Reactive Power Document and Voltage Control of North Eastern Region

Size: px
Start display at page:

Download "Reactive Power Document and Voltage Control of North Eastern Region"

Transcription

1 Reactive Power Document and Voltage Control of North Eastern Region December-2018 Edition-10 EHV Shunt Reactor North Eastern Regional Load Despatch Centre Shillong Power System operation Corporation Limited (A Government of India Enterprise)

2 CONTENTS CONTENTS...1 List Details....2 List of Figures:...2 List of Tables: REACTIVE POWER MANAGEMENT AND VOLTAGE CONTROL Introduction Analogy of Reactive Power Understanding Vectorally Voltage Stability Voltage Collapse Proximity to Instability Reactive Reserve Margin NER GRID Overview Reliability Improvement Due to Local Voltage Regulation TRANSMISSION LINES AND REACTIVE POWER COMPENSATION Introduction Surge Impedance Loading (SIL) Shunt Compensation in Line Line loading as function of Line Length and Compensation SERIES AND SHUNT CAPACITOR VOLTAGE CONTROL Introduction MeSeb Capacity Building And Training Document Suggest (Sub Title As Given In The PFC Document For Corporatization Of MeSeb): As Per The Assam Gazette, Extraordinary, February 10, TRANSFORMER LOAD TAP CHANGER AND VOLTAGE CONTROL Introduction As Per The Assam Gazette, Extraordinary, February 10, HVDC AND VOLTAGE CONTROL Introduction HVDC Configuration Reactive Power Source ±800 kv HVDC Bi-Pole Technical details of Biswanath Chariali Alipurduar-Agra HVDC: Impact of Largest Filter Switching Under Different HVDC Power Order FACTS AND VOLTAGE CONTROL Introduction Static Var Compensator (SVC) Page 1 of 60

3 6.3 Converter-based Compensator Series-connected controllers GENERATOR REACTIVE POWER AND VOLTAGE CONTROL Introduction Synchronous Condensers CONCLUSION SUMMARY STATUTORY PROVISIONS FOR REACTIVE POWER MANAGEMENT AND VOLTAGE CONTROL Provision in the Central Electricity Authority (Technical Standard for connectivity to the grid) Regulations 2007 [8]: Provision in The Indian Electricity Grid Code (IEGC), 2010: BIBLIOGRAPHY: List Details. List 1 International connectivity of NER at 400kV (Charged at 132kV) List 2 International Connectivity of NER at 132kV List 3 +/- 800 kv HVDC Lines Agra-BNC List 4: Fixed, Switchable and Convertible Line reactors in North Eastern Region List 5: Bus Reactors in North Eastern Region List 6: List of Upcoming Bus Reactors in North Eastern Region. 29 List 7: Tertiary Reactors on 33kV side of 400/220/33 kv ICTs in North Eastern Region List 8: Shunt Capacitors details in North Eastern Region List 9: Transmission/Transformation/VAR Compensation Capacity of North Eastern Region List of Figures: Figure 1 Voltage and Current Waveform... 6 Figure 2 Power Triangle... 7 Figure 3 Boat Pulled by Horse... 8 Figure 4 Direction of Pull... 8 Figure 5 Vector Representation of Analogy... 8 Figure 6 Labyrint Spel... 9 Figure 7 Vector Representation Figure 8 Time frames for voltage stability phenomena Figure 9 PV curve and Voltage stability margin under different conditions Figure 10 Average cost of Reactive power technologies Figure 11 NER Grid map Figure 12 Switching principle of LTC...33 Page 2 of 60

4 Figure 13: An example of voltage scatter plot 35 Figure 14 HVDC Fundamental components Figure 15: Schematic Diagram of HVDC-BNC Figure 16 Static VAR Compensators (SVC): TCR/TSR, TSC, FC and Mechanically Switched Resistor Figure 17 STATCOM topologies:(a) STATCOM based on VSI and CSI (b) STATCOM with storage Figure 18 Series-connected FACTS controllers: (a) TCSR and TSSR; (b) TSSC; (c) SSSC Figure 19 D-Curve of a typical Generator List of Tables: Table 1: Reactive power compensation sources Table 2 : Line Parameters & Surge Impedance Loading of Different Conductor Type Table 3: Equipment preference Table 4: AC Filter Bank at HVDC Agra Table 5: AC Filter Bank at HVDC BNC Table 6: Impact of Largest Filter Switching under different HVDC Power order Table 7: List of units in NER required to be normally operated with free governer action and AVR in service Table 8: IEGC operating voltage range ANNEXURES Annexure I: Fault levels of major substation in NER Annexure II: List of Lines in North Eastern Region Annexure III: List of ICTs in North Eastern Region Annexure IV: Substations in North Eastern Region Annexure V: Voltage Deviation Index of 400 kv Substations of North Eastern Region for the Month of November 2018 Annexure VI: Over-Voltage relay settings of lines connected at 400 kv Substations of NER Grid Annexure VII: Capability curves of various generators in NER GRID Annexure VIII: The AEGCL Gazette, Extraordinary, February 10, 2005 Annexure IX: NERLDC SCADA display for Real time Reactor status Annexure X: NERLDC URTDSM (WAMS) display for real time voltage contour view Page 3 of 60

5 EXECUTIVE SUMMARY Quality of power to the stakeholders is the question of the hour worldwide. Enactment of several regulations viz. IE act 2003, ABT, Open access regulations, IEGC, DSM and several other amendments are in the direction towards improvement of system reliability and power quality. It is also significant to mention that due to the massive load growth in the country, the existing power networks are operated under greater stress with transmission lines carrying power near their limits. Increase in the complexity of network and being loaded non-uniformly has increased its vulnerability to grid disturbances due to abnormal voltages (High and Low). In the past, reason for many a black outs across the world have been attributed to this cause. Three objectives dominate reactive power management. Firstly, maintaining adequate voltage throughout the transmission system under normal and contingency conditions. Secondly, minimizing congestion of real power flows. Thirdly, minimizing real power losses. Also with dynamic ATCs, var compensation, congestion charges, if not seriously thought, it may have serious commercial implications in times to come due to the amount of bulk power transfer across the country. Highlights of rolling year of NER grid include commercial operation of Unit 1 & 2 of Pare HEP of 55 MW each, 400/132 / 33 kv, 315 MVA ICT 3 at Silchar, 400 kv Silchar Melriat D/C line (charged at 132 kv), 132 kv Ranganadi Itanagar S/C line, 132 kv Ranganadi Pare II, 132 kv Pare Itanagar S/C line, 132 kv Teju Namsai S/C, LILO of 132 kv Aizwal Jiribam at Tipaimukh S/S of Manipur, LILO of 132 kv Ranganadi Lekhi at Pare S/S. Commissioning of 110 MW Pare HEP has increased the generation availability of NER Region. The reactive power generation/absorption capability of both the units of Pare HEP is also being used for voltage management. The 400/132/33 kv ICT 3 at Silchar has fulfilled the N-I-I contingency requirement of existing 400/132 kv 2 x 200 MVA ICT at Silchar. The N-I contingency requirement of the existing 132 kv Aizawl Melriat T/L has been fulfilled with the commissioning of 132 kv Silchar Melriat D/C lines. This has increased the reliability of Melriat S/S which is a major connectivity of the Mizoram system with the rest of NER Grid. The 132 kv Itanagar S/S of Arunachal Pradesh which was earlier radially connected from 132 kv Lekhi S/S, has been connected from 132 kv Ranganadi S/S and Pare S/S through 132 kv Ranganadi Itanagar S/C line and 132 kv Pare Itanagar S/C line, thus increasing the reliability of Itanagar S/S, which serves a major portion of the capital load of Arunachal Pradesh. Page 4 of 60

6 Other major elements commissioned during current year were 420 kv 125 MVAR Bus Reactor at Bongaigaon S/S, 420 V 125 MWAR Bus Reactor at Balipara S/S, 420 V 125 MVAR Bus Reactor at Silchar S/S and 420kV 80 MVAR Bus Reactor at Imphal S/S. These reactors have helped in controlling the problem of high voltage in the 400 kv System in the Northern part of NER Grid which mainly occurs as the 400 kv lines are very lightly loaded during the off-peak hours. The 132 kv Tezu Namsai S/C line, 132/ 33 kv 15 MVA ICT-I & ICT-II at Namsai S/S, and 145 kv 20 MVAR Bus Reactor at Namsai S/S of Arunachal Pradesh were also commissioned during the current year. Commissioning Namsai S/S has improved the connectivity of Arunachal Pradesh system with the rest of the NER Grid. The load of Namsai area of Arunachal Pradesh has been connected with the rest of NER grid through the Namsai S/S. With the increase in controllability compared to earlier years, grid operation has been smooth and grid parameters were maintained within the prescribed IEGC limits. This manual is in continuation to the previous edition for understanding the basics of reactive power and its management towards voltage control, its significance and consequences of inadequate reactive power support. It also includes details of reactive power support available at present and efforts by planners from future perspective in respect of NER grid. New inclusions and updations in the current edition of the manual are as follows: Details of total 498 ckm of transmission lines which were commissioned in NER Grid during the year 2018 have been included. Details of total 507 MVARs of Shunt Reactors which were commissioned in NER Grid during the year 2018 have been included. Details of total 345 MVA of Transformers which were commissioned in NER Grid during the year 2018 have been included. Fault level of major substations of NER Grid has been updated as on December Tap Settings of ICTs have been updated as on May 2018 Voltage Deviation Index of 400 kv Substations of North Eastern Region for the Month of November 2018 have been added. Over-Voltage relay settings for all lines connected at 400 kv Substations of NER Grid as on August 2018 have been added. Capability curve for Unit I and Unit II (55 MW each) of Pare HEP has been included. NERLDC SCADA display for Reactor Status and NERLDC URTDSM display for Voltage Contour has been added. Page 5 of 60

