Solar Photovoltaic (PV) Installation - Updates

Size: px
Start display at page:

Download "Solar Photovoltaic (PV) Installation - Updates"

Transcription

1 Solar Photovoltaic (PV) Installation - Updates Malcolm Brown CCEI Electrical Safety Authority Technical Advisor - Western Region Electrical Safety Authority For Your Safety

2 Topics of discussion ESA; Mandate - Mission Vision Feed-in Tariff Program in Ontario Technical and OESC Requirements Updates: Wiring methods; PV modules as part of the building construction; PV DC Arc Fault Protection Requirement; and PV wiring color coding Incident - Incorrect Wiring Results in Failure ESA Resources Electrical Safety Authority For Your Safety

3 Electrical Safety Authority Mandate - Mission - Vision Electrical Safety Authority For Your Safety

4 Electrical Safety Authority (ESA) Who is ESA? ESA is a financially self-sustaining, not-for-profit corporation. ESA is a delegated authority, responsible for administering specific regulations related to: Ontario Electrical Safety Code (OESC); licensing Electrical Contractors and Master Electricians; electricity distribution system safety; and electrical products safety. Electrical Safety Authority For Your Safety

5 Electrical Safety Authority (ESA) Mandate - Mission - Vision Mandate Enforcing the Ontario Electrical Safety Code, and appointing Inspectors. Mission Improve electrical safety for the well-being of the people of Ontario. Vision An Ontario free from electrical fatalities and serious injuries, damage or loss (Getting to ZERO). Electrical Safety Authority For Your Safety

6 Feed-In Tariff Program in Ontario Electrical Safety Authority For Your Safety

7 What is a Feed-In-Tariff (FIT) Program? A program set by the Government of Ontario to contract for renewable energy generation. Ontario Power Authority (OPA) is responsible for administering the FIT program. On September 24, 2009, the government of Ontario officially launched Canada s first Feed-In Tariff. MicroFIT is for projects equal to or less than 10 kw. FIT is for greater than 10 kw. Developers of renewable energy projects can apply for a FIT contract if they meet all program requirements. For more information, check OPA website at Electrical Safety Authority For Your Safety

8 microfit and FIT Program Electrical Safety Authority For Your Safety

9 FIT Project Stages Typical FIT project stages are: Customer submits proper applications/forms: To OPA using online form; A connection request to the Local Distribution Company (LDC); Application for inspection (to ESA) Customer installs the project and arranges for ESA Inspection Connection authorization issued by ESA to the LDC LDC connects the generation to supply service LDC informs OPA of connection details OPA prepares and offers microfit contract Electrical Safety Authority For Your Safety

10 ESA Role In addition to the standard wiring inspection process to verify that the electrical installation meets the requirements of OESC, ESA will be reporting the following to the LDC/OPA: The type of the renewable energy of the project. The generator total kw capacity and the inverter maximum output kw capacity. Verification if batteries are installed upstream of the generator meter. Electrical Safety Authority For Your Safety

11 ESA Connection Authorization Sample Electrical Safety Authority For Your Safety

12 Technical and OESC Requirements Updates Electrical Safety Authority For Your Safety

13 Wiring methods Newly developed Solar cables type RPV & RPVU New Subrules to recognize wiring PV systems with newly Canadian approved PV cables type RPV and RPVU (CSA 22.2 No. 271). Photovoltaic Cables specifies the requirements for photovoltaic single-conductor and multiconductor thermoset-insulated wires and cables rated 600 V, 1000 V and 2000 V. Electrical Safety Authority For Your Safety

14 Wiring methods Newly developed Solar cables type RPV & RPVU New cables type RPV and RPVU are also recognized in Tables 6, 10B and 19 Electrical Safety Authority For Your Safety

15 Wiring methods Newly developed Solar cables type RPV & RPVU Electrical Safety Authority For Your Safety

16 Wiring methods Newly developed Solar cables type RPV & RPVU Reminder: The permission for using PV cables approved to UL standards had expired on January 1 st, Where an application for inspection or plan review are submitted after January 1 st, 2013, all wiring used for photovoltaic system installations is required to be approved to Canadian Standards. Electrical Safety Authority For Your Safety

17 PV Modules as part of building construction Rule * In roof PV panels Question: Does the OESC allow open single PV conductors to be run exposed within a building structure without meeting the Rules referenced in for open wiring? Answer: No Electrical Safety Authority For Your Safety

18 PV DC Arc Fault Protection Requirement Rule New Rule had been introduced in Canadian Electrical Code 2012 to require arc fault protection for DC circuits on or penetrating buildings and operating at 80V dc or higher; ESA will extend the postponement of Rule enforcement from May 2013 until January 1 st, 2014 Electrical Safety Authority For Your Safety

