VARIABLE TRANSFERS 2/11/2014. DTC Task Force. Ramu Ramanathan 2/10/2014 1

Size: px
Start display at page:

Download "VARIABLE TRANSFERS 2/11/2014. DTC Task Force. Ramu Ramanathan 2/10/2014 1"

Transcription

1 VARIABLE TRANSFERS 2/11/2014 DTC Task Force Ramu Ramanathan 2/10/2014 1

2 MW Transfer WHAT IS VARIABLE TRANSFER? VT 1 ST VT 2 Time Static Transfer (ST): Conventional transfers across a path / flowgate, usually made up of fixed hourly schedules between defined PORs (Points of Receipt) and PODs (Points of Delivery) Variable Transfer (VT): Refers to the physical variations in actual power flows across a path / flowgate that are generally unpredictable and repetitive during a defined time period (e.g. 30 minutes). 2/10/2014 2

3 WHY VARIABLE TRANSFER LIMIT IS NEEDED IN NW? No ISO or RTO in the region. No one coordinate and control all the reactive devices in real time in the region to maintain the voltage profile. Voltage and transient stability are not yet studied in real time and proper control actions are not implemented. Many shunt devices and transfer taps are not automatically controlled to maintain proper voltage profile. RAS is manually armed. Lot more Variable Energy Resources are integrated in NW 2/10/2014 3

4 DRIVERS FOR VARIABLE TRANSFERS BPA 2010 Peak Load = 9,794 MW 2013 Peak Load = 10,639 MW 2010 Spring Min Load = 4,315 MW 2013 Spring Min Load = 4,424 MW Dec 2010 Installed Wind Gen = 3,297 MW Dec 2013 Installed Wind Gen = 5,000 MW Additional DTC Requests 2014 CAISO/PAC Energy Imbalance market (EIM) 2015/2016 NWPP EIM 2/10/2014 4

5 WHAT LED US HERE? What is DTC? Approach Unanswered Questions? DTC = Dynamic Transfer Capability Customer Impact Acceptable? Equipment Impact Acceptable? Operating Point Reliable? Allowable voltage variation? Elements that limit DTC? Increased wear and tear on equipment? How DTC limits change in real-time? 2/10/2014 5

6 FACTORS INFLUENCING VARIABLE TRANSFERS 2/10/2014 6

7 Transmission System Voltage (pu) DISTRIBUTION IMPACT MODELING ANSI DISTRIBUTION VOLTAGE STANDARD C84.1 ANSI Voltage Limits Voltage Level Min Per-Unit Voltage (pu) Max Per-Unit Voltage (pu) V Systems > 600 V Systems Typical Daily Voltage Variation on BPA System Hour Period 2/10/2014 7

8 VOLTAGE VARIATION As system loading increases, allowable voltage variation decreases As voltage variation increases, ANSI violations increase exponentially Additional regulation equipment relaxes limits at higher loading levels ANSI violations are dramatically reduced by additional regulation equipment Relaxed voltage limits come at the cost of increased wear on equipment 2/10/2014 8

9 ENERGY IMBALANCE MARKET Variable Transfer Limits Step 1: Historic Use Step 2: Static Nomogram Step 3: Real time calculations 2/10/2014 9

10 DTC Task Force HISTORIC USE Ramu Ramanathan 2/10/

11 5 min avg MW change Historic Variation Limit 98% variation SOL Path Flow Actual Flow Upper 5 min Flow Limit MW Schedule Flow Lower 5 min Flow Limit Time 2/10/

12 DTC Task Force STATIC NOMOGRAM Ramu Ramanathan 2/10/

13 DEVELOPMENT OF VTL NOMOGRAM SCADA Real Time Data State Estimation Power Flow Case Aux File Program Saved RT Cases Power System Variable Transfer Limit Calculation Case Selection Path Data 2/10/

14 STATIC VS. VARIABLE TRANSFER Sum of the variable transfers plus the static transfers on a path must be less than or equal to the SOL; ST + VT <= SOL 2/10/

15 VTL Variation SOL Path Flow Actual Flow Upper 5 min Flow Limit MW Schedule Flow Lower 5 min Flow Limit Time 2/10/

16 REAL TIME CALCULATIONS DTC Task Force Ramu Ramanathan 2/10/

17 VTL CALCULATIONS REAL TIME SCADA State Estimation Power Flow Case Real Time Data Power System Variable Transfer Limit Calculation Path Data 2/10/

