1 SERVICE & INSTALLATION RULES Manual No. 32 Published: August 2017 SA Power Networks TS 100: Electrical Design Std for Underground Distribution Cable Networks (up to & including 33kV) Issued - June 2014 SA Power Networks 2014 Page 1 of 149 TS 100: Electrical Design Standards for Underground Distribution Cable Networks (up to and including 33kV)

2 Revision Notice: Date Details Author Authorised Aug 2017 Overall condensation of document to simplify interpretation: Amendments to: Section 1: (1.3) Section 2: (2.3, 2.7, 2.10) Section 4: (4.2, 4.5) Section 5: (5.2, 5.3, deleted 5.4, 5.5, 5.6, 5.7) Section 6: (6.1, 6.2, 6.8, added 6.8.5) Section 7: (7.1,7.2, 7.3, 7.4, 7.5, 7.6, 7.7, 7.8) Section 8: Renumbered; and information from appendices included. Specific metering information removed Section 9: (9.14) The following Appendices moved into main body: A1 7.2 and 7.3 A A3 6.1 A4 8.5, 8.6, 8.9 A4 8.5, 8.6, 8.9 A6 6.2 Appendices renumbered. A. Lee J. Ali Issued August 2017 Page 2 of 149

3 SA Power Networks: SA Power Networks, ABN , a partnership of: Spark Infrastructure SA (No.1) Pty Ltd, ABN Spark Infrastructure SA (No.2) Pty Ltd, ABN Spark Infrastructure SA (No.3) Pty Ltd, ABN each incorporated in Australia CKI Utilities Development Limited, ABN PAI Utilities Development Limited, ABN each incorporated in The Bahamas 1 Anzac Highway, Keswick, South Australia, SA Power Networks Disclaimer: 1. The use of the information contained in this document is at your sole risk. 2. The Information within this document is subject to change without notice. 3. SA Power Networks, its agents, instrumentalities, officers and employees: 3.1 Make no representations, express or implied, as to the accuracy of the information contained within this document; 3.2 Accept no liability for any use of the said information or reliance placed on it; and 3.3 Make no representations, either expressed or implied, as to the suitability of the said information for any particular purpose. 4. SA Power Networks and its agencies and instrumentalities do not endorse or in any respect warrant any third party products or services by virtue of any information, material or content referred to or included on, or linked to this document. SA Power Networks Copyright 2017: This publication is copyright protected. SA Power Networks reserves to itself all rights in such material. You shall not reproduce any content of this document by any process without first obtaining SA Power Networks permission, except as permitted under the Copyright Act Parts of this publication have been reproduced with the express permission of AGL Electricity, CitiPower, Powercor Australia, TRU Energy and United Energy Distribution. All rights reserved. Issued August 2017 Page 3 of 149

4 Preface: These SA Power Networks Service and Installation Rules incorporate the Technical Installation Rules referred to in Regulation 76 of the Electricity (General) Regulations 2012 under the Electricity Act The Technical Installation Rules within this document are denoted by the symbol TIR adjacent to the relevant clause. In accordance with Regulation 76 of the Electricity (General) Regulations 2012, the Technical Installation Rules have been prepared by SA Power Networks, and approved by the Technical Regulator. The parts of the SA Power Networks Service and Installation Rules which are not part of the Technical Installation Rules have been prepared and approved by SA Power Networks. If a provision of the SA Power Networks Service and Installation Rules which is not part of the Technical Installation Rules is inconsistent with the Technical Installation Rules, the Technical Installation Rules shall prevail, and the provision shall, to the extent of the inconsistency, be invalid. These SA Power Networks Service and Installation Rules supersede the SA Power Networks Service and Installation Rules 2016, effective from 29th August Issued August 2017 Page 4 of 149

5 Contents 1. General About this Manual What this document is about Application of this document How to use this document Revisions and Alterations References Acts & Regulations Codes & Guidelines Definitions Introduction Objective Scope Innovation Publication & Revision Administration Publication Revision Service & Installation Rules Management Contact Dispute Resolution Application Responsibilities Failure to Comply with these Rules Exceptional Circumstances Offences Necessity for Employing a Licensed Person Basic Industry Relationship Responsibilities Distributor Retailers Customer Agents Customer Solutions Manager Areas & Contact Details State Customer Solutions Manager Area Boundaries Metro Customer Solutions Manager Area Boundaries Issued August 2017 Page 5 of 149

6 4. General Rules Safety (TIR) Compliance with Regulations, Codes of Practice and these Rules (TIR) Electrical Installations (TIR) Building & Structural Clearances (TIR) Testing (TIR) Equipment Acceptance (TIR) Equipment Required to be Accepted (TIR) Equipment Not Required to be Accepted (TIR) Labelling (TIR) Access to SA Power Networks Equipment (TIR) Locking Facilities (TIR) SA Power Networks Security Seal (TIR) Supply Application, Connection & Disconnection Conditions of Supply (TIR) Compliance with SA Power Networks S&I Rules and AS/NZS 3000 Wiring Rules (TIR) Negotiations for Obtaining/Altering and Electricity Supply & Warning Against Premature Expenditure Alterations to Existing Installations Type of Supply and Load Authorised Service Capacity Application Offer Letter Agreed Maximum Demand Control of Customer Load (TIR) General (TIR) Load Control Device/s (TIR) Typical Connection Process Connection to the SA Power Networks Distribution System Reconnection to the SA Power Networks Distribution System (TIR) Supply Characteristics and Supply Use Supply (TIR) Supply Systems (TIR) Supply Disturbances (TIR) Phase Failure Protection (TIR) Prospective Short Circuit Current (TIR) Issued August 2017 Page 6 of 149

7 6.1.3 Protective Systems (TIR) Earthing of Electrical Installations (TIR) Connection Points Number of Services Subdivisions Incorporating Common Property Subdivisions Not Incorporating Common Property Number of Phases Location Consumer Terminals Number of Consumer Terminals per Point of Supply Identification of Consumer Mains (TIR) Identification of Multiple Supplies (TIR) Customer Load Requirements (TIR) Obligations (TIR) Non Compliance (TIR) Power Factor (TIR) Harmonics (TIR) Load Balance (TIR) Disturbing Loads (TIR) Switched Loads (TIR) Voltage Drop (TIR) Equipment Requiring Special Consideration (TIR) Starting Current of Motors (TIR) General (TIR) Single Phase Motors (TIR) Three Phase Motors 400 Volt (TIR) Test Method for Measurement of Motor Starting Current (TIR) Fall in Voltage Method (TIR) Current Measurements Method (TIR) Restart Delay (TIR) Installations with Generators, Alternative or Parallel Supplies (TIR) Additional Sources of Supply by way of Renewable Energy Systems of Embedded Generating Units General Connection of Break before Make Stand-by Gen-Unit (TIR) Requirements for Parallel Embedded Generating Unit (TIR) Network Connection Agreement (TIR) Notification Requirements (TIR) Issued August 2017 Page 7 of 149

8 6.6.4 Networks Connection of Inverter Energy Systems (TIR) Inverter Requirements (TIR) Installation and Connection to Grid (TIR) Metering (TIR) Standard Networks Connection Agreement (TIR) Storage Systems Low Voltage Supply Services General Type of Service Connections to Services Underground Distribution Areas Consumer Terminals Underground Service Service Pits/Pillars Underground Service Cable Termination Terminals of a Pad Mounted Transformer Terminals of an Open Bushing Transformer Overhead Distribution Network Areas Overhead Lines Over/Under Service LV Isolators on Pole Consumer Terminals Point of Attachment Overhead Distribution Network Point of Attachment on Customer Support Poles Transformers Access to Point of Supply Service Brackets General Provision Specification, Acceptance and Installation Aerial Service Lines Clearances Existing Service Lines New and Replacement Service Lines Achievement and Maintenance of Clearances Aerial Service Lines Sag Service Protection Issued August 2017 Page 8 of 149

9 7.4.1 Customers Protective Equipment (TIR) Application of SA Power Networks Protection Devices TIR) Enclosures (TIR) Access (TIR) Location (TIR) Common Enclosure (TIR) Security General SA Power Networks Operation Operation (TIR) General (TIR) Emergency Services Personnel (TIR) Licensed Contractor (TIR) Fuse removal by a Licensed Electrical Worker/Contractor (TIR) Service Protection Devices Services up to and including 500kVA Services up to an including 500kVA I 2 t Characteristics of LV Fuses Services Greater than 500kVA Acceptable Applications Underground Supply Overhead Supply General Supply to Customer Support Poles Supply from SA Power Networks Pole Consumer Mains that Connect to Consumer Terminals Located upon the Pole Customer s Switchboard and Associated Equipment Mounted on SA Power Networks Poles Supply Direct from Transformers Isolating Devices Meter Isolators (TIR) General (TIR) Features (TIR) Rating (TIR) Application (TIR) Installation (TIR) Location and Access to Isolation Devices Properties which are the Subject of a Strata Plan or Community Title Issued August 2017 Page 9 of 149

10 Properties which are not the Subject of a Strata Plan or Community Title Safety When Working on or Near Distribution Network (TIR) No Go Zone (TIR) Underground Cables (TIR) Transformers (TIR) Poles and Aerial Lines (TIR) Service Pits/Pillars (TIR) Supply Isolation (TIR) Consumer Mains General (TIR) Exclusion Zone (TIR) Unprotected Consumer Mains (TIR) Protected Consumer Mains (TIR) Unprotected Consumer Mains Transformers (TIR) Size of Consumer Mains (TIR) Identification of Consumer Mains (TIR) Joints in Un-Metered Consumer Mains Terminations (TIR) Underground Consumer Mains (TIR) Consumer Mains in Road Reserves (TIR) Consumer Mains on a Third Party Property (TIR) Minimum Insulation Resistance (TIR) Wiring Systems (TIR) Connections (TIR) Pit/Pillar Connections (TIR) Termination on a Distribution Pole (TIR) Work Practices (TIR) Installation (TIR) Special Electrical Installations & Supply Arrangements Limited Period Supplies Provision Customer s Electrical Installation (TIR) Buildings in Course of Erection Multiple Occupancies Plan Subdivision Unmetered Conductors Metering Issued August 2017 Page 10 of 149

11 Control (TIR) Supply Arrangement Diagrams (TIR) Labelling (TIR) Equipment Installed on a Distribution Pole Use of Pole Equipment Installation Electrical Installations on Public Land (TIR) General (TIR) Points of Supply and Consumer Terminals (TIR) Labelling (TIR) Contiguous Land Subdivisions General No Existing Electrical Installation or Supply Existing Electrical Installations or Supply Multiple Occupancies Unmetered Supplies LV Switchboards, Service Equipment & Metering Scope Tariffs & Metering Metering Obligations General (TIR) Alterations & Additions Determination of Meter Type Location General Single Residential Single Non Residential Multiple Residential Installations Multiple Non-Residential Single Customer Rural Installations Combined Residential Non-Residential Use Public Land Unsuitable Metering Locations Clearances around Meter Enclosure Individual Residential Installations Multiple Residential and Commercial Installations Meter Enclosure Mounting Height Issued August 2017 Page 11 of 149

12 8.8 Access General Locks Metering Panels, Surrounds & Enclosures (TIR) General (TIR) Meter panels (TIR) Size (TIR) Installation (TIR) Materials (TIR) Wiring Holes (TIR) Fixing Arrangements (TIR) Wiring (TIR) Metering Surrounds & Enclosures (TIR) General (TIR) Meter Surrounds (TIR) Meter Enclosures (TIR) Equipment Acceptance (TIR) On Meter Panels or Within Enclosures (TIR) Security Seals Customer s Equipment Meter Panel Labelling (TIR) Single Occupancy (TIR) Multiple Occupancies (TIR) Protection (TIR) Whole Current Metering Clearances Meter Panels Equipment (TIR) Isolation of Metering Equipment Single Occupancy Metering Multiple Occupancy Metering LV Current Transformer Metering General Meter Panel Location and Access Clearances Wiring Issued August 2017 Page 12 of 149

13 9. High Voltage Electrical Installations Scope Contractual Arrangements Systems of Supply Preliminary Information Installation Design (TIR) Power Transformers (TIR) Protective Equipment (TIR) Conversion from Low Voltage to High Voltage Supply General Design (TIR) Circuit Connections (TIR) Control of Incoming High Voltage Supply (TIR) Power Factor (TIR) Supply Disturbances (TIR) Voltage Unbalance Factor (TIR) Safety Signs (TIR) Protection (TIR) Insulation Coordination (TIR) Short Time Withstand Current (TIR) Earthing (TIR) General (TIR) Size of Earthing Conductors (TIR) Earthing of Metering Equipment (TIR) SA Power Networks Acceptance Requirements Metering General Requirements Metering Instrument Enclosure Requirements Panel Enclosure Metering Transformers Compliance Transformer Layout Secondary Wiring Access to Meters SA Power Networks Connection Assets Testing & Commissioning (TIR) Customer s HV Installation Operation & Maintenance (TIR) Issued August 2017 Page 13 of 149

14 Operating Procedures (TIR) Trained Operators (TIR) Maintenance (TIR) Appendices Appendix 1 Single Phase URDs Appendix 2 SA Power Networks Service Fuse Time/Current Characteristics Sheet 1 For Service Fuse Type ME & MF (TIR) Sheet 2 For Service Fuse Type J (TIR) Sheet 3 For Service Fuse Type NH Size 2 (TIR) Sheet 4 For Service Fuse Type NH Size 3 (TIR) Sheet 5 For Service Fuse Type NH Size 4A (TIR) Issued August 2017 Page 14 of 149

15 1. General 1.1 About this Manual What this document is about This document is designed to assist customers and electrical contractors by detailing: the method and type of supply from SA Power Networks distribution network; the requirements for electrical installations connected to SA Power Networks distribution network; and some of the customer s obligations relating to that supply. Additional requirements are contained in the Electricity Distribution Code, Connection and Supply Contract and the Electricity Metering Code, copies of which are available on SA Power Networks internet site or from SA Power Networks on request Application of this document This document is intended for use by SA Power Networks staff, engineers, building work contractors, licensed electrical contractors and registered electrical workers who are directly engaged in activities associated with the connection of electricity supply to a customer s property from the SA Power Networks distribution network. The requirements of this document apply to customers and their agents in relation to electrical installations connected to or intended to be connected to SA Power Networks distribution networks. Alterations of, or, additions to an existing electrical installation shall be deemed to be a new electrical installation and are covered by the requirements of this document. In accordance with the Electricity Act 1996 and Electricity (General) Regulations 2012, the requirements within this document also apply to electricity retailers and other parties such as meter providers participating in or executing duties under the National Electricity Rules in relation to installations connected (or intending to be connected) to SA Power Networks distribution network. Unregistered persons may use this document for information purposes only, but are forbidden by law from undertaking electrical work and may be subject to criminal prosecution should they do so How to use this document This is a self-contained document except where it specifically refers to other related documents. It supersedes previous versions of the SA Power Networks Service & Installation Rules Revisions and Alterations 1.2 References SA Power Networks reserves the right to revise this publication. The current edition of this document is available on our website at This list of references has been made as comprehensive as possible at the time of publication. However, other references may have been applicable at the time. The references listed may have been amended or made obsolete and new references may be applicable. The user is responsible to correct references applied Acts & Regulations Electricity Act 1996 and Electricity (General) Regulations 2012 Work Health & Safety Act 2012 and Work Health & Safety Regulations 2012 Issued August 2017 Page 15 of 149

16 Trade Practices Act 1974 (Cth) Plumbers, Gas Fitters & Electricians Act Codes & Guidelines 1.3 Definitions National Electricity Rules Electricity Distribution Code Electricity Retail Code Electricity Metering Code Other references include: Excluded Services Australia/New Zealand Standards Services & Streets Code References, Administrators and their contact details include: Australian Standards Electricity Distributor The Australian Energy Regulator Australian Energy Market Operator WorkCover SA The definitions contained herein apply to these Service & Installation Rules. AEMO AER Aerial Line Agreed Maximum Demand AS/NZS 3000 Wiring Rules Authorised Person Australian Electricity Market Operator the company which operates and administers the National Electricity Market in Accordance with the National Electricity Rules. Australian Energy Regulator (AER) is Australia s national energy market regulator and an independent statutory authority. A powerline placed above the ground and in the open air, but does not include bus bars or any direct current conductors used as traction trolley wires. The maximum demand quantity used in calculation of the maximum demand component of a customer periodic network charge (where applicable). The agreed maximum demand is the highest average demand over a thirty-minute period either recorded or reasonably expected to be recorded as defined in the Demand Schedule of the Electricity Distribution Code. May be in kw or kva as the context requires. The Agreed Maximum Demand can t exceed the Authorised Service Capacity. The current version of the Wiring Rules published by Standards Australia. The person in charge of the premises, or the registered electrical worker or licensed electrical contractor or other person appointed or selected by the person in charge of the premises, to perform certain duties associated with the electrical installation on the premises. Issued August 2017 Page 16 of 149

17 Authorised Service Capacity Community Lot Community Title Scheme Common Property Connection Point Consumer Mains Consumer Terminals CT Metering Customer Customer Agent/s Distributor The demand capacity as detailed in the Offer for Supply which was accepted by the customer. This is the maximum demand capacity that the Service Protection Device, Consumer Terminals and upstream Distribution System have been designed to provide for. When a customer requests a reduction to their Agreed Maximum Demand the new Agreed Maximum Demand will become the Authorised Service Capacity. Is a separately owned Lot within a Community Title Scheme. Is the division of land into at least two lots and generally an area of common property. The Community Title Act provides for implied easements within a Community Title development. These implied easements only relate to private service infrastructure and do not apply to infrastructure that is owned by SA Power Networks. Property within a Community Title Scheme that is owned by the community corporation. The community corporation is comprised of all lot owners within the Community Title Scheme. Common property relates to those parts that do not form part of a lot and typically includes the land for the service infrastructure and driveways that are shared. Roads within Community Title Schemes are generally common property. A connection point to a transmission or distribution network. For the purpose of this document connection point also has the same meaning as Point of Supply as defined in AS/NZS Are the electrical conductors, owned and maintained by the customer, connecting the point of supply and the main switchboard and form part of the customers installation. The junction at which the consumer mains connect to the SA Power Networks service cable or main supply conductors. Refer to Clause 6.3 (Consumer Terminals). A meter where electricity flow is measured by a meter using current transformers (CTs). Note: CT meters are used where the maximum demand of the installation is more than 100 amps. A person who has a supply of electricity available from a transmission or distribution network for consumption by that person and includes: the occupier for the time being of a place to which electricity is supplied; and where the context requires, a person seeking an electricity supply; and a person of a class declared by regulation to be customers. Customer agents are parties representing the customers. Such parties may include registered electrical workers, licensed electrical contractors, consulting engineers, architects, and equipment manufacturers. A person who holds a Distribution Licence, or who is exempted from holding a licence of the Electricity Act. A Distributor is also known as the Local Network Service Provider (LNSP). For the purpose of this document SA Power Networks is the Distributor. Issued August 2017 Page 17 of 149