19 Color Coding of PV (dc) Source & Output Circuit Conductors Recently, a new rule has been approved by the Canadian Electrical Code, Part I Committee to address this issue. The new rule will mandate the dc photovoltaic output circuit conductors, and photovoltaic source circuit conductors installed between a module and the power conditioning unit of the dc system to be colored, coded, or both. This new rule requirement will be mandatory when the 26 th Edition of the OESC is introduced (anticipated in 2015) Electrical Safety Authority For Your Safety

20 Color Coding of PV (dc) Source & Output Circuit Conductors Color coding of PV (dc) source and output circuit conductors DC photovoltaic output circuit conductors and photovoltaic source circuit conductors installed between a module and the power conditioningunit of the dc system are to be coloured and/or coded as follows: (a) for a 2-wire circuit (i) red for positive and black for negative; or (ii) black conductors manufactured with permanent surface printing indicating the polarity on the conductor; and (b) for a 3-wire circuit (bipolar circuit) (i) white** for mid-wire (identified as centre tap), red for positive, and black for negative; or (ii) black conductors manufactured with permanent surface printing indicating the polarity on the conductor(*). Electrical Safety Authority For Your Safety

21 Color Coding of PV (dc) Source & Output Circuit Conductors Color coding of PV (dc) source and output circuit conductors These requirements will not be permitted to be met by field marking or labelling, unless for multi-conductor cables through suitable field labelling or marking in a permanent manner as follows: (i) be made at every point where the separate conductors are rendered accessible and visible by removal of the outer coveringof the cable; (ii) be made by painting or other suitable means; and (ii) not render the manufacturer s numbering of the conductors illegible. Electrical Safety Authority For Your Safety

22 Incident -Incorrect Wiring Results in Failure Electrical Safety Authority For Your Safety

23 Incident - Incorrect Wiring Results in Failure PV System Grid Tie reversed wiring PV utility disconnect from line side of existing main service. Neutral and phase conductor crossed. Electrical Safety Authority For Your Safety

24 ESA Resources Electrical Safety Authority For Your Safety

25 ESA Resources Visit more information about installation of solar photovoltaic installations ESA offers a ½day training workshop Contractors/stt_002.php Electrical Safety Authority For Your Safety

26 ESA Resources Visit for more information about The 2012 OESC. Electrical Safety Authority For Your Safety

27 ESA Resources SPEC-004, Electrical guideline for inverterbased-micro generating facility 10 kw and smaller Used for one of the following applications: microfit program Load displacement Electrical Safety Authority For Your Safety

28 ESA Resources SPEC 005 -Process Guideline for the Installation of Parallel Generating Systems (10 kw or Greater) Electrical Safety Authority For Your Safety

29 ESA Resources ESA Bulletins: 50-1-* Installation of Solar Photovoltaic Systems 50-2-* Grounding and Bonding of Solar Photovoltaic Systems 50-3-* Voltage rating of a photovoltaic source circuit 50-4-* Wiring methods for Solar Photovoltaic Systems 64-1-* Connection of utility-interactive inverters on the load side of service disconnecting means; and 84-1-* Interconnection of Electric Power Production Sources Electrical Safety Authority For Your Safety

30 Product Approval Requirements Rule Approval of electrical equipment Recognized Certification Markings Return Electrical Safety Authority For Your Safety

31 Product Approval Requirements Rule Approval of electrical equipment Recognized Field Evaluation Agency Markings Recognized Panel-Only Field Evaluation Agency Markings Return Electrical Safety Authority For Your Safety

32 Thank you! Electrical Safety Authority For Your Safety

Bulletin Wiring methods for Solar Photovoltaic Systems Rules, 2-034, , and , Tables 11 and 19

Bulletin Wiring methods for Solar Photovoltaic Systems Rules, 2-034, , and , Tables 11 and 19 Bulletin 50-4-4 Wiring methods for Solar Photovoltaic Systems Rules, 2-034, 50-014, 50-018 and 50-020, Tables 11 and 19 Scope (1) Introduction (2) New cable types RPV & RPVU (3) Wiring methods within photovoltaic

More information

Bulletin Wiring methods for Solar Photovoltaic Systems Rules and , Tables 11 and 19

Bulletin Wiring methods for Solar Photovoltaic Systems Rules and , Tables 11 and 19 Bulletin 50-4-1 Wiring methods for Solar Photovoltaic Systems Rules 50-018 and 50-020, Tables 11 and 19 Issued December 2012 Supersedes Bulletin 50-4-0 (1) (2) (3) (4) (5) Scope Introduction New cable