18 ? DTC Task Force Ramu Ramanathan 2/10/

19 TECHNICAL PAPERS Transfer Variability and the Need for New Limits on the Grid, 2012 CIGRÉ Canada Conference, Montréal, Québec, September Methodology of Computing Simultaneous Variable Transfer Limits on Multiple Paths, 2012 CIGRÉ Grid of the Future Symposium, Kansas City, Oct Factors that Influence Variable Transfers UPEC Sept Calculating Variable Transfer Limits for Dynamic Transfers, 2013 CIGRÉ Grid of the Future Symposium, Boston, Oct An Analysis of the Impact of Transmission Level Voltage Variation on Distribution Feeder Power Quality. To Be Submitted 2/10/

20 REPORTS Powerex WAPA Columbia Grid SMUD Northern Tier TANC NWPP PSE Avista Task Force PGE BPA PAC BCH NWE CAISO Gaelectric IPCO MSR Reports Assessing the Impact of Dynamic Transfers on Transmission System Operation, Brian Tuck and R. Ramanathan, February 15, 2010 RD 237 Bidirectional Multipath Dynamic Transfer Analysis, Brian Tuck and R. Ramanathan Oct 6, 2012 Dynamic Transfer Capability Task Force Phase 1 Report, Wind Integration Study team, March 16, 2011 Dynamic Transfer Capability Task Force Phase 2 Report, Wind Integration Study team, July, 2011 Dynamic Transfer Capability Task Force Phase 3 Report, Wind Integration Study team, December, /10/

Dynamic Scheduling NI A F S NI S. Where:

Dynamic Scheduling NI A F S NI S. Where: Dynamic Scheduling FERC Order 888 defines dynamic scheduling: which is the electronic transfer of the time-varying electricity consumption corresponding to a load or the time-varying generation associated

More information

Operational Opportunities to Minimize Renewables Curtailments

Operational Opportunities to Minimize Renewables Curtailments Operational Opportunities to Minimize Renewables Curtailments Clyde Loutan Principal, Renewable Energy Integration July 24, 2017 2017 CAISO - Public Page 1 Agenda Background Real-time control performance

More information

2018 CG Transient Stability and MOD 33 Updates

2018 CG Transient Stability and MOD 33 Updates 2018 CG Transient Stability and MOD 33 Updates CG Planning Meeting Oct. 4, 2018 1 Transient Stability Study Updates 2 Studied Case Study performed for 2024HS case Two Colstrip units retired, with ATR model

More information

MCE SPECIAL MEETING Friday, September 28, :00 A.M. Agenda Page 1 of 2

MCE SPECIAL MEETING Friday, September 28, :00 A.M. Agenda Page 1 of 2 MCE SPECIAL MEETING Friday, September 28, 2018 9:00 A.M. City of Richmond Memorial Auditorium 403 Civic Center Plaza, Richmond, CA Agenda Page 1 of 2 New Board Member Meet and Greet (8:30-9:00) Swearing

More information

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

February 10, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation February 10, 2016 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Market Monitoring Update

Market Monitoring Update Market Monitoring Update Eric Hildebrandt, Ph.D. Executive Director, Department of Market Monitoring EIM Governing Body Meeting General Session January 24, 2019 EIM prices in 2018 reflect regional supply

More information

Optimization of Distributed Energy Resources with Energy Storage and Customer Collaboration

Optimization of Distributed Energy Resources with Energy Storage and Customer Collaboration Optimization of Distributed Energy Resources with Energy Storage and Customer Collaboration NOVEMBER 2014 Jon Hawkins Manager, Advanced Technology and Strategy NOVEMBER 2014 PNM SERVICE TERRITORY 2,572

More information

Using Active Customer Participation in Managing Distribution Systems

Using Active Customer Participation in Managing Distribution Systems Using Active Customer Participation in Managing Distribution Systems Visvakumar Aravinthan Assistant Professor Wichita State University PSERC Webinar December 11, 2012 Outline Introduction to distribution

More information

WESTERN EIM BENEFITS REPORT Second Quarter 2018

WESTERN EIM BENEFITS REPORT Second Quarter 2018 WESTERN EIM BENEFITS REPORT Second Quarter 2018 July 31, 2018 www.westerneim.com CONTENTS EXECUTIVE SUMMARY... 3 BACKGROUND... 4 EIM BENEFITS IN Q2 2018... 4 INTER-REGIONAL TRANSFERS... 5 WHEEL THROUGH

More information

THE TRES AMIGAS PROJECT

THE TRES AMIGAS PROJECT UNITING THE NATION S ELECTRIC POWER GRID THE TRES AMIGAS PROJECT Project Development, Business Case, and Benefits -ERCOT Presentation Jan 22, 2010 Agenda Project Overview Project Objective Project Description,

More information

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

March 14, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 March 14, 2017 Re: California

