1 PARKING Los Robles Garage A D O P T E D C A P I T A L I M P R O V E M E N T P R O G R A M B U D G E T F I S C A L Y E A R 2 1 7

2 FY Capital Improvement Program Description FY 216 FY 217 FY 218 FY 219 FY 22 FY DeLacey, Schoolhouse, and Marriott Garage Improvements - 1,48, 639, 25, 262, 257, FY FY 219 (72151) 2 Paseo, Marengo, Los Robles Garage Improvements - 6,737, 1,954, 25, 1,759, 2,774, FY FY 219 (72152) 3 Holly Street Garage Improvements FY FY 1,549, 91, 125, 448, 75, 219 (72153) 4 Del Mar Station Garage Improvements - FY FY 219 1,79, 43, 125, 12, 431, (72154) 5 Plaza Las Fuentes Garage Improvements FY , 25, 25, 175, 267, FY 219 (72155) 6 Revenue and Access Control System (PARCS) 2,, 2,, 7 Playhouse District Structure (7565) 18,, 113,366 17,886,634 31,715, 4,26,366 1,, 2,764, 3,84, 19,886, Summary

3 FY Capital Improvement Program DeLacey, Schoolhouse, and Marriott Garage Improvements - FY FY DeLacey, Schoolhouse, and Marriott Garage Improvements - FY FY 219 FY 216 FY 217 FY 218 FY 219 FY 22 FY 221 Off-Street Facilities Fund 1,48, 639, 25, 262, 257, 1,48, 639, 25, 262, 257, Marriott Garage DESCRIPTION: This project provides for ADA improvements and ongoing deferred maintenance and improvements to the DeLacey, Marriott, and Schoolhouse parking garages. This project will ensure the parking garage facilities in Old Pasadena meet current safety and maintenance standards. An assessment study of all three garages identified areas of deferred maintenance and needed repairs, including but not limited to: concrete; expansion joints; post tension systems; waterproofing; mechanical/electrical systems; plumbing; parking access revenue control systems (PARCS); fire protection; elevators; metal work; and painting. This project will address the identified areas as part of a ten-year maintenance effort. SCHEDULE: Work for FY 217 includes, but is not limited to: floor drain maintenance; fire extinguisher replacement; light fixture replacement; stair repairs; painting; ventilation maintenance; elevator repairs; and unfinished work from prior years. In addition, ADA improvements will also begin. RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Land Use Element of the General Plan by continuing to implement capital improvements which will maintain or rehabilitate infrastructure. It will also improve the parking conditions within the Central District Specific Plan area. HISTORY: This project was created and initially funded in FY 27 under project number This project was segmented into a mult-year phase starting in FY

4 FY Capital Improvement Program Paseo, Marengo, Los Robles Garage Improvements - FY FY Paseo, Marengo, Los Robles Garage Improvements - FY FY 219 FY 216 FY 217 FY 218 FY 219 FY 22 FY 221 Off-Street Facilities Fund 6,737, 1,954, 25, 1,759, 2,774, 6,737, 1,954, 25, 1,759, 2,774, Los Robles Garage DESCRIPTION: This project provides for ADA improvements, and ongoing deferred maintenance and improvements to the Los Robles, Marengo, and Paseo parking garages. This project will ensure the Los Robles, Marengo, and Paseo parking garage facilities meet current safety and maintenance standards. An assessment study identified areas of deferred maintenance and needed repairs, including but not limited to: concrete; expansion joints; post tension systems; waterproofing; mechanical/electrical systems; plumbing; parking access revenue control systems (PARCS); fire protection; elevators; metal work; and painting. This project will address the identified areas as part of a ten-year maintenance effort. SCHEDULE: Work for FY 217 includes, but is not limited to: expansion joint repair; floor drain maintenance; ventilation repairs and upgrades; fire extinguisher replacement; light fixture replacement; stair repairs; door replacement; signage repair; facade repairs; and unfinished work from prior years. In addition, ADA improvements will also begin. RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Land Use Element of the General Plan by continuing to implement capital improvements which will maintain or rehabilitate infrastructure. It will also improve the parking conditions within the Central District Specific Plan area. SPECIAL CONSIDERATION: The current workplan is contingent on City ownership of the garages. If the parking garages are sold, they will be sold as-is and no additional improvements or repairs will be completed. HISTORY: This project was created and received initial funding in FY 23 under project number This project was segmented into a multi-year phase starting in FY

5 FY Capital Improvement Program Holly Street Garage Improvements FY FY Holly Street Garage Improvements FY FY 219 FY 216 FY 217 FY 218 FY 219 FY 22 FY 221 Off-Street Facilities Fund 1,549, 91, 125, 448, 75, 1,549, 91, 125, 448, 75, Holly Street Garage DESCRIPTION: This project provides for ADA improvements, and ongoing deferred maintenance and improvements of the Holly Street parking garage. This project will ensure the Holly Street parking garage facility meets current safety and maintenance standards. An assessment study identified areas of deferred maintenance and needed repairs, including but not limited to: concrete; expansion joints; post tension systems; waterproofing; mechanical/electrical systems; plumbing; parking access revenue control systems (PARCS); fire protection; elevators; metal work; and painting. This project will address the identified areas as part of a ten-year maintenance effort. SCHEDULE: Work for FY 217 includes, but is not limited to: floor drain maintenance; fire extinguisher replacement; elevator repairs; stair repairs; and unfinished work from prior years. In addition, ADA improvements will also begin. RELATIONSHIP TO GENERAL PLAN: This project is consistent with the Public Facilities Element of the General Plan by encouraging a high level of maintenance of existing facilities. HISTORY: This project was created and received initial funding in FY 1996 under project number This project was segmented into a multi-year phase starting in FY

