1 H.J. Krebs/April 1, 2004 AP , Rev. 1 1 STANFORD LINEAR ACCELERATOR CENTER Mail Address Mail Stop 41 SLAC, P.O. Box 4349 Stanford, California ) IR-2 NON-ROUTINE RIGGING PROCEDURE and JOB HAZARD ANALYSIS FOR REMOVAL/REINSTALLATION of BACKWARD END PLUG, LEAD HORSESHOE and DIRC MAGNETIC SHIELD CYLINDER 1.0 Loads: BWD End Plug Lead Horseshoe DIRC Magnetic Shield Cylinder/Lead Liner Rail Extension Support Structure Rail Extension 16,500 lbs 1630 lbs lbs 680 lbs 210 lbs 2.0 Install Support Structures and Rail Extensions: 2.1 Notify the Safety Officer, Sandy Pierson x2686 (page ), or Frank O Neill x5300, that the backward end plug removal is about to commence. 2.2 Notify Stan Ecklund x3182 (page ) that the backward end plug will be removed. Stan will need to remove the PEP wire alignment components that are located on the Q2, Q4L and the Q5L. Also the alignment wire will need to be slackened to allow the DIRC magnetic shield cylinder, the lead horseshoe and the backward end plug to be extracted. 2.3 Complete overhead crane checklist AP The crane operator shall maintain control of the radio control crane control box at all times during this operation. There is a spare control box. This box shall be stored in the mechanical operations cabinet with the padlock secured. 2.5 Magnetic field from BaBar superconducting solenoid shall be zero with power supply locked out and administrative interlock switch opened with key removed. The administrative key lock switch is located on the lower north wall in the detector area to the east of the chicane opening (see Figure 1). The key is stored in the key box in room 201 on the second floor of Building Disconnect the interlock cable (located in front of the plastic cover, (see Figure 2) from the switch box located on white shield cylinder end flange. Wind cable and store on floor adjacent to PEP Backward Raft. 2.7 Remove the plastic cover that prevents access to the DIRC tunnel. This cover is attached to the DIRC Shield Cylinder lead liner using four.75-10unc grade 5 socket head cap screws x 1.5 long with flat washers. These bolts are removed using a 5/8 hex key. 2.8 Remove the.75-10unc ASTM A325 hex head special bolt x 4 long, flat washer and thick washer, that is located behind the east turnbuckle on the inner circle of the lower DIRC magnetic shield cylinder. (see Figure 2) 1

2 H.J. Krebs/April 1, 2004 AP , Rev. 1 2 Figure 1. Interlock Key Switch Figure 2. Remove Bolt Behind East Turnbuckle 2.9 Install two turnbuckles between cylinder flange and the elephant ear support structures located on PEP pier face. These turnbuckles provide a load path for the weight of the plug/lead/cylinder if the BWD end doors are opened. The turnbuckles are permanently connected to the lower DIRC magnetic shield cylinder flange. The turnbuckles are then connected to brackets fastened to the elephant ear brackets using a.75 diameter shoulder screw x 4 long and 5/8-11UNC hex nut at each connection (see Figure 3). The shoulder screw is tightened hand tight with a 3/8 hex key. The turnbuckles are adjusted to provide an upward force on the lower DIRC magnetic shield cylinder to level the backward end plug rail system. However, all ten of the inner bolts on the lower DIRC magnetic shield cylinder flange will need to be removed to allow vertical adjustment of the rail extension. Adjust the load on the turnbuckles as necessary using a 1.5 open end wrench. Clockwise rotation (as seen from above) shortens the turnbuckle. Counterclockwise rotation (as seen from above) extends the turnbuckle. Figure 3. West Turnbuckle Connection 2

3 H.J. Krebs/April 1, 2004 AP , Rev Install two Crosby Style G-209, Stock number , 6.5-ton capacity screw pin anchor shackles on one of the two green rail extension support structures that are located on the floor in the northwest corner of the detector area Install a LiftAll Tuff-Edge number EN-801T web sling of 3200 lb minimum vertical capacity in a choke configuration on each shackle Lower the 10-ton hoist and slip the slings over the hook. (see Figure 4 for the rigging configuration) Figure 4. Rigging the West Green Rail Extension Support Structure 2.13 The load is resting beyond the north travel of the 10-ton hoist. Gently raise the 10-ton hoist but hold the load to prevent swinging. Once the load can hang plumb, slowly raise the 10-ton hoist and position the green rail extension support structure on the appropriate elephant ear structure Bolt the green rail extension support structure to the elephant ear structure using six UNC ASTM A325 bolts x 4.5 long with hardened flat washers and hex nuts on each structure. The hex nuts are tightened to approximately 100 lb-ft using a 2 box wrench Remove the web slings and screw pin anchor shackles from the green rail support structure and remove the slings from the crane hook Reposition the crane over the remaining green support structure in the northwest corner of the detector area. 3

4 H.J. Krebs/April 1, 2004 AP , Rev Install two Crosby Style G-209, Stock number , 6.5-ton capacity screw pin anchor shackles on the remaining green rail extension support structure that is located on the floor in the northwest corner of the detector area Install a LiftAll Tuff-Edge number EN-801T web sling of 3200 lb minimum vertical capacity in a choke configuration on each shackle Lower the 10-ton hoist and slip the slings over the hook. (see Figure 4 for the rigging configuration) 2.20 The load is resting beyond the north travel of the 10-ton hoist. Gently raise the 10-ton hoist but hold the load to prevent swinging. Once the load can hang plumb, slowly raise the 10-ton hoist and position the green rail extension support structure on the appropriate elephant ear structure Bolt the green rail extension support structure to the elephant ear structure using six UNC ASTM A325 bolts x 4.5 long with hardened flat washers and hex nuts on each structure. The hex nuts are tightened to approximately 100 lb-ft using a 2 box wrench Remove the web slings and screw pin anchor shackles from the green rail support structure and remove the slings from the crane hook Sammy is shown in Figure Install two LiftAll Tuff-Edge number EN-801T web slings of 3200 lb minimum vertical capacity in a choker type connection around one of the rail extensions that are lying on the floor in the northwest corner of the detector area. Use edge protectors to prevent cutting the slings. (see Figure 6) Figure 5. Sammy Figure 6. Rigging the West Rail Extension 2.25 Lower the 10-ton hoist and slip the slings over the hook The load is resting beyond the north travel of the 10-ton hoist. Gently raise the 10-ton hoist but hold the load to prevent swinging. Once the load can hang plumb, slowly raise the 10-ton hoist and position rail extension on the appropriate green support structure Manually raise the north end of the rail extension and remove the sling and edge protectors. Lower the rail extension. 4

5 H.J. Krebs/April 1, 2004 AP , Rev The rail extension bolts to the permanent rails using two ¾-10UNC Hex head Cap screws x 2.5 long, grade 5. These bolts shall be torqued to hand tight Reposition the crane over the remaining rail extension in the northwest corner of the detector area Install a LiftAll Tuff-Edge number EN-801T web sling of 3200 lb minimum vertical capacity in a choker type connection around the rail extension that is left lying on the floor in the northwest corner of the detector area. Use edge protectors to prevent cutting the sling Lower the 10-ton hoist and slip the slings over the hook The load is resting beyond the north travel of the 10-ton hoist. Gently raise the 10-ton hoist but hold the load to prevent swinging. Once the load can hang plumb, slowly raise the 10-ton hoist and position rail extension on the appropriate green support structure Manually raise the north end of the rail extension and remove the sling and edge protectors. Lower the rail extension The rail extension bolts to the permanent rails using two ¾-10UNC Hex head Cap screws x 2.5 long, grade 5. These bolts shall be torqued to hand tight. 3.0 Remove DIRC Magnetic Shield Cylinder: 3.1 Unbolt the outer row of sixteen.75-10unc ASTM A325 hex head special bolts x 4 long, flat washer and thick washer, on the white DIRC magnetic shield cylinder. This cylinder has an 18,000 pound preload on it so these bolts must be backed out in steps approximately one half turn each per side until the preload is removed. The bolts are removed using a 1.25 hex, ¾ drive, socket wrench. 3.2 Remove all of the ¾ bolts from the outer row on the white cylinder. 3.3 The PEP alignment wire components must be removed before proceeding. See procedure The white cylinder is on rollers. Manually extract the white cylinder until it clears the DIRC tunnel opening. Be certain not to extract to the point where the cylinder can roll off of the end of the rail extensions. Caution: There is a crushing/amputation hazard between the white cylinder and the Q5 PEP magnet. 3.5 Remove the four UNC set screws from the top surface of the white cylinder. 3.6 Place two arch spacers (see Figure 7), north and south, and install four custom engineered Crosby 1.75-UNC swivel hoist rings through the holes in the arch spacers into the set screw threaded holes in the white shield cylinder. These swivel hoist rings are rated for 24,000 lb in any direction. Torque the swivel hoist rings to approximately 100 lb-ft using a 1.25 hex key. This small amount of torque is based on the soft structure of the magnetic steel used in the fabrication of the DIRC magnetic shield cylinder. 3.7 Position the 50-ton hoist directly over the center of the four swivel hoist rings. The hoist hook shall be open on the west side. 3.8 Lower the 50-ton hoist and place the eyes of a 6-ft long LiftAll Tuflex number EE120 eye and eye roundsling of 10,600 lb minimum vertical capacity over the hoist hook. 3.9 Repeat step 3.7 with three additional 6-ft long LiftAll Tuflex number EE120 eye and eye roundslings of 10,600 lb minimum vertical capacity over the hoist hook. The hook should be oriented so that the sling eyes are inline adjacent to one another east to west. 5

