Thermal Solutions Communications Gateway Instruction Manual Part Number Revised: April 13, 2015 Contents

Size: px
Start display at page:

Download "Thermal Solutions Communications Gateway Instruction Manual Part Number Revised: April 13, 2015 Contents"

Transcription

1 Thermal Solutions Communications Gateway Instruction Manual Part Number Revised: April 13, 2015 Contents 1. Introduction 2 2. ProtoNode Setup 3 3. Wiring 7 4. Commissioning Field Validating 21 Appendix A. Trouble Shooting 23 B. ABC Boiler Points List 27 C. TSBC Boiler Points List 31 D. Specifications 34 E. Address DIP Switch Settings 35 Application The Thermal Solutions Communications Gateway (Gateway) interfaces Energy Management Systems (EMS) to the Apex Boiler Control (ABC) or Thermal Solutions Boiler Control (TSBC) found on Thermal Solutions Boilers. The gateway options provide monitoring, remote setpoint or remote modulation, and burner on/off control (when using remote modulation) using BACnet MS/TP, BACnet/IP, N2, Modbus TCP or LonWorks protocols. Intent This document provides the necessary information to facilitate Gateway installation. This Instruction Manual includes practical, installation and setup-detailed information. The intended users are contractors and factory support personnel. ProtoNode RER ProtoNode LER

2 1 INTRODUCTION Thermal Solutions Communications Gateway (Gateway) is an external, high performance Energy Management System (EMS) multi-protocol gateway that uses the Field Server ProtoNode Technology. The Gateway can support multiple Boilers. It has been preprogrammed to Auto-Discover any Apex Boiler Control (ABC) or Thermal Solutions Boiler Control (TSBC) equipped boilers connected to the Gateway and automatically configures them for BACnet 1 MS/TP, BACnet/IP, Metasys 2 N2 by JCI, Modbus TCP or LonWorks 3. It is not necessary to download any configuration files to support the required applications. 1.1 BTL Mark BACnet Testing Laboratory 1.2 LonMark Certification The BTL Mark on the Gateway is a symbol that indicates to a consumer that a product has passed a series of rigorous tests conducted by an independent laboratory which verifies that the product correctly implements the BACnet features claimed in the listing. The mark is a symbol of a high-quality BACnet product. Go to for more information about the BACnet Testing Laboratory. LonMark International is the recognized authority for certification, education, and promotion of interoperability standards for the benefit of manufacturers, integrators and end users. LonMark International has developed extensive product certification standards and tests to provide the integrator and user with confidence that products from multiple manufacturers utilizing LonMark devices work together. 1 BACnet is a registered trademark of ASHRAE 2 Metasys is a registered trademark of Johnson Controls Inc. 3 LonWorks is a registered trademark of Echelon Corporation Page 2 of 40 Part Number

3 2 PROTONODE SETUP The following steps need to be performed during installation: 2.1 Set Boiler Boiler Address On ABC equipped boiler from the boiler mounted display, set a unique Sequencer Slave or Boiler Address for each boiler that will be connected to the network. On TSBC equipped boiler from the communication menu set the following: Protocol = Modbus Modbus Address = between (1 and 20) Baud Rate = 38.4kbps Parity = none Refer to the Boiler s instruction manual for password and menu navigation instructions. 2.2 Select Field Protocol Figure 1: ProtoNode showing DIP switch banks on bottom Remove ProtoNode cover and check protocol dip switch settings: NOTE: When setting DIP Switches, please ensure that power to the board is OFF. Page 3 of 40 Part Number

4 - The S0 S2 bank of DIP switches on the ProtoNode RER are used to select the various field protocols (BACnet MS/TP). See the chart below for the DIP switch settings. - The S0 S2 bank of DIP switches on the ProtoNode LER are disabled. ProtoNode RER Field Protocol FPC-N Settings S0 S2 DIP Switches S0 S1 S2 BACnet IP Off Off Off BACnet MSTP On Off Off Metasys N2 Open Off On Off Modbus TCP On On Off 2.3 Auto-Discover and Automatically Load Configuration File Figure 2: S0 S3 DIP Switches shown off position The following chart describes S3 DIP Switch setting for Enabling Auto-Discovering of known devices attached to the ProtoNode RER or LER. - Set S3 DIP switch to On position to Auto-Discover Boilers attached to the ProtoNode. It will take 3 minutes to discover all Modbus RTU devices attached to the ProtoNode. - Once the ProtoNode has discovered all of the Modbus RTU devices, set the S3 DIP switch to the OFF position to save the recently built configuration. ProtoNode RER and LER S3 DIP Switch Auto-Discovery Mode Auto-Discovery ON Build New Configuration Auto-Discover OFF Load Current Configuration S3 On Off NOTE Initial Auto Discovery Cycle All boilers MUST be powered and connected to the ProtoNode before cycling power to the ProtoNode. The ProtoNode will auto discover only connected boilers. If a boiler is connected after the ProtoNode has completed auto discovery it will not find the new boiler. Page 4 of 40 Part Number

5 2.4 BACnet MS/TP Setup (skip if this protocol is not used by the EMS) Set MAC Address - Set ProtoNode MAC Address - Set DIP Switch (A0 A7) for a MAC address between 1 and 127 which are Master addresses. Addresses between 128 and 255 are Slave addresses. BACnet Master Addresses pass tokens on the BACnet MS/TP network and can be Auto-Discovered by Energy Management System (EMS) front end systems that support Auto-Discovery. BACnet Slave Addresses cannot pass Tokens and will never be Auto-Discovered by EMS front end systems that support Auto- Discovery. Figure 2: A0 A7 DIP Switches (MAC address 3 is show) - Please refer to Appendix E for the full range of addresses to set Node-ID/Device Instance. - NOTE: When setting DIP Switches, please ensure that power to the board is OFF Set Serial Baud Rate DIP Switches B0 B3 are used to set the serial baud rate to match the baud rate provided by the Energy Management System. Figure 3: B0 B3 DIP Switches (38400 Baud shown) Baud B0 B1 B2 B On On On Off Off Off Off On On On Off On Off Off On On On Off On On Page 5 of 40 Part Number

6 2.5 BACnet IP Setup (skip if this protocol is not used by the EMS) Set Node-ID Instance Setting - The BACnet device instances will be set by the node offset + the Boiler s Boiler Address (Modbus RTU device) address. o The Node Offset is currently set to 50,000 in the configuration file so o Modbus address 1 would be assigned a device instance of If the 2 nd Device Modbus address is set to 2 then the device instance will be set to o To change the node_offset (Section 4.3). The node offset can be changed from to 1 to 4,194,302 via the Web Configurator. o The BACnet Device Instance can range from 1 to 4,194, Metasys N2 & Modbus TCP/IP Setup (skip if this protocol is not used by the EMS) Metasys N2 & Modbus TCP/IP Device Address Setting - The device addresses will be the same as the discovered Boilers Boiler Address (Modbus RTU devices) (1 through 8). 2.7 Commission the ProtoNode on the LonWorks Network. This needs to be done by the LonWorks administrator using a LonWorks Commissioning tool. (See Section 4) 2.8 If the Field protocol is BACnet/IP or Modbus TCP set IP Address. Run the ProtoNode web GUI utility program to change the IP address. No changes to the configuration file are necessary. (See Section 4) Page 6 of 40 Part Number

7 3 WIRING 3.1 ProtoNode RER (FPC-N34) and LER(FPC-N35) showing connection ports Figure 3: ProtoNode RER (left) and LER (right) 3.2 Wiring Connections to Protonode RER and LER Pins 4 through 6 are for power. See Page 10, Figure 5.3, for Wiring Pinouts Device Pins ProtoNode Pin assignment Pin # Pin RS Pin 1 RS Pin RS Pin 2 RS Pin GND Pin 3 RS-485 GND Power In (+) Pin 4 24Vac Positive Power In (-) Pin 5 24Vac Common Frame Ground Pin 6 FRAME GND Figure 4: Protonode 6 Pin Phoenix Connector Pinouts Page 7 of 40 Part Number

8 RJ11 connection, from the back, on right-hand side of TSBC Control Jumper LR to C if you are writing to the boiler controls TSBC control needs to be programmed for EMS Communications. In the TSBC Control, go to Communications Menu and configure the settings as follows: - Protocol: Program to ModBus - ModBus Address: Configure each boiler with its own unique address (1, 2, 3, etc) - Baud Rate: Program to Parity: Program to None - Timeout: Program to 30 seconds; Must refresh quicker than 30 seconds to avoid a COM Failure In System Configuration Menu, configure Remote Control to either ModBus Mod for modulation rate or ModBus SP for temperature setpoint. Figure 5.1: Connecting the ProtoNode s RS-485 to the TSBC Control Page 8 of 40 Part Number

9 RJ45 connection on left-hand side of Apex Boiler Figure 5.2: Connecting the ProtoNode s RS-485 to the Apex Boiler Control Page 9 of 40 Part Number

10 TSBC RJ11 Wiring Notes: 1 Wire to Black or Yellow 2 Wire to Red or Green Apex RJ45 Wiring Notes: 1 Wire to Brown 2 Wire to White/Brown 3 Wire to Green or Orange Figure 5.3: Connecting the TSBC Control or Apex Boiler Control to the ProtoNode s RS-485 Page 10 of 40 Part Number

11 Bacnet or Lonworks Boiler Firing Rate Enable/Disable 4-20mAdc Demand Contact ENERGY MANAGEMENT SYSTEM Firing Rate 4-20mAdc Demand Boiler Enable/Disable Contact (Typical for each boiler) Low Voltage Wiring Terminal Block # 2 Low Voltage Wiring Terminal Block # 2 T-STAT OR EMS CONTACT T-STAT OR EMS CONTACT T-STAT OR EMS CONTACT T-STAT OR EMS CONTACT Universal Gateway DHW TEMP SWITCH DHW TEMP SWITCH DHW TEMP SWITCH DHW TEMP SWITCH OUTDOOR SENSOR OUTDOOR SENSOR OUTDOOR SENSOR OUTDOOR SENSOR HEADER SENSOR HEADER SENSOR HEADER SENSOR HEADER SENSOR REMOTE FIRING RATE + REMOTE FIRING RATE + REMOTE FIRING RATE + REMOTE FIRING RATE + Note: Connect wires to Protonode by cutting the Ethernet cable and wiring individual conductors using pinout information shown on Figure port RJ45 Splitter p/n EXTERNAL LIMIT EXTERNAL LIMIT 2 port RJ45 Splitter p/n EXTERNAL LIMIT EXTERNAL LIMIT Boiler to Boiler Communication Network (Use Cat5 Cable) Boiler to Boiler Communication Network (Use Cat5 Cable) RJ45 RJ45 Ethernet Cables Apex Boiler #1 Apex Boiler #2 Connects to Up to 8 Boilers Figure 5.4: Boiler Sequencer EMS Wiring for Apex Boiler IMPORTANT NOTES For Apex Connections: 1. When the Energy Management system is connected to the Peer to Peer (boiler to boiler) communication network the boiler sequencing (multiple boiler lead/lag) must be done external to the boiler controls, by others. 2. Both Enable/Disable and Remote Firing Rate must be wired to the boilers to provide boiler sequencing (multiple boiler lead/lag). 3. If only the burner on/off ModBus signal is used instead of the Enable / Disable contact input the boiler will be turned off but the system pump may remain running. Page 11 of 40 Part Number

