GO/GN3637. Guidance on Defective On-Train Equipment. Rail Industry Guidance Note for GO/RT3437. Published by: RSSB

Size: px
Start display at page:

Download "GO/GN3637. Guidance on Defective On-Train Equipment. Rail Industry Guidance Note for GO/RT3437. Published by: RSSB"

Transcription

1 GN Published by: Copyright 2015 Rail Safety and Standards Board Limited GO/GN3637 Guidance on Defective On-Train Equipment Issue Two September 2015 Rail Industry Guidance Note for GO/RT3437

2 Issue record Issue Date Comments One September 2013 Original document, the contents of this document were transferred from GO/RC3537 issue 5 and amended to reflect changes to GO/RT3437 and to GE/RT8000 Rule Book module TW5. Two September 2015 Amendments made to align with changes to GE/RT8000 Rule Book module TW5. Superseded documents The following Railway Group documents are superseded, either in whole or in part as indicated: Superseded documents GO/GN3637 Issue one Guidance on Defective On-Train Equipment Sections superseded All Date when sections are superseded 05 December 2015 Supply The authoritative version of this document is available at Enquiries on this document can be forwarded to enquirydesk@rssb.co.uk. Page 2 of 30

3 Contents Section Description Page Part 1 Introduction 4 G 1.1 Purpose of this document 4 G 1.2 The structure of this document 4 G 1.3 Copyright 4 G 1.4 Approval and authorisation of this document 4 Part 2 5 G 2.1 Responsibilities of infrastructure managers 5 G 2.2 Responsibilities of railway undertakings 6 Appendices Appendix A List of on-train equipment for inclusion in DOTE contingency plans 11 Appendix B List of on-train equipment to be considered for inclusion in DOTE contingency plans 24 References 30 Page 3 of 30

4 Part 1 Introduction G 1.1 G G 1.2 G G G G 1.3 G G G G 1.4 G Purpose of this document This document gives guidance on interpreting the requirements of Railway Group Standard GO/RT3437. It does not constitute a recommended method of meeting any set of mandatory requirements. The structure of this document All requirements from Railway Group Standard GO/RT3437 are reproduced with a grey background in this document. Guidance is provided as a series of sequentially numbered clauses prefixed G immediately below the greyed text to which it relates. Specific responsibilities and compliance requirements are laid down in the Railway Group Standard itself. Copyright Copyright in the Railway Group documents is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No Railway Group document (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. members are granted copyright licence in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited. In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group documents, Rail Safety and Standards Board Limited accepts no responsibility for, nor any liability in connection with, the use of such extracts, or any claims arising therefrom. This disclaimer applies to all forms of media in which extracts from Railway Group Standards may be reproduced. Approval and authorisation of this document The content of this document was approved by TOM Standards Committee on (proposed 28 July 2015). G This document was authorised by on (proposed 30 July 2015). Page 4 of 30

5 Part 2 G 2.1 G Guidance on Defective On-Train Equipment (DOTE) Responsibilities of infrastructure managers Extract from GO/RT3437 Section Review of DOTE contingency plans Infrastructure managers shall review and, if appropriate, comment, on all draft DOTE contingency plans submitted to them by railway undertakings. When an infrastructure manager is reviewing draft DOTE contingency plans, it should check that the following items are covered: a) All items of on-train equipment listed in Appendix A of GO/RT3437, and relevant to the railway undertaking, have been identified. b) Any items of on-train equipment listed in Appendix B of GO/RT3437 that the railway undertaking has decided to include. c) There are statements that identify all locations on routes used by the railway undertaking concerned, at which: i) A defective train or vehicle can be turned, re-marshalled or replaced. ii) iii) iv) A defective train or vehicle can be examined by a rolling stock technician. The defective on-train equipment can be repaired or replaced. The train or vehicle can be taken out of service. d) All maintenance depots used by the railway undertaking, and the items of equipment that can be repaired or replaced at each depot, are specified. e) All stations that are suitable for the detraining of passengers are identified (see also G 2.2.4). f) There are procedures that are designed to control any identified risks. g) There is consistency with the contents of the Sectional Appendix (where relevant). h) The procedures in the plan comply with the requirements of GO/RT3437 and, where they do not follow the additional guidance in this document, there is appropriate and sufficient evidence that the alternative arrangements will control risk to an equivalent or lower level. G An infrastructure manager may, following their review of a DOTE contingency plan, decide that it can accept the contents without further comment. The infrastructure manager should inform the railway undertaking(s) concerned if this is the case. Extract from GO/RT3437 Section Advising railway undertakings of changes to facilities Infrastructure managers shall inform railway undertakings of any changes to facilities, either temporary or permanent, that will affect the detraining of passengers at stations identified in a published DOTE contingency plan. G Changes to facilities should include, but not be limited to, the factors shown as G of this guidance note. Page 5 of 30

6 G 2.2 G G G G G G Responsibilities of railway undertakings Production of contingency plans Extract from GO/RT3437 Section Requirement for the production of a contingency plan for defective on-train equipment Railway undertakings shall produce and publish a DOTE contingency plan that describes the actions to be taken when any item of on-train equipment, as listed in Appendix A of this document, becomes defective and gives due consideration to the inclusion of the items listed in Appendix B. Each railway undertaking should arrange for a competent person(s), with a suitable knowledge of that undertaking's train operation, to produce their DOTE contingency plan. The DOTE contingency plan should describe the action to be taken when a defect is found on a train or vehicle about to enter service, or when on-train equipment becomes defective on any train or vehicle which is in service. The DOTE contingency plan should provide detailed instructions to train operators controllers and others responsible for its implementation, about the action to be taken when any item of on-train equipment specified in the plan and operated by the railway undertaking is reported as defective. These should accurately supplement the working instructions in the Rule Book, which determine the precise instructions to be given to drivers and others in each case (see G 2.2.2). Appendix A of this document lists those items of on-train equipment which have a clear interface and, therefore are within the scope of GO/RT3437. However, railway undertakings should include in their DOTE contingency plans, any additional items of ontrain equipment fitted only to specific rolling stock fleets. Appendix B provides a list of ontrain equipment that railway undertakings should consider for inclusion in their DOTE contingency plan, according to their operational circumstances. This document provides specific guidance in respect of all items of on-train equipment listed in both appendices of GO/RT3437. The following options have been provided to support railway undertakings determine, as part of their contingency plans, how best to manage trains that are found to have defective on-train equipment whilst in service: a) For the train or vehicles to proceed only as far as the next available location. b) For the train or vehicles to complete the journey it is currently on and then be allowed to make one further non-passenger journey to a maintenance depot. c) For the train or vehicles to complete its journeys for the remainder of the day provided its final journey of the day ends at a maintenance depot. G G G G The DOTE contingency plan should identify all items of on-train equipment that can be repaired or replaced on all classes of rolling stock using each maintenance depot, including main works, used by the railway undertaking. The DOTE contingency plan should state the location to which a train or vehicle, which has been permitted to enter service with defective on-train equipment, or on which ontrain equipment has become defective when in service, should proceed. When drafting DOTE contingency plans, consideration should be given to likely traffic levels. For certain on-train equipment defects, it would be consistent with a risk-based contingency plan for different arrangements to be in place on those lines identified as lightly used, as opposed to densely trafficked commuter lines. The recommendations for managing specific equipment defects set out in Appendices A and B give examples of when such differences might be applicable. The DOTE contingency plan should aim to minimise the effect on network performance of a train remaining stationary for a prolonged period. Page 6 of 30

