, File WARNING: Under no circumstances do we recommend

More information

I-Sheet Number Rev.B 3-1/2 OVAL BULL BAR DODGE RAM 1500

I-Sheet Number Rev.B 3-1/2 OVAL BULL BAR DODGE RAM 1500 PARTS LIST: 1 Bull Bar 2 10-1.5mm x 35mm Hex Bolts 2 Tube Brackets (Bull Bar) passenger or driver side 2 10mm Lock Washers 2 Upper Frame Brackets (models w/o tow hooks only) 4 10mm x 27mm OD x 3mm Flat

More information

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS 66748 P:620.473.3664 F:620.869.9031 Turnoverball Gooseneck Hitch Installation Instructions

More information

NOTE: Refer to hardware list provided to identify fasteners supplied. Figure 2-1

NOTE: Refer to hardware list provided to identify fasteners supplied. Figure 2-1 NOTE: Read all instructions carefully, checking shop drawings supplied for any special conditions. Open all crated materials and check for damaged or missing parts prior to installation. NOTE: Proper operation

More information

1989 Jeep Cherokee. STEERING COLUMN' '1989 STEERING Jeep Steering Columns STEERING COLUMN STEERING Jeep Steering Columns

1989 Jeep Cherokee. STEERING COLUMN' '1989 STEERING Jeep Steering Columns STEERING COLUMN STEERING Jeep Steering Columns STEERING COLUMN 1989 STEERING Jeep Steering Columns DESCRIPTION All models use collapsible steering columns. All columns have integral ignition switch and locking device. Optional tilt wheel is available

More information

Installation Instructions

Installation Instructions Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers recommended vehicle

More information

TOYOTA TUNDRA SKID PLATE Preparation

TOYOTA TUNDRA SKID PLATE Preparation Preparation Part Number: PT98-4140 Kit Contents Item # Quantity Reqd. Description 1 1 Skid Plate (Pre-Assembled with Hardware) 2 1 Hardware Bag Hardware Bag Contents Item # Quantity Reqd. Description 1

More information

Chrysler 727, 904, 518 Floor Mount Automatic Transmission Shifter Installation Instructions

Chrysler 727, 904, 518 Floor Mount Automatic Transmission Shifter Installation Instructions Chrysler 727, 904, 518 Mount Automatic Transmission Shifter Installation Instructions Building American Quality With A Lifetime Warranty! TOLL FREE 1-877-469-7440 tech@lokar.com www.lokar.com Release Button

More information

(2) Blank Cover Plates. (2) Light Plates. (2) J Bolts

(2) Blank Cover Plates. (2) Light Plates. (2) J Bolts PARTS LIST: 1 Tall-Size/Mid-Size/Short-size HD Headache Rack 16 10mm Lock Washers 1 Driver/Left Side Mounting Bracket 12 10mm Hex Nuts 1 Passenger/Right Side Mounting Bracket 4 10mm Nylon Lock Nuts 1 Rear

More information

Installation Instructions

Installation Instructions Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill Installation Instructions Short & Long Bed All Megacabs 9464/9474 HIDE-A-GOOSE HITCH INSTALLATION WARNING: Under

More information

Bag 1. Bag 1. Center Pivot. Center Pivot

Bag 1. Bag 1. Center Pivot. Center Pivot 8 00734 01901 5 Center Pivot Bag 1 3374 - Center Pivot Socket 4019 - Alum Pivot ball 3254-2-56 Button Head *Note - Sometimes it is helpful to slightly over-tighten the top clamp screws, then work the ball

More information

Automatic Electronic Sport Mode Shifter Installation Instructions

Automatic Electronic Sport Mode Shifter Installation Instructions Automatic Electronic Sport Mode Installation Instructions Building American Quality With A Lifetime Warranty! TOLL FREE 1-877-469-7440 tech@lokar.com www.lokar.com Release Automatic Electronic Sport Mode

More information

Chevy Nova Pro-Touring Front Suspension Installation Instructions

Chevy Nova Pro-Touring Front Suspension Installation Instructions 1962-1967 Chevy Nova Pro-Touring Front Suspension Installation Instructions 1-800-984-6259 www.totalcostinvolved.com 1 Pro-Touring Clip A-Arm Assembly Sway Bar Assembly Fender Panel Kit 8 7/16-20 * 1 ¼

More information

MF 9690, 9790, Challenger 660, 670

MF 9690, 9790, Challenger 660, 670 Ag Leader Technology Parts List Note: Indented items indicate parts included in an assembly listed above Quantity by Model Part Name/Description Part No. MF 9690 MF 9790 Challenger 660 Challenger 670 Instruction