6 H.J. Krebs/April 1, 2004 AP , Rev. 1 6 Figure 7. Arch Spacer 3.10 The lower end of the east outer sling shall be basket connected to the northeast swivel hoist ring using a Crosby Style G-209, Stock number , 17-ton capacity screw pin anchor shackle. (See Figure 8) Figure 8. DIRC Cylinder East Rigging 6

7 H.J. Krebs/April 1, 2004 AP , Rev The lower end of the east inner sling shall be basket connected to the southeast swivel hoist ring using a Crosby Style G-209, Stock number , 9.5-ton capacity screw pin anchor shackle and a Crosby Style G-209, Stock number , 6.5-ton capacity screw pin anchor shackle in series. (See Figures 7 & 8) Figure 8. DIRC Cylinder Southeast Rigging 3.12 The lower end of the west inner sling shall be basket connected to the southwest swivel hoist ring using a Crosby Style G-209, Stock number , 13.5-ton capacity screw pin anchor shackle. (See Figure 9) Figure 9. DIRC Cylinder West Rigging 7

8 H.J. Krebs/April 1, 2004 AP , Rev The lower end of the west outer sling shall be basket connected to the northwest swivel hoist ring using a Crosby Style G-209, Stock number , 12-ton capacity screw pin anchor shackle. (see Figure 9) The different sized screw pin anchor shackles are used to balance the load and aid ease of installation Slowly raise the white cylinder using the 50-ton hoist on Creep mode. The cylinder will rise first on the north end approximately two inches before the south end. There are cam followers on the bottom east surface of this cylinder. These cam followers must clear the slots in the rail extensions before any side (east or west) movement may commence. Clearances are very tight in this area. Avoid any contact between the cylinder and the PEP beamline components Do not drop load on personnel Park the load directly over the IR-2 shield wall. Turn off the crane control box until the crane operator repositions himself in the assembly area Take to IR-2 assembly area. Avoid transporting the load over the BaBar Electronics House. Be certain that all personnel are clear of the load path. Lower slowly onto four 4 x 4 minimum dunnage. 4.0 Remove Lead Horseshoe: 4.1 Using the ¾ drill motor, extract the plug/horseshoe assembly until the horseshoe clears the DIRC tunnel opening. (see Figure 10) Clockwise extracts, counter-clockwise inserts. The lead horseshoe is cantilevered from the backward surface of the end plug using four.75-10unc socket head cap screws x 2.5 long, grade 5 with flat washers. Figure 10. ¾ Drill Motor 8

9 H.J. Krebs/April 1, 2004 AP , Rev The two ends of a LiftAll Tuff-Edge number EN-801T web sling of 3200 lb minimum vertical capacity is connected to one of the two lift holes on the horseshoe using a Crosby Style G-209, Stock number , 4.75-ton capacity screw pin anchor shackle. 4.3 The two ends of another LiftAll Tuff-Edge number EN-801T web sling of 3200 lb minimum vertical capacity is connected to the other lift hole on the horseshoe using a Crosby Style G-209, Stock number , 4.75-ton capacity screw pin anchor shackle. 4.4 Lower the 10-ton hoist and slip the web slings over the crane hook in a basket type orientation. The rigging hardware for this operation is never altered and is stored in the northwest corner of the detector hall. (see Figure 11) Figure 11. Lead Horseshoe Rigging 4.5 Gently lift on the 10-ton hoist to take most of the weight of the horseshoe (approximately 1630 pounds). 4.6 Unbolt the horseshoe from the back surface of the end plug using a 5/8 hex key. Lift the horseshoe slowly using the 10-ton hoist. 4.7 Do not drop load on personnel. 4.8 Park the load directly over the IR-2 shield wall. Turn off the crane control box until the crane operator repositions himself in the assembly area. 9

10 H.J. Krebs/April 1, 2004 AP , Rev Take to the IR-2 assembly area. Avoid transporting the load over the BaBar Electronics House. Be certain that all personnel are clear of load path. Lower slowly onto the floor. 5.0 Remove Backward End Plug: 5.1 Using the ¾ drill motor, a 6-point hex socket ¾ drive and three 12 lg ¾ drive extensions in series (see Figure 10), extract the backward end plug until it clears the DIRC tunnel opening. Clockwise extracts, counter-clockwise inserts. Be careful not to extract the plug so far that it collides with the PEP Q5 magnet. Also, there is a potential amputation hazard between the end plug and the Q5 magnet. It may be necessary to push the plastic cover that covers the Q4 north end connections out of the way as the plug is extracted. Beware: this is a potential finger crushing area. 5.2 Connect the four special purpose lift pads (see Figure 12) to the end plug using a total of sixteen 7/8-9UNC socket head cap screw x 2.5 long, grade 8. Be certain that the curvature of the lift pad matches the curvature of the end plug. Torque the 7/8 bolts to 100 lb-ft. Figure 12. Special Purpose Lift Pad 5.3 THIS STEP SHOULD BE COMPLETE AFTER THE INITIAL USE OF THIS EQUIPMENT. Install four 15,000 lb capacity swivel hoist rings to the lift pads. Torque each swivel hoist ring to 470 lb-ft. 5.4 Position the 50-ton hoist directly over the center of the four swivel hoist rings. The hoist hook shall be open on the west side. 5.5 Lower the 50-ton hoist and place the eyes of a 6-ft long LiftAll Tuflex number EE120 eye and eye roundsling of 10,600 lb minimum vertical capacity over the hoist hook. 5.6 Repeat step 3.7 with three additional 6-ft long LiftAll Tuflex number EE120 eye and eye roundslings of 10,600 lb minimum vertical capacity over the hoist hook. The hook should be oriented so that the sling eyes are inline adjacent to one another east to west. 5.7 The lower end of the east outer sling shall be basket connected to the northeast swivel hoist ring using a Crosby Style G-209, Stock number , 6.5-ton capacity screw pin anchor shackle. (See Figure 13) 5.8 The lower end of the east inner sling shall be basket connected to the southeast swivel hoist ring using a Crosby Style G-209, Stock number , 13.5-ton capacity screw pin anchor shackle. (See Figure 13) 5.9 The lower end of the west inner sling shall be basket connected to the southwest swivel hoist ring using a Crosby Style G-209, Stock number , 13.5-ton capacity screw pin anchor shackle. (See Figure 13) 10

11 H.J. Krebs/April 1, 2004 AP , Rev Figure 13. Backward End Plug Rigging 5.10 The lower end of the west outer sling shall be basket connected to the northwest swivel hoist ring using a Crosby Style G-209, Stock number , 6.5-ton capacity screw pin anchor shackle. (see Figure 13) The different sized screw pin anchor shackles are used to balance the load and aid ease of installation Slowly raise the end plug using the 50-ton hoist on Creep mode Do not drop load on personnel Park the load directly over the IR-2 shield wall. Turn off the crane control box until the crane operator repositions himself in the assembly area Take to IR-2 assembly area. Avoid transporting the load over the BaBar Electronics House. Be certain that all personnel are clear of load path. Lower slowly onto four 4 x 4 minimum dunnage. 6.0 Install Backward End Plug: 6.1 Notify Joe Kenny x3517 (page ) that there will be an access to the confined space. 6.2 Notify the Safety Officer, Sandy Pierson x2686 (page ), or Frank O Neill x5300, that the installation is about to commence. 11

12 H.J. Krebs/April 1, 2004 AP , Rev Notify Stan Ecklund x3182 (page ) that the backward end plug will be installed. Stan will need to install the PEP wire alignment components that are located on the Q2L, Q4L and the Q5L PEP magnets. 6.4 After the DIRC tunnel has been approved for entry, inspect area for loose debris, magnetic items and potential interferences with the backward end plug. A Go/No Go gauge is provided for both the east and west sides (see Figure 14). These gauges should be slid along the rails to demonstrate that the end plug stops will not interfere during the installation. Figure 14. Backward End Plug Go/No Go Gauges 6.5 The green rail support structures and rail extensions should have been installed during the removal process. It is not customary to remove these items after the end plug removal process is complete unless the plug is expected remain out for a period longer than 7 calendar days (earthquake requirement). If these items are not in place, they must be reinstalled (see Section 2.0). 6.6 Complete overhead crane checklist AP The crane operator shall maintain control of the radio control crane control box at all times during this operation.. There is a spare control box. This box shall be stored in the mechanical operations cabinet with the padlock secured. 6.8 THIS STEP SHOULD ALREADY BE COMPLETE FROM THE REMOVAL PROCESS. Connect the four special purpose lift pads (see Figure 12) to the end plug 12

