Welcome Emmett Avenue Reconstruction Road Reconstruction and Water Service Upgrading Public Open House

Size: px
Start display at page:

Download "Welcome Emmett Avenue Reconstruction Road Reconstruction and Water Service Upgrading Public Open House"

Transcription

1 Welcome mmett Avenue Reconstruction Road Reconstruction and Water Service Upgrading Public Open House Wednesday, March 27, p.m. to 8 p.m. Humber High School 100 mmett Avenue mmett Avenue - Open House Panels.docx1 1

2 Purpose This open house provides members of the community with an opportunity to learn about this project: Preview the design drawings Understand the basic construction process Discuss how temporary disruptions will be addressed Provide comments to the City The project team invites residents to ask questions and discuss the project and related issues mmett Avenue - Open House Panels.docx1 2

3 Background mmett is classified as a local road under the City s Road Classification System. It carries less than 2500 vehicles a day. mmett Avenue has deteriorated to the point where reconstruction is required to correct drainage problems and upgrade the road surface. This project has been included in the 2013 Toronto Transportation Capital Budget mmett Avenue - Open House Panels.docx1 3

4 Road Classification Local Roads Provide access to property Less than 2,500 vehicles per day Low traffic speed o bus routes Sidewalks on at least one side of road Low priority for winter maintenance Collector Roads Provide access to property and traffic movement 2,500 to 8,000 vehicles per day Less than 1,500 bus (or streetcar) passenger per day Signalized intersections at arterial roads Sidewalks on both sides of the road Medium priority for winter maintenance Minor Arterial Roads Traffic movement is a primary function 8,000 to 20,000 vehicles per day 1,500 to 5,000 bus passenger per day Speed limits 40 to 60 km/hr o Stop signs; main intersections controlled by traffic signals Sidewalks on both sides; may have bicycle lanes High priority of winter maintenance Major Arterial Roads Traffic movement is a primary function Subject to access controls Greater than 20,000 vehicles per day Greater than 5,000 bus passengers per day Speed limits 50 to 60 km/hr Sidewalks on both sides; may have bicycle lanes High priority of winter maintenance Toronto xpressway Traffic movement is a primary function o property access Speed limits 80 to 100 km/hr o local transit service Pedestrians and cyclists prohibited Grade-separated intersections (no traffic signals) Highest priority of winter maintenance Stanmills Road lmhurst Drive Gerrard Street ast Yonge Street F.G. Gardner xpressway mmett Avenue - Open House Panels.docx1 4

5 Scope of Work struction is planned for June to ovember 2013 Road Reconstruction Includes: xcavation of the existing road structure and replacement with granular materials followed by asphalt paving struction of new curb and gutter including subdrain pipe below Repair of existing sidewalks ew sidewalks from o. 50 mmett Avenue (existing sidewalk currently terminates at this location) south to York Humber High school. Grading, topsoil and sod for boulevards Restoration for any portions of disturbed driveways and roadway connections to sidestreets Upgrade of TTC stops and shelters Underground Infrastructure Renewal: Any water services that are found to be substandard will be replaced between the watermain and front property line mmett Avenue - Open House Panels.docx1 5

6 What s ew Road redesign of mmett Avenue The existing roadway will be reduced from the existing width 9.8 metres to 8.5 metres. This City standard width improves safety for both pedestrians and motorists and provides new parking opportunities Adjustment of existing or addition of new catchbasins in the new roadway to intercept storm drainage. The roadway pavement will be graded to direct storm drainage down the street and away from driveways Reconfiguration of On-Street Parking Providing parallel on-street parking to enhance safety for both pedestrians and motorists The number of parking spots on mmett Avenue is not expected to change Additional green space to provide more tree planting opportunities mmett Avenue - Open House Panels.docx1 6

7 mmett Avenue - Open House Panels.docx1 7

8 Disruptions During construction, sections of mmett Avenue will be reduced to one lane of traffic. Roadway access will be maintained for emergency vehicles all the time. From time to time access to driveways may be interrupted to allow curb work and road building to take place. If water service upgrade is required, water supply to that house will be disrupted. The contractor will give 24 hour notice for any service disruptions. The City suggests that any front yard landscaping and driveway repaving wait until after the construction work is completed. ormal garbage and recycling schedules will be maintained mmett Avenue - Open House Panels.docx1 8

9 Please take the opportunity to ask questions of the project team today. Comment forms are available at the registration table. tact Us You can also contact the project manager directly: Irfan Arab, P. ng. Senior Project ngineer tobicoke Civic Centre, Floor The West Mall, Toronto O M9C 2Y2 Tel: Fax: mail: iarab@toronto.ca The project web page is: mmett Avenue - Open House Panels.docx1 9

10 ext Steps The required road alteration by-law will be considered by tobicoke York Community Council. A struction otice will be issued after the construction contract is awarded. The notice will include the following details: Actual start date for construction ame of the contractor carrying out the work tact person for any questions or concerns during construction mmett Avenue - Open House Panels.docx1 10

