PROJECT DATA PROJECT ADDRESS: OWNER:
|
|
- Justina Edwards
- 5 years ago
- Views:
Transcription
1 AFFORABLE STORAGE 51 UNIVERSITY AVE. "L" LOS GATOS, C (408) VICINITY MAP SITE PROJECT DIRECTORY ARCHITECT: KOHLSAAT & ASSOCIATES 51 UNIVERSITY AVENUE, SUITE L LOS GATOS, CA TEL: (408) PROJECT ADDRESS: OWNER: PROJECT DATA APN: ZONING: OCCUPANCY GROUP: CONSTRUCTION TYPE: GROSS & NET SITE AREA: AVERAGE SLOPE: PARKING SPACES: PROPOSED PARKING SPACES: REMODELED 649 UNIVERSITY AVENUE LOS GATOS, CA FOX CREEK FUND, LLC LOS GATOS BLVD SUITES LOS GATOS, CA (650) & LM B2 VB SPRINKLERED 13,724 SF 0% 10 SPACES (1 ACCESSIBLE) 12 SPACES (2 ACCESSIBLE) A1 A2 A3 A4 A5 A6 A7 SHEET INDEX COVER SHEET & SITE PLAN SITE PLAN & RO PLAN ASBUILT FLOOR PLANS PROPOSED FLOOR PLANS ASBUILT & PROPOSED FRONT & LEFT ELEVATIONS ASBUILT AND PROPOSED REAR & RIGHT ELEVATIONS WALL SECTION & STREETSCAPE NOTES THE STRUCTURE IS EQUIPPED WITH A FIRE SPRINKLER SYSTEM. ANY INTERIOR MODIFICATIONS MAY REQUIRE MODIFICATION TO THIS SYSTEM. A STATE CALIFORNIA LICENSED (C16) FIRE PROTECTION CONTRACTOR SHALL SUBMIT PLANS, CALCULATIONS, A COMPLETED PERMIT APPLICATION AND APPROPRIATE FEEES TO THIS DEPARTMENT FOR REVIEW AND APPROVAL PRIOR TO BEGINNING THEIR WORK. THE OWNER(S), OCCUPANT(S) AND ANY CONTRACTOR(S) OR SUBCONTRACTOR(S) ARE RESPONSIBLE FOR CONSULTING WITH THE WATER PURVEYOR RECORD IN ORDER TO DETERMINE IF ANY MODIFICATION OR UPGRADE WATER SERVICE IS REQUIRED. THE BUILDING IS EQUIPPED WITH SMOKE/HEAT DETECTION DEVICES. ANY CHANGE TO THE INTERIOR MAY REQUIRE RELOCATION AND/OR ADDITIONAL DEVICES. ALL SUCH WORK MUST BE PERFORMED BYA PROPERLY LICENSED CONTRACTOR AND THEY MUST SUBMIT PLANS, CALCULATIONS, A COMPLETED PERMIT APPLICATION AND APPROPRIATE FEES TO THIS DEPARTMENT FOR REVIEW AND APPROVAL PRIOR TO BEGINNING THEIR WORK. FLOOR AREAS: TOTAL AREAS BY USE: FICE PARKING SPACES: FICE TOTAL PARKING SPACES *5,911 SF 6,478 SF 12,389 SF 1,295 SF 4,616 SF 0 SF CONVERTED <687 SF> 0 SF <687 SF> <113 SF> *<1,510 SF> SF 9,584 / 2,350 = ,182 / 250 = / 300 = PROPOSED 5,224 SF 6,478 SF 11,708 SF 1,182 SF 3,106 SF 924 SF 6,478 SF 0 SF * 687 SF WHICH IS SPACE CONVERTED TO PARKING ARE 6,478 SF SCOPE WORK A REMODEL TO A COMMERCIAL BUILDING WHICH INCLUDES A REMODEL THE FRONT FACADE, REALLOCATION 680 SF SPACE TO FICE SPACE, (3) NEW PARKING SPACES, REPLACEMENT ALL WINDOWS AND DOORS, AND APPROX. 18" EXTENSION TO THE PARAPET AROUND THE ENTIRE PERIMETER. A1 1
2 (E) RO DRAINS RAISE PARAPET 18" REMOVED SLOPED RO & RAISE PARAPET TO LINE UP W/ PERIMETER (1) ADDITIONAL STANDARD PARKING SPACE (1) ADDITIONAL VAN ACCESSIBLE PARKING SPACE 50.00' DRIVEWAY 15' SETBACK 8'6" 1'6" 48.33' (E) DRIVEWAY TO REMAIN MOVE TRASH ENCLOSURE 18", PROVIDE RO AND DRAINAGE (E) LOADING SPACE CURB 51 UNIVERSITY AVE. "L" LOS GATOS, C (408) CANTILEVER 18' RAISE PARAPET 18" (E) LOWSLOPE, BUILTUP RO (E) SKYLIGHTS PARAPET WALL AND SLOPED RO TO BE REMOVED CELLULAR COMMUNICATIONS TOWER RAISE PARAPET 18" RAISE PARAPET 3 RELOCATED FICE SPACE CONVERTED TO ELEC. METER, POWER PANEL,& GAS METER NEW LANDSCAPING TO SCREEN POWER PANEL AND METERS LANDSCAPE AREA ' REMODELED COMMERCIAL BUILDING 50.00' WM FICE SPACE SIDEWALK 2' 16' 25' 15' SETBACK 5' 9' 5' 8'6" 48.33' ' (10) PARKING SPACES,TO BE 8'6" WIDE HALF COMMUNITY USE AREA FOR FICE & (N) 5' WIDE PATH ACCESSIBLE PARKING SPACE TO BE REGRADED LEVEL W/ INTERIOR F.F. CANTILEVER CONVERTED TO (E) FIRE SPRINKLER RISER (E) DRIVEWAY TO REMAIN (E) STREET TREE TO REMAIN NEW FRONT FACADE WALL RO PLAN REMOVED SLOPED RO, EAVE AND GUTTER SCALE: 1/8" = 1' ELEC/CABLE/TEL PROVIDED UNDERGROUND CURB & GUTTER (E) TRELLIS AND GABLE ENTRY RO ABOVE TO BE REMOVED (N) AWNING AT ENTRY * ALL UTILITIES IN LOCATIONS (E) FIRE SPRINKLER VALVE SITE PLAN SCALE: 1" = 10' A2 2