12 Notes: Figure 5.5: Boiler Sequencer EMS Wiring for TSBC Control 1. When the Energy Management system is connected to the Peer to Peer (boiler to boiler) communication network the boiler sequencing (multiple boiler lead/lag) must be done external to the boiler controls, by others. 2. Boiler enable/disable and firing rate are sent over the Gateway or may be direct wiring. Page 12 of 40 Part Number

13 BACnet MS/TP, BACnet/IP, Metasys N2 by JCI, or Modbus TCP (ProtoNode RER) Figure 6: ProtoNode RER Detail Page 13 of 40 Part Number

14 LonWorks (ProtoNode LER) Figure 7: ProtoNode LER Detail Page 14 of 40 Part Number

15 3.3 Wiring the ProtoNode RER to RS-485 Field Protocol - Connection from ProtoNode RER to BACnet MS/TP, and Metasys N2 network. - See Section 4.2 for information on connecting the ProtoNode RER to a BACnet/IP network. - The Field Protocol can be connected to the 3-pin connector on ProtoNode RER as shown. Figure 6: Connection from ProtoNode to RS-485 Field Protocol BACnet MS/TPorMetasys N2. - If the ProtoNode is the last device on the RS-485 trunk, then the End-of-line termination needs to be enabled. The default is off. End-of-Line Switch Figure 8: End-of-line termination from ProtoNode to RS-485 Field Protocol BACnet MS/TP or Metasys N Wiring the ProtoNode LER Field Port to a LonWorks network - Connect the ProtoNode to the field network with the LonWorks terminal using a twisted pair non-shielded cable. LonWorks has no polarity. Page 15 of 40 Part Number

16 4 COMMISSIONING 4.1 Commissioning the ProtoNode LER on a LonWorks network Commissioning may only be performed by the LonWorks administrator. To commission the ProtoNode LER LonWorks port, insert a small screwdriver in the commissioning hole on the face of the LER s enclosure to access the Service Pin. See the illustration on the ProtoNode LER as to which way to toggle the screw driver during commissioning. If an XIF file is required, see steps Section to generate XIF Instructions to Upload XIF File From the ProtoNode LER Using FS GUI Web Server Connect a standard cat5 Ethernet cable between the PC and ProtoNode The Default IP Address of the ProtoNode is , Subnet Mask is If the PC and the ProtoNode are on different IP Networks, assign a static IP Address to the PC on the xxx network For Windows XP: Go to > > Right-click on Local Area Connection > Properties Highlight > For Windows 7: Go to > > > > Right-click on Local Area Connection > Properties Highlight > For Windows XP and Windows 7, select: Use the following IP address Page 16 of 40 Part Number

17 Click twice Open a web browser and go to the following address: IP address of ProtoCessor/fserver.xif Example: /fserver.xif Download and save the file onto the PC. Figure 9: Sample of Fserver.XIF file being generated Page 17 of 40 Part Number

18 4.2 Commissioning BACnet/IP and Modbus TCP/IP address Connect the PC to the ProtoNode via the Ethernet port Ethernet Port Figure 9: Ethernet port location on the ProtoNode Connect a standard CAT5 Ethernet cable (straight through or cross) between the PC and ProtoNode The Default IP Address of the ProtoNode is , Subnet Mask is If the PC and the ProtoNode are on different IP Networks, assign a static IP Address to the PC on the xxx network Go to > > Right-click on Local Area Connection > Properties Highlight > Select: Use the following IP address Click twice Page 18 of 40 Part Number

19 4.3 Use the ProtoNode Web GUI to Connect to the ProtoNode Open PC web browser and enter the default IP address of the ProtoNode ( ). Determine if the ProtoNode is up and communicating. The unit is communicating if the below screen is visible and shows the correct number of Nodes attached. The list of nodes should match the number of boilers attached to the network. If no Nodes are present, then the wiring, baud rate on the Modbus, and DIP switch settings must be checked, because there is a problem with the Modbus COMs. All the active Nodes must show the correct Modbus Node-ID s before proceeding. If the required device instance is greater or smaller than the supported ranges, change node_offset to the proper value (Modbus Node-ID + node_offset = device instance). Figure 10: FST Web Commissioning Screen (showing two Modbus nodes connected to the ProtoNode) Page 19 of 40 Part Number

20 4.4 Set IP Address for BACnet/IP and Modbus TCP When it is necessary to set the BACnet/IP or Modbus TCP ID the following procedure could be followed. Note this is the responsibility of the Energy Management System Administrator. - Open a PC web browser, enter the default IP address of the ProtoNode ( ) and connect to the ProtoNode. - From the Field Server main home page, click the Diagnostic & Debugging button. After the screen changes, from the left hand side of the screen click on Setup and then select Network Settings to enter the Edit IP Address Settings menu. See Figure 11 below. - Modify the IP address (N1 IP address field) of the ProtoNode Ethernet port. - If necessary, change the Netmask (N1 Netmask field). - Type in a new Subnet Mask. - If necessary, change the IP Gateway (Default Gateway field). - Type in a new IP Gateway. - Note: If the ProtoNode is connected to a router, the IP Gateway of the ProtoNode should be set to the IP address of the router that it is connected to. - Reset ProtoNode by cycling power. - Unplug Ethernet cable from PC and connect it to the network hub or router. Figure 11: Changing IP address via FST Web GUI Page 20 of 40 Part Number

21 5 FIELD VALIDATING Chipkin Automation has extended to Thermal Solutions Boilers and their customers a free complementary 2 week fully functional copy of CAS BACnet Explorer that can be used to validate BACnet MS/TP and/or BACnet/IP communications of the ProtoNode in the field without having to have the EMS Integrator on site. A Serial or USB to RS-485 converter is needed to test BACnet MS/TP. 5.1 Downloading Chipkin Automation s CAS Explorer and Requesting an Activation Key - To request a 2 week complementary BACnet CAS key, go to fill in all the information. Contact Thermal Solutions for the Vendor Code. Once completed, the key will be sent to the address that was submitted. From this from Chipkin Automation, the long key will need to be copied and pasted into the CAS key activation page. Go to Chipkin Automation s web site, download, and install the CAS BACnet Explorer to your PC In the CAS Activation form, enter the address and paste the CAS key that was sent from Chipkin Automation. Once completed, select Activation. Page 21 of 40 Part Number

22 5.2 CAS BACnet Setup These are the instructions to set CAS Explorer up for the first time on BACnet MS/TP and BACnet/IP CAS BACnet MS/TP Setup Using the Serial or USB to RS-485 converter, connect it to your PC and the 3 Pin BACnet MS/TP connector on the ProtoNode RER. In CAS Explorer, do the following: o Click on Settings. o Check the BACnet MSTP box and uncheck the BACnet IP and BACnet Ethernet boxes. o Set the BACnet MSTP MAC address to 0. o Set the BACnet MSTP Baud Rate to o Click Ok. o On the bottom right-hand corner, make sure that the BACnet MSTP box is green. o Click on Discover. o Check all 4 boxes. o Click Send CAS BACnet BACnet/IP Setup See Section 5.1 to set the IP address and subnet of the PC that will be running the CAS Explorer. Connect a straight through or cross Ethernet cable from the PC to the ProtoNode. In CAS Explorer, do the following: o Click on Settings. o Check the BACnet IP box and uncheck the BACnet MSTP and BACnet Ethernet boxes. o In the Select a Network Device box, select the network card of the PC by clicking on it. o Click Ok. o On the bottom right-hand corner, make sure that the BACnet IP box is green. o Click on Discover. o Check all 4 boxes. o Click Send. Data is now available to view and edit. Simply select the + signs to open the branches. Data from all connected boilers is available. Page 22 of 40 Part Number

23 Appendix A. Troubleshooting Tips Appendix A.1. Check the Wiring Settings No COMS on Modbus RTU side. If TX/RX is not flashing rapidly then there is a COM issue on the Modbus side and you need to check the following things: o Visual observations of LEDs on ProtoNode. See Appendix A.3 o Check baud rate, parity, data bits, stop bits o Check Modbus device address o o Verify wiring Verify all the Modbus RTU devices that were discovered in the FST Web Commissioning screen. See Section 4.2 Field COM problems. o Visual observations of LEDs on ProtoNode. See Appendix A.3 o Visual dipswitch settings (using correct baud rate and device instance) o Verify IP address setting o Verify wiring If the problem still exists, a log needs to be taken and sent to FieldServer. Appendix A.2. Take Log With Our FieldServer Utilities Once the log is complete, it to support@protocessor.com. The log will allow us to rapidly diagnose the problem. Make sure the FieldServer utilities are loaded on the PC. Figure 12: Ethernet port location of the ProtoNode Disable any wireless Ethernet adapters on the PC/Laptop. Disable firewall and virus protection software. Connect a standard cat5 Ethernet cable between the PC and the ProtoNode. The Default IP Address of the ProtoNode is , Subnet Mask is If the PC and the ProtoNode are on different IP Networks, assign a static IP Address to the PC on the xxx network. For Windows XP: Go to > > Right-click on Local Area Connection > Properties Page 23 of 40 Part Number

24 Highlight > For Windows 7: Go to > > > > Right-click on Local Area Connection > Properties Highlight > For Windows XP and Windows 7, select: Use the following IP address Click twice Double click on the FST Diag Utility. Step 1: Select a Field Server IP Address. The IP address can be entered manually or selected by clicking on button 1 using the Utility. Type in the ProtoNode IP address Default IP Address is Press here to retrieve the IP Locate where the log is saved on Page 24 of 40 Part Number

25 Select a log type. Press the Take Log button. Note: 1. Delete existing log file from directory. 2. You may need to disable your fire wall. 3. You may need to disable any wireless internet connections. Step 2: Take a Log Press the Take Log button. While the Utility runs a few DOS prompts will flash across the monitor. Don't click or type anything in to these DOS prompts. This step may take a few minutes depending on the chosen Log Type and computer speed. When the Utility is finished you will be presented with a log of events that have occurred. Step 3: Send Log Click the Send Log button located near the bottom of the dialog. The following dialog should appear. C:\FieldServer Technologies\FieldServer Utilities\FST_Diag\Logs Push the Locate Folder button to launch explorer and have it point directly at the correct folder. The file upload.zip must be sent to support@fieldserver.com. Step 4:Close the Program Press the exit button when the log is completed Page 25 of 40 Part Number

26 Appendix A.3. LED Diagnostics for Modbus RTU Communications between the ProtoNode and the Boiler. Please see the diagram below for LED Locations A.3.1 ProtoNode LEDs Page 26 of 40 Part Number