More information

PSE Attachment K Puget Sound Area Transmission Meeting

PSE Attachment K Puget Sound Area Transmission Meeting PSE Attachment K Puget Sound Area Transmission Meeting Stephanie Lu Senior Engineer December 15, 2011 Agenda Attachment K Review Economic Studies Process PSE Planning Process and Assumptions PSE Projects

More information

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station

Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station Managing California s Electrical Supply System after the shut down of San Onofre Nuclear Generating Station East Asian Alternative Energy Futures Workshop By the Nonproliferation Policy Education Center

More information

Review of U.S. market reforms for renewable integration, flexibility, and storage

Review of U.S. market reforms for renewable integration, flexibility, and storage Review of U.S. market reforms for renewable integration, flexibility, and storage Eric Hsieh Director Office of Energy Finance and Incentives Analysis U.S. Department of Energy 14 July 2017 Transformations

More information

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013

Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in Stakeholder Webconference February 28, 2013 Proposed Incorporation of Merced Irrigation District into ISO Balancing Authority Area in 2015 Stakeholder Webconference February 28, 2013 Page 2 Merced Irrigation District (Merced) Background Merced Irrigation

More information

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

August 15, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 August 15, 2017 Re: California

More information

April 2, Docket No. ER Independent Assessment Department of Market Monitoring Report on Performance of Energy Imbalance Market

April 2, Docket No. ER Independent Assessment Department of Market Monitoring Report on Performance of Energy Imbalance Market California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 April 2, 2015 Re: California Independent

More information

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company

Docket No. ER June 2018 Informational Report Energy Imbalance Market Transition Period Report Idaho Power Company California Independent System Operator Corporation August 21, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company

December 4, Docket: ER Energy Imbalance Market Special Report Transition Period July 2018 for Idaho Power Company California Independent System Operator Corporation December 4, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Clean Energy Transmission Summit. Stephen Beuning Director Market Operations 1/9/13

Clean Energy Transmission Summit. Stephen Beuning Director Market Operations 1/9/13 Clean Energy Transmission Summit Stephen Beuning Director Market Operations 1/9/13 1 Who We Are Xcel Energy is dedicated to being an environmental leader NSP-Minnesota NSP-Wisconsin 26,000+ MWs of generation

More information

Arizona Transmission Challenges

Arizona Transmission Challenges Power Task Force Agenda Number 2. Arizona Transmission Challenges Central Arizona Water Conservation District Power Committee Presentation May 18, 2017 Transmission Planning Efforts NATIONAL Section 368

More information

Load Modeling for Power System Studies

Load Modeling for Power System Studies Load Modeling for Power System Studies WECC Load Modeling Task Force Dmitry Kosterev Bonneville Power Administration Transmission Planning Timescale of Interest Our primary interest is the fast dynamic

More information

Flexible Ramping Product Technical Workshop

Flexible Ramping Product Technical Workshop Flexible Ramping Product Technical Workshop September 18, 2012 Lin Xu, Ph.D. Senior Market Development Engineer Don Tretheway Senior Market Design and Policy Specialist Agenda Time Topic Presenter 10:00

More information

NERC Load Modeling Activities. Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016

NERC Load Modeling Activities. Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016 NERC Load Modeling Activities Ryan D. Quint, PhD, PE Senior Engineer, System Analysis, NERC MRO Fall Reliability Conference November 2016 Introduction Kickoff January 2016 LMTF webpage Chair: Dmitry Kosterev,

More information

Global Grid Reliability Advances

Global Grid Reliability Advances 1 Global Grid Reliability Advances Jay Giri Director, Power Systems Technology & Strategic Initiatives Redmond, WA jay.giri@ge.com Background The Interconnected Power Grid 3 One of the Most Complex & Immense,

More information

Non-wire Methods for Transmission Congestion Management through Predictive Simulation and Optimization

Non-wire Methods for Transmission Congestion Management through Predictive Simulation and Optimization Non-wire Methods for Transmission Congestion Management through Predictive Simulation and Optimization Presented by Ruisheng Diao, Ph.D., P.E. Senior Research Engineer Electricity Infrastructure Pacific

More information

Department of Market Quality and Renewable Integration November 2016

Department of Market Quality and Renewable Integration November 2016 Energy Imbalance Market March 23 June 3, 216 Available Balancing Capacity Report November 1, 216 California ISO Department of Market Quality and Renewable Integration California ISO i TABLE OF CONTENTS

More information

October 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp.