3 A 51 UNIVERSITY AVE. "L" LOS GATOS, C (408) B C FICE AREA REMOVE GABLE RO REMOVE TRELLISES A = 19'1 X 50'6" = 1, SF B = 71'2" X 56'6" = 4, SF C = 78'6" X 18'6" = 1, SF TOTAL 2ND FL AREA = 6, SF ASBUILT PLAN SCALE: 1/8" = 1' FICE AREA ASBUILT FIRST FLOOR PLAN SCALE: 1/8" = 1' A3 3
4 (1) NEW STANDARD PARKING SPACE 1'9" 18' 4'3" 9' 8' 9' 1'6" (1) NEW VAN ACCESSIBLE PARKING SPACE 51 UNIVERSITY AVE. "L" LOS GATOS, C (408) FICE AREA (N) ENTRY LOCATION TO FICE AREA HALF COMMUNITY USE AREA FOR FICE & NEW FRONT FACADE WALL PROPOSED PLAN SCALE: 1/8" = 1' TO BE CONVERTED TO AREA RELOCATED FICE AREA LOBBY PROPOSED FIRST FLOOR PLAN TO BE CONVERTED TO AREA SCALE: 1/8" = 1' A4 4
5 NEW HORIZONTAL METAL ENTRY DOOR NEW FRONT FACADE WALL W/ SMOOTH STUCCO FINISH (N) WINDOWS 21'6" PARAPET 51 UNIVERSITY AVE. "L" LOS GATOS, C (408) ' PARAPET 10'6" 20'6" 6" 10'6" 22' 6" NEW SKIM COAT SMOOTH STUCCO O/ ROUGH TEXTURED STUCCO POWER PANEL, METER, AND GAS METER REPLACE ALL WINDOWS AND DOORS W/ ANODIZED ALUMINUM FRAMED WINDOWS & DOORS REPLACE (E) FRONT DOOR W/ ANODIZED ALUM. FRAMED PAIR DOORS & SIDELITE ABOVE NEW WALL SCONCES W/ SHIELDED LIGHT SOURCE NEW SLOPED METAL AWNINGS W/ METAL BRACKETS NEW DEC. STUCCO PILASTERS PROPOSED FRONT ELEVATION 21'6" (E) PARAPET 22' 6" (E) PARAPET 21'6" 10'6" NEW SKIM COAT SMOOTH STUCCO O/ ROUGH TEXTURED STUCCO 10'6" (E) LATTICES NEW DEC. STUCCO PILASTERS LOS GATOS, CA NEW SMOOTH STUCCO RAISED PARAPET WALL SCALE: 1/8" = 1' 649 UNIVERSITY AVENUE ASBUILT FRONT ELEVATION SCALE: 3/16" = 1' PROPOSED LEFT ELEVATION SCALE: 1/8" = 1' ASBUILT LEFT ELEVATION SCALE: 1/8" = 1' SHEET A5 5
6 25' (E) ELEVATOR PENTHOUSE 21'6" (E) PARAPET 22' 6" 6" 20'6" 20' (E) PARAPET 51 UNIVERSITY AVE. "L" LOS GATOS, C (408) '6" W/ SMOOTH STUCCO FINISH NEW SMOOTH STUCCO RAISED PARAPET WALL NEW SKIM COAT SMOOTH STUCCO O/ ROUGH TEXTURED STUCCO 10'6" (N) OVERHEAD GARAGE DOORS REPLACE DOORS W/ ANODIZED ALUMINUM FRAMED WINDOWS (N) DOOR W/ ANODIZED ALUMINUM FRAME NEW SLOPED METAL AWNING W/ METAL BRACKETS PROPOSED REAR ELEVATION 25' (E) ELEVATOR PENTHOUSE 21'6" (E) PARAPET 6" 22' 10'6" 6" 20'6" 20' (E) PARAPET 10'6" NEW DEC. STUCCO PILASTERS (N) DOOR W/ ANODIZED ALUMINUM FRAME REPLACE DOORS & WINDOWS W/ ANODIZED ALUMINUM FRAMED WINDOWS REPLACE ROLLUP GARAGE DOORS W/ OVERHEAD GARAGE DOORS W/ LITES (E) ELEVATOR DOOR NEW SKIM COAT SMOOTH STUCCO O/ ROUGH TEXTURED STUCCO W/ SMOOTH STUCCO FINISH NEW SLOPED METAL AWNINGS W/ METAL EACH WINDOW LOS GATOS, CA SCALE: 1/8" = 1' 649 UNIVERSITY AVENUE ASBUILT REAR ELEVATION SCALE: 1/8" = 1' PROPOSED RIGHT ELEVATION SCALE: 1/8" = 1' ASBUILT RIGHT ELEVATION SCALE: 1/8" = 1' SHEET A6 6
7 51 UNIVERSITY AVE. "L" LOS GATOS, C (408) / UNIVERSITY AVENUE BLOSSOM HILL ROAD 633/ WALL SECTION SCALE: 1/2" = 1' STREETSCAPES NEIGHBORHOOD PLAN SCALE: 1" = 20' SCALE: 1" = 40' A7 7
PROPOSED 5' HIGH RETAINING KEYSTONE WALL WITH WROUGHT IRON FENCE ON TOP OF WALL PROPOSED SITE LIGHT (TYP.) PROPOSED FIRE HYDRANT 7.0' 9.