11 o. DAT IITIAL RVISIOS DAT: SURVY (2013) y12512svy2d.dgn ( ) DSIG UTILITY MAPPIG STRTLI y12512pd.dgn, y12512pf, y12512sh.dgn y12512ugs.dgn y12512top.dgn y12512psl.dgn DIGITAL IFORMATIO SIGD ngineering and struction Services TOY PAGALLI, P.G. ACTIG XCUTIV DIRCTOR GIRIG AD COSTRUCTIO SRVICS JOH P. KLLY, P.G. ACTIG DIRCTOR CAPITAL WORKS DLIVRY RIC LO, P.G. ACTIG MAAGR LIAR & WATR TRATMT DSIG SCAL: C. SATOS HORIZOTAL 1:200 VRTICAL 1:100 FBRUARY 04, 2013 DRAWIG UMBR SHT GODTIC DATUM XISTIG CROW LVATIO STATIO OTARIO O CALL MMTT AVU FROM GLITO AVU WST TO VROA AVU LOCAL ROAD RCOSTRUCTIO C.SATOS COTRACT o. 13Y-05RD BFOR YOU DIG CALL 100 m 95 m MATCH LI S DRAW IG y12512p GLITO FLATS RAYMOR PARK 9.42 m m m MMTT AVU GRID TO BLD GLITO AVU W ST HCP WK HW mm MI TI WIR THROUGH BOTH SIDS GOTXTIL FILTR FABRIC TRRAFIX 270R OR APPROVD QUAL COMPACTD BACKFILL I TRCH STRAW BA AS DIRCTD PLAC FILTR FABRIC I TRCH AS SHOW OVRLAD FLOW "T" - BAR FC POST WIR FCIG WIR TIS MI STBACK FROM PROPRTY LIMITS / TOP OF BAK - 3.0m 600mm MI RU WIR I TRCH MI. 50mm TMPORARY SILT COTROL FC.T.S. 500mm MI 1000mm MAX 100 m 95 m GODTIC DATUM XISTIG CROW LVATIO STATIO DRAW CHCKD OT TO SCAL.T.S. GLITO AVU WST y12512p2 JA STRT MMTTAVU MMTT AVU K Y P L A LIFT GRAT AD DRAP TRRAFIX 360R GOTXTIL OVR FRAM. CLOS GRAT TO HOLD GOTXTIL I PLAC. 300mm MI CATCHBASI GRAT 300mm MI COCRT CATCHBASI CATCHBASI FRAM TMPORARY SILT COTROL FILTR FOR CATCHBASI y12512p2 2 OF 8 y12512p3 y12512p4 y12512p5 y12512p6 AV y12512p7 BARTO- VILL MMTTAVU GOLDWI AVU PIHILL CRS y12512p8 VROA AV BALA AV CORLL AV VROA AV MMTTAVU BUTTOWOOD AVU CHARLTO STTLMT AVU FORST POIT DRIV BUTTOWOOD AVU BIRCH TR CRSCT LAXIS ROAD W STO ROAD DORASPCR ROAD JA STRT

12 o. DAT IITIAL RVISIOS DAT: SURVY(2013) y12512svy2d.dgn ( ) DSIG UTILITY MAPPIG STRTLI y12512pd.dgn, y12512pf, y12512sh.dgn y12512ugs.dgn y12512top.dgn y12512psl.dgn DIGITAL IFORMATIO SIGD ngineering and struction Services TOY PAGALLI, P.G. ACTIG XCUTIV DIRCTOR GIRIG AD COSTRUCTIO SRVICS JOH P. KLLY, P.G. ACTIG DIRCTOR CAPITAL WORKS DLIVRY RIC LO, P.G. ACTIG MAAGR LIAR & WATR TRATMT DSIG SCAL: MMTT AVU FROM GLITO AVU WST TO VROA AVU HORIZOTAL 1:200 VRTICAL 1:100 FBRUARY 04, 2013 DRAWIG UMBR SHT GODTIC DATUM XISTIG CROW LVATIO STATIO OTARIO O CALL LOCAL ROAD RCOSTRUCTIO COTRACT o. 13Y-05RD 3 OF BFOR YOU DIG CALL 100 m 95 m MATCH LI S DRAWIG y12512p m PARKIG RAYMOR PARK GLITO FLATS MMTT AVU m G/P MATCH LI S DRAWIG y12512p m 100 m 95 m GODTIC DATUM XISTIG CROW LVATIO STATIO DRAW CHCKD C. SATOS C. SATOS y12512p3 y12512p4 MMTTAVU MMTT AVU y12512p5 y12512p6 MMTTAVU BUTTOWOOD AVU OT TO SCAL y12512p3 GLITO AVU WST y12512p2 JA STRT y12512p7 GOLDWI AVU PIHILL CRS y12512p8 VROA AV VROA AV MMTTAVU CHARLTO STTLMT AVU FORST POIT DRIV BUTTOWOOD AVU BIRCH TR CRSCT LAXIS ROAD W STO ROAD DORASPCR ROAD VILL AV BARTO- CORLL AV BALA AV JA STRT K Y P L A

13 o. DAT IITIAL RVISIOS DAT: DSIG UTILITY MAPPIG STRTLI y12512pd.dgn, y12512pf, y12512sh.dgn y12512ugs.dgn y12512top.dgn y12512psl.dgn DIGITAL IFORMATIO SIGD ngineering and struction Services TOY PAGALLI, P.G. ACTIG XCUTIV DIRCTOR GIRIG AD COSTRUCTIO SRVICS JOH P. KLLY, P.G. ACTIG DIRCTOR CAPITAL WORKS DLIVRY RIC LO, P.G. ACTIG MAAGR LIAR & WATR TRATMT DSIG SCAL: HORIZOTAL 1:200 VRTICAL 1:100 FBRUARY 04, 2013 DRAWIG UMBR SHT GODTIC DATUM XISTIG CROW LVATIO STATIO BFOR YOU DIG CALL OTARIO O CALL COTRACT o. 13Y-05RD MMTT AVU FROM GLITO AVU WST TO VROA AVU LOCAL ROAD RCOSTRUCTIO m 95 m m MATCH LI S DRAW IG y12512p HMH SURVY (2013) y12512svy2d.dgn ( ) MMTT AVU Bol m RAYMOR PARK GLITO FLATS MATCH LI S DRAWIG y12512p m 95 m GODTIC DATUM XISTIG CROW LVATIO STATIO DRAW CHCKD C. SATOS C. SATOS y12512p3 y12512p4 MMTTAVU MMTT AVU y12512p5 y12512p6 MMTTAVU BUTTOWOOD AVU OT TO SCAL GLITO AVU WST y12512p2 JA STRT K Y P L A y12512p4 4 OF 8 AV y12512p7 BARTO- VILL GOLDWI AVU PIHILL CRS y12512p8 VROA AV BALA AV CORLL AV VROA AV MMTTAVU CHARLTO STTLMT AVU FORST POIT DRIV BUTTOWOOD AVU BIRCH TR CRSCT LAXIS ROAD W STO ROAD DORASPCR ROAD JA STRT