6 FY Capital Improvement Program Del Mar Station Garage Improvements - FY FY Del Mar Station Garage Improvements - FY FY 219 FY 216 FY 217 FY 218 FY 219 FY 22 FY 221 Off-Street Facilities Fund 1,79, 43, 125, 12, 431, 1,79, 43, 125, 12, 431, Del Mar Station Garage DESCRIPTION: This project provides for ADA improvements, and ongoing deferred maintenance and improvements to the Del Mar Gold Line Station parking garage. This project will ensure the Del Mar Station parking garage facility in Old Pasadena meets current safety and maintenance standards. An assessment study identified areas of deferred maintenance and needed repairs, including but not limited to: concrete; expansion joints; post tension systems; waterproofing; mechanical/electrical systems; plumbing; parking access revenue control systems (PARCS); fire protection; elevators; metal work; and painting. This project will address the identified areas as part of a ten-year maintenance effort. SCHEDULE: Work for FY 217 includes, but is not limited to: ventilation repairs and upgrades; stair repairs; wall repairs; painting; and unfinished work from prior years. In addition, ADA improvements will also begin. RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with Public Facilities element of the General Plan by encouraging a high level of maintenance of existing facilities. HISTORY: This project was created and initially funded in FY 211 under project number This project was segmented into a multi-year phase starting in FY

7 FY Capital Improvement Program Plaza Las Fuentes Garage Improvements FY FY Plaza Las Fuentes Garage Improvements FY FY 219 FY 216 FY 217 FY 218 FY 219 FY 22 FY 221 Off-Street Facilities Fund 942, 25, 25, 175, 267, 942, 25, 25, 175, 267, Plaza Las Fuentes Garage DESCRIPTION: This project provides for ADA improvements, and ongoing deferred maintenance and improvements to the Plaza Las Fuentes parking garage. This project will ensure the Plaza Las Fuentes parking garage facility meets current safety and maintenance standards. An assessment study identified areas of deferred maintenance and needed repairs, including but not limited to: concrete; expansion joints; post tension systems; waterproofing; mechanical/electrical systems; plumbing; parking access and revenue control systems (PARCS); fire protection; elevators; metal work; and painting. This project will address the identified areas as part of a ten-year maintenance effort. SCHEDULE: Work for FY 217 includes, but is not limited to: floor drain maintenance; ventilation repairs and upgrades; light fixture replacement; stair repairs; door replacement; painting; and unfinished work from prior years. In addition, ADA improvements will also begin. RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with the Public Facilities Element Objective 5 of the General Plan by providing a high level of maintenance of existing facilities. HISTORY: This project was created and initially funded in FY 215 as a multi-year phase project. 6.5

8 FY Capital Improvement Program Revenue and Access Control System (PARCS) 6 Revenue and Access Control System (PARCS) FY 216 FY 217 FY 218 FY 219 FY 22 FY 221 Unfunded 2,, 2,, 2,, 2,, Revenue and Access Control System DESCRIPTION: This project provides for the acquisition of a new parking access and revenue control system (PARCS) in the City's eight garages: DeLacey; Del Mar Station; Holly Street; Los Robles; Marengo; Marriott; Paseo; and Schoolhouse. JUSTIFICATION: Existing PARCS equipment is approaching or at the end of its useful life and needs to be upgraded. This project will provide for one consistent PARCS through most of the City's parking garages. The need for a universal PARCS was identified in a parking garage audit and will improve overall operations and efficiency in the garages. SCHEDULE: This project will begin when funds are identified. RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with Land Use Element Policy 2.7 (Civic and Community Services) by providing diverse uses and services supporting Pasadena s residents such as facilities for civic governance and administration, public safety (police and fire), seniors and youth, community gatherings, and comparable activities. HISTORY: This project was created in FY 217 and is currently unfunded. 6.6

9 FY Capital Improvement Program Playhouse District Structure Playhouse District Structure FY 216 FY 217 FY 218 FY 219 FY 22 FY 221 Pasadena Community Development Commission 113, ,366 Unfunded 17,886,634 17,886,634 18,, 113,366 17,886,634 Playhouse District DESCRIPTION: This project provides for the construction of a parking structure for approximately 4 vehicles in the Playhouse District. JUSTIFICATION: This structure will fill a parking deficiency consistent with the 25 City Council adopted Playhouse Study and will promote economic vitality to this important district. SCHEDULE: Additional work will begin when funds become available. RELATIONSHIP TO THE GENERAL PLAN: This project is consistent with Objective 2 of the Public Facilities Element of the General Plan by better utilizing public land that currently houses a surface parking lot to construct a much needed parking structure to serve the Playhouse District. HISTORY: This project was created and received initial funding in FY 22. In FY 212, design work for an underground structure at the Madison Lot was completed. In addition, $286,634 of redevelopment funding was removed from this project in FY 212 as this funding source was no longer available. The $113,366 of redevelopment funds remaining on this project was spent prior to the loss of redevelopment dollars. 6.7

PARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR

PARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR CIP Title FINAL2:Layout 1 7/27/17 3:35 PM Page 9 PARKING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 218 FY 218-222 Capital Improvement Program Description FY 217 FY 218 FY 219 FY 22 FY 221 FY 222

More information

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING. Underground Vault

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING. Underground Vault CIP_215 Title Pages 217:Layout 1 8/16/16 4:2 PM Page 7 STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING Underground Vault A D O P T E D C A P I T A L I M P R O V E M E N T P R O G R A M B U D G E T

More information

STREET LIGHTING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR

STREET LIGHTING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR CIP Title FINAL2:Layout 1 7/27/17 3:34 PM Page 6 STREET LIGHTING ADOPTED CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 218 FY 218-222 Capital Improvement Program Description FY 217 FY 218 FY 219 FY 22 FY 221

More information

FY Capital Improvement Program Street Lighting

FY Capital Improvement Program Street Lighting FY 219-223 Capital Improvement Program FY 218 FY 219 FY 22 FY 221 FY 222 FY 223 1 2 3 4 5 6 In-Fill and Repair and/or Replacement of Existing Systems FY 216-22 (74413) High Voltage Series Street Light

More information

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING

STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING CIP_215 Title Pages 216:Layout 1 6/22/15 1:48 PM Page 19 STREET LIGHTING AND ELECTRICAL SYSTEM UNDERGROUNDING Rain or Shine WORK By Kent Pulver FY 216-22 Capital Improvement Program Description FY 215

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER May 15, 2006 TO: CITY COUNCIL Through: FROM: FINANCE COMMITTEE Cynthia J. Kurtz, City Manager SUBJECT: Recommended Fiscal Year 2007 to 2012 CIP Budget It is my pleasure to present

More information

street LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932

street LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932 street LIGHtING Display of Street Light Equipment at the Civic Auditorium Exhibition Hall, 1932 A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 1 9 FY 219-223 Capital

More information

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report

Office of Transportation Bureau of Traffic Management Downtown Parking Meter District Rate Report Office of Transportation Bureau of Traffic Management 1997 Downtown Parking Meter District Rate Report Introduction The City operates approximately 5,600 parking meters in the core area of downtown. 1

More information

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt

City of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year

More information

PUBLIC FACILITIES DIRECTORY

PUBLIC FACILITIES DIRECTORY PUBLIC FACILITIES DIRECTORY PROPOSED TOWN INFRASTRUCTURE PROJECT DIRECTORY 2002 Town Beautification E 6 2105 Old Library Re-use E 8 2103 HVAC Upgrades Old Library E 10 2302 Building Replacement at Corporation

More information

7000 Series Railcar Program Overview

7000 Series Railcar Program Overview Finance, Administration and Oversight Committee Information Item IV-B November 6, 2008 7000 Series Railcar Program Overview Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Capital Needs Assessment Riders Advisory Council July2, 2008

Capital Needs Assessment Riders Advisory Council July2, 2008 Capital Needs Assessment 2011-2020 Riders Advisory Council July2, 2008 1 Outline I. Capital Improvement Plan History II. Capital Improvement Plan Update III. Capital Needs Assessment State of Good Repair

More information

Upgrade to Compressed Natural Gas (CNG) Fueling Station at 630 Stoney Drive, South Pasadena CA. Contract No. ML09009A

Upgrade to Compressed Natural Gas (CNG) Fueling Station at 630 Stoney Drive, South Pasadena CA. Contract No. ML09009A Upgrade to Compressed Natural Gas (CNG) Fueling Station at 630 Stoney Drive, South Pasadena CA Contract No. ML09009A City of South Pasadena, CA July 15, 2014 Prepared for the Mobile Source Air Pollution

More information

Parking Utility Function: Public Works & Transportation

Parking Utility Function: Public Works & Transportation Agency Overview 82 Agency Mission The mission of the Parking Utility is to provide safe, convenient and affordable parking to the City s citizens and visitors, consistent with City Transportation policies.

More information

2013 Capital Budget Capital Improvement Program

2013 Capital Budget Capital Improvement Program 213 Capital Improvement Program Agency Name: Parking Utility Agency Number: 58 Capital Budget Future Year Estimates Project Name 213 214 215 216 217 218 1 Parking Garage Repairs $ 927, $ 946, $ 962, $

More information

Capital and Strategic Planning Committee. Item III - A May 10, FY2018 Third Quarter Capital Program Updates

Capital and Strategic Planning Committee. Item III - A May 10, FY2018 Third Quarter Capital Program Updates Capital and Strategic Planning Committee Item III - A May 10, 2018 FY2018 Third Quarter Capital Program Updates Page 4 of 44 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

Exhibit 1. Background. Authorizing Legislation

Exhibit 1. Background. Authorizing Legislation Background Authorizing Legislation The Boulder Canyon Project Act (43 U.S.C. 617, et seq.), enacted by the U.S. Congress in 1928 (The 1928 Act), authorized the Secretary of the Interior to spend up to

More information

CTA Capital Construction Update December 12, 2006

CTA Capital Construction Update December 12, 2006 Red Line/Dan Ryan Blue Line Block 37 Washington Subsurface Station at Block 37 Block 37 Tracks Randolph Red Line Brown Line Howard CTA Capital Construction Update December 12, 2006 1 Capital Construction

More information

Pump Station 7 Improvements

Pump Station 7 Improvements Project Business Case ID: C04 2/18/2017 Pump Station 7 Project Purpose: The purpose of this project is to ensure that Pump Station 7 continues to operate in an efficient and effective manner following

More information

TAUSSIG. Public Finance Public Private Partnerships Urban Economics. Newport Beach Riverside San Francisco Dallas ASSOCIATES, INC.

