Perspectives of Power System Interconnections
|
|
- Dinah Barrett
- 5 years ago
- Views:
Transcription
1 San José, Costa Rica Key-Note Speech * Perspectives of Power Interconnections D. Povh *, D. Retzmann Siemens, Erlangen, ermany Introduction Development of electrical power supplies began more than one hundred years ago. At the beginning, there were only small DC networks within narrow local boundaries, which were able to cover the direct needs of industrial plants by means of hydro power. Surrounding residential areas and neighboring establishments that did not have their own power supplies were then increasingly also supplied via short lines. Longer DC transmission lengths have been achieved as early as 1882 (2 kv, 57 km from Miesbach to Munich, ermany), [2]. In 1891, Oskar von Miller achieved a breakthrough in AC transmission, with the first three-phase AC transmission system from the hydropower station in the erman town of Lauffen, covering a distance of 175 km with 15 kv to Frankfurt am Main. At a frequency of 40 Hz, 210 kw was sent "on its way" and the system was a commercial success. The growth and extension of AC systems and consequently the introduction of higher voltage levels have been driven by an extremely fast growth in power demand over the decades, and have been followed by the development of new technologies in the field of high voltages and innovations in design and manufacturing of equipment. Increasingly higher voltages were used for AC transmission, first in Europe at the 110 kv (1911) and 220 kv levels (1929), then in USA with 287 kv (1932), at 380 kv (1952) in ermany and finally with 735 kv in Canada (1965) and 1150 kv (1985) as a trial transmission project in the erstwhile Soviet Union. In the meantime, DC transmission has also entered completely new dimensions. From the first local "mini networks", to some extent with batteries connected for storage, there are now ways of transmitting 3 to 4 W over large distances with only one bipolar system: 1,000 to 2,000 km or even more are possible with overhead lines. Transmission levels of up to MW over distances of just less than 300 km have already been attained with submarine cables, and cable transmission lengths of up to about 1,300 km are in the planning stage [9]. As a multiterminal system, High Voltage DC Transmission (HVDC) can also be connected at several points with the surrounding three-phase network [3]. Increased engineering knowledge and a greater understanding of the phenomena in the systems made it possible to create larger and larger systems, which operate more efficiently and more reliable [5, 6, 10]. The development of electric power systems and the steps in the technology are demonstrated in Fig. 1. Fig. 2 shows the corresponding development of voltage levels over decades [2]. In the various countries the maximal voltage level became different, depending on the power to be to be transmitted and the transmission distance. A further parameter for selection of the voltage level is the maximum of 1
2 power which is acceptable to be lost at line outages, for stability reasons of the grid. Therefore, it can be expected that worldwide the maximal voltage will remain at 800 kv [1]. Power Consumption per Capita Isolated Small rids Higher Voltage Levels High Investments Long Distance Transmission Transmission Bottlenecks Demand for Clean Power & High Qualiy Least Cost Planning New Technologies Energy Imports Developing Countries Emerging Countries Industrialized Countries Fig. 1: Power Consumption per Inhabitant 1600 kv EHV: 800 kv = Realistic Year kv Lauchhammer Riesa / ermany (1911) kv Brauweiler Hoheneck / ermany (1929) kv Boulder Dam Los Angeles / USA (1932) kv Harspranget Halsberg / Sweden (1952) kv Montreal Manicouagan / Canada (1965) kv Ekibastuz Kokchetav / USSR (1985) Fig. 2: Development of AC-Voltage Levels - Milestones Since the last two decades, this general development has been superposed by new global trends towards liberalization of the electric power markets. The aim of this development is to open up the 2
3 markets and to give consumers the opportunity to purchase energy at more favorable prices. Various countries feature different kinds of market liberalization models. In some countries the liberalization of the power market has already taken place; in others it will still take years before an acceptable solution is found. For all systems, however, the principles are similar: eneration is separated from transmission, to enable competition among the power plants in order to achieve the lowest price. The high voltage system becomes the network simply to transport the energy from the generating plant to the regional networks. The transmission system takes over the role of meeting contractual agreements among different parties for delivering power. This changing environment decisively influences further development and optimization of transmission networks, since the load flows existing today can change considerably. The ancillary functions required for smooth operation of the networks, such as frequency control, load-flow control, reactive-power and voltage control, as well as the responsibility for system security, are in the hands of the system operator. To support the operation and to increase the reliability of heavily loaded networks FACTS (Flexible AC Transmission s, [4]) devices need to be installed. Higher investments into interconnections must be made to achieve cost benefits. For this task HVDC transmission will remain the favorable solution [3]. Power Development The development of power systems is driven by the increasing demand on electric power. lobal studies show that power consumption in the world follows closely the increase of population (Fig. 3). In next 20 years, power consumption in developing and in emerging countries is expected to increase for 220%, in developed countries, however, only for 37%. It means that fast development of power systems can be expected mainly in the areas of developing and emerging countries. This can be also seen from Fig. 4 where the worldwide installed generation capacity is shown by regions and by energy sources. The importance of gas as energy source will further increase, the relative importance of coal, oil and nuclear power will decrease. The regenerative energy sources without hydro are expected to increase fast, however, in total they will be still only in the range of about 4 %. +1.6%/a +1.2%/a 6.1 billion people 8 billion people 25,000 TWh power consumption World population 4.4 billion people +6.6%/a 8,300 TWh 15% +2.2%/a 15,400 TWh 29% 71% +4.2%/a Annual increase in power consumption +1.6%/a 40% Developing and newly industrialized countries Industrialized countries 60% (OECD), CIS, Eastern Europe 85% Sources: IEA; UN; Siemens P CS4-08/2002 Fig. 3: Development of World Population and Power Consumption, 1980 to 2020 The development of power systems takes into account locations of expected load requirements on one hand and the suitable location of power stations on the other hand, to transport the energy from generation to consumers. However, on a long-term basis, it can be expected that the transmission systems will stagnate in their development, since an increasing part of power generation will be 3