27 Appendix B. ABC Boiler Points list BacNet, N2 and LonWorks Points Read/ Write BacNet N2 LonWorks Point Name Data Type Object Id Data Type Pt Addr Lon Name Lon SNVT Type Burner On Off (see note 1) R/W BV 1 DO 1 nvi/nvobrnronoff_xxx SNVT_switch Demand Source AI 3 AI 3 nvodem_src_xxx SNVT_count_f CH Setpoint (see note 2) R/W AV 4 AO 4 nvi/nvoch_sp_xxx SNVT_temp_p DHW Setpoint R/W AV 5 AO 5 nvi/nvodhw_sp_xxx SNVT_temp_p Lead Lag Setpoint R/W AV 6 AO 6 nvi/nvoll_sp_xxx SNVT_temp_p CH TOD Setpoint R/W AV 7 AO 7 nvi/nvoch_tod_sp_xxx SNVT_temp_p CH Setpoint Source AI 8 AI 8 nvoch_sp_src_xxx SNVT_count_f Active CH Setpoint AI 9 AI 9 nvoact_ch_sp_xxx SNVT_temp_p DHW Setpoint Source AI 10 AI 10 nvodhw_spsrc_xxx SNVT_count_f Active DHW Setpoint AI 11 AI 11 nvoactdhw_sp_xxx SNVT_temp_p LL Master Setpoint Source AI 12 AI 12 nvollmstspsr_xxx SNVT_count_f Active LL Setpoint AI 13 AI 13 nvoact_ll_sp_xxx SNVT_temp_p Supply Sensor AI 14 AI 14 nvosupsensor_xxx SNVT_temp_p Return Sensor AI 15 AI 15 nvoretsensor_xxx SNVT_temp_p Header Sensor AI 16 AI 16 nvohdrsensor_xxx SNVT_temp_p Stack Sensor AI 17 AI 17 nvostksensor_xxx SNVT_temp_p Outdoor Sensor AI 18 AI 18 nvootdrsensr_xxx SNVT_temp_p 4-20 ma Remote Control Input AI 19 AI 19 nvoremctrlin_xxx SNVT_count_f Fan Speed AI 20 AI 20 nvofan_speed_xxx SNVT_count_f Flame Signal AI 21 AI 21 nvoflmsig_xxx SNVT_count_f Burner Control State AI 22 AI 22 nvobrnctrlst_xxx SNVT_count_f Lockout Code AI 23 AI 23 nvolockotcod_xxx SNVT_count_f Hold Code AI 24 AI 24 nvoholdcode_xxx SNVT_count_f Burner Cycle Count R/W AV 25 AO 25 nvi/nvobrncyccnt_xxx SNVT_count_f R/W SNVT_time_ho Burner Run Time AV 26 AO 26 nvi/nvobrnruntim_xxx ur System Pump Cycle Count R/W AV 27 AO 27 nvi/nvochpmpcyct_xxx SNVT_count_f DHW Pump Cycle Count R/W AV 28 AO 28 nvi/nvodhwpmcyct_xxx SNVT_count_f Boiler Pump Cycle Count R/W AV 29 AO 29 nvi/nvoblrpmcyct_xxx SNVT_count_f Note 1, If only the burner on/off Modbus signal is used instead of the Enable / Disable contact input the boiler will be turned off but the system pump may remain running. Note 2, when writing CH Setpoint the Energy Management System is responsible for the boiler s setpoint for central heating. Disable the boiler s Outdoor Air Reset function. Page 27 of 40 Part Number

28 Modbus Points Modbus Register Enable / Disable Protocol Name 400,203 Burner on/off 400,006 Demand source Setpoints 410,211 CH setpoint 410,453 DHW setpoint 410,546 Lead Lag setpoint 410,212 CH TOD setpoint 410,065 CH setpoint source 410,016 Active CH setpoint 410, , ,162 DHW setpoint source Active DHW setpoint Lead Lag master setpoint source 410,018 Active LL setpoint Description Enable / disable burner. 1 = on 0 = off 0 = Unknown 1 = No source demand 2 = Central heat 3 = Domestic hot water 4 = Lead Lag slave 5 = Lead Lag master 6 = Central heat frost protection 7 = Domestic hot water frost protection 8 = No demand due to burner switch turned off 9 = Domestic hot water storage 11 = Warm weather shutdown Use this register to change the boiler setpoint. valid range 79 F (26.1 C) to 191 F (88.3 C) Use this register to change the domestic hot water setpoint. valid range 79 F (26.1 C) to 191 F (88.3 C) Use this register to change the lead lag setpoint. valid range 79 F (26.1 C) to 191 F (88.3 C) Use this register to change the central heat time of day setpoint valid range 79 F (26.1 C) to 191 F (88.3 C) 0=Unknown, 1=Normal setpoint, 2=TOD setpoint, 3=Outdoor reset, 4=Remote control (4-20mA ), 7=Outdoor reset time of day -40 F (-40 C) to 266 F (130 C) Setpoint determined by CH setpoint source (register 65). 0=Unknown, 1=Normal setpoint, 2=TOD setpoint, 5=DHW tap setpoint, 6=DHW preheat setpoint -40 F (-40 C) to 266 F (130 C) Setpoint determined by DHW setpoint source (register 81). 0=Unknown, 1=CH setpoint, 2=CH TOD setpoint, 3=Outdoor reset, 4=Remote control (4-20mA ), 5=DHW setpoint, 6=DHW TOD setpoint, 7=Outdoor reset time of day, 8=Mix setpoint -40 F (-40 C) to 266 F (130 C) Setpoint determined by LL setpoint source (register 162). Read/ Write R/W R R/W R/W R/W R/W R R R R R R Page 28 of 40 Part Number

29 Modbus Register Protocol Name Description Read/ Write Temperature Sensors 410,007 Supply sensor -40 F (-40 C) to 266 F (130 C) R 410,011 Return sensor -40 F (-40 C) to 266 F (130 C) R 410,013 Header sensor -40 F (-40 C) to 266 F (130 C) R 410,014 Stack sensor -40 F (-40 C) to 266 F (130 C) R 410,170 Outdoor sensor -40 F (-40 C) to 266 F (130 C) R 400, ma remote control input ma value for S2 (J8-6) parameter selectable as (remote set point) & (remote modulation) Burner 400,009 Fan speed Speed of the combustion air blower in rpm R 400,010 Flame signal 0.01V or 0.01μA precision ( V) R 400,033 Burner control state Trouble Shooting 410,034 Lockout code 410,040 Hold code 0 Initiate 1 Standby Delay 2 Standby 3 Safe Startup 4 Prepurge - Drive to Purge Rate 5 Prepurge Measured Purge Time 6 Prepurge Drive to Lightoff Rate 7 Preignition Test 8 Preignition Time 9 Pilot Flame Establishing Period 10 Main Flame Establishing Period 11 Direct Burner Ignition 12 Run 13 Postpurge 14 Lockout Reasons for burner lockout 0 No lockout, 4 Supply high limit 5 DHW high limit 6 Stack High limit 12 Flame detected out of sequence 18 Lightoff rate proving failed 19 Purge rate proving failed 20 Invalid Safety Parameters 21 Invalid Modulation Parameter 22 Safety data verification needed 23 24VAC voltage low/high 24 Fuel Valve Error 25 Hardware Fault 26 Internal Fault 27 Ignition Failure Reason for burner hold 0 None 1 Anti short cycle 2 Boiler Safety Limit Open 3 Boiler Safety Limit Open, (ILK Off) 7 Return sensor fault 8 Supply sensor fault 9 DHW sensor fault 10 Stack sensor fault 11 Ignition failure 13 Flame rod shorted to ground 14 Delta T inlet/outlet high 15 Return temp higher than supply R R R R Page 29 of 40 Part Number

30 Modbus Register Statistics 400, , , , , , , , , ,139 Protocol Name Description 16 Supply temp has risen too quickly 17 Fan speed not proved 23 24VAC voltage low/high 25 Hardware Fault 27 Ignition Failure Read/ Write Burner cycle count 0-999,999 (U32) R/W Burner run time Hours (U32) R/W System pump cycle count DHW pump cycle count Boiler pump cycle count 0-999,999 (U32) R/W 0-999,999 (U32) R/W 0-999,999 (U32) R/W Page 30 of 40 Part Number

31 Appendix C. TSBC Boiler Points List BACnet, N2 and LonWorks Points Read/ Write BACnet N2 LonWorks Read/ Write BACnet Data Object Data Pt Lon SNVT Point Name Type Id Type Adder Lon Name Type Outdoor Air Reset Enable/Disable BI 1 DI 1 nvooaresends_xxx SNVT_switch Domestic Hot Water Priority BI 2 DI 2 nvodmhtwtpri_xxx SNVT_switch Local/Remote BI 3 DI 3 nvoloc_rem_xxx SNVT_switch Remote On/Off Modbus Command R/W BV 4 DO 4 nvi/nvormonofcmd_xxx SNVT_switch Spare Input (Programmable) BI 5 DI 5 nvosprinput_xxx SNVT_switch Low Water Cutoff Switch BI 6 DI 6 nvolowtctoff_xxx SNVT_switch Burner On/Off Switch BI 7 DI 7 nvobrnonofsw_xxx SNVT_switch Low Water Flow BI 8 DI 8 nvolowtrflo_xxx SNVT_switch High and Low Gas Pressure Switches BI 9 DI 9 nvohilogsprs_xxx SNVT_switch Operating or High Limit BI 10 DI 10 nvooporhilim_xxx SNVT_switch Low Combustion Air Flow BI 11 DI 11 nvolocmbarfl_xxx SNVT_switch Fuel Valve Energized BI 12 DI 12 nvoflvlvenrg_xxx SNVT_switch Flame Safeguard Alarm BI 13 DI 13 nvoflmsfgdal_xxx SNVT_switch Call For Heat (CFH) BI 14 DI 14 nvocallforht_xxx SNVT_switch General Alarm BI 15 DI 15 nvogenalm_xxx SNVT_switch Vent Inducer BI 16 DI 16 nvovntindcr_xxx SNVT_switch Boiler Pump BI 17 DI 17 nvoblrpump_xxx SNVT_switch System Pump BI 18 DI 18 nvosystpmp_xxx SNVT_switch Spare Output (Programmable) BI 19 DI 19 nvosproutput_xxx SNVT_switch State Boiler Disabled BI 20 DI 20 nvostblrdis_xxx SNVT_switch State Weather Shutdown BI 21 DI 21 nvostwthshdn_xxx SNVT_switch State Lockout BI 22 DI 22 nvostlockout_xxx SNVT_switch State Pump Purge BI 23 DI 23 nvostpmppurg_xxx SNVT_switch State Limit Hold BI 24 DI 24 nvostlimhold_xxx SNVT_switch State Purge/Pilot Ign BI 25 DI 25 nvostprgplig_xxx SNVT_switch State Low Fire/Ignition BI 26 DI 26 nvostlofirig_xxx SNVT_switch State Main Ignition BI 27 DI 27 nvostmainign_xxx SNVT_switch State Low Fire Hold BI 28 DI 28 nvostlofrhld_xxx SNVT_switch State Boiler Running BI 29 DI 29 nvostblrrun_xxx SNVT_switch State Fan Post Purge BI 30 DI 30 nvostfnpstpg_xxx SNVT_switch State Pump Cool Down BI 31 DI 31 nvostpmpcldn_xxx SNVT_switch State Standby BI 32 DI 32 nvoststandby_xxx SNVT_switch Annunciator Low Water Level BI 33 DI 33 nvoanlowtlvl_xxx SNVT_switch Annunciator Off Switch BI 34 DI 34 nvoannoffsw_xxx SNVT_switch Annunciator Low Water Flow BI 35 DI 35 nvoanlowtflo_xxx SNVT_switch Annunciator Fuel Limit BI 36 DI 36 nvoannfllim_xxx SNVT_switch Annunciator High Temp Limit BI 37 DI 37 nvoanhitmplm_xxx SNVT_switch Annunciator Low Air Flow BI 38 DI 38 nvoanloarflo_xxx SNVT_switch Annunciator FSG Lockout BI 39 DI 39 nvoanfsglkot_xxx SNVT_switch Annunciator Outlet Temp Fail BI 40 DI 40 nvoanotltpfl_xxx SNVT_switch Annunciator Inlet Temp Fail BI 41 DI 41 nvoaninltpfl_xxx SNVT_switch Annunciator OA Temp Fail BI 42 DI 42 nvoanoatmpfl_xxx SNVT_switch Annunciator Remote Temp Fail BI 43 DI 43 nvoanremtpfl_xxx SNVT_switch Page 31 of 40 Part Number