14 o. DAT IITIAL RVISIOS DAT: SURVY (2013) y12512svy2d.dgn ( ) DSIG UTILITY MAPPIG STRTLI y12512pd.dgn, y12512pf, y12512sh.dgn y12512ugs.dgn y12512top.dgn y12512psl.dgn DIGITAL IFORMATIO SIGD ngineering and struction Services TOY PAGALLI, P.G. ACTIG XCUTIV DIRCTOR GIRIG AD COSTRUCTIO SRVICS JOH P. KLLY, P.G. ACTIG DIRCTOR CAPITAL WORKS DLIVRY RIC LO, P.G. ACTIG MAAGR LIAR & WATR TRATMT DSIG SCAL: HORIZOTAL 1:200 VRTICAL 1:100 FBRUARY 04, 2013 DRAWIG UMBR SHT GODTIC DATUM 100 m XISTIG CROW LVATIO STATIO BFOR YOU DIG CALL OTARIO O CALL MMTT AVU FROM GLITO AVU WST TO VROA AVU LOCAL ROAD RCOSTRUCTIO COTRACT o. 13Y-05RD 5 OF m RAYMOR PARK T 6+00 MATCH LI S DRAWIG y12512p m 6+50 WST PARK HALTHCAR CTR GLITO FLATS 120 HYD Stump Bol Bol BT Pedestal MMTT AVU m MATCH LI S DRAWIG y12512p m 100 m GODTIC DATUM XISTIG CROW LVATIO STATIO DRAW CHCKD C. SATOS C. SATOS y12512p3 y12512p4 MMTTAVU MMTT AVU y12512p5 y12512p6 MMTTAVU BUTTOWOOD AVU OT TO SCAL y12512p5 GLITO AVU WST y12512p2 JA STRT y12512p7 GOLDWI AVU PIHILL CRS y12512p8 VROA AV VROA AV MMTTAVU CHARLTO STTLMT AVU FORST POIT DRIV BUTTOWOOD AVU BIRCH TR CRSCT LAXIS ROAD W STO ROAD DORASPCR ROAD VILL AV BARTO- CORLL AV BALA AV JA STRT K Y P L A

15 DIGITAL IFORMATIO o. DAT IITIAL RVISIOS SIGD DAT: SURVY (2013) y12512svy2d.dgn ( ) DSIG UTILITY MAPPIG STRTLI y12512pd.dgn, y12512pf, y12512sh.dgn y12512ugs.dgn y12512top.dgn y12512psl.dgn ngineering and struction Services TOY PAGALLI, P.G. ACTIG XCUTIV DIRCTOR GIRIG AD COSTRUCTIO SRVICS DSIG SCAL: HORIZOTAL 1:200 VRTICAL 1:100 FBRUARY 04, 2013 DRAWIG UMBR COTRACT o. 13Y-05RD SHT GODTIC DATUM 100 m XISTIG CROW LVATIO STATIO BFOR YOU DIG CALL OTARIO O CALL MMTT AVU FROM GLITO AVU WST TO VROA AVU LOCAL ROAD RCOSTRUCTIO JOH P. KLLY, P.G. ACTIG DIRCTOR CAPITAL WORKS DLIVRY RIC LO, P.G. ACTIG MAAGR LIAR & WATR TRATMT m YORK HUMBR HIGH SCHOOL PAY PARKIG BOX 9.71m 9.37 m MATCH LI S DRAWIG y12512p HYD PM Bol G/P G/P Bol Bol Bol 6 5 PARKIG PARKIG MMTT AVU WST PARK HALTHCAR CTR GLITO FLATS MATCH LI S DRAWIG y12512p m 100 m GODTIC DATUM XISTIG CROW LVATIO STATIO DRAW CHCKD C. SATOS C. SATOS y12512p3 y12512p4 MMTTAVU MMTT AVU y12512p5 y12512p6 MMTTAVU BUTTOWOOD AVU OT TO SCAL y12512p6 GLITO AVU WST y12512p2 JA STRT y12512p7 GOLDWI AVU PIHILL CRS y12512p8 VROA AV VROA AV MMTTAVU CHARLTO STTLMT AVU FORST POIT DRIV BUTTOWOOD AVU BIRCH TR CRSCT LAXIS ROAD W STO ROAD DORASPCR ROAD K Y P L A 6 OF 8 BARTO- VILL AV CORLL AV BALA AV JA STRT

16 DIGITAL IFORMATIO o. DAT IITIAL RVISIOS SIGD DAT: SURVY(2013) y12512svy2d.dgn ( ) DSIG DSIG UTILITY UTILITY MAPPIG MAPPIG STRTLI STRTLI y12512pd.dgn, y12512pf, y12512sh.dgn y12512ugs.dgn y12512top.dgn y12512psl.dgn ngineering and struction Services TOY PAGALLI, P.G. ACTIG XCUTIV DIRCTOR GIRIG AD COSTRUCTIO SRVICS JOH P. KLLY, P.G. ACTIG DIRCTOR CAPITAL WORKS DLIVRY RIC LO, P.G. ACTIG MAAGR LIAR & WATR TRATMT DSIG SCAL: C. SATOS FBRUARY 04, 2013 C. SATOS HORIZOTAL 1:200 VRTICAL 1:100 DRAWIG UMBR COTRACT o. 13Y-05RD SHT 7 OF 8 GODTIC DATUM XISTIG CROW LVATIO STATIO BFOR YOU DIG CALL OTARIO O CALL MMTT AVU FROM GLITO AVU WST TO VROA AVU LOCAL ROAD RCOSTRUCTIO m 120 m XISTIG WOOD POSTS TO B RMOVD MATCH LI S DRAWIG y12512p A HYD 9+00 GK 3 65 PARKIG 65B PARKIG YORK HUMBR HIGH SCHOOL 9.72 m 9+50 MMTT AVU BT BT Pedestal Pedestal BT Pedestal GK MULTI UTIL BMH MULTI Stump UTIL HCP PM HYD PM m 75 PARKIG MULTI UTIL SOD O 100mm TOP SOIL MATCH LI S DRAWIG y12512p m 120 m GODTIC DATUM XISTIG CROW LVATIO STATIO DRAW CHCKD y12512p3 y12512p4 MMTTAVU MMTT AVU y12512p5 y12512p6 MMTTAVU BUTTOWOOD AVU OT TO SCAL y12512p7 GLITO AVU WST y12512p2 JA STRT y12512p7 GOLDWI AVU PIHILL CRS y12512p8 VROA AV VROA AV MMTTAVU CHARLTO STTLMT AVU FORST POIT DRIV BUTTOWOOD AVU BIRCH TR CRSCT LAXIS ROAD W STO ROAD DORASPCR ROAD VILL AV BARTO- CORLL AV BALA AV JA STRT K Y P L A