7 G G G G G DOTE contingency plans instructions to staff The Rule Book, GE/RT8000, sets out the circumstances when trains or vehicles are permitted to enter service with defective on-train equipment and sets out the measures that should be applied in such cases. It also sets out the measures that should be applied when on-train equipment becomes defective on a train or vehicle which is in service. In some situations there may be a range of measures which can be taken. The Rule Book informs drivers that they must obtain instructions about arrangements for dealing with the train or vehicle. It should be noted that not all items of on-train equipment listed in the appendices of GO/RT3437 have related requirements in the Rule Book. Some equipment, such as Automatic Train Protection (ATP), do not have a Rule Book entry as this equipment is not in general use and is applicable to certain rolling stock types only and in certain areas. Where this is the case, the specific guidance will refer users to the alternative source of such information (such as Sectional Appendices). Use of competent people in the resolution of DOTE situations For some items of defective on-train equipment, a competent person may be used to: a) Accompany the driver in the cab, as a mitigating measure when the defect affects incab indications of signals (e.g. Automatic Warning System (AWS), Train Protection and Warning System (TPWS)) or forward visibility from the cab (the windscreen), or to monitor driver alertness (Drivers Safety Device (DSD), vigilance device). b) Travel elsewhere in the train, such as the cab of the rear (empty) unit after operation of the emergency bypass switch (EBS) following a brake defect or in passenger accommodation after failure of the passenger communication apparatus (PCA) or door-related defects. G G G G G G G Use of a competent person in the driving cab should be limited to allowing a train to reach a location where other controls, such as reforming the train, can be applied as soon as is reasonably practicable after a defect is discovered. The likelihood of driver distraction increases the longer the competent person remains in the cab. DOTE contingency plans should identify the approximate journey times for which a competent person could be used, to enable those responsible for implementing plans to have clear guidance as to the limits on such working. The railway undertaking should check that the competent person accompanying the driver has the necessary route knowledge. When the role of the competent person requires the observation of signals (for example, defective AWS, TPWS or obscured windscreen), route knowledge should be sufficient to enable the competent person to identify, and interpret correctly, the signals and other indicators applicable to the train, particularly when the route includes complex layouts. Where the defective equipment relates to driver alertness, the competent person only needs to know how to stop the train if the driver becomes incapacitated, but it would be advantageous for them to be aware what response is required to in-cab warnings, such as AWS. Where the primary purpose of a competent person is to reassure or provide information to passengers, they may remain in place for the remainder of the journey, or the day. GE/RT8000 module TW5 sets out the defective on-train equipment that require a competent person to be used, and the operational consequences of using (or not using) a competent person. GE/RT8000 also sets out the duties of a competent person for the types of failure it includes. Railway undertakings should be aware that other documents, such as Sectional Appendices and Local Instructions, may also provide specific instructions according to the type of equipment and geographical circumstances. Determining what is a suitable station The DOTE contingency plan should identify, if necessary, the suitable stations at which passengers in any train or vehicle with defective on-train equipment should be detrained. In determining the suitability of a station for detraining passengers, the following factors should be taken into account: Page 7 of 30

8 a) The potential number of passengers involved. b) The means of control and maintaining the safety of the detrained passengers. c) The ability to allow a train to remain at the station until alternative transport has been arranged for passengers or staff (where this is the position, that fact should be clearly stated). d) Provision of facilities for people with disabilities. e) Waiting facilities, for example, the provision of refreshments or toilet facilities. f) Ratio of available staff to the number of passengers being detrained. g) Communication facilities, for example, the coverage for mobile telephones or provision of public telephones. G G G G G As part of the process for drafting a DOTE contingency plan, prior to submitting a draft copy to the infrastructure manager responsible for managing the network, the railway undertaking should liaise, discuss and, if possible, reach an agreement with the infrastructure manager responsible for the management of the selected station involved, that it is suitable for use as proposed. Requirement for the distribution of draft and published DOTE contingency plans Extract from GO/RT3437 Section Requirement for the distribution of draft and published DOTE contingency plans Railway undertakings shall distribute a copy of their respective DOTE contingency plan, in draft when they are in development, and in final published format to the following: a) The infrastructure manager responsible for the mainline railway. b) Infrastructure managers responsible for stations where a DOTE contingency plan states that passenger detrainments are permitted. c) Other railway undertakings affected by the operation of a DOTE contingency plan. No guidance is provided for this requirement. Requirement to monitor and amend a published DOTE contingency plan Extract from GO/RT3437 Section Requirement to monitor and amend a published DOTE contingency plan Railway undertakings shall monitor the effectiveness of a published DOTE contingency plan in order to identify any shortcomings Railway undertakings shall amend and update their published plan if required as a result of DOTE contingency plan monitoring. Railway undertakings will have developed and published contingency plans that specifically deal with what will happen in case of a train that has defective on-train equipment. Once the plans have been published, there is a need to make sure that they continue to work efficiently and correctly as intended. For this purpose, joint monitoring of the effectiveness of published DOTE contingency plans should include the following: a) A review of the application of the DOTE contingency plan; this should crossreference the user application instructions as outlined in GE/RT8000 Rule Book, module TW5, as well as any other relevant source publication (such as Sectional Appendices or Local Instructions). b) A joint assessment of on the day amendments to a DOTE contingency plan. Page 8 of 30

9 G G Dealing with exceptional circumstances Where a railway undertaking finds that it is not possible to follow the agreed, published DOTE contingency plan due to exceptional circumstances, the railway undertaking and the infrastructure manager should discuss, resolve and document alternative arrangements. Exceptional circumstances may include: a) Where the train involved is the first train off a branch line in the morning or the last train at night. b) Equipment becoming defective where it is not possible to make alternative transport arrangements for the passengers affected special operating conditions may have to be applied in such circumstances, such as speed restrictions or arranging with the signaller for blocking or clearing of signals as appropriate. c) Where public disorder may result in a higher level of risk than if the train had been allowed to continue in service. d) Temporary changes to the status of elements of the published DOTE contingency plan, for example unforeseen reduction of staff at a station defined in the plan as suitable. e) Where crowding in trains or on stations is at such a level it is likely to create a serious safety incident. G G G G Exceptional weather conditions are likely to affect the assumptions about alternative transport arrangements that were used to compile the DOTE contingency plan. The likely effects of weather on alternative transport arrangements should be considered as part of the contingency arrangements. In all of the above circumstances, the balance of risk between continuing in service with the defect and the consequences of cancelling or reducing the capacity of trains, should be taken into account and fully documented. Alternative arrangements should not be applied to trains which have defective AWS, ERTMS, TPWS or ATP. Requirement to review DOTE contingency plans Extract from GO/RT3437 Section Requirement to review DOTE contingency plan Railway undertakings shall review their published DOTE contingency plan whenever the following occur: a) Changes are made to routes over which they operate. b) Changes to the train service pattern or the level of train service are made that affect a published DOTE contingency plan. c) Changes are made to their rolling stock fleet. d) Removals, modifications, additions and/or withdrawals are made to on-train equipment. e) Changes are made to the rolling stock maintenance arrangements that affect a published DOTE contingency plan. f) Changes are made to facilities, either temporary or permanent, at stations identified for the detraining of passengers in a published DOTE contingency plan. G g) After an issue arising from an application of the DOTE contingency plan. No guidance is provided for this requirement. Page 9 of 30

10 G G G G G G Reviews of published plans when circumstances change Any review should be a robust critique of the DOTE contingency plan and should result in an action plan being developed to improve the clarity and content of the plan and to address any identified deficiencies. The critique should be based upon the application of the DOTE contingency plan and involve those who have had to use it, regardless of which employer is involved, and as such should include infrastructure managers. When factors a) to f) of section prompt a review of the DOTE contingency plan, the review should identify the effects of the change in operation or circumstance and any amendments that should be made to the plan. Any amendments to the plan should then be made in accordance with the normal process. Factor c) of uses the term fleet ; this refers to changes to the classes of trains operated by the railway undertaking. For example, the introduction of a new class of traction into a railway undertaking s operations might cause changes to be made to DOTE plans. Factor d) of refers to changes (such as technical updates and equipment modifications) that might be made to the classes of trains already being operated by the railway undertaking. Page 10 of 30

11 Appendix A List of on-train equipment for inclusion in DOTE contingency plans The content of this appendix is mandatory. The content of this appendix details the minimum list of on-train equipment for which DOTE contingency plans shall be produced (a cross reference to the corresponding sections of GE/RT8000 Rule Book Module TW5, unless otherwise shown, is provided): 1) Air suspension (Section 3) 2) Automatic Dropping Device (Module AC Section 12). 3) Automatic Train Protection (ATP) (not in the Rule Book). 4) Automatic Warning System (AWS) (Section 4) 5) Brake defects (Section 5) 6) Doors (external) general guidance (Section 6) 7) Door defects on passenger vehicles (Section 6) 8) Doors (external) defects in service at any location. Guidance specific to power operated doors (Section 6) 9) Doors (external) defects in service at any location. Guidance specific to central locking (Section 6) 10) Driver s Reminder Appliance (DRA)(Section 7) 11) Driver s Safety Device (DSD) (Section 8) 12) Driving cab windows - broken or obscured (Section 9) 13) Driving controls defective (Section 10) 14) Emergency Bypass Switch (EBS) (Section 11) 15) ERTMS Equipment (Section 12) 16) Headlights, marker lights and tail lamps (Section 14) 17) Hot axle boxes and activation of lineside hot axle box detectors (Section 15) 18) Lifeguards (Section 16) 19) Locked wheels / wheel flats / shifted tyres / dragging brakes (Section 26) 20) On-Train Data Recorder (OTDR) (Section 17) 21) Public Address system - DO trains (Section 18) 22) Sanding equipment to assist train braking (Section 19) 23) Selective Door Opening (Section 20) 24) Speedometer (Section 21) 25) Tilt Authorisation and Speed Supervision system (TASS) (tilting trains only) (Not in the Rule Book) 26) Track Circuit Actuators (TCA) (Section 22) 27) Traction Interlock Switch (TIS) - DO passenger trains (Section 23) 28) Traction Interlock Switch (TIS) - Other passenger trains (Section 23) 29) Train Protection and Warning System (TPWS) (Section 24) 30) Train radio equipment (Section 25) 31) Tripcocks (not in the Rule Book) 32) Vigilance equipment (Section 8) 33) Warning horn (Section 27) 34) Wheel Slide Protection (WSP) equipment (Section 28) Page 11 of 30