More information

Bulletin Interconnection of electric power production sources Rules 2-010, , , , , , and

Bulletin Interconnection of electric power production sources Rules 2-010, , , , , , and Bulletin 84-1-11 Interconnection of electric power production sources Rules 2-010, 64-078, 64-110, 84-004, 84-008, 84-018, 84-022 and 84-030 Scope Issued May 2018 Supersedes Bulletin 84-1-10 1) Requirements

More information

Electrical Guidelines for Inverter-Based Micro-Generating Facility

Electrical Guidelines for Inverter-Based Micro-Generating Facility Electrical Guidelines for Inverter-Based Micro-Generating Facility (10 KW and Smaller) Electrical Safety Authority Contents Section Page 1 Scope 2 2 Overview 2 Types of Distributed Generation 3 Typical

More information

Photovoltaic Installations

Photovoltaic Installations Photovoltaic Installations CanSIA December 2016 Presented by: Malcolm Brown Technical Advisor Western Region Discussion Topics Bulletin 2-11-22 Plan Review Requirements Connection Authorizations for Net

More information

PV Installations 2015 Electrical Code & more. Presented by: Ted Olechna Director Codes and Standards Support

PV Installations 2015 Electrical Code & more. Presented by: Ted Olechna Director Codes and Standards Support PV Installations 2015 Electrical Code & more 1 Presented by: Ted Olechna Director Codes and Standards Support What I will Cover: Who ESA is Ontario Electrical Safety Code Solar PV Voltage limitations Conductor

More information

Bulletin Wiring methods for solar photovoltaic systems Rules 2-034, , , , , Tables 11 and 19

Bulletin Wiring methods for solar photovoltaic systems Rules 2-034, , , , , Tables 11 and 19 Bulletin 64-4-1 Wiring methods for solar photovoltaic systems Rules 2-034, 64-066, 64-210, 64-216, 64-220, Tables 11 and 19 Scope (1) Introduction (2) Cable types RPV & RPVU (3) Wiring methods within photovoltaic

More information

Bulletin Wiring methods for Solar Photovoltaic Systems Rule and , Tables 11 and 19

Bulletin Wiring methods for Solar Photovoltaic Systems Rule and , Tables 11 and 19 -4-0 Bulletin -4-0 Wiring methods for Solar Photovoltaic Systems Rule -018 and -020, Tables 11 and 19 Scope Issued May 2012 (1) Introduction (2) New cable types RPV & RPVU (3) Wiring methods within photovoltaic

More information

Guidelines for Inverter-Based Micro-Generating Facility (10 kw and Smaller)

Guidelines for Inverter-Based Micro-Generating Facility (10 kw and Smaller) Guidelines for Inverter-Based Micro-Generating Facility (10 kw and Smaller) Cover: Photos courtesy of Balance Solutions for Today Inc OVERVIEW Today many home, farm and small business owners are considering

More information

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly. SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS (ELEC) This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

ENGINEERING SPECIFICATION

ENGINEERING SPECIFICATION December 206 ENGINEERING SPECIFICATION No. of 6 DATE: 2-9-6 CATEGORY SUBJECT TABLE OF CONTENTS. Overview... 2 2. General Requirements for Service... 3 3. Definitions... 3 4. Abbreviations... 5 5. References

More information

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018

Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018 Document Requirements for Engineering Review- PV Systems v1.1 12/6/2018 Outlined below are the engineering documents and their associated minimum detail requirements for a Distributed Energy Resource (DER)

More information

Definitions. Scope. Customer Generation Interconnection Requirements

Definitions. Scope. Customer Generation Interconnection Requirements Updated 02/1 Page 1 Scope The purpose of this document is to describe Idaho Power s requirements for the installation and testing of Customer Generation acilities that are interconnected with Idaho Power

More information

SOLAR PV INSTALLATIONS

SOLAR PV INSTALLATIONS Winnipeg Information Bulletin 2016-003-B/E/S/Z SOLAR PV INSTALLATIONS An Information Bulletin is currently being created for City of Winnipeg guidelines for Solar PV Installations and will be published

More information

Photovoltaic Solar Plan Review

Photovoltaic Solar Plan Review PAIGE B. VAUGHAN, CBO Director of Building and Safety Phone (310) 605-5509 Fax Line (310) 605-5598 E-mail:lbutler@comptoncity.org Building & Safety Department Photovoltaic Solar Plan Review Plan Check

