1 A. General ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project will rehabilitate and improve 91 kilometers (km) of the two-lane M6 highway in northern Armenia from Vanadzor through Alaverdi to the border with Georgia. The Asian Development Bank (ADB) and the European Investment Bank (EIB) are cofinancing the project. For economic evaluation purposes, the project comprises both sections. 2. The M6 is of import both nationally and locally. This route handles 80% of all Armenia s imports from Georgia by land and 45% of all Armenia s road imports ( data). 1 The M6 is a vital transport link for the settlements that lie along the route. The M6 has an important role in catering to tourism traffic in the region. Improved accessibility from Yerevan and Tbilisi will improve the prospects for tourism development in the region. However, the M6 is ill-equipped to support these functions. The road is hazardous, averaging six fatalities a year during It runs through the Debed gorge, which is also occupied by the Yerevan Tbilisi railway line. This has resulted in poor vertical and horizontal alignments. Sight distances are poor, especially through its three tunnels; rock falls are frequent; proper road marking and delineation are lacking; and guardrails are inadequate. 3. In the absence of the project (the without-project scenario), the M6 is expected to remain in poor condition, with maintenance largely confined to sealing cracks and patching potholes. Under the with-project scenario, most of the road will be reconstructed, safety features will be improved, and the tunnels will be brought up to modern standards. The improved pavement will have an initial international roughness index (IRI) of 2.0. Average travel speed on the road is expected to increase from 48 km per hour to 54 km per hour. The selection of the project scenario by EIB followed an analysis of alternative alignments and was the option with the lowest initial cost and highest economic internal rate of return (EIRR). B. Demand Estimate 4. Estimates of traffic demand used in the economic analysis are based on traffic counts undertaken by a consultant engaged by EIB to undertake a feasibility study. The study undertook four 6-day classified counts on the project road in April 2014 (one 24-hour count plus five 12-hour counts). These counts are consistent with historic data (including those derived from one automatic traffic counter) held by Armenian Road Directorate (ARD) and traffic survey conducted by ARD in Table 1 shows average traffic flows on each road section, and the fleet composition. In 2014, the weighted annual average daily traffic was 2,840 vehicles per day. Most freight traffic ends in central Armenia and Georgia. Local trips are generated by Vanadzor and Alaverdi, and the local market close to the border. There is also some tourism-related traffic. Hourly traffic data indicate a fairly uniform traffic flow pattern, with two-thirds of daily traffic during daylight hours. Table 1: Baseline Demand, 2014 Section Cars Buses Bus and Truck- Fleet: 76% 9% 2% 6% 2% 5% AADT Vehicle/ day 1. Vanadzor Urban M8 2, ,979 1 European Investment Bank Feasibility Study, EIA and Detailed Engineering Design of the Rehabilitation and Improvement of M6 Vanadzor Georgian Border Interstate Road. Luxembourg.

2 2 Section Cars Buses Bus and Truck- AADT Vehicle/ day 2. M8 Vahagnadzor 2, , Vahagnadzor Dsegh 2, , Dsegh Alaverdi 2, , Alaverdi Shnogh 2, , Shnogh Karkop 1, , Karkop Bagratashen 2, ,910 AADT = Average Annual Daily Traffic. Source: European Investment Bank (EIB) feasibility study (footnote 1). 5. From 2009 to 2014, traffic growth on the M6 averaged 4% per year, but with considerable variability. At least in the short term, this growth rate is expected to continue, driven in part by economic growth of 2% 3% and demand for imports and exports through Bagratashen, which grew 7% annually in tonnage from 2010 to There are two factors affecting traffic growth in the longer term. First, trade with Iran and Georgia may increase, which would raise transport demand. Second, some traffic may divert to Bagratashen from other border crossing points. Based on the various influences on traffic growth, the growth rate is assumed to drop to 3% from A growth rate of 3% implies an income elasticity of 0.9 with respect to forecast GDP growth in This is a conservative assumption, as transport demand is generally expected to display an income elasticity of at least unity. The effect of diversions to Bavra was assessed separately as part of sensitivity testing (para. 22). Significant congestion was not observed under this traffic growth scenario, even at the end of the evaluation period. C. Economic Costs 7. The economic costs of the project comprise (i) capital investment, which includes civil works, land acquisition, and resettlement, as well as consulting services for construction supervision and social safeguard management; and (ii) road maintenance. Costs related to taxes, duties, and financing charges during implementation have been excluded. Table 2 gives a breakdown of the investment costs. Construction was assumed to take place over a 3-year period from Financial costs were converted to economic costs in line with ADB guidelines. 2 All predicted project costs and benefits are measured in late 2015 and early 2016 economic prices expressed in United States (US) dollar. Traded goods are measured at world prices and non-traded inputs at domestic prices less indirect taxes multiplied by a standard conversion factor (SCF) estimated at A shadow wage rate factor (SWRF) of was estimated and applied to unskilled labor used in road construction. A SWRF of 1.0 was applied to skilled and professional labor. Land and resettlement costs were based on the EIB feasibility study, which also considered compensation for crop yields lost, and have been adjusted by the SCF. A residual value equivalent to 20% of the investment cost estimated by applying the straightline depreciation method to individual project items based on assumed lifespans has been included in the economic analysis. 2 ADB Guidelines for the Economic Analysis of Projects. Manila. 3 Using the ADB simplified method based on merchandise imports of $3.892 billion, exports of $1.116 billion, and taxes on trade of $88 million (averages in current US dollar for from World Bank data). 4 An approximation based on the ratio of rural and urban incomes from all sources for 2014 (Armenia National Statistical Service: Household Income, Expenditures, and Basic Food Consumption).