13 H.J. Krebs/April 1, 2004 AP , Rev using a total of sixteen 7/8-9UNC socket head cap screw x 2.5 long, grade 8. Be certain that the curvature of the lift pad matches the curvature of the end plug. Torque the 7/8 bolts to 100 lb-ft. 6.9 THIS STEP SHOULD ALREADY BE COMPLETE FROM THE REMOVAL PROCESS. Install four 15,000 lb capacity swivel hoist rings to the lift pads. Torque each swivel hoist ring to 470 lb-ft Position the 50-ton hoist directly over the center of the four swivel hoist rings. The hoist hook shall be open on the west side Lower the 50-ton hoist and place the eyes of a 6-ft long LiftAll Tuflex number EE120 eye and eye roundsling of 10,600 lb minimum vertical capacity over the hoist hook Repeat step 3.7 with three additional 6-ft long LiftAll Tuflex number EE120 eye and eye roundslings of 10,600 lb minimum vertical capacity over the hoist hook. The hook should be oriented so that the sling eyes are inline adjacent to one another east to west The lower end of the east outer sling shall be basket connected to the northeast swivel hoist ring using a Crosby Style G-209, Stock number , 6.5-ton capacity screw pin anchor shackle. (See Figure 13) 6.14 The lower end of the east inner sling shall be basket connected to the southeast swivel hoist ring using a Crosby Style G-209, Stock number , 13.5-ton capacity screw pin anchor shackle. (See Figure 13) 6.15 The lower end of the west inner sling shall be basket connected to the southwest swivel hoist ring using a Crosby Style G-209, Stock number , 13.5-ton capacity screw pin anchor shackle. (See Figure 13) 6.16 The lower end of the west outer sling shall be basket connected to the northwest swivel hoist ring using a Crosby Style G-209, Stock number , 6.5-ton capacity screw pin anchor shackle. (see Figure 13) The different sized screw pin anchor shackles are used to balance the load and aid ease of installation Slowly raise the end plug using the 50-ton hoist Do not drop load on personnel Park the load directly over the IR-2 shield wall. Avoid transporting the load over the BaBar Electronics House. Be certain that all personnel are clear of load path. Turn off the crane control box until the crane operator repositions himself in the detector area Using the crane bridge and trolley, position the end plug directly over the rail extensions Slowly lower the 50-ton hoist until the end plug is approximately one inch above the rail extensions. Caution: there is anrisk of crushing fingers or toes and amputation of same during this process Switch the crane control box to creep mode Lower the end plug onto the rail extensions using the 50-ton hoist. Be certain that the tow ball enters the receptacle on the southwest corner of the plug and also that the cam followers enter the rail groove on the east rail extension Using a ¾ drive, 1.25 socket wrench, test to make sure that the drive screw will move the end plug Remove the slings from the 50-ton hoist Raise the 50-ton hoist hook out of the way Disconnect the screw pin shackles at the swivel hoist ring Remove the four special purpose lift pads. Leave the swivel hoist rings attached to the lift pads Store the special purpose lift pads with swivel hoist rings in the northwest corner of IR-2 hall in the detector area. 13

14 H.J. Krebs/April 1, 2004 AP , Rev Using the ¾ drill motor, a 6-point hex socket ¾ drive and three 12 lg ¾ drive extensions in series (see Figure 10), insert the backward end plug far enough to ensure that 18 minimum space is provided between the north surface of the end plug and the south surface of Q5L. Clockwise extracts, counter-clockwise inserts. Be careful not to extract the plug into the PEP Q5 magnet by mistake. Also, there is a potential amputation/crush hazard between the end plug and the Q5 magnet. 7.0 Install Lead Horseshoe: 7.1 The two ends of a LiftAll Tuff-Edge number EN-801T web sling of 3200 lb minimum vertical capacity is connected to one of the two lift holes on the horseshoe using a Crosby Style G-209, Stock number , 4.75-ton capacity screw pin anchor shackle. 7.2 The two ends of another LiftAll Tuff-Edge number EN-801T web sling of 3200 lb minimum vertical capacity is connected to the other lift hole on the horseshoe using a Crosby Style G-209, Stock number , 4.75-ton capacity screw pin anchor shackle. 7.3 Lower the 10-ton hoist and slip the web slings over the crane hook in a basket type orientation. The rigging hardware for this operation is never altered and is stored in the northwest corner of the detector hall. (see Figure 11) 7.4 Gently raise the 10-ton hoist. 7.5 Do not drop load on personnel. 7.6 Park the load directly over the IR-2 shield wall. Avoid transporting the load over the BaBar Electronics House. Be certain that all personnel are clear of load path. Turn off the crane control box until the crane operator repositions himself in the detector area. 7.7 Using the crane bridge and trolley, position the horseshoe directly over the rail extensions and immediately to the north of the backward end plug. 7.8 Lower the 10-ton hoist until the four mounting holes in the horseshoe match the corresponding threaded holes in the backward end plug. 7.9 Bolt the horseshoe to the back surface of the end plug using four.75-10unc socket head cap screws x 2.5 long, grade 5 with flat washers. Tighten these bolts to 50 lb-ft using a 5/8 hex key Lower the 10-ton hoist and remove the slings from the hook Remove the two screw pin anchor shackles and store the sling with shackles attached in the northwest corner of IR-2 hall in the detector area Using the ¾ drill motor (see Figure 10), insert the plug/horseshoe assembly completely. Slow the insertion as the final resting position is approached Stan Ecklund will need to install the PEP wire alignment components that are located on the Q2L, Q4L and the Q5L at this time. This will take approximately 45 minutes to 1 hour. 8.0 Install DIRC Magnetic Shield Cylinder: 8.1 THIS STEP SHOULD ALREADY BE COMPLETE FROM THE REMOVAL PROCESS. Remove the four UNC set screws from the top surface of the white cylinder. Place two arch spacers (see Figure 7), north and south, and install four custom engineered Crosby 1.75-UNC swivel hoist rings through the holes in the arch spacers into the set screw threaded holes in the white shield cylinder. These swivel hoist rings are rated for 20,000 lb in any direction. Torque the swivel hoist rings to approximately 14

15 H.J. Krebs/April 1, 2004 AP , Rev lb-ft using a 1.25 hex key. This small amount of torque is based on the soft structure of the magnetic steel used in the fabrication of the DIRC magnetic shield cylinder. 8.2 Position the 50-ton hoist directly over the center of the four swivel hoist rings. The hoist hook shall be open on the west side. 8.3 Lower the 50-ton hoist and place the eyes of a 6-ft long LiftAll Tuflex number EE120 eye and eye roundsling of 10,600 lb minimum vertical capacity over the hoist hook. 8.4 Repeat step 3.7 with three additional 6-ft long LiftAll Tuflex number EE120 eye and eye roundslings of 10,600 lb minimum vertical capacity over the hoist hook. The hook should be oriented so that the sling eyes are inline adjacent to one another east to west. 8.5 The lower end of the east outer sling shall be basket connected to the northeast swivel hoist ring using a Crosby Style G-209, Stock number , 17-ton capacity screw pin anchor shackle. (See Figure 8) 8.6 The lower end of the east inner sling shall be basket connected to the southeast swivel hoist ring using a Crosby Style G-209, Stock number , 9.5-ton capacity screw pin anchor shackle and a Crosby Style G-209, Stock number , 6.5-ton capacity screw pin anchor shackle in series. (See Figures 7 & 8) 8.7 The lower end of the west inner sling shall be basket connected to the southwest swivel hoist ring using a Crosby Style G-209, Stock number , 13.5-ton capacity screw pin anchor shackle. (See Figure 9) 8.8 The lower end of the west outer sling shall be basket connected to the northwest swivel hoist ring using a Crosby Style G-209, Stock number , 12-ton capacity screw pin anchor shackle. (see Figure 9) The different sized screw pin anchor shackles are used to balance the load and aid ease of installation. 8.9 Slowly raise the white cylinder using the 50-ton hoist Do not drop load on personnel Park the load directly over the IR-2 shield wall. Avoid transporting the load over the BaBar Electronics House. Be certain that all personnel are clear of load path. Turn off the crane control box until the crane operator repositions himself in the detector area Using the crane bridge and trolley, position the DIRC shield cylinder directly over the rail extensions and immediately to the north of the DIRC Standoff Box Slowly lower the white cylinder using the 50-ton hoist on Creep mode. There are cam followers on the bottom east surface of this cylinder. These cam followers must be inserted in the slots in the east rail extension. Clearances are very tight in this area. Avoid any contact between the cylinder and the DIRC and the PEP beamline components. Caution: keep fingers and toes clear of load. There is an amputation/crush hazard during this operation After the cylinder is lowered completely onto the rail extensions and the slings are somewhat slack, check to see if the cylinder is free to roll on the rail extensions Remove the slings from the 50-ton hoist hook Raise the 50-ton hoist hook up to the bridge Disconnect the screw pin anchor shackles from the swivel hoist rings Remove the four swivel hoist rings and two arch spacers. Be careful the arch spacers are free to slide. Store all rigging components in the northwest corner of the detector area in IR The white cylinder is inserted manually. Push the cylinder until it comes in contact with the spring loaded plungers located on the horseshoe. A clunk may be heard indicating that the end plug is seated against the stops. 15