More information

INSTALLATION INSTRUCTIONS BULL BAR DODGE RAM 1500 PART # B-D1091;B-D2091

INSTALLATION INSTRUCTIONS BULL BAR DODGE RAM 1500 PART # B-D1091;B-D2091 INSTALLATION INSTRUCTIONS PART # B-D1091;B-D2091 PARTS LIST: Qty Description Qty Description 1 Bull Bar 10 12mm Lock Washers 2 Upper Frame Brackets (for trucks without tow hooks only) 8 12-1.75mm Hex Nuts

More information

Please try our way first.

Please try our way first. 1958-1962 Corvette Raingear installation instructions Designer s Note: The 1958-1962 Corvette RainGear wiper system that you have purchased is complex and will require patient fitting. Complete Instructions

More information

EVO-1162 EVO Tailgate Tire Carrier

EVO-1162 EVO Tailgate Tire Carrier EVO-1162 EVO Tailgate Tire Carrier Bill of Materials EVO-1162 Tailgate Tire Carrier Part number Description Quantity EVO-12161 EVO Tailgate Tire Carrier 1 EVO-12162 Bolt Plate 1 EVO-12163 Wheel Mount 1

More information

Passenger/Right. Driver/Left. Driver/Left Side Frame. Mounting Bracket. (2) 12mm Double Nut Plates (models without tow hooks)

Passenger/Right. Driver/Left. Driver/Left Side Frame. Mounting Bracket. (2) 12mm Double Nut Plates (models without tow hooks) PARTS LIST: Qty Description Qty Description 1 Grille Guard 4 10-1.5mm x 30mm Hex Bolt 1 Driver/left Frame Bracket 8 10mm x 24mm OD x 2.2mm Flat Washer 1 Passenger/right Frame Bracket 4 10-1.5mm Nylon Lock

More information

Installation Manual, Usage Tips, & Warranty Information

Installation Manual, Usage Tips, & Warranty Information Installation Manual, Usage Tips, & Warranty Information Table of Contents 1. Bill of Materials page 2 2. Exploded View of RAIL ASSEMBLY page 2 3. Hardware Pictures page 3 4. Installation: Steps 1 through

More information

TESLA MODEL S REAR UNDER SPOILER & DIFFUSER SYSTEM

TESLA MODEL S REAR UNDER SPOILER & DIFFUSER SYSTEM TESLA MODEL S Thank you for purchasing your Unplugged Performance Rear Under Spoiler & Diffuser System for the Tesla Model S! Please read this manual carefully prior to installation. REAR UNDER SPOILER

More information

NIS NAV AM (MY15 >) - Aluminium Tonneau Cover ATC0051 (silver) ATC0052 (Black) Installation Time: Approx. 60 Minutes WARNING!

NIS NAV AM (MY15 >) - Aluminium Tonneau Cover ATC0051 (silver) ATC0052 (Black) Installation Time: Approx. 60 Minutes WARNING! Installation Time: Approx. 60 Minutes WARNING! When in the closed position, Aluminium Tonneau Cover must be latched and tailgate must be closed. Failure to do so could result in unexpected opening of the

More information

Comfort Ride Shock absorber system part numbers 2450, 2460 and 2470 Installation Instructions

Comfort Ride Shock absorber system part numbers 2450, 2460 and 2470 Installation Instructions Comfort Ride Shock absorber system part numbers 2450, 2460 and 2470 Installation Instructions All specifications are subject to change without notice. MOUNTING FLANGE CENTER HOLE FRONT OF Item Qty Part

More information

Ford C4 and C6 Floor Mount Automatic Transmission Shifter Installation Instructions

Ford C4 and C6 Floor Mount Automatic Transmission Shifter Installation Instructions Ford C4 and C6 Mount Automatic Transmission Shifter Installation Instructions Building American Quality With A Lifetime Warranty! TOLL FREE 1-877-469-7440 tech@lokar.com www.lokar.com Ford C4 and C6 Mount

More information

SLIDE DOOR OPERATOR ADDENDUM

SLIDE DOOR OPERATOR ADDENDUM SLIDE DOOR OPERATOR MODELS SD & GSD ADDENDUM 2 YEAR W ARRANTY Serial # (located on electrical box cover) NOT FOR RESIDENTIAL USE 1B6 Installation Date Wiring Type LISTED DOOR OPERATOR SPECIFICATIONS Adjustable