4 transferred into the distribution or low voltage networks in future. By Region Billion kwh By Energy Carrier Billion kwh % Western Europe Eastern Europe 16% Asia/Pacific 20% Africa/Middle East 6% North and 37% South America % 13% 27% 7% 34% % 10% 33% 8% 34% % 17% 1% 17% 18% 17% 20% 15% 9% 11% 38% 35% % 17% 11% 38% 5% 25% Miscalleneous Regeneratives Hydro Power Nuclear Power Natural as Oil Coal Source: Siemens P CS4-08/2002 Fig. 4: Development of installed eneration Capacity - Worldwide Based on different studies for power systems in different world regions, following general trends can be expected: Further extension of interconnected systems with the increase of power exchange between the systems to gain the advantages of interconnections Transmission of large power blocks over long distances, mainly from Hydro Stations and other renewable power sources via power transmission corridors or through the interconnected systems Increasing part of power generation will, however, be connected to the distribution systems. Development of Distribution s Major changes can be expected in distribution networks where additional investments are also likely. Today: Tomorrow: Fig. 5: Perspectives of Distribution Network Development 4
5 The task of distribution networks in the past was to receive power from the high voltage system and to distribute it to industrial customers and households. Due to pressure to reduce costs in the liberalized markets, more decentralized power generation, mainly from renewable sources if economically justified, will be fed directly into distribution and low voltage networks. Also political support and ecological advantages of renewable generation will contribute to increase the portion of generation on distribution levels. New developments such as fuel cells will be used. Power Electronics will increasingly be applied for connection of wind, solar and fuel-cell generation to the networks via medium or low voltage DC links, as well as to increase the level of power quality. Optimization of operation using decentralized generation, along with the ability to store energy and reduce the peak power taken from the interconnected system, will save costs and contribute ecological benefits through new technologies. The configuration of distribution systems will change as shown in Fig. 5. Interconnected Power s In industrialized countries extensive interconnected systems were built in the past to gain the well known advantages, e.g. an ability to use larger and more economical power plants, reduction of reserve capacity in the systems, utilization of the most efficient energy resources, and an increase in system reliability. A similar development is in progress also in the emerging countries of Asia and Latin America, where the demand for power is still growing fast, ref. to Fig. 3 and 4. The national power grids are in some large countries still at the formation stage, however also under the influence of upcoming changes in the market. The above discussed advantages of power system interconnections are listed in Fig. 6. They are generally valid and do not depend on the kind of the interconnection. Possibility to use larger and more economical Power Plants Reduction of the necessary Reserve Capacity in the Utilization of most favorable Energy Resources Flexibility of building new Power Plants at favorable Locations Increase of Reliability in the s A B a) AC Interconnection b) DC Interconnection Reduction of Losses by an optimized Operation Fig. 6: Advantages of interconnected Power s c) Hybrid AC/DC Interconnection Fig. 7: Alternatives of Power Interconnections Fig. 7 shows schematically different alternatives of system interconnections. In the past, synchronous operation of power systems was the normal way to build an interconnected system (Fig. 7a). Best example for this way is the development of the UCTE system in Western Europe, which has been extended in steps to the to-day very complex configuration [10], with the expected further extension to Romania and Bulgaria. Fig. 8 shows the interconnected power system of West Europe with its stages of extensions to Central and Eastern Europe. However, in large power systems technical problems occur resulting from meshed systems on one hand and problems of long distance transmission on the other hand. They are summarized in Fig. 9. With the increased size of the interconnected system over thousands of kilometers most of the advantages offered by the interconnection reduce. To avoid these problems additional improvements of the system are needed and operation of joint systems becomes very complex and less reliable [6, 10]. The technical limitations of very large interconnected systems have also impact on the cost benefits of the interconnection. The reasons for these limitations are listed in Fig. 10. The easiest way to interconnect large systems is to use HVDC (Fig.7b). This interconnection can be either long distance transmission or a back-to-back link. In such cases there are no special needs to coordinate the behavior of both systems and to provide strong interconnection to establish a dynamic 5
6 stable interconnection. The advantages of the interconnection can fully be utilized without to coordinate the operation of both systems. Fig.12 summarizes the advantages of HVDC as interconnection. Further, HVDC can be built in stages, following closely the demands of the interconnection, thus saving investment costs. UCTE CENTREL * N S SF NORDEL EE RU IRL B F NL B L CH DK D CZ A SLO PL SK H LV LT BY RO MD UKR UPS/IPS B COMELEC I P E MA DZ TN Fig. 8: Trans European interconnected HR BIH SRB AL R B TR B/RO TESIS ** * Synchronous Planned synchr. ** Interconnected s o Load Flow Control o Voltage Stability o Oscillations o Inter-Area Oscillations Long Distance Transmission s o Voltage Control o Reactive Power Control o Steady-State Stability o Dynamic Stability o Subsynchronous Oscillations Fig. 9: Technical Problems in AC systems o Subsynchronous Oscillations Economical limitations of synchronous interconnections are summarized in Fig. 11, ref. to [1, 6, 10]. When medium sized power systems are interconnected, high economic advantages can be expected as the benefits are much larger compared to the measures to synchronize the networks. This could be the case also in the area of Central America. However, above a certain size of the interconnected AC systems, no further advantages can be expected when synchronization is extended to additional networks. In such cases the use of HVDC technology offers technical and economic advantages, as this way of transmission can be performed between systems without the need to adjust the operating conditions. An AC interconnection asks for coordination of a number of system parameters. An important one is the strength of the interconnection. If few lines connect two strong systems, the interconnection becomes unstable. Only if additional lines are built, which increase the strength of the link, the interconnected system becomes stable. In large interconnected systems, power which should be transmitted over longer distances has to flow through the meshed systems producing additional losses and overloading possibly existing bottlenecks. Using the HVDC solution, it is, however, possible to install the link directly between the locations which require power exchange, thus bypassing the system. 6