16 H.J. Krebs/April 1, 2004 AP , Rev Bolt the outer row of sixteen.75-10unc ASTM A325 hex head special bolts x 4 long, flat washer and thick washer, on the white DIRC magnetic shield cylinder. This cylinder has an 18,000 pound preload on it so these bolts must be inserted in steps approximately one half turn each per side until the preload is attained and the cylinder flange is flush with the white end door housing. The bolts are installed using a 1.25 hex, ¾ drive, socket wrench. 9.0 Remove Rail Extensions and Support Structures: 9.1 Remove the east rail extension bolts using a 1.25 hex box or socket wrench. These bolts should only be hand tight. 9.2 Manually raise the north end of the rail extension and slide two LiftAll Tuff-Edge number EN-801T web slings of 3200 lb minimum vertical capacity and edge protectors under the rail. Connect the slings in a choke condition. Lower the rail extension. 9.3 Lower the 10-ton hoist and slip the slings over the hook. 9.4 Gently raise the 10-ton hoist until the rail extension is above the PEP beamline components. (see Figure 6) 9.5 Transport the rail extension to the northwest corner of the detector area and lower to the floor. As the load nears the floor, manually push the rail extension as far north as possible to park the extension out of the path of foot traffic. Be careful not to allow the load to swing. 9.6 Remove the slings from the 10-ton hoist hook. 9.7 Raise the 10-ton hoist and reposition directly over the west rail extension. 9.8 Remove the west rail extension bolts using a 1.25 hex box or socket wrench. These bolts should only be hand tight. 9.9 Manually raise the north end of the rail extension and slide two LiftAll Tuff-Edge number EN-801T web slings of 3200 lb minimum vertical capacity and edge protectors under the rail. Connect the slings in a choke condition. Lower the rail extension Lower the 10-ton hoist and slip the slings over the hook Gently raise the 10-ton hoist until the rail extension is above the PEP beamline components. (see Figure 6) 9.12 Transport the rail extension to the northwest corner of the detector area and lower to the floor adjacent to the east rail extension. As the load nears the floor, manually push the rail extension as far north as possible to park the extension out of the path of foot traffic. Be careful not to allow the load to swing Remove the slings from the 10-ton hoist hook Raise the 10-ton hoist and reposition directly over the east green rail extension support structure Unbolt the green support structure from the elephant ear structure. The 1.25 hex nuts are loosened using a 2 box wrench Install two Crosby Style G-209, Stock number , 6.5-ton capacity screw pin anchor shackles on the east green rail extension support structure Install a LiftAll Tuff-Edge number EN-801T web sling of 3200 lb minimum vertical capacity in a choke configuration on each shackle Lower the 10-ton hoist and slip the slings over the hook. (see Figure 4 for the rigging configuration) 9.19 Gently raise the 10-ton hoist until the green support structure is above the PEP beamline components. 16

17 H.J. Krebs/April 1, 2004 AP , Rev Transport the green rail support structure to the northwest corner of the detector area and lower to the floor adjacent to the rail extensions. As the load nears the floor, manually push the rail extension as far north as possible to park the extension out of the path of foot traffic. Be careful not to allow the load to swing Remove the sling from the 10-ton hoist hook Raise the 10-ton hoist and reposition directly over the west green rail extension support structure Unbolt the green support structure from the elephant ear structure. The 1.25 hex nuts are loosened using a 2 box wrench Install two Crosby Style G-209, Stock number , 6.5-ton capacity screw pin anchor shackles on the west green rail extension support structure Install a LiftAll Tuff-Edge number EN-801T web sling of 3200 lb minimum vertical capacity in a choke configuration on each shackle Lower the 10-ton hoist and slip the slings over the hook. (see Figure 4 for the rigging configuration) 9.27 Gently raise the 10-ton hoist until the green support structure is above the PEP beamline components Transport the green rail support structure to the northwest corner of the detector area and lower to the floor adjacent to the other rail support structure. As the load nears the floor, manually push the rail extension as far north as possible to park the extension out of the path of foot traffic. Be careful not to allow the load to swing Remove the slings from the 10-ton hoist hook Raise the 10-ton hoist up to the bridge Remove the two turnbuckles at the elephant ear support structures located on the PEP pier face. The turnbuckles are left permanently connected to the lower DIRC magnetic shield cylinder flange. The turnbuckles are disconnected using a 3/8 hex key. Adjust the load on the turnbuckles as necessary using a 1.5 open end wrench. Clockwise rotation (as seen from above) shortens the turnbuckle. Counterclockwise rotation (as seen from above) extends the turnbuckle. Insert the shoulder screws back into the lower brackets to prevent them from being misplaced Install the plastic cover that prevents access to DIRC tunnel. This cover is attached to the DIRC Shield Cylinder lead liner using four.75-10unc grade 5 socket head cap screws x 1.5 long with flat washers. These bolts are installed using a 5/8 hex key Connect the magnet interlock cable to the switch box located on white shield cylinder end flange The administrative interlock switch (located on north wall adjacent to end door drive main disconnects) is turned on using a key. The key is stored in the key box in room 201 on the second floor of Building 621. (see Figure 15 for the final configuration) 17

18 H.J. Krebs/April 1, 2004 AP , Rev Potential Hazards: Figure 15. Installation Complete 10.1 Typical hoisting and rigging hazards Crushed extremities Amputation Rotating parts Overhead loads Personnel in path of load movement or under load Restrictive work areas Entry into DIRC tunnel (confined space) Unexpected load movement Operator error Equipment failure Tripping due to awkward work surfaces Opening between platform and detector Sprain/impact injury due to drill torque or recoil Failure of crane or rigging hardware Back strain and foot crush from heavy rigging gear. 18

19 H.J. Krebs/April 1, 2004 AP , Rev Hazard Controls: 11.1 Crane Operator shall be a SLAC-certified (EFD) rigger A minimum of two experienced technical support staff is required. An experienced technician is assumed to be an individual that has been involved in the removal and reinstallation of the backward end plug, lead horseshoe and DIRC magnetic shield cylinder a minimum of ten cycles No one will be allowed under a suspended load or in the path of a load Casual observers will not be allowed in the area Strict controls of crane control box and rigging procedures Inspection of equipment prior to use Inspection of crane functions Current training of personnel. Permit required confined space training is required Use of personnel of adequate physical capability and agility for heavy duty rigging applications Crane maintenance current Review of procedures with rigging and technical support personnel Appropriate use of personnel protection equipment Appropriate supervision of tasks Continuous safety oversight is required Continuous engineering oversight is required Continuous supervision of technical support is required Field Observations and Comments: 19

20 H.J. Krebs/April 1, 2004 AP , Rev Acknowledgements: Name Signature Date H. James Krebs Zohrab Vassilian David Engesser Jason Krebs Andrew Hau Scot Johnson Sandy Pierson Joe Kenny Rich Torres 20

21 H.J. Krebs/April 1, 2004 AP , Rev

Contents. Section 5: Adjustments Ball Detect Adjustment Transport Band Tension Adjustment

Contents. Section 5: Adjustments Ball Detect Adjustment Transport Band Tension Adjustment Contents Section 5: Adjustments... 5-3 1. Ball Detect Adjustment... 5-3 2. Transport Band Tension Adjustment... 5-5 3. Transport Band Drive Belt Tension Adjustment... 5-7 4. Ball Cushion Adjustment...

More information

WARNING!! C-659 SUBKIT FIGURE 4

WARNING!! C-659 SUBKIT FIGURE 4 '0-'0 DODGE / TON TRUCKS '03-' DODGE 3/ & TON TRUCKS (WILL FIT /, 3/ & TON MEGA CAB SHORT BED) WARNING!! BRAKE, FUEL, AND ELECTRICAL LINES MAY NEED TO BE LOOSENED OR REPOSITIONED TO PROVIDE CLEARANCE FOR

More information

Bill of Materials: Please take time to read and understand these installation instructions.

Bill of Materials: Please take time to read and understand these installation instructions. Please take time to read and understand these installation instructions. CORSA recommends that installation of this system be performed by a qualified service center or professional muffler installer who

More information

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS 66748 Turnoverball Gooseneck Hitch Installation Instructions MODEL 1314 2013 2014 RAM 3500

More information

Doc #: 2100 AD Revision:

Doc #: 2100 AD Revision: Doc #: 2100 AD 015 0031 Revision: 4m Dec Axis Counterweight Removal, Disassembly, Maintenance, & Reinstallation Procedure Author(s): Matthew John Evatt Contents 1. Contents... 2 2. Revision History...

