Truss Retrofit to Mitigate Substructure Displacements at I-20 Mississippi River Bridge at Vicksburg

Size: px
Start display at page:

Download "Truss Retrofit to Mitigate Substructure Displacements at I-20 Mississippi River Bridge at Vicksburg"

Transcription

1 Truss Retrofit to Mitigate Substructure Displacements at I-20 Mississippi River Bridge at Vicksburg Zolan Prucz, Ph.D., P.E., Modjeski and Masters, Inc. New Orleans, LA 2013 Louisiana Transportation Engineering Conference Baton Rouge, Louisiana

2 Acknowledgements: Burns Cooley Dennis, Inc. Dr. James H. May and Dr. Richard J. Lutten Lazenby and Associates, Inc. Boh Brothers, LLP C.E.C., Inc. LADOT Headquarters and District FHWA Ardaman & Associates, Inc. and their Team of Experts

3 US 80 W-1 PP15 I-20 PP15 E-1 E-2 E-3

4 Pier-1 E-3 Pier-2 E-2 E-1

5 Pier-2 Pier-1

6 Pier E-2

7

8 Bridge Characteristics West East F E F E F F E F E PP15 PP15 Simple Span Anchor Span Suspended Span Anchor Span Simple Span W-3 W-2 W-1 Cantilever E-1 E-2 E-3 Spans

9 Original Bearings E-1 E-2 E-3

10 PP15 PP15

11 Truss Elevation View at PP15 U14 CANTILEVER SPAN SUSPENDED SPAN U15 U16 FALSE CHORD U15-U16 WEST SUSPENDED SPAN HANGER EAST L14 FALSE CHORD L14-L15 L15 TRUSS ELEVATION VIEW AT PP15 L16

12 Top Lateral System at PP15 CANTILEVER SPAN SUSPENDED SPAN FALSE CHORD U15-U16 WEST EAST FALSE CHORD U15-U16 U14 U15 TOP LATERAL SYSTEM AT PP15 U16

13 Bottom Lateral System at PP15 and PP15 CANTILEVER SPAN PP15 SUSPENDED SPAN SUSPENDED SPAN PP15 CANTILEVER SPAN EAST WEST LONGITUDINAL STRUT FALSE CHORD L14-L15 FALSE CHORD L14 -L15 L14 L15 L16 L16 L15 L14 BOTTOM LATERAL SYSTEM AT PP15 BOTTOM LATERAL SYSTEM AT PP15

14

15 PP 14 Stringer PP 15 Jointmeter Long Strut

16 Bridge Condition After 2000 / 2001 Movements U 15 PIER E-3 BEARINGS E-3 EXP DAM AT PP 15 EXP DAM AT PIER E-3

17 Channel Migrations

18 -46 E F E E E F CR BR ER DR 7 18 PIER 3 PIER 2 PIER 1 TOWER 1 U.S. Route 80 Bridge AR 158 F E F E E E-1 E-2-70 I-20 Mississippi River Bridge

19 Bridge Instrumentation Location of Tiltmeters Location of Jointmeters Location of Datalogger PP15 PP15

20 Summary of I-20 Bridge Pier Movements Estimated Time or Time Period Top of Pier E-2 Top of Pier E-1 (in) (arc-sec) (in) (arc-sec) and 2000 Prior to 5/ Feb 2/5/2003 to 2/6/ Aug 8/2/ Nov 11/17/ Aug - Sep Sep - Dec Sep - Dec Nov Oct June - Dec 8/13/2006 to 9/21/2006 9/21/2009 to 12/19/2007 0/28/2009 to 12/22/ /7/2010 to 11/22/ /20/2011 to 10/24/2011 6/29/2012 to 12/21/ Total Movement (+/-)

21 E-3: Jointmeter Readings Starting 8/27/2004; Updated 2/02/ Joint Opening at E-3 Joint Closing at PP15 Pier Tilt (arc-sec) Pier Tilt (arc-sec) /27/ /7/2004 3/21/2005 8/27/ /7/2004 3/21/2005 7/6/ /29/2005 2/26/2006 6/24/ /6/2006 1/14/2007 4/24/2007 8/2/ /10/2007 2/18/2008 5/28/2008 9/5/ /14/2008 PP-15: Jointmeter Readings Starting 8/27/2004; Updated 2/02/2013 7/6/ /29/2005 2/26/2006 6/24/ /6/2006 1/14/2007 4/24/2007 8/2/ /10/2007 2/18/2008 5/28/2008 9/5/ /14/2008 3/24/2009 7/2/ /10/2009 1/18/2010 4/28/2010 8/6/ /14/2010 2/22/2011 6/2/2011 9/10/ /19/2011 3/28/2012 7/6/ /14/2012 1/22/2013 3/24/2009 7/2/ /10/2009 1/18/2010 4/28/2010 8/6/ /14/2010 2/22/2011 6/2/2011 9/10/ /19/2011 3/28/2012 7/6/ /14/2012 1/22/ River Stage (feet) River Stage (feet)