3 9. The financial cost of the project at 2015 prices was estimated at $109 million. This was converted to an economic price of $89 million by (i) deducting the value-added tax, (ii) converting to US dollar at the February 2016 official exchange rate of AMD495=$1, (iii) applying the SCF (para. 10), (iv) applying the SWRF to an estimated 5% of construction costs, and (v) doubling physical contingencies from 5% to 10%. The weighted average economic cost per km was $0.93 million. The costs per km in Table 2 were based on earlier estimates for each road section. Table 2: Investment Costs Section Intervention Economic Cost ($ million/km) 1. Vanadzor Urban M8 (6.7 km) Mill and Replace M8 Vahagnadzor (13.5 km) Reconstruction Vahagnadzor Dsegh (13.4 km) Reconstruction and Tunnel works Dsegh Alaverdi (17.1 km) Reconstruction Alaverdi Shnogh (2.9 km) Reconstruction Shnogh Karkop (22.7 km) Reconstruction Karkop Bagratashen (13.9 km) Mill and replace 0.26 Total 0.98 km = kilometer. Source: Asian Development Bank (ADB) estimates based on total financial cost and section costs from EIB. 10. Identical maintenance regimes were assumed for both the with-project and withoutproject cases. Routine winter and summer maintenance included pothole patching and crack sealing, as well as snow clearance and drain cleaning, at an average financial cost of about $4,600/km. Periodic maintenance comprised a 40 millimeter overlay at a unit financial cost of $29 per square meter applied from 2025 and triggered by an IRI 10. D. Economic Benefits 11. The main quantifiable economic benefits are vehicle operating cost (VOC) savings, travel time savings, and crash cost savings. Analyses were undertaken on the seven homogeneous sections listed in Table 1. Section geometrical and pavement characteristics were taken from the EIB feasibility study (footnote 1). As the scope for generated traffic was considered insignificant, benefits were confined to normal traffic. 12. Vehicle operating cost savings. The shadow price of gasoline was estimated at $0.53 per liter. This reflects the expected average price of crude oil to 2020 (from the January 2016 World Bank Quarterly Commodity Outlook) and the proportion of vehicles using compressed natural gas. The shadow price of diesel was estimated at $0.50 per liter. Other salient vehicle characteristics and costs are shown in &able 3. Item Unit Cars, SUVs etc. Table 3: M6 Vehicle Fleet Buses Bus and Truck Axles No Km/year km 10,000 80, , , , ,000 Service life Years No. of passengers No

4 4 Item Unit Cars, SUVs etc. Buses Bus and Truck Operating weight tonnes Vehicle cost $ 23,000 18,000 43,000 21,000 40,000 90,000 Tire cost $ Maintenance labor $/h Crew $/h Passenger working time $/h Passenger nonworking time $/h % of work-related trips % h = hour, km = kilometer Source: ADB estimates. 13. The fleet average VOC components against IRI are shown in Table 4. The most significant item is capital, i.e., the equivalent annual cost of a vehicle, which is calculated with the Highway Development and Management model (HDM-4) using the optimal life approach that links vehicle life to IRI. Table 4: Vehicle Operating Cost Components ($/vehicle-km) IRI, m/km Fuel Spares Capital a Others b Total IRI = international roughness index, m = meter, km = kilometer. Notes: (a) equivalent annual cost of vehicle, computed using the optimal life approach, and (b) includes maintenance, crew costs, tires, lubricating oil, and overhead. 14. VOC and travel time savings across the entire fleet during the evaluation period are summarized in Table 5. Table 5: Vehicle Operating Cost and Travel Time Savings Without project With project Saving IRI $/veh-km IRI $/veh-km $/veh-km VOC 8.4 a a Travel time savings IRI = international roughness index, km = kilometer. veh = vehicle, VOC = vehicle operating cost a average over evaluation period. 15. Travel time cost savings. Travel time savings have been identified based upon the vehicle speed relationships included in HDM-4. These identify the number of minutes saved for each vehicle trip. These benefits have been monetized by applying values of time estimated for different categories of road users, differentiating between working and nonworking time. The increase in average speed over the evaluation period is modest at just under 6 km/hour, leading to a travel time savings of about 12 minutes. Based on recent Armenian wages, working

5 time is given a shadow price of between $1/hour (bus passengers) and $3/hour (car passengers). Nonworking time is valued at 25% of working time. As a result, time savings only account for 21% of project benefits. Reducing the inventory costs of goods in transit also has a travel time benefit, but its magnitude is highly uncertain and depends on details concerning, for example, the time sensitivity of goods carried. As such, these benefits are not included in the economic analysis. 16. Crash cost savings. During , an annual average of six deaths and 56 injuries were recorded along the M6. 5 The economic evaluation assumed that the number of deaths is halved as a result of safety investments. No reduction in injuries was assumed. The value of a fatality is estimated at 70 times GDP per head in accordance with methodology suggested by the International Road Assessment Programme (irap) methodology. 6 According to the World Bank, GDP per head in 2014 was $3,870, the value of a fatality is estimated at $0.27 million. GDP per head was assumed to increase at 2% annually at constant prices. Crash cost saving benefits amount to 5% of base case benefits. About 10% of VOC and travel time savings will accrue to the poor, comprising (i) all bus travel time savings ($2.5 million), (ii) 20% of road user cost savings accruing to two-axle trucks ($0.67 million), and (iii) 10% of car road user cost savings ($7.8 million). E. Results of Economic Analysis 17. An economic assessment of the project was carried out using the standard appraisal methodology. This methodology compares the incremental benefits of reductions in VOCs, travel times, and crash costs resulting from the road rehabilitation with the initial investment costs and changes in operation and maintenance costs over a 23-year appraisal period (3 years implementation and 20 years operation). Table 6 shows the results of the economic analysis expressed in terms of the following key economic indicators: benefit-to-cost ratio, EIRR, and net present value at a 12% discount rate. The results are presented using the world price numeraire. The results indicate that the project is economically viable, with a benefit-to-cost ratio of 1.7, an EIRR of 20.9%, and a net present value of $48 million. 18. Table 6 also shows the stream of costs and benefits. Incremental costs are negative in years when the cost of overlays (considered as an investment cost) and maintenance of the improved road are less than the costs that would have been incurred without the improvements. Main project benefits start in 2019; the small benefits shown in 2018 arise from works on sections 1 and 7, which finish a year earlier than those on other sections. Table 6: Costs and Benefits Streams (2015 world prices, $ million) Year Incremental Costs Incremental Benefits Total Net Investment Maintenance VOC Time Safety Benefits Benefits (0.4) (46.8) (38.7) (0.3) (0.4) (0.1) Lotti Feasibility Study, EIA, and Detailed Engineering Design of the Rehabilitation and Improvement of M6 Vanadzor Georgian Border Interstate Road: Road Safety Audit. Rome. 6 irap The True Cost of Road Crashes. London.