More information

Owner s Manual Gantry Cranes

Owner s Manual Gantry Cranes Owner s Manual Gantry Cranes Fixed Height Gantry Crane MODEL NUMBER: SERIAL NUMBER: CAPACITY IN TONS: Telescoping Gantry Crane Bushman Equipment, Inc. 262-790-4200, 800338-7810, Fax 262-790-4200 www.bushman.com

More information

»Product» Safety Warning

»Product» Safety Warning C1351 Installation Instructions 2014 Chevy/GMC, ½ Ton, 2/4wd 3.5" Combo Kit Read and understand all instructions and warnings prior to installation of product and operation of vehicle. Zone Offroad Products

More information

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS

Health & Safety Policy and Procedures Manual SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS SECTION 22 CRANE SUSPENDED PERSONNEL PLATFORMS 1. Scope: This policy and procedure applies to the design, construction testing, use, and maintenance or personnel platforms and hosting of personnel platforms

More information

**DO NOT EXCEED RECOMMENDED VEHICLE TOWING WEIGHT!**

**DO NOT EXCEED RECOMMENDED VEHICLE TOWING WEIGHT!** 60660 SUBKIT 7/8/0 **DO NOT EXCEED RECOMMENDED VEHICLE TOWING WEIGHT!** DODGE 500 / 3500 SHORT AND LONG BED PAGE OF 5 WARNING!! BRAKE, FUEL, AND ELECTRICAL LINES MAY NEED TO BE LOOSENED OR REPOSITIONED

More information

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS 66748 P:620.473.3664 F:620.869.9031 Turnoverball Gooseneck Hitch Installation Instructions

More information

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS 66748 P:620.473664 F:620.869.9031 Turnoverball Gooseneck Hitch Installation Instructions

More information

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W B&W Trailer Hitches 6 Hawaii Rd / PO Box 86 Humboldt, KS 66748 P:60.473664 F:60.869.903 Turnoverball Gooseneck Hitch Installation Instructions MODEL 08

More information

**DO NOT EXCEED RECOMMENDED VEHICLE TOWING WEIGHT!** FORD F-250, F-350

**DO NOT EXCEED RECOMMENDED VEHICLE TOWING WEIGHT!** FORD F-250, F-350 6065 SUBKIT 7/7/0 **DO NOT EXCEED RECOMMENDED VEHICLE TOWING WEIGHT!** FORD F-50, F-50 PAGE OF WARNING!! BRAKE, FUEL, AND ELECTRICAL LINES MAY NEED TO BE LOOSENED OR REPOSITIONED TO PROVIDE CLEARANCE FOR

More information

RUFNEX Series Low Profile Wrenches Operation and Maintenance Manual

RUFNEX Series Low Profile Wrenches Operation and Maintenance Manual RUFNEX Series Low Profile Wrenches Operation and Maintenance Manual http://www.torsionx.com Use the RUFNEX Series Ultra-Low Profile Wrenches to install and remove large bolts that have minimal wrench clearance.

More information

INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS

INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS Tarpaulin Systems Flip -N- Go / Quick Mount Flip -N- Go System INSTALLATION, MAINTENANCE, & SAFETY INSTRUCTIONS (800) CRAMARO (800) 272-6276 Plants In: Delaware, Florida, Massachusetts, Nevada, Ohio Install

More information

**DO NOT EXCEED RECOMMENDED VEHICLE TOWING WEIGHT!** FORD F-250, F-350

**DO NOT EXCEED RECOMMENDED VEHICLE TOWING WEIGHT!** FORD F-250, F-350 60647 SUBKIT 7/3/204 **DO NOT EXCEED RECOMMENDED VEHICLE TOWING WEIGHT!** FORD F-250, F-350 PAGE OF 4 WARNING!! BRAKE, FUEL, AND ELECTRICAL LINES MAY NEED TO BE LOOSENED OR REPOSITIONED TO PROVIDE CLEARANCE

More information

HexPro Series Low Profile Wrenches

HexPro Series Low Profile Wrenches HexPro Series Low Profile Wrenches Operation and Maintenance Manual Model 2HP 4HP 8HP 14HP 30HP www.torquetoolsinc.com Use the HEXPRO Series Low Profile Wrenches Model 2HP 4HP 8HP 14HP 30HP to install

More information

Ford Super Duty Recoil Traction Bar System. Part#: ,123409

Ford Super Duty Recoil Traction Bar System. Part#: ,123409 Part#: 123418,123409 Ford Super Duty Recoil Traction Bar System Rev. 011017 491 W. Garfield Ave., Coldwater, MI 49036. Phone: 517-279-2135 Web/live chat: www.bds-suspension.com. E-mail: tech-bds@sporttruckusainc.com

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS 144F TABLE OF CONTENTS GENERAL... 2 SPECIFICATIONS... 2 PACKAGE CONTENTS... 2 PACKAGE CONTENTS: ACCESSORIES... 3 REQUIRED TOOLS... 3 ADD-ON COMPONENTS... 3 CABINET MOUNTING WALL MOUNT BRACKET ATTACHMENT...

More information

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F:

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F: B&W Trailer Hitches 6 Hawaii Rd / PO Box 86 Humboldt, KS 6678 P:60.7366 F:60.73766 Turnoverball Gooseneck Hitch Installation Instructions MODEL 38 0 06

More information

Low Profile Wrenches Operation and Maintenance Manual

Low Profile Wrenches Operation and Maintenance Manual Low Profile Wrenches Operation and Maintenance Manual http://www.torquetoolsinc.com Use the HEXPRO Series Low Profile Wrenches Model 2HP 4HP 8HP 14HP 30HP to install and remove large bolts that have minimal

More information

INSTALLATION INSTRUCTIONS READ THOROUGHLY BEFORE BEGINNING

INSTALLATION INSTRUCTIONS READ THOROUGHLY BEFORE BEGINNING Catalog No. 6320 INSTALLATION INSTRUCTIONS READ THOROUGHLY BEFORE BEGINNING 6320 RAIL KIT - 1988 through 2000 Chevrolet/GMC Pickup w/6 ft. bed, 1999 Chevrolet C/K LS and GMC Sierra Classic w/6 ft. bed

More information

N/S= Not Shown Bold = Part available for purchase. Italic = Part not available for purchase, listed and shown for reference only.

N/S= Not Shown Bold = Part available for purchase. Italic = Part not available for purchase, listed and shown for reference only. Media Rewind Upgrade Installation Instructions Prepare for Installation This kit includes the parts and documentation necessary to install the media rewind option kit into the 105SL printers. Read these

More information

Operations Manual Eagle 1000 Series Stretch Wrapper

Operations Manual Eagle 1000 Series Stretch Wrapper Operations Manual Eagle 1000 Series Stretch Wrapper Models A & B - 1 - READ ALL INSTRUCTIONS CONTAINED IN THIS MANUAL PRIOR TO MACHINE INSTALLATION! - 2 - Contents page 1. Machine Safety Information 1.1

More information

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F:

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F: B&W Trailer Hitches 26 Hawaii Rd / PO Box 86 Humboldt, KS 66748 P:620.473664 F:620.869.903 Turnoverball Gooseneck Hitch Installation Instructions Mounting

More information

PowerAssist. Installation Manual

PowerAssist. Installation Manual PowerAssist Counterweight Assisted Hoist System Installation Manual Design, Manufacture and Installation of Theatrical Equipment Worldwide (315) 451-3440 Fax (315) 451-1766 www.jrclancy.com Table of Contents

More information

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F:

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W Trailer Hitches 1216 Hawaii Rd / PO Box 186 Humboldt, KS P: F: B&W Trailer Hitches 26 Hawaii Rd / PO Box 86 Humboldt, KS 66748 P:620.473664 F:620.473766 Turnoverball Gooseneck Hitch Installation Instructions Mounting

More information

Raptor "Race 1.5" Upper Control Arm Kit! Installation Guide! Rev 1B! Sales: ext 1! Tech Support: ext 2! Vista Grande!