More information

INSTALLATION & OWNER S MANUAL

INSTALLATION & OWNER S MANUAL Rev. C p. 1 of 21 INSTALLATION & OWNER S MANUAL F5205 HARD SIDED CAB KIT INSTALLATION & OWNER S MANUAL The contents of this envelope are the property of the owner. Be sure to leave with the owner when

More information

Safe-T-element Installation Instructions

Safe-T-element Installation Instructions Safe-T-element Installation Instructions For: PTI STEZA (2x2 Burner Configuration) & PTI STEZB (3x1 Burner Configuration) Revision K (May. 3 2012) TABLE OF CONTENTS 1. PREPARATION... 3 1.1 General Safety

More information

Installation Instructions Table of Contents

Installation Instructions Table of Contents Installation Instructions Table of Contents Pre- Installation of Garage Storage Lift 2 Layout the Garage Storage Lift 3 Installing the strut Channels 3 Install the Drive Assembly 5 Install the Drive Shaft

More information

2 Driver/left Front/Rear Mounting Brackets 6 10mm Lock Washer 2 Passenger/right Front/Rear Mounting 6 10mm Hex Nuts

2 Driver/left Front/Rear Mounting Brackets 6 10mm Lock Washer 2 Passenger/right Front/Rear Mounting 6 10mm Hex Nuts PARTS LIST: STX300 RUNNING BOARD BRACKET KIT 2 Driver/left / Mounting Brackets 6 10mm Lock Washer 2 Passenger/right / Mounting 6 10mm Hex Nuts Brackets 1 Driver/left Center Mounting Bracket 12 8-1.25mm

More information

TEL:1-866-XANATOS INSTALLATION INSTRUCTIONS PART#: SR-FOR SPARTAN RUNNING BOARD FORD ECONOLINE 99-14

TEL:1-866-XANATOS INSTALLATION INSTRUCTIONS PART#: SR-FOR SPARTAN RUNNING BOARD FORD ECONOLINE 99-14 TEL:1-866-XANATOS INSTALLATION INSTRUCTIONS PART#: SR-FOR203796 SPARTAN RUNNING BOARD FORD ECONOLINE 99-14 PARTS LIST: 1 Driver/Left Side Spartan Running Board 2 10mm Lock Washers 1 Passenger/Right Side

More information

Transmission Overhaul Procedures-Bench Service

Transmission Overhaul Procedures-Bench Service How to Assemble the Lower Reverse Idler Gear Assembly Special Instructions In 1996 Eaton changed the reverse idler system design. In the nut design, the reverse idler bearing was lubricated through a hole

More information

TOYOTA TUNDRA SKID PLATE Preparation

TOYOTA TUNDRA SKID PLATE Preparation Preparation Part Number: PT98-4140 Kit Contents Item # Quantity Reqd. Description 1 1 Skid Plate (Pre-Assembled with Hardware) 2 1 Hardware Bag Hardware Bag Contents Item # Quantity Reqd. Description 1

More information

Installation Instructions for the F2B Pedal Bracket Kit

Installation Instructions for the F2B Pedal Bracket Kit Installation Instructions for the F2B Pedal Bracket Kit A. General Information 1. Before you begin, familiarize yourself with this installation procedure. It is assumed that the installer is an experienced

More information

Assembly & Installation Instructions

Assembly & Installation Instructions TM P R O D U C T S Assembly & Installation Instructions FOR 28 SERIES SNOWPLOW PIVOT ASSEMBLY AND FLOAT LIMITER 99103000 FOR SERIAL NUMBERS 28D100000 TO 28D100770 97100552A 1. THINK SAFETY, ALWAYS WEAR

More information

Legacy Installation Manual

Legacy Installation Manual Staying Home Corporation 1503 Vine Street P.O. Box 37 Harrisonville, MO 64701 816.380.2427 www.stayinghome.com A. INSTALLATION SITE REQUIREMENTS Legacy Installation Manual I. PRELIMINARY CHECKS 115 VAC,

More information

SCION FR-S FOG LIGHTS

SCION FR-S FOG LIGHTS Part #: PT413-18130 Conflicts: Lowering Springs PTR07-18130-LL (California only) Kit Contents: For Anniversary Edition, Monogram & RS 2.0 vehicles, additional parts need to be ordered (PT413-18130-LL)

More information

Installation Instructions

Installation Instructions GOOSENECK MOUNTING KIT Equipment Required: Fastener Kit: F Wrenches: 13mm, 3/4, 7/8, 15/16 Drill Bits: 1/4 Other Tools: Drill WARNING: Under no circumstances do we recommend exceeding the towing vehicle