More information

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017

Document Requirements for Engineering Review PV Systems v1.0 6/9/2017 Document Requirements for Engineering Review PV Systems v1.0 6/9/2017 Outlined below are the documents and associated minimum details required for Engineering Review of Distributed Energy Resources Interconnection

More information

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS

RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS RENEWABLE ENERGY PROGRAM Step 1, Section 1 ENROLLMENT FORM FOR LEASED RESIDENTIAL AND SMALL COMMERCIAL PHOTOVOLTAIC AND WIND TURBINE SYSTEMS For residential and commercial systems, the combined generation

More information

Net +Plus Connection Code

Net +Plus Connection Code Net +Plus Connection Code LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED 1.0 BACKGROUND The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in the recent year and at

More information

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements AS/NZS 4777.1:2016 Australian/New Zealand Standard Grid connection of energy systems via inverters Part 1: Installation requirements AS/NZS 4777.1:2016 AS/NZS 4777.1:2016 This joint Australian/New Zealand

More information

Codes and Standards: Focusing on the Sustainability Aspects of Electrical Installations What, Why and How?

Codes and Standards: Focusing on the Sustainability Aspects of Electrical Installations What, Why and How? Codes and Standards: Focusing on the Sustainability Aspects of Electrical Installations What, Why and How? Ark Tsisserev, P.Eng Safe technical systems. Everywhere. FRM-1483-00 Codes and Standards: Focusing

More information

2016 Photovoltaic Solar System Plan Review List

2016 Photovoltaic Solar System Plan Review List Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Photovoltaic Solar System Plan Review List GENERAL PROJECT INFORMATION PLAN CHECK NO DATE JOB ADDRESS CITY ZIP REVIEWED BY PHONE

More information

Ontario s Electrical Product Approval Requirements

Ontario s Electrical Product Approval Requirements Ontario s Electrical Product Approval Requirements Before an electrical product or piece of electrical equipment is used, sold, displayed or advertised for sale in Ontario, it must be approved by an accredited

More information

Minnesota Dept. of Commerce, Division of Energy Resources. Distributed Generation Workshop Interconnection Standards

Minnesota Dept. of Commerce, Division of Energy Resources. Distributed Generation Workshop Interconnection Standards Minnesota Dept. of Commerce, Division of Energy Resources Distributed Generation Workshop Interconnection Standards Presented by Michael Sheehan, P.E. October 11, 2011 Germans Solar Projected Cost Reductions

More information

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase

DISTRIBUTED RESOURCE GENERATION Feed-In-Tariff Single Phase PAGE 1 OF 7 USE: Requirements and guidelines for interconnection of single phase customer owned, (DR) Distributed Resource generation source, to NIPSCO s electric system, configured for. LATEST REVISION:

More information

Questions from the AHJ To Fuse or Not to Fuse?

Questions from the AHJ To Fuse or Not to Fuse? Questions from the AHJ To Fuse or Not to Fuse? by John Wiles Nearly everyone agrees that the National Electrical Code gets better with every edition. However, new technologies like photovoltaic (PV) power

More information

Electrical Safety in the Workplace

Electrical Safety in the Workplace Electrical Safety in the Workplace Increasing Electrical Safety in the Workplace through Purchasing and Procurement Robert Mitchell, Safety and Technical Safety Advisor Safety Risk, Policy and Innovation

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Residential Photovoltaic (PV) Packet

Residential Photovoltaic (PV) Packet Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 (916) 774-5332 Fax (916) 774-5394 Residential Photovoltaic (PV) Packet The Roseville Municipal Code

More information

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...

More information

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects

Instructions for Completing Oncor s Interconnection Application For Solar PV Projects Instructions for Completing Oncor s Interconnection Application For Solar PV Projects Program Year 2009 Take a Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company s commitment

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

Distributed Generation

Distributed Generation Distributed Generation Presented by: Doug Fairchild & Chris Cooper 1 Agenda Hydro One Overview The state of DG in the Province of Ontario Technical Issues Operational Requirements Overview Control Room

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

Louisville Gas and Electric Company

Louisville Gas and Electric Company P.S.C. Electric No. 11, Original Sheet No. 57 APPLICABLE In all territory served. AVAILABILITY OF SERVICE Available to any customer-generator who owns and operates a generating facility located on Customer

More information

Toronto Hydro Distributed Generation Requirements

Toronto Hydro Distributed Generation Requirements Distributed Generation Toronto Hydro Distributed Generation Requirements Effective Date: January 1, 2011 Comments and inquiries shall be e-mailed to: genconnect@torontohydro.com Customers without e-mail

More information

MCS. Important Information on MCS 012 Issue 2.1 for MCS Solar Photovoltaic and Solar Thermal Contractors. Last Updated: 25 th September 2017

MCS. Important Information on MCS 012 Issue 2.1 for MCS Solar Photovoltaic and Solar Thermal Contractors. Last Updated: 25 th September 2017 MCS Important Information on MCS 012 Issue 2.1 for MCS Solar Photovoltaic and Solar Thermal Contractors Last Updated: 25 th September 2017 1. Publication of MCS 012 Issue 2.1 on 5 th April 2016 Please

More information

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV.