7 1 REACTIVE POWER MANAGEMENT AND VOLTAGE CONTROL 1.1 Introduction W hat is Reactive Power? Reactive power is a concept used by engineers to describe the background energy movement in an Alternating Current (AC) system arising from the production of electric and magnetic fields. These fields store energy which changes through each AC cycle. Devices which store energy by virtue of a magnetic field produced by a flow of current are said to absorb reactive power (viz. Transformers, Reactors) and those which store energy by virtue of electric fields are said to generate reactive power (viz. Capacitors) Power flows, both actual and potential, must be carefully controlled for a power system to operate within acceptable voltage limits. Reactive power flows can give rise to substantial voltage changes across the system, which means that it is necessary to maintain reactive power balances between sources of generation and points of demand on a 'zonal basis'. Unlike system frequency, which is consistent throughout an interconnected system, voltages experienced at points across the system form a "voltage profile" which is uniquely related to local generation and demand at that instant, and is also affected by the prevailing system network arrangements In an interconnected AC grid, the voltages and currents alternate up and down 50 times per second (not necessarily at the same time). In Figure 1 Voltage and Current Waveform that sense, these are pulsating quantities. Because of this, the power being transmitted down a single line also pulsates - although it goes up and down 100 times per second rather than 50. Page 6 of 60

8 1.1.4 To distinguish reactive power from real power, we use the reactive power unit called VAR - which stands for Volt-Ampere-Reactive (Q). Normally electric power is generated, transported and consumed in alternating current (AC) networks. Elements of AC systems supply (or produce) and consume (or absorb or lose) two kinds of power: real power and reactive power Real power accomplishes useful work (e.g., runs motors and lights lamps). Reactive power supports the voltages that must be controlled for system reliability. In AC power networks, while active power corresponds to useful work, reactive power supports voltage magnitudes that are controlled for system reliability, voltage stability, and operational acceptability VAR Management? It is defined as the control of generator voltages, variable transformer tap settings, compensation, switchable shunt capacitor and reactor banks plus allocation of new shunt capacitor and reactor banks in a manner that best achieves a reduction in system losses and/or voltage control Although active power can be transported over long distances, reactive power is difficult to transmit, since the reactance of transmission lines is often 4 to 10 times higher than the resistance of the lines. When the transmission system is heavily loaded, the active power losses in the transmission system are also high. Reactive power (vars) is required to maintain the voltage to deliver active power (watts) through transmission lines. Figure 2 Power Triangle When there is not enough reactive power, the voltage sags down and it is not possible to push the power demanded by loads through the lines. Reactive power supply is necessary in the reliable operation of AC power systems. Several recent power outages worldwide may have been a result of an inadequate reactive power supply which subsequently led to voltage collapse Voltage and current may not pulsate up and down at the same time. When the voltage and current do go up and down at the same time, only real power is transmitted. When the voltage and current go up and down at different times, reactive power is also gets transmitted. How much reactive power and which direction it is flowing on a transmission line depend on how different these two items are. Although AC voltage and current pulsate at the same frequency, they peak at a different time. Power is the algebraic product of voltage and current. Over a cycle, power has an average value, called real power (P), measured in voltamperes, or watts. There is also a portion of power with zero average value that Page 7 of 60

9 is called reactive power (Q), measured in volt-amperes reactive, or vars. The total power is called apparent power or Complex power, measured in voltamperes, or VA. 1.2 Analogy of Reactive Power Why an analogy? Reactive Power is an essential aspect of the electricity system, but one that is difficult to comprehend by a lay man. The horse and the boat analogy best describe the Reactive Power aspect. Visualize a boat on a canal, pulled by a horse on the bank of the canal. Figure 3 Boat Pulled by Horse Figure 4 Direction of Pull The horse is not in front of the boat to do a meaningful work of pulling it in a straight path. Due to the balancing compensation by the rudder of the boat, the boat is made to move in a straight manner rather deviating towards the bank. This is in line with the understanding of the reactive power. Figure 5 Vector Representation of Analogy Page 8 of 60

10 1.2.1 In the horse and boat analogy, the horse s objective (real power) is to move the boat straight. The fact that the rope is being pulled from the flank of the horse and not straight behind it, limits the horse s capacity to deliver real work of moving straight. Therefore, the power required to keep the boat steady in navigating straight is delivered by the rudder movement (reactive power). Without reactive power there can be no transfer of real power, likewise without the support of rudder, the boat cannot move in a straight line Reactive power is like the bouncing up and down that happens when we walk on a trampoline. Because of the nature of the trampoline, that up-down bouncing is an essential part of our forward movement across the trampoline, even though it appears to be movement in the opposite direction Reactive power and real power work together in the way that s illustrated very well by the labyrinth puzzle, LABYRINTSPEL: The description of the puzzle begins to show why this game represents the relationship between real and reactive power: The intent is to manipulate a steel ball (1.2cm in diameter) through the maze by rotating the knobs without letting the ball fall into one of the holes before it reaches the end of the maze. If a ball does fall prematurely into a hole, a slanted floor inside the box returns the ball to the user in the trough on the lower right corner of the box. Figure 6 Labyrint Spel The Objective is to twist the two knobs to adjust the angle of the platform in two directions, in order to keep the ball rolling through the maze without falling into any holes. Those twists are REACTIVE POWER, which helps propel the real power through to its ultimate goal, which is delivery to the user. Without reactive power, ball falls into holes along the way, which are NETWORK failures Both of these examples illustrate how important it is to understand the system and how it works in order to meet our objectives effectively. In the LABYRINTSPEL game, if the structure of the system is not taken into account, winning would be really easy because one knob would be turned all the way in Page 9 of 60

11 one direction, and the other knob all the way in the other direction, and the ball would merely roll across the platform. If that s the model how electricity works, then that would deliver the electrons to the end user in the form of real power. But in the game, on the trampoline, and in the electric power network, the system has more going on that means it s essential to do things that seem counterintuitive, like bouncing up and down on the trampoline or turning the platform in the game towards west to avoid the hole to the east, even though we have to go east to win In electric power, the counterintuitive thing about reactive power is to use some power along the path to balance the flow of electrons and the circuits. Otherwise, the electricity just flows from the generator to the largest consumer (that s Kirchhoff s law, basically). In this sense, reactive power is like water pressure in a water network LABYRINTSPEL game and the trampoline are good examples that they capture the fact that mathematically, real power and reactive power are pure conjugates. 1.3 Understanding Vectorally In practice circuits are invariably combinations of resistance, inductance and capacitance. The combined effect of these impedances to the flow of current is most easily assessed by expressing the power flows as vectors that show the angular relationship between the powers waveforms associated with each type of impedance. Figure 7 shows how the vectors can be resolved to determine the net capacity of the circuit needed to transfer the power requirements of the connected equipment The useful power that can be drawn from the electricity distribution system is represented by the vertical vector in the diagram and is measured in kilowatts (kw).the reactive or wattless power that is a consequence of the inductive load in the circuit is represented by the horizontal vector to the right and the reactive power attributable to the circuit capacitance by Page 10 of 60 Figure 7 Vector Representation

12 the horizontal vector to the left. These are measured in kilovars (kvar) The resolution of these vectors, which is the diagonal vector in the diagram is the capacity required to transmit the active power, and is measured in kilovoltsampere (kva). The ratio of the kw to kva is the cosine of the angle in the diagram shown as theta, and is referred to as the power factor When the net impedance of the circuit is solely resistance, so that the inductance and capacitance exactly cancel each other out, then the angle theta becomes zero and the circuit has a power factor of unity. The circuit is now operating at its highest efficiency for transferring useful power. However, as a net reactive power emerges the angle theta starts to increase and its cosine falls At low power factors the magnitude of the kva vector is significantly greater than the real power or kw vector. Since distribution assets such as cables, lines and transformers must be sized to meet the kva requirement, but the useful power drawn by the customer is the kw component, a significant cost emerges from having to over-size the distribution system to accommodate the substantial amount of reactive power that is associated with the active power flow. 1.4 Voltage Stability Power flows, both actual and potential, must be carefully controlled for a power system to operate within acceptable voltage limits and vice versa. Not only is reactive power necessary to operate the transmission system reliably, but it can also substantially improve the efficiency with which real power is delivered to customers. Increasing reactive power production at certain locations (usually near a load center) can sometimes alleviate transmission constraints and allow cheaper real power to be delivered into a load pocket Voltage control (keeping voltage within defined limits) in an electric power system is Important for proper operation of electric power equipment and saving it from imminent damage, to reduce transmission losses and to maintain the ability of the system to withstand disturbances and prevent voltage collapse. In general terms, decreasing reactive power causes voltages to fall, while increasing reactive power causes voltages to rise. A voltage collapse occurs when the system is trying to serve much more load than the voltage can support. Page 11 of 60

13 1.4.3 As voltage drops, current must increase to maintain the power supplied, causing the lines to consume more reactive power and the voltage to drop further. If current increases too much, transmission lines trip, or go offline, overloading other lines and potentially causing cascading failures. If voltage drops too low, some generators will automatically disconnect to protect themselves Usually the causes of under voltages are: Overloading of supply transformers Inadequate short circuit level in the point of supply Excessive voltage drop across a long feeder Poor power factor of the connected load Remote system faults, while they are being cleared Interval in re-closing of an auto-reclosure Starting of large HP induction motors If the declines continue, these voltage reductions cause additional elements to trip, leading to further reduction in voltage and loss of load. The result is a progressive and uncontrollable decline in voltage, all because the power system is unable to provide the reactive power required to supply the reactive power demand. 1.5 Voltage Collapse When voltages in an area are significantly low or blackout occurs due to the cascading events accompanying voltage instability, the problem is considered to be a voltage collapse phenomenon. Voltage collapse normally takes place when a power system is heavily loaded and/or has limited reactive power to support the load. The limiting factor could be the lack of reactive power (SVC and generators hit limits) production or the inability to transmit reactive power through the transmission lines The main limitation in the transmission lines is the loss of large amounts of reactive power and also line outages, which limit the transfer capacity of reactive power through the system In the early stages of analysis, voltage collapse was viewed as a static problem but it is now considered to be a non linear dynamic phenomenon. The dynamics Page 12 of 60