7 Fig. 13 shows both alternatives of long distance transmission, HV AC and HVDC. For HVDC, a +/- 500 kv bipolar line and for AC three 550 kv, alternatively two 765kV lines have been assumed. These transmission configurations are nearly equivalent, also with respect to the reliability. Costs in Euro- Cents/kWh, including cumulated loss costs have been evaluated for 2000 MW transmission power over a distance of 900 km. It can be seen that the DC alternative offers much lower costs. Results of other similar studies show that in general the HVDC interconnection is the cheapest solution at transmission distances over about 700 km at a rating of 1000 MW and above (break-even distance). This is also valid if the energy is transmitted through the AC interconnected system. It means, that the integration of an HVDC transmission into the interconnected system is in total more economical than the power transmission through the AC system [1]. High Costs for Adjustments (Frequency Controls, eneration Reserve) Need for close Coordination of joint Operation AC Interconnections normally weak at the beginning (additional Lines needed or dynamic Problems expected) Bottlenecks in the because of uncontrolled Load Flow Spinning Reserve in the to be transmitted over long Distances (additional Loading and Cost increase) Reduction of economic Advantages because of large Transmission Distances at relatively low Transmission Voltage (e.g kv) In liberalized Markets Disadvantages and higher Costs when transmitting Power through a number of s and involvement of a number of Partners Fig. 10: Problems of large synchronous Interconnections Balancing Load eneration Outages Benefits Efforts Efforts, Benefits Advantages of Interconnected Operation Investment & operation costs Administrative - Savings of generation capacity -Costdegression -Unit commitment - Reduced operation autonomy - Coordination of grid operation Benefits Optimum Quality of Power Supply - Security against outages - Voltage stability - Frequency stability Economics - Investments for grid - rid losses Efforts Size of interconnected rid Fig. 11: Features and Limitations of Interconnected Operations o o o o o Lower Costs (depending on specific conditions) No need for common Frequency Control Stable Operation also at small Power Rating of Interconnection Improvement of dynamic Conditions in the AC systems Transmission of scheduled Power independent of Conditions in the AC s Fig. 12: Advantages of HVDC Interconnections 7
8 HVAC Cents/kWh cents/ kwh Loss costs Loss Costs AC AC 1,5 costs Investment Costs 1,5 1,0 1,0 AC HVDC AC 0,5 HVDC HVDC + ± kv kv 650 kv HVAC3 HVAC3 X 3 X X kv 500 kv kv HVAC HVAC2 HVAC2 2 X X X kv 735 kv kv 3 lines: for redundancy Transmission Distance 900 km Transmission Power 2000 MW Source: Siemens PTD SE NC Fig. 13: Costs of High Voltage Transmission The third possibility is a hybrid interconnection, consisting of an HVDC transmission and a parallel AC interconnection. The interconnection could start with HVDC and be later extended by additional AC links. Advantage of such a solution is that the HVDC can additionally support the operation of the AC interconnection at faults in the system and can control the load flow. The hybrid solution could offer therefore the best possibilities for large power system interconnections. In case of continental, interconnected networks, consisting of a number of smaller systems, a configuration according to Fig. 14 would be technically and economically the best choice. An AC interconnection between the neighboring areas of the interconnected systems enables power exchange among these systems. Transmission of larger power blocks over long distances is, however realized by HVDC transmissions directly to the locations of power demand. The HVDC at the same time can strengthen the synchronous interconnections to avoid possible dynamic problems, which exist in such huge configurations. A B C D E F Large Large Hybrid Hybrid Interconnections with with HVDC HVDC and and FACTS: HVDC - Long Distance DC Transmission DC Interconnection (B2B) High Voltage AC Transmission / FACTS Fig. 14: Large Power Interconnections Examples for HVDC and Hybrid Interconnections USA and Canada In North-America, large interconnected systems exist. In the USA and Canada there are a number of systems which are separated and which are operated asynchronously. Fig. 15 shows the situation in USA with 3 separated power systems. They are, however, interconnected by HVDC links to enable power exchange. 8
9 Western Interconnection Eastern Interconnection Interchange Capacities Western - Eastern 700 MW Western - ERCOT 200 MW Eastern - ERCOT 800 MW ERCOT AC/DC/AC Converter Stations Fig. 15: US rid Areas and DC Energy Bridges Europe In Europe, the large UCTE interconnected system unifies most countries of the European Union and has been recently extended even to countries of Central Europe. Also here, numerous HVDC interconnections exist to the neighboring systems of reat Britain and Northern Europe as shown in Fig. 16. Fig. 16: HVDC in Northern Europe However, further extensions of these interconnected systems or mergers between such systems by way of AC links can not be expected, with the exception of a few specific cases where political decisions and not economic reasons are prevailing to build national systems or where small additional networks can be integrated into the larger system. Reasons for this are shown in Fig. 11. High investments in new equipment and an adjustment of the organizational structure would be needed to enable synchronous operation of the interconnected systems under all operating conditions [1, 6, 9, 10]. Coordination of frequency controls, reactive power control adjustment, a common strategy for outages, comparable reliability and joint protection principles are prerequisite. As shown in the Fig. 11, the total benefits of an AC interconnection therefore diminish with the size of the network. The investments needed to enable synchronous operation soar, and the above-mentioned complex technical problems related to the operation of such systems have to be solved. China Out of Operation (B2B) Dürnrohr 550 MW Wien SO 550 MW Etzenricht Existing Interconnections Cross Channel 2000 MW Skagerrak 940 MW Baltic Cable Kontek otland 260 MW Fenno Skan 500 MW Konti Skan 550 MW Vyborg 355 MW (B2B) Moyle 2 x 250 MW Swepol Planned Interconnections UK-Netherlands 1200 MW Iceland-UK 1100 MW Finland-Estonia 350 MW Ireland Wales 400 MW Options Euro Link 4000 MW (TEN Studies) reat Belt Viking Cable NorNed Norway-UK 1200 MW China is one of the countries with the fastest increase of power demand. The installed generation 9
10 capacity in the last 10 years, from 1990 to 2000, grew from 135 W to 319 W; this is more than 230 %. Main energy resources in the country are hydro power in the Central and South areas and coal in the North [7]. In addition, some nuclear power stations are built close to the load centers. Because of large distances in the country, in the beginning of the system development, smaller isolated regional systems have been built up and developed to seven large independent regional systems, in addition to some small local systems in less populated areas of Tibet and Xinjiang (Fig. 17). Russian Power rid Power network in China Northeast Xinjiang North 500kV North west 330kV Tibet East 220kV Sichuan Central Thermal Pla nt Hydro Pla nt Nuclear South Pla nt Power network coverage 96.4% Source: SP China, ICPS - 09/2001 Existing New ezhouba-shanghai Tianuang 3-ECP I uiuang 3-uangdong NWCP-CCP B2B NCP-CCP B2B NWCP-CSP SPP-ECP B2B 3-ECP II Xiaowan-uangdong Jinghong-Thailand NWCP-NCP HPP-SCP and 4 more until 2020 NECP NCP Wangqu Plant NWCP Yangcheng Plant SPP North Power rid CCP CSP Three orges ECP Center Power rid Jinshajiang River SCP Lanchangjiang River HPP South Power rid Tailand Power rid Source: SP China, ICPS - 09/2001 Fig. 17: Regional Power s in China Fig. 18: China goes hybrid: AC plus 18 HVDC Interconnections Main AC transmission voltage levels in China are 330 kv and 500 kv. Large power blocks, produced by hydro power stations, e.g. at Three orges, have to be transmitted to the load centers over distances of 1000km and more. For this task mainly HVDC transmission is used. However, for the transmission inside of the regional systems also 500 kv AC is utilized. Coal fired power stations can partly be built closer to the load; however they are more concentrated in the North of the country. Power Exchange among the regional systems is still relative low in relation to the installed capacity of the systems. Therefore, only few AC lines would be sufficient for such interconnections to cover needs for power exchange. However, because of dynamic problems and the needed additional