6 6 Year Incremental Costs Incremental Benefits Total Net Investment Maintenance VOC Time Safety Benefits Benefits (11.8) (9.9) (1.8) (3.8) (6.1) (1.8) (20.4) NPV 47.6 EIRR 20.9% BCR 1.7 ( ) = negative. VOC = vehicle operating cost, NPV = net present value, EIRR = economic internal rate of return BCR = benefit-to-cost ratio 19. Sensitivity tests and calculations of switching values were carried out to determine the effect of variations in key input parameters. Table 7 shows switching values of 174% with respect to construction costs and 45% with respect to benefits, meaning that the project would still be economically efficient if construction costs were to rise by 74% or the benefits were to fall to 55% of base case values. Project viability is also robust in the face of traffic diversion to Bavra from 2022 and the absence of crash cost benefits. Similarly, a sensitivity test was conducted on a scenario involving larger traffic disruption than anticipated during the construction years. This involves assigning a disbenefit to each of the construction years equal to half the time saving benefit immediately after opening. Again, the project remains economically viable. In summary, the economic analysis was undertaken in line with ADB guidelines. The project yields an EIRR above the 12% threshold and is therefore considered economically viable. Table 7: Sensitivity Analysis Case EIRR (%) NPV, $ million Switching Value (%) Base case Cost +20% Benefits 20% Cost+20% and benefits 20% Traffic diversion to Bavra from 2022 a No crash cost benefits No periodic maintenance Traffic disruption during construction EIRR = economic internal rate of return, NPV = net present value. Notes: (a) in line with estimates made as part of the North-South Road Corridor Development Program, growth is reduced to allow for a potential 700 vehicles/day diverted to Bavra from 2022 subject to ramp up over 3 years. Source: ADB estimates.

7 F. Financial Analysis 20. The project road will not generate revenue from tolls. Therefore, the financial analysis focuses on financial sustainability. The project is expected to reduce M6 periodic and routine maintenance requirements considerably (Table 8). The routine unit maintenance requirements with the project are close to those budgeted by Ministry of Transport and Communications. The with-project periodic maintenance, when averaged over the evaluation period, is considerably greater than the current Ministry of Transport and Communications allocation, but periodic maintenance interventions will not be needed until 2029 at the earliest. 21. Under the Infrastructure Sustainability Support Program, Phase 2, 7 ADB is helping the Government of Armenia take proactive steps to increase the budget allocation for road maintenance and increase its effectiveness. Such efforts will help further ensure the availability of funding for road maintenance in the years to come, including to the project road. Table 8: Project Maintenance Cost Implications ($ 2015 prices) Without Project ($/km/year) With Project ($/km/year) Periodic maintenance 30,000 5,500 Routine maintenance 6,000 4,600 Km = kilometer 7 ADB Technical Assistance to Armenia for the Infrastructure Sustainability Support Program, Phase 2. Manila (TA 9065-ARM).

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS South Asia Subregional Economic Cooperation Dhaka Northwest Corridor Road Project, Phase 2 (RRP BAN 40540) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS 1. The proposed project primarily aims at capacity

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Second Jharkhand State Road Project (RRP IND 49125) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The project involves capacity augmentation and rehabilitation of four state highway sections in the

More information

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1

ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1 Integrated Road Investment Program (RRP SRI 47273) A. Introduction ECONOMIC AND FINANCIAL ANALYSIS: PROJECT 1 1. Sri Lanka s road network is dense and well laid out, providing basic access to the country

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Second Rural Connectivity Investment Program (RRP IND 48226-002) ECONOMIC AND FINANCIAL ANALYSIS 1. The Second Rural Connectivity Investment Program (the investment program) will build or upgrade about

More information

Priority Transport Projects in Republic of Armenia. 10th Eastern Partnership transport panel Brussels, 11 May 2016

Priority Transport Projects in Republic of Armenia. 10th Eastern Partnership transport panel Brussels, 11 May 2016 Priority Transport Projects in Republic of Armenia 10th Eastern Partnership transport panel Brussels, 11 May 2016 Brief Presentation of North-South Road Corridor Investment Project Estimated length of

More information

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix

The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis. High Speed Intercity Passenger Rail Technical Appendix The Boston South Station HSIPR Expansion Project Cost-Benefit Analysis High Speed Intercity Passenger Rail Technical Appendix Prepared by HDR August 5, 2010 The Boston South Station HSIPR Expansion Project

More information

Project Appraisal Guidelines for National Roads Unit National Parameters Values Sheet

Project Appraisal Guidelines for National Roads Unit National Parameters Values Sheet Project Appraisal Guidelines for National Roads Unit 6.11 - National Parameters Values Sheet TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible

More information

Attachment C: Benefit-Cost Analysis Spreadsheet

Attachment C: Benefit-Cost Analysis Spreadsheet Attachment C: Benefit-Cost Analysis Spreadsheet TIGER VII Application Collier Blvd. Corridor Improvements June 5 th, 2015 Collier Blvd BCA Summary The Collier Boulevard Benefit Cost Analysis (BCA) has

More information

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6

CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE # 6 STRATEGIC AREA OF FOCUS: SUB-PRIORITY: STRATEGY: INITIATIVE: INITIATIVE LEAD(S): BUILDING A SUSTAINABLE CITY

More information

The Value of Travel-Time: Estimates of the Hourly Value of Time for Vehicles in Oregon 2007

The Value of Travel-Time: Estimates of the Hourly Value of Time for Vehicles in Oregon 2007 The Value of Travel-Time: Estimates of the Hourly Value of Time for Vehicles in Oregon 2007 Oregon Department of Transportation Long Range Planning Unit June 2008 For questions contact: Denise Whitney

More information

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016

STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 STRATEGIC PRIORITIES AND POLICY COMMITTEE MAY 5, 2016 Shift Rapid Transit Initiative Largest infrastructure project in the city s history. Rapid Transit initiative will transform London s public transit

More information

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT

State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT State Highway 32 East TIGER Discretionary Grant Application APPENDIX C - BENEFIT COST ANALYSIS REPORT April 2016 I. COST-EFFECTIVENESS ANALYSIS A Benefit-Cost Analysis (BCA) was conducted in conformance