12 G A G A G A G A G A G A G A G A G A Air Suspension Trains should not be permitted to enter service from a maintenance depot if the air suspension is not inflated on any bogie. Trains are permitted to enter service from other than a maintenance depot if the air suspension is not inflated on any bogie, but will be subject to any speed restrictions imposed by company instructions. If the air suspension becomes deflated on any vehicle when in service, the train may continue in service but will be subject to any speed restrictions imposed by company instructions. Consideration should be given to any gauge constraints applicable to vehicles with deflated air suspension on the routes the train will operate over. Automatic Dropping Device (ADD) If the Automatic Dropping Device becomes defective on a train in service, the train may complete its journeys for the remainder of the day provided its final journey ends at a maintenance depot. Any movement of the train should be in accordance with the Rule Book, GE/RT8000 module AC. Automatic Train Protection (ATP) If the Automatic Train Protection becomes defective on a train in service, the train should proceed only as far as the next available location. In the case of a passenger train, the passengers should be detrained at the first suitable station, after which the train should proceed only as far as the next available location. It should be noted that the instructions to train drivers and other staff involved in dealing with defective ATP equipment are published by Network Rail in the Sectional Appendices applicable to the routes on which ATP is installed and do not appear in the GE/RT8000 Rule Book. Automatic Warning System (AWS) A train should not be permitted to enter service from a maintenance depot if the AWS is defective, isolated or the seal is broken in any cab that is required to be driven from with AWS in operation. A train is permitted to enter service (but not passenger service) from other than a maintenance depot if the AWS is defective, isolated or the seal is broken in the cab to be driven from with AWS in operation, to travel to a maintenance depot. A train or traction unit on which the AWS is defective, isolated or the seal is broken on the isolating handle may be allowed to enter service from other than a maintenance depot as long as: a) The AWS will not be required to be used. b) It is a non-passenger train making a movement to a maintenance depot. G A G A G A If the Automatic Warning System becomes defective on a train not fitted with ERTMS in service, and if operating over a line fitted with AWS, the train should proceed only as far as the next available location. In the case of a passenger train, the passengers should be detrained at the first suitable station, after which the train should proceed only as far as the next available location. If a train is operating on a line on which AWS is not fitted and the on train AWS equipment becomes defective, consideration should be given as to whether the train will at any point operate over a line fitted with AWS whilst the on train AWS equipment is defective. If the AWS becomes defective on a train in service, but ATP is available and operational, the train may continue its journey provided it remains in an ATP fitted area. Page 12 of 30

13 G A G A G A If a competent person is available to accompany the driver, the guidance contained at G of this document should be used to determine how far the train can proceed and any movements should be made in accordance with the Rule Book module TW5. Brake defects If the automatic brake system becomes defective on a train in service, the train or vehicle should proceed in accordance with the instructions set out in the Rule Book, GE/RT8000 module TW5. Doors (external) general guidance The railway undertaking s staff should be provided with instructions and guidance for implementing their DOTE contingency plan in respect of external door defects. The instructions should address in particular: a) Where the only door in the train that gives access to, or egress from, accommodation for passengers with reduced mobility is defective. b) When a decision is required about placing the affected vehicle out of passenger use but allowing the train or unit to remain in service, or withdrawing the train or unit. G.A G.A G.A Before a passenger train is permitted to enter service with more than two defective doors on one or both sides of the train, consideration should be given to the likely effect on station dwell times. If a door cannot be closed, module TW5 of the Rule Book states that the signaller should be told and instructions obtained. Appropriate actions in accordance with the Rule Book should be taken in situations where open doors (such as plug type) would cause a train or vehicle to become out of gauge when a train is worked forward with the defective door open. The DOTE contingency plan should take account of the operational impact of the train or unit not entering service as planned, for example: a) Cancellation of train services, especially the first and last advertised trains and infrequent services. b) Overcrowding of trains and station platforms and increased station dwell times. c) The planned diagram for the vehicle or unit before the defect can be repaired. d) Alternative access and egress available for passengers, in normal service and in emergencies (including for passengers with reduced mobility). G.A G.A G.A The DOTE contingency plan should take account of the practicability of preventing passenger access to the vehicle if it remains in service. It is advisable that DOTE contingency arrangements plan for the affected vehicle to be taken out of service for repair within 24 hours of it entering service with the defective door. Though research into the risks from keeping a train in service (subject to the limitations indicated) shows that they are lower than the risks to passengers from cancelled or overcrowded trains caused by withdrawal of the affected unit, the risks increase if the train remains in service with defective doors longer than 24 hours. When doors are locked out of use, consideration should be given to the method of advising passengers that the emergency egress devices at the affected doors will still be operable (if this is the case). This information could be provided by the use of signs, public address announcements or by the provision of a member of staff at the affected doors. Page 13 of 30

14 G A G A Door defects on passenger vehicles A Door includes a pair of doors at the same door opening. The Rule Book GE/RT8000 requires the vehicle concerned to be placed out of public use if: a) all doors including those only available to the public for use as an emergency exit are defective on one or both sides of the vehicle and the nearest door on the next vehicle is also defective. b) a door only used as an emergency exit at the leading end of the first passenger vehicle or the trailing end of the last one. G.A The Rule Book GE/RT8000 allows a vehicle to remain in public use with permission from operations control if the following doors are defective: a) all doors including those only available to the public for use as an emergency exit on one or both sides of the vehicle but the nearest door on the next vehicle is available for use. b) a door at the leading end of the first passenger-carrying vehicle. c) a trailing-end door of the last passenger-carrying vehicle. The following colours show: Yellow door Door out of use. Black door An emergency door that is out of use. Red coach Passengers cannot travel in this vehicle. Yellow coach Permission needed for passengers to use vehicles. Green coach Passengers can travel in this vehicle. Leading end door and Trailing end door defective All doors out of use on one vehicle nearest door on next vehicle available All doors out of use on one vehicle nearest door on next vehicle not available End doors out of use at a vehicle end with no gangway Page 14 of 30

15 Emergency door at leading or trailing end out of use. G A G A G A G A G A G A G A G A G A G A Doors (external) defects in service at any location. Guidance specific to power operated doors If there is a failure of the door operating controls at all positions on a train with power operated doors, the guard should either release a train crew door, or use an emergency door release facility to release one door. If this is not possible, passengers should be detrained at the first suitable station and the train should proceed only as far as the next available location. The driver should report the circumstances to the signaller and act in accordance with the instructions given. If a door cannot be closed, module TW5 of the Rule Book states that the signaller should be told and instructions obtained. Appropriate actions in accordance with the Rule Book should be taken in situations where open doors (such as plug type) would cause a train or vehicle to become out of gauge when a train is worked forward with the defective door open. If there is a failure of a Door Key Switch (DKS) and the only other DKS is in the driving cab from which the train is being driven, the train may complete its journey. If the doors are to be operated by a guard they should not enter the driving cab to use the DKS until the train has come to a stand. Doors (external) defects in service at any location. Guidance specific to central locking If there is a failure of the door operating controls at all positions on a train with slam doors that are fitted with central locking, and it is practicable to release the emergency lock on one door, and to allow passengers to alight from or enter the train through that door, passengers should be detrained at the first suitable station and the train should proceed only as far as the next available location. On a train with slam doors fitted with central locking, if the central locking becomes defective on all doors of a vehicle, and it is practicable to place the vehicle out of use and transfer the passengers to another vehicle, the train may continue its journey. If this is not possible, passengers should be detrained at the first suitable station and the train should proceed only as far as the next available location. Driver s Reminder Appliance (DRA) A train should not be permitted to enter service from a maintenance depot if the DRA is defective in any cab that will be driven from with the DRA required to be used. A train is permitted to enter service, from a location other than a maintenance depot if the DRA is isolated in any cab that will be driven from with the DRA required to be in use. But arrangements should be made for the train to make its last journey to a maintenance depot. If the DRA becomes defective when it is in service, the train may continue normally, subject to the considerations at G A of this document, but arrangements should be made for the train to make its last journey to a maintenance depot. DOTE contingency plans should consider, when determining how long a train may remain in service with a defective DRA, the likely number of occasions that trains will be stopped at signals and the extent to which drivers are reliant on its use. Driver s Safety Device (DSD) A train should not be permitted to enter service from a maintenance depot if the DSD is defective or isolated in any cab that is required to be used. Page 15 of 30