14 in power systems involve the loads, and voltage stability is directly related to the loads. Hence, voltage stability is also referred to as load stability There are other factors which also contribute to voltage collapse, and are as below: Increase in load Action of tap changing transformers Load recovery dynamics All these factors play a significant part in voltage collapse as they effect the transmission, consumption, and generation of reactive power. Usually voltage stability is categorized into two parts Large disturbance voltage stability Small disturbance voltage stability Figure 8 Time frames for voltage stability phenomena When a large disturbance occurs, the ability of the system to maintain acceptable voltages falls due to the impact of the disturbance. Ability to maintain voltages is dependent on the system and load characteristics, and the Page 13 of 60

15 interactions of both the continuous and the discrete controls and protections. Similarly, the ability of the system to maintain voltages after a small perturbation i.e. incremental change in load is referred to as small disturbance voltage stability. It is influenced by the load characteristics, continuous control and discrete controls at a given instant of time. 1.6 Proximity to Instability Static voltage instability is mainly associated with reactive power imbalance. Thus, the loadability of a bus in a system depends on the reactive power support that the bus can receive from the system. As the system approaches the maximum loading point or voltage collapse point, both real and reactive power losses increase rapidly Therefore, the reactive power supports have to be locally adequate. With static voltage stability, slowly developing changes in the power system occur that eventually lead to a shortage of reactive power and declining voltage This phenomenon can be seen from a plot of power transferred versus voltage at the receiving end. These plots are popularly referred to as P V curves or Nose curves. As power transfer increases, the voltage at the receiving end decreases. In the fig(9) eventually, a critical (nose) point, the point at which the system reactive power is out of usage, is reached where any further increase in active power transfer will lead to very rapid decrease in voltage magnitude. v Knee point Figure 9 PV curve and Voltage stability margin under different conditions Before reaching the critical point, a large voltage drop due to heavy reactive power losses is observed. The only way to save the system from voltage collapse is to reduce the reactive power load or add additional reactive power prior to reaching the point of voltage collapse. Page 14 of 60

16 These are curves drawn between V and P of a critical bus at a constant load power factor. These are produced by using a series of power flow solutions for different load levels. At the knee point or the nose point of the V-P curve, the voltage drops rapidly with an increase in the load demand. Power flow solution fails to converge beyond this limit which indicates the instability. 1.7 Reactive Reserve Margin The amount of unused available capability of reactive power static as well as dynamic in the system (at peak load for a utility system) as a percentage of total capability is known as Reactive reserve margin Voltage collapse normally occurs when sources producing reactive power reach their limits i.e. generators, SVCs or shunt reactors, and there is not much reactive power to support the load. As reactive power is directly related to voltage collapse, it can be used as a measure of voltage stability margin The voltage stability margin can be defined as a measure of how close the system is to voltage instability, and by monitoring the reactive reserves in the power system, proximity to voltage collapse can be monitored In case of reactive reserve criteria, the reactive power reserve of an individual or group of VAr sources must be greater than some specified percentage (x %) of their reactive power output under all contingencies. The precincts where reactive power reserves were exhausted would be identified as critical areas Reactive power requirements over and above those which occur naturally are provided by an appropriate combination of reactive source/devices which are normally classified as static and dynamic devices. STATIC SOURCES: Static sources are typically transmission and distribution equipments such as Capacitors and Reactors that are relatively static and can respond to the changes in voltage support requirements only slowly and in discrete steps. Devices are inexpensive, but the associated switches, control, and communications, and their maintenance, can amount to as much as one third of the total operations and maintenance budget of a distribution system. Page 15 of 60

17 DYNAMIC SOURCES: It includes pure reactive power compensators like synchronous condensers, Synchronous generators and solid-state devices such as FACTS, SVC, STATCOM, D-VAR, and SuperVAR which are normally dynamic and can respond within cycles to changing reactive power requirement. These are typically considered as transmission service devices Static devices typically have lower capital costs than dynamic devices, and from a system point of view, they are used to provide normal or intact-system voltage support and to adapt to slowly changing conditions, such as daily load cycles and scheduled transactions. By contrast, dynamic reactive power sources must be deployed to allow the transmission system to respond to rapidly changing conditions on the transmission system, such as sudden loss of generators or transmission facilities. An appropriate combination of both static and dynamic resources is needed to ensure reliable operation of the transmission system at an appropriate level of costs Reactive power absorption occurs when current flows through an inductance. Inductance is found in transmission lines, transformers, and induction motors etc. The reactive power absorbed by a transmission line or transformer is proportional to the square of the current. Sources of Reactive Power Static: Shunt Capacitors Filter banks Underground cables Transmission lines (lightly loaded) Dynamic: Synchronous Generators/Synchronous Condensers FACTS (e.g.,svc,statcom) Sinks of Reactive Power Transmission lines (Heavily loaded) Transformers Shunt Reactors Synchronous Generators FACTS (e.g.,svc,statcom) Induction generators (wind plants) Loads Induction motors (Pumps, Fans etc) Inductive loads (Arc furnace etc) Table 1: Reactive power compensation sources Page 16 of 60

18 1.7.8 A transmission line also has capacitance. When a small amount of current is flowing, the capacitance dominates, and the lines have a net capacitive effect which raises voltage. This happens at night when current flows/load is low. During the day, when current flow/load is high, inductive effect is greater than the capacitance, and the voltage sags. Figure 10 Average cost of Reactive power technologies Page 17 of 60

19 1.8 NER GRID Overview NER grid with a maximum peak requirement of around 2900 MW and installed capacity of 3912 MW caters to the seven north eastern states (namely Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland and Tripura). It is synchronously connected with ER Grid through 400 kv BONGAIGAON NEW SILIGURI D/C, 400 kv BONGAIGAON ALIPURDUAR D/C, 220 kv BIRPARA ALIPURDUAR D/C and internationally through 132 kv SALAKATI GELYPHU(Bhutan), 132 kv RANGIA DEOTHANG (Bhutan), 132 kv D/C SURAJMANINAGAR COMILLA (Bangladesh) and 11 kv MOREH TAMU(Myanmar). Also, it is connected to NR grid through ±800kV HVDC Bipole Biswanath Charali-Agra link. The bottle neck of operating the NER grid arises because of the brittle back bone network of about 8559 Ckt Kms of 132 KV lines, 3410 Ckt Kms of 220 KV lines and 4409 Ckt Kms of 400 KV lines compared to other regional grids With Commissioning of first 800kV multi-terminal HVDC between Biswanath Charali, Alipurduar and Agra, NER grid is directly connected with NR grid by this HVDC link. The capacity of each terminal at Biswanath Charali(NER) and Alipurduar (ER) is 3000 MW and at Agra it is 6000 MW, at ± 800 kv voltage level. Figure 11 NER Grid map Page 18 of 60

20 1.8.3 Highlights of NER grid for current year include commercial operation of Unit 1 & 2 of Pare HEP of 55 MW each, 400/132 / 33 kv, 315 MVA ICT 3 at Silchar, 400 kv Silchar Melriat D/C line (charged at 132 kv), 132 kv Ranganadi Itanagar S/C line, 132 kv Ranganadi Pare II, 132 kv Pare Itanagar S/C line, 132 kv Teju Namsai S/C, LILO of 132 kv Aizwal Jiribam at Tipaimukh S/S of Manipur, LILO of 132 kv Ranganadi Lekhi at Pare S/S. Commissioning of 110 MW Pare HEP has increased the generation availability of NER Region. The reactive power generation/absorption capability of both the units of Pare HEP is also being used for voltage management. The 400/132/33 kv ICT 3 at Silchar has fulfilled the N-I-I contingency requirement of existing 400/132 kv 2 x 200 MVA ICT at Silchar. The N-I contingency requirement of the existing 132 kv Aizawl Melriat T/L has been fulfilled with the commissioning of 132 kv Silchar Melriat D/C lines. This has increased the reliability of Melriat S/S which is a major connectivity of the Mizoram system with the rest of NER Grid. The 132 kv Itanagar S/S of Arunachal Pradesh which was earlier radially connected from 132 kv Lekhi S/S, has been connected from 132 kv Ranganadi S/S and Pare S/S through 132 kv Ranganadi Itanagar S/C line and 132 kv Pare Itanagar S/C line, thus increasing the reliability of Itanagar S/S, which serves a major portion of the capital load of Arunachal Pradesh. Other major elements commissioned during current year were 420 kv 125 MVAR Bus Reactor at Bongaigaon S/S, 420 kv 125 MWAR Bus Reactor at Balipara S/S, 420 V 125 MVAR Bus Reactor at Silchar S/S and 420kV 80 MVAR Bus Reactor at Imphal S/S. These reactors have helped in controlling the problem of high voltage in the 400 kv System in the Northern part of NER Grid which mainly occurs as the 400 kv lines are very lightly loaded during the off-peak hours. The 132 kv Tezu Namsai S/C line, 132/ 33 kv 15 MVA ICT-I & ICT-II at Namsai S/S, and 145 kv 20 MVAR Bus Reactor at Namsai S/S of Arunachal Pradesh were also commissioned during the current year. Commissioning Namsai S/S has improved the connectivity of Arunachal Pradesh system with the rest of the NER Grid. The load of Namsai area of Arunachal Pradesh has been connected with the rest of NER grid through the Namsai S/S Almost 50% of the total NER load is spread out in 132 kv pocket of southern part of NER which were without the direct support of major EHV trunk lines. This part of the network was highly sensitive and was susceptible to grid disturbance in the past and demanded more operational acumen. Increase in the loading of major 132 kv trunk lines, in particular 132 kv DIMAPUR IMPHAL S/C,132 kv JIRIBAM LOKTAK S/C and 132 kv BADARPUR KHLIEHRIAT S/C in peak hours has led to many a grid incidents in the past in the form of cascade tripping accompanied by voltage sag. Page 19 of 60