More information

Department for Transport. Transport Analysis Guidance (TAG) Unit Values of Time and Operating Costs

Department for Transport. Transport Analysis Guidance (TAG) Unit Values of Time and Operating Costs Department for Transport Transport Analysis Guidance (TAG) Unit 3.5.6 Values of Time and Operating Costs September 2006 1 Contents 1. Values of Time and Operating Costs 3 1.1 Introduction 3 1.2 Values

More information

Disaster Prevention and Rehabilitation Project (Philippine-Japan Friendship Highway and Naguilian Road)

Disaster Prevention and Rehabilitation Project (Philippine-Japan Friendship Highway and Naguilian Road) Philippines Disaster Prevention and Rehabilitation Project (Philippine-Japan Friendship Highway and Naguilian Road) 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September

More information

! " # $ % # & " ' % ( ' ) "

!  # $ % # &  ' % ( ' ) "#!! $% ! " # $ % # " ' % ( ' ) ",-..*-/--0"-00"0**0 2 In agreement with the Terms of Reference, we have conducted an analysis of the road user charges (RUC) paid by the users of the road networks in the

More information

4 COSTS AND OPERATIONS

4 COSTS AND OPERATIONS 4 COSTS AND OPERATIONS 4.1 INTRODUCTION This chapter summarizes the estimated capital and operations and maintenance (O&M) costs for the Modal and High-Speed Train (HST) Alternatives evaluated in this

More information

TRAVEL DEMAND FORECASTS

TRAVEL DEMAND FORECASTS Jiangxi Ji an Sustainable Urban Transport Project (RRP PRC 45022) TRAVEL DEMAND FORECASTS A. Introduction 1. The purpose of the travel demand forecasts is to assess the impact of the project components

More information

The project faces a number of challenges:

The project faces a number of challenges: On-Track Light Rail Project The Ministry of Transport of the city of Gotham is proposing to construct an elevated 20- kilometer light rail transit (LRT) with 5 passenger stations, connecting several nearby

More information

Benefit Cost Analysis

Benefit Cost Analysis Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance with the

More information

Introduction and Background Study Purpose

Introduction and Background Study Purpose Introduction and Background The Brent Spence Bridge on I-71/75 across the Ohio River is arguably the single most important piece of transportation infrastructure the Ohio-Kentucky-Indiana (OKI) region.

More information

Bella Vista Bypass Benefit Cost Analysis

Bella Vista Bypass Benefit Cost Analysis Bella Vista Benefit Cost Analysis The Benefit Cost Analysis (BCA) was performed in accordance with the ARRA guidance provided in the Federal Register. These benefits and costs were quantified in accordance

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT Road Network Upgrading Project (RRP TIM 45094) Sector Road Map SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems, and Opportunities 1. Timor-Leste comprises the eastern half of

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: India Project: Delhi Mass Rapid Transport System Project Phase 2 (V) Loan Agreement: March 31, 2010 Loan Amount:

More information

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling.

The capital cost estimates do not include allowances for: ROW acquisition. Third-party mitigation works. Hazardous materials handling. Mode Selection Report 7 Cost Evaluation The cost evaluation criteria used in the evaluation of the transit modes are: Capital cost. operating costs. Fare revenue. Net cost per passenger/passenger-mile.

More information

New Zealand Transport Outlook. VKT/Vehicle Numbers Model. November 2017

New Zealand Transport Outlook. VKT/Vehicle Numbers Model. November 2017 New Zealand Transport Outlook VKT/Vehicle Numbers Model November 2017 Short name VKT/Vehicle Numbers Model Purpose of the model The VKT/Vehicle Numbers Model projects New Zealand s vehicle-kilometres travelled

More information

HDM-4 Road Use Costs Model Documentation. Version February 2, The World Bank

HDM-4 Road Use Costs Model Documentation. Version February 2, The World Bank Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized World Bank Technical Documentation HDM-4 Road Use Costs Model Documentation Version 1.10

More information

Feasibility Study for Promotion of International Infrastructure Projects in FY2011

Feasibility Study for Promotion of International Infrastructure Projects in FY2011 Feasibility Study for Promotion of International Infrastructure Projects in FY2011 STUDY ON THE EXPANSION OF RAIL TRANSPORT CAPACITY FOR ROCK PHOSPHATE, THE KINGDOM OF MOROCCO FINAL REPORT SUMMARY November

More information

AusRAP assessment of Peak Downs Highway 2013

AusRAP assessment of Peak Downs Highway 2013 AusRAP assessment of Peak Downs Highway 2013 SUMMARY The Royal Automobile Club of Queensland (RACQ) commissioned an AusRAP assessment of Peak Downs Highway based on the irap protocol. The purpose is to

More information

Sustainable Urban Transport Index (SUTI)

Sustainable Urban Transport Index (SUTI) Sustainable Urban Transport Index (SUTI) City Comparisons & Way Forward PROF. H.M SHIVANAND SWAMY, CEPT UNIVERSITY DHAKA SEPTEMBER 12, 2018 Purpose Discussion of Results from 5 Cities Reflections on the

More information

Part C. Statistics Bank of Botswana

Part C. Statistics Bank of Botswana Part C Statistics 2017 Bank of Botswana Contents Part C Part C: Statistics 1. NATIONAL OUTPUT TABLE 1.1 Gross Domestic Product by Type of Expenditure (Current Prices) S6 TABLE 1.2 Gross Domestic Product

More information

Alternatives Analysis Findings Report

Alternatives Analysis Findings Report 6.0 This chapter presents estimates of the potential capital, operations and maintenance costs associated with the alternatives carried forward for detailed evaluation. The methodology used to develop

More information

Transport Sector Performance Indicators: Sri Lanka Existing Situation

Transport Sector Performance Indicators: Sri Lanka Existing Situation Transport Sector Performance Indicators: Sri Lanka Existing Situation Amal S. Kumarage Professor, Department of Civil Engineering, University of Moratuwa Chairman, National Transport Commission kumarage@sltnet.lk

More information

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri

New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis. Kansas City, Missouri New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis Kansas City, Missouri New Buck O Neil (U. S. 169) Crossing Benefit-Cost Analysis prepared for Kansas City, Missouri prepared by Burns & McDonnell