Microinverters and AC PV modules are becoming. Microinverters and AC PV Modules. Different Beasts. Perspectives on PV. Perspectives on PV Microinverters and AC PV Modules Are Different Beasts by John Wiles Microinverters and AC PV modules are becoming very common in residential and small commercial PV systems. See photos

More information

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group

Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...

More information

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for

Code Compliance. Perspectives on PV. Back to the Grid, Designing PV Systems for Perspectives on PV A series of articles on photovoltaic (PV) power systems and the National Electrical Code by John Wiles Back to the Grid, Designing PV Systems for Code Compliance 20 IAEI NEWS January.February

More information

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number:

Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone Number: Please print the following information. Interconnect Customer Information Customer Name : Account Number: Customer Service Address (Street, City, State, ZIP Code): Customer Mailing Address: Customer Telephone

More information

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC

Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC Inspector Training Workshops Module One Photovoltaic Labeling based on 2008 NEC NJCE Market Manager HW Construction Department Wayne, NJ Robert A. Menist Contents Site inspections with attention on Labeling

More information

Inverter Advancements in UL1741 and UL 62109

Inverter Advancements in UL1741 and UL 62109 Inverter Advancements in UL1741 and UL 62109 2015 UL LLC Scott Picco Staff Engineer Distributed Energy Resources Equipment UL LLC Renewable Energy Standards for safety of Power Conversion Equipment USA

More information

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL

INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL Photovoltaic (PV) Residential Page 1 of 10 Revision Date: 07/18/2018 INSPECTION REQUIREMENTS: PHOTOVOLTAIC (PV) RESIDENTIAL INSPECTION CODE: 703 SCOPE: RESIDENTIAL APPLICABLE CODES: 2016 CBC, CRC, CPC,

More information

24. SOLAR INCENTIVE PROGRAM II

24. SOLAR INCENTIVE PROGRAM II 24. SOLAR INCENTIVE PROGRAM II A. General California Senate Bill 1 requires publicly owned utilities that sell electricity at the retail level, to adopt, implement, and fund a solar incentive program for

More information

Non-Residential Solar Energy Photovoltaic (PV) Packet

Non-Residential Solar Energy Photovoltaic (PV) Packet Development Services Department Building Inspection Division 311 Vernon Street Roseville, California 95678-2649 (916) 774-5332 Fax (916) 774-5394 Non-Residential Solar Energy Photovoltaic (PV) Packet Permit

More information

Iowa Statewide Solar Readiness Initiative

Iowa Statewide Solar Readiness Initiative Iowa Statewide Solar Readiness Initiative Agenda» Project Background» Iowa Solar Readiness Initiative Overview» Status of Solar in Iowa» Structure of the Iowa Solar Readiness Initiative» Q&A World Food

More information

Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1

Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1 Guideline for Using IEEE 1547 for Solar PV Interconnection Page 1 A Guide for Iowa s Municipal Electric Utilities On the How the IEEE 1547 Distributed Generation Interconnection Standard Affects Solar

More information

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016 DISTRIBUTED GENERATION CHAPTER 5 500. SCOPE This chapter includes distributed or customer-owned generation connected in parallel and operating with Alliant Energy s electric distribution system. For all

More information

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings

SOLAR PV STANDARD PLAN - COMPREHENSIVE Central/String Inverter Systems for One and Two Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems not exceeding a total combined system ac inverter output rating of 10kW on the roof of a one- or two-family dwelling or

More information

Impact of Distributed Energy Resources on Transmission System Reliability

Impact of Distributed Energy Resources on Transmission System Reliability S E P T E M B E R 1 3, 2 0 1 8 W E B I N A R Impact of Distributed Energy Resources on Transmission System Reliability National Council on Electricity Policy (NCEP) Alan McBride D I R E C T O R, T R A

More information

Preface PREFACE. Comments and inquiries can be ed to:

Preface PREFACE. Comments and inquiries can be  ed to: Preface Distributed Generation PREFACE The Conditions of Service of Toronto Hydro requires to include terms and conditions of interconnecting generation facilities to the Toronto Hydro distribution system.