21 However, with system augmentation grid incidence in this part of the grid has become a matter of past Relationship between frequency and voltage is a well-known fact. Studies have revealed that though voltage is a localized factor, it is directly affected by the frequency which is a notional factor. Any lopsidedness in the demand/generation side leading to fluctuations in NEW grid frequency affects NER grid immensely, in particular the voltage profile of the grid, leading to sagging and swelling of voltage heavily during such occasions. Ironically, NER was synchronously connected with NEW grid for stretching the transmission capability to reduce the load generation mismatch of the country FSC s have been integrated with the NER system in the 400 kv Balipara Bongaigaon III & IV at Balipara end Presently NER Grid is supported by 3562 MVAr from shunt reactors and 273 MVAr from shunt capacitors spread across the region Skewness in the location of hydro stations and load centers in NER is another obstacle which aggravates the voltage problem further. Lines are long and pass through difficult terrains to the load centers. Northern part of NER grid which is well supported by some strong 400 KV and 220 KV network faces high voltage regime during lean hydro period as the corridor is not fully utilized and is usually lightly loaded. Supports from hydro stations in condenser mode are not available for containing low voltage conditions. D curve optimization is yet to be realized fully due to technical glitches Reactive power management and voltage control are two aspects of a single activity that both supports reliability and facilitates commercial transaction across transmission network. Controlling reactive power flow can reduce losses and congestion on the transmission system Operationally in NER, Voltage is normally controlled by managing production and absorption of reactive power in real time : a. By Switching in and out of Line reactance compensators such as capacitors and shunt reactors (Line/Bus Reactors) as and when system demands in cooperation with the constituents and the CTU. b. By using automatic voltage regulators (AVR), the generating units control field excitation to maintain the scheduled voltage levels at the terminals of the generators. In real time operation, the generation/consumption of reactive power must be within the capability curve of generator. Page 20 of 60

22 c. By generation re-dispatch/rescheduling. d. By regulating voltage with the help of OLTC s. e. By load staggering/shedding. f. By Circuit switching: Mostly one circuit of the lightly loaded d/c line is kept open keeping in mind the n-1 criterion during high voltage and high frequency period. Voltage differences as well as fault level of stations are taken into account before any switching operation of circuits. Fault Level at important substations of NER is mentioned in Annexure I. All constituents must maintain the voltage of their periphery inside the IEGC band at all times as reactive power management/voltage control is a local phenomenon. 1.9 Reliability Improvement Due to Local Voltage Regulation Local voltage regulation to a voltage schedule supplied by the utility can have a very beneficial effect on overall system reliability, reducing the problems caused by voltage dips on distribution circuits such as dimming lights, slowing or stalling motors, dropout of contactors and solenoids, etc In past years a voltage drop would inherently reduce load, helping the situation. Light bulbs would dim and motors would slow down with decreasing voltage. Dimmer lights and slower motors typically draw less power, so the situation was in a certain sense self-correcting. With modern loads, this situation is changing Today many incandescent bulbs are being replaced with compact fluorescent lights, LED lamps that draw constant power as voltage decreases, and motors are being powered with adjustable-speed drives that maintain a constant speed as voltage decreases. In addition, voltage control standards are rather unspecific, and there is a tremendous opportunity for an improvement in efficiency and reliability from better voltage regulation. Capacitors supply reactive power to boost voltage, but their effect is dramatically diminished as voltage dips Capacitor effectiveness is proportional to the square of the voltage, so at 80% voltage, capacitors are only 64% as effective as they are at normal conditions. As voltage continues to drop, the capacitor effect falls off until voltage collapses. The reactive power supplied by an inverter is dynamic, it can be controlled very rapidly, and it does not drop off with a decrease in voltage. Distribution systems that allow customers to supply dynamic reactive power to regulate voltage could be a tremendous asset to system reliability and efficiency by expanding the margin to voltage collapse. Page 21 of 60

23 2 TRANSMISSION LINES AND REACTIVE POWER COMPENSATION 2.1 Introduction In moving power from generators to loads, the transmission network introduces both real and reactive losses. Housekeeping loads at substations (such as security lighting and space conditioning) and transformer excitation losses are roughly constant (i.e., independent of the power flows on the transmission system). Transmission-line losses, on the other hand, depend strongly on the amount of power being transmitted Real-power losses arise because aluminum and copper (the materials most often used for transmission lines) are not perfect conductors; they have resistance. The consumption of reactive power by transmission lines increases with the square of current i.e., the transmission of reactive power requires an additional demand for reactive power in the system components The reactive-power nature of transmission lines is associated with the geometry of the conductors themselves (primarily the radius of the conductor) and the geometry of the conductor configuration (the distances between each conductor and ground and the distances among conductors) The reactive-power behavior of transmission lines is complicated by their inductive and capacitive characteristics. At low line loadings, the capacitive effect dominates, and generators and transmission-related reactive equipment must absorb reactive power to maintain line voltages within their appropriate limits. On the other hand, at high line loadings, the inductive effect dominates, and generators, capacitors, and other reactive devices must produce reactive power The thermal limit is the loading point (in MVA) above which real power losses in the equipment will overheat and damage the equipment. Most transmission elements (e.g., conductors and transformers) have normal thermal limits below which the equipment can operate indefinitely without any damage. These types of equipment also have one or more emergency limits to which the equipment can be loaded for several hours with minimal reduction in the life of the equipment If uncompensated, these line losses reduce the amount of real power that can be transmitted from generators to loads. Transmission-line capacity decreases as the Page 22 of 60

24 line length increases if there is no voltage support (injection or absorption of reactive power) on the line. 2.2 Surge Impedance Loading (SIL) Transmission lines and cables generate and consume reactive power at the same time. The reactive power generation is almost constant, because the voltage of the line is usually constant, and the line s reactive power consumption depends on the current or load connected to the line that is variable. So at the heavy load conditions transmission lines consume reactive power, decreasing the line voltage, and in the low load conditions generate, increasing line voltage The case when line s reactive power produced by the line capacitance is equal to the reactive power consumed by the line inductance is called natural loading or surge impedance loading (SIL), meaning that the line provides exactly the amount of MVAr needed to support its voltage. The balance point at which the inductive and capacitive effects cancel each other is typically about 40% of the line s thermal capacity. Lines loaded above SIL consume reactive power, while lines loaded below SIL supply reactive power A 400 kv, line generates approximately 55 MVAR per 100 km/ckt, when it is idle charged due to line charging susceptance. This implies a 300 km line generates about 165 MVAR when it is idle charged. 2.3 Shunt Compensation in Line Normally there are two types of shunt reactors; Line reactor and bus reactor. Line reactors are normally used to control over voltage due to switching and load rejection whereas Bus reactors are normally used to control the steady state over voltages during light load conditions The degree of compensation is decided by an economic point of view between the capitalized cost of compensator and the capitalized cost of reactive power from supply system over a period of time. In practice a compensator such as a bank of capacitors (or inductors) can be divided into parallel sections, each Switched separately, so that discrete changes Page 23 of 60

25 in the compensating reactive power may be made, according to the requirements of the load In general, shunt compensation is provided in all lines of length 120 km and above Reasons for the application of shunt capacitor units are : Increase voltage level at the load Improves voltage regulation if the capacitor units are properly switched. Reduces I 2 R power loss in the system because of reduction in current. Increases power factor of the source generator. Decrease kva loading on the source generators and circuits to relieve an overloaded condition or release capacity for additional load growth. By reducing kva loading on the source generators additional kilowatt loading may be placed on the generation if turbine capacity is available. 2.4 Line loading as function of Line Length and Compensation The operating limits for transmission lines may be taken as minimum of thermal rating of conductors and the maximum permissible line loadings derived. SIL given in table below is for uncompensated line. Table 2 : Line Parameters & Surge Impedance Loading of Different Conductor Type Page 24 of 60

26 List 1: International connectivity of NER at 400kV (Charged at 132kV) SR. NO FROM TO UTILITY KM CKT CONDUCTOR. 1 Comilla Surajmani Nagar POWERGRID 47 1 ACSR Twin Moose 2 Comilla Surajmani Nagar POWERGRID 47 2 ACSR Twin Moose List 2 : International Connectivity of NER at 132kV SR. NO. FROM TO UTILITY KM CKT CONDUCTOR 1 Gelyphu(BH Salakati(IND U) ) POWERGRID ACSR Panther 2 Motonga(BH U) Rangia(IND) AEGCL 49 2 ACSR Panther List 3 : +/- 800 kv HVDC Lines Agra-BNC SR. NO. FROM TO UTILITY KM CKT CONDUCTOR 1 Agra Biswanath Hexa Lapwing POWERGRID Charali 2 Agra Biswanath Hexa Lapwing POWERGRID Charali List of Transmission Lines in NER GRID along with their line length and conductor type is given in ANNEXURE II Page 25 of 60