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT. 1. Sector Performance, Problems, and Opportunities Road Network Upgrading Sector Project (RRP TIM 46260) Sector Road Map SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems, and Opportunities 1. Timor-Leste comprises the eastern

More information

Three ULTra Case Studies examples of the performance of the system in three different environments

Three ULTra Case Studies examples of the performance of the system in three different environments Three ULTra Case Studies examples of the performance of the system in three different environments airport application: London Heathrow : linking business and staff car parks through the access tunnel

More information

Economy. 38% of GDP in 1970; 33% of GDP in 1998 Most significant decline in Manufacturing 47% to 29%

Economy. 38% of GDP in 1970; 33% of GDP in 1998 Most significant decline in Manufacturing 47% to 29% Economy MCMA as important, but declining, force in national economy 38% of GDP in 1970; 33% of GDP in 1998 Most significant decline in Manufacturing 47% to 29% Relatively constant contribution of Financial

More information

Future Funding The sustainability of current transport revenue tools model and report November 2014

Future Funding The sustainability of current transport revenue tools model and report November 2014 Future Funding The sustainability of current transport revenue tools model and report November 214 Ensuring our transport system helps New Zealand thrive Future Funding: The sustainability of current transport

More information

EFFECT ON COST OF ROAD CONSTRUCTION & MAINTENANCE DUE TO OVERLOADING

EFFECT ON COST OF ROAD CONSTRUCTION & MAINTENANCE DUE TO OVERLOADING EFFECT ON COST OF ROAD CONSTRUCTION & MAINTENANCE DUE TO OVERLOADING INTERNATIONAL CONFERENCE ON ASSESSING THE NEED FOR THE MANAGEMENT OF AXLE LOADS IN DEVEOPING COUNTRIES, COLOMBO, SRI LANKA 16-17 JUNE

More information

The Impact on Québec s Budget Balance

The Impact on Québec s Budget Balance ISSN 1715-2682 Volume 1, no. 2 August 17, 2005 Higher Fuel Prices The Impact on Québec s Budget Balance Summary 1. The increase in the price of gasoline at the pump since 1999 is due primarily to the soaring

More information

Aim: Integration of Road Infrastructure of Georgia with European Standards and effective satisfaction of the Road User needs. Annual Report 2013

Aim: Integration of Road Infrastructure of Georgia with European Standards and effective satisfaction of the Road User needs. Annual Report 2013 www.georoad.ge Annual Report 2013 Aim: Integration of Road Infrastructure of Georgia with European Standards and effective satisfaction of the Road User needs Objectives: Improvement of road safety Reduction

More information

Operating & Maintenance Cost Results Report

Operating & Maintenance Cost Results Report Operating & Maintenance Cost Results Report Prepared for: Hennepin County Regional Railroad Authority Prepared by: Connetics Transportation Group Under Contract To: Kimley-Horn and Associates FINAL June

More information

Funding Scenario Descriptions & Performance

Funding Scenario Descriptions & Performance Funding Scenario Descriptions & Performance These scenarios were developed based on direction set by the Task Force at previous meetings. They represent approaches for funding to further Task Force discussion

More information

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 30, 2013 GROSS DOMESTIC PRODUCT: FOURTH QUARTER AND ANNUAL 2012 (ADVANCE ESTIMATE)

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 30, 2013 GROSS DOMESTIC PRODUCT: FOURTH QUARTER AND ANNUAL 2012 (ADVANCE ESTIMATE) NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 30, 2013 Lisa Mataloni: (202) 606-5304 (GDP) gdpniwd@bea.gov Recorded message: (202) 606-5306 BEA 13-02 GROSS DOMESTIC PRODUCT:

More information

Task Force Meeting January 15, 2009

Task Force Meeting January 15, 2009 Task Force Meeting January 15, 2009 Study Update August 14 th Task Force Meeting Update on Traffic Projections and Financial Feasibility Study presented by Kane County and WSA staff The presentation summarized

More information

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 31, 2007 GROSS DOMESTIC PRODUCT: FOURTH QUARTER 2006 (ADVANCE)

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 31, 2007 GROSS DOMESTIC PRODUCT: FOURTH QUARTER 2006 (ADVANCE) NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, JANUARY 31, 2007 Virginia H. Mannering: (202) 606-5304 BEA 07-02 Recorded message: (202) 606-5306 GROSS DOMESTIC PRODUCT: FOURTH QUARTER

More information

EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS

EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS EFFECT OF PAVEMENT CONDITIONS ON FUEL CONSUMPTION, TIRE WEAR AND REPAIR AND MAINTENANCE COSTS Graduate of Polytechnic School of Tunisia, 200. Completed a master degree in 200 in applied math to computer

More information

Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa

Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa Back ground Founded in 1887, and has expanded rapidly Altitude about 2500 meters above MSL Now among the ten largest cities in Sub Saharan Africa Annual growth rate is 3.8% By 2020 population growth would

More information

Statistical Annex. European Economic Forecast Spring 2018

Statistical Annex. European Economic Forecast Spring 2018 European Economic Forecast Contents Output : GDP and its components 1. Gross domestic product 160 2. Profiles (q-o-q) of quarterly GDP 160 3. Profiles (y-o-y) of quarterly GDP 161 4. GDP per capita 161

More information

Federated States of Micronesia

Federated States of Micronesia IMF Country Report No. 13/17 Federated States of Micronesia 2012 ARTICLE IV CONSULTATION 2012 Statistical Appendix January 29, 2001 January 29, 2001 This Statistical Appendix paper for the Federated States

More information

QUARTERLY REVIEW OF BUSINESS CONDITIONS: NEW MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 2 ND QUARTER 2017

QUARTERLY REVIEW OF BUSINESS CONDITIONS: NEW MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 2 ND QUARTER 2017 NATIONAL ASSOCIATION OF AUTOMOBILE MANUFACTURERS OF SOUTH AFRICA GROUND FLOOR, BUILDING F ALENTI OFFICE PARK 457 WITHERITE ROAD, THE WILLOWS, X82 PRETORIA PO BOX 40611, ARCADIA 0007 TELEPHONE: (012) 807-0152

More information

Port of South Louisiana. Benefit Cost Analysis. Globalplex Intermodal Efficiency Improvements Project