LAND USE: VACANT AND ELECTRICAL TRANSMISSION LINES GENERAL PLAN: PLANNED COMMUNITY ZONING: PC (CDP04-01) UTILITIES 3' WIDE BIOFILTRATION WITH UNDERDRAIN. TOP ELEVATION AT 3" BELOW PARKING LOT SURFACE SITE
More informationDUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS
PRELIMINARY ENGINEERING PLANS DUNKIN DONUTS 206 EAST STATE STREET GENEVA, ILLINOIS ERIC CARLSON ARCHITECTS LOCATION MAP DRAWINGS INDE CONTACTS REV DATE NOT TO SCALE BENCHMARKS CRISSEY AVENUE IL ROUTE 38
More informationALEXANDRIA, VIRGINIA PRINCE ST. SUITE 114. ADG, INC. COPYRIGHT c. PH
1600 PRINCE ST. SUITE 114 ALEXANDRIA, VIRGINIA 22314 PH. 703.549.9556 www.archdesigngroup.com ADG, INC. COPYRIGHT c C-1 1 2 3 4 5 6 E D Tie Prop. Sidewalk, Curb & Gutter Into Existing Prop. Storm Drain
More informationSAN FRANCISCO VETERANS WAR MEMORIAL
WAR CA 94107 \\NETGEAR\Share\ S\CURRENT S\San Francisco Veterans Memorial\Post Award\SCHEMATIC DESIGN\SD Historical package\sd_historical_062612 Folder\Links\Narduli_Cochran_aerial_large.jpg 50% DEVELOPMENT
More informationBig Easy RV & Boat Storage A Green Energy Project Jana Lane Wildomar, California
Big Easy RV & Boat Storage A Green Energy Project 36215 Jana Lane Wildomar, California 1 PROJECT OVERVIEW Project Description The construction and operation of a solar generation facility consisting of
More informationFOR REFERENCE ONLY LEGEND: GENERAL NOTES: UNDERGROUND GARAGE LEVEL FLOOR PLAN DR-10-0 SCALE : 1" = 30'-0"
L:\Projects\089-0\0 Project\ Boise City\OUT\06 JUMP Design Review\Sheets\DR-0-0.dwg 6//0 :8 PM ORIGINAL SHEET SIZE: " x " Last saved by -bazild 5 7 UNDERGROUND GARAGE LEVEL FLOOR PLAN DR-0-0 SCALE : "
More informationCertificate of Appropriateness Monthly Issuance Report March 2012
3/7/2012 852 East Ocean Blvd. Adelaide Tichenor House Upgrade electrical meter and place on west elevation of garage in a new enclosure using existing materials. 3/16/2012 5725 Corso di Napoli Replace
More informationApplication for Service Residential Subdivision / Development
Application for Service Residential Subdivision / Development Please complete this application and submit the completed form and attachments to PG&E Application for Service at P.O. Box 24047 Fresno CA
More information/Volumes/work-1/e+a projects/2015 Projects/15-02-013 The Metro On Manchester - Brentwood MO/02 Schematic Design/B. Drawings/A. Archicad Files/ 8019 FAWN CT MARY SUSAN WARD FA W N CO 8015 FAWN CT MALLORY
More informationCITY OF MIAMI HISTORIC AND ENVIRONMENTAL PRESERVATION BOARD BAYSIDE HISTORIC DISTRICT PARKING DESIGN GUIDELINES
CITY OF MIAMI HISTORIC AND ENVIRONMENTAL PRESERVATION BOARD BAYSIDE HISTORIC DISTRICT PARKING DESIGN GUIDELINES Purpose and Intent The Bayside Historic District's (BHD) streetscape is irregular and differs
More informationPublic Works Right of Way Permit Application
Public Works Right of Way Permit Application City and County of Denver Public Works Permit Operations 2000 West 3rd Avenue, Room 107 Denver, CO 80223-1027 Telephone: (303) 446-3469 www.denvergov.com Application
More informationTemporary Sales Trailer Application
Development Services Department Building Division 311 Vernon Street Roseville, California 95678-2649 Temporary Sales Trailer Application General: Requests for temporary sales trailers, which comply with
More informationCODE ANALYSIS BUILDING AREA STORIES 2 BUILDING HEIGHT 25'
CODE ANALYSIS APPLICABLE CODES (*- w/ local amendments) BUILDING CODE IBC 2006 * PLUMBING CODE IPC 2006* MECHANICAL CODE IMC 2006* ELECTRICAL CODE NFPA 70 (NEC) 2008* ENERGY CONSERVATION CODE IECC 2006
More informationCENTENNIAL PARK EXPANSION
2 working days CITY ELKO EXISTING LEGEND PROPOSED CENTENNIAL PARK EXPANSION SEET LIGHT POWER POLE ELECICAL BOX 1-800-227-2600 AVOID CUTTING UNDERGROUND UTILITIES WATER VALVE GAS VALVE FIRE HYDRANT OWNER/DEVELOPER:
More informationConstruction Staging Area 4 Avenue Road
REPORT FOR ACTION Construction Staging Area 4 Avenue Road Date: September 27, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District
More informationA13 AVILA RANCH DEVELOPMENT PLAN SITE PLAN. Typical 58 R-1 Residential Street Section STREET SECTION. July 19, 2016 #
STREET SECTION SITE PLAN Typical 58 R-1 Residential Street Section 0 4 8 16 SCALE: 1 =8 (24 x36 sheet) A13 STREET SECTION SITE PLAN Typical 60 Collector Street Section 0 4 8 16 SCALE: 1 =8 (24 x36 sheet)