18 Distribution Network Determined Maximum Demand Distribution Licence Dual Fronted Property Electricity Distribution Code Electrical Installation Embedded Generating Unit Licensed Contractor Meter Isolator Meter Provider Metering Metering Coordinator Metering Point MNSP Must NATA NER The whole or a part of a system for the distribution of electricity, but does not include anything declared by regulation not to be a distribution network or part of a distribution network. For the purposes of these rules references to Distribution Network means the network poles, wires, underground cables, transformers, substations etc, operated by SA Power Networks, which transports electricity from the transmission system to a customer s Connection Point. The electrical demand, both instantaneous and sustained load, in kva or amps required from the Distributor s supply system as assessed by the Responsible SA Power Networks Officer. A licence authorising the operation of a distribution network, granted under the Electricity Act A property that has a frontage on two independent boundaries, one of which is the street address and the other being another public area. Note: does not apply to corner properties. The Electricity Distribution Code administered by the Essential Services Commission of SA. A set of wires and associated fittings, equipment and accessories installed in a place for the conveyance, control, measurement and/or use of electricity that is, or is to be, or has been, supplied for consumption in the place, but does not include: Electricity infrastructure owned or operated by an electricity entity Any wires, fittings, equipment or accessories connected to and beyond any electrical outlet at which fixed wiring terminates (other than any such outlet used to connect sections of fixed wiring). A generator such as solar PV, wind or battery storage that is owned, operated or controlled by a customer and is connected to the customer s electrical installation. A contractor licensed to perform electrical work under the Plumbers, Gas Fitters and Electricians Act A circuit breaker that isolates the supply to the metering equipment (including CTs where installed) and the corresponding installation or tenancy. Is a person registered with AEMO who provides and maintains metering installations in accordance with the National Electricity Rules requirements. Is metering instruments and associated fuses, links, transformers and wiring installed by a Meter Provider at the Metering Point as required by the National Electricity Rules. A person registered by AEMO who engages in the coordination and provision of metering services at the connection point. Is the physical and electrical location at which metering equipment is connected. Manager Network Standards & Performance. Is to be understood as mandatory. National Association of Testing Authorities National Electricity Rules. Issued August 2017 Page 18 of 149

19 Occupancy Occupancies Multiple or Multiple Occupancies Offer Letter Point of Attachment Point of Supply Principle Frontage Property Boundary Property Public Land PV Readily Accessible Regulator Requested Maximum Demand An electrical installation or part thereof, which is supplied with electricity through a specific meter or meters and for which an individual electricity consumption account is rendered. More than one Occupancy connected to the same electrical installation. A letter documenting an offer by SA Power Networks to a customer in relation to a contract to undertake and complete works for the supply of electricity. Is the point that the aerial conductors of an overhead service are physically anchored on a customer s building, pole or structure. Refer to Connection Point. Is that boundary between the real property and the gazetted road. However, where a property has boundaries with two (2) or more gazetted roads, the principal frontage boundary will be that which provides primary public/personal access. Either what is commonly described as a Torrens Title allotment, a Community Title Scheme or Land which is owned by the Crown on which the owner/occupier has the right to the installation of an electricity supply. A property may include any combination of contiguous (adjacent) land and/or an individual title that constitutes a single development, to which an owner/occupier or a developer has the right to the installation of an electricity supply. Land owned by the Crown or an instrumentality or agent of the Crown or by a council or other local government body, including any such land that is subject to native title. Photo Voltaic System Capable of being reached quickly and without climbing over or removing obstructions, mounting upon a chair, or using a movable ladder, and in any case, not more than two metres (2m) above the ground, floor or platform. The agency authorised by law to administer the relevant act, code, standard or requirement. This may be: The Australian Energy Regulator (AER), Office of the Technical Regulator (OTR), Australian Competition and Consumer Commission (ACCC), Essential Services Commission of SA (ESCOSA), Australian Energy Market Commission (AEMC), Australian Energy Market Operator (AEMO), Or other agencies The maximum demand that the Customer or their agent have requested to be provided (as determined under AS/NZS3000 or by other method). Retailer A holder of a licence under the South Australian Electricity Act, 1996 authorised to retail electricity. Issued August 2017 Page 19 of 149

20 Responsible Officer REW Rules SA Power Networks Manager Security Seal Service Cable Service Fuse Service Fuse Enclosure Service Point Service Protection Device Service Line Shall Should Strata Title Development Subdivision Suitable (or suitably) Supply Connection Facility Temporary TIR The officer appointed by the relevant SA Power Networks Manager to be responsible for the application of these Rules. There may be multiple Responsible Officers with specific responsibilities, eg negotiation for supply, provision of transformers, specification of points of supply, types of supply, servicing and metering etc. Means Registered Electrical Worker. Unless referring to another specific document the term Rules means this document. The SA Power Networks Manager or the authorised Officer serving that area of The customer s installation. Note: The Minor Connections Group can be contacted via the Builders and Contractors Line on A device used by SA Power Networks and meter providers to seal the unmetered portion of a customer s installation, the metering installation and SA Power Networks equipment. Refer to Service Line. Refer to Service Protection Device. Enclosure to house the Service Protection Device. Refer to Connection Point. A device provided by SA Power Networks, generally a fuse but may be a circuit breaker for larger installations, to protect SA Power Networks assets. Constructed or designed or ordinarily used for the supply of electricity at low voltage; and through which electricity is or is intended to be supplied by an electricity entity to a customer from the distribution network of the entity. Is to be understood as mandatory. Is to be understood as non mandatory, ie advisory or recommended. A Strata Title Development is regarded as a Community Title Scheme for the purpose of this document. All terms related to Strata Title have the equivalent meaning to the terms relating to the Community Title. The division of land into two or more parts which can be disposed of separately. To the satisfaction of the relevant SA Power Networks Manager. A facility containing consumer terminals, eg, pillar, cubicle, service fuse enclosure or other agreed facilities. Unless otherwise agreed to by SA Power Networks, the term temporary shall mean for a period no longer than 12 months. The Technical Installation Rules referred to in regulation 76 of the Electricity (General) Regulations 2012 within this document are denoted by the symbol (TIR) adjacent to the relevant clause. Issued August 2017 Page 20 of 149

21 Torrens Title UG Underground Service Un-metered Supply Whole Current Meter A Torrens Title land division is a division of land into at least two allotments, which are held / owned independently of one another. A Torrens Title land division requires that each new allotment has frontage to a public road or adequate access to a public road. There are generally no shared facilities or infrastructure as each allotment must have its own infrastructure arrangements in place. Underground Service The electricity distributors supply network to the point of supply. An authorised supply that is not metered. A meter where the electricity flow is directly measured by the meter ie the current under measurement passes through the meter itself. Note: Whole current meters are generally used where the maximum demand of the installation is less than 100Amps. Issued August 2017 Page 21 of 149

22 2. Introduction 2.1 Objective 2.2 Scope The objective of these Rules is to provide South Australian electricity customers, registered electrical workers and other people in the industry with the technical requirements for electrical installations connected to the SA Power Networks distribution network. Customer s electrical installations must comply with the Wiring Rules in AS/NZS 3000 as they apply from time to time. These Service and Installation Rules apply to new installations, alterations or additions to existing installations that are or are intended to be connected to the SA Power Networks distribution network. It is not intended to apply any additional requirements to installations that were compliant at the time of the original installation and are not being altered. For the purpose of these Rules, a relocatable premise is considered a new installation when it is relocated. This document is designed to assist users by detailing: the method and type of supply from the SA Power Networks distribution network the requirements for customer electrical installations connected to SA Power Networks distribution network some of the customers obligations relating to that supply Additional requirements may be contained in the Electricity Distribution Code, Connection and Supply Contract and the Electricity Metering Code, copies of which are available on SA Power Networks internet site or from SA Power Networks on request. There may be situations the Rules do not cover. This may include unusual connections, and alterations to legislation and codes. SA Power Networks must be consulted where these situations are encountered. Where an electrical installation consists of an embedded network (as defined in the (SA) Electricity Metering Code) the requirements of these Rules apply to the operator of the embedded network (parent) and their electrical installation. An embedded network child customer (sub-metered) must liaise with the operator of the embedded network for conditions relating to their supply. SA Power Networks has no obligation, responsibility or involvement with the embedded network child customer except as noted below. Note: These Rules are not intended for application to off-grid networks. Conditions relating to these off-grid networks should be sought from the appropriate operator. 2.3 Innovation These Rules do not preclude other methods, innovation, or technology that achieves the same outcomes as the specifications detailed in this document. Any such proposal should be put to SA Power Networks Manager Network Standards & Performance (MNSP) for acceptance during concept/design phase and prior to commencement of work. 2.4 Publication & Revision Administration The revision, development and publication of these Rules are compiled and administered by SA Power Networks and subject to Technical Regulator approval. Issued August 2017 Page 22 of 149

23 2.4.2 Publication Revision The latest version is currently available on SA Power Networks website. SA Power Networks reserves the right to revise this publication. Although changes to regulations are usually the catalyst for revision, users and interested parties are invited to provide written comment and suggestions to assist further development of the Rules at any time. Correspondence for this purpose should be forwarded to the SA Power Networks MNSP. Any approved written submissions will be incorporated in the annual review of this document and subject to Technical Regulator approval. 2.5 Service & Installation Rules Management Contact Contact for any matters related to the content of these Rules may be made through written correspondence to the SA Power Networks MNSP or website ( Any enquiries relating to a specific installation are to be directed to the SA Power Networks Responsible Officer assigned to the specific project. If specific installation is not assigned to a Responsible Officer, then direct enquiry to the Builders and Contractors Line. 2.6 Dispute Resolution Where a customer has a complaint involving these Rules, they should firstly contact the SA Power Networks Responsible Officer and register their concern. If not resolved, the complaint may be referred to a higher level person than the SA Power Networks Responsible Officer within the management structure. Where this does not result in a resolution, the complaint will be resolved in accordance with the SA Power Networks Customer Complaint & Inquiries Procedure. 2.7 Application Responsibilities These Rules are applicable from 29th August As per Regulation 12, work on an electrical installation completed within 6 months of the publication of this version of these Rules may be carried out in accordance with the previous version of the Service and Installation Rules. Transitional arrangements or exemptions may be able to be made with SA Power Networks where it is deemed necessary to do so. Meter Providers are responsible for compliance with the metering requirements contained within these Rules. Up until, and including the 30 November 2017, the metering requirements are to be carried out in accordance to the previous version of the Service and Installation Rule, which is available on SA Power Networks website. Each customer has an initial and ongoing responsibility to ensure their electrical installation complies with these Rules and AS/NZS 3000 when carrying out any alterations, additions and repairs and any other conditions for supply. This is normally accomplished through their agents, eg their Registered Electrical Worker or Licensed Electrical Contractor. Refer to Section 5 for complete details on Supply Applications. 2.8 Failure to Comply with these Rules Should an installation not satisfy the requirements of these Rules, connection of electricity supply may be delayed or withheld, and installations with supply may be disconnected until such time as the non-compliance/s has been rectified. Issued August 2017 Page 23 of 149

24 A fee will be charged where a failure to comply with these Rules occurs and in the Responsible Officer s opinion a subsequent attendance is required to verify that the non-compliances within these Rules have been rectified. Refer to SA Power Networks website for current fees. 2.9 Exceptional Circumstances In exceptional circumstances, the stated requirements contained in these Rules may be waived or modified by submission of a written request. The written request shall be accompanied by: a detailed statement of the reasons why non-compliance with these Rules is sought; and a Statement of Consent from the owner or controlling body of the installation. No action should be taken until a written reply to such a request has been received. Any request in this regard shall be addressed to: Manager Network Standards & Performance, SA Power Networks, GPO Box 77, Adelaide Where SA Power Networks agrees to a variation to the requirements of these Rules, a copy of SA Power Networks written acceptance to the variation must be provided to the Connecting Officer with the valid ECC at the time of connection Offences The Electricity Act 1996 and Electricity (General) Regulations 2012, codes and guidelines enacted under those and other legislation include regulations for protection of Distributor assets and qualification of persons who may work on those assets. Offences under these regulations include: 1. Any work on SA Power Networks network assets unless authorised by SA Power Networks. 2. The damage or interference of any SA Power Networks assets such as: fuse link removal break a seal or lock dismantle or detach any SA Power Networks cables or equipment interference with electricity meters, time switches, equipment and/or service cables obtaining electricity by fraud 3. Unauthorised entry of SA Power Networks assets eg substations and infrastructure. If a person is found guilty of an offence, it could result in the imposition of substantial fines together with an order for damages to compensate SA Power Networks for any loss and court costs. It may also cause that person to have a criminal record Necessity for Employing a Licensed Person The Plumbers, Gas Fitters and Electricians Act 1995 requires that all electrical work carried out on electrical installations connected to or intended to be connected to the SA Power Networks distribution network, subject to certain exemptions, will be performed by a registered Electrical Worker(s) who is suitably licensed for such work in South Australia Basic Industry Relationship This section is intended to provide an understanding of the basic relationships of industry stakeholders, (regulators and distributor, retailers, meter providers, customer and their agents), in respect to connection of electrical installations to SA Power Networks distribution network. Refer to figure 2.1 Stakeholders. Issued August 2017 Page 24 of 149

25 TS 100: Electrical Design Standards for Underground Distribution Cable Networks (up to and including 33kV) Responsibilities Distributor Retailers Negotiate provision and connection of supply with customers. Transport and deliver electricity purchased by retailers and sold to customers. Connect customer electrical installations to SA Power Networks distribution network and administer technical supply aspects of the connection. Determine the network tariff to be applied to the installation. Energise up to the line side of the meter isolator. Is responsible for matters such as electricity supply quality and reliability. Purchase electricity and retail the electricity (transported by Distributors) to customers. Nominate rates and arrange customer s contract for the purchase of electricity. Engage a Meter Provider. Request Distributors to connect or disconnect the customer installations to the Distributor s network in accordance with the customer s contract with the Retailer Customer Agents Customer agents are parties representing the customers. Such parties may include registered electrical workers, licensed electrical contractors, consulting engineers, architects, and equipment manufacturers. Meter Provider Figure 2.1 Stakeholders TS 100: Electrical Design Std for Underground Distribution Cable Networks (up to & including 33kV) Issued - June 2014 SA Power Networks 2014 Page 25 of 149

26 3. Customer Solutions Manager Areas & Contact Details 3.1 State Customer Solutions Manager Area Boundaries Issued August 2017 Page 26 of 149

27 Service & Installation Rules Metro Customer Solutions Manager Area Boundaries 3.2 Issued August 2017 SA Power Networks 2017 Page 27 of 149

28 4. General Rules 4.1 Safety (TIR) All persons and contractors are responsible for all aspects of safety related to work performed by those persons and employees. The works should be performed in accordance with all relevant Acts, Regulations, Codes of Practice, Standards and the Rules within this document that are related to the safety of the work being performed. Electrical contractors (including meter providers) are not to connect any wires that form part of the customer s electrical installation to the SA Power Networks network at the connection point. SA Power Networks will make the final service connection. Where any SA Power Networks employee discovers that there is an immediate safety risk resulting from: exposed live electrical parts which pose an immediate threat to safety a customer s meter box is in such a condition as to pose a threat to electrical equipment integrity and safety a customer s structure interferes with access to the SA Power Networks service point and would also pose a threat to SA Power Networks personnel in performing their service delivery to customers safely a customer s structure reduces the prescribed safety clearances detailed in Regulation 10, Schedule 1 of the Electricity (General) Regulations 2012 under the Electricity Act 1996 The employee will arrange to have the supply to the customer s premise de-energised to make the installation safe. In these situations, where possible, the customer at the premise will be notified immediately. Written notification of the disconnection will be left at the premise when a customer is not in attendance at the premise. 4.2 Compliance with Regulations, Codes of Practice and these Rules (TIR) Any connection or reconnection to SA Power Networks distribution network is required to comply with the Electricity Act 1996 and the Electricity (General) Regulations 2012, all codes and any other relevant legislation or guidelines Electrical Installations (TIR) The above clause 4.2 applies to the following electrical installations: New installations; Alteration to existing installations as prescribed in AS/NZS 3000; Addition to existing installations as prescribed in AS/NZS 3000; or Special electrical installations Building & Structural Clearances (TIR) The above clause 4.2 applies to buildings and structures constructed in the vicinity of: Service pits/pillars where a minimum clearance of 1.2m is required as per Figure 4.1. Aerial lines where for clarification, the relevant SA Power Networks Manager is to be contacted in relation to the specific voltage level of the aerial line and the OTR is to be contacted in relation to specific clearance details. Padmounted transformers and switching cubicles, refer to NICC-802 Padmount Transformer Brochure, and TS102 Easement Standard for Distribution Networks. Both these documents are available on the SA Power Networks website. Issued August 2017 Page 28 of 149

29 4.3 Testing (TIR) Figure 4.1 Example Service Pit/Pillar Building Clearance The Electricity Act 1996 and the Electricity (General) Regulations 2012 require all electrical installation work to be tested in accordance with that Act and Regulations. All electrical work to be connected to SA Power Networks must be tested by the customer s registered electrical worker or licensed electrical contractor prior to a connection. 4.4 Equipment Acceptance (TIR) Equipment used to interface with SA Power Networks assets in accordance with these Rules must comply with the Electricity Act 1996 and Electricity (General) Regulations 2012 and be of a standard suitable for interfacing safely with SA Power Networks assets Equipment Required to be Accepted (TIR) SA Power Networks may refuse to connect equipment required to be accepted that has not been accepted, and/or is not suitably identified in accordance with these Rules. Service raiser brackets, service fuse enclosures and whole current metering enclosures and surrounds that are commonly distributed by electrical wholesalers and similar distributors, are required to be accepted for use by SA Power Networks prior to being connected to supply. Service raiser brackets specifications may be referenced in clause and whole current metering panel and surrounds in clause m All enquiries and submissions relating to acceptance of equipment should be forwarded to the Manager Network Standards & Performance (MNSP) in accordance with clause 2.7 at the earliest opportunity Equipment Not Required to be Accepted (TIR) It is recommended manufacturers and/or suppliers of equipment used to interface with SA Power Networks assets and not required to be submitted for acceptance, submit their proposed equipment and installation arrangement to the SA Power Networks MNSP for comment prior to use where there is no certified evidence of such equipment s compliance and/or its suitability for its intended purpose with SA Power Networks assets and these Rules. Examples of such equipment that are not required to be accepted include whole current meter isolators and CT metering facilities. Issued August 2017 Page 29 of 149