17 DIGITAL IFORMATIO o. DAT IITIAL RVISIOS SIGD DAT: SURVY(2013) y12512svy2d.dgn ( ) DSIG UTILITY MAPPIG STRTLI y12512pd.dgn, y12512pf, y12512sh.dgn y12512ugs.dgn y12512top.dgn y12512psl.dgn ngineering and struction Services TOY PAGALLI, P.G. ACTIG XCUTIV DIRCTOR GIRIG AD COSTRUCTIO SRVICS CAPITAL WORKS DLIVRY DSIG SCAL: C. SATOS C. SATOS HORIZOTAL 1:200 VRTICAL 1:100 DRAWIG UMBR COTRACT o. 12Y-04RD SHT GODTIC DATUM XISTIG CROW LVATIO STATIO BFOR YOU DIG CALL OTARIO O CALL MMTT AVU FROM GLITO AVU WST TO VROA AVU LOCAL ROAD RCOSTRUCTIO JOH P. KLLY, P.G. ACTIG DIRCTOR RIC LO, P.G. ACTIG MAAGR LIAR & WATR TRATMT MARCH 15, m 130 m 125 m 120 m 9.79 m XISTIG TR TO B RMOVD GRID TO BLD GRID TO BLD VROA AVU PARKIG m m MMTT AVU PARKIG MULTI UTIL MULTI UTIL BMH MULTI UTIL HYD 7 65A A GK MATCH LI S DRAWIG y12512p7 MULTI UTIL 65 PARKIG 135 m 130 m 125 m 120 m GODTIC DATUM XISTIG CROW LVATIO STATIO DRAW CHCKD y12512p3 y12512p4 MMTTAVU MMTT AVU y12512p5 y12512p6 MMTTAVU BUTTOWOOD AVU OT TO SCAL GLITO AVU WST y12512p2 JA STRT K Y P L A y12512p8 8 OF 8 AV y12512p7 BARTO- VILL GOLDWI AVU PIHILL CRS y12512p8 VROA AV BALA AV CORLL AV VROA AV MMTTAVU CHARLTO STTLMT AVU FORST POIT DRIV BUTTOWOOD AVU BIRCH TR CRSCT LAXIS ROAD W STO ROAD DORASPCR ROAD JA STRT

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits

CITY CLERK. Warrants for All-Way Stop Sign Control and 40 km/h Maximum Speed Limits CITY CLERK Clause embodied in Report No. 9 of the, as adopted by the Council of the City of Toronto at its Special Meeting held on July 30, 31 and August 1, 2002. 10 Warrants for All-Way Stop Sign Control

More information

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS

CAPITAL FUND 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 9510 STREET & SIDEWALK IMPROVEMENTS FIVE-YEAR CAPITAL IMPROVEMENT PROGRAM FISCAL YEARS 2019-2023 9510 STREET & SIDEWALK IMPROVEMENTS - 01 STREET AND SIDEWALK MAINTENANCE PROGRAM $1,250,000 $0 $1,250,000

More information

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction

Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction Brigham City 1200 West Box Elder Creek Bridge - Widening Project Type Reconstruction 550 North to 650 North $ 1,750,000 $ 1,582,113 To widen an existing bridge on 1200 West over Box Elder Creek that will

More information

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School

McNICOLL BUS GARAGE. Public Open House June 12, 2017 Mary Ward Catholic School McNICOLL BUS GARAGE Public Open House June 12, 2017 Mary Ward Catholic School THE NEED FOR A NEW BUS GARAGE riders Increased ridership means buses Need for new buses garage And a new bus facility Garages

More information

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN

EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) PLEASE SIGN IN WELCOME TO OUR PUBLIC OPEN HOUSE EGLINTON CROSSTOWN LIGHT RAIL TRANSIT (LRT) Preliminary Planning for a Transit Project Assessment June 15, 17, 18, 23, 24 and 25, 2009 PLEASE SIGN IN Members of the Project

More information

Construction Staging Area 4 Avenue Road

Construction Staging Area 4 Avenue Road REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

2.0 Development Driveways. Movin Out June 2017

2.0 Development Driveways. Movin Out June 2017 Movin Out June 2017 1.0 Introduction The proposed Movin Out development is a mixed use development in the northeast quadrant of the intersection of West Broadway and Fayette Avenue in the City of Madison.

More information

Chapter 740, Street Vending One Year Review

Chapter 740, Street Vending One Year Review STAFF REPORT ACTION REQUIRED Chapter 740, Street Vending One Year Review Date: April 7, 2015 To: From: Wards: Reference Number: Licensing and Standards Committee Executive Director, Municipal Licensing

More information

City of Houston Fondren Road Paving and Drainage

City of Houston Fondren Road Paving and Drainage City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial

More information

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID

BIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION

More information

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE

CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE CITY OF TORRANCE PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION INFRASTRUCTURE UPDATE TUESDAY, DECEMBER 5, 2017 1 DISCUSSION TOPICS Update of Infrastructure Action Plan (IAP) o Sidewalk and Roadway projects

More information

ENGINEERING BEST PRACTICE BP2.2.1

ENGINEERING BEST PRACTICE BP2.2.1 1. SUBJECT DRIVEWAY REQUIREMENT POLICIES RESIDENTIAL 2. DEFINITIONS Driveway Paved area that provides access from a roadway to private property. Frontage Exterior lot line abutting a public right-of-way,

More information

and Members of Municipal Council City of Niagara Falls, Ontario Mewburn Road Speed Control Review

and Members of Municipal Council City of Niagara Falls, Ontario Mewburn Road Speed Control Review TS-2018-10 May 8, 2018 REPORT TO: SUBMITTED BY: SUBJECT: Mayor James M. Diodati and Members of Municipal Council City of Niagara Falls, Ontario Transportation Services Department TS-2018-10 Mewburn Road

More information

WELCOME TO OUR PUBLIC OPEN HOUSE Eglinton Crosstown Light Rail Transit (LRT)

WELCOME TO OUR PUBLIC OPEN HOUSE Eglinton Crosstown Light Rail Transit (LRT) WELCOME TO OUR PUBLIC OPEN HOUSE Eglinton Crosstown Light Rail Transit (LRT) Preliminary Planning for a Transit Project Assessment November 23 rd, 24 th, 25 th, 26 th & December 2 nd, 8 th, 10 th 2009

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 6, 2018

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 6, 2018 TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON FEBRUARY 6, 2018 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR, ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER HAMILTON