More information

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements.

3. Customer shall provide space for metering equipment and meter base as per Springville City Power requirements. A. General This Customer-Owned Generation Standards for Customer-Owned Grid Connected Electric Generating Systems sets forth the requirements and conditions for interconnected non-utility-owned electric

More information

STREAMLINED SOLAR CHECKLIST Owner Name:

STREAMLINED SOLAR CHECKLIST Owner Name: STREAMLINED SOLAR CHECKLIST Owner Name: Address: DEPARTMENT OF PUBLIC WORKS AND PLANNING ALAN WEAVER, DIRECTOR This checklist must be completed by the contractor or an authorized agent of the contractor

More information

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018.

The Green Meter Adapter (GMA) program will become effective on January 15, Customers may start applying for a GMA on January 15, 2018. SUMMARY This bulletin introduces a new PG&E program that allows the installation of an electric meter socket adapter that will accept a wired connection directly from a residential customer s Photo Voltaic

More information

Arial Regular 25pt. Learn Solar Installation From the Pros!

Arial Regular 25pt. Learn Solar Installation From the Pros! Arial Regular 25pt ARIAL Solar Certification BOLD 60pt Training Learn Solar Installation From the Pros! What s the Hype about Solar? Rising Energy Costs Increased demand for energy Expensive infrastructure

More information

P.O. Box 790 Kingston, ON, Canada, K7L 4X7 Phone: Fax:

P.O. Box 790 Kingston, ON, Canada, K7L 4X7 Phone: Fax: Appendix B to Kingston Hydro s Conditions of Service Guide for Distributed Generators Version 2.7, May 19, 2011 Appendix B to Kingston Hydro s Conditions of Service v. 2.7 Page 1 of 29 Table of Contents

More information

APPROACHING. The Inverter. 92 IAEI NEWS May.June approaching the inverter

APPROACHING. The Inverter. 92 IAEI NEWS May.June approaching the inverter APPROACHING approaching the inverter The Inverter 92 IAEI NEWS May.June 2009 www.iaei.org by John Wiles approaching the inverter In our top-to-bottom perspective of a photovoltaic (PV) system, we are still

More information

Green Building Technology

Green Building Technology Green Building Technology Renewable Energy Sources and Design/Specification Guidelines Presented by: Kurt Uhlir & Brian Kustwin Why Renewables? Reduction of SO 2 and NOX along with greenhouse gases such

More information

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW)

City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems <48kW) City of Banning Electric Utility - Residential Self Generating Facility Program (Photovoltaic Systems

More information

Cornerstone Hydro Electric Concepts (CHEC)

Cornerstone Hydro Electric Concepts (CHEC) Guidelines for Applicants Connecting Distributed Generation to Member LDCs of Cornerstone Hydro Electric Concepts Association Inc. Cornerstone Hydro Electric Concepts (CHEC) The CHEC Group is an association

More information

Supply-Side PV Connections

Supply-Side PV Connections Perspectives on PV Supply-Side PV Connections by John Wiles Plan reviewers and inspectors throughout the country are seeing increasing numbers of supply-side connected utility interactive photovoltaic

More information

Corporate Brochure. June 2016

Corporate Brochure. June 2016 Corporate Brochure June 2016 Background SolarCast (Parent) founded August 2012 Solar-Tec spun off as a division of SolarCast in 2014 Focus on Commercial, Industrial, Institutional, Non-Profit, Community

More information

Solar PV Standard Electrical Plan

Solar PV Standard Electrical Plan *** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Permit Number: SCOPE: Standard plan for installation of solar PV systems utilizing 2 wire

More information

REQUIREMENTS FOR APPROVAL OF AN ONLINE - DEFENSIVE DRIVING COURSE (O-DDC) Defensive Driving. Course. Online. Online DDC December 2007 Page 1 of 11

REQUIREMENTS FOR APPROVAL OF AN ONLINE - DEFENSIVE DRIVING COURSE (O-DDC) Defensive Driving. Course. Online. Online DDC December 2007 Page 1 of 11 Defensive Driving Course Online Online DDC December 2007 Page 1 of 11 Alberta Transportation Alberta Transportation Driver Programs & Licensing Standards Driver Programs & Licensing Standards 1 st Floor,

More information

32 IAEI NEWS March. April

32 IAEI NEWS March. April 32 IAEI NEWS March. April 2013 www.iaei.org PV Perspectives by John Wiles perspectives on pv Batteries in PV Systems Electrical power outages are becoming more common in recent times with man-made and