30 4.5 Labelling (TIR) SA Power Networks may require certified evidence of such equipment s compliance and/or its suitability for its intended purpose. SA Power Networks may accept such equipment, provided it is satisfied with the evidence provided. Certified evidence may include provision of documents to certify compliance with the specification contained in these Rules and its intended purpose by a suitably qualified person, eg an engineer or consultant. SA Power Networks may refuse to connect equipment where it is not satisfied that the relevant specifications have been met, and/or where suitable certified evidence is not provided. Every label required by these Rules shall be permanent, indelible, legible from normal viewing level and suitable for the purpose for which it is intended for the life of the installation. A minimum requirement for label is a product manufactured in block lettering and numbers not less than 6mm in height with an operating temperature rating of between -15 C and 100 C. For exterior applications, a UV and moisture resistant material and marking that is suitable for the environmental conditions in which it is installed is required. For interior applications, including within transformers, service pit/pillars and switchboards, and service fuse enclosures moisture resistant material is required. Note: Insulation tape is not acceptable for this requirement. 4.6 Access to SA Power Networks Equipment (TIR) A customer must provide SA Power Networks representative a safe, convenient and unhindered access to their equipment in accordance with the Connection and Supply Contract and these Rules for any purposes associated with the supply, metering of electricity and testing of the customer s electrical installation including connection, disconnection or reconnection of supply. 4.7 Locking Facilities (TIR) Where SA Power Networks metering equipment is enclosed or within a low security area, the access facility to the area or enclosure must be fitted with an approved lock which is compatible with SA Power Networks Master Key System. Refer to ES and CM types in Table 4.1. Enclosures containing SA Power Networks service fuses are to be locked with SA Power Networks service fuse enclosure lock as shown in Table 4.1. Other lock types called up in these Rules are detailed in Table SA Power Networks Security Seal (TIR) All portions of an un-metered supply to a customer installation including access panels, junction boxes, metering equipment, lockable isolators, fuse boxes and enclosures shall be made ready for sealing using a security seal. Sealing shall not rely on holes to be aligned through nuts and threaded studs. Escutcheon panels which provide access to un-metered sections or terminals of switchboards shall also be provided with sealing facilities. Any sealing hole/s shall be at least 2mm in diameter. Any un-authorised person or persons found tampering or breaking a seal will be considered as acting in contravention of the Electricity Act Issued August 2017 Page 30 of 149

31 LOCK SUPPLIED BY CRITICAL DIMENSIONS USED FOR ES Customer Lock CM Customer Lock CM Customer Pad Lock SA Power Networks Service Fuse Enclosure Lock Customer provides lock. Customer provides lock. Customer provides lock. Customer provides lock. SA Power Networks replaces barrel on connection. Refer supplier ie. Master Locksmith or electrical wholesaler. Refer supplier ie. Master Locksmith or electrical wholesaler. 5 Pin tumbler mechanism, diam. 30mm & depth 28mm. Refer supplier ie. Master Locksmith or electrical wholesaler. Refer supplier ie. Master Locksmith or electrical wholesaler. 6 Pin tumbler mechanism, diam. 30mm & depth 28mm. Table 4.1 Customer Supplied SA Power Networks Master Key System Locks Low security enclosures such as Meter boxes, Cupboards, Gates, etc. Medium Security enclosures such as Switch rooms, Gates, etc. Locking of personal access gates. Locking of service fuse enclosure. Operated by SA Power Networks personnel only. Issued August 2017 Page 31 of 149

32 LOCK SUPPLIED BY CRITICAL DIMENSIONS USED FOR SA Power Networks Switching Lock SA Power Networks Meter readers lock SA Power Networks provides lock. SA Power Networks provides lock. A = 170mm B = 50mm C = 120mm D = Dia. 10mm A = 132mm B = 45mm C = 87mm D = Dia. 5mm Table 4.2 SA Power Networks Supplied SA Power Networks Master Key System Locks A C B D Locking of HV switchgear and earthing switches. Used by SA Power Networks personnel only. Locking of LV meter isolators by SA Power Networks personnel. Issued August 2017 Page 32 of 149

33 5. Supply Application, Connection & Disconnection 5.1 Conditions of Supply (TIR) Compliance is required with the Electricity Act 1996, the Electricity (General) Regulations 2012, SA Electricity Distribution Code and all other relevant acts and codes associated with the supply of electricity Compliance with SA Power Networks S&I Rules and AS/NZS 3000 Wiring Rules (TIR) The Electrical Certificate of Compliance as applicable at the time of electrical installation works issued by the installing registered electrical worker/licensed electrical contractor is used to confirm that the electrical installation complies with AS/NZS 3000 and these Rules. In order for SA Power Networks to make a connection, the certificate of compliance must be completed in accordance with the requirements of the Electricity (General) Regulations If in the opinion of the Responsible Officer the certification of the electrical installation is incomplete or invalid or the electrical installation is considered unsafe, then it will not be connected or remain connected to the SA Power Networks distribution network. Note: Also refer to clause Negotiations for Obtaining/Altering and Electricity Supply & Warning Against Premature Expenditure At the earliest opportunity, negotiations should commence with SA Power Networks for the costs and availability of supply to: a new electrical installation an addition or alteration to an existing electrical installation a change of load a new or altered supply point Adequate written notice of the customer s proposed requirements should be provided and the customer should be prepared to meet the costs involved. Sufficient time must be allowed for SA Power Networks to plan, determine and negotiate appropriate supply arrangements. No expense on the installation should be incurred by a prospective customer until negotiations for supply have been completed with SA Power Networks. An offer will be provided with the conditions under which SA Power Networks would agree to the connection of the proposed load. These Rules form part of any offer provided by SA Power Networks. The conditions of the offer may affect your selection of equipment and the design of the project. Points of consideration may be: the point and type of supply specifications of customer s equipment the position of the metering and servicing equipment the point of attachment of an aerial service cable point of entry of an underground service cable Issued August 2017 Page 33 of 149

34 the location of any SA Power Networks equipment on the premises upgrading of existing customer s installation to current standards Alterations to Existing Installations Where work is undertaken with an existing customer s installation, which results in an additional appliance or equipment being installed of input capacity greater than 2.5kW, and the appropriate documentation as stated on our website must be completed and submitted to SA Power Networks. Where equipment input capacity exceeds 5kW, the customer must have approval of the relevant SA Power Networks Manager prior to connection of that equipment. 5.3 Type of Supply and Load The Connection and Supply Contract or Offer Letter specifies: the conditions for connection of the customer s electrical installation to the electricity network; the type of supply including the voltage and number of phases; and the allocated supply capacity where this is applicable. SA Power Networks should be contacted to determine the supply arrangements where a customer does not have: a specific electricity distribution connection agreement; or Offer Letter; or demand tariff agreement. 5.4 Authorised Service Capacity Application SA Power Networks will determine the service capacity upon agreement with the customer Offer Letter For a new or altered supply, the service capacity available to the customer will be detailed in the Offer Letter. This will be the initial authorised service capacity. This authorised service capacity will remain for the life of the connection except where as varied as per SA Power Networks will require the customer to provide control equipment to limit the load to the agreed service capacity Agreed Maximum Demand The agreed maximum demand is the maximum demand used to calculate the demand component of a customer s network demand tariff charge. A customer may renegotiate their agreed maximum demand subject to the requirements of the Distribution Code, the Electricity Act and the initial connection contract. Any renegotiated agreed maximum demand request must take into consideration the following: reasonable expectations of future use past demand history changes to processes or type of business; or energy efficiency or demand control measures Issued August 2017 Page 34 of 149

35 When an agreed maximum demand is reduced at a customer s request and the reduction is approved, then the new agreed maximum demand will also be the new Authorised Service capacity Control of Customer Load (TIR) General (TIR) SA Power Networks will require a customer to provide load-limiting control no greater than the agreed service capacity. Acceptable methods to control the maximum demand include the use of Circuit Breakers and/or Load Management Systems. Fuses are not an acceptable means of load control. Where the supply is via a dedicated distribution transformer, use of a single main circuit breaker is mandatory (notwithstanding the requirements of AS/NZS 3000 in relation to the circuit protection for essential services). This circuit breaker will combine the functions of maximum demand control and the customer s main switch as per clause 7.4.5, except where a load management system performs the function of the maximum demand control Load Control Device/s (TIR) Circuit Breakers May be installed at the main switchboard in accordance with the Electricity Act and Regulations, the AS/NZS 3000, and these Rules; Must be arranged to ensure the aggregate rating of the device does not exceed the authorised service capacity where multiple devices are used; and Shall have access and means to seal any adjustable settings by the user of SA Power Networks security seal or equivalent means. Load Management System/s To prevent loss of supply, situations where the installation of a load management system should be considered include: where the electrical installation incorporates essential building services such as fire and smoke control equipment, evacuation equipment and or lifts; where prioritisation of loads is desirable in order to protect against the adverse effects of loss of supply eg, loss of production, spoilt goods etc. 5.5 Typical Connection Process Connection to the SA Power Networks Distribution System The process for connection to the SA Power Networks distribution system can be found on SA Power Networks website, Reconnection to the SA Power Networks Distribution System (TIR) For installations that have been disconnected for an extended period of time (12 months or greater) or any alterations made during the period of disconnection, SA Power Networks will require a valid Electrical Certificate of Compliance. Meter isolator must be installed as per clause with the same requirement as a repair. Notwithstanding the above, for safety reasons, SA Power Networks reserves the right to request a valid Electrical Certificate of Compliance prior to reconnection. Issued August 2017 Page 35 of 149

36 6. Supply Characteristics and Supply Use 6.1 Supply (TIR) Supply Systems (TIR) SA Power Networks applies the 230/400V low voltage standard as recommended by AS Standard Voltages. New installations must be designed for this standard low voltage. SA Power Networks may, subject to availability, undertake to provide: 3 Phase, 4 Wire 230/400 Volt System A three phase, four-wire electricity supply of alternating current at a frequency of nominally 50 Hertz and having an approximate sinusoidal wave shape. The voltage is nominally 230/400 rms in accordance with AS60038 Standard Voltages. 2 Phase, 3 Wire 230/460 Volt System A two phase, three-wire electricity supply of alternating current at a frequency of nominally 50 Hertz and having an approximate sinusoidal wave shape. The voltage is nominally 230 rms in accordance with AS60038 Standard Voltages. Note: Refer to Appendix 1 for housing developments limited to 1 phase only supply arrangements. The supply arrangements may be restricted in some locations for example, some country areas are limited to a SWER supply, similarly, some built-up areas are restricted to a single phase 230V system only. The above supply voltages will have a sustained range of no more than +10% or not less than -6% under normal conditions Supply Disturbances (TIR) SA Power Networks may modulate the normal 50Hz sinusoidal wave by signals of other frequencies for distribution network and load control and communication purposes. SA Power Networks will endeavour to ensure that voltage fluctuations and total harmonic distortion will be limited in accordance with AS/NZS Disturbances in Mains Supply Networks. Due to the nature of transient voltages, and the uncontrollability of their source, SA Power Networks can t provide any limitation on these types of supply disturbances. Consequently, customers are advised to provide protective devices to protect equipment within their installation Phase Failure Protection (TIR) It is recommended that Customers, with sensitive equipment on multi-phase installations, connected to the SA Power Networks network should provide the appropriate phase failure, over voltage and under voltage protection on their customer distribution board to protect their installation against the loss of one phase of the SA Power Networks supply Prospective Short Circuit Current (TIR) Where a new or upgraded installation is supplied from a distribution network along a public road, the prospective fault current at the connection point will not generally exceed the following: Issued August 2017 Page 36 of 149

37 Residential Environment Up to 63A Installations: Greater than 50m from Supply Transformer Table 6.1 shows the prospective fault current (ka) applicable to installations with a 63A service. These maximum prospective phase to earth bolted fault currents are expected to occur on the load side of the consumer mains for commonly used cable sizes when the customer s connection point is greater than 50m from the supply transformer. Total Consumer Mains Length Mains Size (mm 2 Copper) m m m m m m m m Table 6.1 Prospective Fault Current (ka) for 63A service greater than 50m from supply transformer (Non TIR) Greater than 10m and less than 50m from Supply Transformer Table 6.2 shows the prospective fault current (ka) applicable to installations with a 63A service. Testing may indicate a lower fault current, therefore an appropriate size protection device may be used. These maximum prospective phase to earth bolted fault currents are expected to occur on the load side of the consumer mains for commonly used cable sizes when the customer s connection point is greater than 10m and less than 50m from the supply transformer. Total Consumer Mains Length Mains Size (mm 2 Copper) m m m m m m m m Table 6.2 Prospective Fault Current (ka) for 63A service between 10 and 50m from supply transformer (Non TIR) In residential environments where the installation requires a service greater than 63A, please consult the relevant SA Power Networks Manager. Commercial / Industrial Environment Installations Where a customer is supplied direct from a transformer greater than 315kVA, consult the relevant SA Power Networks Manager. Issued August 2017 Page 37 of 149

38 6.1.3 Protective Systems (TIR) The SA Power Networks distribution network employs either a multiple earth neutral (MEN) or common multiple earth neutral (CMEN) earthing system. In general, the CMEN system only exists within defined town boundaries. All other areas are served by an MEN system. The relevant SA Power Networks Manager should be consulted on the precise configuration of the earthing system employed. The service is supplied without an earth conductor. The neutral conductor performs the multiple functions of neutral and distribution network earth. Notwithstanding this, customers are required to ensure the adequacy and maintenance of the earthing system within their electrical installation Earthing of Electrical Installations (TIR) 6.2 Connection Points The earthing of electrical installation shall be in accordance with AS/NZS 3000 Wiring Rules requirements for a MEN earthing system. The MEN connection and outgoing earthing conductors shall be accessible for inspection and testing without the need to interfere with SA Power Networks or the meter provider s security seal. SA Power Networks will provide a connection to the distribution network that complies with the Electricity Act 1996 and Electricity (General) Regulations 2012 as amended and the SA Distribution Code. With the exception of metering equipment and service fuses, the customer is responsible for the installation and supply of all equipment beyond the point of supply Number of Services In general, SA Power Networks will provide only one connection point to a property. An installation on one or more adjacent titles or a multi tenanted development including Strata and Community Title Schemes, whether staged development or not, will be provided with a single connection point for the connection of one consumer mains. Provided it is not necessary for SA Power Networks to undertake unreasonable augmentation of the network to provide an additional connection point, more than one connection point may be provided to a property in the following circumstances: Multiple Occupancy (i) comprising separate individual domestic dwellings intended to be occupied by different customers and does not include any common area; and (ii) the land associated with each of the domestic dwellings directly abuts a public road reserve; and (iii) the land owner is prepared to submit a draft plan of subdivision to SA Power Networks, verifying any future subdivision of the land will not incorporate common property. Individual connection arrangements for separate buildings or properties will only be considered for developments involving Torrens Titles where buildings and electrical installations are constructed such that they do not cross title boundaries (excluding consumer mains entering the road reserve or registered easement). Issued August 2017 Page 38 of 149

39 Subdivisions Incorporating Common Property The electricity to all of the allotments shown on the plan of subdivision shall be supplied from a common distribution point which is connected to a single connection point where: the plan of subdivision incorporates common property; and the allotments shown on the plan of subdivision are affected by any Owners Corporation. Notwithstanding the above, allotments shown on the plan of subdivision incorporating common property that are not affected by any Owners Corporation and abut a public road reserve may be provided with a separate connection point. SA Power Networks may consider a request to provide more than one connection point under the relevant provisions of clause (Number of Services). The consumer mains, metering equipment, general distribution switchboard and the individual consumer sub-mains, installed for the purpose of supplying electricity to each of the allotments, must be placed within the common property. For the purpose of supplying the electricity to each of the allotments intended to be supplied from a single point, each of the allotments must abut common property. Additional information related to the arrangement wiring and equipment is provided in clauses: 6.2 Connection Points 6.3 Consumer Terminals Multiple Occupancy Electrical Installations Further information is provided in the figures below. Underground Consumer Mains drawings to be provided in accordance with AS/NZS Issued August 2017 Page 39 of 149

40 Service & Installation Rules Issued August 2017 SA Power Networks 2017 Page 40 of 149

41 Service & Installation Rules Issued August 2017 SA Power Networks 2017 Page 41 of 149

42 Service & Installation Rules Issued August 2017 SA Power Networks 2017 Page 42 of 149

43 Service & Installation Rules Issued August 2017 SA Power Networks 2017 Page 43 of 149

44 Subdivisions Not Incorporating Common Property Allotments shown on the plan of subdivision, which does not incorporate common property, may be provided with a connection point for each allotment. For the purposes of establishing a single connection point for each of the allotments, all of the allotments shown on the plan of subdivision must abut a public road reserve. The connection point, consumer terminals and metering equipment must be arranged in accordance with clauses: 6.2 Connection Points 6.3 Consumer Terminals Contiguous Land Single Residential Single Non-Residential Further information is provided in the figures below. Issued August 2017 Page 44 of 149

45 Service & Installation Rules Issued August 2017 SA Power Networks 2017 Page 45 of 149

46 Service & Installation Rules Issued August 2017 SA Power Networks 2017 Page 46 of 149

47 Service & Installation Rules Issued August 2017 SA Power Networks 2017 Page 47 of 149

48 Service & Installation Rules Issued August 2017 SA Power Networks 2017 Page 48 of 149

49 Service & Installation Rules Issued August 2017 SA Power Networks 2017 Page 49 of 149

50 Service & Installation Rules Issued August 2017 SA Power Networks 2017 Page 50 of 149

51 Reference Number of Phases A low voltage service will be provided as either, one, two or three phase. All high voltage services will be three phase. Unless otherwise agreed by the relevant SA Power Networks Manager, the number of phases provided for a low voltage supply will be determined as indicated below. In local supply areas supplied by: 3 Phase, 4 Wire 230/400 Volt System Where an installation has one customer, the number of phases provided (up to a maximum level of three) will be primarily based on the service capacity required as specified in rows A1-3 of Table 6.4. Where an installation has two or more potential customers, each with a maximum demand that does not exceed 63 Amperes per phase, the number of phases provided will be determined from rows B and C of Table 6.4. However, where the maximum demand determined for two customers, both connected to the same phase, does not exceed a 63A, then a single-phase supply may be provided. For example: a house and granny flat where a load control circuit breaker ensures that the total maximum demand of the house and granny flat does not exceed the maximum single phase service capacity. Number of customers Service Capacity required Number of Phases A1 One Not exceeding 63A One (2 wire service) A2 One Exceeding 63A but not exceeding 126A (equivalent single phase load) A3 One Exceeding 126A (equivalent single phase load) Two (3 wire service) Or Three (4 wire service) Three (4 wire service) B Two Not exceeding 63A per phase Two (3 wire service) C1 Three Not exceeding 63A per phase Three (4 wire service) C2 Three or more Exceeding 63A per phase Three (4 wire service) Table Phase, 3 Wire 230/460 Volt System (SWER, Rural or some Underground Residential Distribution Networks) A three-phase service is not available to customers supplied via a single phase 230/460 Volt system. The number of phases (up to a maximum of two) will be based on the service capacity required as specified in Table 6.5. Note: Where a 4 core cable is used to connect an installation as a 3 wire system, then the unused wire shall be terminated in a suitable connector and labelled at both ends. Issued August 2017 Page 51 of 149

52 Reference Number of Service Capacity Required Number of Phases Customers A1 One Not exceeding 63A One (2 wire service) A2 One Exceeding 63A Two (3 wire service) B Two or more Not exceeding 63A per phase Two (3 wire service) Table Phase, 2 Wire 230 Volt Rural System A single phase, two-wire 230 Volt 63A service is available only at a transformer. Refer to clause 6.7 for authorised service capacity. Note: Maximum service capacity normally available from a single SWER line is 25kVA per customer at a transformer. A customer may have two or more services from a transformer provided their total demand does not exceed 25kVA. For example: The absolute maximum service capacity from single-phase 11kV line is 50kVA per connection. This arrangement can only be provided by negotiation. A residential installation with a maximum demand of 50A, the electrical contractor would provide a 63A meter isolating circuit breaker, which will grade with the SA Power Networks service fuse. The service fuse is provided for short circuit protection only and the meter isolating circuit breaker essentially provides the overload protection Location In all cases, SA Power Networks reserves the right to determine the location of the connection point and consumer terminals. The customer may be required to arrange facilities for the installation of the service lines and conduits at the customer s expense. Typical connection points are shown in Table 6.6. Refer to clauses and and Section 9 High Voltage Electrical Installations for specific details of connection point and consumer terminal arrangements for low and high voltage supplies. Issued August 2017 Page 52 of 149