16 G A G A G A G A G A G A G A G A G A G A G A G A G A A train is permitted to enter service (but not passenger service) from other than a maintenance depot if the DSD is defective or isolated in the cab to be used, to travel to a maintenance depot, provided AWS or TPWS are operative. If the DSD becomes defective on a train in service and AWS or TPWS are operative, the train should proceed only as far as the next available location. In the case of a passenger train, the passengers should be detrained at the first suitable station, after which the train should proceed only as far as the next available location subject to the limitations shown in GE/RT8000 module TW5. Details for dealing with a train on which the DSD is defective and either the AWS or TPWS are not operative are shown in GE/RT8000 module TW5. If the DSD becomes defective on a train in service and both AWS and TPWS are not operative, the train should not make any further movement until a competent person is provided. In the case of a passenger train, the passengers should be detrained at the first suitable station, after which the train should proceed only as far as the next available location. A train on which the DSD is defective or isolated in any cab that is required to be used and on which the AWS and TPWS are not operative, may be permitted to enter service (not passenger service) from other than a maintenance depot to travel to a maintenance depot, as long as a competent person is provided. A train on which the DSD is defective or isolated in any cab that is required to be used may enter passenger service, provided the routes over which it will operate are fitted with ATP and all cabs in which the train will be driven are fitted with ATP which is operable. A train in service on which the DSD is defective or isolated may continue its journey provided it remains in an ATP fitted area and the cab from which it is being driven is fitted with ATP which is operable. If the DSD becomes defective or isolated and the ERTMS is working correctly, the train can continue normally as long as it will only operate over a line on which ERTMS is in operation. Consideration should be taken for plans to be made should the train be required to leave a line on which ERTMS is in operation whilst the DSD is defective or isolated. If the DSD becomes defective or isolated and the ERTMS is not working correctly and required for use, the train should not make any further movement until a competent person is provided. Details for dealing with the train when a competent person is available to accompany the driver, including setting out the duties of the competent person, are shown in GE/RT8000 module TW5. Driving cab windows - broken or obscured A train should not be permitted to enter service from a maintenance depot if any cab window is broken or obscured and prevents the driver obtaining a clear view of the line ahead or train dispatch equipment. If a train is to enter service from other than a maintenance depot with a broken or obscured windscreen, appropriate action should be taken. This may include reducing the speed of the train. If the train cannot proceed safely the signaller should be informed and a competent person may be required to assist the driver. In the event of a report from a driver that the driving cab windscreen is broken or obscured, and the driver considers that the safe operation of the train will be affected, the driver s judgement, together with the availability of a competent person to accompany the driver, should be taken into account in determining how long the train may continue safely in service. Page 16 of 30

17 G A G A G A G A G A G.A G.A G A G A G A GE/RT8000 module TW5 sets out the duties of a competent person accompanying the driver when the cab windscreen is broken or obscured. Driving controls defective If the driving controls become defective in the leading cab the train should proceed only to the first location where it can clear the running line. It may be necessary for a competent person to be provided to assist with the movement. Emergency Bypass Switch (EBS) The Emergency Bypass Switch is a device operated by the driver to restore brake control following defects in the brake continuity on train formations with energise to release electric brake control (predominantly multiple-units). Once operated, other safety systems are isolated, e.g. the train brake system no longer has the function of brake (train) continuity detection (for train divisions) and passenger communication alarms may be disabled on certain fleets. As a consequence, it will not be possible to apply the emergency brake in any other driving cab than the one from which the train is being driven. A train should not be allowed to enter service from a maintenance depot if the EBS has been operated in any cab. A train can enter service (but not passenger service) with the EBS operated to travel to a maintenance depot for repair as long as permission has been given and the signaller has been informed. If the train is formed of more than one unit, a guard or competent person should be provided. If the EBS is operated whilst in passenger service and the train is formed of more than one multiple unit, if possible, all passengers should be transferred to the leading unit. A guard or competent person should travel in the rear unit. ERTMS Equipment A train or traction unit may not be permitted to enter service from a maintenance depot if the on-board ERTMS equipment is not working in any cab which is required to be driven from with ERTMS in operation. A train or traction unit on which ERTMS is not operative may be allowed to enter service from other than a maintenance depot as long as the ERTMS will not be required to be used. A train or traction unit may be allowed to enter service from other than a maintenance depot, where ERTMS is in operation, with ERTMS not working in a cab to be driven from over a line on which ERTMS is in operation as long as one of the following applies: a) On a line where lineside signals are provided, both AWS and TPWS are operating. b) On a line where lineside signals are not provided, to travel (not in passenger service) to a maintenance depot for repair. G.A G.A G.A If ERTMS becomes defective when it should be in operation on a line fitted with lineside signals and AWS and TPWS are operating, the train may proceed obeying all lineside signals. If AWS and TPWS are not operating it will be necessary for the train to proceed but under degraded working conditions. If ERTMS becomes defective when it should be in operation and AWS and TPWS are not operating, it will be necessary for the signaller to authorise the driver to pass each end of authority without a movement authority in line with rule book module S5 passing a signal at danger or an end of authority (EOA) without a movement authority (MA). If an ERTMS failure occurs when required to be in operation over a line not fitted with lineside signage. Consideration would need to be given to extended journey times over the portion of line affected. Page 17 of 30

18 G A G A Headlights, marker lights and tail lamps A traction unit should not enter service from a maintenance depot if any headlight, tail lamp or marker light is not working on any vehicle that is required to be at the front or rear of a train. A train may enter service, from other than a maintenance depot, with a failed headlight as long as a portable headlight has been provided. G A If the headlight completely fails when in service a train can proceed at reduced speed (20 mph/30km/h) until such point as a portable headlight can be provided, during this movement a white light is required to be displayed at the front of the train. Once the portable headlight has been fitted the train can proceed at a higher speed (75 mph/120 km/h). G A G A G A G A G A G A G A G A G A G A G A A train can enter service with a defective tail lamp if it is fitted with two tail lamps and one is working, or a portable tail lamp is provided. If a built-in tail lamp becomes defective on a train in service resulting in no tail lamp being displayed, and a portable tail lamp is provided, the train may continue in service until its next scheduled visit to a maintenance depot. If a portable tail lamp is not available the train should proceed only as far as the next available location. If a train with two built-in tail lamps enters service with one lamp defective, the train may complete its journeys for the remainder of the day, provided that its final journey of the day ends at a maintenance depot. Hot axle boxes and activation of lineside hot axle box detectors A train, traction unit or vehicle should not be allowed to enter service with a hot axle box. If a hot axle box is detected by any means, and if the driver decides (in accordance with the Rule Book GE/RT8000 TW5) that the train may go forward for examination by a rolling stock technician, the train should proceed only as far as the next available location. The judgement of the rolling stock technician should form the basis of any decision regarding what further measures need to be applied, for example, detaching the affected vehicle. If the driver decides that the train may go forward only after examination by a rolling stock technician, the judgement of the rolling stock technician should be relied upon in determining what further measures need to be applied. Lifeguards A train should not be permitted to enter service with a loose or damaged lifeguard. A train should not be permitted to enter service with a missing lifeguard at the leading end of the train. If a lifeguard on a train or vehicle in service is loose or damaged, it may become a hazard to the infrastructure with the potential to cause derailment. The driver may decide, in accordance with the GE/RT8000 Rule Book TW5, that the train may proceed forward only after examination by a rolling stock technician. The judgement of the rolling stock technician should form the basis of any decision regarding what further measures need to be applied. Locked wheels / wheel flats / shifted tyres / dragging brakes In the event of locked wheels, wheel flats, shifted tyres or dragging brakes on a train or vehicle in service, and the driver decides that the train may proceed forward for examination by a rolling stock technician, the train should proceed only as far as the next available location. The judgement of the rolling stock technician should form the basis of any decision regarding what further measures need to be applied. Page 18 of 30