More informationCOMMISSION CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN AUGUST, 2017
SAN FRANCISCO PUBLIC UTILITIES COMMISSION CIVIC DESIGN REVIEW - CONCEPTUAL DESIGN AUGUST, 2017 Civic Design Review - Conceptual Design August 2017 Page 2 PROJECT BACKGROUND AND OBJECTIVE: The Central Bayside
More informationARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS
ARTICLE 8 OFF-STREET PARKING AND PRIVATE DRIVEWAY STANDARDS TABLE OF CONTENTS SECTION PAGE 8.1 GENERAL STANDARDS...8-2 8.2 PRIVATE DRIVEWAY PROVISIONS...8-4 8.3 OFF-STREET PARKING STANDARDS...8-5 8.4 OFF-STREET
More informationExpedited Permitting Process for Electric Vehicle Charging Stations
Expedited Permitting Process for Electric Vehicle Charging Stations BPC-062 Purpose: This document provides all of the needed links to forms and checklists necessary to utilize Permit Sonoma s Expedited
More informationParking Areas and Driveways for Single and Two Family Dwellings
Building Information BURNABY PLANNING AND BUILDING DEPARTMENT Parking Areas and Driveways for The purpose of this brochure is to explain to owners, designers and builders the parking and driveway requirements
More informationFOR SALE OR LEASE PORTLAND PORTAL INDUSTRIAL CENTER - PHASE II SITE. NE 172nd Place & NE 170th Place, Gresham, Oregon
NE Sandy Blvd PORTLAND PORTAL INDUSTRIAL CENTER - PHASE II NE 7nd Place & NE 7th Place, Gresham, Oregon SITE NE 7th Pl NE 7nd Pl NE 8st Ave FOR SALE OR LEASE FOR MORE INFORMATION, NTACT: Rod Brokenshire
More informationPlease Refer to Attached Sample Form
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32104-E Cancelling Revised Cal. P.U.C. Sheet No. 28312-E Electric Sample Form No. 62-0685 Application for Service
More informationCITY OF FONTANA HANDBOOK ON RESIDENTIAL DRIVEWAY APPROACH CONSTRUCTION PERMITS
CITY OF FONTANA HANDBOOK ON RESIDENTIAL APPROACH CONSTRUCTION PERMITS GENERAL INFORMATION A driveway approach is an area, construction or improvement between the roadway of a public street and private
More informationFertilizer Type B 2 CWT $ $ $60.00 $ $60.00 $ Sod Water 60 MGAL $60.60 $3, $30.00 $1, $30.00 $1,
BID TABS PROJECT 18-1029 22 nd AVENUE RECONSTRUCTION BID DATE: MAY 9, 2018 Stark Pavement Corp. Lalonde Contractors Cornerstone Pavers LLC Brookfield, WI Waukesha, WI Racine, WI Item Number Roadway Quantity
More informationANDERSON DRIVE & LANDSCAPE 10'-0" PUE SETBACK BUILDING SETBACK SIGN 20'-0" ENTRY /EXIT 71'-3" CHILD CARE CENTER 4,700 S.F. EXIT EXIT PLAYGROUND
SI GNAGE LANDSCAPE SETBACK T COMPACT 8'-0" 16'-0" LOCATION LIGHT POST LIGHT POST NEW STREET (E) STREET RELOCATE CL 36'-0" SHARED DRIVEWAY 20'-0" 6'-0" TRASH ENCLOSURE, SEE DETAIL 1/DR-2.1 20'-0" 20'-0"
More informationAppendix A ILLUSTRATIONS
Appendix A ILLUSTRATIONS Part 1 - BUILDINGS Part 2 - LOTS Part 3 - PARKING Part 4 - SCREENING Part 5 - SETBACKS/YARDS Appendix 1 Appendix 2 Part 1 BUILDINGS Appendix 3 Appendix 4 FIGURE 1.1 ATTACHED DWELLINGS
More informationGeneral Provisions. Obstructions
CHAPTER 98: STREETS AND SIDEWALKS Section General Provisions 98.01 Throwing or burning of trash on street prohibited 98.02 Tree trimmings 98.03 Snow and ice removal 98.04 Damages to bridges and culverts
More informationSidewalk Working Group Update October 22, 2018
Sidewalk Working Group Update October 22, 2018 The Neighborhood Sidewalk Repair Program & The Sidewalk Gap Program Improving Mobility Freedom in Denver Neighborhood Sidewalk Repair Program: Repairing hazardous
More informationPROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS
PROPOSED AMENDMENTS TO RESIDENTIAL PARKING STANDARDS To review the proposed amendments Approval of the amendments (5-3) Ogden City Planning is proposing several amendments and clarifications to the parking
More informationCity of Manhattan Beach Community Development
City of Manhattan Beach Community Development Phone: (310) 802-5500 FAX: (310) 802-5501 TDD: (310) 546-3501 Photovoltaic Solar Panel Plan Check Guidelines Updated: 10-01-15 ORDINANCE NO. 15-0022 MBMC 9.06
More informationSUNSET BLVD. EL. 38'-0" EL. 56'-0" EL. 38'-0" ROOF TERRACE EL. 20'-0" PLAZA EL. 0'-0" PRIVATE TERRACE EL. 47'-0" POOL 3BR-UNIT A EL.