22 February 5-6, 2003 Movement of Piers E-1 and E-2 Pier E-3: Jointmeter Readings vs. River Stage Started 1/4/2003; Updated 3/10/2003 Difference Between Measured and Calculated Expansion Readings for ' Span River Stage Jointmeter Reading (in) /7 18: Gage height (ft) :00 1/4/2003 0:00 1/14/2003 0:00 1/22/2003 0:00 1/31/ :00 2/8/2003 2/4 0: 18:00 2/16/ :00 2/24/ :00 3/4/

23 June 22, 2003 Longitudinal Strut Damage PP 15

24 2004 Bridge Modifications (Remedial) Contractor: Boh Bros., Constr. Company, LLC Bridge Modifications (Proactive) Contractor: C.E.C. Inc., David Huval Jr. E F E F E F E F F E F E PP15 PP W-5 W-4 W-3 W-2 W-1 E-1 E-2 E-3

25 2004 Bridge Modifications Measure 1 Measure 2 Measure 3 PP15 PP14 PP14 PP15

26 Summary of 2004 Bridge Modification Measures Measure Objective Retrofit Prevent roadway traffic hazard at expansion dam at Pier E-3. Prevent Span E-2 E-3 drop at Pier E-3. Eliminate locked-in stresses between Piers E-1 and W-1. Replace expansion dam at Pier E-3. Widen top of pier area. Add catch blocks under the trusses. Shorten span between Piers E-1 and W-1. Repair longitudinal strut L15 - L14.

27 Expansion Dam Modifications at Pier E-3 E-3 E-3 EXPANSION DAM MODIFICATION EXISING CONDITION

28 Expansion Dam at Pier E-3 After Modifications

29 Pier E-3 Modifications E-3 EXISING CONDITION AFTER MODIFICATIONS MODIFICATION OF PIER E-3

30 Shortening of Span Between Piers E-1 and W-1 PP14 PP15 Opening of Expansion Dam at PP15 by Jacking Span PP15-PP14 Towards PP14

31 PP 15 Shortening of Span L14 L15 PP 14 CUT OUT PP 14 SHIFT AFTER CUT EXISTING CONDITION SHORTENING OF STRINGERS BETWEEN L14 AND L15

32

33 PP 14 AFTER SPAN SHORTENING EXPANSION DAM AT PP 15 AFTER SPAN SHORTENING

34 Truss False Chord Modifications at U15 U16

35

36 Longitudinal Strut Shortening at Span L14 L15 PP14 PLAN - PANEL POINT 14 MODIFICATION OF LONGITUDINAL STRUT

37

38 Longitudinal Strut Repair at Span L14 L15

39 Deck Joints After 2004 Repairs PP 15 E-3 PP 15

40 2010 Bridge Modifications for Increased Movement Capacity Measure 1 Measure 2 Measure 3 Measure 4 Measure 5 PP15 PP14 PP14 PP15

41 Summary of 2010 Bridge Modification Measures Measure Objective Retrofit 1 Increase movement capacity of expansion dam at Pier E-3. Replace expansion dam at Pier E Increase movement capacity at bearings at Piers E-3 and E-2. Increase movement capacity within the deck, between Pier E-1 and W-1. Prevent span drop at Pier E-2 and E-1. Provide redundancy to the suspended span hangers. Replace bearings at E-3 and E-2 with inverted sliding disc bearings. Shorten span PP14-15 and replace expansion dams at Pier E-2 and PP15. Widen top of pier area at E-2 and E-1. Add bearing blocks at E-2 and E-1. Add eyebars at each suspended span hanger.

42 Expansion Dam Replacement at Pier E-2

43 Bearing Replacement at Pier E-3

44 Bearing Replacement at Pier E-2

45 E-2 E-3

46 PP 14 Shortening of Span L14 L15 PP14 CUT OUT SHIFT AFTER CUT SHORTENING OF STRINGERS BETWEEN L14 AND L15

47 PP14

48 PP14

49 PP15

50 PP15

51 Expansion Dam Replacement at PP15

52 PP 14 AFTER SPAN SHORTENING EXPANSION DAM AT PP 15 AFTER SPAN SHORTENING

53 False Chord Adjustments at U15 False Chord Modifications at U15

54 Widening of Pier Top Area at Pier E-1

55

56 Addition of Eyebars to the Suspended Span Hangers at PP15 and PP15

57

58 Deck Joints After 2010 Modifications PP 15 E-3 E-2

59 Summary Remedial Structural Modifications Proactive Structural Modifications for: Anticipated movements Extreme scenarios

60 Thank you!

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow

Commercial-in-Confidence Ashton Old Baths Financial Model - Detailed Cashflow Year 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 2,038 2,922 4,089 4,349 6,256 7,124 8,885 8,885 8,885 8,885 8,885 8,885 9,107