October 1, Docket: ER Energy Imbalance Market Special Report Transition Period June 2018 for Powerex Corp. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 October 1, 2018 Re: California

More information

Flexible Capacity Needs and Availability Assessment Hours Technical Study for 2020

Flexible Capacity Needs and Availability Assessment Hours Technical Study for 2020 Flexible Capacity Needs and Availability Assessment Hours Technical Study for 2020 Clyde Loutan Principal, Renewable Energy Integration Hong Zhou Market Development Analyst, Lead Amber Motley Manager,

More information

Distributed Energy Resources

Distributed Energy Resources Distributed Energy Resources WECC Data Subcommittee Rich Hydzik, Avista (ERSWG/DER Subgroup Lead) June 29, 2018 Why Are We Concerned About DER? Concern about changing generation fleet Large coal fired

More information

WHEELING CHARGES. Ali Miremadi (916)

WHEELING CHARGES. Ali Miremadi (916) WHEELING CHARGES Charge # 0382: High Voltage Wheeling Charge Due ISO Charge # 0383: Low VoltageWheeling Charge Due ISO Charge # 0384: High Voltage Wheeling Revenue Due TO Charge # 0385: Low VoltageWheeling

More information

Transmission Planning for Wind Energy Resources in the Eastern United States. Dale Osborn

Transmission Planning for Wind Energy Resources in the Eastern United States. Dale Osborn Transmission Planning for Wind Energy Resources in the Eastern United States Dale Osborn Layered Design Typical utility planning Distribution delivery to loads Lower voltage transmission delivery from

More information

DMM 2017 Q4 Report Highlights

DMM 2017 Q4 Report Highlights DMM 2017 Q4 Report Highlights Gabe Murtaugh Senior Analyst Department of Market Monitoring Conference Call February 21, 2018 Outline Real-time market performance Higher prices in the 15-minute market Large

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Implications of Alberta s Evolving Electricity Market for Solar

Implications of Alberta s Evolving Electricity Market for Solar Implications of Alberta s Evolving Electricity Market for Solar Matt Ayres CEO, Market Surveillance Administrator matt.ayres@albertamsa.ca What does the Market Surveillance Administrator do? Investigation

More information

Modeling and Simulation of Battery Energy Storage Systems for Grid Frequency Regulation. X. XU, M. BISHOP, D. OIKARINEN S&C Electric Company USA

Modeling and Simulation of Battery Energy Storage Systems for Grid Frequency Regulation. X. XU, M. BISHOP, D. OIKARINEN S&C Electric Company USA , rue d Artois, F-8 PARIS CIGRE US National Committee http : //www.cigre.org Grid of the Future Symposium Modeling and Simulation of Battery Energy Storage Systems for Grid Frequency Regulation X. XU,

More information

Accommodating High Levels of Variable Generation. EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009

Accommodating High Levels of Variable Generation. EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009 Accommodating High Levels of Variable Generation EPRI Managing Complexity for Safety and Reliability September 14-15, 15, 2009 Agenda About NERC About the Integration of Variable Generation Task Force

More information

PEAK DEMAND MANAGEMENT IN NEW ENGLAND A DYNAMIC SOLUTION TO MANAGING PEAK DEMAND CHARGES

PEAK DEMAND MANAGEMENT IN NEW ENGLAND A DYNAMIC SOLUTION TO MANAGING PEAK DEMAND CHARGES PEAK DEMAND MANAGEMENT IN NEW ENGLAND A DYNAMIC SOLUTION TO MANAGING PEAK DEMAND CHARGES What are peak demand (capacity) charges? Every month your business is charged a fee called a capacity charge or

More information

Association of Energy Engineers January 9, Michael Dirrane Director, Northeast Marketing

Association of Energy Engineers January 9, Michael Dirrane Director, Northeast Marketing Association of Energy Engineers January 9, 2013 Michael Dirrane Director, Northeast Marketing Spectra Energy U.S. Transmission Map Miles of Pipe 13,297 Number of Compressor Stations 129 Total Horsepower

More information

Reactive Power Compensation for Solar Power Plants. Andy Leon IEEE PES Chicago Chapter December 12 th, 2018

Reactive Power Compensation for Solar Power Plants. Andy Leon IEEE PES Chicago Chapter December 12 th, 2018 1 Reactive Power Compensation for Solar Power Plants Andy Leon IEEE PES Chicago Chapter December 12 th, 2018 2 Objectives Refresh the basics of reactive power from a generator s perspective Regulatory

More information

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal

TransWest Express Transmission AC and DC Project Interregional Transmission Project Submittal TransWest Express Transmission AC and DC Project 2018 2019 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission

More information

Distributed Energy Storage John Steigers Generation Project Development Energy / Business Services