SUNSET BLVD. -2' -2'-0" (EL. +40.00') + (EL. +4000') +'-0" 0" (EL. 40.00') (N) (N) -4'-0" (EL. +40.00') +'-0" (EL. 40.00') 0.0 0' ) 0 +2'-" 2 (EL. ( 40.0') 40.0 ) (N) (EL. 4000') 4 (EL. +4000') 4 2 +2'-0"
More informationCity of. Bird s Eye View of Pasadena, circa CAPitAL improvement PRoGRAM BUDGEt
Title pages 09 print.qnd:layout 8/7/8 : PM Page 7 City of Bird s Eye View of Pasadena, circa 890-90 CAPitAL improvement PRoGRAM BUDGEt FISCAL YEAR 09-0 The Capital Improvement Program (CIP) is a 5-year
More informationNOTICE OF PUBLIC HEARING ANAHEIM PUBLIC UTILITES BOARD IS HOLDING A PUBLIC HEARING ON THE FORMATION OF UNDERGROUND DISTRICT No. 66 (BEACH) TO UNDERGROUND OVERHEAD FACILTIIES, INCLUDING POWER AND COMMUNICATION
More informationElectric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections. Minnesota North Dakota South Dakota
Electric Service Conversion Overhead-to-Underground Xcel Energy Electric Connections Page 1 of 7 17-02-420 Electric Service Conversion Overhead-to-Underground Overview and process of converting residential
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 4, 2016 TO: ACTION TRANSMITTAL No. 2016-19 TAC Funding and Programming Committee PREPARED BY: Joe Barbeau, Senior
More information24" DLO 24" DLO 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 1/2" " FRAME DIMENSION 34" DAYLITE OPENING 1/8" 85 1/2" FRAME DIMENSION 3 OPP 3.
SERIES 87-AR SINGLE AND DOUBLE BUTT HINGE HUNG DOORS W/ & W/O SIDELITE(S), W/ & W/O TRANSOM SHOWN WITH OPTIONAL CRL WOOD FLUSH DOOR SYSTEM DESIGNED TO WRAP -7/8" ( MM) WALLS DESIGNED FOR TOP LOAD GASKETS
More informationChapter PARKING REGULATIONS
17.112.010 Chapter 17.112 PARKING REGULATIONS Sections: 17.112.010 Scope of Regulations Applicability. 17.112.020 Schedule of Off-Street Parking Requirements. 17.112.030 Off-Street Loading Requirements.
More informationBIDDER'S PROPOSAL (continued) CITY OF BERKELEY BID PROPOSAL ITEM NO. A: BASE BID
SPECIFICATION 16-11031-C CITY OF BERKELEY BID PROPOSAL A: BASE BID 1 MOBILIZATION 1 LS 2 TRAFFIC CONTROL 1 LS 3 CONTRACTOR INFORMATION SIGN 2 EA 4 CONSTRUCTION AREA SIGN 18 EA 5 PROJECT IDENTIFICATION
More informationCanfield Apartments Canfield Ave. Los Angeles, CA PROPERTY HIGHLIGHTS
Canfield Apartments 3766 Canfield Ave. Los Angeles, CA 90034 PROPERTY HIGHLIGHTS Dominick Faraone Investment Sales Associate 3107958567 dom@mdrealtycorp.com 3627 Motor Avenue Centrally located in Palms
More information3. Application Fees, Certificate Of Insurance & Performance Bond
SUBSECTION 13.10 CONSTRUCTION OF DRIVEWAYS 13.10A PERMIT REQUIREMENTS 1. General A driveway or access road serving private property and intersecting with a town road shall be constructed in such a manner
More informationSTANDARD DRAWING INDEX
ATTACHMENT B STANDARD DRAWING INDEX DESCRIPTION EXISTING DRAWING NO. GENERAL Typical Layout for Improvement Plans City of Stockton Standard Border and Title Block for 8 1/2 x11 Sheet City of Stockton Standard
More informationDESIGN STANDARDS SECTION DS 3 STREETS
DESIGN STANDARDS SECTION DS 3 STREETS DS 3-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of public streets. These standards are intended to
More informationCity of Manhattan Beach Community Development
City of Manhattan Beach Community Development Phone: (310) 802-5500 FAX: (310) 802-5501 TDD: (310) 546-3501 Photovoltaic Solar Panel Plan Check Guidelines Updated: 12-20-16 ORDINANCE NO. 15-0022 MBMC 9.06
More informationRequest for Statements of Qualification Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV
Gardnerville Station (Eagle Gas Station Redevelopment Project) 1395 Highway 395 N Gardnerville, NV Issued: Monday, Site Tour: Friday, January 30, 2015 at 10:00 a.m. Submittal Deadline: 5:00 p.m. on Friday,
More informationWestwood Blvd. Apartments
Westwood Blvd. Apartments 3610 Westwood Blvd. PROPERTY HIGHLIGHTS Dominick Faraone Investment Sales Associate 3107958567 dom@mdrealtycorp.com 3627 Motor Avenue Great location in Palms adjacent to Culver
More informationChapter 5. General Site and Building Elements
501 General Chapter 5. General Site and Building Elements 501.1 Scope. General site and building elements required to be accessible by the scoping provisions adopted by the administrative authority shall
More informationCommercial Plan Submittal Form Utility Service Requirements
Commercial Plan Submittal Form Utility Service Requirements City s Electrical Required: In order to proceed with a design for new service, modified service or additional service to a commercial or multifamily
More informationCHAPTER 19 PARKING TABLE OF CONTENTS
CHAPTER 19 PARKING TABLE OF CONTENTS Section Title Page 19.1 General... 19-1 19.2 On-Street Parking... 19-1 19.2.1 Parallel Parking...19-1 A. No Parking Signs...19-1 19.2.2 Non-Parallel Parking...19-1