More information

INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS

INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS Tarpaulin Systems Flip -N- Go / Quick Mount Flip -N- Go System INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS (800) CRAMARO (800) 272-6276 Plants In: Delaware, Florida, Massachusetts, Nevada, Ohio Install

More information

INSTALLATION INSTRUCTIONS GRILLE GUARD F-150 P/N 3066;3066-2

INSTALLATION INSTRUCTIONS GRILLE GUARD F-150 P/N 3066;3066-2 INSTALLATION INSTRUCTIONS P/N 3066;3066-2 PARTS LIST: 1 Grille Guard 4 12mm Lock Washer 1 Driver/left Frame Bracket 4 10-1.5mm x 30mm Hex Bolt 1 Passenger/right Frame Bracket 8 10mm x 24mm OD x 2.2mm Flat

More information

INSTALLATION DESCRIPTION

INSTALLATION DESCRIPTION The Series 2011xTJ20 / 3000LCxTJ20 is a 1200 pound holding force top jamb-mounted electromagnetic lock designed to secure a single-inswinging door. The lock requires both installation procedures as described

More information

RIGID SERIES REAR BUMPER RB-F-100-JK, RB-F-101-JK, RB-F-102-JK, RB-F-103-JK RB-F-100-JKA, RB-F-101-JKA, RB-F-102-JKA, RB-F-103-JKA

RIGID SERIES REAR BUMPER RB-F-100-JK, RB-F-101-JK, RB-F-102-JK, RB-F-103-JK RB-F-100-JKA, RB-F-101-JKA, RB-F-102-JKA, RB-F-103-JKA RIGID SERIES REAR BUMPER RB-F-100-JK, RB-F-101-JK, RB-F-102-JK, RB-F-103-JK RB-F-100-JKA, RB-F-101-JKA, RB-F-102-JKA, RB-F-103-JKA PARTS LIST QTY DESCRIPTION QTY DESCRIPTION 1 Rear Bumper 1 1'' Washer

More information

Model 2300DL Installation Guide

Model 2300DL Installation Guide Model 2300DL Installation Guide POWER ACCESS CORPORATION 4 HERSHEY DRIVE, DOCK 4 ANSONIA, CT 06401 800-344-0088 WEBSITE: www.power-access.com EMAIL: salesinfo@power-access.com 1 STANDARD PARTS MODEL 2300DL

More information

C15C C15C. Page 1 of 20

C15C C15C. Page 1 of 20 2 x Lid Front Hinge 1135 8 x M8 Bolt 8 x M8 Washer (3mm Thick) 4 x M6 Large washers 4 x M6 Spring washers 4 x M6 x 40mm Bolts 6 x M6 20mm Bolts 6 x M6 Washers 20 x Screws 2 x Lid mount gas strut bracket

More information

H15P. Toyota Hilux A-DECK Dual Cab

H15P. Toyota Hilux A-DECK Dual Cab Toyota Hilux A-DECK Dual Cab Page 1 of 14 Fitting Instructions Part Number H15 Toyota Hilux A-DECK Dual Cab 2015+ To suit Sports Bars Check contents of kit before commencing fitment and report any discrepancies

More information

FOR SIT-STAND WORKSTATION

FOR SIT-STAND WORKSTATION INSTALLATION MANUAL FOR SIT-STAND WORKSTATION Weight Capacity: 6.5-24.5 lbs. 6017180 Rev. B Contents Tools Required / Supplied Part Kits / Warnings/Disclaimers...2 Base Installation Clamp Mount Base Location...3

More information

626F Exit Device Trim Installation Instructions

626F Exit Device Trim Installation Instructions 626F Exit Device Trim Installation Instructions For use with all Yale 7000, 2100, 1800 and 1500 Series Exit Devices (Wood and Metal Doors) Attention Installer Any retrofit or other field modification to

More information

TOYOTA HIGHLANDER RUNNING BOARD HIGHLANDER HV Preparation

TOYOTA HIGHLANDER RUNNING BOARD HIGHLANDER HV Preparation Preparation Part Number: PT738-48080 Kit Contents Item # Quantity Reqd. Description 1 1 Driver Side Running Board 2 1 Passenger Side Running Board 3 4 /Middle Mount Bracket 4 2 Rear Mount Bracket 5 2 Rear