32 Read/ Write N2 Read/ Write BACnet Data Object Data Pt Lon SNVT Point Name Type Id Type Adder Lon Name Type Annunciator Comm Fail BI 45 DI 45 nvoancomfl_xxx SNVT_switch Annunciator Low Inlet Temp BI 46 DI 46 nvoanloinltp_xxx SNVT_switch Annunciator Memory Failure BI 47 DI 47 nvoannmemfl_xxx SNVT_switch Boiler Outlet Water Temp AI 48 AI 48 nvoblotlwttp_xxx SNVT_temp_p Boiler Inlet Water Temp AI 49 AI 49 nvoblinlwttp_xxx SNVT_temp_p Outside Air Temp AI 50 AI 50 nvooatmp_xxx SNVT_temp_p Boiler Actual SP AI 51 AI 51 nvoblractsp_xxx SNVT_temp_p Remote System Temp AI 52 AI 52 nvoremsystmp_xxx SNVT_temp_p Remote Firing Rate or Remote SP R/W AV 53 AO 53 nvi/nvormfrratsp_xxx SNVT_count_f PCB Temp Sensor AI 54 AI 54 nvopcbtmpsen_xxx SNVT_temp_p Firing Rate Output to Mod Motor AI 55 AI 55 nvofrrtotmod_xxx SNVT_lev_perc ent Minimum Return Temp SP AI 56 AI 56 nvomnrettpsp_xxx SNVT_temp_p Mixing Valve Output AI 57 AI 57 nvomixvlvout_xxx SNVT_lev_perc ent Control Mode AI 58 AI 58 nvoctrlmode_xxx SNVT_count_f Modbus Points BACnet LonWorks Coil Address Description Read/Write coil = 0 coil = 1 Notes Outdoor Air Reset Enable/Disable Disable Enable Domestic Hot Water Priority Disable Enable (DHWP) Local / Remote Local Remote Remote On / Off Modbus Y Off On 1 Command Spare Input (Programmable) Off On Low Water Cutoff Switch Off On Burner On / Off Switch Off On Low Water Flow Off On High and Low Gas Pressure Off On 2 Switches Operating or High Limit Off On Low Combustion Air Flow Off On Fuel Valve Energized Off On Flame Safeguard Alarm Off On Call For Heat (CFH) Off On General Alarm Off On Vent Inducer Off On Boiler Pump Off On System Pump Off On Spare Output (Programmable) Off On State Boiler Disabled Off On State Weather Shutdown Off On State Lockout Off On State Pump Purge Off On State Limit Hold Off On State Purge/Pilot Ign Off On State Low Fire/Ignition Off On 3 Page 32 of 40 Part Number

33 Coil Address Description Read/Write coil = 0 coil = 1 Notes State Main Ignition Off On State Low Fire Hold Off On State Boiler Running Off On State Fan Post Purge Off On State Pump Cool Down Off On State Standby Off On Annunciator Low Water Level Off On Annunciator Off Switch Off On Annunciator Low Water Flow Off On Annunciator Fuel Limit Off On Annunciator High Temp Limit Off On Annunciator Low Air Flow Off On Annunciator FSG Lockout Off On Annunciator Outlet Temp Fail Off On Annunciator Inlet Temp Fail Off On Annunciator OA Temp Fail Off On Annunciator Remote Temp Fail Off On Annunciator Remote In Fail Off On Annunciator Comm Fail Off On Annunciator Low Inlet Temp Off On Annunciator Memory Failure Off On 4 Modbus Register Address Description Read/ Write Engineering Units for Register = 0 Engineering Units for Register= Boiler Outlet Water Temperature F Boiler Inlet Water Temperature F Outside Air Temperature F Boiler Actual Setpoint F Remote System Temperature F Remote Firing Rate or Remote Y or 300 % or F 1 Setpoint PCB Temperature Sensor F Firing Rate Output to Mod Motor % Minimum Return Temperature F Setpoint Mixing Valve Output % Control Mode 1 7 Units Notes Page 33 of 40 Part Number

34 Appendix D. Specifications Protocol ProtoNode Part Number Electrical Connections Approvals Operating Temperature Humidity ProtoNode RER ProtoNode LER BACnet MS/TP, BACnet/IP, Metasys LonWorks N2 Open, or Modbus TCP Thermal Solutions #: Thermal Solutions #: FieldServer #: FPC-N FieldServer #: FPC-N One 6-pin Phoenix connector, one One 6-pin Phoenix connector, one RS-485 +/- ground port, power +/- RS-485 +/- ground port, power +/- frame ground port frame ground port One 3-pin RS-485 Phoenix connector, One Ethernet 10/100 BaseT port one RS-485 +/- ground port One FTT-10 LonWorks port One Ethernet-10/100 Ethernet port CE (EN55022;EN55024; EN60950), UL916, FCC Class A Part 15, DNP3 Conformance Tested, OPC Self-tested for Compliance, RoHS Compliant, CSA 205 Approved BTL Marked LonMark Certified -40 C to 75 C (-40 F to167 F) 5-90% RH (non-condensing) Boiler Communication Statistics Protocol Modbus RTU Baud Rate Parity None Data Bits 8 Stop Bits 1 Page 34 of 40 Part Number

35 Appendix E. Address DIP Switch Settings A7 A6 A5 A4 A3 A2 A1 A0 Address Off Off Off Off Off Off Off Off 0 Off Off Off Off Off Off Off On 1 Off Off Off Off Off Off On Off 2 Off Off Off Off Off Off On On 3 Off Off Off Off Off On Off Off 4 Off Off Off Off Off On Off On 5 Off Off Off Off Off On On Off 6 Off Off Off Off Off On On On 7 Off Off Off Off On Off Off Off 8 Off Off Off Off On Off Off On 9 Off Off Off Off On Off On Off 10 Off Off Off Off On Off On On 11 Off Off Off Off On On Off Off 12 Off Off Off Off On On Off On 13 Off Off Off Off On On On Off 14 Off Off Off Off On On On On 15 Off Off Off On Off Off Off Off 16 Off Off Off On Off Off Off On 17 Off Off Off On Off Off On Off 18 Off Off Off On Off Off On On 19 Off Off Off On Off On Off Off 20 Off Off Off On Off On Off On 21 Off Off Off On Off On On Off 22 Off Off Off On Off On On On 23 Off Off Off On On Off Off Off 24 Off Off Off On On Off Off On 25 Off Off Off On On Off On Off 26 Off Off Off On On Off On On 27 Off Off Off On On On Off Off 28 Off Off Off On On On Off On 29 Off Off Off On On On On Off 30 Off Off Off On On On On On 31 Off Off On Off Off Off Off Off 32 Off Off On Off Off Off Off On 33 Off Off On Off Off Off On Off 34 Off Off On Off Off Off On On 35 Off Off On Off Off On Off Off 36 Off Off On Off Off On Off On 37 Off Off On Off Off On On Off 38 Off Off On Off Off On On On 39 Off Off On Off On Off Off Off 40 Off Off On Off On Off Off On 41 Off Off On Off On Off On Off 42 Off Off On Off On Off On On 43 Off Off On Off On On Off Off 44 Off Off On Off On On Off On 45 Off Off On Off On On On Off 46 Page 35 of 40 Part Number

36 A7 A6 A5 A4 A3 A2 A1 A0 Address Off Off On Off On On On On 47 Off Off On On Off Off Off Off 48 Off Off On On Off Off Off On 49 Off Off On On Off Off On Off 50 Off Off On On Off Off On On 51 Off Off On On Off On Off Off 52 Off Off On On Off On Off On 53 Off Off On On Off On On Off 54 Off Off On On Off On On On 55 Off Off On On On Off Off Off 56 Off Off On On On Off Off On 57 Off Off On On On Off On Off 58 Off Off On On On Off On On 59 Off Off On On On On Off Off 60 Off Off On On On On Off On 61 Off Off On On On On On Off 62 Off Off On On On On On On 63 Off On Off Off Off Off Off Off 64 Off On Off Off Off Off Off On 65 Off On Off Off Off Off On Off 66 Off On Off Off Off Off On On 67 Off On Off Off Off On Off Off 68 Off On Off Off Off On Off On 69 Off On Off Off Off On On Off 70 Off On Off Off Off On On On 71 Off On Off Off On Off Off Off 72 Off On Off Off On Off Off On 73 Off On Off Off On Off On Off 74 Off On Off Off On Off On On 75 Off On Off Off On On Off Off 76 Off On Off Off On On Off On 77 Off On Off Off On On On Off 78 Off On Off Off On On On On 79 Off On Off On Off Off Off Off 80 Off On Off On Off Off Off On 81 Off On Off On Off Off On Off 82 Off On Off On Off Off On On 83 Off On Off On Off On Off Off 84 Off On Off On Off On Off On 85 Off On Off On Off On On Off 86 Off On Off On Off On On On 87 Off On Off On On Off Off Off 88 Off On Off On On Off Off On 89 Off On Off On On Off On Off 90 Off On Off On On Off On On 91 Off On Off On On On Off Off 92 Off On Off On On On Off On 93 Off On Off On On On On Off 94 Off On Off On On On On On 95 Off On On Off Off Off Off Off 96 Page 36 of 40 Part Number