More informationC Tenant Improvements 2,901, C Fire Standpipe Repairs and Fire Sprinkler System Upgrade for
GENERAL FUND (01) C017060.589000 EXPO Maintenance Yard Buffer Park 440,000 - - - C019098.589000 Downtown Santa Monica Temporary Use TOD Site 836,400 - - - M014078.589000 Swim Facilities Planned Maintenance
More information923 N. Ardmore Avenue
N. Ardmore Avenue LOS ANGELES Great Fourplex in a Popular Neighborhood Duplex and Two Bungalows $1,350,000 Consisting of a Duplex and two Bungalows, this fourplex offers tenants privacy, fruit trees and
More informationClear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL
Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL 6800-6880 N. Broadway, Denver CO 80221 Lease rates & terms AVAILABLE 6860 6850 3.1 Acre Build-To-Suit Site 6800 8 High-quality buildings
More information400 SOUTH MAIN VICINITY MAP SITE PLAN ARCHITECTS ENGINEERS SURVEYORS PLANNERS FREDERICK WARD ASSOCIATES. frederickward.com 1"=2000'
M:\PROJECTS\505.0 SCHEFFENACKER 400 S MAIN ST\DESIGN\\CAD\SITE AND LANDSCAPE\SP0 - SITE PLAN.DWG, SP-4X36, /9/07 :05 PM,ddw W " = 0' DESIGNED BY: VV/DW VV/DW SHEET OF 3RD ELECTION DISTRICT SS PO Box 77,
More informationTown of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166
Town of Medley Office of Capital Projects & Development Services 7777 NW 72 Avenue, Medley, Florida 33166 Date: August 10, 2016 Subject: Bid for Construction of NW 89 th Avenue, NW 93 rd Street and NW
More informationPARKING REGULATIONS MAP
2.6. PARKING REGULATIONS This section contains development standards and design guidelines regulating the creation of new parking facilities. Regulations for the provision of an adequate, but not excessive
More information77'-0" 77'-0" 40'-4" 9'-0" 0'-0" 1'-4" Site Plan Maximum Impervious Coverage Scale: /2"=1'-0" SET BACK (REAR) SET BACK (FRONT) 140'-0" 60'-8" 52'-4" 27'-0" 11'-8" 11'-8" 8'-8" 1'-8" FUTURE POOL POOL DECK
More information1007 Elwell Court Palo Alto, CA 94303
1007 Elwell Court Palo Alto, CA 94303 August 1, 2016 CONTENTS IMPORTANT MESSAGE ABOUT REVISIONS NOTABLE CHANGES FROM THE PREVIOUS RELEASE INTRODUCTION ELECTRIC UTILITIES SERVICE DIRECTORY SECTION I TEMPORARY
More informationFor Sale Auto Body Shop
For Sale Auto Body Shop AUTO BODY SHOP 1570 Tollhouse Road Clovis, CA 93611 Investment Overview Sale Price: $525,000 Lot Size: Building Size: 0.54 Acres 4,500 SF Grade Level Doors: 4 Year Built: 2007 Zoning:
More informationM1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT MANCHESTER ROAD DES PERES, MO 63131
M1 BANK PETITION FOR FINAL SITE PLAN APPROVAL & CONDITIONAL USE PERMIT 11679 MANCHESTER ROAD DES PERES, MO 63131 N. BALLAS RD BOPP RD PRELIMINARY - NOT FOR CONSTRUCTION SHEET INDEX - SITEPLAN & CUP G-0
More informationRESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS SECTION II RESIDENTIAL UNDERGROUND AND OVERHEAD SERVICE REQUIREMENTS
SECTION II This section discusses the City of Palo Alto's requirements for establishing electric service to new or upgraded residential installations. The same requirements apply to both underground and
More informationLake County Building Department
Lake County Building Department P.O. Box 513 505 Harrison Avenue Leadville, CO 80461 (719) 486-2875 Fax (719) 486-4179 Driveway Permit (Resolutions 98-15 and 98-35) PERMIT: To connect a driveway or parking
More informationElectric Service Guide. Residential
Electric Service Guide Residential January 1, 2017 Contact MID s Electric Engineering Department (electric.standards@mid.org) with any questions about this Service Guide. Check MID s website (www.mid.org)
More informationRESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS SECTION VI RESIDENTIAL SUBDIVISION SERVICE REQUIREMENTS
SECTION VI SERVICE REQUIREMENTS This section discusses the requirements for establishing electric service to new residential subdivisions in Palo Alto. Subdivisions are normally constructed on dedicated
More informationCITY OF ESCONDIDO Planning Division 201 North Broadway Escondido, CA (760) Fax: (760)
CITY OF ESCONDIDO Planning Division 201 North roadway Escondido, CA 92025-2798 (760) 839-4671 Fax: (760) 839-4313 PARALLEL PARKING PERMIT FOR INTERNAL USE ONLY Case No: Date Submitted: Fees Submitted:
More informationSOLID WASTE AND RECYCLING ENCLOSURE STANDARDS
SOLID WASTE AND RECYCLING ENCLOSURE STANDARDS Kitsap County Public Works July 2019 If you have any questions regarding the Standards or have recommendations for improvement, please contact: Sarah Olson
More informationSolid Waste Service Company Review and Collection Space Standards
Handout 109 Solid Waste Service Company Review and Collection Space Standards Development Services Department 1775 12 th Ave. NW P.O. Box 1307 Issaquah, WA 98027 425-837-3100 DSD@issaquahwa.gov Review