More information

Attachment 1 - City of Toronto Priority Projects for Phase 1: Federal Public Transit Infrastructure Fund (PTIF)

Attachment 1 - City of Toronto Priority Projects for Phase 1: Federal Public Transit Infrastructure Fund (PTIF) EX20.4 Attachment 1 Attachment 1 - City of Toronto Priority Projects for Phase 1: Federal Public Transit Infrastructure Fund () Project Title Toronto Transit Commission Led Projects Bridges/ Structures

More information

Appendix C Preferred Solution

Appendix C Preferred Solution Appendix C Preferred Solution C.1 Conceptual Design Drawings C.2 Preferred Option Ideas and Inspiration C.3 Concept Renderings C.4 Cost Estimate Appendix C.1 Conceptual Design Drawings Plan View Brock

More information

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN

2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN 2 MAJOR MACKENZIE DRIVE WEST JOG ELIMINATION AT HUNTINGTON ROAD CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior

More information

Chapter 740, Street Vending One Year Bylaw Review

Chapter 740, Street Vending One Year Bylaw Review Chapter 740, Street Vending One Year Bylaw Review Licensing and Standards Committee City Hall, 2 nd Floor, Committee Room 1 Tuesday April 21, 2015 Carleton Grant, Director, Policy and Strategic Support

More information

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited.

RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Guycoki (Eastern) Limited. RICHMOND OAKS HEALTH CENTRE 6265 PERTH STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: Guycoki (Eastern) Limited June 16, 2016 116-638 Brief_1.doc D. J. Halpenny & Associates Ltd. Consulting

More information

MIDWAY CITY Municipal Code

MIDWAY CITY Municipal Code TITLE 8 STREETS AND SIDEWALKS MIDWAY CITY Municipal Code CHAPTER 8.01 UTAH CRIMINAL AND TRAFFIC CODE ADOPTED CHAPTER 8.02 UNLAWFUL PARKING CHAPTER 8.03 TRAFFIC REGULATIONS CHAPTER 8.04 RIGHT-OF-WAY REGULATIONS

More information

TORONTO MUNICIPAL CODE CHAPTER 903, PARKING FOR PERSONS WITH DISABILITIES. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES

TORONTO MUNICIPAL CODE CHAPTER 903, PARKING FOR PERSONS WITH DISABILITIES. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES 903-1. General definitions. 903-2. Specific definitions 903-3. Interpretation. 903-4. Use and display of permit. Chapter 903 PARKING FOR PERSONS WITH DISABILITIES ARTICLE I On-Street and Off-Street Parking

More information

SECTION 9 STORM SEWER INLETS

SECTION 9 STORM SEWER INLETS SECTION 9 STORM SEWER INLETS CITY OF WESTMINSTER STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA SECTION 9 STORM SEWER INLETS 9.1 INTRODUCTION There are three types of inlets: curb opening, grated, and combination

More information

CITY OF STEVENS POINT AGENDA

CITY OF STEVENS POINT AGENDA CITY OF STEVENS POINT BOARD OF PUBLIC WORKS MEETING Monday, September 11, 2017 6:00 p.m. (or immediately following previously scheduled meeting) Lincoln Center 1519 Water Street Stevens Point, WI 54481

More information

Parking Areas and Driveways for Single and Two Family Dwellings

Parking Areas and Driveways for Single and Two Family Dwellings Building Information BURNABY PLANNING AND BUILDING DEPARTMENT Parking Areas and Driveways for The purpose of this brochure is to explain to owners, designers and builders the parking and driveway requirements

More information

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP)

Public Information Packet FY Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Public Information Packet FY - Fargo-Moorhead Metropolitan Transportation Improvement Program (TIP) Comment Form Annual Element TIP Projects - TIP Projects Year - Metropolitan Transportation Improvement

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. Design Endorsement for Sterling Boulevard Extension Date of Meeting: July 20, 2017 # 6 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Design Endorsement for Sterling Boulevard Extension

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Service/Safety Committee December 15, 2015 City Council December 21, 2015 Agenda Item: Amendment No. 1 to Engineering Services Agreement with CPS for City Project No. 7143,

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 EXECUTIVE SUMMARY July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Executive Summary Prepared For: Ms. Khalilah Ffrench,

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year

Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020

More information

5. OPPORTUNITIES AND NEXT STEPS

5. OPPORTUNITIES AND NEXT STEPS 5. OPPORTUNITIES AND NEXT STEPS When the METRO Green Line LRT begins operating in mid-2014, a strong emphasis will be placed on providing frequent connecting bus service with Green Line trains. Bus hours

More information

Steese Rd - Curb & Sidewalk Improvement

Steese Rd - Curb & Sidewalk Improvement REF. NO. ITEM NO. Steese Rd - Curb & Sidewalk Improvement DESCRIPTION QTY UNITS UNIT COST SUB-TOTAL 1 103.05 Requirement of Contract Bid 1 LS 24,048.00 24,048.00 2 201 Clearing and Grubbing 1 LS 11,077.00

More information

Secured Market Rental 100 Project at 3070 Kingsway, Vancouver, BC Letter Report

Secured Market Rental 100 Project at 3070 Kingsway, Vancouver, BC Letter Report ovember 10, 2017 6085.02 Tamara Rowland Conwest Development Consultants 250-1311 Kootenay Street Vancouver, BC V5K 4YR VIA E-MAIL Tamara.Rowland@conwest.com Dear Tamara Re Secured Market Rental 100 Project

More information

DRIVEWAY/SIDEWALK PERMIT APPLICATION

DRIVEWAY/SIDEWALK PERMIT APPLICATION JOB INFORMATION CITY OF ALEXANDRIA 704 Broadway Alexandria, MN 56308 Phone: 320-763-6678 Fax: 320-763-3511 DRIVEWAY/SIDEWALK PERMIT APPLICATION Permit Fee: $50.00 Deposit: $300.00 PERMIT NUMBER: ROW DATE:

More information

Revised Evaluation Scores. System Preservation

Revised Evaluation Scores. System Preservation Revised Evaluation s System Preservation This page provides a summary of any revisions made to the draft scores presented at the October th Attributable Funds mmittee meeting. The information below highlights