costs for adjustment of the systems to enable synchronous operation, mainly HVDC transmission is used for the interconnections. In future, the today existing seven independent regional systems will be merged to three large interconnected systems (North, Center and South Power rid). The interconnection among these grids will be done mainly by HVDC as shown in Fig. 18, ref. to [7]. In addition to the existing five HVDCs, further 13 HVDC transmission links are planned. Only for some smaller and remote local networks, the connection to the larger regional grids should be realized by AC, and, due to the long distances, probably using 765 kv. Possible interconnections to neighboring countries should also be realized by HVDC. India India is the second large country, a subcontinent with a population of over 1 billion people and in the last decades a very rapidly growing economy. In the 1960 s with, at that time, still low demands for energy, the Indian power industry consisted of individual isolated grids within each state, with local state power plants. In 1970 s some of these state grids were interconnected to form regional grids. With the increasing power demand, the step was envisaged in 1980's to build a national grid by the interconnection of the regional networks to gain the advantages of power exchange, sharing generation resources, to increase the reliability and to reduce the power outages in some areas. At present, the installed generation capacity is 110 W, 71% produced in coal fired plants, 25% in hydro plants and 4% in nuclear plants and others, in which the wind generation is the most important one [8]. 10
11 Large hydro energy resources in India are available in the North and North-East of the country, near the Himalayan Mountains. 25 W hydro potential is already used, 19 W in implementation and further 66 W still available. Huge coal reserves are available in the West and East areas of the country. Power produced in hydro stations and coal fired plants has to be transmitted to the loads over large distances of 1000 km and more. The interconnection of the regional grids started by the realization of HVDC back-to-back stations and the HVDC long distance transmission Rihand-Delhi. The status of interconnections in the year 2002 is shown in Fig. 19. DEVELOPMENT OF NATIONAL RID DEVELOPMENT OF NATIONAL RID PHASE-I (By 2002) URI WAOORA DULHASTI KISHENPUR RAVI SATLUJ PHASE - III (By 2012) JULLANDHAR LAKSHADWEEP NR AURAIYA 500 MALANPUR MW SR SAHUPURI VINDHYACHAL KORBA 500 MW DEHRI SASARAM ER NER CHANDRAPUR 1000 WR MW BALIMELA 500 KOLHAPUR MW U.SILERU AZUWAKA EXISTIN UNDER BELAUM CONST. EXISTIN 400 kv 220 kv BONAIAON BIRPARA MALDA BUDHIPADAR ANDAMAN & N ICOBAR MOA TEHRI CHICKEN NECK BALLABARH A'PUR (DELHI RIN) MEERUT BHUTAN HISSAR DIHAN TALA DAMWE RANANADI LUCKNOW ARUN TEESTA BHIWADI M'BAD 'PUR KATHAL- NR BONAIAON URI JAIPUR ARA ALLAHABAD /UNNAO MARIANI PURNEA MISA SHIROHI MALANPUR VARANASI SILIURI/BIRPARA SINRAULI BADARPUR 500MW TIPAIMUKH B'SHARIF ZERDA /BARH KAHALAON DEHAM NADA BINA SATNA VINDHYA- CHAL NER KRISHNA N.K. LIMBDI ANDHAR/ SEONI SIPAT NAAR AMRELI KAWAS ROURKELA BANLA JETPUR CHEAON KORBA VAPI DESH BHANDARA RAIPUR HIRMA PIPAVAV AKOLA BOISAR TARAPUR PADHE AMRAVATI CHANDRAPUR TALCHER ER 1000MW JEYPORE LAKSHADWEEP DHABOL KOYNA KOLHAPUR PONDA KAIA MANALORE BANALORE 3000MW WR LONIKAND KARAD NARENDRA SIRSI SR KOZHIKODE COCHIN PUALUR RAMAUNDAM 2000MW HOSUR 2000MW AZUWAKA LEEND EXISTIN/ X PLAN XI PLAN IX PLAN VIJAYAWADA 765 KV LINES 400 KV LINES KRISHNAPATNAM HVDC B/B CHITTOOR HVDC BIPOLE SOUTH CHENNAI SINARPET CUDDALORE ANDAMAN AND NICOBAR KAYAMKULAM TRIVANDRUM KARAIKUDI KAYATHAR Fig. 19: India Power rid 2002 Fig. 20: India Power rid in the Future Main reason for the decision towards HVDC was that the costs to improve the regional systems to enable them for synchronous operation would be very high and would need long time to build up sufficient generation reserve. The second reason was that HVDC offers also technical advantages supporting the operation of the AC systems. At present, the cumulative interconnection capacity is about 5 W, about 6% of total peak power. Also in the next development step towards a national grid, the interconnections between the regional systems will be realized mainly by HVDC. In the phase II of building the national grid, however, also the AC interconnections at a voltage level of 400 kv will be extended and the higher voltage level 765 kv will be introduced to build high capacity transmission highways. The capacity of the interconnections in this phase (years ) should reach 23 W. The interconnection capacity will further be increased to 30 W in the years In this phase, a strong AC interconnection will be established on 765 kv level, synchronizing Northern, Western and Eastern regions. However, also in this stage further HVDC links will strengthen the interconnections to the Southern region (Fig. 20). Conclusions Power systems develop on line with the increasing demand on energy. With time, large interconnected systems come into existence. Further development will be also influenced by the liberalization of power industry. Transmission systems have to be improved by new investments, including the use of HVDC, FACTS and other new technologies. 11
12 interconnections offer technical and economical advantages. These advantages are high when medium sized systems are interconnected. However, when using synchronous AC interconnection, the advantages become lower with the increasing size of the systems to be interconnected and on the other hand, the costs to adjust systems for synchronous operation increase. An HVDC interconnection, however, does not need system adjustments and it provides therefore a more economic solution. In addition, when power has to be transmitted through the system over longer distances, the HVDC transmission is technically and economically the superior solution. On long term, however, a hybrid solution, consisting of HVDC and AC links, is the most promising solution for large national and continental interconnections. There are no technical limits to build continental and even intercontinental interconnections by hybrid solutions. However, the exchange of electric power over distances of more than 3000 km seems not to be economically justified at the to-day cost relations. The presented examples in USA, Europe, China and India show in a very clear way that HVDC or hybrid interconnections offers best possibilities to build a large interconnected system using a pragmatic solution, at the beginning the HVDC interconnections, and later, depending on the requirements, to apply also the AC interconnection. Acknowledgments The Authors would like to thank the State Power Company of China and the Power rid Corporation of India for the permission to use the presented figures of their power system development. References [1] Povh, D., Ehmcke, B.: Möglichkeiten und renzen beim Stromtransport. VDI Berichte Nr. 1129, 1994 [2] Kahnt, R.: Entwicklung der Hochspannungstechnik 100 Jahre Drehstromübertragung. Elektrizitätswirtschaft 90 (1991), H. 11, S [3] Economic Assessment of HVDC Links. CIRE Brochure Nr.186 (Final Report of W 14-20) [4] FACTS Overview. IEEE and Cigré, Catalog Nr. 95 TP 108 [5] Brumshagen, H. et al.: Limits of Interconnection - Criteria for and Examples of Reasonable Extension. CIRE Report , Paris, Session 1990 [6] Müller, H.-C.; Haubrich, H.-J.; Schwartz, J.: Technical Limits of Interconnected s. CIRE Report , Paris, Session 1992 [7] Lu Yanchang: China Power Industry Entering to the 21 st Century. ICPS, 2001, Wuhan, China [8] Wheeler, J. D. et. al.: Building India's rid: an Examination of the Infrastructure. Benefits of HVDC Transmission; CIRE Report , Paris, Session 2002 [9] Povh, D.; Lei, X.; Retzmann, D.; Han, Y.; Wang, Zh.: Role of HVDC and FACTS in future Power s. Cigré Symposium, April 8-10, 2003, Shanghai, China [10] Breulmann, H.; rebe, E.; Lösing, M.; Winter, W.; Witzmann, R.; Dupuis, P.; Houry, M. P.; Margotin, T.; Zerenyi, J.; Dudzik, J.; Machowski, J.; Martin, L.; Rodriguez, J. M.; Urretavizcaya, E.: Analysis and Damping of Inter-Area Oscillations in the UCTE/CENTREL Power. CIRE Report , Paris, Session