Port of South Louisiana. Benefit Cost Analysis. Globalplex Intermodal Efficiency Improvements Project October 2017 Port of South Louisiana Benefit Cost Analysis Globalplex Intermodal Efficiency Improvements TIGER IX Grant Cost-Benefit Analysis in Support of the Globalplex Intermodal Efficiency Improvements

More information

Statistical tables S 0. Money and banking. Capital market. National financial account. Public finance

Statistical tables S 0. Money and banking. Capital market. National financial account. Public finance Statistical tables Money and banking Page S South African Reserve Bank: Liabilities... 2 South African Reserve Bank: Assets... 3 Corporation for Public Deposits: Liabilities... 4 Corporation for Public

More information

Statistical tables S 0. Money and banking. Capital market. National financial account. Public finance

Statistical tables S 0. Money and banking. Capital market. National financial account. Public finance Statistical tables Money and banking Page S South African Reserve Bank: Liabilities... 2 South African Reserve Bank: Assets... 3 Corporation for Public Deposits: Liabilities... 4 Corporation for Public

More information

NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EDT, THURSDAY, MARCH 27, 2014

NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EDT, THURSDAY, MARCH 27, 2014 NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EDT, THURSDAY, MARCH 27, 2014 Lisa Mataloni: (202) 606-5304 (GDP) gdpniwd@bea.gov BEA 14-13 Kate Shoemaker: (202) 606-5564 (Profits) cpniwd@bea.gov GROSS

More information

Parks and Transportation System Development Charge Methodology

Parks and Transportation System Development Charge Methodology City of Sandy Parks and Transportation System Development Charge Methodology March, 2016 Background In order to implement a City Council goal the City of Sandy engaged FCS Group in January of 2015 to update

More information

BASELINE STUDY ON VEHICLE INVENTORY AND FUEL ECONOMY FOR MALAWI (KEY FINDINGS)

BASELINE STUDY ON VEHICLE INVENTORY AND FUEL ECONOMY FOR MALAWI (KEY FINDINGS) BASELINE STUDY ON VEHICLE INVENTORY AND FUEL ECONOMY FOR MALAWI (KEY FINDINGS) TASK TEAM- LEAD INSTITUTION Ministry of Natural Resources, Energy and Mining Mount Soche Hotel, Blantyre. 11 th December 2017

More information

National Economic Estimating Conference Held July 12, 2018 FINAL Long-Run Tables

National Economic Estimating Conference Held July 12, 2018 FINAL Long-Run Tables TABLE OF CONTENTS SECTION PAGE Executive Summary 2 Real Expenditures 4 Components of Income 6 Employment and Output 7 Financial Markets 9 Prices 10 Nominal Expenditures 12 The National Economic Estimating

More information

Forecasting of Russian economy. Energy sector model

Forecasting of Russian economy. Energy sector model Forecasting of Russian economy Energy sector model Alexandria September, 2014 Energy Sector in Russian Economy Energy sector of Russian economy Produces 14,2% of GDP Forms 66,5% of Russian exports (33%

More information

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps

PEACHTREE CORRIDOR PARTNERSHIP. Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Current Status & Next Steps PEACHTREE CORRIDOR PARTNERSHIP Why Peachtree? Why Now? I. THE CONTEXT High Level View of Phasing Discussion Potential Ridership Segment 3 Ease

More information

Philip Schaffner & Jason Junge Minnesota Department of Transportation

Philip Schaffner & Jason Junge Minnesota Department of Transportation Philip Schaffner & Jason Junge Minnesota Department of Transportation 100% 80% 60% 40% 20% 0% 9% 33% 9% 21% 29% Trunk Highways $1.3B 14% 16% 19% 33% 17% Greater Minnesota Transit $55.7M 25% 27% 36% Note:

More information

Money and banking. Flow of funds for the third quarter

Money and banking. Flow of funds for the third quarter Statistical tables Money and banking Page S South African Reserve Bank: Liabilities... 2 South African Reserve Bank: Assets... 3 Corporation for Public Deposits: Liabilities... 4 Corporation for Public

More information

Recent Transportation Projects

Recent Transportation Projects Dr. Dazhi Sun Associate Professor Director of Texas Transportation Institute Regional Division Department of Civil & Architectural Engineering Texas A&M University-Kingsville 1 Recent Transportation Projects

More information

Late Starter. Tuesday, November 6, 2018

Late Starter. Tuesday, November 6, 2018 Late Starter Tuesday, Please note the following item(s) was not included with your agenda as this item(s) was received after the agenda package was printed. Planning and Works Committee Report TES-RTS-18-09,

More information

RIETI BBL Seminar Handout

RIETI BBL Seminar Handout Research Institute of Economy, Trade and Industry (RIETI) RIETI BBL Seminar Handout Autonomous Vehicles, Infrastructure Policy, and Economic Growth September 25, 2018 Speaker: Clifford Winston https://www.rieti.go.jp/jp/index.html

More information

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India

Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India Madhya Pradesh Road Development Corporation: A Case Study of ADB Assistance for Institutional Development in the Transport Sector in India South Asia Transport Team Presented by Prodyut Dutt Asian Development

More information

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, TUESDAY, DECEMBER 22, 2015

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, TUESDAY, DECEMBER 22, 2015 NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, TUESDAY, DECEMBER 22, 2015 GDP: Lisa Mataloni (202) 606-5304 gdpniwd@bea.gov Profits: Kate Pinard (202) 606-5564 cpniwd@bea.gov News Media: Jeannine

More information

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, TUESDAY, DECEMBER 23, 2014

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, TUESDAY, DECEMBER 23, 2014 NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, TUESDAY, DECEMBER 23, 2014 Lisa Mataloni: (202) 606-5304 (GDP) gdpniwd@bea.gov BEA 14-65 Kate Shoemaker: (202) 606-5564 (Profits) cpniwd@bea.gov Jeannine

More information

Travel Time Savings Memorandum

Travel Time Savings Memorandum 04-05-2018 TABLE OF CONTENTS 1 Background 3 Methodology 3 Inputs and Calculation 3 Assumptions 4 Light Rail Transit (LRT) Travel Times 5 Auto Travel Times 5 Bus Travel Times 6 Findings 7 Generalized Cost