More information

Horseshoe Bay Terminal Open House

Horseshoe Bay Terminal Open House Horseshoe Bay Terminal Open House July 5, 2007 Welcome Aboard The purpose of this Open House is to provide you with information and to receive your input for consideration on the Horseshoe Bay Terminal

More information

Status Report on Bridges and Roads Repair/Renovations

Status Report on Bridges and Roads Repair/Renovations Basis FOR Analysis Compliance with the Clean Water Act as set forth in a Consent Decree approved by the U.S. District Court of Guam in February 2004 Layon site selected by Government of Guam and approved

More information

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED

DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED DRAFT REPORT TXDOT SH 183 MASTER DRAINAGE STUDY HYDRAULIC ANALYSIS OF ELM FORK OF TRINITY RIVER CROSSING AT SH 183 WITHIN THE ELM FORK WATERSHED FOR TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT CONTRACT

More information

Total Production by Month (Acre Feet)

Total Production by Month (Acre Feet) Production by Month (acre-feet) 2008 2009 2010 2011 2012 2013 2014 2015 2016 January 25 339.10 228.90 249.50 297.99 243.06 327.14 247.66 212.37 February 234.00 218.80 212.10 241.52 245.82 279.08 234.16

More information

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee 05.28.09 09 Bridge Type - Cost Vertical Clearance Bicycle Pedestrian Path Width Bridge Type - Cost WRBAC

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates For Internal Use Only. FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

Action Requested From AMWG

Action Requested From AMWG Action Requested From AMWG NONE, These Two Presentations Are For Information Transfer Only The information is derived from a multi-year synthesis research effort related to existing data on flow, sediment-transport

More information

Appendix E Water Supply Modeling

Appendix E Water Supply Modeling Supply Modeling Modesto Irrigation District Treatment Plant Expansion Project Modeling I. Introduction The Modesto Irrigation District (MID) is situated adjacent to and north of the Tuolumne River. Over

More information

Michigan Division Federal Highway Administration Update

Michigan Division Federal Highway Administration Update Federal Highway Administration Update Ted Burch, P.E. Assistant Division Administrator FHWA Michigan Division 2010 Michigan Bridge Conference Topics ARRA Update Scour Evaluation & POAs Load Rating & Posting

More information

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007

Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 EAST-WEST CORRIDOR Challenges in a Post-Katrina Environment East-West Corridor Project Overview February, 2007 Presentation Agenda Project Overview / Purpose and Need Highway Component Transit Component

More information

WIM #37 was operational for the entire month of September Volume was computed using all monthly data.

WIM #37 was operational for the entire month of September Volume was computed using all monthly data. SEPTEMBER 2016 WIM Site Location WIM #37 is located on I-94 near Otsego in Wright county. The WIM is located only on the westbound (WB) side of I-94, meaning that all data mentioned in this report pertains

More information

September 2016 Water Production & Consumption Data

September 2016 Water Production & Consumption Data September 2016 Water Production & Consumption Data September 2016 monthly water production (288.48 AF) was lowest in at least 17 years. Monthly water production has increased slightly each month since

More information

Comparison of T-Beam Girder Bridge with Box Girder Bridge for Different Span Conditions.

Comparison of T-Beam Girder Bridge with Box Girder Bridge for Different Span Conditions. The International Journal of Engineering and Science (IJES) ISSN (e): 2319 1813 ISSN (p): 23-19 1805 Pages PP 67-71 2018 Comparison of T-Beam Girder Bridge with Box Girder Bridge for Different Span Conditions.

More information

I-405 Sepulveda Pass Improvements Project

I-405 Sepulveda Pass Improvements Project I-405 Sepulveda Pass Improvements Project 26, 2012 Click to edit Master title January style Community Advisory Committee 1 Community Meeting Schedule for 2012 26-Jan CAC, Final Meeting Feb 22-Mar Community

More information

NJ Solar Market Update As of 6/30/15

NJ Solar Market Update As of 6/30/15 NJ Solar Market Update As of 6/30/ Prepared by Charlie Garrison July 17, 20 SOLAR INSTALLED CAPACITY DATA The preliminary installed solar capacity as of 6/30/ is approximately 1,500.7 MW. Approximately

More information

B.C. MINISTRY OF TRANSPORTATION. Vancouver Island Electrical Services Area - LOCAL AREA SPECIFICATION #1 MOVABLE BRIDGE MAINTENANCE

B.C. MINISTRY OF TRANSPORTATION. Vancouver Island Electrical Services Area - LOCAL AREA SPECIFICATION #1 MOVABLE BRIDGE MAINTENANCE 1. OBJECTIVE B.C. MINISTRY OF TRANSPORTATION Vancouver Island Electrical Services Area - LOCAL AREA SPECIFICATION #1 MOVABLE BRIDGE MAINTENANCE 17 th Street Bridge (lift span, at Courtenay) To ensure safe

More information

NJ Solar Market Update As of 2/29/16

NJ Solar Market Update As of 2/29/16 NJ Solar Market Update As of 2/29/16 Prepared by Charlie Garrison March 24, 2016 SOLAR INSTALLED CAPACITY DATA The installed solar capacity as of 2/29/16 is approximately 1,644.3 MW. Approximately 20.3