SOLUTIONS FOR LARGE POWER SYSTEM INTERCONNECTIONS. V. Sitnikov D. Povh, D. Retzmann E. Teltsch
For Synchronous Operation of the East- West Interconnection in Europe 17. 19. Sept. 2003 St. Petersburg Russian National Committee SOLUTIONS FOR LARGE POWER SYSTEM INTERCONNECTIONS V. Sitnikov D. Povh,
More informationFuture Power Supply Scenario
Indian Power Scenario At a glance Surplus Regions 30,860 MW 2300 2300 16,000 32,700 MW 30,500 MW Deficit Regions Installed Capacity : 1,18,000 MW Peak Demand : 87,000 MW Peak Availability : 77,000 MW Energy
More informationDietmar Retzmann From Blackout towards a Smart Grid more Reliability and Flexibility with Power Electronics
Dietmar Retzmann From Blackout towards a Smart Grid more Reliability and Flexibility with Power Electronics 1 04-2007 PTD H 1 MT/Re lobal rends in Power Markets 2 04-2007 PTD H 1 MT/Re Electrical Energy
More informationUse of Advanced Solutions for UHV Transmission
More Power out of the Grid plus CO 2 Reduction Use of Advanced Solutions for UHV Transmission 1 06-2007 PTD H 1 MT/Re Advanced Power Transmission Systems HVDC - High Voltage DC Transmission: HVDC Classic
More informationOPERATION & MAINTENANCE OF HVDC STATION
OPERATION & MAINTENANCE OF HVDC STATION Praveen Ranjan Resident Project Manager India-Bangladesh Inter-connector Project Powergrid Corporation Of India Ltd. POWERGRID, An OVERVIEW Incorporated in 1989
More informationB4-106 APPLICATION OF HVDC FOR LARGE POWER SYSTEM INTERCONNECTIONS. (Germany)
21, rue d'artois, F-75008 Paris http://www.cigre.org B4-106 Session 2004 CIGRÉ APPLICATION OF HVDC FOR LARGE POWER SYSTEM INTERCONNECTIONS W. BREUER, V. HARTMANN, D. POVH*, D. RETZMANN, E. TELTSCH SIEMENS
More informationPERSPECTIVES OF HVDC AND FACTS FOR SYSTEM INTERCONNECTION AND GRID ENHANCEMENT
PERSPECTIVES OF HVDC AND FACTS FOR SYSTEM INTERCONNECTION AND RID ENHANCEMENT Wilfried Breuer, Mário Lemes, Dietmar Retzmann Siemens Power Transmission and Distribution Presentation in two Parts: DC and
More informationTrends for future HVDC Applications
Trends for future HVDC Applications W. Breuer, D. Povh*, D. Retzmann, E. Teltsch Siemens, Germany ABSTRACT During their development, power systems become more and more interconnected and heavily loaded.
More informationLarge Interconnected Systems for Economical and Secure Power Supply
1 Large Interconnected s for Economical and Secure Power Supply Dusan Povh* and Dietmar Retzmann Siemens, Germany Abstract-- The demand for electrical energy in industrialized countries keeps on growing,
More informationRole of System Operator in a Vibrant Power Market & Smart Grid
Role of System Operator in a Vibrant Power Market & Smart Grid S.K. Soonee Chief Executive Officer Power System Operation Corporation Ltd. (POSOCO) NLDC 1 Indian Power System : Amongst the Largest in the
More informationEfficient & Reliable Power Delivery
Efficient & Reliable Power Delivery Dr. Udo Niehage CEO Power Transmission Division Energy Sector CEPSI 2008 Macau Macau, October 30, 2008 Siemens AG 2008 Energy Sector The future energy market Strong
More informationProspects of Bulk Power EHV and UHV Transmission
5th & 6th Feb, 2007 at India Trade Promotion Organisation - Pragati Maidan, New Delhi, India Prospects of Bulk Power EHV and UHV Transmission V. Ramaswami, D. Retzmann*, K. Uecker Siemens, ermany ABSTRACT
More informationBenefits of HVDC and FACTS Devices Applied in Power Systems
Benefits of HVDC and FACTS Devices Applied in Power Systems 1 P. SURESH KUMAR, 2 G. RAVI KUMAR 1 M.Tech Research Scholar, Priyadarshini Institute of Technology & Management 2 Associate Professor, Priyadarshini
More informationInternational Journal of Scientific & Engineering Research, Volume 4, Issue 6, June ISSN
International Journal of Scientific & Engineering Research, Volume 4, Issue 6, June-2013 101 Novel Algorithms of HVDC and FACTS in future Power Systems ABHIJIT T. NAGHATE abhijitnaghate@gmail.com GAURAV
More informationTibin Joseph Marie Curie Early Stage Researcher Institute of Energy Cardiff University
Tibin Joseph Marie Curie Early Stage Researcher Institute of Energy Cardiff University Contents Introduction Planned Network Reinforcement for 2020 The Three Machine Generic Model Subsynchronous Resonance
More informationHVDC / FACTS Highlights
11/04 HVDC / FACTS Highlights www.siemens.com/hvdc NEW! >>> Welcome to Siemens Highlights & Innovations in Transmission and Distribution History of High Voltage Direct Current Transmission (HVDC) To transmit
More informationHVDC Systems in India
HVDC Systems in India Outline Introduction HVDC Systems presently in operation Main Data/Salient Features Upcoming Projects Future Challenges Transmission Network - Present 765kV/400kV lines: about 1,03,000
More informationTHE BALTIC SEA POWER RING CONNECTED: A GLANCE AT NORDBALT AND LITPOL LINK TODAY AND OUTLOOK FOR TOMORROW
THE BALTIC SEA POWER RING CONNECTED: A GLANCE AT NORDBALT AND LITPOL LINK TODAY AND OUTLOOK FOR TOMORROW Daivis Virbickas Litgrid CEO 24 November 2015 90 Electricity consumption reflects the level of economy
More informationInnovative technologies ready for the Supergrid
Innovative technologies ready for the Supergrid The Roadmap to the Supergrid Technologies EEF lunchtime discussion Feb 6, 2013 in Strasbourg Presented by Dr. Magnus Callavik, ABB (Convenor of WG 2 - Technology)
More informationOverview of Indian Power Sector. February 29, 2008
Overview of Indian Power Sector February 29, 2008 Evolutionary Phase of Power Sector Radical changes in structural, institutional and operational arrangements. Supply of electricity is moving away from
More informationHVDC Transmission: Part of the Energy Solution? Peter Hartley Economics Department & James A. Baker III Institute for Public Policy, Rice University
HVDC Transmission: Part of the Energy Solution? Peter Hartley Economics Department & James A. Baker III Institute for Public Policy, Rice University Why has HVDC taken off? HV is needed to transmit DC
More informationEuropean Power Markets. Jukka Ruusunen President and CEO
European Power Markets President and CEO Fortum's Capital Markets Day Stockholm, Sweden 5-6 th 2 Driver for the development: European energy policy goals Energy future is: more sustainable - towards carbon
More informationThe Electric Power System
The Electric Power System INDIA Indian Power System 1 2 Basic facts Area:3.288 million km² Population:1.25 Billion Electricity consumers: 216 Million- (31.3.2013) Number of TSOs: 14- (31.3.2013) Numbe
More informationProspects for HVDC - Getting more Power out of the Grid
JORNADAS TECNICAS SOBRE LA "SESION PLENARIA CIRÉ 2006" Comité de estudios B4 (HVDC y electrónica de potencia) Madrid, 29-30 noviembre 2006 Prospects for HVDC - etting more Power out of the rid Juan Miguel
More informationHVDC Solutions. for Integration of the Renewable Energy Resources. Marcus Haeusler HVDC Lead Engineer. siemens.com/energy/power-transmission
HVDC Solutions for Integration of the Renewable Energy Resources Marcus Haeusler HVDC Lead Engineer siemens.com/energy/power-transmission Agenda Principles of HVDC operation HVDC converter types HVDC configurations
More informationImproving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E)
Improving the integration of electricity networks: Prospects of the European Network of Transmission System Operators for Electricity (ENTSO-E) 1. Context: ENTSO-E, 10/20/40 year views, network codes 2.