27 List 4 : Fixed, Switchable and Convertible Line reactors in North Eastern Region SR. NO. UTILITY FROM TO INSTALLED AT (STATION) KV MVAR KM CONVERTIBLE SWITCHABLE FIXED 1 POWERGRID BONGAIGAON BALIPARA BONGAIGAON TRUE.. 2 POWERGRID BONGAIGAON BALIPARA BONGAIGAON TRUE.. 3 POWERGRID BONGAIGAON BALIPARA BALIPARA TRUE.. 4 POWERGRID BONGAIGAON BALIPARA BALIPARA TRUE.. 5 POWERGRID BONGAIGAON BALIPARA BONGAIGAON TRUE.. 6 POWERGRID BONGAIGAON BALIPARA BONGAIGAON TRUE.. 7 POWERGRID BONGAIGAON BALIPARA BALIPARA TRUE.. 8 POWERGRID BONGAIGAON BALIPARA BALIPARA TRUE.. 9 POWERGRID BONGAIGAON BINAGURI(ER) BONGAIGAON TRUE 10 POWERGRID BONGAIGAON BINAGURI(ER) BONGAIGAON TRUE 11 POWERGRID MISA NEW MARIANI MISA TRUE 12 POWERGRID MISA MARIANI MISA TRUE 13 POWERGRID PALATANA SILCHAR SILCHAR TRUE. 14 POWERGRID PALATANA SILCHAR SILCHAR TRUE. 15 OTPC PALATANA SILCHAR PALLATANA TRUE. 16 OTPC PALATANA SILCHAR PALLATANA TRUE. BISWANATH.. 17 NEEPCO RANGANADI CHARALI RANGANADI TRUE BISWANATH.. 18 NEEPCO RANGANADI CHARALI RANGANADI TRUE BISWANATH. 19 POWERGRID CHARALI BALIPARA BALIPARA TRUE... BISWANATH. 20 POWERGRID CHARALI BALIPARA BALIPARA TRUE POWERGRID SILCHAR BYRNIHAT SILCHAR TRUE. Page 26 of 60

28 22 MeECL SILCHAR BYRNIHAT BYRNIHAT TRUE.. 23 POWERGRID SILCHAR AZARA SILCHAR TRUE. 24 AEGCL SILCHAR AZARA AZARA TRUE 25 POWERGRID BANGAIGAON BYRNIHAT BANGAIGAON TRUE.. 26 POWERGRID BANGAIGAON AZARA BANGAIGAON TRUE.. 27 NEEPCO NEW MARIANI AGBPP AGBPP TRUE.. NOTE: CONVERTIBLE: LINE REACTORS WHICH CAN BE OPERATED UPON ONLY WHEN LINE IS IN OUT CONDITION. SWITCHABLE: LINE REACTORS WHICH CAN BE OPERATED EVEN WHEN LINE IS IN SERVICE. FIXED: LINE REACTORS WHICH ARE FIXED AND CANNOT BE OPERATED UPON AS A BUS REACTOR. Page 27 of 60

29 List 5: Bus Reactors in North Eastern Region SR. NO. UTILITY INSTALLED AT RATING KV (STATION) MVAR MAKE STATUS 1 POWERGRID BALIPARA BHEL IN SERVICE 2 POWERGRID BALIPARA BHEL IN SERVICE 3 POWERGRID BONGAIGAON X 50 BHEL IN SERVICE 4 POWERGRID BONGAIGAON X 80 BHEL IN SERVICE 5 POWERGRID MISA BHEL IN SERVICE 6 POWERGRID SILCHAR X 63 CGL IN SERVICE 7 POWERGRID BISWANATH IN SERVICE X 80 CHARALI 8 OTPC PALATANA BHEL IN SERVICE 9 ASSAM MARIANI X IN SERVICE 10 ASSAM SAMAGURI X IN SERVICE 11 POWERGRID AIZWAL IN SERVICE 12 POWERGRID KUMARGHAT IN SERVICE 13 TRIPURA DHARMANAGAR X 2. IN SERVICE 14 POWERGRID ZIRO IN SERVICE 15 POWERGRID IMPHAL IN SERVICE 16 POWERGRID NEW MARIANI IN SERVICE 17 ASSAM SAMAGURI 132 2X12.5. IN SERVICE 18 ASSAM AZARA BHEL IN SERVICE 19 MEGHALAYA BYRNIHAT CGL NOT IN SERVICE To be replaced with 80 MVAR B/R. Sent to CEA for approval 20 POWERGRID ROING IN SERVICE 21 POWERGRID TEJU IN SERVICE 22 POWERGRID BISWANATH. IN SERVICE X 63 CHARALI 23 POWERGRID NAMSAI IN SERVICE 24 POWERGRID BONGAIGAON IN SERVICE 25 POWERGRID BALIPARA IN SERVICE 26 POWERGRID MOKOKCHUNG IN SERVICE 27 POWERGRID IMPHAL IN SERVICE 28 POWERGRID SILCHAR IN SERVICE Page 28 of 60

30 List 6: List of Upcoming Bus Reactors in North Eastern Region SR. NO. UTILITY TO BE INSTALLED AT (STATION) KV RATING (MVAR) 1 AEGCL Rangia AEGCL Sonapur POWERGRID Misa POWERGRID New Mariani POWERGRID Imphal STERLITE PK Bari STERLITE Surjamaninagar List 7: Tertiary Reactors on 33kV side of 400/220/33 kv ICTs in North Eastern Region SR. NO. UTILITY INSTALLED RATING INSTALLED AT ON MVAR MAKE (STATION) STATUS 1 POWERGRID BALIPARA 33 KV SIDE IN 4 X 25 BHEL OF ICT I SERVICE 2 POWERGRID BONGAIGAON 33 KV SIDE IN 2 X 25 BHEL OF ICT I SERVICE 3 POWERGRID MISA 33 KV SIDE IN 4 X 25 BHEL OF ICT I SERVICE Page 29 of 60

December-2017 Edition-9

December-2017 Edition-9 A Typical SVC Station Reactive Power Document and Voltage Control of North Eastern Region December-2017 Edition-9 North Eastern Regional Load Despatch Centre Shillong Power System operation Corporation

More information

Information regarding charging of New Transmission Element in North Eastern Region under perview of NERLDC

Information regarding charging of New Transmission Element in North Eastern Region under perview of NERLDC Information regarding of New Transmission Element in North Eastern Region under perview of Element for 1st time for on 1 400 kv Silchar-Azara NETC 16.06.14 18.06.14 23.06.14 25.07.14 18:48 20.08.14 29.08.14

More information

Concepts And Application Of Flexible Alternating Current Transmission System (FACTS) In Electric Power Network

Concepts And Application Of Flexible Alternating Current Transmission System (FACTS) In Electric Power Network Concepts And Application Of Flexible Alternating Current Transmission System (FACTS) In Electric Power Network Nwozor Obinna Eugene Department of Electrical and Computer Engineering, Federal University

More information

STATION OWNER UNIT NO. UNIT CAPACITY (MW) TYPE

STATION OWNER UNIT NO. UNIT CAPACITY (MW) TYPE Updated on 20.06.2011 LIST OF UNITS IN NER THAT REQUIRE APPROVAL OF OCC AS WELL AS NERLDC FOR PLANNED SHUT DOWN & MANUAL DESYNCHRONISATION / SYNCHRONISATION. TRIPPING OF THESE UNITS ALSO NEED TO BE INTIMATED

More information

Agenda of 11 th System Studies Meeting in NER

Agenda of 11 th System Studies Meeting in NER Agenda of 11 th System Studies Meeting in NER Date: 16.12.2015. Venue: Hotel Nandan, Guwahati 1. Review of SPS I, II, III & SPS IV related to Palatana GBPP, OTPC after commissioning of Palatana Module

More information

ELG4125: Flexible AC Transmission Systems (FACTS)

ELG4125: Flexible AC Transmission Systems (FACTS) ELG4125: Flexible AC Transmission Systems (FACTS) The philosophy of FACTS is to use power electronics for controlling power flow in a transmission network, thus allowing the transmission line to be loaded

More information

Overview of Flexible AC Transmission Systems

Overview of Flexible AC Transmission Systems Overview of Flexible AC Transmission Systems What is FACTS? Flexible AC Transmission System (FACTS): Alternating current transmission systems incorporating power electronic-based and other static controllers

More information

Report. the feasibility of

Report. the feasibility of Report on the feasibility of Additional Interconnection between India and Bangladesh Joint Technical Team (JTT) of India and Bangladesh July 2016 Contents 1.0 Background 1 2.0 Additional power export to

More information

INSTALLATION OF CAPACITOR BANK IN 132/11 KV SUBSTATION FOR PARING DOWN OF LOAD CURRENT

INSTALLATION OF CAPACITOR BANK IN 132/11 KV SUBSTATION FOR PARING DOWN OF LOAD CURRENT INSTALLATION OF CAPACITOR BANK IN 132/11 KV SUBSTATION FOR PARING DOWN OF LOAD CURRENT Prof. Chandrashekhar Sakode 1, Vicky R. Khode 2, Harshal R. Malokar 3, Sanket S. Hate 4, Vinay H. Nasre 5, Ashish

More information

Agenda for 6th Standing Committee Meeting on Power System Planning of NER

Agenda for 6th Standing Committee Meeting on Power System Planning of NER Agenda for 6 th Standing Committee Meeting on Power System planning of North Eastern Region 1.0 Confirmation of the minutes of 5 th Standing Committee Meeting on Power System planning of North Eastern

More information

Grid Stability Analysis for High Penetration Solar Photovoltaics

Grid Stability Analysis for High Penetration Solar Photovoltaics Grid Stability Analysis for High Penetration Solar Photovoltaics Ajit Kumar K Asst. Manager Solar Business Unit Larsen & Toubro Construction, Chennai Co Authors Dr. M. P. Selvan Asst. Professor Department

More information

Is Uncorrected Power Factor Costing You Money?