More information

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension

Appendix C. 5% Design Plan and Profile Drawings/ Additional Design Information. South Oak Cliff Corridor Blue Line Extension Appendix C 5% Design Plan and Profile Drawings/ Additional Design Information The 5% plan and profile drawings were provided in a separate volume with the Draft Local EA and have not changed. Hard copies

More information

US 191 Load Rating Past and Present. By Ron Pierce, P.E.,S.E., CBI David Evans & Associates Bridge Operations Services Practice Leader

US 191 Load Rating Past and Present. By Ron Pierce, P.E.,S.E., CBI David Evans & Associates Bridge Operations Services Practice Leader US 191 Load Rating Past and Present By Ron Pierce, P.E.,S.E., CBI David Evans & Associates Bridge Operations Services Practice Leader Inspection Experience Bridge Inspection with Idaho Transportation Department

More information

Rural Two-Lane Roadways in Louisiana

Rural Two-Lane Roadways in Louisiana Impact of Pavement Edge Line on Vehicular Lateral Position on Narrow Rural Two-Lane Roadways in Louisiana Xiaoduan Sun Jaehyun Park University of Louisiana at Lafayette Dean Tekell Nina Ludington Dean

More information

Approximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders.

Approximately 11,200 mm c/c (field measurement) Two glulam slab girders mm x 1210 mm; 3100 mm clear distance between girders. BRIDGE INSPECTION BRIDGE NO./NAME SI - 3041: Mt. Brenton FSR (2.00 KM) Inspection Date: October 31 st 2012 Inspected By: D. Chen, D. Harrison Year Built: 1995 Number of Spans: 1 Span Lengths: Superstructure

More information

City of Peachtree City

City of Peachtree City City of Peachtree City Lake Peachtree Spillway Replacement City Council Update September 15, 2016 Project Team Integrated Science & Engineering 1 Spillway Alternatives Analysis Spillway Alternatives Evaluated

More information

Impact of Heavy Loads on State and Parish Bridges. Aziz Saber, Ph.D., P.E. Program Chair Civil Engineering Louisiana Tech University

Impact of Heavy Loads on State and Parish Bridges. Aziz Saber, Ph.D., P.E. Program Chair Civil Engineering Louisiana Tech University Impact of Heavy Loads on State and Parish Bridges Aziz Saber, Ph.D., P.E. Program Chair Civil Engineering Louisiana Tech University Acknowledgement Funds from Louisiana Transportation Research Center LA

More information

TRAFFIC VOLUME TRENDS

TRAFFIC VOLUME TRENDS Page 1 U. S. Department Transportation Federal Highway Administration Office Highway Policy Information TRAFFIC VOLUME TRENDS September Travel on all roads and streets changed by +2.5 (5.8 billion vehicle

More information

TRAFFIC VOLUME TRENDS July 2002

TRAFFIC VOLUME TRENDS July 2002 TRAFFIC VOLUME TRENDS July 2002 Travel on all roads and streets changed by +2.3 percent for July 2002 as compared to July 2001. Estimated Vehicle-Miles of Travel by Region - July 2002 - (in Billions) West

More information

US Rt. 12/20/45 at US Rt. 20 <Westbound and Southbound>

US Rt. 12/20/45 at US Rt. 20 <Westbound and Southbound> US Rt. 12/20/45 at US Rt. 20 Village of Stone Park, Illinois R L R F o l l o w - U p E v a l u a t i o n R e p o r t Reference No: 016-43280 December 2010 Table of Contents

More information

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25 TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 28Dec2016 25.00 Introduction Chapter 25... 28Dec2016 VDOT STANDARD PARAPETS

More information

Asphalt Pavement Construction Update

Asphalt Pavement Construction Update Asphalt Pavement Construction Update 2013 FTBA Construction Conference Richard Hewitt, PE State Construction Pavement Engineer Smoothness Developmental Specification Smoothness Developmental Specification

More information

Rolling Road (Route 638) Widening Project

Rolling Road (Route 638) Widening Project Rolling Road (Route 638) Widening Project From: 0.369 Mile North of Fairfax County Parkway (Route 286) To: Old Keene Mill Road (Route 644) State Project No. 0638-029-156, P104, R204, C504; UPC 5559 Public

More information

WHITE POINT LANDSLIDE

WHITE POINT LANDSLIDE Gary Lee Moore, PE, ENV SP Alfred L. Mata, P.E., Deputy City Engineer WHITE POINT LANDSLIDE Status Report Recommended Immediate Measures (Estimate $12.96 Million) FUNDING APPROVED BY CITY COUNCIL ON: AUGUST

More information

ANCR CRU Statistics February 2007 to December 2007

ANCR CRU Statistics February 2007 to December 2007 ANCR CRU Statistics February 2007 to December 2007 o Jan/07 Feb/07* Mar/07 Apr/07 May/07 Jun/07 Jul/07 Aug/07 Sep/07 Oct/07 Nov/07 Dec/07 Total notes data from Perimeter phone system unavailable prior