More informationEnergy Challenges and Costs for Transport & Mobility. 13th EU Hitachi Science and Technology Forum: Transport and Mobility towards 2050
Energy Challenges and Costs for Transport & Mobility 13th EU Hitachi Science and Technology Forum: Transport and Mobility towards 25 Dr. Lewis Fulton Head, Energy Policy and Technology, IEA www.iea.org
More informationThe Electric Power System
The Electric Power System - Sweden- Swedish Power System 1 2 Basic facts 2014 Area: 450 295 km 2 Population: 9.6 Million Number of electricity consumers: 5.3 Million Number of TSOs: 1 Number of DSOs: 170
More informationIndia Smart Grid Week, 2017
India Smart Grid Week, 2017 N. Venu President and Head, Power Grids Division, South Asia, Middle East and Africa ABB 1 Big Shift in Power: Shaping the System of the Future Several global challenges Population
More informationMikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative
Mikael Dahlgren, ABB Corporate Research, 02 December 2011 ABB Technology providers perspective Energidagen Chalmers Energyinitiative ABB HVDC Slide 1 ABB Five global divisions Power Products Power Systems
More informationABB, November 2012 The high voltage DC breaker The power grid revolution. ABB 07 November 2012 Slide 1
ABB, November 2012 The high voltage DC The power grid revolution 07 November 2012 Slide 1 Solving a hundred year old technology puzzle The war of currents DC was the missing link J. P. Morgan N. Tesla
More informationNext Generation of UHVDC System. R. Montaño, D Wu, L. Arevalo, B. Jacobson ABB - HVDC Sweden
Conference-1 Latest Technologies in T & D, Renewable Energy Integration, Smart Grid, Energy Efficiency, Communication Next Generation of UHVDC System R. Montaño, D Wu, L. Arevalo, B. Jacobson ABB - HVDC
More informationGetting Smart Evolution to the Smart Grid April 2008
Getting Smart Evolution to the Smart Grid April 2008 Thomas F Garrity Vice President, Sales and Business Development Siemens Power T&D, Inc. Electrical energy is the backbone of our society Page 2 Mar-07
More informationEuropean Wind Integration Study (EWIS) Towards a Successful Integration of Wind Power into European Electricity Grids
European Wind Integration Study (EWIS) Towards a Successful Integration of Wind Power into European Electricity Grids EWIS Concluding Discussion 13th April 2010, Brussels Network Strengthening findings
More informationAn overview of HVDC market and future outlook. Saqib Saeed Principal Analyst Power Technology Research LLC (PTR)
An overview of HVDC market and future outlook Saqib Saeed Principal Analyst Power Technology Research LLC (PTR) Agenda Global overview of HVDC market Specifics of growing HVDC markets Manufacturer profiles
More informationChapter 1. Overview of HVDC applications
ELEC0445 - High Voltage Direct Current grids Part 1. Line Commutated Converters Chapter 1. Overview of HVDC applications Patricia Rousseaux t.vancutsem@ulg.ac.be Thierry Van Cutsem www.montefiore.ulg.ac.be/~vct
More informationThe Swedish Government Inquiry on Smart Grids
The Swedish Government Inquiry on Smart Grids Math Bollen Athens, Greece, 18 December 2010 Smart grid inquiry What are smart grids? Why do we need smart grids? State of deployment and development Conclusions
More informationExplanatory document for the Nordic synchronous area proposal for ramping restrictions for active power output in accordance with Article 137(3) and
Explanatory document for the Nordic synchronous area proposal for ramping restrictions for active power output in accordance with Article 137(3) and (4) of the Commission Regulation (EU) 2017/1485 of 2
More informationElectricity System Reform in Japan and the Significance of International Grid Connection
Sept. 8, 2016/Hall D7, Tokyo International Forum (Chiyoda-ku, Tokyo) International Symposium organized by Renewable Energy Institute Global Energy Interconnections; Status and Perspectives Realizing the
More information67 th edition. Renewable energy. Appendices. 44 Other renewables consumption 45 Biofuels production
Renewable energy 44 Other renewables consumption 45 Biofuels production Appendices A1 Solar Generation A2 Wind Generation A3 Geothermal, biomass and other Generation A4 Geothermal Cumulative installed
More informationHVDC Innovative Technology for Smart Grids and Super Grids. Wilfried Breuer CEO Power Transmission Solutions, Siemens Energy Sector
HVDC Innovative Technology for Smart Grids and Super Grids CEO Power Transmission Solutions, Siemens Energy Sector BritNed: Pre-launch Press Event Maasvlakte, March 31, 2011 Siemens AG 2011 Energy Sector
More informationInfrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India
Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India 26th March 2014 Infrastructure Revitalization in India 1 Outline Indian Power System Indian Grid - WAMS
More informationDG system integration in distribution networks. The transition from passive to active grids
DG system integration in distribution networks The transition from passive to active grids Agenda IEA ENARD Annex II Trends and drivers Targets for future electricity networks The current status of distribution
More informationHigh Voltage Direct Current Systems
GE Grid Solutions High Voltage Direct Current Systems imagination at work Today s Environment Globally the utility environment is becoming more complex and utilities are having to manage new challenges
More informationABB s capabilities in advanced power transmission
Power from shore inauguration event Jan Söderström Head of Business Unit Grid Systems ABB s capabilities in advanced power transmission ABB-Toll Inauguration -1 - Power Technology Systems Intelligent systems:
More informationRegional Cooperation Infrastructure Development and Operation. EU Energy Governance. Olaf Ziemann Member of ENTSO-E s System Operations Committee
Regional Cooperation Infrastructure Development and Operation EU Energy Governance 30 April 2014, Berlin Olaf Ziemann Member of ENTSO-E s System Operations Committee About ENTSO-E 41 TSOs from 34 countries
More informationThe Renewable Energy Market Investment Opportunities In Lithium. Prepared by: MAC Energy Research
The Renewable Energy Market Investment Opportunities In Lithium Prepared by: MAC Energy Research 2016 Table of Contents: Introduction. Page 2 What is Lithium?... Page 2 Global Lithium Demand Page 3 Energy
More informationUse of High-Power Thyristor Technology for Short-Circuit Current Limitation in High Voltage Systems
Advanced Power Transmission Solutions Power Transmission and Distribution Use of High-Power Thyristor Technology for Short-Circuit Current Limitation in Systems s Development of Power Markets Increasing
More informationWorld Energy Investment 2017
World Energy Investment 217 Economics and Investment Office IEA OECD/IEA 217 USD (216) billion Global energy investment fell 12% in 216, a second consecutive year of decline 1 75 5-1% Networks Global energy
More informationLooking Towards the Future: Advantages of 765-kV Transmission Technology
Looking Towards the Future: Advantages of 765-kV Transmission Technology In the electric transmission business, design plays a key role in the efficiency and productivity of the nation s energy delivery
More informationFirst South East European Regional CIGRÉ Conference. Portoroz, Slovenia, 7 8 June 2016
First South East European Regional CIGRÉ Conference Portoroz, Slovenia, 7 8 June 2016 Submarine projects in the Mediterranean Sea. Technology developments and future challenges 2-01 Paolo Maioli on behalf
More informationREDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION
REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION Summary Abhay Kumar Mata Prasad R C Maheshwari Asea Brown Boveri Ltd. 4th Floor, 71 Nehru Place, New Delhi
More informationPower Grid & Blackouts. Prof. Ramzy R. Obaid
Power Grid & Blackouts Prof. Ramzy R. Obaid With many thanks and appreciation to Professor Mohamed A. El Sharkawi Power System The electric power systems in the North America and Europe are probably the
More informationEEL303: Power Engineering - 1 Introductory Lecture
EEL303: Power Engineering - 1 Introductory Lecture Course Coordinator: A. R. Abhyankar Office: Block II, Room 135 Email: abhyankar@ee.iitd.ac.in 1 Evaluation Scheme Minor 1: 20 Minor 2: 20 Re-Minor: 20
More informationEvaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection
Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection B. Bagen, D. Jacobson, G. Lane and H. M. Turanli Manitoba
More informationClimate change drivers for a single and smart EU grid
Climate change drivers for a single and smart EU grid Smart and Secure Transmission Grids to Realise US and EU Renewable Energy Potentials Keith Bell University of Strathclyde, Scotland Expected growth
More informationProspects of HVDC and FACTS for Sustainability and Security of Power Supply
Prospects of HVDC and FACTS for Sustainability and Security of Power Supply Advances in Power System Control, Operation and Management APSCOM, 8 th 11 th of November 2009, Hong Kong Wilfried Breuer, CEO
More informationPower import, transboundary connections, Market Coupling. Grzegorz Onichimowski President of the Board, TGE S.A.