53 Supply Type Connection Point Over / Under Services Overhead Lines Isolators On Pole Service Pit / Pillar Terminals of An Adjacent Pad-Mounted Transformer Service Fuse Enclosure Within 8m of The Boundary High Voltage 6.3 Consumer Terminals At the load side terminals of the service fuse, on a pole nominated by the SA Power Networks Manager in the vicinity of the property where supply is requested. At the load side terminals of the service fuse, mounted on the facia or façade of the customers building or structure. At the load side terminals of the LV isolator, on a pole nominated by the SA Power Networks Manager in the vicinity of the property where supply is requested. At the terminals or block inside the LV, service pit / pillar nominated by the SA Power Networks Manager in the vicinity of the property where supply is requested. At the LV terminals of the LV transformer fuses or LV isolators inside the LV compartment of a pad mount transformer nominated by the SA Power Networks Manager on or adjacent to the property where supply is requested. At the load side terminals of the service fuse, inside the LV compartment of a service fuse enclosure nominated by SA Power Networks Manager on the property where supply is required. The point agreed between the SA Power Networks Manager and the Customer. Table 6.6 Connection Point/Customer Terminals Location Number of Consumer Terminals per Point of Supply No more than one set of consumer mains shall be connected to each consumer terminal at a connection point. SA Power Networks may agree to a customer s request to provide more than one set of consumer terminals to a connection point dependent upon the circumstances. Refer to the relevant SA Power Networks Manager Identification of Consumer Mains (TIR) Consumer mains originating at a pit/pillar, pole or transformer shall be labelled as close as practical to the cable ends adjacent to the consumer terminals at the connection point to identify the electrical installation they supply. Refer also to clause for conductor identification details. For over/under services on poles, the labelling shall be at the top of the mechanical protection and for services from a pit/pillar, the labelling is required to be attached to the consumer mains conductor. Labelling shall be in accordance with clause 4.5. Consumer mains originating from an overhead service attached to the same building that the consumer mains supply, need not be labelled with the street address at the connection point. Issued August 2017 Page 53 of 149

54 6.4 Identification of Multiple Supplies (TIR) In addition to the requirements of the Electricity Act and Regulations and AS/NZS 3000, a prominent warning notice alerting to the presence of multiple supplies shall be installed on each main switchboard. The following applies where, in accordance with the provisions of clause 6.2.2: more than one connection point is provided to a property and/or more than one set of consumer terminals are connected to a connection point; and the property s supply arrangements; and segregation between the electrical installations and occupancies un-metered wiring, switchboards and metering. This identification shall be permanent, indelible and legible. Labelling and diagrams are also required for supply changeover arrangements, generator connections and multiple metered installations. The customer is responsible for the provision and maintenance of any diagrams and to ensure they are permanent, legible and are current at all times. The diagrams must show the location of the point of supply for the electrical installation, the layout of un-metered wiring and additional metering points. 6.5 Customer Load Requirements (TIR) Obligations (TIR) Under the Connection and Supply Contract from the Electricity Distribution Code, customers must use their best endeavour to ensure: protection equipment in the customer s electrical installation is effectively coordinated with the electrical characteristics of the distribution network; ensure that the distribution network and the reliability and quality of supply to other customers are not adversely affected by the customer s actions or equipment; the customer must ensure that the maximum continuous current drawn by the installation does not exceed the authorised service capacity; and SA Power Networks agreement is obtained for additional loads as specified in clause for alterations to existing installations. Additional requirements of the Connection and Supply Contract are duplicated in these Rules for convenience of reference. However, the current Contract should be referenced for specific detail. This clause also contains some specifications that are not included in the Contract. Generally, all installation and maintenance of equipment beyond the load side of the point of supply is the customer s responsibility. However, customers are required to make provision for the meter provider to safely house appropriate metering equipment and in some cases SA Power Networks service fuses Non Compliance (TIR) If, in the opinion of SA Power Networks, a person uses or deals with electricity supplied in such a manner as to cause undue interference with the supply to themselves or any other customer, SA Power Networks may direct the customers to take corrective action. The connection by SA Power Networks is not to be taken as acceptance of any load whatsoever. It is the customer s responsibility to ensure compliance with the Connection and Supply Contract. Issued August 2017 Page 54 of 149

55 Supply voltage Power Factor (TIR) The customer must ensure that, at all times of monthly maximum demand, the power factor of the electrical installation is maintained within the relevant range set out in Table 6.7 below. At all other times, the customer must take all reasonable steps to maintain power factor within that same relevant range. Minimum lagging Maximum demand of electrical installation Up to 100kVA 100kVA to 2MVA Exceeding 2MVA Minimum leading Minimum lagging Minimum leading Minimum lagging Minimum leading <6.6kV kV to 66kV Harmonics (TIR) Table 6.7 The customer must ensure that harmonic distortion caused by the electrical installation or by any appliances is not in excess of the limits prescribed in AS/NZS part 3.2, 3.4 and 3.12 for low voltage and part 3.6 for high voltage. Notwithstanding the above, no customer shall make a contribution to harmonic voltage distortion of the network greater than the values listed in Table 6.8 below Load Balance (TIR) Maximum allowable harmonic distortion at the point of common coupling (PCC): total any individual odd harmonic any individual even harmonic Table 6.8 % 1.67 % 1.33 % 0.67 % The circuits of an installation, or separately metered part of an installation, which is supplied by more than one phase, must be balanced as near as practicable over all the available active conductors. Single-phase circuits must be arranged such that under normal circumstances the out of balance current does not exceed 25A or 10% of the agreed maximum demand, whichever is the greater Disturbing Loads (TIR) The customer must ensure that voltage disturbances caused by the electrical installation or by any appliances do not result in voltage disturbances to other customers, greater than the limits prescribed in AS/NZS parts 3.3 and 3.5 for low voltage and part 3.7 for high voltage. Issued August 2017 Page 55 of 149

56 6.5.7 Switched Loads (TIR) To meet the specifications regarding load balance and disturbing loads, the following rule will apply: In electrical installations of 100A or less, the maximum single-phase load that can be switched without specific authorisation from the relevant SA Power Networks Manager is shown in Table 6.9 below. Local Supply System Single Phase 460/230 Volt areas of supply Three Phase 400/230 Volt areas of supply Table 6.9 Load Rating 20 Amperes 25 Amperes Specific authorisation may be given by the relevant SA Power Networks Manager to switch larger loads provided it can be demonstrated that the voltage disturbances do not affect other customers. Refer to clause A copy of any authorisation or approval must be provided to the Connect Officer at the time of connection. Specific equipment included in this requirement is: Motors, including air conditioners and pumps Combined rating of all elements in an underfloor heating system Individual rating of water heating devices Combined rating of storage heaters (heat banks) Electric vehicle chargers Cyclic load which may cause disturbances Electric cooking appliances in residential installations with a rating of less than 17kW are acceptable for the purpose of this clause Voltage Drop (TIR) AS/NZS 3000 specifies the allowable voltage drop within an electrical installation Equipment Requiring Special Consideration (TIR) A customer proposing to connect the type(s) of equipment listed below must apply to SA Power Networks for approval to do so. SA Power Networks may refuse to permit or apply conditions and/or tests for the connection of equipment in the following categories if it considers that by such connection, the supply to other customers would likely be adversely affected. 1. Equipment, which could cause excessive fluctuation of voltage on SA Power Networks distribution system as a result of its large or fluctuating demand, eg motors with disturbing loads or control, gas discharge lighting, arc furnaces, welding machines, X-ray units, starting of large motors etc. 2. Equipment which could cause excessive distortion of the wave shape of SA Power Networks system voltage, eg rectifiers, frequency converters, load control devices using thyristor or saturable reactors etc. No commitment or expense should be undertaken by any customer or prospective customer until an application has been made to SA Power Networks and advice has been received that the supply will be given and upon what terms and conditions it will be given. Issued August 2017 Page 56 of 149

57 Starting Current of Motors (TIR) General (TIR) Motor Size The current taken by a motor of a type mentioned in this clause under the conditions of starting shall not exceed the values in Table 6.10 and Table 6.11 when measures by the methods outlined in clause not exceeding 1.5 kw exceeding 1.5 kw, but not exceeding 3.75 kw Exceeding 3.75 kw Single Phase Motors (TIR) Allowable Current I I = 26 Amperes I = (Motor kw x 17.5) Amperes (a) I = (Motor kw x 3.5) + 53 Amperes, or (b) I = total kw of motors installed x 1.1 Amperes Where, I = the starting current of the largest of the other motors installed calculated in accordance with (a) above, whichever is the greatest. Table 6.10 Three Phase Motors 400 Volts Motor Voltage Motor Size Allowable Current I 230 Volts All sizes I = 45 Amperes 460 Volts Not exceeding 1.5 kw Exceeding 1.5 kw, but not exceeding 3.75kW Three Phase Motors 400 Volt (TIR) Table 6.11 Single Phase Motors I = 45 Amperes I = (Motor kw x 9.5) + 26 Amperes The motors output kw ratings referred to in this clause refer to a motors output rating. The total motor load is the combined output ratings of motors installed in the particular electrical installation from which the proposed motor is to be supplied and includes the proposed motor. No limitation need be placed on the starting current of any three phase motor which is not frequently started and the rating of which does not exceed 10% of the total motor load installed Test Method for Measurement of Motor Starting Current (TIR) The starting currents of alternating current motors shall be determined by either of the following methods. Issued August 2017 Page 57 of 149

58 Fall in Voltage Method (TIR) The starting current shall not cause a fall in voltage of more than 5% for more than 0.02 seconds when connected to a typical 400/230 Volt, three phase, 50Hz supply having a supply system impedance of: j 0.2 ohms (phase-neutral) j 0.1 ohms (line impedance per phase) The fall in voltage shall be determined by the oscillographic method or any other method considered appropriate by SA Power Networks Current Measurements Method (TIR) The starting current may be determined by the locked rotor method with low voltage, 50Hz, as appropriate, applied to the terminals of the motor. In the cause of motors having rotors, which can t readily be locked, the current may be measured with a backstopped ammeter or by other methods approved by SA Power Networks Restart Delay (TIR) Where the following appliances or equipment are installed: The installation s total heating system rated at 6kW or greater; or Compressor equipment (including air conditioning) rated at greater than 2.4kW the customer must ensure that the equipment, appliance, socket outlet or final subcircuit supplying the equipment has either: an under-voltage release with a manual reset; or an ON-delay timer which senses the supply voltage and, where automatically operated, has a minimum on delay of not less than 10 seconds Installations with Generators, Alternative or Parallel Supplies (TIR) Where customers generators and/or alternative supplies are used for standby generation, they must be connected in such a manner that they can t feed back into the SA Power Networks distribution network. Refer 6.8. Any changeover mechanism used to switch between supplies shall break connection from the SA Power Networks supply prior to making connection to the generator supply. Where customers are provided with alternative supplies from different sources within the SA Power Networks distribution network, these supplies shall be connected in such a way that they can t be connected in parallel to ensure isolation between the relevant sources within the SA Power Networks distribution network. Changeover devices are required to interrupt one source of supply before connecting to the alternative source of supply. The changeover device must incorporate a mechanical interlock to prevent the simultaneous connection of the generator/alternative/parallel supply and the normal supply system. Parallel supplies (eg Photo Voltaic and generators) must not be connected unless prior written approval has been given by the relevant SA Power Networks Manager. Requirements will be provided on application. For more detailed information on other sources of supply refer to clause 6.6. Issued August 2017 Page 58 of 149

59 6.6 Additional Sources of Supply by way of Renewable Energy Systems of Embedded Generating Units General Any alternative source of supply that is intended to supplement the main supply is included in the requirements of this section. The term embedded generation and renewable energy systems includes systems such as co-generating units, diesel generators, photovoltaic systems, micro-hydro systems, wind turbines, and battery storage systems. Where an embedded generating unit installation is proposed, including battery storage systems, the proposal shall be submitted to SA Power Networks for approval at the earliest opportunity. For the network connection requirements of inverter energy systems, refer to SA Power Networks NICC-270 Guide for Connecting Large Embedded Generation, TS130 Technical Standard for Inverter Energy Systems (IES)- Capacity up to or equal to 200kVA, and TS131 Technical Standard for Large Inverter Energy Systems above 200kW or Rotating Generating Systems available on SA Power Networks website. It is essential that SA Power Networks be formally consulted before any commitment to proceed is made. A connection agreement in accordance with the Distribution Code is required before an embedded generating unit can be connected to the customer s installation. Where applicable, the customer should also advise their Retailer of the proposal Connection of Break before Make Stand-by Gen-Unit (TIR) Where SA Power Networks agrees to connection arrangements that enable an electrical installation to be disconnected from SA Power Networks supply system and connected to a private alternative source, the arrangements shall be such that the SA Power Networks supply system, service, and metering equipment can t be energised from the alternative source. This can be arranged either directly (automatically) and by suitable mechanical interlocking devices to prevent the simultaneous connection of the alternative supply to the SA Power Networks supply system. The opening or closing of any associated switchgear door or cover shall not affect the interlocking system. A prominent label shall be fixed at the consumer terminals and the main switchboard to show that such facilities exist, and the sections of the electrical installation they supply including their point of control. If the alternative supply automatically comes into operation on the loss of SA Power Networks mains supply, a means of isolating the alternative supply from the SA Power Networks equipment shall be provided on the electrical installation main switchboard or distribution switchboard to which the alternative supply is connected. Where a generator is directly connected under emergency conditions, the interlocking arrangement may be achieved by creating a physical break, eg disconnection of cables, which requires other than normal operational means to restore. The neutral shall not be switched or broken on the distribution supply (upstream) side of the MEN connection. Refer also to the AS/NZS 3000 Wiring Rules and AS/NZS Electrical Installations Supply by Generating Set for specific installation requirements. Issued August 2017 Page 59 of 149

60 6.6.3 Requirements for Parallel Embedded Generating Unit (TIR) Specific requirements apply in respect of any proposal to incorporate parallel generation facilities, Embedded Generating Units, within an electrical installation. These requirements are specified in: The National Electricity Rules The Electricity Distribution Code Australian Standards as required by the Electricity Act 1996 Work Health and Safety Act 2012 It is therefore essential that SA Power Networks be formally consulted before any commitment to proceed is made Network Connection Agreement (TIR) The Electricity Distribution Code specifies that the Distributor must not connect embedded generating unit to the SA Power Networks distribution network unless it has entered into a connection agreement with the proponent in respect of that embedded generating unit Notification Requirements (TIR) The proposal shall include: details of the proposed connection requirements specification of the facility to be connected details of the power transfer capability that the network should provide technical data to suit the size and complexity of the proposed facility to be connected a schematic diagram of the proposed electrical installation supply arrangements SA Power Networks has prepared standard enquiry and application forms to enable SA Power Networks to process the application. These are available on SA Power Networks website Networks Connection of Inverter Energy Systems (TIR) For small inverter energy systems, including battery storage systems, connected to the grid, the maximum allowable size shall be 5kVA for single phase systems, as outlined in AS/NZS SA Power Networks may provide an exemption to allow up to 10kVA if exporting to the grid is limited, using an approved limiting device, to 5kVA. For multiphase system, the maximum allowable size shall be 30kVA with a tolerance of no greater than 5kVA unbalance between the phases. For larger multiphase system consult SA Power Networks. Where the inverter system is used solely as a back-up or alternative supply for the electrical installation, refer to the changeover arrangements Inverter Requirements (TIR) Only approved models that satisfy AS/NZS Grid Connection of Energy Systems via Inverters - Inverter Requirements may be connected to the grid. Type Test certification of compliance with this standard must be provided to SA Power Networks prior to the grid connection of the inverter Installation and Connection to Grid (TIR) The installation of the inverter shall be in accordance with the requirements of AS/NZS 3000, AS/NZS and AS/NZS and these Rules: Issued August 2017 Page 60 of 149

61 The customer s inverter must be connected to a dedicated circuit on the customer s main switchboard or distribution switchboard closet to the inverter via a lockable isolating switch. All switchboards associated with the inverter energy system must be clearly and permanently labelled as having an Inverter Energy System connected to it. The circuit breaker, fuse or switch must also be clearly labelled. A label indicating that an alternative power supply system is connected to the electrical installation shall be fitted at the meter position and main switchboard. Refer to clause Metering (TIR) Under the Metering Code, a meter with import and export registers is required. This meter will be provided by the relevant meter provider. It is recommended that the customer advise their Retailer of this requirement at the earliest opportunity Standard Networks Connection Agreement (TIR) SA Power Networks can only agree to provide connection services for an Inverter Energy System to its distribution network in accordance with the terms and conditions of an approved standard connection agreement. For a copy of the approved standard connection agreement for Small Embedded Generator Connection, refer to SA Power Networks website Storage Systems Storage systems such as batteries shall be installed in accordance to the relevant Australian Standards (ie AS/NZS 4777, AS/NSZ 3000, etc) which are published at the time of installation. Due consideration shall be given to ventilation, prevention of unauthorised access and electrical safety. Issued August 2017 Page 61 of 149

62 7. Low Voltage Supply 7.1 Services SA Power Networks will provide a connection that complies with the Electricity Act 1996, Electricity (General) Regulations 2012 and the SA Distribution Code. The customer is responsible for the installation and supply of all equipment beyond the connection point, with exception of metering and service protection equipment General The customer, at their expense, shall provide adequate mounting and installation facilities for SA Power Networks service equipment in accordance with these Rules. Service equipment supplied and installed by SA Power Networks shall remain the property of, and be maintained by SA Power Networks Type of Service The type of service to be provided shall be determined in conjunction with clause 6.2, where SA Power Networks nominates the point of supply and consumer terminals location. The service configuration provided by SA Power Networks is dependent upon: Service capacity; and Configuration of the local distribution network. The service provided will be designed only to accommodate the customers determined maximum demand at the time of application (as supplied to SA Power Networks). SA Power Networks will provide a standard service, in accordance with the Distribution Code, as described in Tables 7.1 and 7.2 below, unless an alternative connection configuration is requested by the customer. Costs attributable to the customer will be determined at the time the service connection is scoped by the Responsible Officer. The availability of a particular configuration of service may be restricted by conditions at or near a particular supply address. Where underground consumer mains are located within public land, the customer must obtain Council, Department of Planning, Transport & Infrastructure (DPTI) or the relevant Authorities approval to install underground electrical cables in the road reserve. The customer is responsible for trenching, backfilling, reinstatement and any other associated cost applicable to the installation of underground consumer mains. If SA Power Networks is required to trench, the cost will be scoped into the capital cost by the Responsible Officer Connections to Services Cables required to be connection to service protective devices or to the point of supply or metering instruments, will be installed, identified (including the provision of permanent phase identification) and prepared prior to a connection (or reconnection) appointment, and will be a size, type and material compatible with SA Power Networks terminals. Hard drawn copper, compressed cables or aluminium cables are not suitable for termination directly into SA Power Networks services or metering equipment rated at 100A or less. There are also limits on the size of conductors to be connected into SA Power Networks equipment such as service pits and metering. Refer to Tables 7.1 and 7.2 Issued August 2017 Page 62 of 149