Distributed Energy Storage John Steigers Generation Project Development Energy / Business Services 1 Distributed Energy Storage John Steigers Generation Project Development Energy / Business Services 2 2 Distributed Energy Storage Sited within Utility & Serving One or More Value Propositions Peak Shaving

More information

Ancillary Services. Horace Horton. Market Overview Course. Senior Market Trainer, Market Training, NYISO. March 8, Rensselaer, NY 12144

Ancillary Services. Horace Horton. Market Overview Course. Senior Market Trainer, Market Training, NYISO. March 8, Rensselaer, NY 12144 Ancillary Services Horace Horton Senior Market Trainer, Market Training, NYISO Market Overview Course March 8, 2018 Rensselaer, NY 12144 1 Ancillary Services Objectives At the end of this session attendees

More information

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers

Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Updated Transmission Expansion Plan for the Puget Sound Area to Support Winter South-to-North Transfers Puget Sound Area Study Team Bonneville Power Administration, Puget Sound Energy, Seattle City Light,

More information

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period August 2018 for Idaho Power Company California Independent System Operator Corporation January 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Impact of Distributed Energy Resources on Transmission System Reliability

Impact of Distributed Energy Resources on Transmission System Reliability S E P T E M B E R 1 3, 2 0 1 8 W E B I N A R Impact of Distributed Energy Resources on Transmission System Reliability National Council on Electricity Policy (NCEP) Alan McBride D I R E C T O R, T R A

More information

Renewable Grid Integration Research in the U.S.

Renewable Grid Integration Research in the U.S. Renewable Grid Integration Research in the U.S. Barry Mather Ph.D. NREL- Distributed Energy Systems Integration Group UNSW IEA PVPS Task 14 Workshop Sydney, AU November 26 th, 2013 NREL is a national laboratory

More information

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks

Operational Planning Study Report. RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Operational Planning Study Report RTA to BCH transfer limit updates For Kitimat 4 Capacitor Banks Report No. T&S Planning 2013-062 British Columbia Hydro and Power Authority British Columbia Hydro and

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Harry Allen to Eldorado 2015 No. Comment Submitted ISO Response Date Q&A Posted 1 Will the ISO consider proposals that are not within the impedance range specified? Yes. However, the benefits estimated and studies performed by the

More information

October 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing.

October 17, Please contact the undersigned directly with any questions or concerns regarding the foregoing. California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 October 17, 2017 Re: California

More information

PUD ELECTRIC SYSTEM INTERCONNECTION

PUD ELECTRIC SYSTEM INTERCONNECTION APPENDIX A PROCEDURES & REQUIREMENTS for OKANOGAN PUD ELECTRIC SYSTEM INTERCONNECTION Version 4.0 December 2011 Version 4.0 12/28/2011 Page 1 of 15 TABLE OF CONTENTS DEFINITIONS 1.0 Introduction 2.0 Procedures

More information

Decision on Merced Irrigation District Transition Agreement

Decision on Merced Irrigation District Transition Agreement California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Karen Edson, Vice President Policy & Client Services Date: March 13, 2013 Re: Decision on Merced Irrigation

More information

1. ESWG had an update regarding the SPP Probabilistic Assessment.

1. ESWG had an update regarding the SPP Probabilistic Assessment. Southwest Power Pool ECONOMIC STUDIES WORKING GROUP January 10, 2013 Web Conference SUMMARY OF ACTIONS TAKEN 1. ESWG had an update regarding the SPP Probabilistic Assessment. 1 of 18 Southwest Power Pool

More information

Accidental Islanding of Distribution Systems with Multiple Distributed Generation Units of Various Technologies

Accidental Islanding of Distribution Systems with Multiple Distributed Generation Units of Various Technologies CIGRÉ-EPRI Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS Boston, MA, October 20-22, 2013 http : //www.cigre.org Accidental Islanding of Distribution Systems with Multiple Distributed Generation

More information

Impact of Distributed Energy-Efficiency with Solar on SMUD s Peak Load

Impact of Distributed Energy-Efficiency with Solar on SMUD s Peak Load Impact of Distributed Energy-Efficiency with Solar on SMUD s Peak Load Mike Keesee, Sacramento Municipal Utility District Rob Hammon, ConSol ABSTRACT One of the advertised benefits of distributed solar

More information

Updates. Pat Reiten President and CEO, PacifiCorp Transmission

Updates. Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission and Regional Updates Pat Reiten President and CEO, PacifiCorp Transmission PacifiCorp Transmission Overview 16,400 circuit-miles of transmission lines 12,685 MW record peak demand

More information

ANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV

ANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV ANCILLARY SERVICES WITH VRE (VARIABLE RENEWABLE ENERGY): FOCUS PV September 2017 1st International Conference on Large-Scale Grid Integration of Renewable Energy in India Andreas Falk, Ancillary services