Power import, transboundary connections, Market Coupling Grzegorz Onichimowski President of the Board, TGE S.A. Power import, transboundary connections, Market Coupling Conference Power Ring, December_2008
More informationRenewables from a TSO Perspective. M.BENA, SmartGrids Director, RTE, French TSO Vienna, 18 May 2015
Renewables from a TSO Perspective M.BENA, SmartGrids Director, RTE, French TSO Vienna, 18 May 2015 RTE in Europe 8500 employees Owner and Operator of the Assets 100 000 km UHV and HV lines (400 kv -> 63
More informationEverything under control Thanks to reliable power grids
Power generation Power transmission, power distribution and smart grid Energy application Imaging and in-vitro diagnostics Everything under control Thanks to reliable power grids Brazil s social and economic
More informationGood afternoon Chairman Maziarz and Members of the Senate. Standing Committee on Energy and Telecommunications. We welcome this
Welcome and Introductions Good afternoon Chairman Maziarz and Members of the Senate Standing Committee on Energy and Telecommunications. We welcome this opportunity to address the impact that closing the
More informationNorth-South Interconnections in Central-East and South- East Europe
European Network of Transmission System Operators for Electricity North-South Interconnections in Central-East and South- East Europe Building power bridges between Eastern and Western Europe; relieving
More informationHVDC Multi-Terminal Interconnections a viable and optimal solution for India
Presented at Cigré 2000 Conference, Paris, France, Aug/Sept 2000 HVDC Multi-Terminal Interconnections a viable and optimal solution for India K.M.Saxena Dr. Channakeshava Mata Prasad* Dr.R.P.Bhatele Dr.
More informationModelling of reserve procurement and exchange of balancing services in Northern Europe: Real-time dispatch
1 International workshop on Exchange of balancing services - Market design and modelling Modelling of reserve procurement and exchange of balancing services in Northern Europe: Real-time dispatch Hossein
More informationAlfen acquires Elkamo in Finland A platform for expansion in the Nordics
Alfen acquires Elkamo in Finland A platform for expansion in the Nordics 2 July 2018 Disclaimer This communication may include forward-looking statements. All statements other than statements of historical
More informationLong distance bulk transmission
Long distance bulk transmission Dr. Yanny Fu, KEMA Consulting 6 October 2010 Experience you can trust. 2 Contents Transmission technologies AC and DC Overhead lines and underground/submarine cables Transmission
More informationElectric Vehicle Initiative (EVI) What it does & where it is going
Indian Transport Sector: Marching towards Sustainable Mobility Electric Vehicle Initiative (EVI) What it does & where it is going COP-23 Side Event, November 14, 2017 India Pavilion, Bonn, Germany Sarbojit
More informationMemo. Michael P. Walsh International Consultant. 1. Background and Introduction
Michael P. Walsh International Consultant Memo To: Whom It May Concern From: Michael P. Walsh Date: June 12, 2005 Re: Status Report: Low Sulfur Diesel Fuel Trends Worldwide 1. Background and Introduction
More informationBenefits of HVDC for System Interconnection. Energy Sector
Benefits of HVDC for System Interconnection Energy Sector Giacomo Cordioli Dietmar Retzmann Karl Uecker 1 11-2008 E T PS SL/Re MT/Re G lobal Trends CO 2 Reduction Green Energy Megacities Security of Supply
More information1. INTERNATIONAL OVERVIEW. 1.0 Area and population. population (1,000) area
1.0 Area and population area population (1,000) km 2 2000 2010 2018 1 inhabitants per km 2 Belgium 30,530 10,251 10,920 11,443 375 Germany 357,380 82,212 81,777 82,952 232 Estonia 45,230 1,397 1,331 1,315
More informationnortheast group, llc Southeast Asia Smart Grid: Market Forecast ( ) Volume II October group.com
northeast group, llc Southeast Asia Smart Grid: Market Forecast (2014 2024) Volume II October 2014 www.northeast- group.com Southeast Asia Smart Grid: Market Forecast (2014-2024) Southeast Asia is a growing
More informationReport. the feasibility of
Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to
More informationValeo reports 14% growth in consolidated sales for third quarter 2011
24.11 Valeo reports 14 growth in consolidated sales for third quarter 2011 Third quarter 2011-14 growth in consolidated sales (12 on a like-for-like basis 1 ) to 2,662 million euros - 17 growth in original
More informationMVDC PLUS Managing the future grid
MVDC PLUS Managing the future grid Bridge the distance How should we connect Islands, platforms, and remote areas? Connecting weak or unstable grids How will we integrate and stabilize grids? Reduce footprint
More informationThe Role of Offshore Wind
The Role of Offshore Wind Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Richard Proctor ENI
More informationShare with the GHSEA. Smart Energy Initiatives. Collaboration and a partner eco-system to achieve results
Share with the GHSEA on behalf of the DSEA - learning and experience Color variant: Siemens Cool Gray Smart Energy Initiatives Collaboration and a partner eco-system to achieve results Realizing a Community-centric
More informationSeptember Jan Sobotka Mayor of Vrchlabi town. Martin Machek Project Manager, ČEZ
September 2015 Jan Sobotka Mayor of Vrchlabi town Martin Machek Project Manager, ČEZ September 2015 Jan Sobotka Mayor of Vrchlabi town Martin Machek Project Manager, ČEZ CZECH REPUBLIC VRCHLABI TOWN Basic
More informationSmart Grids in a new age of electricity
Grids in a new age of electricity Press Conference Metering Europe Barcelona, October 7, 2009 Ralf Christian CEO Power Distribution Division, Siemens Energy Sector Siemens AG 2009 Energy Sector Long-term
More informationAdvanced Active And Reactive Power Control For Mini Grids
RIO 9 - World Climate & Energy Event, 17-19 March 2009, Rio de Janeiro, Brazil Advanced Active And Reactive Power Control For Mini Grids Stratis Tapanlis and Michael Wollny SMA Solar Technology AG Sonnenallee