More informationINTEROFFICE MEMORANDUM
INTEROFFICE MEMORANDUM DATE: November 9, 2010 TO: Public Works Commission FROM: Catherine Chertudi, Environmental Programs Manager SUBJECT: Solid Waste Policy 1 Commercial Service Location Design Standards
More informationChapter. Parking SECTION OFF STREET PARKING AND LOADING REQUIREMENTS
Chapter 14 Parking It is the purpose and intent of this Ordinance that parking and loading areas be provided and adequately maintained in every zoning district for the purposes of promoting safe and efficient
More informationa space for life WEAVER BARNS PRICE LIST 2016
a space for life WEAVER BARNS PRICE LIST 2016 WEAVER BARNS FACT SHEET Why Should You Choose a Weaver Barn? The Weaver Barns Difference FLOORING FRAMING Weaver Barns EXCLUSIVE FEATURES 1 x 6 Cedar Fascia
More informationPUBLIC FACILITIES DIRECTORY
PUBLIC FACILITIES DIRECTORY PROPOSED TOWN INFRASTRUCTURE PROJECT DIRECTORY 2002 Town Beautification E 6 2105 Old Library Re-use E 8 2103 HVAC Upgrades Old Library E 10 2302 Building Replacement at Corporation
More informationVan Ness Transit Corridor Improvement Project. Engineering, Maintenance and Safety Committee March 25, 2015
Van Ness Transit Corridor Improvement Project Engineering, Maintenance and Safety Committee March 25, 2015 Project Need 16,000 daily passenger boardings within the project corridor Average bus speed 8
More informationSITE PLANS ASSISTED LIVING REDEVELOPMENT
SITE PLANS ASSISTED LIVING REDEVELOPMENT PROJECT SUMMARY TOTAL LOT AREA - 39.0 ACRES EXISTING BUILDING FOOTPRINT 48,060 S.F. PROPOSED 25,869 S.F. TOTAL BUILDING FOOTPRINT 73,929 S.F. ZONING COMPLIANCE
More informationInvestment Portfolio. 48 Spiller Dr & 600 County Rd Westbrook, ME Property Highlights. Property Description. For Sale Industrial Buildings
For Sale Industrial Buildings $12,500,000 Investment Portfolio 48 Spiller Dr & 600 County Rd Westbrook, ME 04092 Property Highlights 134,000± SF Building on 9.47± acres 28,580± SF Building on 3.06± acres
More information5000 Series Rotors 5000, Plus, PRS, SAM
Tech Spec 5000 Series Rotors 5000, Plus, PRS, SAM Built from top to bottom with the contractor in mind, the Rain Bird 5000 Series product line is the durable, reliable rotor for residential and commercial
More informationPlan Check Policies and Guidelines
Plan Check Policies and Guidelines VII. A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider. Transportation
More informationARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES
ARTICLE X OFF-STREET AUTOMOBILE PARKING AND LOADING AND UNLOADING SPACES Section 1000. Off-Street Automobile Parking and Loading and Unloading Spaces Required Off-street automobile parking and loading
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 H DATE: August 10, 2017 ****************************************************************************** SUBJECT: SDSU Pugsley Center Renovation
More information5.12. DOWNTOWN AREA INFILL INCENTIVE DISTRICT (IID)
5.12. DOWNTOWN AREA INFILL INCENTIVE DISTRICT (IID) UNIFIED DEVELOPMENT CODE: 5.12.1 Purpose 5.12.1. PURPOSE The primary purpose of the Downtown Area Infill Incentive District (IID) is to encourage redevelopment
More informationFair Park - Capital Needs Inventory
: 1: Permanent Facility with Occupant; : Year-Round Visitation; 3: Potential to Attract Year-Round or Tenants; 4:, Security, Code, ADA; 5: Urgent Major Maintenance 1 3 4 July 10, 017- DRAFT PRIORITIES
More informationPublic Works Department, Capital Improvement Program Project Tracking
Community Facilities Name CF-01 Eastshore State Park/Powell Street Bioswale Seeking grant funding. TT CF-02 South Bayfront Bridge and Horton Landing Park CF-03 / - 04 Transit Center Updated plans are being
More informationORDINANCE NUMBER 3424
ORDINANCE NUMBER 3424 AN ORDINANCE OF THE MISSOULA CITY COUNCIL AMENDING TITLE 12 STREETS, SIDEWALKS AND PUBLIC PLACES TO ADD CHAPTER 12.22 ENTITLED "PARKING FACILITIES," SECTIONS 12.22.010 THROUGH 12.22.130
More informationPROJECT PRESENTATION NOBE II 14 JULY 2014
PROJECT PRESENTATION NOBE II 14 JULY 2014 Map 8: Building Height Plan Map 10: Density and Height White Flint Sector Plan April 2010 Approved and Adopted 19 WHITE FLINT SECTOR PLAN - APRIL 2010 nobe ii
More informationExpo Light Rail Line Project Status Update Meeting Holman United Methodist Church January 27, 2011
Project Status Update Meeting Project Status Update Meeting Holman United Methodist Church January 27, 2011 Phase 1 Project Description Phase 1 from Downtown Los Angeles to Culver City: 8.6 mile corridor
More informationAssisted Living / Memory Care - South Forsyth
! Assisted Living / Memory Care - South Forsyth LOCATION: 6388 Post Road, Cumming, GA 30040 - Forsyth County Parcel ID - 037-012 2 nd District, 1 st Section, Land Lot 317 SIZE: 5.4723 acres +/- ZONING:
More informationARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS
ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016153 TRACS No. Project No. County District Gross
More informationSection III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year
Section III Transportation and Stormwater Projects Receiving Additional Funding Project Detail Sheets Alphabetical Listing by Project Name Five Year Capital Improvement Plan FY2015/2016 through FY2020
More informationA-001 IRISH CULT URAL CENT ER HUDSON VALLEY COVER SHEET SHEET INDEX. Name. Abeel Street CONSULTANTS
SHEET INEX & Planning PLLC - BIM Server: HMKBIM - BIM Server /Ashokan/ICCHV - A-00 COVER SHEET - Printed by Brad Will, AIA on Monday, ecember, 0 at : PM I Monday, ecember, 0 Ô CULT URAL CENT ER Name A-00
More informationMUNCIPAL WORK PROGRAMS FY 2015/ /20. MPO Transportation Improvement Program 2015/ /20 Page 9-1
MUNCIPAL PROGRAMS BELLEAIR 2000 Curb/Sidewalk 35 2001 Roadway Projects 2,500 = ; = Local Funds 35 MPO Transportation Improvement Program 2015/16 2019/20 Page 9-1 MUNCIPAL PROGRAMS BELLEAIR BEACH 3000 Resurface/curb
More informationCity of Houston Fondren Road Paving and Drainage
City of Houston Fondren Road Paving and Drainage From Braeswood Boulevard to Creekbend Drive TRC Meeting March 2016 Location and Vicinity Maps City Council District K Key Map 530 Z, 530 Y Land Use Commercial
More informationCORE AREA SPECIFIC PLAN
only four (A, B, D, and F) extend past Eighth Street to the north, and only Richards Boulevard leaves the Core Area to the south. This street pattern, compounded by the fact that Richards Boulevard is
More informationPlan Check Policies and Guidelines
VIII. TRAFFIC SIGNING AND STRIPING PLANS A. INTRODUCTION Traffic signing and striping plans are required for all General Plan Roads and any roadway that is 56-foot wide curb-to-curb (78 R/W) or wider.
More informationCondition of Approval Building Standards Development Planning Engineering TRCA PowerStream Ministry of Transportation Other -
File: A207/14 Item # 19 Ward #3 Applicant: MARCO AND LUCIA UNCAO Address: Agent: 27 Templewood Crescent, Woodbridge NONE Adjournment Status: Notes: Comments/Conditions: Commenting Department Comment Condition
More informationSCHEDULE OF CAPITAL PROJECTS BY FUND
CIP Project Funding Summary 5 7 8 9 10 11 Streets & Highways Fund 3,950,541 2,148,259 1,250,000 1,290,000 1,250,000 9,888,800 Prop C Fund 20,936,435 700,000 700,000 700,000 700,000 23,736,435 Measure R
More informationNEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis
Gibson Traffic Consultants 2802 Wetmore Avenue Suite 220 Everett, WA 98201 425.339.8266 NEWCASTLE MIDDLE SCHOOL Traffic Impact Analysis Prepared for: Renton School District Jurisdiction: City of Newcastle
More informationGREAT NECK UNION FREE SCHOOL DISTRICT
GREA NECK UNION FREE SCHOOL DISRIC December March 13, 12, 2017 2016 RECOMMENDED BOND IEMS BBS ARCHIECS, LANDSCAPE ARCHIECS & ENGINEERS, P.C. BBS COS ELEMENS "A LIS" GREA NECK PUBLIC SCHOOLS BOND REFERENDUM
More informationSITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING
SITE PLAN REVIEW COMMITTEE MEETING #3 VIRGINIA HOSPITAL CENTER (SP #177 AMENDMENT) Thursday, March 8, 2018 SITE PLAN UPDATES & PARKING 2 Site Plan Modifications From SPRC #1 &2 3 Current 4.1 Submission
More informationCapital Improvement Projects Status Report December 2014 (Actuals through October) Percent Design Complete. Design Finish. Construction Finish
Title I. Terminals Berth 90-93 - World Cruise Center 4. B. 93 - Cruise Terminal - Customs and Border Protection Improvements Conceptual (2525300) d 11/27/14 100% N/A $140,000 $73,479 52% 5. B. 91-93 -
More information2731 Beverly Boulevard
2731 Beverly Boulevard 65 UNITS + GROUND RETAIL IN WESTLAKE 2731 Beverly Boulevard Los Angeles, CA 90057 Alex Galuz President Mixed Use Opportunity DISCLAIMER The information contained herein has been
More informationPotrero Boosters Neighborhood Association:
Potrero Boosters Neighborhood Association: Proposed UCSF Minnesota Graduate Student/Trainee Housing Building Design Presentation April 25, 2017 Key Topics 1. Introductions and Project Overview 2. UCSF
More informationBAYARD AVE STORMWATER STUDY. Commissioners Presentation November 17, :00 PM
Board of Commissioners 229 Rehoboth Avenue P.O. Box 1163 Rehoboth Beach, Delaware 19971 City of Rehoboth Beach Telephone 302-227-6181 www.cityofrehoboth.com THE COMMISSIONERS OF REHOBOTH BEACH Special
More informationExpo Light Rail Line. Expo Line Project Westside/Central Metro Service Council November 2014
Expo Line Project Westside/Central Metro Service Council November 2014 2 Expo Line Project Description Phase 2 Expo Line from Culver City to Santa Monica: 6.6 mile corridor 7 new Stations 64,000 Daily
More information