19 G A G A G A G A G A GM/RT2466 Railway Wheelsets sets out requirements for railway wheelsets. On-Train Data Recorder (OTDR) A train may enter service from any location with a defective On-Train Data Recorder in the cab required to be used provided there is another data recorder on the train which is functioning correctly. The train may complete its journeys for the rest of the day. Railway undertakings should be aware that OTDRs other than the one located at the driving cab from where the train is being driven may not record the same range of drivers activities (such as AWS/TPWS). If the OTDR in a cab that is required to be used becomes defective on a train in service, the railway undertaking concerned should apply their contingency arrangements for this defect as if it had been found on entry into service. Public Address system - DO trains On DO (passenger) trains, the Public Address system (PA) provides a means of communication between the controlling signaller and passengers in the event of the driver becoming incapacitated. In the event of: a) A DO train entering service from other than a maintenance depot with a defective PA system in any vehicle. Or b) The PA system on a DO train becoming defective in any vehicle in service. The train may complete its journeys for the rest of the day as long as the passengers can be moved to a vehicle in which the PA is working and the affected vehicle placed out of passenger use. The final journey of the day should finish at a maintenance depot. G A G A G A G A G A If a competent person, who has access to the affected vehicle(s), is available to provide safety information to passengers, the train may complete its journeys for the rest of the day, provided it completes its last journey at a maintenance depot. Sanding equipment to assist train braking A train should not be permitted to enter service from a maintenance depot if the sanding equipment is defective or the sand boxes are empty. A train is permitted to enter service from other than a maintenance depot if the sanding equipment is defective or the sand boxes are empty, except where the driver believes that there may be difficulty in stopping the train. In all circumstances, the train should end its final journey of the day at a location where the sand can be replaced, the sanding equipment repaired, or a maintenance depot. If sanding equipment that is used to assist train braking becomes defective on a train in service, or if the supply of sand is completely exhausted, the train should end its final journey of the day at a location where the sand can be replaced, the sanding equipment repaired, or a maintenance depot. If the driver believes that there may be difficulty in stopping the train if it was to continue in service, the train should proceed only as far as the next available location, if necessary at reduced speed. In the case of a passenger train, the train may proceed at reduced speed to the next available location to detrain passengers, or passengers should be detrained at the first suitable station, depending on the judgement of the driver. Page 19 of 30

20 G A Selective Door Opening If the Selective Door Opening (SDO) facility, which is required to be used, becomes defective on a train in service or on a train entering service from other than a maintenance depot, the train may complete its journeys for the remainder of the day, provided that measures can be put in place to control the hazard to passengers of opening doors where there is no platform. Consideration should be given to the number of short platforms on the route, availability of public address systems and competent staff on trains and at stations, and the likelihood of local awareness of passengers of the hazard (for example daily commuters compared with infrequent travellers). Measures may include: a) Providing a competent person in the affected vehicle to prevent egress where there is no platform. b) Use of the Public Address system. c) Locking the affected door(s) out of use. d) Transferring passengers from the affected vehicle(s) and for the vestibule doors on the affected vehicle(s) to be locked. e) Reducing the length of the train. f) Changing the stopping pattern to avoid the short platforms. g) Redeploying the train to another route without short platforms. G A G A G A G A G A G A G A G A The train should end its final journey of the day at a maintenance depot. If alternative measures cannot be applied, passengers should be detrained at the first suitable station. Speedometer A train or traction unit should not be allowed to enter service unless there is a working speedometer in any driving cab which is required to be driven from. If no operative speedometer is available in any cab required to be used on a train in service, the train should proceed only as far as the next available location. An alternative speedometer might be provided by the Train Management System (TMS) or other systems. If the size of the display and location in the cab allows it to be viewed and read from the normal driving position, it can be considered as an operative speedometer. This information should be included in the working instructions for each class of traction unit or shown in the contingency plan. Tilt Authorisation and Speed Supervision system (TASS) (tilting trains only) The DOTE contingency plan should identify the hazards associated with Tilt Authorisation and Speed Supervision (TASS) systems becoming defective in service and the controls for those hazards. Provided that the train tilt system has failed in the tilt centred position ( right side failure), such controls might include allowing the train to run at permissible speed (not enhanced permissible speed - EPS), or confining the train to routes where there is no TASS lineside equipment. If the Speed Supervision system becomes defective when a train is in service, the train may complete its journeys for the remainder of the day provided its final journey ends at a maintenance depot. In such circumstances, the train may only proceed at permissible speed (not enhanced permissible speed). If the Tilt Authorisation system becomes defective when a train is in service then the train may complete its journeys for the remainder of the day provided its final journey ends at a maintenance depot. Page 20 of 30

Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7

Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7 GERT8000-TW5 Rule Book Module TW5 Preparation and movement of trains Defective or isolated vehicles and on-train equipment Issue 7 September 2016 Comes into force 03 December 2016 Published by: RSSB The

More information

Issue 8. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

Issue 8. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book GERT8000-TW5 Rule Book Preparation and movement of trains: Defective or isolated vehicles and on-train equipment Issue 8 Module TW5 September 2017 Comes into force 02 December 2017 Conventions used in

More information

Issue 9. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book

Issue 9. Module TW5. Preparation and movement of trains: Defective or isolated vehicles and on-train equipment. GERT8000-TW5 Rule Book GERT8000-TW5 Rule Book Preparation and movement of trains: Defective or isolated vehicles and on-train equipment Issue 9 Module TW5 September 2018 Comes into force 01 December 2018 Conventions used in

More information

Uncontrolled when printed Supersedes GERT8000-RBBL Iss 31.1 with effect from 01/12/2018. Rule Book Briefing Leaflet. Issue 32

Uncontrolled when printed Supersedes GERT8000-RBBL Iss 31.1 with effect from 01/12/2018. Rule Book Briefing Leaflet. Issue 32 Rule Book Briefing Leaflet Issue 32 December 2018 The following modules and handbooks will be reissued and come into force on 01 December 2018: Glossary Glossary of Railway Terminology Handbook 8 IWA,

More information

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage Document comes into force and supersedes GKRT0075 Iss 3 on 05/12/15 With effect from 03/03/18 parts of this document have been superseded by Date September 15 Lineside Signal Spacing and Speed Synopsis

More information

Track Circuit Assister Configuration for Rail Vehicles

Track Circuit Assister Configuration for Rail Vehicles Track Circuit Assister Configuration for Rail Synopsis This Standard mandates where TCAs shall be fitted onto a vehicle and how they shall be set up. It also contains the requirements for testing a TCA.

More information

Risk Management of Rail Vehicle Axle Bearings

Risk Management of Rail Vehicle Axle Bearings Railway Group Standard Risk Management of Rail Vehicle Axle Bearings Synopsis This Railway Group Standard mandates that there shall be riskbased processes to minimise and detect failures of rail vehicle

More information

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001

Train Safety Systems. Railway Group Standard GM/RT2185 Issue Two Date December 2001 Train Safety Systems Synopsis This document defines the requirements for train safety systems to enable safe operation of trains on Railtrack controlled infrastructure. Signatures removed from electronic

More information

Preparation and movement of trains

Preparation and movement of trains GERT8000-TW1 Rule Book Uncontrolled When Printed Preparation and movement of trains Issue 11 Module TW1 September 2016 Comes into force 03 December 2016 Published by: RSSB The authoritative version of

More information

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015

Module SP. Speeds. GE/RT8000/SP Rule Book. Issue 5. September 2015 GE/RT8000/SP Rule Book Module SP Speeds Issue 5 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk/rgsonline Contents

More information

GM/RC2532. Recommendations for Rail Vehicle Emergency and Safety Equipment. Uncontrolled When Printed. Railway Group Recommendations for GM/RT2130

GM/RC2532. Recommendations for Rail Vehicle Emergency and Safety Equipment. Uncontrolled When Printed. Railway Group Recommendations for GM/RT2130 RC Published by Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2008 Rail Safety and Standards Board Limited GM/RC2532 Issue One: June 2008 Railway Group Recommendations

More information

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 4. Glossary of Railway Terminology. Glossary of Railway. Terminology Glossary of Railway Terminology Issue 4 Glossary of Railway Terminology December 2017 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology

Issue 5. Glossary of Railway Terminology. Glossary of Railway. Terminology Glossary of Railway Terminology Issue 5 Glossary of Railway Terminology December 2018 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

Controlling the Speed of Tilting Trains Through Curves

Controlling the Speed of Tilting Trains Through Curves Controlling the Speed of Tilting Trains Through Curves Synopsis This document mandates the means by which Tilting Trains may be operated at higher speeds than nontilting trains around curves. Signatures

More information

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2.