More information

2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics

2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics 2014 Fall Asphalt Conference October 7, 2014 Richmond, VA Review of Virginia s 2013 Work Zone Crash Statistics David Rush WZ Safety Program Manager Traffic Engineering Division Review of Virginia s 2013

More information

SunZia Southwest Transmission Project

SunZia Southwest Transmission Project SunZia Southwest Transmission Project SunZia Project Update for the 9 th Annual Transmission Summit West October 13, 2017 SUNZIA SOUTHWEST TRANSMISSION PROJECT OCTOBER 13, 2017 0 SouthWestern Power Group

More information

New McNicoll Bus Garage Public Open House

New McNicoll Bus Garage Public Open House New McNicoll Bus Garage Public Open House Kennedy Public School 1 The Need for a New Bus Garage Riders Increased ridership means Buses Need for new buses Garage And a new buses facility Problems Garages

More information

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project

PCDO. Jan Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project PCDO Jan-2018 Launched portion of Viaduct Deck Structure from S-180 (KATRA- BANIHAL SECTION) Udhampur-Srinagar-Baramulla Rail Link Project Northern Railway vuqjkx dqekj lpku vkbzvkj,lb Anurag Kumar Sachan

More information

4/2/18 MP NORTHPOINT MALL GENERAL GROWTH PROPERTIES

4/2/18 MP NORTHPOINT MALL GENERAL GROWTH PROPERTIES PHOTOGRAPH OF PIONEER PLACE, PORTLAND, OREGON APPLICATION FOR MASTER PLAN AMENDMENT CITY OF ALPHARETTA, GEORGIA Photograph of Pioneer Place, Portland, Oregon, showing exterior of a leasable office use

More information

Richmond Area MPO Regional Priority Transportation Projects

Richmond Area MPO Regional Priority Transportation Projects Regional Priority Transportation Projects September 27, 2007 HANOVER GOOCHLAND ASHLAND POWHATAN RICHMOND HENRICO NEW KENT CHESTERFIELD CHARLES CITY 9211 Forest Hill Avenue, Suite 200 Richmond, Virginia

More information

University of Michigan Eco-Driving Index (EDI) Latest data: October 2017

University of Michigan Eco-Driving Index (EDI)   Latest data: October 2017 University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: October 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation

More information

Design Criteria Data

Design Criteria Data LAS VEGAS/MCCARRAN NV Latitude = 36.8 N WMO No. 72386 Longitude =115.1 W Elevation = 2179 feet Period of Record = 1973 to 1996 Average Pressure = 27.67 inches Hg Design Criteria Data Mean Coincident (Average)

More information

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237)

W&OD TRAIL BRIDGE OVER LEE HIGHWAY I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) W&OD TRAIL BRIDGE OVER LEE HIGHWAY A COMPONENT OF THE I-66 EASTBOUND WIDENING INSIDE THE BELTWAY FROM THE DULLES CONNECTOR ROAD (ROUTE 267) TO FAIRFAX DRIVE (ROUTE 237) October 11, 2018 Bill Cuttler, PE

More information

Capital Project Tracking Report

Capital Project Tracking Report BTC Annex IT Services: Installation Firm: DataPlus Communications Funding: $167,170 Start: March 2018 End: May 2018 NTP & Preconstruction Meeting. Bus Shelter Pad & Installation Phase 6 TBD Start: TBD

More information

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA

Broward County Intermodal Center And People Mover. AASHTO Value Engineering Conference Presentation. September 1, 2009 San Diego, CA Project Development & Environment Study Broward County Intermodal Center And People Mover AASHTO Value Engineering Conference Presentation September 1, 2009 San Diego, CA Background P D & E Study Regional

More information

BRIDGEBY BURLEIGH LAW, P.E. Bringing Back the Big Four. An unused railroad truss bridge is reinvented as a new pedestrian gateway over the Ohio River.

BRIDGEBY BURLEIGH LAW, P.E. Bringing Back the Big Four. An unused railroad truss bridge is reinvented as a new pedestrian gateway over the Ohio River. An unused railroad truss bridge is reinvented as a new pedestrian gateway over the Ohio River. Bringing Back the Big Four BRIDGEBY BURLEIGH LAW, P.E. PHOTOS BY HNTB Burleigh Law (blaw@hntb.com) is a senior

More information

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT

WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 US 2, MP 8.0 EAST GRAND FORKS, MN JANUARY 2015 MONTHLY REPORT WIM #31 EAST GRAND FORKS MONTHLY REPORT - JANUARY 2015 WIM Site Location WIM #31 is located on US 2 at mile post 8.0, southeast of

More information

increase of over four per cent compared to the average of $409,058 reported in January 2010.

increase of over four per cent compared to the average of $409,058 reported in January 2010. SINGLE FAMILY RESIDENTIAL BREAKDOWN uary 211 26.8 % 1.7 % 7.%.4%.1 % Good Start to 211 TORONTO - February 4, 211 Greater Toronto REALTORS reported 4,337 transactions through the TorontoMLS system in uary

More information

Projected 2011 Missouri River Flood Elevations

Projected 2011 Missouri River Flood Elevations Projected 2011 Missouri River Flood Elevations Kansas City District, US Army Corps of Engineers The following table presents two water surface profiles based on the likely range of flows that are expected

More information

Local Market Update February 2013

Local Market Update February 2013 Local Market Update February 213 February sales of single-family homes reported in Lucas and Upper Wood County by the Toledo Board of REALTORS totaled 315. This was unchanged compared to February of 212.