Raptor Race 1.5 Upper Control Arm Kit! Installation Guide! Rev 1B! Sales: ext 1! Tech Support: ext 2! Vista Grande! Raptor "Race 1.5" Upper Control Arm Kit Installation Guide Rev 1B Sales: 866-691-7750 ext 1 Tech Support: 866-691-7750 ext 2 23231 Vista Grande Laguna Hills, CA 92653 Install Videos: YouTube "Raptor Performance

More information

Rear Bumper Installation Instructions

Rear Bumper Installation Instructions KEY TO COMPONETS A. 1 ea. Rear bumper B. 2 ea. Mounting L bracket C. 11 ea. M12x1.75 hex head bolt D. 4 ea. M12x1.75 hex head bolt E. 6 ea. M12 Hex head lock nut F. 9 ea. Pressure washer G. 19 ea. M12

More information

Page 1 of 15 Transmission, Model S5-42 ZF Model S5-42 ZF Disassembly NOTE: For 4x4 and F-Super Duty vehicles, skip to Step 5. 1. Attach the transmission to the Bench Mounted Holding Fixture T57L-500-B

More information

GPS AutoSteer System Installation Manual

GPS AutoSteer System Installation Manual GPS AutoSteer System Installation Manual Supported Vehicles Case IH Vehicles Case 2577 Combines Case 2588 Combines Accuguide Ready PN: 602-0233-01-A LEGAL DISCLAIMER Note: Read and follow ALL instructions

More information

600 SERIES STANDARD DUTY STRAIGHT TRACK INSTALLATION INSTRUCTIONS

600 SERIES STANDARD DUTY STRAIGHT TRACK INSTALLATION INSTRUCTIONS 600 SERIES STANDARD DUTY STRAIGHT TRACK INSTALLATION INSTRUCTIONS PLEASE READ INSTRUCTIONS THOROUGHLY BEFORE BEGINNING. A. BI-PARTING TRAVEL 1. Before raising track into position, determine location of

More information

CONTENTS: 5740AH - 40 Ton Air/Hydraulic Shop Press 5750AH - 50 Ton Air/Hydraulic Shop Press OWNER'S MANUAL

CONTENTS: 5740AH - 40 Ton Air/Hydraulic Shop Press 5750AH - 50 Ton Air/Hydraulic Shop Press OWNER'S MANUAL OWNER'S MANUAL CONTENTS: Page 1 Specifications 2 Safety Information and Warranty Information 3 Parts List 4-6 Assembly Instructions 7 Pump and Ram Assembly Instructions 8 Procedure for Bleeding Air 9 Pump

More information

** DO NOT EXCEED THE RECOMMENDED VEHICLE TOWING WEIGHT RATING ** DODGE RAM 1500

** DO NOT EXCEED THE RECOMMENDED VEHICLE TOWING WEIGHT RATING ** DODGE RAM 1500 10/3/2017 DODGE RAM 1500 WARNING!! BRAKE, FUEL, AND ELECTRICAL LINES MAY NEED TO BE LOOSENED OR REPOSITIONED TO PROVIDE CLEARANCE FOR NEW HARDWARE. ON SHORT BED MODELS, CHECK FOR ADEQUATE TURNING CLEARANCE

More information

Chevy HD Recoil Traction Bar System. Part#: ,

Chevy HD Recoil Traction Bar System. Part#: , Part#: 121408, 123409 Chevy HD Recoil Traction Bar System Rev. 111816 491 W. Garfield Ave., Coldwater, MI 49036. Phone: 517-279-2135 Web/live chat: www.bds-suspension.com. E-mail: tech-bds@sporttruckusainc.com

More information

E-LIFT II+ SYSTEM WITH SPRING LEVER FOR A-SERIES AND FULL FRAME LOOMS

E-LIFT II+ SYSTEM WITH SPRING LEVER FOR A-SERIES AND FULL FRAME LOOMS Congratulations on your purchase of the E-Lift II+ system. This system replaces the action of treadling, eliminating leg strain and fatigue. When you activate the Foot Switch, the motor turns, and selected

More information

Part No Part No Product Name: Adventure System

Part No Part No Product Name: Adventure System WARNING: DO NOT DRILL, WELD OR MODIFY TO THIS ASSEMBLY. TOOLS REQUIRED 3/16 Allen Wrench 7/32 Allen Wrench 1/2 Wrench 9/16 Wrench IMPORTANT NOTES USE ONLY THE FASTENERS SUPPLIED OR APPROVED BOLTS, LOCKNUTS,

More information

»Product» Safety Warning

»Product» Safety Warning C9151 Installation Instructions 2014-15 Chevy/GMC 1/2 Ton 2WD & 4WD 1.5" Body Lift Read and understand all instructions and warnings prior to installation of product and operation of vehicle. Zone Offroad

More information

Responsible Unit: Facilities Management

Responsible Unit: Facilities Management Policy Sponsor: Assistant Vice President Approval Date: January 2010 Mobile Overhead Cranes Safe Work Instructions Responsible Unit: Revisions: Service: Trade Services Shop: Mechanical & Welding Hazards

More information

Comfort Ride Shock absorber system part numbers 2450, 2460 and 2470 Installation Instructions

Comfort Ride Shock absorber system part numbers 2450, 2460 and 2470 Installation Instructions Comfort Ride Shock absorber system part numbers 2450, 2460 and 2470 Installation Instructions All specifications are subject to change without notice. MOUNTING FLANGE CENTER HOLE FRONT OF Item Qty Part

More information

4, 6 Suspension System. Ford F250/350 4WD Part#: ,

4, 6 Suspension System. Ford F250/350 4WD Part#: , Part#: 013411, 013611 4, 6 Suspension System Ford F250/350 4WD 2005-2007 Rev. 071917 491 W. Garfield Ave., Coldwater, MI 49036. Phone: 517-279-2135 E-mail: tech-bds@sporttruckusainc.com Read And Understand

More information

2 Strut Spacer / Preload Lift. Ford Ranger 4wd Part#:

2 Strut Spacer / Preload Lift. Ford Ranger 4wd Part#: Part#: 013203 2 Strut Spacer / Preload Lift Ford Ranger 4wd 2019 Rev. 022119 491 W. Garfield Ave., Coldwater, MI 49036. Phone: 517-279-2135 Web: www.bds-suspension.com. E-mail: tech-bds@ridefox.com Read

More information

FRONT & 4 REAR GM WD LOWERING KIT

FRONT & 4 REAR GM WD LOWERING KIT 92725200 88-98 2 FRONT & 4 REAR GM 1500 2WD LOWERING KIT Thank you for choosing Rough Country for all your suspension needs. Rough Country recommends a certified technician install this system. In addition

More information

Read and understand all instructions and warnings prior to installation of product and operation of vehicle.

Read and understand all instructions and warnings prior to installation of product and operation of vehicle. #F9378 Installation Instructions 1998-2000 Ford Ranger 3" Body Lift Kit Read and understand all instructions and warnings prior to installation of product and operation of vehicle. Zone Offroad Products

More information

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W

<THESE INSTRUCTIONS MUST BE GIVEN TO THE END USER> B&W B&W Trailer Hitches 6 Hawaii Rd / PO Box 86 Humboldt, KS 6678 P:60.7366 F:60.86.03 Turnoverball Gooseneck Hitch Installation Instructions MODEL 38 0 08

More information

Installation and Parts Manual for SPANCO A Series Steel Gantry Cranes

Installation and Parts Manual for SPANCO A Series Steel Gantry Cranes Manual No. 103-0002 08/14 Installation and Parts Manual for SPANCO A Series Steel Gantry Cranes ISO 9001 REGISTERED 2 TABLE OF CONTENTS Warnings... 3 Assembly and Operation...4 Track Installation Instructions...6

More information

160S Rewind Option Kit Installation Instructions

160S Rewind Option Kit Installation Instructions Installation Instructions GENERAL This kit includes the parts and documentation necessary to install the Media Rewind Option into the Zebra 160S printer. Read these instructions thoroughly before attempting

More information

4, 6 Suspension System. Ford Super Duty 4WD Part#: ,

4, 6 Suspension System. Ford Super Duty 4WD Part#: , Part#: 013413, 013610 4, 6 Suspension System Ford Super Duty 4WD 2011-2016 Rev. 012518 491 W. Garfield Ave., Coldwater, MI 49036. Phone: 517-279-2135 E-mail: tech-bds@sporttruckusainc.com Read And Understand

More information

Installation Instructions

Installation Instructions Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16, 10mm, 18mm Drill Bits: 1/4 Other Tools: Drill, Reciprocating saw 9465/9475 HIDE-A-GOOSE HITCH INSTALLATION All Fasteners Typical, Both Sides WARNING:

More information

INSTALLATION / OPERATING INSTRUCTIONS Reese Elite Series FIFTH WHEEL SLIDER HITCH

INSTALLATION / OPERATING INSTRUCTIONS Reese Elite Series FIFTH WHEEL SLIDER HITCH INSTALLATION / OPERATING INSTRUCTIONS Reese Elite Series FIFTH WHEEL SLIDER HITCH DEALER/INSTALLER: (1) Provide this Manual to end user. (2) Physically demonstrate hitching and unhitching procedures in

More information

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market 1 888-323-8755 www.nwlifts.com JEEVES Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market This manual will cover the installation procedure step-by-step. The installation of this dumbwaiter

More information

PRODUCT USE INFORMATION

PRODUCT USE INFORMATION 921654300 Thank you for choosing Rough Country for your suspension needs. *65430BAG1* 65430BAG1 JEEP JL 3.5 Control Arm Drop Suspension Kit Rough Country recommends a certified technician install this

More information

Cleaning and Rotor Replacement Instructions

Cleaning and Rotor Replacement Instructions Technical Note 704 Valco Instruments Co. Inc. Cleaning and Rotor Replacement Instructions High Temperature Valco Multiposition Valves Air and Electric Actuation CAUTION: Perform all other system checks

More information

The Caldwell Group Fax

The Caldwell Group Fax Model 82NC - Narrow Coil C Hook *Will not hang level when empty. Center of gravity must be centered under crane hook to prevent tilting of the lifter & load. Handles narrow coils with less coil edge damage.