More information

Table 1 ANTIGUA AND BARBUDA: MAIN ECONOMIC INDICATORS

Table 1 ANTIGUA AND BARBUDA: MAIN ECONOMIC INDICATORS Antigua Tables 2006 1 Main Indicators 03/11/2006 08:05 AM Table 1 ANTIGUA AND BARBUDA: MAIN ECONOMIC INDICATORS 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 a/ Annual growth rates b/ Gross domestic

More information

Real GDP: Percent change from preceding quarter

Real GDP: Percent change from preceding quarter EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, WEDNESDAY, FEBRUARY 28, 2018 BEA 18-08 Technical: Lisa Mataloni (GDP) (301) 278-9083 gdpniwd@bea.gov Media: Jeannine Aversa (301) 278-9003 Jeannine.Aversa@bea.gov

More information

Japanese ODA Loan. Ex-ante Evaluation

Japanese ODA Loan. Ex-ante Evaluation Japanese ODA Loan Ex-ante Evaluation 1.Name of the Project Country:Republic of the Philippines Project:Capacity Enhancement of Mass Transit Systems in Metro Manila Project Loan Agreement:27 March 2013

More information

Contents. Executive Summary...1 Introduction...2 Operating Plan...4 System Connectivity...5

Contents. Executive Summary...1 Introduction...2 Operating Plan...4 System Connectivity...5 Contents Executive Summary...1 Introduction...2 Operating Plan...4 System Connectivity...5 Project Benefits...6 Economic Growth...7 Infrastructure Improvements...9 Quality of Life... 11 Next Steps... 12

More information

Item

Item Key Indicators for Asia and the Pacific 2009 POPULATION Total population a thousand; as of 1 July 295 305 316 328 340 353 366 380 394 409 420 432 444 457 470 483 496 510 524 Population density persons

More information

STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION

STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION A P P E N D I X B STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION C O N T E N T S NATIONAL INCOME OR EXPENDITURE Page B 1. Gross domestic product, 1960 2009... 328 B 2. Real gross domestic

More information

Unlocking Private Sector Financing for Alternative Fuel Vehicles and Fueling Infrastructure

Unlocking Private Sector Financing for Alternative Fuel Vehicles and Fueling Infrastructure July 1, 2015 Unlocking Private Sector Financing for Alternative Fuel Vehicles and Fueling Infrastructure Nick Nigro, Atlas Public Policy Findings Workshop Project Overview Partners: NASEO, C2ES, Transportation

More information

CONTRIBUTION OF THE BIODIESEL INDUSTRY TO THE ECONOMY OF THE UNITED STATES

CONTRIBUTION OF THE BIODIESEL INDUSTRY TO THE ECONOMY OF THE UNITED STATES CONTRIBUTION OF THE BIODIESEL INDUSTRY TO THE ECONOMY OF THE UNITED STATES Prepared for the National Biodiesel Board With Funding Support from the United Soybean Board 1 John M. Urbanchuk Director LECG,

More information

Ghana Kumasi-Paga Road Rehabilitation Project. Report date: March 2001 Field survey: July Project Profile and Japan s ODA Loan

Ghana Kumasi-Paga Road Rehabilitation Project. Report date: March 2001 Field survey: July Project Profile and Japan s ODA Loan Ghana Kumasi-Paga Road Rehabilitation Project Report date: March 2001 Field survey: July 2000 1. Project Profile and Japan s ODA Loan Site Map: major road network in the Republic of Ghana Kumasi-Paga Road

More information

Additional Transit Bus Life Cycle Cost Scenarios Based on Current and Future Fuel Prices

Additional Transit Bus Life Cycle Cost Scenarios Based on Current and Future Fuel Prices U.S. Department Of Transportation Federal Transit Administration FTA-WV-26-7006.2008.1 Additional Transit Bus Life Cycle Cost Scenarios Based on Current and Future Fuel Prices Final Report Sep 2, 2008

More information

Electric Vehicle Cost-Benefit Analyses

Electric Vehicle Cost-Benefit Analyses Electric Vehicle Cost-Benefit Analyses Results of plug-in electric vehicle modeling in five Northeast & Mid-Atlantic states Quick Take With growing interest in the electrification of transportation in

More information

Traffic Data For Mechanistic Pavement Design

Traffic Data For Mechanistic Pavement Design NCHRP 1-391 Traffic Data For Mechanistic Pavement Design NCHRP 1-391 Required traffic loads are defined by the NCHRP 1-37A project software NCHRP 1-39 supplies a more robust mechanism to enter that data

More information

Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers

Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers Fueling Savings: Higher Fuel Economy Standards Result In Big Savings for Consumers Prepared for Consumers Union September 7, 2016 AUTHORS Tyler Comings Avi Allison Frank Ackerman, PhD 485 Massachusetts

More information

SECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT

SECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT Vientiane Sustainable Urban Transport Project (RRP LAO 45041) Sector Road Map SECTOR ASSESSMENT (SUMMARY): URBAN TRANSPORT 1. Sector Performance, Problems, and Opportunities 1. Road transport dominates

More information

QUARTERLY REVIEW OF BUSINESS CONDITIONS: MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 4 TH QUARTER 2016

QUARTERLY REVIEW OF BUSINESS CONDITIONS: MOTOR VEHICLE MANUFACTURING INDUSTRY / AUTOMOTIVE SECTOR: 4 TH QUARTER 2016 NATIONAL ASSOCIATION OF AUTOMOBILE MANUFACTURERS OF SOUTH AFRICA GROUND FLOOR, BUILDING F ALENTI OFFICE PARK 457 WITHERITE ROAD, THE WILLOWS, X82 PRETORIA PO BOX 40611, ARCADIA 0007 TELEPHONE: (012) 807-0152

More information

Benefit-Cost Analysis Technical Memo

Benefit-Cost Analysis Technical Memo I-40 Douglas Boulevard Interchange Reconstruction and Related Widening Oklahoma County, OKLAHOMA INFRA Grant Application Benefit-Cost Analysis Technical Memo November 2017 Submitted by: Oklahoma Department

More information

US 377 Relief Route Appendix C: Benefit Cost Analysis

US 377 Relief Route Appendix C: Benefit Cost Analysis US 377 Relief Route Appendix C: Benefit Cost Analysis TIGER FY17 Grant Application October 2017 Table of Contents 1.0 Executive Summary... 1 2.0 Purpose... 8 3.0 Benefits and Disbenefits... 8 3.1 Detours