Is Uncorrected Power Factor Costing You Money? Is Uncorrected Power Factor Costing You Money? Are You Being Overcharged by Your Energy Provider? Find Out! Everyone s trying to lower their energy bill these days. If you re a business owner, facilities

More information

Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC

Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC IJSTE - International Journal of Science Technology & Engineering Volume 2 Issue 01 July 2015 ISSN (online): 2349-784X Voltage Sag Mitigation in IEEE 6 Bus System by using STATCOM and UPFC Ravindra Mohana

More information

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014

Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014 Minutes of the 4 th Meeting of Standing Committee on Power System Planning of North Eastern Region held on 13 th Dec., 2014 1.0 The 4 th meeting of the Standing Committee on Power System Planning of North

More information

HVDC Systems in India

HVDC Systems in India HVDC Systems in India Outline Introduction HVDC Systems presently in operation Main Data/Salient Features Upcoming Projects Future Challenges Transmission Network - Present 765kV/400kV lines: about 1,03,000

More information

Implementation of FC-TCR for Reactive Power Control

Implementation of FC-TCR for Reactive Power Control IOSR Journal of Electrical and Electronics Engineering (IOSR-JEEE) e-issn: 2278-1676,p-ISSN: 2320-3331, Volume 5, Issue 5 (May. - Jun. 2013), PP 01-05 Implementation of FC-TCR for Reactive Power Control

More information

North Eastern Regional Power Committee

North Eastern Regional Power Committee North Eastern Regional Power Committee Agenda For 6 th Protection Coordination Sub-Committee Meeting Time of meeting : 10:00 AM. Date of meeting : 11 th December, 2012 (Tuesday) Venue : Hotel Grand Starline

More information

Integration of Large Wind Farms into Electric Grids

Integration of Large Wind Farms into Electric Grids Integration of Large Wind Farms into Electric Grids Dr Mohammad AlZoubi Introduction Development WHAT IS NEXT!! Over the next 12 years, Europe must build new power capacity equal to half the current total.

More information

ABB POWER SYSTEMS CONSULTING

ABB POWER SYSTEMS CONSULTING ABB POWER SYSTEMS CONSULTING DOMINION VIRGINIA POWER Offshore Wind Interconnection Study 2011-E7406-1 R1 Summary Report Prepared for: DOMINION VIRGINIA POWER Report No.: 2011-E7406-1 R1 Date: 29 February

More information

Pump ED 101. Power Factor (Part 2) - - Electricity Behaving Better

Pump ED 101. Power Factor (Part 2) - - Electricity Behaving Better Pump ED 101 Power Factor (Part 2) - - Electricity Behaving Better Joe Evans, Ph.D http://www.pumped101.com Last month we took a close look at the flow of voltage and current in purely resistive and inductive

More information

Power Quality Improvement Using Statcom in Ieee 30 Bus System

Power Quality Improvement Using Statcom in Ieee 30 Bus System Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 3, Number 6 (2013), pp. 727-732 Research India Publications http://www.ripublication.com/aeee.htm Power Quality Improvement Using

More information

Paper ID: EE19 SIMULATION OF REAL AND REACTIVE POWER FLOW ASSESSMENT WITH FACTS CONNECTED TO A SINGLE TRANSMISSION LINE

Paper ID: EE19 SIMULATION OF REAL AND REACTIVE POWER FLOW ASSESSMENT WITH FACTS CONNECTED TO A SINGLE TRANSMISSION LINE SIMULATION OF REAL AND REACTIVE POWER FLOW ASSESSMENT WITH FACTS CONNECTED TO A SINGLE TRANSMISSION LINE Prof. Mrs. Shrunkhala G. Khadilkar Department of Electrical Engineering Gokhale Education Society.

More information

Power Quality Luis Vargas Research Engineer 9/18/2008

Power Quality Luis Vargas Research Engineer 9/18/2008 Page: 1 of 5 Luis Vargas Research Engineer 9/18/2008 Page: 2 of 5 As we make advances on green technology, we get a better understanding of the efficiencies and deficiencies on how we consume electricity.

More information

A Review on Reactive Power Compensation Technologies

A Review on Reactive Power Compensation Technologies IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 11, 2017 ISSN (online): 2321-0613 A Review on Reactive Power Compensation Technologies Minal Dilip Sathe 1 Gopal Chaudhari

More information

DRAFT. Guidelines on Power quality & safety issues in usage of roof-top solar pv system CENTRAL ELECTRICITY AUTHORITY

DRAFT. Guidelines on Power quality & safety issues in usage of roof-top solar pv system CENTRAL ELECTRICITY AUTHORITY DRAFT Guidelines on Power quality & safety issues in usage of roof-top solar pv system CENTRAL ELECTRICITY AUTHORITY 2018 1. INTRODUCTION Solar energy has become the most popular renewable energy source

More information

Ancillary Services & Essential Reliability Services

Ancillary Services & Essential Reliability Services Ancillary Services & Essential Reliability Services EGR 325 April 19, 2018 1 Basic Products & Ancillary Services Energy consumed by load Capacity to ensure reliability Power quality Other services? o (To

More information

IJRASET 2013: All Rights are Reserved

IJRASET 2013: All Rights are Reserved Power Factor Correction by Implementation of Reactive Power Compensation Methods of 220 KV Substation MPPTCL Narsinghpur Ria Banerjee 1, Prof. Ashish Kumar Couksey 2 1 Department of Energy Technology,

More information

Power Factor Correction

Power Factor Correction AE9-1249 R10 August 2008 Power Factor Correction Index Page 1. Introduction... 1 2. Electrical Fundamentals... 1 3. Electrical Formulas... 2 4. Apparent Power and Actual Power... 2 5. Effects of Poor Power

More information

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS

THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS THE NECESSITY OF THE 500 KV SYSTEM IN NWE S TRANSMISSION SYSTEM TO MAINTAIN RELIABLE SERVICE TO MONTANA CUSTOMERS 2/27/2018 ELECTRIC TRANSMISSION PLANNING Table of Contents Table of Contents... 2 Executive

More information

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection

Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection Evaluation of the Performance of Back-to-Back HVDC Converter and Variable Frequency Transformer for Power Flow Control in a Weak Interconnection B. Bagen, D. Jacobson, G. Lane and H. M. Turanli Manitoba

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Microcontroller Based Power Factor Correction Using SCR

Microcontroller Based Power Factor Correction Using SCR Proceedings of International Conference on Innovation & Research in Technology for Sustainable Development (ICIRT 2012), 01-03 November 2012 124 Microcontroller Based Power Factor Correction Using SCR

More information

INTRODUCTION. In today s highly complex and interconnected power systems, mostly made up of thousands of buses and hundreds of generators,

INTRODUCTION. In today s highly complex and interconnected power systems, mostly made up of thousands of buses and hundreds of generators, 1 INTRODUCTION 1.1 GENERAL INTRODUCTION In today s highly complex and interconnected power systems, mostly made up of thousands of buses and hundreds of generators, there is a great need to improve electric

More information

Power Quality. Power Factor Wiring and Service. Background. Introduction. bchydro.com

Power Quality. Power Factor Wiring and Service. Background. Introduction. bchydro.com Power Quality Power Factor Wiring and Service Scope Power factor is a major consideration in efficient building or system operation. It is the measure of how effectively your equipment is converting electric

More information

Medium Voltage. Power Factor Correction Reactive Compensation Harmonic Filters. Electrical Power Quality Management at its best.

Medium Voltage. Power Factor Correction Reactive Compensation Harmonic Filters. Electrical Power Quality Management at its best. Medium Voltage Power Factor Correction Reactive Compensation Harmonic Filters POWER QUALITY Electrical Power Quality Management at its best. From electricity generation, transmission, thru its distribution

More information

TECHNICAL TERMS AND ABBREVIATIONS

TECHNICAL TERMS AND ABBREVIATIONS THIRD REVISED SHEET NO. 3.1 CANCELS SECOND REVISED SHEET NO. 3.1 TECHNICAL TERMS AND ABBREVIATIONS ALTERNATING CURRENT (A-C): AMPERE: BASE RATES: BRITISH THERMAL UNIT (BTU): CAPACITOR or CAPACITANCE: CAPACITY

More information

Technical News. Power Factor Correction. What technology is best for you? Specialists in electrical and automation products, systems and solutions

Technical News. Power Factor Correction. What technology is best for you? Specialists in electrical and automation products, systems and solutions Issue #79 - Winter 2018 Technical News Specialists in electrical and automation products, systems and solutions Power Factor Correction What technology is best for you? Written by Samuel Hodgetts NHP nhp.com.au

More information

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority

4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority ,.,.;i')!i,:;;',;~~~. 'ffrff mm I Government of India ~ ~.I Ministry of Power 4,1 '~ ~ ~ 1I1f lc/)~ul I Central Electricity Authority III ~~~~~~I"1",~~1 ;J' :. r System Planning & Project Appraisal Division

More information

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1

TRANSMISSION CAPACITY ADDITION PROGRAMME DURING No. 1 Introduction 1 TRANSMISSION CAPACITY ADDITION PROGRAMME DURING 2006-07 Sl. No. Contents Page No. 1 Introduction 1 2 Chapter 1 Transmission Capacity Additions During 2005-06 of 10 th plan period 3 Chapter 2 Construction

More information

STATE LOAD DISPATCH CENTRES (SLDC)

STATE LOAD DISPATCH CENTRES (SLDC) ACTIVITIES OF SLDC STATE LOAD DISPATCH CENTRES (SLDC) **The State Load Despatch Centre:- As per section 33 of Electricity Act - 2003 (Central Act 36 of 2003), SLDC performs powers as defined below:- SLDC

More information

Dynamic Control of Grid Assets

Dynamic Control of Grid Assets Dynamic Control of Grid Assets Panel on Power Electronics in the Smart Grid Prof Deepak Divan Associate Director, Strategic Energy Institute Director, Intelligent Power Infrastructure Consortium School