63 Service Termination Metering Overhead or Over/Under Services up to 100A Over/Under Services greater than 100A and up to 200A Connection to Pole Top Isolators 100A Pit/Pillar 200A Pit 400A Pit Padmount Transformer 150kVA 300kVA 500kVA 750kVA 1.0MVA 1.5MVA 2.0MVA Notes: Cable Sizes and Type Flexible (with ferules) or Soft drawn copper cables no greater than 25mm². Single copper cables no greater than 35mm² PVC/PVC cables (to provide the minimum required bending radii for the terminal loop). For polyphase services the customer shall provide a suitable M8 crimp lug for the neutral. Refer Figures 7.2, 7.3 and 7.5. Single copper cables no greater than 70mm². Customer to provide suitable M12 crimp lugs. Up to 150mm 2 can be accommodated by prior arrangement. Copper cables no greater than 150mm². Customer to provide suitable M12 crimp lugs. Refer Figure 7.6. Single soft drawn copper cables no greater than 35mm². Customer to provide suitable crimp lugs. Refer Figure 7.5. Copper cables no greater than 95mm². Suitable crimp lugs to be provided. Note: Electrical Contractor to supply crimping tool. Copper cables no greater than 240mm². Suitable crimp lugs to be provided. Note: Electrical Contractor to supply crimping tool. Table 7.1 Typical Customers Service Terminations Copper cables suitable for loads no greater than 700A. Maximum size conductor per phase single fuse disconnect - 2x300mm² Cu or 1x500mm²Cu. Copper cables suitable for loads no greater than 1,000A and 1,400A. Maximum size conductor per phase 4x500mm² Cu 1,250A Fuse Disconnect. Copper cables suitable for loads no greater than 3,000A. Maximum size conductor per phase - 6x500mm² Cu. Table 7.2 Maximum Size of Customer Cables 1. By prior arrangement, aluminium cables of the same number and dimensions are acceptable provided the required bi-metal lugs are provided and installed. 2. Where non-compliant cables are installed, they shall be converted to compliant cables prior to being connected to SA Power Networks equipment. 3. SA Power Networks must be consulted where the suitability of proposed connection facilities is in doubt. Issued August 2017 Page 63 of 149

64 7.2 Underground Distribution Areas In all cases, the type and installation of, and connection to an underground service cable is subject to the agreement of SA Power Networks. Except in exceptional circumstances, an underground service shall be provided where: the area is serviced by underground distribution mains; the formal conditions under which supply is to be provided specify and underground service; the required clearances and facilities for an aerial service cable can t be achieved and/or maintained; the determined maximum demand to be provided from the LV overhead distribution mains exceeds 63A per phase; and where the customer would normally be provided with an overhead line, but has requested, and SA Power Networks has agreed to the installation of an underground service. In underground distribution areas, the SA Power Networks Manager will provide a service configuration as indicated in Table 7.3. Once nominated, all remaining options shown in the schedule become alternative configurations. Service Capacity required Not exceeding 63A per phase 63A up to 200A per phase Exceeding 200A per phase Consumer Terminals Preferred Connection Configuration 100A service pit / pillar 100A service pit / pillar 200A service pillar With agreement of SA Power Networks Manager Overhead transformer Padmount transformer Service fuse enclosure Service pit / pillar Table 7.3 None None None SA Power Networks shall provide the consumer terminals. Alternate Connection Configuration The consumer terminals for an underground consumer mains shall be one of the following: Service Pit/Pillar At the terminals or block inside the LV service pit/pillar nominated by the relevant SA Power Networks Manager on or adjacent to the property where supply is requested or from the nearest service pit if Council agrees to the installation of consumer mains in the road reserve. Terminals of Padmount Transformer At the LV terminals of the LV transformer fuses or LV isolators inside the LV compartment of a padmounted transformer nominated by SA Power Networks Manager on or adjacent to the property where supply is requested. Refer to SA Power Networks Padmounted Transformer Brochure NICC-802 on the SA Power Networks website. Issued August 2017 Page 64 of 149

65 Service Fuse Enclosure Where SA Power Networks supply cable terminates directly into a service fuse enclosure which has been nominated by the relevant SA Power Networks Manager, then the consumer terminals are at the load side terminals of the service fuse Underground Service Service Pits/Pillars Where a customer is supplied via an SA Power Networks service pit/pillar, the customer will be provided with a point of supply at a junction terminal, fuse terminal or terminal block inside a pit/pillar. The customer is responsible for providing and maintaining all consumer mains and equipment from the point of supply with the exception of metering equipment and service fuses (where required). For a residential development, the service pit/pillar will normally be located 600mm from the front boundary and 500mm from the side boundary of the customer s property. Other locations may be approved with agreement between the relevant SA Power Networks Manager and the customer. Any pit/pillar is installed with the express knowledge and agreement by the property owner that SA Power Networks may elect to supply the property it is installed on as well as adjacent properties. Where consumer mains enter into an SA Power Networks service pit/pillar, they must enter through the aperture or ducting system provided. If no ducting is available, please consult the relevant SA Power Networks Manager. The consumer mains will be of sufficient continuous length to effect a connection between the customer s main switchboard and the pit leaving cable tails of a minimum length of 600mm beyond the top of the pit/pillar lid (refer Figure 7.1). It is recommended that a seal is installed to prevent the transmission liquids, termites and vermin through the conduit or duct. The ends of the cable not connected must be effectively terminated as per AS/NZS 3000 and protected by the equivalent of double insulation to prevent inadvertent contact with live conductors within the service pit/pillar. For further details, refer to Figure 7.1. Issued August 2017 Page 65 of 149

66 Figure 7.1: Underground Services Underground Service Cable Termination Where a customer is supplied via SA Power Networks service lines to the customers service fuse enclosure, the customer will be provided with a point of supply at a terminal inside the enclosure. The customer is responsible for providing and maintaining all consumer mains and equipment from the point of supply to the customers main switchboard with the exception of meters and service fuses (were required). Subject to access and safety requirements, the position of the service fuse enclosure may be nominated by the customer, but must be mounted at a minimum height of 0.3m from the finished ground level up to a maximum height of 4m and be within 10m from the entry point of the SA Power Networks service lines onto the property. For further details, refer to the relevant SA Power Networks Manager Terminals of a Pad Mounted Transformer Where a customer is supplied via an SA Power Networks transformer, that customer will be provided with a point of supply on the outgoing connections of the low voltage switchgear from inside the vault. The customer is responsible for providing and maintaining all consumer mains and equipment from the point of supply to the customers main switchboard. The transformer vault location agreed to by the relevant SA Power Networks Manager and the customer. Issued August 2017 SA Power Networks 2017 Page 66 of 149 Service & Installation Rules

67 Where consumer mains enter into an SA Power Networks transformer vault, they must enter through the aperture or ducting system provided for consumer mains as shown in the SA Power Networks Transformer Brochure (NICC-802). It is recommended that a seal is installed to prevent the transmission of liquids, termites and vermin through the conduit or duct that is the entry into SA Power Networks transformer vault. (The ends of the cable not connected must be protected by the equivalent of double insulation to prevent inadvertent contact with live conductors within the transformer vault). For further details, refer to the relevant SA Power Networks Manager Terminals of an Open Bushing Transformer The relevant SA Power Networks Manager will provide advice to the method of connection to the LV bushings of the transformer. 7.3 Overhead Distribution Network Areas In general, the service connection point will be of a type as detailed below, however, due to circumstances in some localities or due to the nature of the customer s load, an underground supply arrangement may be provided. SA Power Networks shall be contacted where any clarification is required. The supply shall be placed underground where the required clearances and all other provisions of these Rules cannot be achieved or are not maintained. In overhead distribution areas, the SA Power Networks Manager will nominate a standard service configuration as indicated in Table 7.4. Once nominated, all remaining options shown in column 3 of Tables 7.3 and 7.4 become alternative configurations. Service Capacity Required Not exceeding 63A per phase Standard Connection Configuration Over/under service on a Stobie Pole; or An existing service pit / pillar Alternate Connection Configuration Overhead 25mm 2 Aluminium ABC service; or new service pit. Exceeding 63A per phase 100A over under on a pole New service pit Exceeding 100A per phase Exceeding 200A per phase 200A over/under service on pole; or 200A isolators on pole, or 200A service pit / pillar With agreement of SA Power Networks Manager Overhead transformer Padmount transformer Service fuse enclosure Service pit / pillar Table 7.4 None Issued August 2017 Page 67 of 149

68 TS 100: Electrical Design Standards for Underground Distribution Cable Networks (up to and including 33kV) Overhead Lines Where a customer is supplied via an overhead line, the customer is responsible for providing and maintaining a suitable point of attachment for the attachment of the cables(s) and facilities for mounting of SA Power Networks service fuses. The point of attachment to the customer s building or structure may be: An anchorage typically fixed to the timber fascia or wall using 10mm coach bolts or 10mm masonry anchors or other suitable fasteners of equivalent strength. Where masonry anchors are used, a minimum of 25mm thread must remain exposed. A raiser bracket typically fixed to the fascia and wall. The point of attachment must be generally on the same side of the building or structure as the pole from which the service emanates. Attachment to the side of a building is not permitted unless: The point of supply location is more than 1.5m from the side boundary; and There is no likelihood of building extensions that would prevent direct access to the point of supply. For further details, refer to Figure 7.2 and 7.3. For a typical overhead supply arrangement where a customer requests an upgrade of the overhead service then a customer support pole must be provided on the road frontage boundary with service fuse facing and be accessible from the road reserve. Where the supply pole is in a side street or rear street then a customer support pole must be provided in the facing boundary with the service fuse enclosure attached. Larger or rural properties where the pole is located on the property, the supply arrangement will be assessed on its merits. TS 100: Electrical Design Std for Underground Distribution Cable Networks (up to & including 33kV) Issued - June 2014 SA Power Networks 2014 Page 68 of 149

69 Service & Installation Rules Figure 7.2: Two Wire Overhead Services Issued August 2017 SA Power Networks 2017 Page 69 of 149

70 Figure 7.3: Three & Four Wire Overhead Services The minimum height of the service conductors above ground level (including the entry point into the service fuse box) must not be less than 2.7m at any point along the conductor. The service fuse box must not be mounted more than 4m above the surrounding ground level. All service lines must be more than 600mm from overhead telephone, cable television or other services, if present. Issued August 2017 SA Power Networks 2017 Page 70 of 149 Service & Installation Rules

71 The point of attachment must be capable of supporting the mechanical force that will be placed upon it by the overhead cable(s). For all services, the mechanical force may be up to 1kN along the service lines at the point of attachment. (Refer to clause for service bracket specifications). Where a customer requests an overhead line to a customer s support pole, (ie free standing meter enclosure or temporary builders supply) it is the customer s responsibility for providing a pole of adequate strength and height for mounting SA Power Networks overhead equipment. This pole shall be identified with a permanent tag (eg metal) stamped with Private Pole. The customers support pole must comply with the requirements of AS/NZS For further details, refer to Figure 7.4. Figure 7.4: Customer Service Poles Issued August 2017 SA Power Networks 2017 Page 71 of 149 Service & Installation Rules

72 Service & Installation Rules Over/Under Service Where a customer is supplied via an over/under service on an SA Power Networks pole, the customer will be provided with a point of supply at the load side terminals of a service protective device enclosure (generally a fuse box). The bottom of this enclosure will be between 3.0m and 3.7m above ground level. For further details, refer to Figure 7.5. In situations where the consumer mains are installed before the over/under service is installed, the consumer mains must be able to reach to a height of 3.7m on all faces of the pole. The customer is responsible for providing and maintaining all consumer mains and equipment from the point of supply to the customer s main switchboard. Figure 7.5: Over/Under Services LV Isolators on Pole Where a customer is supplied via LV isolators on a pole, the customer will be provided with a point of supply at the load side terminals of the LV isolators. These isolators are normally installed below the LV crossarm. Depending upon the pole height, this will generally be between 6.0m and 11.0m above ground level. Issued August 2017 SA Power Networks 2017 Page 72 of

73 Service & Installation Rules The customer is responsible for providing and maintaining all consumer mains and equipment from the point of supply to the customer s main switchboard. For further details, refer to Figure 7.6. Figure 7.6: Customer Service Poles Consumer Terminals The consumer terminals shall be: Over/Under Services At the load side terminals of the service fuse, on a pole nominated by the relevant SA Power Networks Manager on or adjacent the property where supply is requested. Issued August 2017 SA Power Networks 2017 Page 73 of 149

74 Overhead Lines At the load side terminals of the service fuse, mounted on the fascia or façade of the customers building or structure. Isolators on Pole At the load side terminals of the LV isolator, on a pole nominated by the relevant SA Power Networks Manager on or adjacent the property where supply is requested. Service Pit/Pillar At the terminals or block inside the LV service pit/pillar nominated by the relevant SA Power Networks Manager on or adjacent to the property where supply is requested or from the nearest service pit if Council agrees to the installation of consumer mains in the road reserve. Terminals of a Pad Mounted Transformer At the LV terminals of the LV transformer fuses or LV isolators inside the LV compartment of a pad mounted transformer nominated by the relevant SA Power Networks Manager on or adjacent to the property where supply is requested. Service Fuse Enclosure within 10m of the Boundary At the load side terminals of the service fuse nominated by the relevant SA Power Networks Manager Point of Attachment Overhead Distribution Network The Electricity Act 1996 and Electricity (General) Regulations 2012 regulate requirements for poles and posts including supports and structures used to support SA Power Networks aerial lines. All supports for service brackets used to support aerial conductors are required to comply with the Act and Regulations. AS/NZS 3000 deals with the requirements of the customer s installation. The point of attachment, whether it be a structure, an extension or strut attached to a building or structure, or a private pole must be of sufficient strength to support the specified service bracket load applied by the service cable as detailed in clause (c) (Strength Rating). The point of attachment of an aerial service cable to a customer s electrical installation: Shall be selected in accordance with this clause and the details provided in Figures 7.2 and 7.3. Shall be not less than 2.7m or higher than 4.0m from the ground. Will not be installed above verandas, carports and roofs. Must be located to limit the length of service line to 20m. Refer Figure 7.7. The service line route needs to consider site use ie private roadways carrying commercial vehicles, site access and additional minimum height requirements in accordance with Electricity (General) Regulations Shall be located on the foremost portion of any structure facing the pole or point where the aerial service line originates, and in a position where the service lines can achieve and maintain all clearances unless a more appropriate location is available. SA Power Networks shall be consulted where: The customer s maximum demand is greater than 63A on a single phase basis Issued August 2017 Page 74 of 149

75 An electrical installation on a corner allotment has potential to be service from either street The service line would cross the boundary of an adjacent property The customer proposes SA Power Networks install a service pole There is a possibility of the pole being relocated The point of attachment is proposed to be located on other than the foremost portion of the structure facing the pole or point where the service lines originates Vegetation may encroach on the proposed service lines clearance space The service lines may pass over a roof or structure The required clearances and provisions of this section may not be achieved or maintained In all cases, the point of attachment must be located to achieve or exceed the minimum service lines clearances detailed in this clause and the minimum aerial line requirements in accordance with the Electricity Act 1996 and Electricity (General) Regulations 2012 are maintained, and a clearance of 600mm from communications services is maintained at the point of attachment. Failure to consult SA Power Networks in the above cases and where clearances cannot be achieved or maintained may result in refusal to permit and or maintain an overhead supply. Vegetation Clearing Vegetation must be cleared from the service line in accordance with Schedule 1 Parts B and C of Electricity (Principle of Vegetation Clearance) Regulations Issued August 2017 Page 75 of 149

76 Figure 7.7: Stringing Tension Guidelines Point of Attachment on Customer Support Poles A point of attachment can be installed on a customer s support pole located on the customer s property to terminate a temporary or permanent SA Power Networks service line. As a customer support pole forms part of an electrical installation, regulations applicable to electrical installations include the standard of construction and permitted locations for customer support poles, including private builder supply poles. Issued August 2017 SA Power Networks 2017 Page 76 of 149 Service & Installation Rules

77 The customer s support pole must comply with the requirements of AS/NZS 3000 and an Electrical Certificate of Compliance, validly completed is required before a connection will be made. Refer to Figure 7.4 The point of attachment on a customer support pole shall be located to achieve or exceed the required clearances and all other requirements of these Rules Transformers For the requirements relating to transformers or other SA Power Networks equipment on customer premises, consult the relevant SA Power Networks Manager Access to Point of Supply Customers are required to provide unimpeded access to the point of supply at all times. Overhead Supply Points For a point of supply attached to a customer s structure or a SA Power Networks pole on a customer s property, a clearance area of at least 1.5m in front and 600mm both sides of the supply point shall be maintained to enable a ladder to be placed to gain unimpeded, safe access. The customer must not erect a structure (such as a carport) beneath the point of supply, or have plants, trees or other obstructions which prevents access to the point of supply from a location on the ground immediately beneath the point of supply. Underground Supply Points The customer is required to keep access to service pillars (or pits) installed on the customer s premises free from obstruction caused by fences or the like and maintain the appropriate ground level around the pillar/pit and over service lines and consumer mains. Refer Figure 7.8 Figure 7.8 Service Pit Work Zone For access, a work zone clear of obstructions with minimum dimensions of 1m x 1m located immediately adjacent and at the same ground level as at the pillar/pit will be adequate. For unusual situations, consult the relevant SA Power Networks Manager for site requirements Service Brackets General 1m Service Pit/Pillar Road Reserve Property Boundary 1m Required operating work zone All service brackets required by these Rules shall comply and be installed to comply with this specification and these Rules. 1m 1m Issued August 2017 Page 77 of 149

78 Provision No metal parts of the service bracket shall enter the service fuse enclosure. The customer shall provide, install and maintain a service bracket that complies with these Rules at the point of attachment for the attachment of the service line Specification, Acceptance and Installation Service Bracket For the purpose of this specification, there are two types of service brackets: (i) (ii) Hook Standard Service Bracket A standard service bracket, which is supplied by SA Power Networks, is defined as a bracket attached to a building or structure to provide a point of attachment for the service line at the point where the bracket is fixed. Refer to Figures 7.2 and 7.3. Service Raiser Bracket A service raiser bracket, which is to be supplied and attached by the customer, is defined as a service bracket attached to a building or structure to provide a higher point of attachment for the service line. Refer to Figures 7.2 and 7.3. The hook shall be a minimum of 10mm in diameter and constructed so as to retain a service line grip on the hook throughout an arc of 360 degrees in all directions from the normal without the service cable grip interfering with access to connection boxes or removal of their covers. The hook must be able to accept closed hole and hook type service strain clamps. Strength Rating All service brackets and hooks shall have a minimum installed safe working load (SWL) of 1kN without fracture or permanent deformation. The hook strength rating must be met throughout an area contained in the vertical planes 90 degrees either side of the bracket s front vertical centreline and 60 degrees above or below the bracket s from horizontal centreline. When installed in accordance with its installation instructions, service brackets shall be of sufficient strength to withstand fracture or permanent deflection in excess of 30 degrees. Marking Service brackets that are required to be accepted shall be clearly and permanently marked with: Their strength rating (SWL); and Manufacturer identification. These markings shall be readily and clearly visible to a person adjacent to the bracket with the bracket in service. Failure to follow this process will usually result in SA Power Networks refusal to connect to the electricity supply until such time as the customer can provide evidence of suitability. Issued August 2017 Page 78 of 149