Module T11. Movement of engineering trains and on-track plant under T3 arrangements. GE/RT8000/T11 Rule Book. Issue 2. GE/RT8000/T11 Rule Book Module T11 Movement of engineering trains and on-track plant under T3 arrangements Issue 2 January 2007 Comes into force 02 June 2007 Issue Date Comments Comes into force 1 June

More information

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998

Rapid Response. Lineside Signal Spacing. Railway Group Standard GK/RT0034 Issue Three Date September 1998 Rapid Response Railway Group Standard Lineside Signal Spacing Synopsis This Standard specifies the minimum distance that must be provided between the first signal displaying a cautionary aspect and the

More information

Terminology. Glossary of Railway. Glossary of Railway Terminology

Terminology. Glossary of Railway. Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Issue 1 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved

More information

Mechanical Trainstop Systems

Mechanical Trainstop Systems Mechanical Trainstop Systems Synopsis This document defines the functional requirements for mechanical trainstop systems and the requirements relating to their use on both track and trains. Signatures

More information

Module T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015

Module T3. Possession of a running line for engineering work. GE/RT8000/T3 Rule Book. Issue 6. September 2015 GE/RT8000/T3 Rule Book Module T3 Possession of a running line for engineering work Issue 6 September 2015 Comes into force 05 December 2015 Published by: RSSB The authoritative version of this document

More information

Requirements for the Application of Standard Vehicle Gauges

Requirements for the Application of Standard Vehicle Gauges Synopsis This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure. [This document contains one or more pages which contain colour] Copyright

More information

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1.

Withdrawn Document Uncontrolled When Printed. SP (issue 1).qxd 16/4/03 1:04 pm Page 1. Module SP. GE/RT SP Rule Book. Speeds. Issue 1. SP (issue 1).qxd 16/4/03 1:04 pm Page 1 GE/RT8000 - SP Rule Book Module SP Speeds Issue 1 June 2003 Comes into force 6 December 2003 SP (issue 1).qxd 16/4/03 1:04 pm Page 2 Issue Date Comments Comes into

More information

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book

Handbook 11. Issue 6. Duties of the person in charge of the possession (PICOP) GERT8000-HB11 Rule Book GERT8000-HB11 Rule Book Duties of the person in charge of the possession (PICOP) Issue 6 September 2017 Comes into force 02 December 2017 Handbook 11 Uncontrolled when printed Published by: RSSB The authoritative

More information

Compatibility Between Electric Trains and Electrification Systems

Compatibility Between Electric Trains and Electrification Systems Compatibility Between Electric Trains and Electrification Systems Synopsis Process for managing change that affects the compatibility between electric trains and electrification systems Submitted by Signatures

More information

Compatibility Requirements for Braking Systems of Rail Vehicles

Compatibility Requirements for Braking Systems of Rail Vehicles GMRT2043 Iss 2, GMRT2044 Iss 4, Iss 3, GMRT2046 Iss 1, GMGN2615 Iss 1 (G 2.1.83 to G 2.1.132 inclusive) Compatibility Requirements for Braking Systems of Rail Synopsis This document defines the compatibility

More information

Rail Industry Standard for the Design of On- Track Machines in Travelling and Working Modes

Rail Industry Standard for the Design of On- Track Machines in Travelling and Working Modes Supersedes Iss 1 with effect from 01/09/2018 for the Design of On- Track Machines in Travelling and Working Modes Synopsis This document sets out requirements and guidance for the application of the BS

More information

Control, Safe Use and Operation of Road-Rail Plant

Control, Safe Use and Operation of Road-Rail Plant Control, Safe Use and Operation of Page 1 of 13 Part A Synopsis A Standard detailing the requirements for the control, safe use and operation of road-rail plant in the railway environment. Approval and

More information

Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003

Module M4. Floods and snow. GE/RT M4 Rule Book. Issue 1. June 2003 GE/RT8000 - M4 Rule Book Module M4 Floods and snow Issue 1 June 2003 Comes into force 6 December 2003 Issue Date Comments Comes into force 1 June 2003 Initial issue 6 December 2003 Copyright 2003 Railway

More information

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book

Handbook 15. Issue 5. Duties of the machine controller (MC) and ontrack plant operator. GERT8000-HB15 Rule Book GERT8000-HB15 Rule Book Duties of the machine controller (MC) and ontrack plant operator Handbook 15 Issue 5 September 2017 Comes into force 02 December 2017 Published by: RSSB The authoritative version

More information

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3.

Uncontrolled When Printed Supersedes GERT8000-DC Iss 2 on 01/03/2014. Module DC. GE/RT8000/DC Rule Book. DC electrified lines. Issue 3. GE/RT8000/DC Rule Book Module DC DC electrified lines Issue 3 March 2014 Comes into force 07 June 2014 Conventions used in the Rule Book Example A black line in the margin indicates a change to that rule

More information

Centralised Traffic Control System - Rules 1 to 17

Centralised Traffic Control System - Rules 1 to 17 Centralised Traffic Control System - Rules 1 to 17 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 2 13 May 2012 0 04 October 2015 Australian Rail

More information

National technical rules for vehicles Related Control Command and Signalling Requirements

National technical rules for vehicles Related Control Command and Signalling Requirements National technical rules for vehicles Related Control Command and Signalling Requirements Note: Relevant TSI is Control, Command and Signalling (Commission Regulation (EU) 2016/919 of 27 May 2016 - which

More information

Standards Manager Web Standards List RSSB-Rail Safety and Standards Board

Standards Manager Web Standards List RSSB-Rail Safety and Standards Board Standards Manager Web Standards List RSSB-Rail Safety and Standards Board Id Number Title Year Organization Page GERT80 Iss ERTMS/ETCS DMI National Requirements 06 RSSB 0 GIGN7608 Iss Guidance on the Infrastructure

More information

Requirements for the Application of Standard Vehicle Gauges

Requirements for the Application of Standard Vehicle Gauges Requirements for the Application of Standard Vehicle Gauges Synopsis This Railway Group Standard defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.

More information

Rail Safety and Standards Board

Rail Safety and Standards Board Rail Safety and Standards Board Certificate of Derogation from a Railway Group Standard (under 8.3 of the Railway Group Standards Code) Derogation Number: Applicant: Subject Matter of Derogation: RGS Number:

More information

GK/GN0644. Guidance on Permissive Working. Rail Industry Guidance Note for GK/RT0044

GK/GN0644. Guidance on Permissive Working. Rail Industry Guidance Note for GK/RT0044 GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GK/GN0644 Issue Two December 2014 Rail Industry Guidance Note for GK/RT0044

More information

Document Control Identification. Document History. Authorisation

Document Control Identification. Document History. Authorisation Document Control Identification Document History Authorisation Rail Safety Manager Brookfield Rail 1 October 2016 Table of Contents Glossary for this Rule... 4... 9... 9... 9... 10... 11... 12... 13...

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title

More information

Requirements for the Application of Standard Vehicle Gauges

Requirements for the Application of Standard Vehicle Gauges Requirements for the Application of Standard Vehicle Gauges Synopsis This defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure. This document contains

More information

Tram Driver. Mentor s Q&A

Tram Driver. Mentor s Q&A Tram Driver Mentor s Q&A (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates developed as guides for heritage tramway operators

More information

Signing of Permissible Speeds and Speed Restrictions

Signing of Permissible Speeds and Speed Restrictions Document to be withdrawn as of 04/06/11 Railway Group Standard published on 05/03/11 Date December 00 Signing of Permissible Speeds and Speed Restrictions Synopsis This document defines the principles

More information

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment

Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Control, Safe Use and Operation of Excavators, Loaders and Earth Moving Equipment Page 1 of 14 Part A Synopsis A standard detailing the requirements for the control, safe use and operation of excavators,

More information

Low Voltage Power Supplies in Electrified Areas

Low Voltage Power Supplies in Electrified Areas Low Voltage Power Supplies in Electrified Areas Synopsis This document mandates requirements for control of return and stray currents and the management of earthing for low voltage power supplies in electrified

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures s Rule Number: 3025 Version 1.0, 31 March 2016 Temporary Speed Restrictions Rule Number: 3025 Document Control Identification Document title Number Version Date

More information

Permissible Track Forces for Railway Vehicles

Permissible Track Forces for Railway Vehicles British Railways Board Page 1 of 11 Part A Synopsis This document prescribes design and maintenance requirements for traction and rolling stock and for on track plant to ensure that interactive forces

More information

Interface between Rail Vehicle Weights and Underline Bridges

Interface between Rail Vehicle Weights and Underline Bridges Interface between Rail Vehicle Weights and Synopsis This document sets out the requirements for managing the risk of overloading of underline bridges by rail vehicles Submitted by Signatures removed from

More information

Structural Requirements For Drawgear And Buffers On Railway Vehicles

Structural Requirements For Drawgear And Buffers On Railway Vehicles Structural Requirements For Drawgear And Buffers On Railway Vehicles Submitted by D. Boocock Nominated Responsible Manager Synopsis This standard prescribes the strength requirements for drawgear and buffers