More information

COMPARISON OF STATCOM AND TCSC ON VOLTAGE STABILITY USING MLP INDEX

COMPARISON OF STATCOM AND TCSC ON VOLTAGE STABILITY USING MLP INDEX COMPARISON OF AND TCSC ON STABILITY USING MLP INDEX Dr.G.MadhusudhanaRao 1. Professor, EEE Department, TKRCET Abstract: Traditionally shunt and series compensation is used to maximize the transfer capability

More information

Targeted Application of STATCOM Technology in the Distribution Zone

Targeted Application of STATCOM Technology in the Distribution Zone Targeted Application of STATCOM Technology in the Distribution Zone Christopher J. Lee Senior Power Controls Design Engineer Electrical Distribution Division Mitsubishi Electric Power Products Electric

More information

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM

CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM 61 CHAPTER 3 TRANSIENT STABILITY ENHANCEMENT IN A REAL TIME SYSTEM USING STATCOM 3.1 INTRODUCTION The modeling of the real time system with STATCOM using MiPower simulation software is presented in this

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

Enhancement of Voltage Stability Margin Using FACTS Controllers

Enhancement of Voltage Stability Margin Using FACTS Controllers International Journal of omputer and Electrical Engineering, Vol. 5, No. 2, April 23 Enhancement of Voltage Stability Margin Using FATS ontrollers H. B. Nagesh and. S. uttaswamy Abstract This paper presents

More information

EH2741 Communication and Control in Electric Power Systems Lecture 3. Lars Nordström Course map

EH2741 Communication and Control in Electric Power Systems Lecture 3. Lars Nordström Course map EH2741 Communication and Control in Electric Power Systems Lecture 3 Lars Nordström larsn@ics.kth.se 1 Course map 2 1 Outline 1. Repeating Power System Control 2. Power System Topologies Transmission Grids

More information

Electric Power Research Institute, USA 2 ABB, USA

Electric Power Research Institute, USA 2 ABB, USA 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Congestion Reduction Benefits of New Power Flow Control Technologies used for Electricity

More information

Electrical Theory. Generator Theory. PJM State & Member Training Dept. PJM /22/2018

Electrical Theory. Generator Theory. PJM State & Member Training Dept. PJM /22/2018 Electrical Theory Generator Theory PJM State & Member Training Dept. PJM 2018 Objectives The student will be able to: Describe the process of electromagnetic induction Identify the major components of

More information

Interconnection Feasibility Study Report GIP-226-FEAS-R3

Interconnection Feasibility Study Report GIP-226-FEAS-R3 Interconnection Feasibility Study Report GIP-226-FEAS-R3 System Interconnection Request #226 70 MW Wind Generating Facility Kings County (L-6013) 2010 07 21 Control Centre Operations Nova Scotia Power

More information

Field Verification and Data Analysis of High PV Penetration Impacts on Distribution Systems

Field Verification and Data Analysis of High PV Penetration Impacts on Distribution Systems Field Verification and Data Analysis of High PV Penetration Impacts on Distribution Systems Farid Katiraei *, Barry Mather **, Ahmadreza Momeni *, Li Yu *, and Gerardo Sanchez * * Quanta Technology, Raleigh,

More information

A Transient Free Novel Control Technique for Reactive Power Compensation using Thyristor Switched Capacitor

A Transient Free Novel Control Technique for Reactive Power Compensation using Thyristor Switched Capacitor A Transient Free Novel Control Technique for Reactive Power Compensation using Thyristor Switched Capacitor 1 Chaudhari Krunal R, 2 Prof. Rajesh Prasad 1 PG Student, 2 Assistant Professor, Electrical Engineering

More information

NYCA LOLE Violations (Methods D and E )

NYCA LOLE Violations (Methods D and E ) Proposals for Cost Allocation of Regulated Reliability Solutions Associated with NYCA LOLE Violations (Methods D and E ) Presented by Jerry Ancona National Grid For Discussion by NYISO Electric System

More information

Electric Power System Under-Voltage Load Shedding Protection Can Become a Trap

Electric Power System Under-Voltage Load Shedding Protection Can Become a Trap American Journal of Applied Sciences 6 (8): 1526-1530, 2009 ISSN 1546-9239 2009 Science Publications Electric Power System Under-Voltage Load Shedding Protection Can Become a Trap 1 Luiz Augusto Pereira

More information

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators

Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators Fuzzy based STATCOM Controller for Grid connected wind Farms with Fixed Speed Induction Generators Abstract: G. Thrisandhya M.Tech Student, (Electrical Power systems), Electrical and Electronics Department,

More information

Dynamic Control of Grid Assets

Dynamic Control of Grid Assets Dynamic Control of Grid Assets ISGT Panel on Power Electronics in the Smart Grid Prof Deepak Divan Associate Director, Strategic Energy Institute Director, Intelligent Power Infrastructure Consortium School

More information

Working Principle of Power Saver as per Manufacture:

Working Principle of Power Saver as per Manufacture: Analysis the Truth behind Household Power Savers Introduction: A House hold power saving devices has recently received a lot of attention from both consumers and manufacturers. It is generally used in

More information

Electric Power Delivery To Big Cities

Electric Power Delivery To Big Cities Problem Definition Electric Power Delivery To Big Cities a) Socio-economic incentives are a major factor in the movement of population to big cities b) Increasing demand of electric power has strained

More information

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION

PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION PLANNING, ELIGIBILITY FOR CONNECTION AND CONNECTION PROCEDURE IN EMBEDDED GENERATION Presentation by Engr. O. C. Akamnnonu Chief Executive Officer, Ikeja Electricity Distribution Company AGENDA WORK THROUGH

More information

Surabaya Seminar Ferdinand Sibarani, Surabaya, 30 th October Power Quality

Surabaya Seminar Ferdinand Sibarani, Surabaya, 30 th October Power Quality Surabaya Seminar 2014 Ferdinand Sibarani, Surabaya, 30 th October 2014 Power Quality Content 1. Power quality problems 2. ABB s low voltage (LV) solution PCS100 AVC (Active Voltage Conditioner) PCS100

More information

TRANSMISSION LOSS MINIMIZATION USING ADVANCED UNIFIED POWER FLOW CONTROLLER (UPFC)

TRANSMISSION LOSS MINIMIZATION USING ADVANCED UNIFIED POWER FLOW CONTROLLER (UPFC) TRANSMISSION LOSS MINIMIZATION USING ADVANCED UNIFIED POWER FLOW CONTROLLER (UPFC) Nazneen Choudhari Department of Electrical Engineering, Solapur University, Solapur Nida N Shaikh Department of Electrical

More information

EPRLAB FAQ v1.0 Page 1 / 8 Copyright EPRLAB December 2015

EPRLAB FAQ v1.0 Page 1 / 8 Copyright EPRLAB December 2015 e EPRLAB FAQ v1.0 Page 1 / 8 e EPRLAB Electric Power Research Laboratory, EPRLAB is a high-tech power electronics company that has been specialized on design, manufacturing and implementation of industrial

More information

EE 742 Chap. 7: Wind Power Generation. Y. Baghzouz Fall 2011

EE 742 Chap. 7: Wind Power Generation. Y. Baghzouz Fall 2011 EE 742 Chap. 7: Wind Power Generation Y. Baghzouz Fall 2011 Overview Environmental pressures have led many countries to set ambitious goals of renewable energy generation. Wind energy is the dominant renewable

More information

Guidelines for connection of generators:

Guidelines for connection of generators: Guidelines for connection of generators: Greater than 30 kva, and not greater than 10 MW, to the Western Power distribution network January, 2017. EDM 32419002 / DM 13529244 Page 1 of 14 Contents 1 INTRODUCTION...

More information

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India

Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India Infrastructure Revitalization in India Power System Operation Corporation (POSOCO) New Delhi, India 26th March 2014 Infrastructure Revitalization in India 1 Outline Indian Power System Indian Grid - WAMS

More information

Gateway South Transmission Project

Gateway South Transmission Project Phase 1 Comprehensive Progress Report Volume 1 - Technical Report Report Prepared by PacifiCorp Transmission Planning Department November 21, 2008 WECC1-V4 Phase 1 Comprehensive Progress Report Executive

More information

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM

CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM 106 CHAPTER 5 FAULT AND HARMONIC ANALYSIS USING PV ARRAY BASED STATCOM 5.1 INTRODUCTION Inherent characteristics of renewable energy resources cause technical issues not encountered with conventional thermal,

More information

Alternator as a voltage Generating source and its response to the leading power factor loads

Alternator as a voltage Generating source and its response to the leading power factor loads Alternator as a voltage Generating source and its response to the leading power factor loads Presentation by: Jay Deshpande (Engineered Solutions- Mission Critical) Kohler Power Systems Washington, DC

More information

Small Electrical Systems (Microgrids)

Small Electrical Systems (Microgrids) ELG4126: Microgrids Small Electrical Systems (Microgrids) A microgrid is a localized, scalable, and sustainable power grid consisting of an aggregation of electrical and thermal loads and corresponding

More information

15 Nelson-Marlborough Regional Plan

15 Nelson-Marlborough Regional Plan 15 Nelson-Marlborough Regional Plan 15.1 Regional overview 15.2 Nelson-Marlborough transmission system 15.3 Nelson-Marlborough demand 15.4 Nelson-Marlborough generation 15.5 Nelson-Marlborough significant

More information

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC

Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Research on Transient Stability of Large Scale Onshore Wind Power Transmission via LCC HVDC Rong Cai, Mats Andersson, Hailian Xie Corporate Research, Power and Control ABB (China) Ltd. Beijing, China rong.cai@cn.abb.com,

More information

Review paper on Fault analysis and its Limiting Techniques.