More information

Scarborough Transit Planning

Scarborough Transit Planning Scarborough Transit Planning April 23, 2016 Transportation Planning Section City Planning Division Overview 1. Developing Toronto s Transit Network Plan 2. Scarborough Transit Planning 1. Minutes of last

More information

2011 LOCAL STREET IMPROVEMENTS

2011 LOCAL STREET IMPROVEMENTS 11 LOCAL STREET IMPROVEMENTS FOR THE MARCH 11 LIST OF DRAWINGS W. MAIN STREET/STH 19 E. MAIN STREET/STH 19/STH 113 DRAWING TITLE NO. TITLE 1 PROJECT OVERVIEW 2 KLEIN DRIVE CONSTRUCTION PHASING PLAN 3 PHASE

More information

Green Line LRT: Beltline Segment Update April 19, 2017

Green Line LRT: Beltline Segment Update April 19, 2017 Green Line LRT: Beltline Segment Update April 19, 2017 Quick Facts On April 11, 2017, City Council approved Administration s recommendation for the Green Line to be underground in the Beltline from 2 Street

More information

PIER 1 WEST BASIN MARINA SLIP 1 PIER 2 SLIP 2 PIER 3 SHEET 2 SHEET 3 SHEET 4 SHEET 5 PORT OF ASTORIA PORT OF ASTORIA SURVEY EXTENT NOTES: LEGEND

PIER 1 WEST BASIN MARINA SLIP 1 PIER 2 SLIP 2 PIER 3 SHEET 2 SHEET 3 SHEET 4 SHEET 5 PORT OF ASTORIA PORT OF ASTORIA SURVEY EXTENT NOTES: LEGEND SURVY XTT SHT 2 SHT PIR 1 SLIP 1 WST BASI MARIA SHT 4 SLIP 2 PIR SHT 5 OTS: 1. THS CHARTS RPRSTS S COLLCTD O MARCH 4 21 BY TRRASOD LIMITD AT CTRAL WATRFROT SHIPPIG TRMIALS 2. DATA WAS COLLCTD USIG A 4

More information

State Avenue Corridor Bus Rapid Transit (BRT)

State Avenue Corridor Bus Rapid Transit (BRT) State Avenue Corridor Bus Rapid Transit (BRT) Moving Forward Incrementally April 2010 State Ave. BRT Update Bus Rapid Transit Overview State Ave. Alternatives Analysis Results What s Coming Up Right Away!

More information

Contract Awards for Tender Calls and for the Construction of Works Associated with the City's Basement Flooding Protection Program

Contract Awards for Tender Calls and for the Construction of Works Associated with the City's Basement Flooding Protection Program STAFF REPORT ACTION REQUIRED Contract Awards for Tender Calls 319-2013 and 70-2014 for the Construction of Works Associated with the City's Basement Flooding Protection Program Date: April 30, 2014 To:

More information

EXCEPTION TO STANDARDS REPORT

EXCEPTION TO STANDARDS REPORT EXCEPTION TO STANDARDS REPORT PROJECT DESCRIPTION AND NEED The project is located in Section 6, Township 23 North, Range 9 East and Section 31 Township 24 North, Range 9 East, in the Town of Stockton,

More information

Dixie Transportation Planning Office

Dixie Transportation Planning Office A project must be given a yes rating on items 1 & 2 in order to be prioritized. Sponsor: St. George City Project: Pioneer Parkway Type: Road Widening and Reconstruction Rev. 9/17/2010 Dixie Transportation

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

3.15 SAFETY AND SECURITY

3.15 SAFETY AND SECURITY 3.15 SAFETY AND SECURITY Introduction This section describes the environmental setting and potential effects of the alternatives analyzed in this EIR with regard to safety and security in the SantaClara-Alum

More information

Public Works. Capital Projects FY

Public Works. Capital Projects FY Public Works Capital Projects FY 2015-17 Projects Completed FY 2014 All Done Projects! Residential and Collector Street Paving Lower Westside Arterial Street Rehab: Front, River St South, Soquel Hwy 1

More information

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC

DATE: March 21, 2017 REPORT NO. PW TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ] 2.0 TOPIC PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION DATE: March 21, 2017 REPORT NO. PW2017-022 TO: FROM: Chair and Members Committee of the Whole Operations and Administration E. (Beth) Goodger, General Manager

More information

Project Scoping Open House Welcome

Project Scoping Open House Welcome Scoping Meeting Project Scoping Open House Welcome Alternatives Analysis (AA) and Draft Environmental Impact Statement/Draft Environmental Impact Report (DEIS/DEIR) Project Purpose Purpose of the Project

More information

800 Access Control, R/W Use Permits and Drive Design

800 Access Control, R/W Use Permits and Drive Design Table of Contents 801 Access Control... 8-1 801.1 Access Control Directives... 8-1 801.2 Access Control Policies... 8-1 801.2.1 Interstate Limited Access... 8-1 801.2.2 Limited Access... 8-1 801.2.3 Controlled

More information

4 Circulation & Transportation

4 Circulation & Transportation 4.1 Mobility Network The mobility network at the new St. Paul s hospital and health campus is comprised of an interconnected system of sidewalks, cycle paths, transit routes and roadways. Figure 4-1: Indicative

More information

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269)

City Hall 539 Phoenix Street South Haven, Michigan Telephone (269) Fax (269) City of South Haven City Hall 539 Phoenix Street South Haven, Michigan 49090-1499 Telephone (269) 637-0700 Fax (269) 637-5319 Dunkley and Black River Infrastructure Improvements Dunkley - Dyckman Avenue

More information

Plan Check Policies and Guidelines

Plan Check Policies and Guidelines VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.