More information

Installation Instructions Vanishing Lid Bracket

Installation Instructions Vanishing Lid Bracket -800-447-88 www.coverpools.com Installation Instructions Vanishing Lid WARNING FOR YOUR SAFETY This product must be installed and serviced by a contractor who is licensed and qualified in pool equipment

More information

THE GLIDER 5th Wheel Attachment

THE GLIDER 5th Wheel Attachment April 2007 APPLICATION: INSTALLATION INSTRUCTIONS MODEL NO. 70460 70046 THE GLIDER 5th Wheel Attachment For use on short bed pickup applications US Patent No. 6247720 COMPLETE PARTS LIST Part Description

More information

Installation Instructions

Installation Instructions Equipment Required: Fastener Kit: F Wrenches: 15/16, 10 mm Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw 9464/9474 HIDE-A-GOOSE HITCH INSTALLATION All Fasteners Typical, Both Sides WARNING: Under

More information

(2) Top Support Backing Plates. Passenger/Right Top Bracket. (2) Frame Mounting Brackets. (2) 12mm x 35mm Single Bolt Plates

(2) Top Support Backing Plates. Passenger/Right Top Bracket. (2) Frame Mounting Brackets. (2) 12mm x 35mm Single Bolt Plates PARTS LIST: 1 Grille Guard Assembly 6 12-1.75mm Hex Nuts 2 Frame Brackets 4 10-1.50mm x 30mm Hex Bolts 1 Driver/Left Mounting Bracket 8 10mm x 27mm OD x 3mm Flat Washers 1 Passenger/Right Mounting Bracket

More information

Times-2 Speed Files INSTALLATION INSTRUCTIONS

Times-2 Speed Files INSTALLATION INSTRUCTIONS Times-2 Speed Files INSTALLATION INSTRUCTIONS AURORA from RICHARDS-WILCOX, INC. 600 South Lake Street Aurora, Illinois 60506 Phone: 630-897-6951 Fax: 630-897-6994 Toll Free: 800-277-1699 TIMES-2 SPEED

More information

Siderolling Tarp Systems Under 9 6 Wide

Siderolling Tarp Systems Under 9 6 Wide Load Loc Select Maximizer Grain Carts Grain Bagger Siderolling Tarp Systems Under 9 6 Wide CRANK STYLE INSTALLATION INSTRUCTIONS MICHEL S INDUSTRIES, LTD. P.O. BOX 119 ST. GREGOR, SK. S0K 3X0 PH:306.366.2184

More information

Shaver Industries. Assembly Instructions Spring-Assist Vertical Vinyl Curtain Door

Shaver Industries. Assembly Instructions Spring-Assist Vertical Vinyl Curtain Door Shaver Industries 20 Steckle Place, Kitchener, ON N2E 2C3 Ph 1(888) 766 8328 www.shaverinc.com Assembly Instructions Spring-Assist Vertical Vinyl Curtain Door System Overview: Your Shaver's Spring-Assist

More information

Detroit Speed, Inc. Second Generation Camaro/Firebird Mini-Tub Kit Camaro/Firebird P/N: ,

Detroit Speed, Inc. Second Generation Camaro/Firebird Mini-Tub Kit Camaro/Firebird P/N: , Detroit Speed, Inc. Second Generation Camaro/Firebird Mini-Tub Kit 1970-1981 Camaro/Firebird P/N: 041222, 041223 The Detroit Speed Second Generation Camaro/Firebird Rear Mini-Tub Kit is designed to accommodate

More information

Comfort Ride Shock absorber system part numbers 2450, 2460 and 2470 Installation Instructions

Comfort Ride Shock absorber system part numbers 2450, 2460 and 2470 Installation Instructions Comfort Ride Shock absorber system part numbers 2450, 2460 and 2470 Installation Instructions All specifications are subject to change without notice. Item Qty Part number Description 1... 4... 204000-00...shock

More information

2103 NITRO RAIL DRAGSTER KIT

2103 NITRO RAIL DRAGSTER KIT 203 NITRO RAIL DRAGSTER KIT THANKS FOR BUYING RJ SPEED S NITRO DRAG KIT. IT IS A LITEWEIGHT CAR MADE FOR STRAIGHT LINE DRAG RACING AND CAN BE BROKEN IF RUN INTO SOLID OBJECTS AT HIGH SPEED. YOU WILL NEED

More information

Installation Instructions

Installation Instructions Equipment Required: Installation Instructions Fastener Kit: F Wrenches: 8mm, 13mm, 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw, File WARNING: Under no circumstances do we recommend

More information