TAUSSIG. Public Finance Public Private Partnerships Urban Economics. Newport Beach Riverside San Francisco Dallas ASSOCIATES, INC. DAVID TAUSSIG & ASSOCIATES, INC. MONTECITO ESTATES PUBLIC IMPROVEMENT DISTRICT FISCAL YEAR 2015-2016 FINAL BUDGET JULY 27, 2015 Prepared on Behalf of: MONTECITO ESTATES PUBLIC IMPROVEMENT DISTRICT Department

More information

Brownfields to Brightfields

Brownfields to Brightfields Lori Ribeiro, Brockton Brightfields Consultant LRibeiro@bluewavestrategies.com (781) 648-2605 Brownfields to Brightfields Revitalizing Brockton by Converting a Former Manufactured Gas Plant to a Solar

More information

Executive Summary EXECUTIVE SUMMARY Parking Issues Trenton Downtown Parking Policy and Sidewalk Design Standards E.S. Page 1 Final Report 2008

Executive Summary EXECUTIVE SUMMARY Parking Issues Trenton Downtown Parking Policy and Sidewalk Design Standards E.S. Page 1 Final Report 2008 EXECUTIVE SUMMARY A walkable environment that accommodates market demand while minimizing the negative impacts of growth is an important element in promoting the City s downtown revitalization. There are

More information

Metropolitan Council Budget Overview SFY

Metropolitan Council Budget Overview SFY Metropolitan Council Budget Overview SFY 2016-2017 H T t ti C itt House Transportation Committee February 4, 2015 Transit connects us to the places that matter Transportation Needs Grow as the Region Grows

More information

Paid Parking at Park & Ride Lots: Framing the Issues. Capital Programs Committee May 2014

Paid Parking at Park & Ride Lots: Framing the Issues. Capital Programs Committee May 2014 Paid Parking at Park & Ride Lots: Framing the Issues Capital Programs Committee May 2014 Outline Current Status Industry Review DART Case Study Issues Alternatives Mechanics 2 Current Status: All Lots

More information

Summer Reliability Assessment Report Electric Distribution Companies Perspective

Summer Reliability Assessment Report Electric Distribution Companies Perspective Energy Association of Pennsylvania Summer Reliability Assessment Report Electric Distribution Companies Perspective to the Pennsylvania Public Utility Commission June 9, 2011 Harrisburg, PA Terrance J.

More information

El Metro Operations Proposed FY Budget

El Metro Operations Proposed FY Budget Laredo Transit Management Inc.- El Metro El Metro Operations Proposed FY 2017-2018 Budget Claudia San Miguel Acting General Manager Mission Statement To provide a safe, reliable, cost effective, and efficient

More information

Alameda Point Electric Infrastructure Improvements Public Utilities Board Update May 15, 2017

Alameda Point Electric Infrastructure Improvements Public Utilities Board Update May 15, 2017 Alameda Point Electric Infrastructure Improvements Public Utilities Board Update May 15, 2017 Presentation Overview I. Mutual Goals II. Alameda Point Overview III. Incremental Development Process and Project

More information

Balancing the Transportation Needs of a Growing City

Balancing the Transportation Needs of a Growing City Balancing the Transportation Needs of a Growing City FY 2019 and FY 2020 Capital Budget SFMTA Board Meeting Ed Reiskin, Director of Transportation April 3, 2018 1 FY 2019-23 Capital Improvement Program

More information

Parking Management Element

Parking Management Element Parking Management Element The State Transportation Planning Rule, adopted in 1991, requires that the Metropolitan Planning Organization (MPO) area implement, through its member jurisdictions, a parking

More information

CORE AREA SPECIFIC PLAN

CORE AREA SPECIFIC PLAN only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is

More information

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015

Chicago to St. Louis High-Speed Rail. IDOT District 8 Crossings. July 29, 2015 Chicago to St. Louis High-Speed Rail IDOT District 8 Crossings July 29, 2015 1 History: Chicago-St. Louis Corridor» IDOT has actively developed the Chicago to St. Louis corridor since the mid 1980 s» In

More information

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200

The 2017 Program will be comprised of the following: Long Term Projects $15,295,100 Short Term Projects 18,000,100 TOTAL $33,295,200 PITTSBURGH SCHOOL DISTRICT 2017/2023 CAPITAL PROGRAM The following is the proposed 2017 / 2023 Capital Program. These projects have been identified as a result of Board Actions, input from Facilities,

More information

EXECUTIVE SUMMARY. Introduction

EXECUTIVE SUMMARY. Introduction EXECUTIVE SUMMARY Introduction The purpose of this study is to ensure that the Village, in cooperation and coordination with the Downtown Management Corporation (DMC), is using best practices as they plan

More information

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas

Tax Increment Reinvestment Zone #1 City of Kaufman, Texas Tax Increment Reinvestment Zone #1 City of Kaufman, Texas PRELIMINARY PROJECT AND FINANCING PLAN DECEMBER 2015 Foreword Table of Contents Introduction TIRZ Boundary Current Conditions & Ownership Proposed