More information

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014

Background. Request for Decision. Pedestrian Lighting Standards for Road Right-of-ways. Recommendation. Presented: Monday, Mar 17, 2014 Presented To: Operations Committee Request for Decision Pedestrian Lighting Standards for Road Right-of-ways Presented: Monday, Mar 17, 2014 Report Date Thursday, Mar 06, 2014 Type: Presentations Recommendation

More information

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY

MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY MOBILITY AND ACCESSIBILITY IN OUR COMMUNITY MOBILITY AND ACCESSIBILITY BACKGROUND Mobility and Accessibility Working Committee Broad representation Transit, Transportation, Planning and Development, Facility

More information

Attachment F Transportation Technical Memorandum

Attachment F Transportation Technical Memorandum Attachment F Transportation Technical Memorandum Sounder Yard and Shops Facility Project Transportation Technical Memorandum March 25, 216 Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff

More information

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS

November 1, Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway. Traffic Impact Statement BH-1 and BH-2, Southgate Drive, Bedford, NS 161-12598 Mr. Jafar Tabrizi President, Tabrizi Rugs 180 Bedford Highway Bedford, NS B4A 1C1 [Via Email: tabrizi@tabrizi.com] RE: Traffic Impact Statement Dear Mr. Tabrizi: Plans are being prepared for

More information

Date of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card)

Date of Issue: For: County Engineer. County Road No.: Maintenance Area: Section Forman Payment Required: (Options: Cash Cheque Credit Card) County of Wellington Engineering Services Department Roads Division 74 Woolwich Street Guelph, Ontario N1H 3T9 Phone: (519) 837-2601 Fax: (519) 837-8138 Email: roadsinfo@wellington.ca ENTRANCE PERMIT OWNER/APPLICANT

More information

PROPOSED TRAFFIC RESOLUTION

PROPOSED TRAFFIC RESOLUTION Reference Number: TR 50-18 Location:, Brooklyn Bus Hub - Brooklyn Proposal: Information: To provide new bus stops to create a Bus hub location on Cleveland Street, Brooklyn, as part of Wellington s new

More information

1 Downtown LRT Connector: Draft Concept

1 Downtown LRT Connector: Draft Concept Downtown LRT Connector: Draft Concept Plan November 2010 We re moving forward. Get involved. On June 21, 2010, City Council approved a street-level downtown LRT route, including a connector for the future

More information

SCAN Land Use and Transportation Committee Report June 10, 2015

SCAN Land Use and Transportation Committee Report June 10, 2015 DRAFT DRAFT DRAFT Exhibit A to SCAN Minutes - June 10, 2015 SCAN Land Use and Transportation Committee Report June 10, 2015 Gaiety Hollow In April the Committee provided testimony in support of the Lord

More information

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011)

POLICIES FOR THE INSTALLATION OF SPEED HUMPS (Amended May 23, 2011) (Amended May 23, 2011) 1. Speed humps are an appropriate mechanism for reducing speeds on certain streets in Pasadena when properly installed under the right circumstances. 2. Speed humps can be considered

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 2/19/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015

Van Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015 Van Ness Transit Corridor Improvement Project Engineering, Maintenance and Safety Committee March 25, 2015 Project Need 16,000 daily passenger boardings within the project corridor Average bus speed 8

More information

Public Works and Infrastructure Committee. General Manager, Transportation Services and Treasurer. P:\2015\Internal Services\rev\pw15018rev (AFS20761)

Public Works and Infrastructure Committee. General Manager, Transportation Services and Treasurer. P:\2015\Internal Services\rev\pw15018rev (AFS20761) Increases to Parking Ticket Set Fines STAFF REPORT ACTION REQUIRED Date: September 14, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation

More information

CITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS

CITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS CITY OF FONTANA HANDBOOK ON RESIDENTIAL APPROACH CONSTRUCTION PERMITS GENERAL INFORMATION A driveway approach is an area, construction or improvement between the roadway of a public street and private

More information

EMERGING REQUIREMENTS

EMERGING REQUIREMENTS Page of 0 EMERGING REQUIREMENTS EXTERNALLY INITIATED PLANT RELOCATIONS THESL distributes electricity to residential, commercial, and industrial customers via overhead and underground infrastructure. This

More information

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Rocky Mount. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed by the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion

Workshop Agenda. Bransford Roundabout. Bedford Intersection/Roundabout. Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Workshop Agenda Bransford Roundabout Bedford Intersection/Roundabout Section 3 Revisions (Left turn lanes) Roadway Section/Curb Type Discussion Project Phasing Summary of Recommendation Purpose: Provide

More information

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way

APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove within a county road right-of-way IONIA COUNTY ROAD COMMISSION 170 E. Riverside Drive; P.O. Box 76, Ionia MI 48846 (616) 527-1700 (office) or (616) 527-8848 (fax) APPLICATION FOR PERMIT to construct, operate, maintain, use and/or remove

More information

West Broadway Reconstruction/LRT Design. March 19, 2015

West Broadway Reconstruction/LRT Design. March 19, 2015 West Broadway Reconstruction/LRT Design March 19, 2015 1 Meeting Agenda 6:05 6:30 PM Brief presentation What we heard Project overview 6:30 8:00 PM Visit Six Topic Areas Road and LRT design elements Pedestrian

More information

MOTION INNOVATION. winnipegtransit.com

MOTION INNOVATION. winnipegtransit.com INNOVATION IN MOTION SPEED RELIABILITY INFORMATION COMFORT Winnipeg Transit 2010 Winner of Canadian Urban Transit Association s Exceptional Performance/Outstanding Achievement Award Winnipeg Transit Improvements

More information

Alconbury Weald: the story so far

Alconbury Weald: the story so far Alconbury Weald: the story so far The development of Alconbury Weald is a 20 year project, which will be rolled out with a series of phased investments in new infrastructure on site and across the local

More information

SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS

SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS SPEED HUMP POLICY and PROCEDURES for RESIDENTIAL AREAS City of Panama City, Florida Public Works Department 9 Harrison Avenue Panama City, Florida 32401 Phone: (850) 872-3015 Effective 1/22/08 Table of

More information

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury

TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury TRANSIT FEASIBILITY STUDY Town of Bradford West Gwillimbury Open House Presentation January 19, 2012 Study Objectives Quantify the need for transit service in BWG Determine transit service priorities based

More information

Capital Improvement Plan Review

Capital Improvement Plan Review City of Manhattan Beach Public Works Department Fiscal Year 2014/2015 2018/2019 Capital Improvement Plan Review Community Meeting: April 10, 2014 Objectives Creating the Capital Improvement Plan Funding

More information

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for

C Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for GENERAL FUND (01) C017060.589000 EXPO Maintenance Yard Buffer Park 440,000 - - - C019098.589000 Downtown Santa Monica Temporary Use TOD Site 836,400 - - - M014078.589000 Swim Facilities Planned Maintenance

More information

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By:

TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY. Sacramento, CA. Prepared For: MBK Homes. Prepared By: TALMONT TOWNHOMES MADISON KENNETH SPA TRAFFIC IMPACT STUDY Sacramento, CA Prepared For: MBK Homes Prepared By: KD Anderson & Associates 3853 Taylor Road, Suite G Loomis, California 95650 (916) 660-1555