More informationPeter Leupp, Head of Power Systems, ABB Group, Namibia, 11 Nov 2011 HVDC power technology A key enabler for evolving trends
Peter Leupp, Head of Power Systems, ABB Group, Namibia, 11 Nov 2011 HVDC power technology A key enabler for evolving trends Challenge: more power with less environmental impact ABB offering across the
More informationEurope's first blockchain project to stabilize the power grid launches: TenneT and sonnen expect results in 2018
Press release Europe's first blockchain project to stabilize the power grid launches: TenneT and sonnen expect results in 2018 TenneT uses decentralized home energy storage systems networked via blockchain
More informationTÖÖSTUSE ÄRIPLAAN 2018, , SWISSOTEL, TALLINN ABB in Baltics. Today and tomorrow. Jukka Patrikainen, Country Manager, Baltic States
TÖÖSTUSE ÄRIPLAAN 2018, 30.11.2017, SWISSOTEL, TALLINN ABB in Baltics Today and tomorrow Jukka Patrikainen, Country Manager, Baltic States ABB One Campus, Jüri Drives and Renewables Factory Grids Integration
More informationElectromobility for Heavy-Duty Vehicles. Long Beach Convention Center, May 15-17, 2012 ACT Expo 2012
Electromobility for Heavy-Duty Vehicles Long Beach Convention Center, May 15-17, 2012 ACT Expo 2012 Siemens AG 2012. All Siemens rights reserved. AG 2010 Forecast: The demand for mobility keeps rising
More informationResearch on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC
Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Rong Cai, Mats Andersson, Hailian Xie Corporate Research, Power and Control ABB (China) Ltd. Beijing, China rong.cai@cn.abb.com,
More informationBackground Information
HVDC smart solution for a wide range of power transmission applications Background Information Erlangen, April 16, 2015 HVDC transmission technology is the method of choice for transmitting large amounts
More informationReliability is our profession
Reliability is our profession Drive components for wind turbines Siemens AG Am Industriepark 2 46562 Voerde Germany Phone +49 2871 92-4 Fax +49 2871 92-2487 E-Mail info@winergy-group.com www.winergy-group.com
More informationRENEWABLE ENERGY TRANSMISSION INTERCONNECTION. Line Tveter
RENEWABLE ENERGY TRANSMISSION INTERCONNECTION Line Tveter ltveter@kentlaw.edu Roadmap A. The Norwegian Electricity Sector The Basics B. The Norwegian Electricity Grid Organization and Regulation C. Grid
More informationOffshore Wind: Grid Connection & Technology Options. Dietmar Retzmann Focus on. CO 2 Reduction Green Energy Megacities Security of Supply
Offshore Wind: Grid Connection & Technology Options Dietmar Retzmann 1 10-2011 E T PS S/Re Focus on CO 2 Reduction Green Energy Megacities Security of Supply 2 10-2011 E T PS S/Re 1 EWEA s 2030 Offshore
More informationGLOBAL ENERGY STORAGE MARKET UPDATE: AUSTRALIAN ENERGY STORAGE ASSOCIATION
GLOBAL ENERGY STORAGE MARKET UPDATE: AUSTRALIAN ENERGY STORAGE ASSOCIATION JUNE 2, 2016 ANISSA DEHAMNA PRINCIPAL RESEARCH ANALYST NAVIGANT RESEARCH 1 TABLE OF CONTENTS SECTION 1: SECTION 2: SECTION 3:
More informationRole of HVDC and FACTS in future Power Systems
Role of HVDC and FACTS in future Power Systems W. Breuer, D. Povh, D. Retzmann, E. Teltsch X. Lei Siemens AG, Germany XJ Group, China Abstract Development of electrical power supplies began more than one
More informationThe Grid Link Project. Summary of the Report for the Independent Expert Panel
The Grid Link Project Summary of the Report for the Independent Expert Panel Who are EirGrid - and what do we do? EirGrid is responsible for a safe, secure and reliable supply of electricity: now and in
More informationHow to make urban mobility clean and green
POLICY BRIEF Decarbonising Transport Initiative How to make urban mobility clean and green The most effective way to decarbonise urban passenger transport? Shared vehicles, powered by clean electricity,
More informationGrid Impacts of Variable Generation at High Penetration Levels
Grid Impacts of Variable Generation at High Penetration Levels Dr. Lawrence Jones Vice President Regulatory Affairs, Policy & Industry Relations Alstom Grid, North America ESMAP Training Program The World
More informationIndian engineering TRANSFORMING TRANSMISSION
Indian engineering TRANSFORMING TRANSMISSION A 2016 NASA photo of India s electrification. India to become the world s first country to use LEDs for all its lighting needs by 2019 (photograph courtesy
More informationNordic co-operation when meeting System challenges
Nordic co-operation when meeting System challenges Evolving the market conference Ulla Sandborgh CEO Agenda > System challenges > System development plan > Strategies > Grid development > Tariff development
More informationSelling PFIFFNER in the UK. Paul Haines
Selling PFIFFNER in the UK. Paul Haines Contents Introduction, Country & Market Overview UK. Accessing the Market Critical Success Factors. Developing the Business Together. Proposed Pfiffner Support.
More informationNorthern European power system scenarios for EMPS 2010 to 2030
Stefan Jaehnert Northern European power system scenarios for EMPS 21 to 23 Brukermøte Produksjonsplanlegging 22. Mai 213 1 Outline 1. Basic modelling assumption Northern Europe 2. 23 scenario development
More informationIEEE PES Panel Discussion
Chaiyot Piyawannarat, Country MD, November, 2016 IEEE PES Panel Discussion Question # 1 EV charger ABB EV Charging Overview We offer DC Charging solutions for Electric Vehicles from 10-450KW based on standards
More informationESS for Thailand Future Power Grid Energy Absolute PCL.
ESS for Thailand Future Power Grid Energy Absolute PCL. Supa Waisayarat Energy Storage System (ESS) 2 Type of Energy Storage System (ESS) Source: PwC 2015 3 Application of ESS LAES or CES Li-ion Battery
More information-Mobility Solutions. Electric Taxis
-Mobility Solutions Electric Taxis This paper was prepared by: SOLUTIONS project This project was funded by the Seventh Framework Programme (FP7) of the European Commission Solutions project www.uemi.net
More information