More information

Draft Results and Recommendations

Draft Results and Recommendations Waco Rapid Transit Corridor (RTC) Feasibility Study Draft Results and Recommendations Chris Evilia, Director of Waco Metropolitan Planning Organization Allen Hunter, General Manager Waco Transit System

More information

SUBJECT: CONTRACT C080S, HOIST REPLACEMENT AT BUS MAINTENANCE DIVISIONS 3, 5, 9, 10, AND 18, PETERSON HYDRAULICS AND ROTARY LIFT, A JOINT VENTURE

SUBJECT: CONTRACT C080S, HOIST REPLACEMENT AT BUS MAINTENANCE DIVISIONS 3, 5, 9, 10, AND 18, PETERSON HYDRAULICS AND ROTARY LIFT, A JOINT VENTURE æ Metro Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA 9 012-2952 3~ 213-922.2000 Tel metro. net OPERATIONS COMMITTEE NOVEMBER 15, 2007 SUBJECT: CONTRACT C080S, HOIST REPLACEMENT

More information

Minnesota Avenue Station Parking Garage Repair Project

Minnesota Avenue Station Parking Garage Repair Project Finance & Administration Committee Action Item III-B July 10, 2014 Minnesota Avenue Station Parking Garage Repair Project Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

AWARD CONTRACT FOR LINE BREAKERS

AWARD CONTRACT FOR LINE BREAKERS @ Metro Metropolitan Transportation Authority 45 One Gateway Plaza 213.922.2000 Los Angeles, CA 90012-2952 metro.net OPERATIONS COMMITTEE JULY 16,2009 SUBJECT: LINE BREAKERS ACTION: AWARD CONTRACT FOR

More information

City Council. DATE: October 6, SUBJECT: PCR # B-4 Culinary Arts and Hospitality District Text

City Council. DATE: October 6, SUBJECT: PCR # B-4 Culinary Arts and Hospitality District Text TO: City Council DATE: SUBJECT: PCR #16-008 B-4 Culinary Arts and Hospitality District Text BACKGROUND PCR #16-009 Food Truck Regulations PCR #16-010 B-4 Culinary Arts and Hospitality District Rezoning

More information

FY 2018 Recommended Wake Transit Work Plan

FY 2018 Recommended Wake Transit Work Plan FY 2018 Recommended Wake Transit Work Plan FY 2018 Capital Budget & Multi-Year Capital Improvement Program 49 GOTRIANGLE FISCAL YEAR 2018 TRIANGLE TAX DISTRICT -- WAKE CAPITAL FUND ORDINANCE 2018 000X

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Parking Utility Agency Overview

Parking Utility Agency Overview Agency Overview Agency Mission The mission of the Parking Utility is to provide safe, convenient and affordable parking to the City s residents and visitors, consistent with City transportation policies.

More information

Downtown Community Plan Adopted April 2006

Downtown Community Plan Adopted April 2006 Downtown Community Plan Adopted April 2006 Chapter 5.8 Goals and Policies: Sustainable Development Far Bonus Program: Eco-Roof Urban plazas, street activation and Neighborhood Centers Suburban vs. Urban

More information

Engaging Communities on Cleaning Up Contaminated Sites: EPA s Brownfields Program

Engaging Communities on Cleaning Up Contaminated Sites: EPA s Brownfields Program Engaging Communities on Cleaning Up Contaminated Sites: EPA s Brownfields Program September 11, 2018 2018 AAPA Energy and Environment Seminar What Is A Brownfield? What Is A Brownfield? What Is A Brownfield?

More information

Oakland County Board of Commissioners General Government Committee April 23, SMART Services in Oakland County

Oakland County Board of Commissioners General Government Committee April 23, SMART Services in Oakland County Oakland County Board of Commissioners General Government Committee April 23, 2018 SMART Services in Oakland County Today s Presentation SMART in Oakland County Promises Kept Fixed Route Buses Small Buses

More information

Update on Transportation Activities in Fairfax County

Update on Transportation Activities in Fairfax County Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation Association June 13, 2018 Tom Biesiadny, Director Fairfax County Continuing Project Implementation

More information

Capital Improvement Program FY Adopted: June 17, 2015

Capital Improvement Program FY Adopted: June 17, 2015 Capital Improvement Program FY 2015-2020 Adopted: June 17, 2015 Capital Improvement Program Guide Overview The fiscal years 2015-2020 Capital Improvement Program ( CIP ) is a planning tool that identifies

More information

Appendix C. Parking Strategies

Appendix C. Parking Strategies Appendix C. Parking Strategies Bremerton Parking Study Introduction & Project Scope Community concerns regarding parking impacts in Downtown Bremerton and the surrounding residential areas have existed

More information

Demographics and Sales

Demographics and Sales Demographics and Sales What is an E-Bike? Almost identical to a traditional bicycle in appearance Small electric motor and battery to provide motorized assistance (pedal or throttle), up to 750 w (the

More information

Purpose of Capital Improvement Program

Purpose of Capital Improvement Program 1 Purpose of Capital Improvement Program o To identify capital projects and funding sources. o To strategically plan and prioritize projects within a budget to maximize the efficient use of funds. o Preserve

More information

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project

MOTION NO. M Preferred Alternative for the Puyallup Station Access Improvement Project MOTION NO. M2014 64 Preferred Alternative for the Puyallup Station Access Improvement Project MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee Board PROPOSED ACTION 8/14/14 8/28/14 Recommendation