79 TS 100: Electrical Design Standards for Underground Distribution Cable Networks (up to and including 33kV) Corrosion Resistance The corrosion resistance of all components of a service bracket shall be not less than that provided by galvanising in accordance with Australian Standard 4689 Hot Dipped Galvanised (Zinc) Coatings on Fabricated Ferrous Articles; Australian Standard 4791 Hot Dipped Galvanised (Zinc) Coatings on Open Section Ferrous Articles; Australian Standard 4792 Hot Dipped Galvanised (Zinc) Coatings on Hollow Section Ferrous Articles; and Australian Standard Hot-Dip Galvanised Coatings for Threaded Fasteners ISO Metric Coarse Thread Series. Prevention of Conductor Insulation Damage There shall be no sharp edges and projections that the service or consumer mains cables may come in contact with whether on external or internal surfaces. The connection box mounting plate shall not protrude beyond the edge of the connection box. The service line bracket shall be constructed and installed in a manner to enable the service line and equipment to maintain clearance from the connection box and bracket in situ. All connection box access covers must be able to be removed without the necessity for the covers to contact the service line or equipment. Provision for Earthing Where single insulated consumer mains are installed, the raiser must be earthed in accordance with the requirements of AS/NZS Aerial Service Lines Clearances Existing Service Lines The customer is responsible to ensure that modifications to the property they occupy do not breach the minimum clearances from ground, structures, objects, trees and vegetation to the service lines supplying the property they occupy required by the Rules and Regulations at the time of the service cable s installation and the current Electricity Act, Legislation and Regulations relating to line vegetation clearance New and Replacement Service Lines Unless advised otherwise by SA Power Networks, clearances for new and replaced aerial service lines initiated by the customer must comply with the requirements of the following: These Rules The Electricity (Principles of Vegetation Clearance) Regulations 2010 The customer is responsible to: Provide a point of attachment and arrangements on their property to ensure the clearances and conditions of these Rules, the current Electricity Act and Regulations are achieved and maintained; and Ensure that modifications to the property they occupy do not breach the minimum clearances require by these Rules and the current Electricity Act and Regulations from ground, structures, objects, trees and vegetation to the service cable supplying the property Achievement and Maintenance of Clearances Where the customer is unable to provide facilities for the aerial service line to meet and maintain the required clearances within their property in accordance with these Rules, the property shall be supplied by an underground service at the customer s expense. TS 100: Electrical Design Std for Underground Distribution Cable Networks (up to & including 33kV) Issued - June 2014 SA Power Networks 2014 Page 79 of 149

80 SA Power Networks will make arrangements with the customer for appropriate clearances to be met where the aerial service line is to be replaced in circumstances other than by works initiated by the customer. If the customer fails to maintain clearances prescribed by Electricity Regulations from vegetation within their property to the aerial service line supplying the property, SA Power Networks may clear that vegetation in accordance with the Electricity Act and Regulations at the customer s expense. The customer shall advise SA Power Networks where alterations to their property may in any way affect the clearances required for an aerial service line. In all cases where clearances can t be achieved and maintained, the property shall be supplied by means of an underground service at the customer s cost Aerial Service Lines Sag 7.4 Service Protection Aerial service lines will sag after installation due to temperature rise and construction loadings. SA Power Networks will make appropriate allowances for this additional sag during the provision of these service arrangements to maintain clearances in accordance with the Electricity Act and Regulations. Customers should make allowances for the maintenance of building and vegetation clearances as set out in the Electricity Act and Regulations. In general, SA Power Networks will provide the service fuses and carriers for the protection of SA Power Networks service line. Refer to clause Customers Protective Equipment (TIR) The customer s protective equipment including the meter isolator must effectively grade with the SA Power Networks service protection device. Customers are also advised to install protective equipment to limit possible damage to their electrical installation or equipment which may be sensitive to voltage variation, transients, loss of one or more phases of supply or due to leakage current. Refer to clause 6.5 and the Electricity Distribution Code. To satisfy the Electricity Distribution Code, customers must control sustained overload, short circuits, phase loading, power factor, transient current, harmonic current, inrush current and other negative effects originating within the electrical installation to minimise adverse effects on other customers and the distribution network. Compliance with this clause and clause 6.7 will assist control of sustained overload, short circuits and phase loading arising from electrical installations, and limit adverse voltage fluctuations on other customers and the distribution network. Further to the above, the customer must ensure that the installation is kept within the required limits Application of SA Power Networks Protection Devices TIR) Enclosures (TIR) Enclosures containing SA Power Networks protective devices must have sufficient stability and strength to withstand distortion and contain any energy which might be caused in both normal and fault conditions. Where the service protective device(s) are to be installed in a metering enclosure, it shall comply with the requirements of AS/NZS 3000 Wiring Rules. The customer will Issued August 2017 Page 80 of 149

81 provide facilities for the securing of the incoming consumer mains conductor(s) to the panel. Metal enclosures which contain SA Power Networks service protection equipment must be neutralised or earthed in accordance with AS/NZS 3000 Wiring Rules. In general, SA Power Networks metal enclosures containing service protection equipment shall be earthed by a conductor, with a cross sectional area not less than the consumer mains neutral conductor, connected to the main neutral conductor or bar. The termination shall be labelled Unprotected Mains Bonding Conductor Access (TIR) Where the customer is required to make provisions for the service protection devices, the position provided shall be free of obstruction and access must be continuously available for SA Power Networks to safely operate on the device or devices at all hours Location (TIR) Enclosures containing the SA Power Networks service protection equipment must be located in an exterior location that is accessible at all times. The enclosure must be a minimum of 0.3m above the finished ground level and no greater than 4.0m to the top of the enclosure. Where the location is greater than 2.0m in height, then the clearance for ladder access as stated in is applicable Common Enclosure (TIR) The electrical wiring associated with service protection devices installed in a common enclosure with other electrical installation control or protective equipment shall be segregated by barriers from that associated with such other equipment Security General Service protection devices should be located and arranged to limit the ability of unauthorised persons to interfere with and operate the device(s). An acceptable method to restrict unauthorised interference is to locate device(s) other than those associated with an overhead line mains within an enclosure fitted with a lock in accordance with clause SA Power Networks Operation Where a separate enclosure is provided for the service fuse protection, the enclosure shall be secured by means of a lock. The locking facility shall be capable of accepting an SA Power Networks service fuse enclosure lock. Refer to clause 4.7. Where the service fuses are installed within a meter enclosure, the customer may elect to lock the enclosure with a ES or CM lock as shown in clause 4.7. Subject to the agreement of the Responsible Officer, other methods of security may be acceptable. Such other methods may include location of the device in an area restricted to authorised persons and locking with a lock in accordance with clause 4.7. Persons interfering with SA Power Networks seals or locks or operating service protection devices other than in accordance with the conditions of these Rules may be subject to action, including legal action. Issued August 2017 Page 81 of 149

82 TS 100: Electrical Design Standards for Underground Distribution Cable Networks (up to and including 33kV) Operation (TIR) General (TIR) Fuse cartridges for service fuses shall be supplied and installed by SA Power Networks. Service protection devices shall only be operated by: SA Power Networks; or Persons authorised by SA Power Networks Emergency Services Personnel (TIR) Emergency Services personnel should only operate service protection devices if so authorised by their organisation. Where the service protection device is operated by emergency service personnel, it should only be operated to de-energise the electrical installation and shall not be operated to energise or re-energise the electrical installation. Where emergency services personnel de-energise an electrical installation, SA Power Networks must be advised at the earliest opportunity Licensed Contractor (TIR) Only licensed contractors authorised by SA Power Networks are permitted to operate service protection devices Fuse removal by a Licensed Electrical Worker/Contractor (TIR) Electrical Worker/Contractors must obtain authorisation to remove service protection devices specific to that property. The service must remain de-energised until an Electrical Certificate of Compliance is received by the electricity officer responsible. Approval will only be given by Builders and Contractors ph , or for a fault condition Faults and Emergencies ph All calls will be voice recorded and noted in the appropriate system. Approval will only be given for the following circumstances. Emergency Operation: To prevent further damage to an installation or where immediate action is required to make safe to permit repairs to occur to consumer mains or main switchboard. Alterations: To permit alterations or repairs to occur to consumer mains or main switchboard. Approval will only be given for the following service fuse arrangements where Service rated at or below 100Amps: Overhead service mounted on a building in good condition (excludes damaged or open wire services) and must be in an accessible location that complies with the required clearances. Over/under service fuse box arrangement on a pole. Service fuse mounted on a meter panel. Multiple customers will require the appropriate notification. Note: It is the responsibility of the Electrical Worker/Contractor to ensure that they are appropriately qualified and trained with a relevant Safe Work Method Statements. TS 100: Electrical Design Std for Underground Distribution Cable Networks (up to & including 33kV) Issued - June 2014 SA Power Networks 2014 Page 82 of 149

83 TS 100: Electrical Design Standards for Underground Distribution Cable Networks (up to and including 33kV) Service Protection Devices Services up to and including 500kVA Services up to an including 500kVA SA Power Networks will provide the service fuse(s). The customer will be required to provide the meter isolator and under some circumstances provide a service fuse enclosure. The service fuse enclosure is to be installed at the boundary where supply enters the property or adjacent to a pit etc. accessible and operational from the road reserve. For larger properties within 10m of the connection point if supply is within the property I 2 t Characteristics of LV Fuses Characteristics of low voltage fuses used by SA Power Networks as service protective devices are given in AS/NZS Low Voltage Fuses Fuses with Enclosed Fuse Links (specifically Parts 1 and 3). Pre-arcing l 2 t characteristics for fuses conforming to AS/NZS are given in Table 7.6. Details for larger services is available from the relevant SA Power Networks Manager. Typical Time/Current curve for SA Power Networks service fuses are shown in Appendix 2. Fuse Element Rating (Prior to de-rating) I 2 t min (A 2. s. 1000) I 2 t max (A 2. s. 1000) 63A Services Greater than 500kVA 80A A Table 7.6 For larger installations where SA Power Networks does not provide low voltage service protection, the customer will be required to provide single circuit breaker. This circuit breaker will be the installations main switch. The main switchboard shall be located within 10m of the connection point but not within the SA Power Networks easements (including statutory easements), as shown in Figure 7.9. HV earth in MEN area may change clearances. Please refer to the relevant project officer for clarification. TS 100: Electrical Design Std for Underground Distribution Cable Networks (up to & including 33kV) Issued - June 2014 SA Power Networks 2014 Page 83 of 149

84 Figure 7.9 Refer also to for unsuitable metering locations. The main switchboard cannot be within 4m of the transformer to ensure a 4m separation between the transformer s HV earthing and the MSBs LV earthing. The MSB doors should open away from the transformer to reduce the risk of shock from step touch potential. If the transformer is located within a CMEN area, the main switchboard may be closer than 4m provided a non-conductive wall or barrier is present to prevent step touch potential. The circuit breaker which is used in place of a low voltage service protection device shall: have, or be installed with, a facility for preventing the handle to be operated when in the off position by an SA Power Networks padlock as defined in clause 4.7; have access to any adjustable settings capable of being restricted to authorised persons by sealing or equivalent means; have all live terminals and connections enclose; will not have an auto reclosing facility; if installed as a combined supply protection/load control device, the circuit breaker shall operate so as to prevent the authorised service capacity being exceeded if installed to control supply capacity in accordance with clause ; if it is required by other standards that the essential services supply bypasses the main service protection device, those circuits must be individually protected at the main switchboard. The circuit breaker required by this clause shall: comply to AS/NZS :2002; and have an instantaneous tripping characteristic settable between 2xIN and 10xIN; and ensure grading, with the upstream (SA Power Networks) and downstream (customer s) protective devices; and have a rated short circuit current capacity equal to or greater than the prospective short circuit current at the point it is installed; and where the current carrying capacity of the neutral is less than that of the associated active conductors, then the circuit breaker shall have earth fault protection capable of preventing over-current in the neutral conductor. (See Note). Short circuit ratings and SA Power Networks protection characteristics are available from the relevant SA Power Networks Manager. Issued August 2017 Page 84 of 149 4m

85 Note: 1. It is suggested that the use of a circuit breaker that does not break the neutral with current settings to trip at neutral current greater than maximum out of balance current and less than neutral conductor current carrying capacity will satisfy the earth fault required Acceptable Applications Underground Supply This clause covers the service protection requirements where supply is provided from an underground service line or unfused service pit. A customer shall supply an enclosure to accommodate the service protection devices. The enclosure shall be installed at ground operating level at a minimum height of 0.3m and in a position free of obstruction and where access is readily available for: manual operation of the service protection device(s) from ground level; and safe work on the service protection device(s). Alternatively, for enclosures rated at 200A or less, the enclosure may be installed in a location accessible by a service ladder and in all cases, the top of the enclosure must be no greater than 4m from ground level. All locks required to be operated to gain access to the service protection devices will be the type approved by SA Power Networks. Refer to clause 4.7. The enclosure must: have sufficient stability and strength to withstand distortion and contain any energy which might be caused in both normal and fault conditions; be neutralised or earthed in accordance with A/NZS 3000 where the enclosure is metallic. In general, metal enclosures containing service protection equipment shall be earthed by a conductor, with a cross sectional area not less than the customer s main neutral conductor, connected to the main neutral conductor or bar. Where the service protection device(s) are to be installed in a metering enclosure, it shall comply with the requirements of AS/NZS The customer will provide facilities for the securing of the incoming consumer mains active conductor(s) to the panel Overhead Supply General This clause covers supply from an aerial service line. The customer shall provide mounting facilities for the enclosure of the SA Power Networks service protection device. The facility shall be located in a position free of obstruction and where access is readily available for: 1. manual operation of device(s) from a service ladder and in all cases, the top of the enclosure must be no greater than 4m and no less than 2.7m from ground level; and 2. safe access to work on the device(s) in accordance with clause 7.3 (Overhead Distribution Network Areas) Supply to Customer Support Poles SA Power Networks services can be attached to the customers support pole in accordance with clause and Refer to Figure 7.4. Issued August 2017 Page 85 of 149

86 Supply from SA Power Networks Pole This clause covers customer s equipment mounted on SA Power Networks poles Consumer Mains that Connect to Consumer Terminals Located upon the Pole SA Power Networks will provide service protection devices and consumer terminals on the pole for connection of the customers installation. Refer to Figures 7.5 and 7.6. Mechanical Protection of Consumer Mains The consumer mains shall be mechanically protected in accordance with AS/NZS 3000 Wiring Rules. Consumer mains located on an SA Power Networks pole shall be mechanically protected to a minimum height of 2.4m and a maximum height of 2.6m from ground level. The enclosure or system shall be classified as WSX3 or better under AS/NZS This mechanical protection shall be: a suitable enclosure attached by means of saddles or clamps in at least two positions using either: galvanised steel bolts Hilti threaded studs or self-tapping screws electrically bonded to the steel of the pole by a minimum bonding conductor of 25mm 2 attached to the steel of the pole and mechanical protection by means of at least galvanised steel M8 bolts; or a suitable enclosure with steel mounting tags or studs welded to the mechanical protection and attached to the steel of the pole in at least two positions by means of galvanised steel bolts of at least M8 size (not welded to the pole). The protection and attachments shall be installed in a manner such as to not cause a hazard to pedestrians or the link and able to be removed and reinstated with the use of a standard tool. For SA Power Networks purposes, a Hilti threaded stud or tapped hole (not self-tapping) of at least M8 will also be deemed suitable for the electrical bond connection. Where supply is from a timber or wooden pole then a junction box will need to be provided at the top of the mechanical protection to allow for a 25mm 2 bonding conductor connected to the consumer mains neutral. Note: Band Strap, cable ties or similar systems are not deemed suitable for securing of consumer mains mechanical protection Customer s Switchboard and Associated Equipment Mounted on SA Power Networks Poles Customer s equipment, other than consumer mains, cannot be mounted on SA Power Networks poles. SA Power Networks Manager Network Standards & Performance may provide exemption to other utilities or public authorities for specific applications. Where an exemption is granted, the equipment must meet the requirements of No equipment other than consumer mains, and associated equipment, will be permitted on HV poles with a transformer, SWER poles or any pole with a switching device. Issued August 2017 Page 86 of 149

87 Supply Direct from Transformers 7.5 Isolating Devices SA Power Networks will provide the consumer terminals at a low voltage transformer bushing or isolating device as part of the transformer installation. The customer shall provide and maintain adequate clearance and mechanical protection facilities appropriate for the transformer installation. Details are available from the relevant SA Power Networks Manager. In some circumstances, SA Power Networks may provide service protection devices within the transformer installation. Where the service protection devices are not provided by SA Power Networks as part of the transformer installation, the customer shall make this provision as part of their installation Meter Isolators (TIR) General (TIR) Where an electrical installation has one or more customers, a meter isolator shall be provided to individually isolate the metering equipment and outgoing sub-mains (circuits) associated with each customer. The intent of the meter isolator is to provide a safe and convenient isolation point for: electrical contractors to work safely on the customer s installations; emergency situations; and the meter provider to service and maintain the metering installation. This requirement is applicable to all new and altered electrical installations. For altered electrical installations, refer to clause Features (TIR) The meter isolator shall be a circuit breaker with its operational status clearly visible at all times and operating mechanism accessible for local operation by the customer. Meter isolators are to be lockable and have the terminals and load settings under SA Power Networks or metering provider s security seal. The isolator is required to isolate the metering for a customer s installation including any CT chamber. Provisions for the attachment of SA Power Networks security seal are required for all terminal covers as well as the adjustment mechanisms where an adjustable circuit breaker is used. The means of locking is required to be of adequate construction and permanently attached to either the circuit breaker or its enclosure. Wherever reasonably practical, the meter isolator shall be located immediately adjacent the meter(s) or metering transformers which it isolates. Where a large number of meter isolators are required, or for safe switchboard design the meter isolators may be installed in a separate sealed compartment of the switchboard. In such cases, the means of operating and locking each meter isolator shall be accessible without the need to open escutcheon panels or break the security seal. The orientation and spacing of the meter isolators shall be such that any locks will not impede or obscure the operation or labels of any tenancies meter isolator or other device. Each meter isolator shall be capable of being individually locked in the off (open) position only. However, where safety services systems as defined in AS/NZS 3000 such as fire detection, warning and extinguishing systems, smoke control systems, evacuation systems and/or lifts are supplied through the meter isolator, then the meter isolator Issued August 2017 Page 87 of 149