37 A7 A6 A5 A4 A3 A2 A1 A0 Address Off On On Off Off Off Off On 97 Off On On Off Off Off On Off 98 Off On On Off Off Off On On 99 Off On On Off Off On Off Off 100 Off On On Off Off On Off On 101 Off On On Off Off On On Off 102 Off On On Off Off On On On 103 Off On On Off On Off Off Off 104 Off On On Off On Off Off On 105 Off On On Off On Off On Off 106 Off On On Off On Off On On 107 Off On On Off On On Off Off 108 Off On On Off On On Off On 109 Off On On Off On On On Off 110 Off On On Off On On On On 111 Off On On On Off Off Off Off 112 Off On On On Off Off Off On 113 Off On On On Off Off On Off 114 Off On On On Off Off On On 115 Off On On On Off On Off Off 116 Off On On On Off On Off On 117 Off On On On Off On On Off 118 Off On On On Off On On On 119 Off On On On On Off Off Off 120 Off On On On On Off Off On 121 Off On On On On Off On Off 122 Off On On On On Off On On 123 Off On On On On On Off Off 124 Off On On On On On Off On 125 Off On On On On On On Off 126 Off On On On On On On On 127 On Off Off Off Off Off Off Off 128 On Off Off Off Off Off Off On 129 On Off Off Off Off Off On Off 130 On Off Off Off Off Off On On 131 On Off Off Off Off On Off Off 132 On Off Off Off Off On Off On 133 On Off Off Off Off On On Off 134 On Off Off Off Off On On On 135 On Off Off Off On Off Off Off 136 On Off Off Off On Off Off On 137 On Off Off Off On Off On Off 138 On Off Off Off On Off On On 139 On Off Off Off On On Off Off 140 On Off Off Off On On Off On 141 On Off Off Off On On On Off 142 On Off Off Off On On On On 143 On Off Off On Off Off Off Off 144 On Off Off On Off Off Off On 145 On Off Off On Off Off On Off 146 Page 37 of 40 Part Number

38 A7 A6 A5 A4 A3 A2 A1 A0 Address On Off Off On Off Off On On 147 On Off Off On Off On Off Off 148 On Off Off On Off On Off On 149 On Off Off On Off On On Off 150 On Off Off On Off On On On 151 On Off Off On On Off Off Off 152 On Off Off On On Off Off On 153 On Off Off On On Off On Off 154 On Off Off On On Off On On 155 On Off Off On On On Off Off 156 On Off Off On On On Off On 157 On Off Off On On On On Off 158 On Off Off On On On On On 159 On Off On Off Off Off Off Off 160 On Off On Off Off Off Off On 161 On Off On Off Off Off On Off 162 On Off On Off Off Off On On 163 On Off On Off Off On Off Off 164 On Off On Off Off On Off On 165 On Off On Off Off On On Off 166 On Off On Off Off On On On 167 On Off On Off On Off Off Off 168 On Off On Off On Off Off On 169 On Off On Off On Off On Off 170 On Off On Off On Off On On 171 On Off On Off On On Off Off 172 On Off On Off On On Off On 173 On Off On Off On On On Off 174 On Off On Off On On On On 175 On Off On On Off Off Off Off 176 On Off On On Off Off Off On 177 On Off On On Off Off On Off 178 On Off On On Off Off On On 179 On Off On On Off On Off Off 180 On Off On On Off On Off On 181 On Off On On Off On On Off 182 On Off On On Off On On On 183 On Off On On On Off Off Off 184 On Off On On On Off Off On 185 On Off On On On Off On Off 186 On Off On On On Off On On 187 On Off On On On On Off Off 188 On Off On On On On Off On 189 On Off On On On On On Off 190 On Off On On On On On On 191 On On Off Off Off Off Off Off 192 On On Off Off Off Off Off On 193 On On Off Off Off Off On Off 194 On On Off Off Off Off On On 195 On On Off Off Off On Off Off 196 Page 38 of 40 Part Number

39 A7 A6 A5 A4 A3 A2 A1 A0 Address On On Off Off Off On Off On 197 On On Off Off Off On On Off 198 On On Off Off Off On On On 199 On On Off Off On Off Off Off 200 On On Off Off On Off Off On 201 On On Off Off On Off On Off 202 On On Off Off On Off On On 203 On On Off Off On On Off Off 204 On On Off Off On On Off On 205 On On Off Off On On On Off 206 On On Off Off On On On On 207 On On Off On Off Off Off Off 208 On On Off On Off Off Off On 209 On On Off On Off Off On Off 210 On On Off On Off Off On On 211 On On Off On Off On Off Off 212 On On Off On Off On Off On 213 On On Off On Off On On Off 214 On On Off On Off On On On 215 On On Off On On Off Off Off 216 On On Off On On Off Off On 217 On On Off On On Off On Off 218 On On Off On On Off On On 219 On On Off On On On Off Off 220 On On Off On On On Off On 221 On On Off On On On On Off 222 On On Off On On On On On 223 On On On Off Off Off Off Off 224 On On On Off Off Off Off On 225 On On On Off Off Off On Off 226 On On On Off Off Off On On 227 On On On Off Off On Off Off 228 On On On Off Off On Off On 229 On On On Off Off On On Off 230 On On On Off Off On On On 231 On On On Off On Off Off Off 232 On On On Off On Off Off On 233 On On On Off On Off On Off 234 On On On Off On Off On On 235 On On On Off On On Off Off 236 On On On Off On On Off On 237 On On On Off On On On Off 238 On On On Off On On On On 239 On On On On Off Off Off Off 240 On On On On Off Off Off On 241 On On On On Off Off On Off 242 On On On On Off Off On On 243 On On On On Off On Off Off 244 On On On On Off On Off On 245 On On On On Off On On Off 246 Page 39 of 40 Part Number

40 A7 A6 A5 A4 A3 A2 A1 A0 Address On On On On Off On On On 247 On On On On On Off Off Off 248 On On On On On Off Off On 249 On On On On On Off On Off 250 On On On On On Off On On 251 On On On On On On Off Off 252 On On On On On On Off On 253 On On On On On On On Off 254 On On On On On On On On 255 Revision Notes: - January 1, 2014 Added Apex Boiler Control to the Manual - August 25, 2014 Revised S0-S2 DIP switches for BACnet IP, BACnet MS/TP, Metasys N2 Open and Modbus TCP on page 4 to reflect changes to the gateway software in July October 20, 2014 Updated Section 3 Wiring. Updated wording on wiring illustrations for clarity: Sections 3.1 (Figure 3, better arrow designations) & 3.2 (Figure 4, removed V+ and V- terminology; This means 5 vdc on control and 24vac here). Updated TSBC wiring illustrations & notes in Figure 5.1. Added Apex Boiler Control wiring in Figure 5.2 and Wiring from TSBC & Apex Boiler Control to ProtoNode in Figure 5.3. Added note to Figure 5.4 & Figure 5.5 to see Figure 5.3 for ProtoNode connection. Page 40 of 40 Part Number

ProtoNode FPC-N34 and FPC-N35

ProtoNode FPC-N34 and FPC-N35 ProtoNode FPC-N34 and FPC-N35 FOR BUDERUS SSB BOILERS Installation and Service Instructions for Contractors 6720818452 (2015/10) US 3.4 2 Contents 1 Key to symbols and safety instructions... 3 1.1 Key

More information

ProtoNode RER and ProtoNode LER. Startup Guide

ProtoNode RER and ProtoNode LER. Startup Guide ProtoNode RER and ProtoNode LER Startup Guide For Interfacing Customer Product: Harsco Industrial Patterson-Kelley ENVI Control Systems and Love Controller To Building Automation Systems: BACnet MS/TP,

More information

Thermal Solutions Universal Gateway Part Number: Instruction Manual June 11, 2015 Revision 10

Thermal Solutions Universal Gateway Part Number: Instruction Manual June 11, 2015 Revision 10 Thermal Solutions Universal Gateway Part Number: 106417-01 Instruction Manual June 11, 2015 evision 10 Contents 1. Introduction 4 2. Setup 5 3. Wiring 11 4. Commissioning 23 5. Field Validating 29 6. Troubleshooting

More information

EIP APPLICABILITY & EFFECTIVITY

EIP APPLICABILITY & EFFECTIVITY ProtoCessor ProtoNode RER Startup Guide For Interfacing Toshiba Products: G8000 & G9000 To Building Automation Systems: Modbus/RTU, Modbus/TCP, BACnet MS/TP, BACnet/IP, Metasys N2, SNMP and AB EIP APPLICABILITY

More information

ProtoNode RER and ProtoNode LER Startup Guide For Interfacing Infinite Energy 2 Products: Argus Managing/Standalone Boiler and Dependent Boiler To

ProtoNode RER and ProtoNode LER Startup Guide For Interfacing Infinite Energy 2 Products: Argus Managing/Standalone Boiler and Dependent Boiler To ProtoNode RER and ProtoNode LER Startup Guide For Interfacing Infinite Energy 2 Products: Argus Managing/Standalone Boiler and Dependent Boiler To Building Automation Systems: BACnet MS/TP, BACnet/IP,

More information

MCS-BMS-GATEWAY STARTUP GUIDE Covers Model No. FPC-C35

MCS-BMS-GATEWAY STARTUP GUIDE Covers Model No. FPC-C35 Version 4.2 - Rev. 2017-11-30 5580 Enterprise Pkwy. Fort Myers, FL 33905 MCS-BMS-GATEWAY STARTUP GUIDE Covers Model No. FPC-C35 Office: 239-694-0089 Fax: 239-694-0031 www.mcscontrols.com MCS Total Solution

More information

Universal Communication Gateway Instruction Manual

Universal Communication Gateway Instruction Manual Universal Communication Gateway Instruction Manual The Universal Communication Gateway (UCG) is an external, high performance, low cost building automation multi-protocol gateway that has been preprogrammed

More information

Document Revision: 4.4

Document Revision: 4.4 ProtoNode RER and ProtoNode LER Startup Guide For Interfacing Camus Products: Honeywell Sola (DynaFlame, Dynaforce, DynaMax HS, TH Series, Advantus TM ) To Building Automation Systems: BACnet MS/TP, BACnet/IP,

More information

ET9500 BEMS Interface Box Configuration Guide

ET9500 BEMS Interface Box Configuration Guide ET9500 BEMS Interface Box Configuration Guide APPLICABILITY & EFFECTIVITY Explains how to install and configure ET9500 BEMS Interface Box. The instructions are effective for the above as of August, 2015

More information

QuickServer Start-up Guide

QuickServer Start-up Guide QuickServer Start-up Guide FS-QS-1010/1011/12X0/12X1 APPLICABILITY & EFFECTIVITY Effective for all systems manufactured after August 2013 Kernel Version: 6.10 Document Revision: 1 QuickServer Start-up

More information

QuickServer Industrial Protocol Gateway

QuickServer Industrial Protocol Gateway Manual No: 577014-367 Revision: A QuickServer Industrial Protocol Gateway Startup Guide Notice Veeder-Root makes no warranty of any kind with regard to this publication, including, but not limited to,

More information

APPLICABILITY & EFFECTIVITY

APPLICABILITY & EFFECTIVITY ProtoNode RER and ProtoNode LER Startup Guide For Interfacing Lochinvar Products: Lochinvar s Armor, SYNC /Armor X2, Knight /Knight XL, Crest, Copper Fin II and Power Fin boilers To Building Automation

More information

Observe all necessary safety precautions when controlling the soft starter remotely. Alert personnel that machinery may start without warning.