More information

Transit Maintenance Equipment. Maintenance Facilities FY

Transit Maintenance Equipment. Maintenance Facilities FY Transit Maintenance Equipment TIP ID: 5861 Fed/St/Loc Title: Maintenance Equipment 2015-2020 Local 0/0/100 4,300 e 42,635 e 58,414 e 41,428 e 35,820 e 15,805 e 198,401 PRIIA 50/0/50 24,290 e 27,144 e 20,409

More information

Transit Vehicle (Trolley) Technology Review

Transit Vehicle (Trolley) Technology Review Transit Vehicle (Trolley) Technology Review Recommendation: 1. That the trolley system be phased out in 2009 and 2010. 2. That the purchase of 47 new hybrid buses to be received in 2010 be approved with

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 11, 2018 To: The Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee

More information

FOR IMMEDIATE RELEASE January 17, CONTACT: Mayor s Press Office

FOR IMMEDIATE RELEASE January 17, CONTACT: Mayor s Press Office FOR IMMEDIATE RELEASE January 17, 2012 CONTACT: Mayor s Press Office 312.744.3334 press@cityofchicago.org MAYOR EMANUEL OPENS NEWLY-RENOVATED GRAND AVENUE RED LINE STATION Announces New Green Line Station

More information

City of Roseville Budget Detail by Function: Tax-Supported Program

City of Roseville Budget Detail by Function: Tax-Supported Program City Council Personal Services 40,044 40,044 42,885 42,885-0.0% Other Services & Charges 137,979 127,257 153,230 162,490 9,260 6.0% City Council Program Total $ 178,023 $ 167,301 $ 196,115 $ 205,375 $

More information

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX:

CITY OF BLAINE 435 Martin Street, #3000 BLAINE, WA BUS: FAX: 435 Martin Street, #3000 BLAINE, WA 98230 BUS: 360.332.8311 FAX: 360.332.8330 www.cityofblaine.com September 10, 2018 To: From: Subject: City Council Department Heads Michael Jones, City Manager Jeffrey

More information

San Fernando Valley Service Changes For December 2015

San Fernando Valley Service Changes For December 2015 Los Angeles County Metropolitan Transportation Authority San Fernando Valley Service Changes For December 2015 Presented by Israel Marin Presented by Israel Marin Bus Stop Optimization Plan Background:

More information

Toward the Realization of Sustainable Mobility

Toward the Realization of Sustainable Mobility GIES 2008 Toward the Realization of Sustainable Mobility March 13, 2008 Toyota Motor Corporation Senior Technical Executive Hiroyuki Watanabe 1 CO 2 Emission from Transportation Sector Distribution by

More information

Restoration of Historic Streetcar Services in Downtown Los Angeles

Restoration of Historic Streetcar Services in Downtown Los Angeles Restoration of Historic Streetcar Services in Downtown Los Angeles Alternatives Analysis Community Update Meeting August 2, 2011 Introduction Key players Local lead agency: Metro Federal lead agency: Federal

More information

WHITE POINT LANDSLIDE

WHITE POINT LANDSLIDE Gary Lee Moore, PE, ENV SP Alfred L. Mata, P.E., Deputy City Engineer WHITE POINT LANDSLIDE Status Report Recommended Immediate Measures (Estimate $12.96 Million) FUNDING APPROVED BY CITY COUNCIL ON: AUGUST

More information

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1

Proposed FY Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 Proposed FY 2019-2023 Capital Improvement Program (CIP) March 5, 2018 Capital Planning Committee 1 The Capital Improvement Program is: A fiscally constrained, 5-year program of capital projects An implementation

More information

Case of Toyama City. Public Transport Planning and Development toward Resilience. Mayor Masashi Mori Toyama City, Japan RESILIENT CITY TOYAMA

Case of Toyama City. Public Transport Planning and Development toward Resilience. Mayor Masashi Mori Toyama City, Japan RESILIENT CITY TOYAMA Public Transport Planning and Development toward Resilience Case of Toyama City Mayor Masashi Mori Toyama City, Japan TOYAMA City Partnership RESILIENT CITY TOYAMA Rockefeller 100 Resilient Cities -1-

More information

Region: Year Total Expense Total Revenue Difference , , Prior Years

Region: Year Total Expense Total Revenue Difference , , Prior Years Project Number: 21-200 ADA Door & Restroom Retrofits at Various Facilities - Phase I Renovation or Rehabilitation Year Identified: 2016 Start Date: Est. Completion Date: Upgrade or replace existing entrance

More information

CITY OF DECATUR, TEXAS Development Services 1601 S. State Street Decatur, TX (940) voice (940) fax

CITY OF DECATUR, TEXAS Development Services 1601 S. State Street Decatur, TX (940) voice (940) fax CITY OF DECATUR, TEXAS Development Services 1601 S. State Street Decatur, TX 76234 (940) 393-0250 voice (940) 626-4629 fax AGENDA Planning and Zoning Commission and City Council Joint Workshop* Monday,

More information

Chapter PARKING REGULATIONS

Chapter PARKING REGULATIONS 17.112.010 Chapter 17.112 PARKING REGULATIONS Sections: 17.112.010 Scope of Regulations Applicability. 17.112.020 Schedule of Off-Street Parking Requirements. 17.112.030 Off-Street Loading Requirements.