More information

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT

ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS VAUXHALL WASTEWATER TREATMENT PLANT 2013 ANNUAL REPORT FEBRUARY 2014 Vauxhall Wastewater Treatment Plant 2013

More information

Probability based Load Rating

Probability based Load Rating Probability based Load Rating Dennis R. Mertz, Ph.D., P.E. Center for Innovative Bridge Engineering University of Delaware Fundamentals of LRFR Part 1 Introduction to Load Rating of Highway Bridges 1-2

More information

Appendix I. Canning River Fan Stream Data

Appendix I. Canning River Fan Stream Data Appendix I Canning River Fan Stream Data Table 1: Available Stream Width and Bankfull Data Collected on the Canning River Fan Within 5 Miles of the Coast Stream Width (ft) Ordinary Top of Flood- Site

More information

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE

AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE AVERAGE DELAY PER VEHICLE EXISTING CONDITIONS AND NO BUILD ALTERNATIVE EXISTING CONDITIONS (1) NO BUILD ALTERNATIVE () Compared to existing conditions Peak Hour/Train Scenario No Train 1 With Train No

More information

Local Market Update 2012 Year In Review

Local Market Update 2012 Year In Review Northwest Area Home Sales for the Year 2012 Sales of single-family homes reported in Toledo and the surrounding area by the Toledo Board of REALTORS totaled 6,793. This was an increase of 6% compared to

More information

Hurricane Gustav & Ike Impacts to U.S. Petroleum Supply and Infrastructure Jeremy J. Cusimano Office of Petroleum Reserves Washington, DC

Hurricane Gustav & Ike Impacts to U.S. Petroleum Supply and Infrastructure Jeremy J. Cusimano Office of Petroleum Reserves Washington, DC Click to edit Master title style Hurricane Gustav & Ike Impacts to U.S. Petroleum Supply and Infrastructure Jeremy J. Cusimano Office of Petroleum Reserves Washington, DC Hurricane Gustav and Ike Impacts

More information

Design Criteria Data

Design Criteria Data BURLINGTON VT Latitude = 44.47 N WMO No. 72617 Longitude = 73.15 W Elevation = 341 feet Period of Record = 1973 to 1996 Average Pressure = 29.61 inches Hg Design Criteria Data Mean Coincident (Average)

More information

SunZia Southwest Transmission Project

SunZia Southwest Transmission Project SunZia Southwest Transmission Project SunZia Project Update for the Southern Arizona Economic Development Group September 12, 2017 SUNZIA SOUTHWEST TRANSMISSION PROJECT SEPTEMBER 12, 2017 0 SouthWestern

More information

Design Criteria Data

Design Criteria Data RAPID CITY SD Latitude = 44.5 N WMO No. 72662 Longitude =3. W Elevation = 3169 feet Period of Record = 1973 to 1996 Average Pressure = 26.67 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data COLUMBIA SC Latitude = 33.95 N WMO No. 7231 Longitude = 81.12 W Elevation = 226 feet Period of Record = 1973 to 1996 Average Pressure = 29.8 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data PHILADELPHIA PA Latitude = 39.88 N WMO No. 7248 Longitude = 75.25 W Elevation = 3 feet Period of Record = 1973 to 1996 Average Pressure = 29.98 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data HONOLULU/OAHU HI Latitude = 21.35 N WMO No. 91182 Longitude =157.9 W Elevation = 16 feet Period of Record = 1967 to 1996 Average Pressure = 29.96 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data MACON/LEWIS WILSON GA Latitude = 32.7 N WMO No. 72217 Longitude = 83.65 W Elevation = 361 feet Period of Record = 1973 to 1996 Average Pressure = 29.66 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data PIERRE SD Latitude = 44.38 N WMO No. 726686 Longitude =1.2 W Elevation = 1742 feet Period of Record = 1973 to 1996 Average Pressure = 28.1 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data INDIANAPOLIS IN Latitude = 39.73 N WMO No. 72438 Longitude = 86.27 W Elevation = 87 feet Period of Record = 1973 to 1996 Average Pressure = 29.15 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data OKLAHOMA CITY OK Latitude = 35.4 N WMO No. 72353 Longitude = 97.6 W Elevation = 133 feet Period of Record = 1973 to 1996 Average Pressure = 28.62 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data ANCHORAGE AK Latitude = 61.17 N WMO No. 7273 Longitude =15. W Elevation = 131 feet Period of Record = 1973 to 1996 Average Pressure = 29.6 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data DENVER/STAPLETON CO Latitude = 39.75 N WMO No. 72469 Longitude =14.8 W Elevation = 5332 feet Period of Record = 1973 to 1995 Average Pressure = 24.66 inches Hg Design Criteria Data Mean Coincident (Average)