Review paper on Fault analysis and its Limiting Techniques. Review paper on Fault analysis and its Limiting Techniques. Milap Akbari 1, Hemal Chavda 2, Jay Chitroda 3, Neha Kothadiya 4 Guided by: - Mr.Gaurang Patel 5 ( 1234 Parul Institute of Engineering &Technology,

More information

VOLTAGE STABILITY IMPROVEMENT IN POWER SYSTEM BY USING STATCOM

VOLTAGE STABILITY IMPROVEMENT IN POWER SYSTEM BY USING STATCOM VOLTAGE STABILITY IMPROVEMENT IN POWER SYSTEM BY USING A.ANBARASAN* Assistant Professor, Department of Electrical and Electronics Engineering, Erode Sengunthar Engineering College, Erode, Tamil Nadu, India

More information

Chapter 3.1: Electrical System

Chapter 3.1: Electrical System Part-I: Objective type Questions and Answers Chapter 3.1: Electrical System 1. The heat input required for generating one kilo watt-hour of electrical output is called as. a) Efficiency b) Heat Rate c)

More information

Experience on Technical Solutions for Grid Integration of Offshore Windfarms

Experience on Technical Solutions for Grid Integration of Offshore Windfarms Experience on Technical Solutions for Grid Integration of Offshore Windfarms Liangzhong Yao Programme Manager AREVA T&D Technology Centre 18 June 2007, DTI Conference Centre, London Agenda The 90MW Barrow

More information

Simulation of Voltage Stability Analysis in Induction Machine

Simulation of Voltage Stability Analysis in Induction Machine International Journal of Electronic and Electrical Engineering. ISSN 0974-2174 Volume 6, Number 1 (2013), pp. 1-12 International Research Publication House http://www.irphouse.com Simulation of Voltage

More information

Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System

Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System Enhancement of Power Quality in Transmission Line Using Flexible Ac Transmission System Raju Pandey, A. K. Kori Abstract FACTS devices can be added to power transmission and distribution systems at appropriate

More information

Technical Guide No. 7. Dimensioning of a Drive system

Technical Guide No. 7. Dimensioning of a Drive system Technical Guide No. 7 Dimensioning of a Drive system 2 Technical Guide No.7 - Dimensioning of a Drive system Contents 1. Introduction... 5 2. Drive system... 6 3. General description of a dimensioning

More information

SECTION 9: ELECTRICAL POWER DISTRIBUTION. ESE 470 Energy Distribution Systems

SECTION 9: ELECTRICAL POWER DISTRIBUTION. ESE 470 Energy Distribution Systems SECTION 9: ELECTRICAL POWER DISTRIBUTION ESE 470 Energy Distribution Systems 2 Introduction The Electrical Grid 3 Three main components to the electrical grid Generation ESE 450 Transmission Transmission

More information

Exercise 6. Three-Phase AC Power Control EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Introduction to three-phase ac power control

Exercise 6. Three-Phase AC Power Control EXERCISE OBJECTIVE DISCUSSION OUTLINE DISCUSSION. Introduction to three-phase ac power control Exercise 6 Three-Phase AC Power Control EXERCISE OBJECTIVE When you have completed this exercise, you will know how to perform ac power control in three-phase ac circuits, using thyristors. You will know

More information

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian

Shunt Capacitor Bank Protection in UHV Pilot Project. Qing Tian Shunt Capacitor Bank Protection in UHV Pilot Project Qing Tian 2012-5 INTRODUCTION State Grid Corp. of China, the largest electric power provider in the country, has first build a 1000 kv transmission

More information

Okelola, M. O. Department of Electronic & Electrical Engineering, Ladoke Akintola University of Technology, P.M.B. 4000, Ogbomoso, Nigeria

Okelola, M. O. Department of Electronic & Electrical Engineering, Ladoke Akintola University of Technology, P.M.B. 4000, Ogbomoso, Nigeria International Journal of Scientific Research and Management (IJSRM) Volume 6 Issue 7 Pages EC-28-53-58 28 Website: www.ijsrm.in ISSN (e): 232-348 Index Copernicus value (25): 57.47, (26):93.67, DOI:.8535/ijsrm/v6i7.ec

More information

Dynamic Reactive Power Control for Wind Power Plants

Dynamic Reactive Power Control for Wind Power Plants Dynamic Reactive Power Control for Wind Power Plants Ernst Camm, Charles Edwards, Ken Mattern, Stephen Williams S&C Electric Company, 6601 N. Ridge Blvd, Chicago IL 60626 USA ecamm@sandc.com, cedwards@sandc.om,

More information

ABB n.v Power Quality in LV installations

ABB n.v Power Quality in LV installations ABB n.v. - 1 - Power Quality in LV installations PQ problems in LV installations 750 500 250 Volts 0-250 -500 Amps -750 3000 2000 1000 0-1000 -2000-3000 10:25:43.72 10:25:43.73 10:25:43.74 10:25:43.75

More information

DC CIRCUITS ELECTROMAGNETISM

DC CIRCUITS ELECTROMAGNETISM DC CIRCUITS 1. State and Explain Ohm s Law. Write in brief about the limitations of Ohm s Law. 2. State and explain Kirchhoff s laws. 3. Write in brief about disadvantages of series circuit and advantages

More information

Eskisehir Light Train- Correcting Capacitive

Eskisehir Light Train- Correcting Capacitive Case Study-Estram Light Train Eskisehir Light Train- Correcting Capacitive Power Factor Eskisehir, a city in the Anatolia region of Turkey is located in an area inhabited since at least 3500 BCE- the copper

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

Benefits of HVDC and FACTS Devices Applied in Power Systems

Benefits of HVDC and FACTS Devices Applied in Power Systems Benefits of HVDC and FACTS Devices Applied in Power Systems 1 P. SURESH KUMAR, 2 G. RAVI KUMAR 1 M.Tech Research Scholar, Priyadarshini Institute of Technology & Management 2 Associate Professor, Priyadarshini

More information

Statcom Operation for Wind Power Generator with Improved Transient Stability

Statcom Operation for Wind Power Generator with Improved Transient Stability Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 4, Number 3 (2014), pp. 259-264 Research India Publications http://www.ripublication.com/aeee.htm Statcom Operation for Wind Power

More information

American Journal of Science, Engineering and Technology

American Journal of Science, Engineering and Technology American Journal of Science, Engineering and Technology 017; (4): 10-131 http://www.sciencepublishinggroup.com/j/ajset doi: 10.11648/j.ajset.017004.14 Application of Distribution System Automatic Capacitor

More information

2015 Grid of the Future Symposium

2015 Grid of the Future Symposium 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http ://www.cigre.org 2015 Grid of the Future Symposium Flexibility in Wind Power Interconnection Utilizing Scalable Power Flow Control P. JENNINGS,

More information

Use of High-Power Thyristor Technology for Short-Circuit Current Limitation in High Voltage Systems

Use of High-Power Thyristor Technology for Short-Circuit Current Limitation in High Voltage Systems Advanced Power Transmission Solutions Power Transmission and Distribution Use of High-Power Thyristor Technology for Short-Circuit Current Limitation in Systems s Development of Power Markets Increasing

More information

Final Written Examination.

Final Written Examination. Benha University Semester (3 th year Power &Control) Faculty of Engineering Electrical Power Systems (E1331) Electrical Engineering Department Semester 2015-2016 Final Written Examination. 10/1/2016 Time

More information

Wind Power Plants with VSC Based STATCOM in PSCAD/EMTDC Environment

Wind Power Plants with VSC Based STATCOM in PSCAD/EMTDC Environment 2012 2nd International Conference on Power and Energy Systems (ICPES 2012) IPCSIT vol. 56 (2012) (2012) IACSIT Press, Singapore DOI: 10.7763/IPCSIT.2012.V56.2 Wind Power Plants with VSC Based STATCOM in

More information

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION

REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION REDUCING VULNERABILITY OF AN ELECTRICITY INTENSIVE PROCESS THROUGH AN ASYNCHRONOUS INTERCONNECTION Summary Abhay Kumar Mata Prasad R C Maheshwari Asea Brown Boveri Ltd. 4th Floor, 71 Nehru Place, New Delhi

More information

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK

CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK 91 CHAPER 5 POWER FLOW STUDY IN THE INTEGRATED GRID NETWORK CHAPTER CONTENTS: 5.1 INTRODUCTION 5.2 CONDUCTION OF VARIOUS POWER FLOW STUDIES ON THE MODEL 5.3 EXPERIMENTS CONDUCTED FOR VARIOUS POWER FLOW

More information

EE 456 Design Project

EE 456 Design Project F-2014 EE 456 Design Project PROJECT REPORT MALUWELMENG, CONNIE SHARP, MEGAN Table of Contents Introduction... 2 Assignment I... 2 Setup... 2 Simulation... 2 Assignment II... 3 Problems... 3 Solution...

More information

Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid

Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid Role of Energy Storage Technologies in Providing Ancillary Services, Improving Power Quality and Reliability of the Indian Grid India need regulations for energy storage to implement grid ancillary services

More information

List of Grid Disturbances above 10 MW. Page 1 of 8

List of Grid Disturbances above 10 MW. Page 1 of 8 List of Disturbances above 10 Page 1 of 8 ई.एल. 24 द व र A. Disturbance above 10 : 1 2 132 kv Imphal (PG) - Imphal (MA) I 132 kv Imphal (PG) - Imphal (MA) II घटन क of 132 kv Imphal (PG) - Imphal (MA) I

More information

Georgia Transmission Corporation Georgia Systems Operations Corporation

Georgia Transmission Corporation Georgia Systems Operations Corporation Georgia Transmission Corporation Georgia Systems Operations Corporation Reactive Power Requirements for Generating Facilities Interconnecting to the Georgia Integrated Transmission System with Georgia

More information