Observe all necessary safety precautions when controlling the soft starter remotely. Alert personnel that machinery may start without warning. Introduction OPERATING INSTRUCTIONS: MCD REMOTE OPERATOR Order Codes: 175G94 (for MCD 2) 175G361 + 175G9 (for MCD 5) 175G361 (for MCD 3) 1. Introduction 1.1. Important User Information Observe all necessary

More information

SNMP dedicated to ORVALDI Solar Infini

SNMP dedicated to ORVALDI Solar Infini SNMP dedicated to ORVALDI Solar Infini User s Manual Management Software for Solar Inverter Table of Contents 1. 2. 3. Overview...1 1.1 Introduction...1 1.2 Features...1 1.3 Overlook...1 1.4 Installation

More information

APPLICATION GUIDE. Simplicity LINC GATEWAY OVERVIEW. 24 must be grounded close to the Simplicity LINC

APPLICATION GUIDE. Simplicity LINC GATEWAY OVERVIEW. 24 must be grounded close to the Simplicity LINC APPLICATION GUIDE Simplicity LINC GATEWAY OVERVIEW The Simplicity LINC Gateway operates as a Modbus Client providing an interface between a MS/TP control system and devices that communicate using the Modbus

More information

USERS MANUAL MCD REMOTE OPERATOR

USERS MANUAL MCD REMOTE OPERATOR USERS MANUAL MCD REMOTE OPERATOR Order Code: 175G9004, 175G3061 Contents Contents Introduction...2 Important User Information...2 General Description...2 Symbols Used in this Manual...2 Installation...3

More information

PowerCommand 500/550 Remote Monitoring System

PowerCommand 500/550 Remote Monitoring System PowerCommand 500/550 Remote Monitoring System Complete remote monitoring of your power system The PowerCommand 500 series provides a convenient means of remotely monitoring generator sets, transfer switches,

More information

ECL Apex 10. User Guide. ECL Apex 10 *087R9745* Installation and configuration. *vijem102*

ECL Apex 10. User Guide. ECL Apex 10 *087R9745* Installation and configuration. *vijem102* User Guide ECL Apex 10 *087R9745* *vijem102* Installation and configuration VI.JE.M1.02 Danfoss 11/2004 DH-SMT VI.JE.M1.02 Danfoss 11/2004 DH-SMT ECL Apex 10 VI.JE.M1.02 Danfoss 11/2004 DH-SMT VI.JE.M1.02

More information

INTECH Micro 2300-RTD6

INTECH Micro 2300-RTD6 INTECH Micro 2300-RTD6 6 Channel RTD Input Station Overview. The Intech Micro 2300 Series is a system of modular I/O Remote Stations, that add an even lower cost option to Intech s already extensive intelligent

More information

WEM-MX-333mV. Integrated Meter Installation Guidelines

WEM-MX-333mV. Integrated Meter Installation Guidelines WEM-MX-333mV Integrated Meter Installation Guidelines Energy Tracking, LLC Dated: February 8, 2013 By: Support Staff Table of Contents Enclosure Mounting... 2 High Voltage Wiring Type... 4 High Voltage

More information

Modbus Integration Integration for Modbus Functionality for VT8600 Series

Modbus Integration Integration for Modbus Functionality for VT8600 Series Modbus Integration Integration for Modbus Functionality for VT8600 Series Building Management System *For data visualization and analysis Modbus Controller VT8000 Series room controllers 2 TABLE OF CONTENTS

More information

Installation and Programming Manual Part: Building Network Interface Card Product: 4100ES

Installation and Programming Manual Part: Building Network Interface Card Product: 4100ES Installation and Programming Manual Part: Building Network Interface Card 4100-6047 Product: 4100ES Cautions and Warnings READ AND SAVE THESE INSTRUCTIONS- Follow the instructions in this installation

More information

Features and Benefits. Certifications

Features and Benefits. Certifications iologik 4000 Series Modular remote I/O Features and Benefits I/O expansion without a backplane Active communication with MX-AOPC UA Server Supports SNMP v1/v2c Easy configuration with Modular ioadmin utility

More information

Installation Instructions & Users Manual

Installation Instructions & Users Manual Installation Instructions & Users Manual UTILITY/ BUILDING INPUT 120 VAC ( OPTION) 15-20A N L CONTROL BOARD G SECURITY LIGHTING POWER SUPPLY (OPTION) CHARGER- POWER SUPPLY ASSBY XFMR (OPTION) CBM MODEL

More information

PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS. v1.1 Revised Nov 29, 2016

PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS. v1.1 Revised Nov 29, 2016 PF3100 TROUBLESHOOTING SOLUTIONS TO COMMON PROBLEMS v1.1 Revised Table of Contents 1 Common Alarms and Warnings... 1 2 Common Issues... 6 2.1 Communication problems... 6 2.1.1 Controller communication

More information

POWERCOMMAND CLOUD REMOTE MONITORING SYSTEM

POWERCOMMAND CLOUD REMOTE MONITORING SYSTEM Specification sheet POWERCOMMAND CLOUD REMOTE MONITORING SYSTEM Cummins Digital Solutions will provide customers with the ability to manage their power system assets, globally Description The PowerCommand

More information

Eco-Propel TM Variable Speed Pump Kit Instruction and Operation Manual, P/N: , Revision 1

Eco-Propel TM Variable Speed Pump Kit Instruction and Operation Manual, P/N: , Revision 1 Eco-Propel TM Variable Speed Pump Kit Instruction and Operation Manual, P/N: 107065-01, Revision 1 March 03, 2017 Contents Introduction 2 Installation Pre-installation 3 Installation Procedure 4 Electrical

More information

Eco-Propel TM Variable Speed Pump Kit Instruction and Operation Manual, p/n Revision 0

Eco-Propel TM Variable Speed Pump Kit Instruction and Operation Manual, p/n Revision 0 Eco-Propel TM Variable Speed Pump Kit Instruction and Operation Manual, p/n 107065-01 Revision 0 May 20, 2016 Contents Introduction 2 Installation Pre-installation 3 Installation Procedure 4 Electrical

More information

Buildings. Product Name. THE SMART CHOICE FOR ENERGY SAVINGS. SmartVFD HVAC and BYPASS

Buildings. Product Name. THE SMART CHOICE FOR ENERGY SAVINGS. SmartVFD HVAC and BYPASS Buildings Product Name THE SMART CHOICE FOR ENERGY SAVINGS. SmartVFD HVAC and BYPASS SMARTVFD HVAC AND BYPASS Saving Energy the Smart Way Buildings consume more than 70 percent of the electricity produced

More information

User s Manual. Suitable Products: Three phase grid tie inverter with energy storage Three phase off Grid inverter

User s Manual. Suitable Products: Three phase grid tie inverter with energy storage Three phase off Grid inverter SolarPower Pro User s Manual Suitable Products: Three phase grid tie inverter with energy storage Three phase off Grid inverter Management Software for Solar Inverter Table of Contents 1. SolarPower Pro

More information

Wide Bank 28 DS3 QUICK START GUIDE

Wide Bank 28 DS3 QUICK START GUIDE Wide Bank 28 DS3 QUICK START GUIDE Product Number: 002-0139-0500 Product Release: 2.4 July 2004 Copyright 2004 Carrier Access Corporation. All rights reserved. The information presented in this manual

More information

CLA-VAL e-drive-34. User Manual. Motorised Pilots. CLA-VAL Europe LIN072UE - 04/16

CLA-VAL e-drive-34. User Manual. Motorised Pilots. CLA-VAL Europe LIN072UE - 04/16 User Manual CLA-VAL Europe www.cla-val.ch cla-val@cla-val.ch 1 - LIN072UE - 04/16 Table of Contents 1 Introduction... 3 1.1 Precautions Before Starting... 3 1.2 Troubleshooting... 3 1.3 General Disclaimer...

More information

GS2 Series - Introduction

GS2 Series - Introduction GS2 Series - Introduction GS2 Series Drives Rating Hp.25.5 1 2 3 5 7.5 10 kw 0.2 0.4 0.75 1.5 2.2 3.7 5.5 7.5 Single-Phase 115 Volt Class Single/Three-Phase 230 Volt Class Three-Phase 230 Volt Class Three-Phase

More information

STRA-24 for chilled beams

STRA-24 for chilled beams STRA- Installation and commissioning manual STRA- for chilled beams STRA- is the room controller for the pressure independent (Pi) and constant air volume chilled beams. It is possible to set different

More information

Power Flame Incorporated

Power Flame Incorporated Power Flame Incorporated DC-4 SEQUENCE OVERFIRE DRAFT CONTROL SYSTEM OPERATING AND MAINTENANCE MANUAL THE POWER TO MANAGE ENERGY 2001 South 21 st Street, Parsons, Kansas 67357 Telephone 620-421-0480, Fax

More information

INSTALLATION USER MANUAL

INSTALLATION USER MANUAL INSTALLATION & USER MANUAL DYNAMIC LOAD MANAGEMENT -PREMIUM- This document is copyrighted, 2016 by Circontrol, S.A. All rights are reserved. Circontrol, S.A. reserves the right to make improvements to

More information

Factory Packaged Controls. OE (AAON Part No. V12090) MODGAS-X Controller Field Technical Guide

Factory Packaged Controls. OE (AAON Part No. V12090) MODGAS-X Controller Field Technical Guide Factory Packaged Controls OE377-26-00058 (AAON Part No. V12090) MODGAS-X Controller Table of Contents GENERAL INFORMATION... 3 Overview...3 Features...3 INSTALLATION & WIRING... 4 Supply Air Temperature

More information

EPAS Desktop Pro Software User Manual

EPAS Desktop Pro Software User Manual Software User Manual Issue 1.10 Contents 1 Introduction 4 1.1 What is EPAS Desktop Pro? 4 1.2 About This Manual 4 1.3 Typographical Conventions 5 1.4 Getting Technical Support 5 2 Getting Started 6 2.1

More information

Model ESV Uninterruptible Power System 1.5 KVA/KW KVA/KW Single Phase

Model ESV Uninterruptible Power System 1.5 KVA/KW KVA/KW Single Phase Model ESV Uninterruptible Power System 1.5 KVA/KW - 14.0 KVA/KW Single Phase 1.0 General General Specification This specification describes the features and design of an on-line, dual conversion, uninterruptible

More information

AQUAVAR Intelligent Pump Controller TECHNICAL BROCHURE BCPAQIPC R2

AQUAVAR Intelligent Pump Controller TECHNICAL BROCHURE BCPAQIPC R2 AQUAVAR Intelligent Pump Controller TECHNICAL BROCHURE BCPAQIPC R2 INTRODUCTION The Aquavar Intelligent Pump Controller from utilizes an all new Aquavar platform, and combines it with over 20 years of

More information

Issue 2.0 December EPAS Midi User Manual EPAS35

Issue 2.0 December EPAS Midi User Manual EPAS35 Issue 2.0 December 2017 EPAS Midi EPAS35 CONTENTS 1 Introduction 4 1.1 What is EPAS Desktop Pro? 4 1.2 About This Manual 4 1.3 Typographical Conventions 5 1.4 Getting Technical Support 5 2 Getting Started

More information

Application Engineering Europe

Application Engineering Europe Date of last update: Feb-12 Ref: D7.8.4/0112-0212/E Application Engineering Europe CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS 1/17 1 Introduction CoreSense is an ingredient brand name for

More information

ZT-USB Series User Manual

ZT-USB Series User Manual ZT-USB Series User Manual Warranty Warning Copyright All products manufactured by ICP DAS are under warranty regarding defective materials for a period of one year, beginning from the date of delivery

More information

Safety Precautions Product Contents Product PIN Diagram LED indicators Product Dimensions Installation of Panel with Casing Wire Legend Power Wiring

Safety Precautions Product Contents Product PIN Diagram LED indicators Product Dimensions Installation of Panel with Casing Wire Legend Power Wiring www.zkteco.com Safety Precautions Product Contents Product PIN Diagram LED indicators Product Dimensions Installation of Panel with Casing Wire Legend Power Wiring Diagram FR1200 Connection Weigand Connection

More information

BT300 Variable Frequency Drives. Redesigned, re-tooled, and ready to meet rigorous demands.