More information

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016

VIRGINIA RAILWAY EXPRESS MANASSAS PARK STATION PARKING EXPANSION. Site Evaluation & Recommendation. October 18, 2016 MANASSAS PARK STATION PARKING EXPANSION Site Evaluation & Recommendation October 18, 2016 1 INFORMATION ITEM Project Overview Parking Demand Site Evaluation VRE Recommended Preferred Alternative Next Steps

More information

Experimental and Analytical Study of a Retrofitted Pin and Hanger Bridge

Experimental and Analytical Study of a Retrofitted Pin and Hanger Bridge Lehigh University Lehigh Preserve ATLSS Reports Civil and Environmental Engineering 12-1-2004 Experimental and Analytical Study of a Retrofitted Pin and Hanger Bridge Robert J. Connor Bridget Webb Ian

More information

Design Criteria Data

Design Criteria Data JACKSONVILLE FL Latitude = 3.5 N WMO No. 7226 Longitude = 81.7 W Elevation = 3 feet Period of Record = 1973 to 1996 Average Pressure = 3.1 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data MEDFORD/JACKSON CO. OR Latitude = 42.37 N WMO No. 72597 Longitude =122.8 W Elevation = 1329 feet Period of Record = 1973 to 1996 Average Pressure = 28.61 inches Hg Design Criteria Data Mean Coincident

More information

Design Criteria Data

Design Criteria Data SPOKANE WA Latitude = 47.63 N WMO No. 72785 Longitude =117.5 W Elevation = 2366 feet Period of Record = 1973 to 1996 Average Pressure = 27.5 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data LOUISVILLE/STANDIFORD KY Latitude = 38.18 N WMO No. 72423 Longitude = 85.73 W Elevation = 489 feet Period of Record = 1973 to 1996 Average Pressure = 29.49 inches Hg Design Criteria Data Mean Coincident

More information

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008

CCoWS. Central Coast Watershed Studies. Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008 Central Coast Watershed Studies CCoWS Summary of Precipitation and Streamflow for Potrero and San Clemente Creeks in Water-Year 2008 Santa Lucia Preserve Monterey County, California Publication No. WI-2009-01

More information

Design Criteria Data

Design Criteria Data DAYTON/JAMES M COX OH Latitude = 39.9 N WMO No. 72429 Longitude = 84.2 W Elevation = 14 feet Period of Record = 1973 to 1996 Average Pressure = 28.95 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data SPRINGFLD MO Latitude = 37.23 N WMO No. 7244 Longitude = 93.38 W Elevation = 127 feet Period of Record = 1973 to 1996 Average Pressure = 28.66 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data BIRMINGHAM AL Latitude = 33.57 N WMO No. 72228 Longitude = 86.75 W Elevation = 63 feet Period of Record = 1973 to 1996 Average Pressure = 29.36 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Transportation Improvement Program (TIP) Candidate Project List for Public Review

Transportation Improvement Program (TIP) Candidate Project List for Public Review 2011-2014 Transportation Improvement Program (TIP) Candidate List for Public Review Table 1 Annual Listing Of Federal Aid Obligation For Federal Fiscal Year 2010 North Dakota s Number Transit 410083 Transit

More information

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25

PARAPETS / RAILS / MEDIANS / SIDEWALKS TABLE OF CONTENTS CHAPTER 25 TABLE OF CONTENTS CHAPTER 25 FILE NO. TITLE DATE TABLE OF CONTENTS AND INTRODUCTION 25.TOC-1 Table of Contents Chapter 25... 08Aug2018 25.00 Introduction Chapter 25... 03May2018 VDOT STANDARD PARAPETS

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS THE PROJECT Last updated on 9/8/16 FREQUENTLY ASKED QUESTIONS What s happening on Highway 169? The Minnesota Department of Transportation (MnDOT) is planning to rebuild and repair the infrastructure on

More information

Job Report. Bosphorus Bridge, Turkey

Job Report. Bosphorus Bridge, Turkey Bosphorus Bridge, Turkey Bridge length: 1 400 m Bridge width: 59 m Dimensions bridge elements: 59.00/24.00 m Weight bridge elements: 1 000 to Lifting distance from water surface: 80.00 m Number of elements