More information

Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan

Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan Customer Services, Operations, and Safety Committee Board Information Item III-E May 13, 2010 Bus Fleet Plan Page 72 of 96 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM MIAMI-DADE DEPT OF TRANSPORTATION AND PUBLIC WORKS TPO Facility/ Name Prior s Detailed Description TA000100 MDT - DADE / MONROE EXPRESS BUS ROUTE COMMUTER TRANS ASSISTANCE C-6 $12,978 $7,385 4180513, 4409141 Operating assistance of Dade/Monroe Express

More information

CITY OF PASADENA TRANSPORTATION

CITY OF PASADENA TRANSPORTATION Page 1 of 9 MISSION STATEMENT The Department of Transportation is committed to achieving the safe and sustainable movement of people and goods within Pasadena, while concurrently ensuring a balance between

More information

Capital Improvement Plan, Summary, All '10/'11. City of St. Albans, Vermont Contact Fire Chief. Fire -E-1. Description. Justification.

Capital Improvement Plan, Summary, All '10/'11. City of St. Albans, Vermont Contact Fire Chief. Fire -E-1. Description. Justification. Department Fire Department City of St. Albans, Vermont Contact Fire Chief Fire -E-1 Useful Life 15 years Project Name Engine 1 Debt Service 1 Urgent Ongoing debt payments for Engine 1. Final payment 2014.

More information

Proposed Downtown Miami Link

Proposed Downtown Miami Link March 30, 2016 Proposed Downtown Miami Link A PUBLIC PRIVATE PARTNERSHIP Presented to: Secretary Boxold, FDOT Presented by: Jack Stephens, Executive Director, SFRTA March 30, 2016 Downtown Miami Link Costs

More information

Capital Improvement Plan

Capital Improvement Plan PROGRAM DESCRIPTION: The represents City Council approved projects and includes each of the project's total costs and the estimated funding requirements for the next five years. Projects are funded by

More information

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description

CITY OF ELMIRA, NEW YORK ADOPTED ADOPTED ADOPTED ADOPTED ADOPTED Description 2017 CAPITAL BUDGET FUNDING SOURCES State & Other Government Funding CHIPS Funding (NYSDOT) 791,000 791,000 791,000 791,000 791,000 PAVE NY (NYSDOT) 172,153 172,153 172,153 172,153 - WINTER RECOVER/SNOW

More information

CAPITAL AREA RURAL TRANSPORTATION SYSTEM

CAPITAL AREA RURAL TRANSPORTATION SYSTEM CAPITAL AREA RURAL TRANSPORTATION SYSTEM The Capital Area Rural Transportation System (CARTS) is a political subdivision of Texas that Texas Transportation Code Chapter 458 authorized to establish in 1978,

More information

CHAPTER 5 CAPITAL ASSETS

CHAPTER 5 CAPITAL ASSETS CHAPTER 5 CAPITAL ASSETS This chapter describes the capital assets of GCTD, including revenue and nonrevenue vehicles, operations facilities, passenger facilities and other assets. VEHICLE REVENUE FLEET

More information

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014

Midtown Corridor Alternatives Analysis. Policy Advisory Committee Meeting February 12, 2014 Midtown Corridor Alternatives Analysis Policy Advisory Committee Meeting February 12, 2014 Today s Agenda Introductions Outreach efforts and survey results Other updates since last meeting Evaluation results

More information

To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin AGM-Customer Resources. From: Kelly Birdwell Brezovec Approved by: /s/

To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin AGM-Customer Resources. From: Kelly Birdwell Brezovec Approved by: /s/ AGENDA ITEM NO.: 5.A.1 MEETING DATE: 10/16/2017 ADMINISTRATIVE REPORT NO.: 2018-15 To: Honorable Public Utilities Board Submitted by: /s/ Rebecca Irwin AGM-Customer Resources From: Kelly Birdwell Brezovec

More information

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION

6/6/2018. June 7, Item #1 CITIZENS PARTICIPATION June 7, 2018 Item #1 CITIZENS PARTICIPATION 1 Item #2 APPROVAL OF MINUTES Item #3 TRAC GOALS, FRAMEWORK & AGENDA REVIEW 2 COMMITTEE GOALS Learn about Southern Nevada s mobility challenges, new developments

More information

WELCOME Open House on Parking

WELCOME Open House on Parking WELCOME Open House on Parking Tonight we re presenting our policy responses for your input on how to best manage our public parking. Parking is a shared community resource. To best serve everyone in our

More information

YUKON DEVELOPMENT CORPORATION

YUKON DEVELOPMENT CORPORATION YUKON DEVELOPMENT CORPORATION 2 http://www.ydc.yk.ca YUKON DEVELOPMENT CORPORATION ANNUAL REPORT 2016 TABLE OF CONTENTS Message from the Chair...4 Message from the President and Chief Executive Office...