BT300 Variable Frequency Drives. Redesigned, re-tooled, and ready to meet rigorous demands. www.usa.siemens.com/hvac BT300 Variable Frequency Drives Redesigned, re-tooled, and ready to meet rigorous demands Answers for infrastructure & cities. 2 Save 20-50% on energy costs and gain reliable control

More information

Invensys (Foxboro) IMV25 Multivariable Setup

Invensys (Foxboro) IMV25 Multivariable Setup Invensys (Foxboro) IMV25 Multivariable Setup MEASUREMENT & CONTROL SYSTEMS Intellectual Property & Copyright Notice 2010 by ABB Inc., Totalflow Products ( Owner ), Bartlesville, Oklahoma 74006, U.S.A.

More information

22 POINT FULLY PROGRAMMABLE HVAC CONTROLLER

22 POINT FULLY PROGRAMMABLE HVAC CONTROLLER UHC 300 22 POINT FULLY PROGRAMMABLE HVAC CONTROLLER OVERVIEW The HVAC building automation controls market requires a DDC controller that provides scalable, consolidated control in a fully programmable,

More information

Operating Instructions

Operating Instructions Operating Instructions CPU-95 Digital Ignition System with Enhanced Display Form 1.0 OVERVIEW 1.1 The Altronic CPU-95 Digital Ignition system with enhanced display has been designed for application on

More information

CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS

CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS Date of last update: Apr-15 Ref: D7.8.4/0112-0415/E Application Engineering Europe CORESENSE DIAGNOSTICS FOR STREAM REFRIGERATION COMPRESSORS CoreSense Diagnostics for Stream Refrigeration Compressors...

More information

SPD DEVICE USER MANUAL V1.2.

SPD DEVICE USER MANUAL V1.2. USER MANUAL V1.2 contact@sedox.com www.sedox-performance.com 1. Introduction Congratulations! With your new Sedox SPD Device you can now easily reprogram your car in a few minutes. Sedox SPD Device is

More information

REV F2.0. User's Manual. Hydraulic ABS (HABS) Hydraulic Power Brake (HPB) Page 1 of 28

REV F2.0. User's Manual. Hydraulic ABS (HABS) Hydraulic Power Brake (HPB) Page 1 of 28 REV F2.0 User's Manual Hydraulic ABS (HABS) Hydraulic Power Brake (HPB) Page 1 of 28 Table of Contents INTRODUCTION...4 Starting TOOLBOX Software... 5 MAIN MENU...6 System Setup... 6 Language... 7 Select

More information

SP PRO ABB Managed AC Coupling

SP PRO ABB Managed AC Coupling SP PRO ABB Managed AC Coupling Introduction The SP PRO ABB Managed AC Coupling provides a method of linking the ABB PVI-3.0/3.6/4.2- TL-OUTD and ABB PVI-5000/6000-TL-OUTD string inverters to the SP PRO

More information

BT300 Variable Frequency Drives Redesigned, re-tooled, and ready to meet rigorous demands Answers for Infrastructure.

BT300 Variable Frequency Drives Redesigned, re-tooled, and ready to meet rigorous demands Answers for Infrastructure. www.usa.siemens.com/hvac BT300 Variable Frequency Drives Redesigned, re-tooled, and ready to meet rigorous demands Answers for Infrastructure. 2 Save 20-50% on energy costs and gain reliable control of

More information

INSTALLATION GUIDE. InBio Pro Series Access Control Panels. Date: Dec., 2015 Version: 1.1

INSTALLATION GUIDE. InBio Pro Series Access Control Panels. Date: Dec., 2015 Version: 1.1 INSTALLATION GUIDE InBio Pro Series Access Control Panels Date: Dec., 2015 Version: 1.1 2 3 What s in the Box CONTENT 2 Screws & Anchors 2 Screwdriver 4 Diode Contents What s in the Box...2 Optional accessories...4

More information

Remote Monitoring System

Remote Monitoring System Specification Sheet PowerCommand Cloud Remote Monitoring System Power Generation Telematics Description The PowerCommand Cloud is a robust and reliable remote monitoring system that provides information

More information

ITCEMS950 Idle Timer Controller - Engine Monitor Shutdown Isuzu NPR 6.0L Gasoline Engine

ITCEMS950 Idle Timer Controller - Engine Monitor Shutdown Isuzu NPR 6.0L Gasoline Engine Introduction An ISO 9001:2008 Registered Company ITCEMS950 Idle Timer Controller - Engine Monitor Shutdown 2014-2016 Isuzu NPR 6.0L Gasoline Engine Contact InterMotive for additional vehicle applications

More information

BT300 HVAC Drives Conventional Bypass (C-Bypass) Options

BT300 HVAC Drives Conventional Bypass (C-Bypass) Options BT300 HVAC Drives Conventional Bypass (C-Bypass) Options Description The BT300 Conventional Bypass is a companion package for the family of BT300 HVAC Drives. For information on the family of BT300 HVAC

More information

Idle Timer Controller - ITC Freightliner MT45 Contact InterMotive for additional vehicle applications

Idle Timer Controller - ITC Freightliner MT45 Contact InterMotive for additional vehicle applications An ISO 9001:2008 Registered Company System Operation Idle Timer Controller - ITC805 2013-2018 Freightliner MT45 Contact InterMotive for additional vehicle applications The ITC805 system shuts down idling

More information

Hamilton 3VO Submittal

Hamilton 3VO Submittal Job RESET FORM Engineer Hamilton 3VO Submittal BOILER s H3H 750 WATER HEATER s H3D 750 Contractor Prepared By Date Input 100% factory fire tested Efficiency: up to 99.8% (based on incoming water) Maximum

More information

Installation Guide. ECL Comfort 210 / 310, application A231 / A Table of Contents

Installation Guide. ECL Comfort 210 / 310, application A231 / A Table of Contents 1.0 Table of Contents 1.0 Table of Contents... 1 1.1 Important safety and product information..................... 2 2.0 Installation... 4 2.1 Before you start.....................................................

More information

R11B EN R11A EN. RackCDU. Service Manual. Edition August 2016 Page 1 of 24 V /8

R11B EN R11A EN. RackCDU. Service Manual. Edition August 2016 Page 1 of 24 V /8 R11B-1528-02EN R11A-0555-03EN Service Manual - English RackCDU Service Manual Edition August 2016 Page 1 of 24 Version history Issue number Reason for update 1.0 / December 2015 Initial release 2.0 / February

More information

Hi-Z USB Wireless. Introduction/Welcome

Hi-Z USB Wireless. Introduction/Welcome Hi-Z USB Wireless Introduction/Welcome Thank you for selecting the Hi-Z Antennas USB Wireless system. The Hi-Z USB Wireless system provides control functions from a personal computer to operate a Hi-Z

More information

APP EOLE4. Applicable to program versions TAC5 Version DT & DG 2.7.0

APP EOLE4. Applicable to program versions TAC5 Version DT & DG 2.7.0 APP EOLE4 Applicable to program versions TAC5 Version DT 2.8.2 & DG 2.7.0 2 THE APP EOLE4 INTERFACE This interface can be used on Android, IOS and PC. Download the app from the App Store/Google Play or

More information

Service Bulletin Immobilizer System (Type 6) (Supersedes , dated February 20, 2009; see REVISION SUMMARY) February 22, 2013

Service Bulletin Immobilizer System (Type 6) (Supersedes , dated February 20, 2009; see REVISION SUMMARY) February 22, 2013 Service Bulletin 06-033 Applies To: 2007-09 MDX ALL 2007-12 RDX ALL February 22, 2013 Immobilizer System (Type 6) (Supersedes 06-033, dated February 20, 2009; see REVISION SUMMARY) REVISION SUMMARY This

More information

MATRIX LLC LEVEL CONTROL PANEL

MATRIX LLC LEVEL CONTROL PANEL MATRIX LLC LEVEL CONTROL PANEL Installation Operation Maintenance Manual 1-26-09 REV-0.3 1 INDEX Introduction. 3 Product Configurations..... 4 I/O Descriptions. 8 Operation o Intercooler, Accumulator,

More information

Industrial Renewable Energy. 4-Port 10/100/1000T 802.3at PoE+ Managed Ethernet Switch BSP-360. Quick Installation Guide

Industrial Renewable Energy. 4-Port 10/100/1000T 802.3at PoE+ Managed Ethernet Switch BSP-360. Quick Installation Guide Industrial Renewable Energy 4-Port 10/100/1000T 802.3at PoE+ Managed Ethernet Switch BSP-360 Quick Installation Guide Safety Precautions Please read the following before using: 1. All electrical work must

More information

Installation Manual. ACL3200 Flare Stack / Incinerator Ignition Systems

Installation Manual. ACL3200 Flare Stack / Incinerator Ignition Systems Installation Manual for the ACL3200 Flare Stack / Incinerator Ignition Systems WARNING This manual must be read in its entirety before installation of this controller. Installation must be performed by

More information

IBM CMM Quick Reference Guide

IBM CMM Quick Reference Guide IBM CMM Quick Reference Guide Contents Introduction Prerequisites Requirements Components Used CMM Overview CMM Layout Useful CMM Screens Login Screen System Information Screen Event Log Screen Chassis

More information

Dominion PX. Quick Setup Guide. Before You Begin. Mounting Zero U Models Using L-Bracket. Zero U Size. 1U and 2U Size

Dominion PX. Quick Setup Guide. Before You Begin. Mounting Zero U Models Using L-Bracket. Zero U Size. 1U and 2U Size Dominion PX Quick Setup Guide Thank you for purchasing the Dominion PX intelligent power distribution unit (PDU). The intended use of the Raritan Dominion PX is distribution of power to information technology

More information

E Series CE Approved Intermittent Pilot Ignition Control

E Series CE Approved Intermittent Pilot Ignition Control Installation Instructions Issue Date January 11, 2013 E Series CE Approved Intermittent Pilot Ignition Control Application The E Series CE Approved Intermittent Pilot Ignition Control is a safety control

More information

Dusty / Dusty Ex. Low-Cost Broken Bag Detection. Operating Instructions. SWR engineering Messtechnik GmbH

Dusty / Dusty Ex. Low-Cost Broken Bag Detection. Operating Instructions. SWR engineering Messtechnik GmbH EN Dusty / Dusty Ex Operating Instructions Low-Cost Broken Bag Detection SWR engineering Messtechnik GmbH CONTENTS Page 1. Introduction.............................................................. 3 1.1

More information

SP PRO KACO Managed AC Coupling

SP PRO KACO Managed AC Coupling SP PRO KACO Managed AC Coupling Introduction The SP PRO KACO Managed AC Coupling provides a method of linking the KACO Powador xx00 and Powador xx02 series grid tie inverters to the SP PRO via the AC Load

More information

WPT Installation Manual. Wireless Pneumatic Thermostat- WPT-800 Series. 1. Overview. 1.1 Parts Included. 1.2 Prerequisites for Installation

WPT Installation Manual. Wireless Pneumatic Thermostat- WPT-800 Series. 1. Overview. 1.1 Parts Included. 1.2 Prerequisites for Installation Wireless Pneumatic Thermostat- WPT-800 Series 1. Overview Cypress Envirosystems Wireless Pneumatic Thermostat (WPT) retrofits existing Pneumatic Thermostats in minutes to deliver Direct Digital Control

More information

User Manual Solar Charge Controller 3KW

User Manual Solar Charge Controller 3KW User Manual Solar Charge Controller 3KW Version: 1.3 CONTENTS 1 ABOUT THIS MANUAL... 1 1.1 Purpose... 1 1.2 Scope... 1 1.3 SAFETY INSTRUCTIONS... 1 2 INTRODUCTION... 2 2.1 Features... 2 2.2 Product Overview...