More information

April 30, Michael Schilmoeller, Senior Power Systems Analyst

April 30, Michael Schilmoeller, Senior Power Systems Analyst Bill Bradbury Chair Oregon Henry Lorenzen Oregon W. Bill Booth Idaho James A. Yost Idaho Jennifer Anders Vice Chair Montana Pat Smith Montana Tom Karier Washington Phil Rockefeller Washington April 30,

More information

APPENDIX F: Project Need and Description

APPENDIX F: Project Need and Description APPENDIX F: Project Need and Description California ISO/MID F-1 Intentionally left blank California ISO/MID F-2 Name Brief Description Type Lugo Victorville 500 kv Upgrade (SCE portion) The project was

More information

Sacramento Municipal Utility District s EV Innovators Pilot

Sacramento Municipal Utility District s EV Innovators Pilot Sacramento Municipal Utility District s EV Innovators Pilot Lupe Jimenez November 20, 2013 Powering forward. Together. Agenda SMUD Snapshot Pilot Plan v Background v At-a-Glance v Pilot Schedule Treatment

More information

Facilities Study for Alberta to US Available Transfer Capability

Facilities Study for Alberta to US Available Transfer Capability Facilities Study for Alberta to US Available Transfer Capability Report No: NPP2002-05 June 3, 2002 System Planning & Grid Operations, Transmission Line of Business Engineering Services Executive Summary

More information

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period September 2018 for Idaho Power Company

January 18, Docket: ER Energy Imbalance Market Special Report Transition Period September 2018 for Idaho Power Company California Independent System Operator Corporation January 18, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Targeted Application of STATCOM Technology in the Distribution Zone

Targeted Application of STATCOM Technology in the Distribution Zone Targeted Application of STATCOM Technology in the Distribution Zone Christopher J. Lee Senior Power Controls Design Engineer Electrical Distribution Division Mitsubishi Electric Power Products Electric

More information

Contact person: Pablo Taboada Mobile:

Contact person: Pablo Taboada   Mobile: Contact person: Pablo Taboada e-mail: ptaboada@aenor.es Mobile: 34 609015450 Génova 6 28004 Madrid. Spain Phone: 34 91 4326004 Fax: 34 91 3190581 CDM Executive Board RESPONSE TO REQUEST FOR REVIEW Request

More information

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

Consulting Agreement Study. Completed for Transmission Customer

Consulting Agreement Study. Completed for Transmission Customer Completed for Transmission Customer Proposed Resource & Transmission Carbon County, MT & 230 kv Transmission in North Wyoming August 2016 Table of Contents 1.0 Description... 1 2.0 Overall Assumptions...

More information

RES integration into energy system

RES integration into energy system RES integration into energy system Konstantin Staschus ENTSO-E, Secretary-General SET-Plan Conference, Bratislava, 2 December 2016 1 WHO IS ENTSO-E? 2 THE POWER SYSTEM IS CHANGING, SO ARE WE Where we were

More information

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Moenkopi) Scheduling at Willow Beach. Operating Procedure

Table of Contents. Purpose. Eldorado Intertie and System (Eldorado- Moenkopi) Scheduling at Willow Beach. Operating Procedure No. 6930 Table of Contents Purpose... 1 1. Limits, Ratings, & Effectiveness Factors... 2 2. Contingency Operations... 2 2.1 Transmission Lines Outages... 2 2.2 APS Terminal Equipment Outages... 2 2.3 SCE

More information

Western Area Power Administration Sierra Nevada Region

Western Area Power Administration Sierra Nevada Region Western Area Power Administration Sierra Nevada Region 2014 Annual Ten-Year Transmission Plan Assessment Report November 20, 2014 For information or questions regarding this Transmission Assessment Report,

More information

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015 PDR Energy Baseline Alternative Proposal for Discussion October 27, 2015 Update Since Last Meeting Since the October 12 th Working Group Meeting Stem, Solar City, AMS and CESA have had over a half-dozen

More information

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting

Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting Transmission Coordination and Planning Committee 2016 Q4 Stakeholder Meeting BHE Wyoming Q4 Stakeholder Meeting November 17, 2016 @ 1:00PM MT Black Hills Energy Service Center 409 Deadwood Avenue, Rapid

More information

Using Hosting Capacity Methodology to Develop Simplified Screens for New Solar PV Interconnections

Using Hosting Capacity Methodology to Develop Simplified Screens for New Solar PV Interconnections Using Hosting Capacity Methodology to Develop Simplified Screens for New Solar PV Interconnections Jeff Smith, Matt Rylander EPRI Robert Broderick Sandia National Laboratory Barry Mather NREL 6 th International