More information

Interconnection Process Simplification Webinar

Interconnection Process Simplification Webinar Please stay tuned for the 1 Interconnection Process Simplification Webinar We will be starting momentarily last updated 3.4.13 2 Agenda Overview of PG&E s NEM Program What you need to know about NEM interconnections

More information

Municipality Generator Interconnection Application Single Meter Application Part I

Municipality Generator Interconnection Application Single Meter Application Part I Municipality Generator Interconnection Application Single Meter Application Part I New Application Revised Application A single customer interconnecting to a single meter at a single premise makes a new

More information

TILLAMOOK PEOPLE S UTILITY DISTRICT

TILLAMOOK PEOPLE S UTILITY DISTRICT TILLAMOOK PEOPLE S UTILITY DISTRICT DISTRIBUTION INTERCONNECTION PROCEDURE Inverter Based Generators 25 kw and Smaller This document contains the interconnection requirements for inverter based generators,

More information

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES

DIVISION 311 MISCELLANEOUS ELECTRICAL RULES DIVISION 311 MISCELLANEOUS ELECTRICAL RULES 918-311-0000 Design, Planning and Lay Out of Electrical Installations by Supervising Electricians A licensed supervising electrician may design, plan and lay

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 27, 2017

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 27, 2017 CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 27, 2017 Item 6, Report No. 26, of the Committee of the Whole, which was adopted without amendment by the Council of the City of Vaughan on

More information

ADOPT INTERCONNECTION AGREEMENT FORMS FOR CUSTOMERS INSTALLING GENERATION EQUIPMENT PURSUANT TO REGULATION 23.

ADOPT INTERCONNECTION AGREEMENT FORMS FOR CUSTOMERS INSTALLING GENERATION EQUIPMENT PURSUANT TO REGULATION 23. TO: Honorable Mayor and City Council THROUGH: Municipal Services Committee (May 10, 2016) FROM: SUBJECT: Water and Power Department ADOPT INTERCONNECTION AGREEMENT FORMS FOR CUSTOMERS INSTALLING GENERATION

More information

Renewable sources of electricity a brief overview

Renewable sources of electricity a brief overview Micro generation 11 Renewable sources of electricity a brief overview THE SCOPE of the 17th Edition is wider and contains many new requirements, including additional requirements to ensure the safe connection

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility

Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Processed Date Columbia Water & Light Interconnection & Net Metering Agreement Electrical Facility Customer s Printed Name Installation Street Address Account Number Please note: Columbia Water & Light

More information

Solar Farm Electrical Control Buildings & Substation Build Project

Solar Farm Electrical Control Buildings & Substation Build Project Brock s Solar Farm Electrical Control Buildings & Substation Build Project PROJECT PROFILE Canadian Solar Inc. Recognized as a leading global solar manufacturer, Canadian Solar Inc. delivers high-efficiency

More information

Duke Energy Carolinas North Carolina Interconnection Request Checklist

Duke Energy Carolinas North Carolina Interconnection Request Checklist Duke Energy Carolinas North Carolina Interconnection Request Checklist The North Carolina Utilities Commission issued North Carolina Interconnection Procedures, Forms, And Agreements For State-Jurisdictional

More information

SOLAR POWER. Stefanie Mathes Project 1 White Paper TWR2009 Select Topics 1Stefanie. A White Paper

SOLAR POWER. Stefanie Mathes Project 1 White Paper TWR2009 Select Topics 1Stefanie. A White Paper SOLAR POWER Project 1 TWR2009 Select Topics 1Stefanie A White Paper Mathes WHAT IS SOLAR? Solar Energy is produced Canadians are becoming increasingly concerned about the environment and how their choices

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Demand Charge-based Time-of- Use Tariff, Net Metering Customer, Customer, Time-of-Use Customer, Time-of-Use Tier,

More information

Customers without access can fax comments and inquiries to , Attn: Gary Thompson, or submit through regular mail to:

Customers without  access can fax comments and inquiries to , Attn: Gary Thompson, or submit through regular mail to: Preface Distributed Generation PREFACE The Conditions of Service of Toronto Hydro requires to include terms and conditions of interconnecting generation facilities to the Toronto Hydro distribution system.