More information

ZIP Economizer Fault Detection and Diagnostics (FDD) Table

ZIP Economizer Fault Detection and Diagnostics (FDD) Table Fault Detection and Diagnostics (FDD) Table Fault Detection Problem Diagnostic ction (in addition to alarm stored / transmitted) Potential Cause C Fault Code OT sensor predetermined range O damper returns

More information

HVAC Products. Introducing the SED2 Variable Frequency Drives

HVAC Products. Introducing the SED2 Variable Frequency Drives HVAC Products Introducing the SED2 Variable Frequency Drives Designed Specifically for HVAC Applications From a global leader in drives technology and innovation, now comes a drive specifically configured

More information

HGM1780. Automatic Genset Controller USER MANUAL. Smartgen Technology

HGM1780. Automatic Genset Controller USER MANUAL. Smartgen Technology HGM1780 Automatic Genset Controller USER MANUAL Smartgen Technology Smartgen Technology Co., Ltd No. 28 Jinsuo Road Zhengzhou Henan Province P. R. China Tel: 0086-371-67988888/67981888 0086-371-67991553/67992951

More information

B U L L E T I N. Application Engineering. AE June Intelligent Store Discus 2.0

B U L L E T I N. Application Engineering. AE June Intelligent Store Discus 2.0 June 2008 Intelligent Store Discus 2.0 Table of Contents 1.0 Overview of Intelligent Store Discus 2.0 4.9 Crankcase Heater Control 1.1 Functionality 4.10 Anti Short Cycle 1.1.1 Diagnostics 4.11 MCC Value

More information

Delta Products VFD CP2000 Bypass Control Packages.

Delta Products VFD CP2000 Bypass Control Packages. Delta Products VFD CP2000 Bypass Control Packages www.deltaww.com Delta Products VFD CP2000 Bypass Control Packages The Delta Products VFD CP2000 Bypass Control Packages are designed for the Delta Products

More information

An ISO 9001:2008 Registered Company

An ISO 9001:2008 Registered Company An ISO 9001:2008 Registered Company Introduction Engine Monitor System 2009-2018 Ford E Series (EMS501-D) 2008-2010 Ford F250-550 6.2L, 6.8L (EMS506-D) 2011-2016 Ford F250-550 6.2L, 6.8L (EMS507-D) 2017

More information

Metasys Zoning Package Installation

Metasys Zoning Package Installation Technical Bulletin Issue Date August 28, 2002 Metasys Zoning Package Installation Metasys Zoning Package Installation...2 Introduction... 2 Key Concepts... 3 Installation Overview... 3 Metasys Zoning Package

More information

CRAGG RAILCHARGER Instruction Manual for 20SMC-12V 20SMC-24V 40SMC-12V 40SMC-24V 60SMC-12V 80SMC-12V

CRAGG RAILCHARGER Instruction Manual for 20SMC-12V 20SMC-24V 40SMC-12V 40SMC-24V 60SMC-12V 80SMC-12V CRAGG RAILCHARGER for 20SMC-12V 20SMC-24V 40SMC-12V 40SMC-24V 60SMC-12V 80SMC-12V Contents 1 Warnings, Cautions, and Notes... 1 2 Description... 2 3 Features... 2 3.1 STANDARD FEATURES... 2 3.2 OPTIONAL

More information

PROFIRE 1100i IGNITION FLAME SAFETY CONTROLLER

PROFIRE 1100i IGNITION FLAME SAFETY CONTROLLER PROFIRE 1100i IGNITION FLAME SAFETY CONTROLLER Cautions WARNING: EXPLOSION HAZARD- -DO NOT SERVICE UNLESS AREA IS KNOWN TO BE NON- HAZARDOUS -DO NOT OPEN WHEN ENERGIZED EXPLOSION HAZARD- -SUBSTITUTION

More information

QUICK START GUIDE FOR ACCESS CONTROL BOARDS. DX Series Four Door TCP/IP Web Server Controller. Model: ACP-DXEL4

QUICK START GUIDE FOR ACCESS CONTROL BOARDS. DX Series Four Door TCP/IP Web Server Controller. Model: ACP-DXEL4 QUICK START GUIDE FOR ACCESS CONTROL BOARDS DX Series Four Door TCP/IP Web Server Controller Model: ACP-DXEL Table of Contents 0- Introduction 0 - Overview 0. - Package Contents 0. - Installation Requirements

More information

Model H30 Operation Manual

Model H30 Operation Manual Model H30 Operation Manual Model H30 Version 1.0 August 1, 2007 2 135 West Davenport Street Rhinelander WI 54501 Phone: 866.441.7997 Fax: 866.278.0036 info@houstonst.com www.houstonst.com 3 Table of Contents

More information

Quick Setup Guide. WARNING! Connect this product to an AC power source whose voltage is within the range specified on the product's nameplate.

Quick Setup Guide. WARNING! Connect this product to an AC power source whose voltage is within the range specified on the product's nameplate. Thank you for purchasing the Raritan PX intelligent power distribution unit (PDU). The intended use of the Raritan PX is distribution of power to information technology equipment such as computers and

More information

HMM Series Mechanical Heat Meters

HMM Series Mechanical Heat Meters Mechanical Heat Meters Important: Retain these instructions These instructions shall be used by trained service personnel only If the equipment is used in a manner not specified by these instructions,

More information

Gillig EFAN Diagnostic Software User Guide & Troubleshooting Guide 8A Rev H Last Revised: 3/23/2017

Gillig EFAN Diagnostic Software User Guide & Troubleshooting Guide 8A Rev H Last Revised: 3/23/2017 Gillig EFAN Diagnostic Software User Guide & Troubleshooting Guide 8A003334 Rev H Last Revised: 3/23/2017 Table of Contents Section 1: Introduction... 2 Connector Definitions... 2 Location of Connectors...

More information

Acid Resistant AVC6000

Acid Resistant AVC6000 Accutrol, LLC Product Sheet Acid Resistant AVC6000 US Patents 6,991,177 & 7,543,759 Laboratories, Life Sciences, Healthcare Innovative features for the AVC6000! AHR Expo AWARDS WINNER Intuitive Graphical

More information

Subject Underhood G System Error Codes and Symptoms System or Parts affected

Subject Underhood G System Error Codes and Symptoms System or Parts affected System or Parts affected Index Underhood70G (V90Gxxx) System or Parts affected... 1 Overview... 1 Identifying your System... 1 Retrieving Logged Error Messages... 1 Error Messages... 3 Error Message Table...

More information

BAPI-Stat Quantum Temperature Sensor with Display, Button Setpoint, Fan or System Mode Control

BAPI-Stat Quantum Temperature Sensor with Display, Button Setpoint, Fan or System Mode Control Product Identification and Overview The BAPI-Stat Quantum style room temperature sensor features a large format LCD and pushbutton setpoint adjustment. Additional options include pushbutton override, fan

More information

ELD DRIVER GUIDE June 21, 2018

ELD DRIVER GUIDE June 21, 2018 ELD DRIVER GUIDE June 21, 2018 Contents Getting Started with PrePass ELD...4 Enroll in the PrePass ELD Program... 4 For a Carrier Enroll in the ELD Service... 4 For a Driver Get Driver Login Information...

More information

BAPI-Stat Quantum Temperature Sensor with Display and Slider Setpoint

BAPI-Stat Quantum Temperature Sensor with Display and Slider Setpoint Product Identification and Overview The BAPI-Stat Quantum style room temperature sensor features a large format LCD and slider setpoint adjustment. Additional options include button override and communication

More information

LED/Switch Modules Installation Instructions

LED/Switch Modules Installation Instructions LED/Switch Modules Installation Instructions Introduction This publication describes the installation procedure for the 4100-1288 LED/Switch Controller Card and the associated 4100-1275 to 1278, 4100-1280

More information

Installing a Programmed Fronius SCERT in a Managed AC Coupled system

Installing a Programmed Fronius SCERT in a Managed AC Coupled system Installing a Programmed Fronius SCERT in INTRODUCTION This document is included with Fronius SCERT PV Inverters that have been programmed. It applies only to units that have been programmed and are ready

More information

VFD. Variable Frequency Drive

VFD. Variable Frequency Drive VFD Variable Frequency Drive Mitsubishi Mitsubishi D700 VFD Installation Mitsubishi FR-D700 VFD User Manual Mitsubishi D700 Parallel Braking Resistors VFD Wiring Diagram - Apollo Mitsubishi VFD to Interpreter

More information

SERIES VAC Microprocessor Based Direct Spark Ignition Control FEATURES DESCRIPTION APPLICATIONS THE TOTAL SOLUTION FOR GAS IGNITION CONTROL

SERIES VAC Microprocessor Based Direct Spark Ignition Control FEATURES DESCRIPTION APPLICATIONS THE TOTAL SOLUTION FOR GAS IGNITION CONTROL SERIES 35-72 120 VAC Microprocessor Based Direct Spark Ignition Control 35.72.03 FEATURES Two Mounting Configurations Open Board With Stand-Off's - saves space and cost Potted - protection for washdown

More information

CurveMaker DFS v2.0 Dyna FS Ignition Programming Software

CurveMaker DFS v2.0 Dyna FS Ignition Programming Software CurveMaker DFS v2.0 Dyna FS Ignition Programming Software Contents Dynatek 164 S. Valencia St. Glendora, CA 91741 phone (626)963-1669 fax (626)963-7399 page 1) Installation 1 2) Overview 1 3) Introduction

More information

Pulsar Evolution 1500 / 1500 Rack 1100 / 1100 Rack 800 / 800 Rack 500 Rack

Pulsar Evolution 1500 / 1500 Rack 1100 / 1100 Rack 800 / 800 Rack 500 Rack www.mgeups.com MGE UPS SYSTEMS Pulsar Evolution 1500 / 1500 Rack 1100 / 1100 Rack 800 / 800 Rack 500 Rack Installation and user manual S T O P Y O U N O W L L W I N G I T H N O 34007117EN/AB - Page 1 Page

More information