88 shall be provided with facilities for locking it in both the on (closed) and off (open) positions. Except where safety services exist, for all single and multiple residential installations, the meter isolator shall be regarded as the main switch and shall be marked accordingly. Consequently, the enclosure housing this device becomes the main switchboard and the MEN connection shall be made within that enclosure. Refer to AS/NZS 3000 clauses and and their associated sub-clauses Rating (TIR) The rating of the circuit breaker for the meter it isolates must be sized or adjusted as close as practical to the maximum demand specified in the connection agreement between the customer and SA Power Networks. The meter isolator will be required to grade with the SA Power Networks service protection device. Refer to clause and Appendix 2 for SA Power Networks service fuse characteristics. Where approved motor starting prevents effective grading with SA Power Networks service fuse, then the meter isolator circuit breaker may be selected for effective grading for sustained overload protection characteristics only. When selecting a suitable circuit breaker, consideration should be given to the environment in which it is to be installed (ie high ambient temperatures may affect some circuit breakers performance) Application (TIR) The requirement to install a meter isolator applies: to all new installations including Whole Current (WC), Current Transformer (CT) and High Voltage (HV); to existing installations where an alteration and/or upgrade has, or is being undertaken, including: where an additional tenancy is added; where attendance is required to change metering where the maximum demand has changed; where the meter enclosure or meter panel is replaced; where the consumer mains are upgraded due to the installation s maximum demand being increased or intended to be increased; an additional tariff is requested (eg feed-in tariff due to PV installation) and a meter change is required; where the meter location is changes; or where the metering is changed from a CT to a WC or vice versa. Notwithstanding the above, a meter isolator is not required to be installed on existing installations in the following situations: the Retailer has requested a meter exchange and no alteration/upgrade to the installation occurred (meter churn); a change in tariff is requested and no metering change is required; a change in tariff is requested and no electrical work has been conducted on the consumer mains or main switchboard that will or would have required disconnection from SA Power Networks distribution system; a CT or HV meter is changed at the customer s request and there is no change to the consumer mains, meter location, the authorised capacity, or the current/voltage transformer ratio; Issued August 2017 Page 88 of 149

89 the meter is remote from the main switchboard; where only an additional tariff is requested and the meter is mounted on a SA Power Networks LV pole; there are multiple occupancy installations with grouped meter positions. If an additional meter is added, a meter isolator is required for that meter; the electrical installation requires reconnection of supply, including reconnection after 12 months, and no electrical work on the consumer mains or main switchboard has been undertaken; where meter maintenance is only being undertaken; where consumer mains (installations > 100A) are repaired, relocated or extended to a new supply point (ie junctioned in or to existing conductors or replaced like for like) Installation (TIR) Where a single customer has multiple meters due to tariff requirements, a single meter isolator shall be used for isolation of that metering combination. (Refer to for the additional requirements if 3 or more whole current meters are present). Wherever reasonably practical, the meter isolator shall be located immediately adjacent to the meter(s) or metering transformers which it isolates. The meter isolator can be installed on the existing meter panel providing it is in a serviceable condition, it doesn t contain asbestos (refer 8.3.2) and it meets the minimum space requirements as stated in 8.9. Where a meter isolator has been installed to meet these requirements, an active link shall be provided. The neutral link shall be mounted either on the rear of the meter panel or within the enclosure behind the meter panel/meter isolator compartment. Active links are required to be provided for multiple meters requiring connection to the same phase (refer ). Where there is insufficient room or the installation of a link may cause other electrical hazards, this requirement need not be enforced Location and Access to Isolation Devices Properties which are the Subject of a Strata Plan or Community Title Where the installation is to be, or is the subject of a Strata Plan or Community Title, all metering isolation equipment, including meter isolators and panel isolators, installed under the provisions of the Service & Installation Rules must be in a location which is common property and accessible at all times through common property as defined in the Strata Plan or Community Title. Where there is no common land defined on the Community Title allocated for services, an agreed location between all parties and complying with all requirements of clause shall be used when supplied via a single connection point. Where supplied by separate connection points, each single customer supply shall comply with the requirements of Properties which are not the Subject of a Strata Plan or Community Title Where the installation has multiple customers and is not the subject of a Strata Plan or Community Title, all metering isolation equipment, including meter isolators and panel isolators, installed under the provisions of the Service & Installation Rules must be located in a common area which is accessible at all times. Issued August 2017 Page 89 of 149

90 TS 100: Electrical Design Standards for Underground Distribution Cable Networks (up to and including 33kV) 7.6 Safety When Working on or Near Distribution Network (TIR) No Go Zone (TIR) The Electricity Act 1996 and Electricity (General) Regulations 2012 require specific clearances to the distribution network be maintained at all times. The Office of the Technical Regulator (OTR) administers and provides information relating to the required clearances to the distribution network. Where the required clearances can t be maintained, SA Power Networks must be contacted to arrange the appropriate isolation or alterations to the distribution network to achieve the required clearances. Refer to SA Power Networks website for further details in relation to Network Access Procedure. Customers and their agents must consider these requirements when planning any works near distribution network and employ a safe system of work Underground Cables (TIR) Any work carried out by a customer or a customer s agent in the vicinity of underground cables shall be carried out in accordance with clause Customers and their agents must contact Dial Before Your Dig (telephone 1100) to obtain information on the location of any underground assets before any works involving excavations are commenced Transformers (TIR) Under no circumstances shall a customer or a customer s agent enter a substation/padmount transformer enclosure or climb a pole without a specific written approval and permission from SA Power Networks in accordance with the SA Power Networks Network Access Procedure. Where cables are to be installed on or in a substation/padmount transformer enclosure, no excavation work greater than 0.3m within 3.0m of the substation/padmount transformer enclosure shall commence before the route of the cable has been approved by, and advice regarding the substation/padmount transformer enclosure earthing system obtained from the relevant SA Power Networks Manager. Extensive earthing systems exist where Single Wire Earth Return (SWER) distribution transformers are installed. Refer to the Electricity Act 1996 and Electricity (General) Regulations 2012 for specific clearance details. For further details of the procedure for excavation in the vicinity of SA Power Networks equipment, refer to SA Power Networks Customer Information Brochure NICC-404, which is available on the SA Power Networks website. SA Power Networks must be contacted to locate the earthing systems and where required to de-energise the transformer prior to trenching operations. Unless specifically authorised by the relevant SA Power Networks Manager, the customer s: underground wiring; or wiring embedded in a concrete floor; or structural metalwork or metallic cladding which is in contact with the electrical installation including switchboards and metering enclosures must not be located within 4.0m of a steel pole supporting SA Power Networks HV distribution network, or a transformer s HV earthing system. Consumer mains can be installed within this zone subject to all other requirements of sub-section 7.6. TS 100: Electrical Design Std for Underground Distribution Cable Networks (up to & including 33kV) Issued - June 2014 SA Power Networks 2014 Page 90 of 149

91 Note that damage to a high voltage earthing system can cause an extremely hazardous situation Poles and Aerial Lines (TIR) Any works carried out by a customer or a customer s agent in the vicinity of overhead lines or poles shall be carried out in accordance with and the Electricity Act 1996 and Electricity (General) Regulations Unless specifically authorised by the relevant SA Power Networks Manager, the customers: underground wiring; or wiring embedded in a concrete floor; or structural metalwork or metallic cladding which is in contact with the electrical installation including switchboards and metering enclosures must not be located within 4.0m of a steel pole supporting SA Power Networks HV distribution network, or a transformer s HV earthing system. Consumer mains can be installed within this zone subject to all other requirements of sub-section Service Pits/Pillars (TIR) Any cables within a service pit/pillar shall be treated as ALIVE and shall not be handled without taking appropriate safety precautions. Access to service pits/pillars is only available via a Network Access Permit Supply Isolation (TIR) SA Power Networks shall be contacted at the earliest opportunity to isolate supply where required to enable work to be performed safely. Refer to SA Power Networks website for further details in relation to Network Access Procedure. Issued August 2017 Page 91 of 149

92 7.7 Consumer Mains General (TIR) All electrical wiring work associated with the installation and maintenance of consumer mains shall be carried out in accordance with the Electricity Act 1996 and Electricity (General) Regulations 2012, the Rules and AS/NZS In accordance with clause 6.2.3, SA Power Networks reserves the right to determine the location of the consumer terminals, and the method of termination of consumer mains where they are not specified by these Rules. The type of consumer mains connected to SA Power Networks equipment must conform to clause Exclusion Zone (TIR) Consumer mains are NOT allowed to enter into or be installed externally on a building anywhere within the exclusion zone as indicated in Figure 7.10 below. The exclusion zone applies to all installations where there is a gas meter box below the electricity meter box or service fuse enclosure. Figure 7.10 Underground Consumer Mains Entry with and without gas meter Issued August 2017 Page 92 of 149

93 Unprotected Consumer Mains (TIR) Consumer mains which are not protected by short-circuit protection devices (eg service fuses), must not be allowed to enter into or be installed internally in a building other than within the vertical planes between ground level and the enclosure containing the service protective device(s). Where this is prohibited due to the exclusion zone created by the installation of a gas meter box or proposed gas meter box, the consumer mains shall enter as indicated in Figure Protected Consumer Mains (TIR) Consumer mains which are protected by short-circuit devices (eg service fuses) may enter into or be installed internally in a building other than within the exclusion zone as indicated in Figure 7.11 when a gas box is present. All connections must enter within the 500mm entry zones as per Figure Figure 7.11 Protected Consumer Mains Entry with and without gas meter Unprotected Consumer Mains Transformers (TIR) Where supply is obtained direct from a distribution transformer with no low voltage protection at the connection point, then the main switchboard must be located in a continuously accessible exterior location. Where the transformer is inside the building then the main switchboard must be in a room immediately adjacent to, or directly above, or directly below the transformer room. The transformer and the main switchboard must be accessible at all times to SA Power Networks personnel. Issued August 2017 Page 93 of 149

94 7.7.2 Size of Consumer Mains (TIR) The size of the consumer mains should be selected with consideration to the requirements of the Electricity Act 1996 and Electricity (General) Regulations 2012, these Rules and AS/NZS It is the responsibility of the contractor to ensure that the conductor or lug used is compatible with the connection point terminals. Refer to clause Where the connection point for any installation that is unprotected by an SA Power Networks service fuse at the connection point, then to allow for various SA Power Networks transformers, LV mains sizes and LV fuse ratings, the minimum size consumer mains shall be 16mm 2 copper cable. Where existing consumer mains are relocated or repaired by replacement with larger conductors, the work may be considered as a repair and not considered upgrades for the purposes of this document. In this case, the capacity of the installation must be limited by a meter isolator (circuit breaker) rated at no greater than the capacity of the consumer mains prior to the repairs or the authorised service capacity whichever is the lesser Identification of Consumer Mains (TIR) All conductors at consumer terminals and metering facilities shall be colour coded to clearly and permanently identify each active conductor and the neutral conductor. This includes: 1. The consumer terminals 2. The service protective devices 3. The incoming supply to the metering enclosure (a) Neutral Identification: In all cases, the neutral conductor shall be a black conductor or a conductor with black sleeving. Any sleeving required is to be for 500mm from the termination point(s) within the connection facility (eg service fuse enclosure, service pit/pillar) or main switchboard or the entire exposed length of the conductor. (b) Active Identification: In all cases, the active conductor shall be an active colour as permitted by AS/NZS 3000 or a conductor sleeved with an active colour as permitted by AS/NZS Any sleeving required is to be for 500mm from the termination point(s) within the connection facility (eg service fuse enclosure, service pit/pillar) or main switchboard or the entire exposed length of the conductor. (c) Phase Identification: In the case of polyphase supplies, consumer mains are to be permanently identified red, white and blue. Where the active conductors as identified above are not the correct phase colours, a minimum length of 100mm sleeving in the correct phase colour shall be used to identify the conductor at the termination point(s). Insulation tape is not an acceptable means of identification. Issued August 2017 Page 94 of 149

95 7.7.4 Joints in Un-Metered Consumer Mains Joints in un-metered mains shall be made in such a manner as to deter unauthorised access, interference or diversion of electricity supply, to the satisfaction of SA Power Networks. For repairs to whole current installations including, extending or relocating consumer mains, then inline crimp sleeves with heat shrink and enclosed in conduit is required. Where a junction box is used to make the joints, then the lid shall be glued shut with screws covered in a hard setting 2-part epoxy compound or similar to prevent removal. Any enclosure or link that contains un-metered terminations must have provision for SA Power Networks security seal in accordance with clause Terminations (TIR) Terminations of consumer mains shall be in accordance with the Electricity Act and Regulations, and these Rules. Where termination methods are not specified in these Rules, the relevant SA Power Networks Manager shall be consulted to determine acceptable arrangements Underground Consumer Mains (TIR) Consumer Mains in Road Reserves (TIR) Where underground consumer mains are to be located within a road reserve, the customer must obtain approval from Council or any other relevant authority prior to installation commencing Consumer Mains on a Third Party Property (TIR) Consumer mains can enter a service pit/pillar on a third party s property where the service pit/pillar is installed in the standard or an agreed location adjacent to the property boundary. Refer to For installations where the SA Power Networks service point is not in the standard or agreed location and underground consumer mains need to cross a third party s land, a registered easement granted by the third party property owner for the installation of consumer mains is required. Note: 1. Such an easement is a private easement and SA Power Networks is not party to it Minimum Insulation Resistance (TIR) The insulation resistance between conductors and between conductors and earth or metallic sheath of consumer mains shall comply with the minimum requirements of AS/NZS Wiring Systems (TIR) Consumer mains shall be installed in a manner that in the event of accidental damage being sustained, the likelihood of a short circuit between conductors or earth will operate electrical protection where this is fitted and minimise damage. To assist in achieving this result, the following applies: The route of underground consumer mains shall, to the extent of which is practicable, be selected so as to avoid distribution transformers earthing systems. Where any proposed unprotected consumer mains pass under any building or the route is not obvious (point to point) from connection point to service fuse enclosure then this must be changed to protected consumer mains. The consumer mains between the point of supply and the metering instruments will be completely enclosed in an approved conduit or ducting. Enclosures will not be Issued August 2017 Page 95 of 149

96 required for metal armoured cable, metal sheathed cable, neutral screened cable or where other types of cables or conductors are readily open to view or located in normally inaccessible places or underground. Metal and non-flexible enclosures, sheathing or armouring of the consumer mains must not be joined rigidly to SA Power Networks service protection enclosures. The connection of any wiring enclosure to SA Power Networks service protection enclosure must be through adaptors etc that will enable convenient replacement of the service protection enclosure. For all overhead services, the minimum requirement is: Neutral Screen cable, or wiring systems in: UV stabilised flexible conduit; or UV stabilised Black Nylon corrugated conduit. For over/under services, the minimum requirement is: UV stabilised flexible conduit; or UV stabilised Black Nylon corrugated conduit. It is recommended that precautions be taken to avoid moisture entering the building via consumer mains enclosure. The requirements of other authorities for use of a common trench including clearances and minimum depth are to be met. Armoured cables, mineral insulated metal-sheathed cables, neutral screened cables and metallic piping must not enter into SA Power Networks service pit/pillar Connections (TIR) Pit/Pillar Connections (TIR) Consumer mains to be terminated in service pits shall be prepared and installed by the customer s agent in accordance with clause It is the responsibility of the contractor to ensure that the conductor or lugs used are compatible with the connection point terminals. For installations with a maximum demand of less than 100A, stranded copper conductors with a cross sectional area between 6mm 2 and 35mm 2 as single conductors per phase or neutral will be suitable. Flexible cables must have ferrules installed. Refer clause for compatibility details. For installations with multiple cables per phase, only one cable per phase or neutral is to enter the pit. The consumer mains cables for each electrical installation that are supplied from any pit/pillar shall be identified with a permanent water resistant label at ground level and left neatly coiled within the pit. The label shall be a minimum of 400mm from the cut end of the tail provided for the connection. The label shall be permanently marked specifying the lot or street number of the premises it supplies or for street lighting, the location, direction and number of lights on the circuit Termination on a Distribution Pole (TIR) Work Practices (TIR) Termination of consumer mains on a distribution pole must be carried out in accordance with clause 7.6 and all applicable industry requirements. Issued August 2017 Page 96 of 149

97 These include; but are not limited to the following: No Go Zone guidelines (refer clause 7.6.1) Clause of these Rules Installation (TIR) The customer is responsible for the installation of the cables and equipment to maintain a minimum clearance in accordance with the Electricity Act and Regulations, SA Power Networks shall be responsible to perform any works within the No Go Zone. Cables and equipment shall be placed in a position such that they are least liable to mechanical danger and shall not obscure a distribution pole identification mark or number. They must not impede the access to the pole for fixing of other consumer mains. The relevant SA Power Networks Manager will determine under what conditions other equipment may be attached to SA Power Networks poles or structures. Refer to clause for specific details on mechanical protection of consumer mains. 7.8 Special Electrical Installations & Supply Arrangements The following Rules apply for specific type of electrical installations and various supply arrangements. For unusual installations or situations not specifically covered in this document, the relevant SA Power Networks Manager must be consulted for any conditions or requirements that may be applicable Limited Period Supplies Provision SA Power Networks may, subject to supply being available and the payment of relevant charges, provide a supply to an electrical installation for a limited period, eg building supplies. The customer should ascertain that the supply can be made available, and the conditions which would apply before commencement of any works. Where a supply is provided for a limited period, it shall be disconnected at the time of connection of the permanent supply or expiry of the limited period, unless prior arrangements have been made by the customer for the retention of the supply and any relevant additional charge paid Customer s Electrical Installation (TIR) The Electricity Act 1996 and Electricity (General) Regulations 2012 requires all construction works to be carried out safely, whether new (under construction), altered or being demolished and to comply with the requirements of AS/NZS The electrical installation shall be constructed in accordance with the servicing and metering arrangements as detailed in AS/NZS 3000 and these Rules and adequate protection must be installed to prevent damage to SA Power Networks servicing and metering equipment Buildings in Course of Erection Where an electricity supply is required to a building in the course of erection for constructional purposes, supply may be given when the permanent consumer mains and metering facilities are installed in their permanent position. Issued August 2017 Page 97 of 149

98 The weatherproof meter enclosure must be installed in accordance with: the Electricity Act, Regulations, AS/NZS3000 Wiring Rules and these Rules; the manufacturer s installation instructions; and be securely and rigidly fixed in its permanent position installed in a manner to prevent excessive vibration or movement. To limit additional costs, the electrical installation should be constructed in a manner to avoid the necessity for further visits by SA Power Networks connection personnel; eg be connected to permanent consumer mains and include provision for the permanent metering equipment Multiple Occupancies Plan A plan for any electrical installation proposed to contain multiple occupancies; ie more than one separately metered occupancy, shall be submitted to the Responsible Officer for approval prior to the intended commencement of the electrical installation. The plan must show the meter locations in relation to the main structural features and property boundaries, together with a schematic diagram indicating the proposed control, isolation and metering arrangements of the electrical installation and occupancies Subdivision Where a multiple occupancy property is subdivided, is intended to be subdivided, or has potential for subdivision, consideration should be given in its original design to minimise future rectification for it to comply with the requirements of the Electricity Act and these Rules, particularly clause Unmetered Conductors Customers equipment including devices that consume or measure electricity must not be connected to any unmetered conductor. This does not include metering equipment supplied by SA Power Networks or registered metering provider or equipment required by 7.5 or for multiple customer installations. Where unmetered sub-mains are intended to supply a separate group meter position, then a lockable circuit breaker shall be provided at the origin of the unmetered submains. Except as noted in the following paragraph, unmetered sub-mains or circuits shall be completely enclosed in an approved conduit or ducting. Enclosures will not be required for metal armoured cable, metal sheathed cable, neutral screened cable or where other types of cables or conductors are readily open to view or located in normally inaccessible places or underground. Joints in unmetered sub-mains shall be made in such a manner as to deter unauthorised access, interference or diversion of electricity supply, to the satisfaction of SA Power Networks. No accessible joints or terminals will be permitted along the route of the unmetered sub-mains. Any enclosure (junction box) must be permanently glued shut or resin filled with no visible screws. Any pits installed for pulling cables in shall be filled with sand or soil to meet the AS/NZS 3000 requirement for underground cables. Where a junction box, enclosure or link contains unmetered conductors, provision of SA Power Networks security seal shall be in accordance with clause 4.8. Sealing shall not rely on holes to be aligned through nuts and threaded studs. Issued August 2017 Page 98 of 149