More information

Form C Renewable Energy Micro-Generation Connection Application Distribution System

Form C Renewable Energy Micro-Generation Connection Application Distribution System Form C Renewable Energy Micro-Generation Connection Application Distribution System (Micro-Generation Facilities 10 kw total nameplate capacity) This form is applicable to single or multiple generating

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT INTERCONNECTION AGREEMENT FOR SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION THIS AGREEMENT MUST ACCOMPANY

More information

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Microinverter and ACM Systems for One- and Two-Family Dwellings TOOLKIT DOCUMENT #4 Your City logo here Solar Standard Plan Simplified Microinverter and M Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for systems using utility-interactive Microinverters

More information

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings Your City logo here Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems

More information

Northeast Autonomous and Connected Vehicle Summit

Northeast Autonomous and Connected Vehicle Summit Northeast Autonomous and Connected Vehicle Summit June 12, 2018 Cathie Curtis, Director, Vehicle Programs AAMVA 1 1 Founded in 1933, the American Association of Motor Vehicle Administrators (AAMVA) represents

More information

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings

Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings PV TOOLKIT DOCUMENT #3 Solar PV Standard Plan Simplified Central/String Inverter Systems for One- and Two-Family Dwellings SCOPE: Use this plan ONLY for utility-interactive central/string inverter systems

More information

General Installation Manual July 1, SANYO Energy (USA) Corp. All Rights Reserved.

General Installation Manual July 1, SANYO Energy (USA) Corp. All Rights Reserved. General Installation Manual for SANYO HIT Photovoltaic Modules. Please read this manual completely before use of, or installation of HIT Power modules. This manual applies to the following models: HIT

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP

More information

NET METER REQUEST FORM

NET METER REQUEST FORM Form No. 3651 02/17 NET METER REQUEST FORM In order to receive a Net Meter, please provide the information requested below, sign and return only this coversheet by mail to the address below. NorthWestern

More information

Zero Energy Verification An Alternative Approach. Timothy Snow CESCP Electrical Safety Officer

Zero Energy Verification An Alternative Approach. Timothy Snow CESCP Electrical Safety Officer Zero Energy Verification An Alternative Approach Timothy Snow CESCP Electrical Safety Officer Hierarchy of Risk Control Methods In Order from Safest to Least Safe Elimination Substitution Minimizes Human

More information

Energy Storage System Application Guidelines

Energy Storage System Application Guidelines Energy Storage System Application Guidelines Xcel Energy- Wisconsin January 18 th, 2019 Agenda Guidelines Development Process ESS Review Considerations Net Energy Metering (NEM) Integrity Application Process

More information

Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic

Submission to the IESO re: RDGI Fund Virtual Net Metering Investigation Topic 1. Introduction The Canadian Solar Industries Association (CanSIA) is a national trade association that represents the solar energy industry throughout Canada. CanSIA s vision is for solar energy to be

More information

General Installation Manual Mar 2009, Sanyo Electric Co., Ltd. All Rights Reserved 3/23/09

General Installation Manual Mar 2009, Sanyo Electric Co., Ltd. All Rights Reserved 3/23/09 General Installation Manual General Installation Manual for SANYO HIT Photovoltaic Modules. Please read this manual completely before installation or use of SANYO modules. This manual applies to the following

More information

NET METERING ENROLLMENT APPLICATION REFERENCE GUIDE

NET METERING ENROLLMENT APPLICATION REFERENCE GUIDE NET METERING ENROLLMENT APPLICATION REFERENCE GUIDE March 20, 2006 Updated September 2013 SCOPE The purpose of this Guide is to help you understand sections 2 to 9 of the Net Metering Enrollment Application.

More information

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market

Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market Beacon Power Corporation Participation of Beacon Power s Flywheel Energy Storage Technology in NYISO s Regulation Service Market Prepared for: New York Business Issues Committee May 21, 2008 Safe Harbor

More information

A Look at the 2017 NEC Significant Changes

A Look at the 2017 NEC Significant Changes A Look at the 2017 NEC Significant Changes A Look at the 2017 NEC Significant Changes Michael J. Johnston NECA James T. Dollard Local 98 Philadelphia Electrical JATC This session is eligible for 1 Continuing

More information

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 RULE NO. 17 NET ENERGY METERING Third Revised Sheet 55a Cancels Second Revised Sheet 55a A. ELIGIBLE CUSTOMER-GENERATOR RULE NO. 17 NET ENERGY METERING Net energy metering is available to eligible customer-generators, defined as, permanent

More information

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION

Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION SAMPLE ORDINANCE 3/5/2012 Rider : NET METERING SERVICE AND ELECTRICAL SYSTEM INTEGRATION Section 1: Applicable Service Territory Net metering and electrical system interconnection is available on a first-come,

More information

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy

ENERGY STRATEGY FOR YUKON. Independent Power Production Policy ENERGY STRATEGY FOR YUKON Independent Power Production Policy May 20, 2014 Page 2 of 11 BACKGROUND The Government of Yukon released the Energy Strategy for Yukon in January 2009. The strategy sets out

More information