More information

Road Map for Sustainable Transport Strategy for Colombo Metropolitan Region with Cleaner Air, through Experience

Road Map for Sustainable Transport Strategy for Colombo Metropolitan Region with Cleaner Air, through Experience Workshop on Air Quality and Environmentally Sustainable Transport April 28 th 2011 Don S. Jayaweera Road Map for Sustainable Transport Strategy for Colombo Metropolitan Region with Cleaner Air, through

More information

Annual Report on National Accounts for 2015 (Benchmark Year Revision of 2011) Summary (Flow Accounts)

Annual Report on National Accounts for 2015 (Benchmark Year Revision of 2011) Summary (Flow Accounts) Annual Report on National Accounts for 2015 (Benchmark Year Revision of 2011) Summary (Flow Accounts) I. Overview of Benchmark Year Revision of 2011 P 2 II. Expenditure Series P 3 III. Income Series P

More information

4.0 TIER 2 ALTERNATIVES

4.0 TIER 2 ALTERNATIVES 4.0 TIER 2 ALTERNATIVES The Tier 2 Alternatives represent the highest performing Tier 1 Alternatives. The purpose of the Tier 2 Screening was to identify the LPA utilizing a more robust list of evaluation

More information

The Case for. Business. investment. in Public Transportation

The Case for. Business. investment. in Public Transportation The Case for Business investment in Public Transportation Introduction Public transportation is an enterprise with expenditure of $55 billion in the United States. There has been a steady growth trend

More information

Gross Domestic Product: Third Quarter 2016 (Third Estimate) Corporate Profits: Third Quarter 2016 (Revised Estimate)

Gross Domestic Product: Third Quarter 2016 (Third Estimate) Corporate Profits: Third Quarter 2016 (Revised Estimate) EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, THURSDAY, DECEMBER 22, 2016 BEA 16-71 Technical: Lisa Mataloni (GDP) (301) 278-9083 gdpniwd@bea.gov Kate Pinard (Corporate Profits) (301) 278-9417 cpniwd@bea.gov

More information

Table B1. Advanced Economies: Unemployment, Employment, and Real per Capita GDP (Percent)

Table B1. Advanced Economies: Unemployment, Employment, and Real per Capita GDP (Percent) Statistical Appendix Table B1. Advanced Economies: Unemployment, Employment, and Real per Capita GDP (Percent) Unemployment Rate 2 Averages 1 1993 2002 2003 12 Advanced Economies 6.8 6.9 6.7 6.5 6.3 5.8

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 24, 2012 SUBJECT: DOWNTOWN RAPID TRANSIT EXPANSION STUDY (DRTES) PHASE 1 STRATEGIC PLAN ACTION ITEM RECOMMENDATIONS

More information

ASIAN DEVELOPMENT FUND (ADF) ADF XI REPLENISHMENT MEETING 7 9 March 2012 Manila, Philippines. Post-Conflict Assistance to Afghanistan

ASIAN DEVELOPMENT FUND (ADF) ADF XI REPLENISHMENT MEETING 7 9 March 2012 Manila, Philippines. Post-Conflict Assistance to Afghanistan ASIAN DEVELOPMENT FUND (ADF) ADF XI REPLENISHMENT MEETING 7 9 March 2012 Manila, Philippines Post-Conflict Assistance to Afghanistan February 2012 ABBREVIATIONS ADB Asian Development Bank ADF Asian Development

More information

In the following letter I would like to share with you the developments we reached in the referred subjects.

In the following letter I would like to share with you the developments we reached in the referred subjects. Ref. Ref. Ares(2012)75556 Ares(2018)3432564 - - 23/01/2012 28/06/2018 Managing Authority of Transport Operational Programme Budapest, 20 January 2012 Our ref. number: 48/ / /2012 Subject: Transport Operational

More information

Gross Domestic Product: Fourth Quarter and Annual 2016 (Second Estimate)

Gross Domestic Product: Fourth Quarter and Annual 2016 (Second Estimate) EMBARGOED UNTIL RELEASE AT 8:30 A.M. EST, TUESDAY, FEBRUARY 28, 2017 BEA 17-07 Technical: Lisa Mataloni (GDP) (301) 278-9083 gdpniwd@bea.gov Media: Jeannine Aversa (301) 278-9003 Jeannine.Aversa@bea.gov

More information

Item

Item Key Indicators for Asia and the Pacific 2010 POPULATION a Total population million; as of 1 July 18.17 18.55 18.93 19.33 19.73 20.14 20.56 20.99 21.42 21.87 22.32 22.79 23.30 23.82 24.36 24.91 25.47 26.04

More information

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EDT, THURSDAY, MAY 29, 2014

EMBARGOED UNTIL RELEASE AT 8:30 A.M. EDT, THURSDAY, MAY 29, 2014 NEWS RELEASE EMBARGOED UNTIL RELEASE AT 8:30 A.M. EDT, THURSDAY, MAY 29, 2014 Lisa Mataloni: (202) 606-5304 (GDP) gdpniwd@bea.gov BEA 14-21 Kate Shoemaker: (202) 606-5564 (Profits) cpniwd@bea.gov GROSS

More information

Aging of the light vehicle fleet May 2011

Aging of the light vehicle fleet May 2011 Aging of the light vehicle fleet May 211 1 The Scope At an average age of 12.7 years in 21, New Zealand has one of the oldest light vehicle fleets in the developed world. This report looks at some of the

More information

US 69/75 Controlled Access Highway and Grade Separations Benefit-Cost Analysis Narrative

US 69/75 Controlled Access Highway and Grade Separations Benefit-Cost Analysis Narrative US 69/75 Controlled Access Highway and Grade Separations Introduction The Oklahoma Department of Transportation (ODOT) proposes to improve safety and efficiency of high volume freight traffic along the

More information

Appendix B STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION

Appendix B STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION Appendix B STATISTICAL TABLES RELATING TO INCOME, EMPLOYMENT, AND PRODUCTION C O N T E N T S Page NATIONAL INCOME OR EXPENDITURE: B. Gross domestic product, 959 005... 80 B. Real gross domestic product,

More information