More information

EASY CONNECT CRANE KIT Festoon Conductor Systems

EASY CONNECT CRANE KIT Festoon Conductor Systems ASSEMBLY INSTRUCTION MANUAL EASY CONNECT CRANE KIT Festoon Conductor Systems October, 2005 Copyright 2005, Yale Lift-Tech, division of Columbus McKinnon Corporation Part No. 117463-05 Mounting Instructions

More information

Installation and Maintenance Instructions JSE MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

Installation and Maintenance Instructions JSE MAEAD Extruder Clutch. World Leader in Modular Torque Limiters World Leader in Modular Torque Limiters Installation and Maintenance Instructions JSE.5-0104MAEAD Extruder Clutch 1304 Twin Oaks Street Wichita Falls, Texas 76302 (940) 723-7800 Fax: (940) 723-7888 E-mail:

More information

OPERATION AND MAINTENANCE INSTRUCTIONS

OPERATION AND MAINTENANCE INSTRUCTIONS OPERATION AND MAINTENANCE INSTRUCTIONS 334 SERIES THREE-PIECE BALL VALVES 1/4 to 2-1/2 Installation and Operation Always install your valve according to accepted industry standards and practices and operate

More information

Installation and Maintenance Instructions JSE1-0128MAEAD Extruder Clutch. World Leader in Modular Torque Limiters

Installation and Maintenance Instructions JSE1-0128MAEAD Extruder Clutch. World Leader in Modular Torque Limiters World Leader in Modular Torque Limiters Installation and Maintenance Instructions JSE1-0128MAEAD Extruder Clutch 1304 Twin Oaks Street Wichita Falls, Texas 76302 (940) 723-7800 Fax: (940) 723-7888 E-mail:

More information

SAFETY. Read and understand all safety precautions and instructions before installing this product.

SAFETY. Read and understand all safety precautions and instructions before installing this product. SAFETY Your safety and the safety of others is very important. In order to help you make informed decisions about safety, we have provided installation instructions and other information. These instructions

More information

AEV30308AA Last Updated: 05/31/18. 4 DUALSPORT sc SUSPENSION system for RAM 1500 air ride standard and rebel INSTALLATION GUIDE

AEV30308AA Last Updated: 05/31/18. 4 DUALSPORT sc SUSPENSION system for RAM 1500 air ride standard and rebel INSTALLATION GUIDE AEV30308AA Last Updated: 05/31/18 4 DUALSPORT sc SUSPENSION system for RAM 1500 air ride standard and rebel INSTALLATION GUIDE PLEASE READ BEFORE YOU START TO GUARANTEE A QUALITY INSTALLATION, WE RECOMMEND

More information

INSTALLATION INSTRUCTIONS FOR DSP9600/9100 WHEEL BALANCER

INSTALLATION INSTRUCTIONS FOR DSP9600/9100 WHEEL BALANCER Form 5063T, 06-05 Supersedes Form 5063T, 02-04 INSTALLATION INSTRUCTIONS FOR DSP9600/9100 WHEEL BALANCER This document provides the information needed to install the DSP9600/9100 Wheel Balancer. NOTE:

More information

ASSEMBLY INSTRUCTIONS Reese Elite Series FIFTH WHEEL SLIDER HITCH

ASSEMBLY INSTRUCTIONS Reese Elite Series FIFTH WHEEL SLIDER HITCH ASSEMBLY INSTRUCTIONS Reese Elite Series FIFTH WHEEL SLIDER HITCH DEALER/INSTALLER: (1) Provide this Manual to end user. (2) Physically demonstrate procedures in this Manual to end user. (3) Have end user

More information

CRANE OPERATION INSTRUCTION AND GUIDELINES

CRANE OPERATION INSTRUCTION AND GUIDELINES CRANE OPERATION INSTRUCTION AND GUIDELINES Qualifications Crane operation, to be safe and efficient, requires skill, the exercise of extreme care and good judgment, alertness and concentration, and a rigid

More information

Patriot. Aluminum and Steel 5spring. Step #1 Tarp Spool with Gear Motor (Includes Instructions for Optional Wind Deflector)

Patriot. Aluminum and Steel 5spring. Step #1 Tarp Spool with Gear Motor (Includes Instructions for Optional Wind Deflector) Aluminum and Steel 5spring Qty. Component Parts Description: LONG BOX: (1) 103 Aluminum Tarp Axle (2) 98 Upper Arms with 90 Degree Elbow (2) Lower Aluminum ( 84 ) (1) Aluminum Cross Tube SMALL HARDWARE

More information

READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS PRIOR TO INSTALLATION OF SYSTEM AND OPERATION OF VEHICLE.

READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS PRIOR TO INSTALLATION OF SYSTEM AND OPERATION OF VEHICLE. #9378 Installation Instructions 3 Body Lift Kit 1998-2000 Ranger READ AND UNDERSTAND ALL INSTRUCTIONS AND WARNINGS PRIOR TO INSTALLATION OF SYSTEM AND OPERATION OF VEHICLE. SAFETY WARNING BDS Suspension

More information

AP-Xtreme Sim-Racing Chassis Master Assembly Guide

AP-Xtreme Sim-Racing Chassis Master Assembly Guide AP-Xtreme Sim-Racing Chassis Master Assembly Guide This guide covers all options available for the AP-Xtreme chassis. Some sections of this guide will be skipped based on the options chosen. APX1000 APX2000

More information

Installation Instructions

Installation Instructions Equipment Required: Fastener Kit: F Wrenches: 15/16, 15/16 Crowfoot Adaptor Drill Bits: 1/4 Other Tools: Drill, Reciprocating saw Optional, Raise Bed: 18mm socket, 15 extension As an option you can loosen

More information

Installation Instructions

Installation Instructions Equipment Required: Fastener Kit: F Wrenches: 15/16, 10 mm Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw 9464/9474 HIDE-A-GOOSE HITCH All Fasteners Typical, Both Sides WARNING: Under no circumstances

More information

Maintenance Instructions. World Leader in Modular Torque Limiters. JSE AEA Extruder Clutch

Maintenance Instructions. World Leader in Modular Torque Limiters. JSE AEA Extruder Clutch World Leader in Modular Torque Limiters PROTECTING EQUIPMENT& MACHINERYYEARSInstallation and Maintenance Instructions JSE.5-0234AEA Extruder Clutch 1304 Twin Oaks Street Wichita Falls, Texas 76302 (940)

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS --1075 North Ave. Sanger, CA 93657-3539 local: 559-875-0222 fax: 559-876-2259 toll free: 800-445-3767-- 6522 REAR AXLE FLIP & SHACKLE KIT 07-UP CHEVROLET 1500 REGULAR CAB ONLY

More information

Installation Instructions

Installation Instructions Equipment Required: Fastener Kit: F Wrenches: 3/4, 15/16 Drill Bits: 1/4 Other Tools: Drill WARNING: Under no circumstances do we recommend exceeding the towing vehicle manufacturers recommended vehicle

More information

MM Tubular K-Member, (Mm5KM-7)

MM Tubular K-Member, (Mm5KM-7) 3430 Sacramento Dr., Unit D San Luis Obispo, CA 93401 Telephone: 805/544-8748 Fax: 805/544-8645 www.maximummotorsports.com MM Tubular K-Member, 2005-14 (Mm5KM-7) This Kit Contains Congratulations on purchasing

More information

Product Description. Product Numbers. Warning/Caution Notations. Required Tools. Wiring. Prerequisites

Product Description. Product Numbers. Warning/Caution Notations. Required Tools. Wiring. Prerequisites Document No. 155-302N VE 598 Electronic Flowrite Valve Field Assembly Product Description The VE 598 Electronic Valve Assemblies consist of an electronic actuator, linkage kit, and a valve body assembly.

More information

VHM-P (Non-Locking) and VHM-PL (Locking) Variable Height Arm with Slide-In Mounting Plate

VHM-P (Non-Locking) and VHM-PL (Locking) Variable Height Arm with Slide-In Mounting Plate 3875 Cypress Drive Petaluma, CA 94954 800.228.2555 +1.707.773.1100 Fax 707.773.1180 www.gcx.com VHM-P (Non-Locking) and VHM-PL (Locking) Variable Height Arm with Slide-In Mounting Plate (Refer to qualified

More information

Installation Instructions Table of Contents

Installation Instructions Table of Contents Installation Instructions Table of Contents Pre- Installation of Garage Storage Lift 2 Layout the Garage Storage Lift 3 Installing the strut Channels 3 Install the Drive Assembly 5 Install the Drive Shaft

More information

Installation Instructions

Installation Instructions Equipment Required: Fastener Kit: F Wrenches: 15/16, 10 mm Drill Bits: 1/4 Other Tools: Drill, Reciprocating Saw 9464/9474 HIDE-A-GOOSE HITCH INSTALLATION All Fasteners Typical, Both Sides WARNING: Under

More information

Operating Procedures for Test Plug Lifting Fixture

Operating Procedures for Test Plug Lifting Fixture EST Group DC2590 04/14 Page 1 of 8 Operating Procedures for Test Plug Lifting Fixture WARNING The Test Plug Lifting Fixture is designed for use with 10 thru 24 (DN250 DN600) GripTight Test Plugs, as well

More information

IBT Series Square Drive Torque Wrenches

IBT Series Square Drive Torque Wrenches IBT Series Square Drive Torque Wrenches Operation and Maintenance Manual Model.75, 1, 3, 5, 8, 10, 20, 25, 35, 50 http://www.torsionx.com Use the IBT Series Square Drive Torque Wrenches Model.75, 1, 3,

More information

INSTRUCTION INFORMATION FOR TYPE "DB" ELECTRIC DISC BRAKE (DB-0, DB-2, DB-4)

INSTRUCTION INFORMATION FOR TYPE DB ELECTRIC DISC BRAKE (DB-0, DB-2, DB-4) The Last Word in Cranes INSTRUCTION INFORMATION FOR TYPE "DB" ELECTRIC DISC BRAKE (DB-0, DB-2, DB-4) OPERATION Zenar's type "DB" brakes are classified as a holding or parking type electro-mechanical operated

More information

SAFETY. Read and understand all safety precautions and instructions before installing this product.