More information

DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES

DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES DRIVEWAY DESIGN AND CONSTRUCTION GUIDELINES These guidelines are provided to assist you in the construction of your driveway to help you determine: The best location on your property. What you need to

More information

5 SPEED LIMIT REVISIONS ON REGIONAL ROADS JANUARY UPDATE

5 SPEED LIMIT REVISIONS ON REGIONAL ROADS JANUARY UPDATE Clause No. 5 in Report No. 1 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on January 23, 2014. 5 SPEED LIMIT REVISIONS

More information

FY Projects

FY Projects FY 2009-2010 Projects Project # 1 1037 Light Emitting Diode (LED) Signal Lamps Upgrading Program Replace Light Emitting Diode indications in traffic signal heads. $50,000 2 1103 City Government Channel

More information

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017

US 29 Bus Rapid Transit Planning Board Briefing. February 16, 2017 US 29 Bus Rapid Transit Planning Board Briefing February 16, 2017 Project Goals Improve the quality of transit service Improve mobility opportunities and choices Enhance quality of life Support master

More information

Purpose of Tonight s Meeting

Purpose of Tonight s Meeting Purpose of Tonight s Meeting Point Dume Neighborhood Traffic Calming Project background, goals Resident Safety Concerns Existing Conditions Fact Sheets Map of Proposed Improvements Discussion Next Steps

More information

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date,

Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, Welcome The City has undertaken a naming exercise for the existing and future LRT lines. The SE to West LRT, as the project has been called to date, is now called the Valley Line. We are here to present

More information

THE WAY WE MOVE LRT FOR EVERYONE

THE WAY WE MOVE LRT FOR EVERYONE THE WAY WE MOVE LRT FOR EVERYONE 2 LRT for Everyone LRT FOR EVERYONE Light rail is about more than transit; it s about transforming Edmonton. As the city grows, so do its transportation needs. LRT is an

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS

SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS SPEED CUSHION POLICY AND INSTALLATION PROCEDURES FOR RESIDENTIAL STREETS CITY OF GRAND PRAIRIE TRANSPORTATION SERVICES DEPARTMENT SPEED CUSHION INSTALLATION POLICY A. GENERAL Speed cushions are an effective

More information

4 SPEED LIMIT REVISIONS ON REGIONAL ROADS

4 SPEED LIMIT REVISIONS ON REGIONAL ROADS Report No. 4 of the Transportation Services Committee Regional Council Meeting of April 19, 2012 4 SPEED LIMIT REVISIONS ON REGIONAL ROADS The Transportation Services Committee recommends the adoption

More information

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment APPENDIX Q SUBWAY OPERATIONS REPORT Spadina Subway Extension Downsview Station to Steeles Avenue Environmental Assessment

More information

STREET IMPROVEMENTS PROPOSAL BID ITEMS

STREET IMPROVEMENTS PROPOSAL BID ITEMS STREET IMPROVEMENTS 1 Excavation 3,525 CY $ $ 2 A.C. Planing (2" to 4" Depth) 20,586 SY $ $ 3 Furnish & Install Asphalt Concrete 4,270 TON $ $ 4 Furnish & Install Aggregate Base 2,955 TON $ $ 5 Remove

More information

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001

Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Right-of-Way Obstruction Permit Fee Structure Minneapolis Department of Public Works May 10, 2001 Revised April 5, 2005 Revised January 27, 2006 Prepared by: Steve Collin, Engineer 2.5 Revised by Douglas

More information

On-Street Electric Vehicle Charging Stations - Parking Amendments

On-Street Electric Vehicle Charging Stations - Parking Amendments / STAFF REPORT ACTION REQUIRED On-Street Electric Vehicle Charging Stations - Amendments Date: August 20, 2012 To: From: Toronto and East York Community Council Acting Director, Transportation Infrastructure

More information

Public Works Right of Way Permit Application

Public Works Right of Way Permit Application Public Works Right of Way Permit Application City and County of Denver Public Works Permit Operations 2000 West 3rd Avenue, Room 107 Denver, CO 80223-1027 Telephone: (303) 446-3469 www.denvergov.com Application

More information

a. A written request for speed humps must be submitted by residents living along the applicable street(s) to the Public Works Department.

a. A written request for speed humps must be submitted by residents living along the applicable street(s) to the Public Works Department. WASHOE COUNTY POLICY FOR INSTALLATION OF SPEED HUMPS BACKGROUND The quality of life in residential neighborhoods can be significantly affected by the traffic issues of speeding and high vehicle volumes.

More information

RE: A Traffic Impact Statement for a proposed development on Quinpool Road

RE: A Traffic Impact Statement for a proposed development on Quinpool Road James J. Copeland, P.Eng. GRIFFIN transportation group inc. 30 Bonny View Drive Fall River, NS B2T 1R2 May 31, 2018 Ellen O Hara, P.Eng. Project Engineer DesignPoint Engineering & Surveying Ltd. 200 Waterfront

More information

Green Line LRT: Beltline Recommendation Frequently Asked Questions

Green Line LRT: Beltline Recommendation Frequently Asked Questions Green Line LRT: Beltline Recommendation Frequently Asked Questions June 2017 Quick Facts Administration has evaluated several alignment options that would connect the Green Line in the Beltline to Victoria

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: BETWEEN $1,000,000 TO $5,000,000 FOR THE PERIOD AUGUST 1, 2009 TO SEPTEMBER 30, 2009 INFORMATION

More information

Confederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018

Confederation Line Stage 1 and 2. Our Lady of Fatima Church May 10 th, 2018 Confederation Line Stage 1 and 2 Our Lady of Fatima Church May 10 th, 2018 Agenda Confederation Line Stage 1 Overview project, consortium, vehicles Confederation Line Stage 2 Overview project, benefits

More information

RESTRICTIONS ON PARKING; POSTED LIMITATIONS.

RESTRICTIONS ON PARKING; POSTED LIMITATIONS. CHAPTER 3 Parking Regulations 9-3-1 Restrictions on Parking; Posted Limitations 9-3-2 Parking Restrictions During Street Maintenance or Temporary Snow Removal 9-3-3 Stopping or Parking Prohibited in Certain

More information