More information

Interconnection System Impact Study Report Request # GI

Interconnection System Impact Study Report Request # GI Executive Summary Interconnection System Impact Study Report Request # GI-2008-23 34 MW Solar Generation Ranch at Hartsel, Colorado Public Service Company of Colorado Transmission Planning August 19, 2010

More information

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection B. Bagen, D. Jacobson, G. Lane and H. M. Turanli Manitoba

More information

Partial Automation for Truck Platooning

Partial Automation for Truck Platooning Partial Automation for Truck Platooning Observations and Lessons Learned to Date from California's Experience with Truck Platooning Matt Hanson 2017 ITS CA Conference September 18, 2017 Burlingame, CA

More information

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008

PJM Generator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study September 2008 PJM enerator Interconnection Request Queue #R60 Robison Park-Convoy 345kV Impact Study 504744 September 2008 PJM Interconnection 2008. All rights reserved R60 Robison Park-Convoy 345kV Impact Study eneral

More information

POWER SYSTEM OPERATION AND CONTROL YAHIA BAGHZOUZ UNIVERSITY OF NEVADA, LAS VEGAS

POWER SYSTEM OPERATION AND CONTROL YAHIA BAGHZOUZ UNIVERSITY OF NEVADA, LAS VEGAS POWER SYSTEM OPERATION AND CONTROL YAHIA BAGHZOUZ UNIVERSITY OF NEVADA, LAS VEGAS OVERVIEW Interconnected systems Generator scheduling/dispatching Load-generation balancing Area Control Error (ACE) Load

More information

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective

Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective Smarter Network Storage: Introduction to grid-scale storage and applications, the DNO perspective 2 Storage: the DNO perspective Context to the storage boom Smarter Network Storage: What have we achieved?

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information

Optimal Design of Hybrid Energy System with PV/ Wind Turbine/ Storage: A Case Study

Optimal Design of Hybrid Energy System with PV/ Wind Turbine/ Storage: A Case Study Optimal Design of Hybrid Energy System with PV/ Wind Turbine/ Storage: A Case Study Presenter: Amit Kumar Tamang PhD Student Supervisor: Prof. Weihua Zhaung Smart Grid Research Group at BBCR September

More information

Portland General Electric

Portland General Electric Portland General Electric Ray Payne Grid Operations Manager WEI Operations Conference One Grid Closing the Chasm April 25, 2018 PGE Service Territory/Regions 2 PGE Overview Population of service area 1,900,000

More information

The Prince Lab microgrid test bed

The Prince Lab microgrid test bed BUCHAREST 2018 SYMPOSIUM ON MICROGRIDS University Politehnica of Bucharest, Romania 2-6 Sept. 2018 The Prince Lab microgrid test bed Enrico De Tuglie enricoelio.detuglie@poliba.it DEPARTMENT OF ELECTRICAL

More information

Feasibility Study Report

Feasibility Study Report Generator Interconnection Request Feasibility Study Report For: Customer --- Service Location: Rutherford County Total Output: 79.2 MW Commercial Operation Date: 9/1/2014 In-Service Date (if given): 9/1/2014

More information

SDG&E Electric Vehicle activities

SDG&E Electric Vehicle activities SDG&E Electric Vehicle activities Managing load and storage while maximizing customer value CAISO V2G Workshop Tuesday, February 5, 2013 Matt Zerega mzerega@semprautilities.com 2011San Diego Gas & Electric

More information

Inventory Levels - All Prices. Inventory Levels - By Price Range

Inventory Levels - All Prices. Inventory Levels - By Price Range Inventory Levels - All Prices Idaho Falls Bonneville Total 3-Nov-17 198 128 326 2-Nov-18 155 134 289-11% Inventory Levels - By Price Range 3-Nov-17 2-Nov-18 0-100,000 17 11 100,001-125,000 15 9 125,001-150,000

More information

Utilizing Analytics to Model Distribution System Losses with Smart Grid Data

Utilizing Analytics to Model Distribution System Losses with Smart Grid Data Utilizing Analytics to Model Distribution System Losses with Smart Grid Data Scott Albrechtsen BC Hydro, Load Analysis February 19, 2014 2 Author Scott Albrechtsen is a Senior Load Advisor at BC Hydro.

More information

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS

CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS CITY OF PASADENA APPLICATION FOR PARTICIPATING TRANSMISSION OWNER STATUS July 15, 2004 TABLE OF CONTENTS Page No. 1. Description of Pasadena s Transmission Lines and Facilities...1 A. Overview:... 1 B.