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: December 16, 2009 SUBJECT: CANADIAN CONTENT BUS PROCUREMENTS ACTION ITEM RECOMMENDATION It is recommended that the Commission

More information

Solid Waste Management

Solid Waste Management Solid Waste Management Options and Recommendations A project of the Environmental Policy Advisory Committee of PACOG Purpose Give overview of considerations Show possible Courses of Action Report recommendations

More information

Welcome. Green Line in Your Community

Welcome. Green Line in Your Community Welcome Green Line in Your Community Today's session will provide you with information about Administration's recommendation for connecting the Green Line in the Beltline to Victoria Park and Inglewood/Ramsay

More information

P2000 RAIL CAR AUXILIARY INVERTERS

P2000 RAIL CAR AUXILIARY INVERTERS 031160722012000 REGULAR BOARD MEETING DECEMBER 4, 2003 Metropolitan Transportation Authority SUBJECT: ACTION: P2000 RAIL CAR AUXILIARY INVERTERS AWARD CONTRACT FOR AUXlLARY INVERTERS One Gateway Plaza

More information

CITY OF OAKLAND INTRODUCTION

CITY OF OAKLAND INTRODUCTION CITY OF OAKLAND CITY HALL ONE FRANK OGAWA PLAZA 3RD FLOOR OAKLAND CA 94612 City Administrator s ADA Programs Division (510) 238-4754 TDD: (510) 238-2007 : January 4, To: Mayor s Commission on Persons with

More information

Purpose of Presentation

Purpose of Presentation New Mexico Recycling & Solid Waste Conference Solid Waste Assessment & Management Study for Santa Fe Solid Waste Management Agency, City of Santa Fe and Santa Fe County September 24, 2014 Presented by:

More information

Options for Scenario Five Mileage Fee (DMV Collection)

Options for Scenario Five Mileage Fee (DMV Collection) Options for Scenario Five Mileage Fee (DMV Collection) Mileage data is uploaded to Department of Motor Vehicles locations for fee calculation and payment as a condition of registering passenger vehicles.

More information

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion

Link LRT: Maintenance Bases, Vehicles and Operations for ST2 Expansion Project Number SYS-LRT Subareas All Primary Mode Impacted Link Facility Type Link Service Version Number 4.0 Date Last Modified 7/24/2008 Project Locator Map Short Project Description Construct new light

More information

Executive Summary. DC Fast Charging. Opportunities for Vehicle Electrification in the Denver Metro area and Across Colorado

Executive Summary. DC Fast Charging. Opportunities for Vehicle Electrification in the Denver Metro area and Across Colorado Opportunities for Vehicle Electrification in the Denver Metro area and Across Colorado Overcoming Charging Challenges to Maximize Air Quality Benefits The City and County of Denver has set aggressive goals

More information

FIVE-YEAR CAPITAL IMPROVEMENT PLAN

FIVE-YEAR CAPITAL IMPROVEMENT PLAN FIVE-YEAR CAPITAL IMPROVEMENT PLAN 147 OVERVIEW Purpose of the Capital Improvement Plan A Capital Improvement Plan (CIP) is a guide to efficiently and effectively provide for public infrastructure and

More information

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1

Transportation. Background. Transportation Planning Goals. Level of Service Analysis 5-1 Transportation portion of the city s stormwater utility, and state road and fuel taxes. Background The transportation needs of the City of Lacey and its planning areas are met by a growing multimodal network

More information

Colorado Legislative Council Staff Fiscal Note STATE REVISED FISCAL IMPACT (replaces fiscal note dated March 21, 2013)

Colorado Legislative Council Staff Fiscal Note STATE REVISED FISCAL IMPACT (replaces fiscal note dated March 21, 2013) Drafting Number: Prime Sponsor(s): Colorado Legislative Council Staff Fiscal Note STATE REVISED FISCAL IMPACT (replaces fiscal note dated March 21, 2013) LLS 13-0800 Rep. Duran; Singer Sen. Johnston; Ulibarri

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM

CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: March 26, 2013 CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM To: From: The Honorable City Council c/o City Clerk, Room 395 Attention: Honorable Mitchell Englander, Chair, Public Safety Committee

More information

To: Honorable Public Utilities Board Submitted by: Senior Energy Resources Analyst Deborah Whiteman Senior Energy Resources Analyst Approved by:

To: Honorable Public Utilities Board Submitted by: Senior Energy Resources Analyst Deborah Whiteman Senior Energy Resources Analyst Approved by: AGENDA ITEM NO.: 5.G.1 MEETING DATE: 07/16/2018 ADMINISTRATIVE REPORT NO.: 2018-73 To: Honorable Public Utilities Board Submitted by: /S/ Vidhi Chawla AGM-Energy Resource Planning From: Alan Hanger Senior

More information

Joe Butler owns both full electric and hybrid electric vehicles since His fully electric EV became their primary vehicle in 2016.

Joe Butler owns both full electric and hybrid electric vehicles since His fully electric EV became their primary vehicle in 2016. Rate Mitigation Review Public Utilities Board P.O. Box 21040 St. John s NL A1A 5B2 Submission for Rate Mitigation Review Prepared by Drive Electric NL Thursday, January 17, 2019 Introduction Drive Electric

More information

T OWN OF LOS GATOS CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEAR S 2015/ /20

T OWN OF LOS GATOS CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEAR S 2015/ /20 T OWN OF LOS GATOS C A L I F O R N I A CAPITAL IMPROVEMENT PROGRAM BUDGET FISCAL YEAR S - Cover Photo: Ken Benjamin, TOWN OF LOS GATOS CALIFORNIA PROPOSED Capital Improvement Program for Fiscal Years July

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

Capital Improvement Program Overview

Capital Improvement Program Overview Capital Improvement Program Overview A Capital Improvement Plan (CIP) is a multiyear plan that provides a planned and programmed approach to utilizing the City s financial resources in the most efficient

More information