SAFETY. Read and understand all safety precautions and instructions before installing this product. SAFETY Installation Instructions Application: 2015+ FORD F150 Your safety and the safety of others is very important. In order to help you make informed decisions about safety, we have provided installation

More information

Assembly & Installation Instructions

Assembly & Installation Instructions TM P R O D U C T S Assembly & Installation Instructions FOR 28 SERIES SNOWPLOW PIVOT ASSEMBLY AND FLOAT LIMITER 99103000 FOR SERIAL NUMBERS 28D100000 TO 28D100770 97100552A 1. THINK SAFETY, ALWAYS WEAR

More information

Installation Instructions

Installation Instructions DODGE 20K Industry Standard Rail Custom Mounting Kit #2740 Gross Trailer Weight (Maximum)...20,000 lbs. Vertical Load Weight (Max. Pin Weight)...5,000 lbs. SYSTEM TOW CAPACITY Please note, in order to

More information

JEEP JK 4 SUSPENSION KIT

JEEP JK 4 SUSPENSION KIT 92168100 Thank you for choosing Rough Country for your suspension needs. JEEP JK 4 SUSPENSION KIT Rough Country recommends a certified technician install this system. In addition to these instructions,

More information

ReadyLift (Part# ) Ford F-350 4WD Leveling Kit Installation Instructions

ReadyLift (Part# ) Ford F-350 4WD Leveling Kit Installation Instructions 999-004 Ford F-350 4WD Leveling Kit SAFETY WARNING:ReadyLift Suspension Inc. recommends this system be installed by a professional technician. In addition to these instructions, professional knowledge

More information

Required tools General hand tools 21/64" drill bit Torque wrench Threadlocker Center punch

Required tools General hand tools 21/64 drill bit Torque wrench Threadlocker Center punch Slipper Spring Kit (part numbers 2560, 2570 and 2580) Item Qty Part number Description 1... 8... 350054-50...3/8-16 x 1" grade 8 self-tapping screw 2... 4... 350084-00...7/16-14 x 4" grade 5 3... 6...

More information

Auto-Lift Operating System

Auto-Lift Operating System Installation Instructions Parasol Cellular Shades Auto-Lift Operating System CONTENTS Getting Started: Product View... 1 Tools and Fasteners Needed... 2 Installation: Installation Overview... 3 STEP 1

More information

Sachs 48mm Closed Cartridge fork Service Manual

Sachs 48mm Closed Cartridge fork Service Manual Sachs 48mm Closed Cartridge fork Service Manual 1 Fork seal driver 2 Special soft jaws 3 Fork cap wrench 4 Rebound rod holding tool 5 Compression assembly holding tool 6 Retaining clip tool Special Tools

More information

MULTI-POLE MOUNT MULTI-POLE MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation

MULTI-POLE MOUNT MULTI-POLE MOUNT. Assembly Instructions. Assembly Instructions. step-by-step assembly and installation MULTI-POLE MOUNT Assembly Instructions MULTI-POLE MOUNT Assembly Instructions step-by-step assembly and installation PCN 062411-2 The Multi-Pole Mount A few words about the product The Multi-Pole Mount

More information

The POWER. In PRESENTATION PRODUCTS. Instruction Book for BOARDROOM ELECTROL DA-LITE SCREEN COMPANY, INC.

The POWER. In PRESENTATION PRODUCTS. Instruction Book for BOARDROOM ELECTROL DA-LITE SCREEN COMPANY, INC. The POWER In PRESENTATION PRODUCTS Instruction Book for BOARDROOM ELECTROL DA-LITE SCREEN COMPANY, INC. 3100 North Detroit Street Post Office Box 137 Warsaw, Indiana 46581-0137 Phone: 574-267-8101 800-622-3737

More information

LIFTING MECHANISM PART NO SRM 965

LIFTING MECHANISM PART NO SRM 965 LIFTING MECHANISM B60Z [A230]; B80Z [A233]; C60Z [A478]; C80Z [A479]; W60Z [A231]; W65Z [A229]; W80Z [A234]; B60Z AC [B230]; B80Z AC [B233]; C60Z AC [B478]; C80Z AC [B479] PART NO. 1500202 4000 SRM 965

More information

Gen 2 Raptor Adjustable Spring Perch Collar Installation Guide Rev X1

Gen 2 Raptor Adjustable Spring Perch Collar Installation Guide Rev X1 Gen 2 Raptor Adjustable Spring Perch Collar Installation Guide Rev X1 Tech Support: 866-691-7750 ext 2 Install Videos: YouTube "Raptor Performance Group" COMPLETELY READ INSTALLATION INSTRUCTIONS PRIOR

More information

Operation and Maintenance Manual http://www.torsionx.eu Use the MaxDrv Series Square Drive Torque Wrench Model.75, 1, 3, 5, 8, 10, 20, 25, 35, 50 to install and remove threaded fasteners requiring precise

More information

Maintenance Information

Maintenance Information 04581245 Edition 2 May 2014 Air Grinder, Die Grinder and Sander Series G2 (Angle) Maintenance Information Save These Instructions Product Safety Information WARNING Failure to observe the following warnings,

More information

Valtek Auxiliary Handwheels and Limit Stops

Valtek Auxiliary Handwheels and Limit Stops Valtek Auxiliary s and Limit Stops Table of Contents Page 1 General information 2 Installation 2 Side-mounted handwheels, size 25 and 50 (linear actuators) 3 Side-mounted handwheels, size 100 and 200 (linear

More information

Opening Quality Doors Around The World. Installation Instructions Bi-Parting Freight Doors - Q Style (Power and Manual)

Opening Quality Doors Around The World.  Installation Instructions Bi-Parting Freight Doors - Q Style (Power and Manual) Opening Quality Doors Around The World www.couriondoors.com Installation Instructions Bi-Parting Freight Doors - Q Style (Power and Manual) Table of Contents For Immediate Help Call 1-800-533-5760 Q Style

More information

Ford Super Duty Recoil Traction Bar System. Part#: ,

Ford Super Duty Recoil Traction Bar System. Part#: , Part#: 123408, 123409 Ford Super Duty Recoil Traction Bar System Rev. 090817 491 W. Garfield Ave., Coldwater, MI 49036. Phone: 517-279-2135 E-mail: tech-bds@sporttruckusainc.com Read And Understand All

More information

INSTRUCTIONS, (FORD) SUPER DUTY INSTALLATION KIT (C2 PICKUP LIFTGATES)

INSTRUCTIONS, (FORD) SUPER DUTY INSTALLATION KIT (C2 PICKUP LIFTGATES) LIFT CORPORATION Sht. 1 of 22 DSG# M-16-32 Rev. - Date: 12/13/16 INSTRUCTIONS, (FORD) SUPER DUTY INSTALLATION KIT (C2 PICKUP LIFTGATES) FORD SUPER DUTY F-250, F-350 & F-450 PICKUP TRUCKS, 2017 MODEL KIT

More information

SAFETY. Read and understand all safety precautions and instructions before installing this product.

SAFETY. Read and understand all safety precautions and instructions before installing this product. SAFETY Your safety and the safety of others is very important. In order to help you make informed decisions about safety, we have provided installation instructions and other information. These instructions

More information

Cranes. OSHA Office of Training & Education 1

Cranes. OSHA Office of Training & Education 1 Cranes OSHA Office of Training & Education 1 Major Causes of Crane Accidents Contact with power lines Overturns Falls Mechanical failures OSHA Office of Training & Education 2 How Do Accidents Occur? Instability

More information

Office Work Basic Job Steps Potential Hazards Controls & Recommended Actions

Office Work Basic Job Steps Potential Hazards Controls & Recommended Actions 1 Office Work Using computer/data entry/email Strains: eye, neck,muscle Ergonomic evaluation (through Medical Dept.), Talk on phone Carpal tunnel follow their recommendations Reading/working at desk Back

More information