More information

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012

Uncontrolled When Printed Document to be superseded on 01/12/2012 Superseded by GERT8000-HB15 Iss 2 published on 01/09/2012 GE/RT8000/HB15 Rule Book Handbook 15 Duties of the machine controller (MC) and on-track plant operator Handbook 15 Issue 1 Valid from June 2011 Published by: RSSB Block 2 Angel Square 1 Torrens Street

More information

Annex A. to Technical Specification "Operations and traffic management" adopted by

Annex A. to Technical Specification Operations and traffic management adopted by Document version : 1 Annex A to Technical Specification "Operations and traffic management" adopted by Commission Decision 2008/231/EC of 1 st February 2008 concerning the technical specification of interoperability

More information

RULE BOOK APPENDIX ISSUE 11/07

RULE BOOK APPENDIX ISSUE 11/07 RULE BOOK APPENDIX ISSUE 11/07 I, the undersigned, acknowledge receipt of this publication. I undertake to familiarise myself with any alterations which apply to me. FULL NAME (CAPITALS) STAFF NUMBER GRADE

More information

Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7)

Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7) Deviation from a Railway Group Standard (In accordance with the Railway Group Standards Code, Issue Four, part 7) Deviation Number: 14/078/DEV 1. Start and End Date: From 26/06/2014 to 22/10/2018 2. Details

More information

Branding of Wheels,Tyres and Axles

Branding of Wheels,Tyres and Axles Branding of Wheels,Tyres and Axles Signatures removed from electronic version Submitted by G A Clayton Nominated Responsible Manager Synopsis This standard details the branding requirements for all wheels,

More information

Train Order System - Rules 1 to 37

Train Order System - Rules 1 to 37 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04 October 2015 1 01 July 2018 Australian Rail Track Corporation Limited (ARTC)

More information

Acceptance of Trams and Light Rail or Metro Vehicles for Shared Running on Railtrack Controlled Infrastructure

Acceptance of Trams and Light Rail or Metro Vehicles for Shared Running on Railtrack Controlled Infrastructure Acceptance of Trams and Light Rail or Metro Vehicles for Shared Running on Railtrack Controlled Infrastructure Synopsis This Standard defines the mandatory requirements for trams, light rail or metro vehicles

More information

Uncontrolled When Printed Document comes into force 06/12/2014 Supersedes GERT8000-T10 Iss 3 on 06/12/2014

Uncontrolled When Printed Document comes into force 06/12/2014 Supersedes GERT8000-T10 Iss 3 on 06/12/2014 GE/RT8000/T10 Rule Book Module T10 Duties of a designated person () and people working on rail vehicles Issue 4 September 2014 Comes into force 06 December 2014 Published by: RSSB Block 2 Angel Square

More information

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK

RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK R A I L T R A C K Safety and Standards Directorate RAILWAY GROUP STANDARD GO/RT3000 MASTER RULE BOOK Railtrack, Safety and Standards Directorate Railtrack House DP01 Euston Square LONDON NW1 2EE 08/1999

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

GM/GN2169. Combined Manual for AWS and TPWS Trainborne Equipment. Railway Group Guidance Note. Issue One: April Uncontrolled When Printed

GM/GN2169. Combined Manual for AWS and TPWS Trainborne Equipment. Railway Group Guidance Note. Issue One: April Uncontrolled When Printed GN Published by Rail Safety and Standards Board Evergreen House 160 Euston Road London NW1 2DX Copyright 2007 Rail Safety and Standards Board Limited GM/GN2169 Issue One: April 2007 Railway Group Guidance

More information

UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS

UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS UCKFIELD MODEL RAILWAY CLUB BENTLEY MINIATURE RAILWAY TRACK SAFETY REGULATIONS (revised July 2005) (amended April 2012) REFERENCE DOCUMENTS These Regulations should be read in conjunction with the following

More information

Rule Book Index. Rule Book Index. covering all modules. Document Withdrawn as of December 2008 Uncontrolled When Printed. Rule Book Index.

Rule Book Index. Rule Book Index. covering all modules. Document Withdrawn as of December 2008 Uncontrolled When Printed. Rule Book Index. Rule Book Index Document Withdrawn as of December 2008 Rule Book Index covering all modules Rule Book Index Issue 7 April 2008 Comes into force 07 June 2008 Issue Date Comments Comes into force 1 June

More information

Index (part 1) covering all modules except the train signalling modules. Withdrawn Document Uncontrolled When Printed. Rule Book Index.

Index (part 1) covering all modules except the train signalling modules. Withdrawn Document Uncontrolled When Printed. Rule Book Index. index (part 1).qxd 23/5/03 12:05 pm Page 1 Rule Book Index Index (part 1) Index (part 1) covering all modules except the train signalling modules Issue 1 June 2003 Comes into force 6 December 2003 index

More information

Module AC. AC electrified lines

Module AC. AC electrified lines GE/RT8000/AC Rule Book Module AC AC electrified lines Issue 1 April 2009 Comes into force 06 June 2009 Published by: Rail Safety & Standards Board Block 2 Angel Square 1 Torrens Street London EC1V 1NY

More information

Control, Safe Use and Operation of Forklift Trucks and Sideloaders

Control, Safe Use and Operation of Forklift Trucks and Sideloaders Control, Safe Use and Operation of Forklift Trucks and Sideloaders British Railways Board Page 1 of 12 Part A Synopsis A standard detailing the requirements for control, safe use and operation of forklift

More information

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook

Train Examination (Braking System) Addendum. Lesson Plan and WorkBook Train Examination (Braking System) Addendum Lesson Plan and WorkBook (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates

More information

BOTHWELL CASTLE GOLF CLUB BUGGY POLICY

BOTHWELL CASTLE GOLF CLUB BUGGY POLICY BOTHWELL CASTLE GOLF CLUB BUGGY POLICY Introduction The purpose of this document is to establish a standard for the safe operation of all ride- on buggies operated on the course at Bothwell Castle Golf

More information

Port of Oulu Ltd. 8 Dec PERIOD OF VALIDITY AND INFORMING OF CHANGES RAIL NETWORK... 2

Port of Oulu Ltd. 8 Dec PERIOD OF VALIDITY AND INFORMING OF CHANGES RAIL NETWORK... 2 1 NETWORK STATEMENT for the 2019 timetable period (Link to Finnish version) Contents 1 PERIOD OF VALIDITY AND INFORMING OF CHANGES... 2 1.1 INFORMING OF CHANGES... 2 2 RAIL NETWORK... 2 2.1 DESCRIPTION,

More information

Guidance for Low Voltage Electrical Installations

Guidance for Low Voltage Electrical Installations Guidance for Low Voltage Electrical Synopsis This document provides information in support of GI/RT7007 Low Voltage Electrical. Signatures removed from electronic version Submitted by Anne E Blakeney Standards

More information

Working of Trains - Rules 1 to 45

Working of Trains - Rules 1 to 45 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 201 0 04 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This

More information

Locomotive Specific Interface Requirements WOS

Locomotive Specific Interface Requirements WOS Discipline Engineering Standard Category Rolling Stock Locomotive Specific Interface Requirements WOS 01.300 Applicability ARTC Network wide New South Wales Western Jurisdiction Victoria Primary Source

More information

TOPAS 2130A (Draft v3)

TOPAS 2130A (Draft v3) TOPAS 2130A (Draft v3) Revision Date Scope Authorised by A (v1) 10/10/17 Draft A (v2) 11/11/17 Draft A (v3) 15/12/17 Draft Traffic Open Products And Specifications Limited 2017. This document is the property

More information

Conduct on-road training for motorcycle riders

Conduct on-road training for motorcycle riders Page 1 of 5 Conduct on-road training for motorcycle riders Level 5 Credits 10 Purpose This unit standard is for licensed motorcycle riding instructors who wish to conduct on-road motorcycle training. People

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 26.5.2011 Official Journal of the European Union L 139/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 26 April 2011 concerning a technical specification for interoperability relating to the

More information

TA20 ARTC Code of Practice for the Victorian Main Line Operations

TA20 ARTC Code of Practice for the Victorian Main Line Operations TA20 ARTC Code of Practice for the Victorian Main Line Operations Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1.2 07 August 2011. 2.0 04 October

More information

Train Examination (Braking System) Addendum

Train Examination (Braking System) Addendum Train Examination (Braking System) Addendum Mentor s Q&A (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates developed by

More information

PS 127 Abnormal / Indivisible Loads Policy

PS 127 Abnormal / Indivisible Loads Policy PS 127 Abnormal / Indivisible Loads Policy June 2017 Version 1.5 Statement of legislative compliance This document has been drafted to comply with the general and specific duties in the Equality Act 2010;