More information

Design Criteria Data

Design Criteria Data BOSTON/LOGAN MA Latitude = 42.37 N WMO No. 7259 Longitude = 71.3 W Elevation = 3 feet Period of Record = 1967 to 1996 Average Pressure = 29.95 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data MINNEAPOLIS-ST PAUL MN Latitude = 44.88 N WMO No. 72658 Longitude = 93.22 W Elevation = 837 feet Period of Record = 1973 to 1996 Average Pressure = 29.7 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data DES MOINES IA Latitude = 41.53 N WMO No. 72546 Longitude = 93.65 W Elevation = 965 feet Period of Record = 1973 to 1996 Average Pressure = 28.96 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data MIDLAND TX Latitude = 31.95 N WMO No. 72265 Longitude =2. W Elevation = 2861 feet Period of Record = 1973 to 1996 Average Pressure = 27.3 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Design Criteria Data

Design Criteria Data NEW YORK/JOHN F KENNEDY NY Latitude = 4.65 N WMO No. 74486 Longitude = 73.78 W Elevation = 23 feet Period of Record = 1973 to 1996 Average Pressure = 29.98 inches Hg Design Criteria Data Mean Coincident

More information

Design Criteria Data

Design Criteria Data WASHINGTON/DULLES VA Latitude = 38.95 N WMO No. 7243 Longitude = 77.45 W Elevation = 322 feet Period of Record = 1973 to 1996 Average Pressure = 29.68 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data LANDER/HUNT WY Latitude = 42.82 N WMO No. 72576 Longitude =18.7 W Elevation = 5558 feet Period of Record = 1973 to 1996 Average Pressure = 24.44 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data ALBUQUERQUE NM Latitude = 35.5 N WMO No. 72365 Longitude =16.6 W Elevation = 5315 feet Period of Record = 1967 to 1996 Average Pressure = 24.72 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data DULUTH MN Latitude = 46.83 N WMO No. 72745 Longitude = 92.18 W Elevation = 1417 feet Period of Record = 1973 to 1996 Average Pressure = 28.43 inches Hg Design Criteria Data Mean Coincident (Average) Values

More information

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693.

Past Due. Account Charges. Contract Charges Security Deposit Due - Jun 09, , Customer Service. Jun 19, PAST DUE $1,693. 11983978 Jun 19, 217 1 124 958 PAST DUE $1,693.97 Meter Reading Information Meter # 55271 May 3 655 Jun 15 6642 17 days 1397 on or about Aug 15 82 Past Due Balance payable includes an amount which is payable

More information

Design Criteria Data

Design Criteria Data MINOT AFB ND Latitude = 48.42 N WMO No. 727675 Longitude =11.3 W Elevation = 1667 feet Period of Record = 1967 to 1996 Average Pressure = 28.16 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data CHARLESTON/KANAWHA WV Latitude = 38.37 N WMO No. 72414 Longitude = 81.6 W Elevation = 981 feet Period of Record = 1973 to 1996 Average Pressure = 29. inches Hg Design Criteria Data Mean Coincident (Average)

More information

Design Criteria Data

Design Criteria Data PHOENIX/SKY HARBOR AZ Latitude = 33.43 N WMO No. 72278 Longitude =112. W Elevation = 116 feet Period of Record = 1973 to 1996 Average Pressure = 28.72 inches Hg Design Criteria Data Mean Coincident (Average)

More information

Bridge Types Discussion. January 18, 2008 Oversight Team Meeting

Bridge Types Discussion. January 18, 2008 Oversight Team Meeting Bridge Types Discussion January 18, 2008 Oversight Team Meeting What do we want to accomplish? Review the type of bridges appropriate for project Examples Cost ranges Discuss staff s preliminary recommendation

More information

Terminal Alternatives

Terminal Alternatives Chapter 5 Terminal Alternatives Missoula International Airport Master Plan Update Prepared for Missoula County Airport Authority OCTOBER 2008 Contents Section Page 5 Terminal Alternatives...5-1 5.1 Terminal

More information

2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton

2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station. Prepared by: Steven Paton 0 2014 Meteorological and Oceanographic Summary for the Bocas del Toro Research Station Prepared by: Steven Paton 1 Introduction This is the second of a series of yearly reports summarising the past year

More information

Harlem Avenue between 63 rd and 65 th

Harlem Avenue between 63 rd and 65 th Harlem Avenue between 63 rd and 65 th Public Meeting #2 March 13, 2018 Summit Park District Welcome to the second Public Meeting for the preliminary engineering and environmental studies of Illinois 43

More information

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015

PDR Energy Baseline Alternative. Proposal for Discussion October 27, 2015 PDR Energy Baseline Alternative Proposal for Discussion October 27, 2015 Update Since Last Meeting Since the October 12 th Working Group Meeting Stem, Solar City, AMS and CESA have had over a half-dozen

More information

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2

Balance from your previous bill $0.00 Meter # Basic Charge: 17 $ /day 3.23* Energy charge:¹ 2 11983979 Jun 19, 217 1 124 962 Jul 11, 217 $24.34 Meter Reading Previous Bill. Balance from your previous bill $. Meter # 552711 May 3 19813 Account Account charge 12.4* Charges 17 days 82 Jun 15 19895

More information