More information

Western Electricity Coordinating Council Modeling and Validation Work Group

Western Electricity Coordinating Council Modeling and Validation Work Group Western Electricity Coordinating Council Modeling and Validation Work Group Renewable Energy Modeling Task Force Development of Planning Models dl for Solar PV Systems November 18, 2009 Phoenix, AZ Contact:

More information

Energy Storage and Distributed Energy Resource ( ESDER ) Initiative

Energy Storage and Distributed Energy Resource ( ESDER ) Initiative Energy Storage and Distributed Energy Resource ( ESDER ) Initiative Demand Response Baselines Working Group August 27, 2015 ESDER Stakeholder process schedule Step Date Event Revised Straw Proposal Draft

More information

Conservation Voltage Reduction (CVR) for Electric Distribution Cooperatives

Conservation Voltage Reduction (CVR) for Electric Distribution Cooperatives Conservation (CVR) for Electric Distribution Cooperatives Rob Ardis, PE COO, Pee Dee Electric Cooperative Bob Uluski, PE Utility Integration Solutions (UISOL) Volt-VAR Control Not a New Concept Maintain

More information

PV Grid Integration Research in the U.S.

PV Grid Integration Research in the U.S. PV Grid Integration Research in the U.S. Barry Mather Ph.D. NREL- Power Systems Engineering Center HEPIA IEA PVPS Task 14 Utility Workshop Geneva, Switzerland March 31 st, 2014 NREL is a national laboratory

More information

CAPACITY LIMITED RESOURCES (CLR) / ENERGY LIMITED RESOURCES (ELR)

CAPACITY LIMITED RESOURCES (CLR) / ENERGY LIMITED RESOURCES (ELR) CAPACITY LIMITED RESOURCES (CLR) / ENERGY LIMITED RESOURCES (ELR) 1 INTRODUCTION A new bidding mechanism is available for qualified generators which allows them to offer generation in the New York market

More information

Integration of Large Wind Farms into Electric Grids

Integration of Large Wind Farms into Electric Grids Integration of Large Wind Farms into Electric Grids Dr Mohammad AlZoubi Introduction Development WHAT IS NEXT!! Over the next 12 years, Europe must build new power capacity equal to half the current total.

More information

Modeling and Comparison of Dynamics of AC and DC Coupled Remote Hybrid Power Systems

Modeling and Comparison of Dynamics of AC and DC Coupled Remote Hybrid Power Systems Modeling and Comparison of Dynamics of AC and DC Coupled Remote Hybrid Power Systems Presenter: Tanjila Haque Supervisor : Dr. Tariq Iqbal Faculty of Engineering and Applied Science Memorial University

More information

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market Beacon Power Corporation Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market Prepared for: New York Business Issues Committee May 21, 2008 Safe Harbor

More information

Challenges and opportunities in the integration of PV in the electricity distribution networks

Challenges and opportunities in the integration of PV in the electricity distribution networks REPOWERING EUROPE Photovoltaics: centre-stage in the power system Challenges and opportunities in the integration of PV in the electricity distribution networks Nikos Hatziargyriou, HEDNO, BoD Chairman

More information

DER Portfolio Optimization and Dispatch, Tertiary Control/Monitoring Strategies

DER Portfolio Optimization and Dispatch, Tertiary Control/Monitoring Strategies DER Portfolio Optimization and Dispatch, Tertiary Control/Monitoring Strategies Maggie Clout Siemens Energy Management Digital Grid Siemens AG 2016 Three Pillars of a Microgrid System Mixed Generation

More information

Energy Storage Interconnection Initiative

Energy Storage Interconnection Initiative Energy Storage Interconnection Initiative Stakeholder Call November 25, 2014 Agenda Time Agenda Item Speaker 10:00-10:10 Introduction, Stakeholder Process Tom Cuccia 10:10-10:30 Applying the GIDAP to energy

More information

ECE 740. Optimal Power Flow

ECE 740. Optimal Power Flow ECE 740 Optimal Power Flow 1 ED vs OPF Economic Dispatch (ED) ignores the effect the dispatch has on the loading on transmission lines and on bus voltages. OPF couples the ED calculation with power flow

More information

Ancillary Services. Horace Horton Senior Market Trainer, Market Training, NYISO. New York Market Orientation Course (NYMOC)

Ancillary Services. Horace Horton Senior Market Trainer, Market Training, NYISO. New York Market Orientation Course (NYMOC) Ancillary Services Horace Horton Senior Market Trainer, Market Training, NYISO New York Market Orientation Course (NYMOC) June 5-8, 2018 Rensselaer, NY 12144 1 Ancillary Services SESSION OBJECTIVES: attendees

More information