More information

Study Group WAGON USERS Groupe d Etudes UTILISATEURS WAGONS Studiengruppe WAGENVERWENDER

Study Group WAGON USERS Groupe d Etudes UTILISATEURS WAGONS Studiengruppe WAGENVERWENDER Study Group WAGON USERS Groupe d Etudes UTILISATEURS WAGONS Studiengruppe WAGENVERWENDER Amendments and additions to the GCU: Appendix 9, Proposal 2 Exceeding of the maximum load limit and entry of axle

More information

Guidelines for Safety Training of Overhead Crane Operators and Supervisors

Guidelines for Safety Training of Overhead Crane Operators and Supervisors Guidelines for Safety Training of Overhead Crane Operators and Supervisors Purpose These guidelines present minimum recommended safety requirements for ensuring the safe and efficient operation of overhead

More information

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act Land Transport Rule: Vehicle Standards Compliance 2002

WELLINGTON, NEW ZEALAND. PURSUANT to section 152 of the Land Transport Act Land Transport Rule: Vehicle Standards Compliance 2002 WELLINGTON, NEW ZEALAND PURSUANT to section 152 of the Land Transport Act 1998 I, Mark Gosche, Minister of Transport, HEREBY make the following ordinary Rule: Land Transport Rule: Vehicle Standards Compliance

More information

Motor Vehicle Policy Essential Knowledge

Motor Vehicle Policy Essential Knowledge Motor Vehicle Policy Essential Knowledge Policy Description This policy outlines requirements for work related use of Carclew Youth Arts, Fleet SA and private vehicles. Carclew Youth Arts is committed

More information

Diesel Locomotive Train Driver. Mentor s Q&A

Diesel Locomotive Train Driver. Mentor s Q&A Diesel Locomotive Train Driver Mentor s Q&A (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates developed by the Association

More information

Port of Oulu Ltd. 9 Dec 2016

Port of Oulu Ltd. 9 Dec 2016 1 NETWORK STATEMENT Replaces the safety instruction for rail network traffic and rail work of the that entered into force on 1 June 2016. Contents 1 PERIOD OF VALIDITY AND INFORMING OF CHANGES... 2 1.1

More information

Note: it is a criminal offence to give false information in this application.

Note: it is a criminal offence to give false information in this application. Note: it is a criminal offence to give false information in this application. Section 1 - Your contact details (Please read Guidance Note 1) 1a) Please give full details of the person that can be contacted

More information

Aerodrome Operating Procedures

Aerodrome Operating Procedures Airside Driving Permit Scheme 1 Policy 1.1 Jersey Airport has a responsibility to regulate the management and control of surface vehicles operating on, or in the vicinity of the airside area of Jersey

More information

Ballast Water Management Surveyor Guidance An outline of Maritime NZ requirements of Surveyors for the purposes of Ballast Water Management

Ballast Water Management Surveyor Guidance An outline of Maritime NZ requirements of Surveyors for the purposes of Ballast Water Management Ballast Water Management Surveyor Guidance An outline of Maritime NZ requirements of Surveyors for the purposes of Ballast Water Management Ballast water management surveyor guidance Page 1 of 9 Ballast

More information

Guardian Electrical Solutions Ltd DRIVING AT WORK POLICY

Guardian Electrical Solutions Ltd DRIVING AT WORK POLICY 1. Introduction Guardian recognises that it employs a number of staff who are required as part of their employment to operate vehicles whilst at work. In this context driving at work means 'driving whilst

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and HIGH VOLTAGE METAL CLAD SWITCHGEAR WITH SPOUTS Copyright National Grid plc 2014, all rights reserved. No part of this publication

More information

Diesel Locomotive Train Driver. Lesson Plan and WorkBook

Diesel Locomotive Train Driver. Lesson Plan and WorkBook Diesel Locomotive Train Driver Lesson Plan and WorkBook (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates developed by

More information

Equipotential Bonding of Rail Vehicles to Running Rail Potential

Equipotential Bonding of Rail Vehicles to Running Rail Potential Railway Group Standard Equipotential Bonding of Rail Vehicles to Running Rail Potential Synopsis This standard mandates the requirements for equipotenial bonding of rail vehicles to comply with the Electricity

More information

Certificate of Acceptance

Certificate of Acceptance HILTI TE6, TE7 and TE30 36 volt hand drills Product Description Product Image TE6, TE7 and TE30 36 volt hand drills TE6 and TE7 are existing Hilti drilling units to be replaced, through continued renewals

More information

SUBSTATION INTERLOCKING SCHEMES

SUBSTATION INTERLOCKING SCHEMES SUBSTATION INTERLOCKING SCHEMES This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses

More information

VALIDITY AND INFORMING OF CHANGES...

VALIDITY AND INFORMING OF CHANGES... 1/7 NETWORK STATEMENT Replaces the safety instruction for shunting work and rail work in the rail network of Port of HaminaKotka Ltd, which entered into force on 1 September 2016. Contents 1 VALIDITY AND

More information

Module DC. DC electrified lines

Module DC. DC electrified lines GE/RT8000/DC Rule Book Module DC DC electrified lines Issue 1 October 2006 Comes into force 02 December 2006 Issue Date Comments Comes into force 1 October 2006 Initial issue 02 December 2006 Copyright

More information

Diesel Locomotive Train Driver Performance Checklist

Diesel Locomotive Train Driver Performance Checklist Diesel Locomotive Train Driver Performance Checklist (Generic Version) Version 1 June, 2011 IMPORTANT NOTICE This booklet is one of a series of generic training and assessment templates developed by the

More information

Motor Vehicle Safety and Journey Management Document Number OHS-PROC-31. Rockhampton Office Brisbane Office Tarong Site

Motor Vehicle Safety and Journey Management Document Number OHS-PROC-31. Rockhampton Office Brisbane Office Tarong Site Business Procedure Motor Vehicle Safety and Journey Management Document Number OHS-PROC-31 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron

More information

DB BR261 - Voith Gravita 10BB

DB BR261 - Voith Gravita 10BB DB BR261 - Voith Gravita 10BB 1 BACKGROUND... 3 1.1 Loco...3 1.2 Design & Specification...3 2 ROLLING STOCK... 4 2.1 DB BR261 Voith Gravita...4 2.2 Zacns 95m Tanker...4 2.3 Rnoos 644...5 2.4 Cab Controls...6

More information

Contents. Port of Hanko Ltd. NETWORK STATEMENT for the timetable period of Change on section 7, agreement on the use of rail network

Contents. Port of Hanko Ltd. NETWORK STATEMENT for the timetable period of Change on section 7, agreement on the use of rail network Sivu 1 / 7 Port of Hanko Ltd NETWORK STATEMENT for the timetable period of 2019 Change on section 7, agreement on the use of rail network Contents 1 Validity and informing of changes... 2 2 Rail network...

More information

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER

THE ROYAL SOCIETY FOR THE PREVENTION OF ACCIDENTS RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER RoSPA RESPONSE TO THE DRIVING STANDARDS AGENCY CONSULTATION PAPER DRIVER CERTIFICATE OF PROFESSIONAL COMPETENCE 8 FEBRUARY 2006 DRIVER CERTIFICATE OF PROFESSIONAL COMPETENCE This is the response of the

More information

UNISIG * EEIG ERTMS USERS GROUP * UNIFE

UNISIG * EEIG ERTMS USERS GROUP * UNIFE ERTMS/ETCS REF: VERSION: DATE: 17/12/15 Page 1/18 Modification history Issue number date Draft 27.07.99 Draft 01 30.08.99 0.1.1 24.09.99 1.0.0 11.10.99 1.0.1 31.01.2000 1.0.2 14.02.2000 1.0.3 22.02 1.1.0

More information

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide.

Discipline: Engineering (Track & Civil) Category: Code of Practice. Clearances. Section 7. Applicability. ARTC Network wide. Discipline: Engineering (Track & Civil) Category: Code Practice Clearances Section 7 Applicability ARTC Network wide Primary Source Document Status Version Date Reviewed Prepared by Reviewed by Endorsed

More information

Engineering Design of On-Track Machines in Running Mode

Engineering Design of On-Track Machines in Running Mode Engineering Design of On-Track Machines in Running Synopsis This document mandates requirements for the design of on-track machines in running mode. Copyright in the s is owned by Rail Safety and Standards

More information

SYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE

SYDNEY TRAMWAY MUSEUM TROLLEY WIRE INSPECTION PROCEDURE TROLLEY WIRE INSPECTION PROCEDURE JUNE 2014 1. Document Details: Name: SYDNEY TRAMWAY MUSEUM Document Control Record Number STM 6029 Version Number: 15 TrolleyWire Inspection Procedure Document Status:

More information