99 Escutcheon panels, which provide access to unmetered sections or terminals of switchboards, shall also be provided with sealing facilities Metering Metering is to be installed in accordance with Section 8 of these Rules and the Metering Code. The metering must be installed as close as reasonably practical (both physically and electrically) to the point of supply. Metering shall be located in groups at the origin of the tenancy sub-mains. Metering must not be located within an individual tenancy unless prior written agreement has been obtained from the relevant SA Power Networks Manager Control (TIR) The electrical installation for premises comprising a number of separately metered occupancies shall be controlled in accordance with the requirements of AS/NZS 3000 and these Rules. (a) (b) Meter Panels and Occupancies Each group of three or more whole current meters on a common panel which share any phase in common requires a panel isolator per panel for isolation of the entire panel in addition to the individual meter isolators required by clause This may be a circuit breaker installed to comply with the requirements of clause Meter Isolator The metering for each separately metered occupancy, shall be capable of individual isolation from supply by means of a meter isolator installed in accordance with clause Supply Arrangement Diagrams (TIR) Where there is a risk of incorrect identification of the occupancies supply arrangements, including segregation between the electrical installations, occupancies unmetered wiring and switchboards and metering, supply arrangement diagrams that comply with clause 6.4 shall be installed and maintained Labelling (TIR) Labels that comply with clause 4.5 and remain clearly visible after installation of all equipment shall be provided to: Any isolator installed as per clause (a) shall be labelled PANEL ISOLATOR and any isolator installed as per clause (b) shall be labelled METER ISOLATOR (see Note). Each portion of the installation shall be suitably identified by means of permanent labels at the isolating device, meter, switch, link, fuse or circuit breaker located at the origin of the circuits and at their main control. Where a building is subdivided and a supply of electricity is given to occupiers of individual rooms, suites, shops, flats or the like, a means of identification such as a letter or number must be permanently marked on the main entrance door of each room, suite, shop or flat and on each corresponding fuse, circuit breaker and switchboard. Any protection device or isolator supplying essential services must indicate the portion/s of the electrical installation it controls and be labelled in accordance with clause 4.5. Issued August 2017 Page 99 of 149

100 TS 100: Electrical Design Standards for Underground Distribution Cable Networks (up to and including 33kV) Meter panels shall be labelled in accordance with clause Note: 1. Devices that provide multiple functions, eg as a main switch and meter isolator, shall be labelled in accordance with these Rules in addition to the labelling requirements of AS/NZS Equipment Installed on a Distribution Pole Use of Pole Equipment shall not be installed upon a distribution pole unless the equipment installed is: Underground consumer mains and its associated service protection device and consumer terminals as detailed in clause ; or Installed in accordance with an agreement with SA Power Networks, the Shared Use of Poles Code and these Rules. Typical equipment that is subject to an agreement with SA Power Networks and compliance with Shared Use of Poles Code includes: Electrical installations attached to poles for broadband transmissions and mobile library supplies; and Parts of electrical installations containing other than consumer terminals and service protection devices, eg circuit breakers, residual current devices or other control gear and cabling that supply electrical installations such as telecommunications equipment; and Lights, traffic signals, antennas, telecommunication/broadband cabling, signs, banners, decorations etc. Application for installation of equipment on a distribution pole should be made in accordance with the appropriate process as outlined on our website at the earliest opportunity after a decision to proceed is made. In all cases, where equipment other than network assets are located upon a distribution pole, the customer/person or body responsible for the equipment shall be responsible for the installation, maintenance and liability associated with their equipment. This shall include the removal and/or relocation of the equipment if it impedes use of the pole by SA Power Networks, and the removal and reinstatement of their equipment upon pole maintenance, relocation or replacement Equipment Installation Termination of underground consumer mains and a private overhead line shall be in accordance with clause and clause respectively and this clause. The construction of any electrical installation or part thereof on a distribution pole not covered by clauses and shall be in accordance with the Electricity Act 1996 and Electricity (General) Regulations 2012 and AS/NZS 3000, the agreement as established in the Code to install the equipment, and this clause. Equipment attached to poles other than consumer mains requires MNSP approval. Unless otherwise agreed with SA Power Networks, all electrical installation equipment shall be located in a position such that the equipment: Is least liable to mechanical damage; Does not obscure a distribution pole identification mark or number; TS 100: Electrical Design Std for Underground Distribution Cable Networks (up to & including 33kV) Issued - June 2014 SA Power Networks 2014 Page 100 of 149

101 Maintains integrity and be appropriately spaced from network earthing conductors; and Does not interfere with safe access to other equipment located on the pole. Consumer terminals installed on poles shall be located between 3.0m and 3.7m above ground level. Equipment other than cables attached to pole shall not be lower than 2.5m above ground level. The installation of earth electrodes shall not be located within 4.0m of an SA Power Networks pole or sub-station earthing systems in MEN areas Electrical Installations on Public Land (TIR) General (TIR) Electrical installations supplied from and contained within public land shall comply with this clause and the other requirements of these Rules. SA Power Networks must be contacted prior to finalising any proposal to install an electrical installation on public land Points of Supply and Consumer Terminals (TIR) The point of supply and consumer terminals for electrical installations supplied from and located upon public land shall be nominated by SA Power Networks and shall, unless otherwise agreed be: Within a service pit/pillar, normally at the boundary or adjacent to the portion of land the electrical installation occupies; or The consumer terminals located between 3.0m and 3.7m where the electrical installation is located upon a distribution pole or where underground mains originate at the pole; or In accordance with clauses and Labelling (TIR) Electrical installation s equipment located upon public and private land (eg a private road) shall be labelled where there is a risk of incorrect identification between electrical installation s equipment and the distribution network. Equipment that shall be labelled includes public lighting columns operated and maintained by bodies such as Department Planning, Transport and Infrastructure (DPTI), Local Councils and Body Corporate, and other equipment such as pillars and cubicles where there is a risk of incorrect identification. Refer to clause 10.1 of TS101 Public Lighting Standard for Overhead and Underground Networks. Labels shall include the responsible organisation and their contact telephone number and be installed in accordance with clause Contiguous Land Where supply has been provided to a property that comprises of contiguous land in accordance with clause 6.2, and the electrical installation and/or occupancies wiring extend into or across property, the customer or controlling body will not have rights upon the land becoming non-contiguous rearrange the supply to comply with these Rules and the Electricity Act and Regulations. Issued August 2017 Page 101 of 149

102 7.8.6 Subdivisions General A copy of any Plan of Subdivision should be submitted to SA Power Networks during its planning stage or as soon as a decision is made to proceed. References that should be considered that may affect the subdivision s design include: Clause 6.2 and the definition of property and points of supply Clause and other Rules such as metering arrangements in Section 8 The Electricity Act and Regulations Consideration for a Torrens Titles subdivision should include provision of an individual POS for each residential allotment with the service pillar being located in the standard or agreed position to ensure the pillar can supply more than one allotment. Refer to Where an electrical installation is being designed and the development, property or building is of a type which may be subdivided, the design should be such as to minimise rectification at the time of sub-division to comply with these Rules. To assist with a subdivision or potential subdivision electrical design, it is recommended that an electrical contractor; electrical design consultant or similarly qualified person be engaged to assist with the design and development of the application. Applicants should nominate proposed loadings for any proposed lot with a load above 63A and consider existing supply arrangements and the potential necessity for existing arrangements to be altered where applicable, prior to presenting any submission No Existing Electrical Installation or Supply Where there is no electrical installation or supply within the area to be subdivided, the application should include the proposed lots and the proposed loadings that have been determined in accordance with clause Existing Electrical Installations or Supply Where there is an existing electrical installation/s and supply within the area to be subdivided, the application should include the proposed lots and proposed loadings that have been determined in accordance with clause Where an area is subdivided into individual lots and does not contain common property, the point of supply and consumer terminals must be in accordance with clauses 6.2 and 6.3 and each electrical installation s wiring shall not extend outside the property boundary or common property, except if and where permitted by the Electricity Act, Regulations and these Rules Multiple Occupancies Where a multiple occupancy is to be subdivided and contains common property, the lots with access to the common property shall be supplied from and arranged such that the consumer terminals, unmetered switchboards and metering equipment are installed in common property in accordance with clauses 6.3, 7.8.2, 8.9 and 8.10, and all other supply arrangements must comply with these Rules. Where a multiple occupancy is subdivided and does not contain common property, the point of supply and consumer terminals must be in accordance with clauses 6.2, 6.3 and all the electrical installation s wiring shall not extend outside the property boundary, except if and where permitted by the Electricity Act, Regulations and these Rules. Issued August 2017 Page 102 of 149

103 7.8.7 Unmetered Supplies Suitable applications and additional requirements for unmetered supplies are described in SA Power Networks Network Tariff & Negotiated Services Manual. The following general conditions apply to new or altered unmetered supplies: An appropriate load limiting circuit breaker with provision for SA Power Networks security seal is to be used as specified in clause of the Network Tariff & Negotiated Services Manual. Where the service is not protected by a fuse at the point of supply, the customer will provide suitable facilities for the installation of service fuses with consideration to the location of the installation and the circumstances under which the device needs to be accessed. Where a submersible fuse is required, the customer shall supply and maintain the submersible fuse carrier and enclosure. SA Power Networks must be advised prior to any changes to the load characteristics. Approval must be gained (as appropriate) from any relevant authority for equipment installed in the road reserve. Socket outlets are NOT permitted in any unmetered installation other than for an approved Type-7 load. Issued August 2017 Page 103 of 149

104 8. LV Switchboards, Service Equipment & Metering 8.1 Scope These Rules apply to all new installations, and additions to existing switchboards, service equipment and metering of energy connected to SA Power Networks distribution network. Where a situation arises where a Rule requires clarification, contact is to be made with the relevant Responsible Officer. As of 1/12/2017 all new metering is the responsibility of the Retailer. Up until, and including the 30 November 2017, the metering requirements are to be carried out in accordance to the previous version of the Service and Installation Rule, which is available on SA Power Networks website. Refer to Section 9 High Voltage Electrical Installations for Rules applicable to High Voltage Metering. The metering standards are covered by the National Electricity Rules, Electricity Metering Code, National Metrology Procedure and the Electricity Act Tariffs & Metering The customer or their agent should consult with the customer s retailer at the earliest opportunity in order to determine their Retail Tariff and metering requirements. The metering will also need to meet the Network Tariff requirements. In some cases, the customer or retailer can elect a Network Tariff (subject to eligibility criteria) and in some cases SA Power Networks is required to assign a tariff. Details of current Network Tariffs are available from the SA Power Networks website. 8.3 Metering Obligations General (TIR) Separate meter(s) shall be provided for each individual customer and/or customer s electrical installation. The customer shall provide and maintain facilities in accordance with the applicable Metering Regulations and Codes, the Electricity Act and these Rules to accommodate the meters. In general, this requires the customer to provide facilities that do not require the meter provider to interfere with the facilities and wiring to install the metering, other than that required to connect, fix and maintain the metering equipment Alterations & Additions Where the customer initiates alterations, additions or relocation of existing metering, facilities that are in accordance with these Rules shall be provided. (eg where an existing timber, Masonite or asbestos meter board or panel exists, it shall be replaced with a hinged insulated panel with appropriate clearances in accordance with these Rules). Asbestos material that may create an Occupational Health & Safety risk must not be in the enclosure containing the meter. The entire enclosure and cables must be free of any asbestos fibres and the panel must be in a sound condition. Repairs to the metering facility may be permitted where asbestos exists provided that the change will not cause any asbestos dust or loose fibres. Where the location of the metering position is to be changed, it must comply with the requirements of clause 8.5 of these Rules: Have sufficient space to adequately accommodate the intended equipment; and Have minimum wiring space complying with clause at the rear of the board or panel. Issued August 2017 Page 104 of 149

105 8.4 Determination of Meter Type Where the determined maximum demand of any separately metered portion of an electrical installation exceeds 100A per active conductor, the metering will be of a CT meter type. 8.5 Location General The National Electricity Rules requires that metering is installed as close as practicable to the connection point. The meter enclosure, in most cases, is the main switchboard and must be readily accessible to provide efficient and effective isolation of electricity supply from the electrical installation in emergency situations by persons such as emergency services personnel. In addition, meters shall be located in accordance with these Rules to enable safe and ready access in accordance with clause 8.6 for installing, fixing, reading, testing, maintenance and removal of metering equipment without difficulty or hazard. The meter isolator should be located: in a position as close as practicable to the public entrance to the property or premises; in areas to eliminate the necessity to enter secured areas and rooms or areas that are not normally entered by visitors or available for public access. Clearances for meter panels shall be in accordance with clause for Whole Current Metering and clause for LV Current Transformer Metering. Any gas meter, fittings, fixtures, enclosures or other obstructions installed below the metering panel shall not project further than 300mm from the face of the wall on or in which the metering panel is mounted. Metering equipment is required to be installed outside hazardous areas defined in AS/NZ Where a perimeter fence restricts access between the building and the public access point, the metering equipment shall be: located to ensure convenient and safe access from the public access side of the fence; and installed in a suitable vandal resistant lockable enclosure which is located in a externally accessible part of the fence, which does not protrude outside the building line; or subject to the approval of the Responsible Officer, where an access door or gate is fitted, a lock shall be installed in accordance with clause 4.7. This lock shall be accessible from outside the door or gate; or subject to availability and agreement between the customer and the meter provider an alternative metering system may be installed by the meter provider. Additional costs may be incurred in adopting this option. Issued August 2017 Page 105 of 149

106 Service & Installation Rules Single Residential Requirements: exterior location in Principle Frontage area; location readily accessible, free from animals; security system not compromised (during normal business hours); minimum working and access clearances maintained; locks required to be operated are keyed to SA Power Networks master key system; and metering enclosures are not permitted inside garages or carports. Where the premises is on a larger allotment (greater than 1 hectare) the principle frontage area should be utilised when the supply point is on or near the principle frontage, where the supply is not from the principle frontage side an alternative meter position may be used where safe and convenient access to the same extent is readily achieved. Legend: Acceptable Location Main Entrance Driveway Suggested Meter Positions Figure 8.1 Suitable Metering Locations for Single Domestic Installation with Single Frontage Issued August 2017 SA Power Networks 2017 Page 106 of 149 In individual residential installations, metering equipment shall be fixed outside the building where the meter provider can gain access without hindrance.

107 Service & Installation Rules Figure 8.2 Suitable Metering Locations for Single Domestic Installation on corner blocks Figure 8.3 Suitable Metering Locations for Single Domestic Dual Fronted Properties Issued August 2017 SA Power Networks 2017 Page 107 of 149

108 Service & Installation Rules Figure 8.4 Suitable Metering Locations for Torrens Titles Allotments Main Public Access via Reserve Figure 8.5 Suitable Metering Locations for Torrens Titles Allotments Main Public Access via Lane Issued August 2017 SA Power Networks 2017 Page 108 of 149

109 Figure 8.6 Suitable Metering Locations for Single Domestic Installations with High Security Perimeter Fence. The design and structure of the building are such that the meter box cannot be located within the 1.5 metres of the corner of the building (eg where windows are installed within 1.5 metres of the corner of the building). Figure (2) Meter enclosure built into Meter enclosure built into perimeter fence or low security perimeter fence or low security air lock. air lock. Issued August 2017 Page 109 of 149

110 Non lockable personal access gate or gate locked with SA Power Networks master key system. Figure (3) The building is constructed up to the Principal Frontage Property Boundary and access is available along a side walkway on the real property. The meter position should be accessible to the same extent as the primary dwelling entrance ie between property entry point and the front door. The building is built to all boundaries thereby eliminating any access to the meter box except through a low security area. Figure (4) Issued August 2017 Page 110 of 149

111 8.5.3 Single Non Residential Where practical, the metering enclosure shall be located in an exterior location as near as practical to the connection point and where meter providers and Electricity Officers can gain safe and unimpeded access. Consideration should also be given to selecting a location that does not compromise the customer s quarantine or security requirements. Metering may be located inside a premise provided access is available during normal business hours (8:00am to 5:00pm Monday to Friday) only where agreed by SA Power Networks. (Commercial, Industrial, Primary Production) Requirements: location readily accessible, free from animals; security system not compromised (during normal business hours); minimum working and access clearances maintained; locks required to be operated are keyed to SA Power Networks master key system; not reliant on special keys, access codes, security cards, property manager or their agent for access; location free from hazards (chemicals, machinery etc); and location free from quarantine restrictions. Where the premises are built to the boundaries, and the premises will be accessible during normal business hours (eg shop), an interior location is acceptable subject to safe and convenient access being maintained. If the required access cannot be maintained, the customer must arrange for relocation of the metering enclosure to a compliant location at their expense. Figure 8.8 Suitable Metering Locations for Single Non-residential Installation built to the boundary Issued August 2017 Page 111 of 149

112 8.5.4 Multiple Residential Installations Where an electrical installation is of a type which may be subdivided, consideration to the metering and wiring arrangements should be made at the initial wiring stage to design the electrical installation in accordance with clauses and to minimise rectification in the event of subdivision. Metering equipment shall, unless otherwise agreed with the relevant Meter Provider to comply with this clause and clause 8.8 and in a position to which all occupants and SA Power Networks have common right of access; with common property provided for the purpose or if no common property, then in accordance with the Community Title Act 1996 and with ongoing unhindered access for all Community Title owners and in accordance with all other requirements of these rules; and be grouped at the main switchboard for the electrical installation; or at the origin of each tenancy sub-main and be grouped at a number of distribution switchboard locations as determined by engineering considerations of supply. These conditions include voltage drop as, for example, in the case of multi-storey buildings etc. The group meter position may be in a room, cupboard or alcove in a common area set aside for the purpose which complies with clause 8.5 and not within a single occupancy. The door/s of rooms and enclosures housing metering equipment shall be labelled Electricity Meters. If the door is to be locked, it shall be locked with a lock in accordance with clause Refer to clauses and for Rules applying to potential or proposed subdivisions. Metering equipment associated with an installation that is to be or is the subject of a Community Title or Strata Plan shall be installed in a location that is common property and accessible through common property as defined in the Strata Plan or Community Title. Where an installation with multiple tenancies is not subject to Community Title or Strata Plan, the metering shall be located in a common area that is accessible during normal business hours. Requirements: location area defined as a common area; access through common area; location readily accessible, free from animals; security system not compromised (during normal business hours); minimum working and access clearances maintained; locks required to be operated are keyed to SA Power Networks master key system; not reliant on special keys, access codes, security cards, property manager or their agent for access; metering installed in a group or groups; accessible to each tenant supplied via the installed meters; Issued August 2017 Page 112 of 149

113 Service & Installation Rules metering at origin of single customer sub-main; and metering enclosures are not permitted inside garages or carports. Figure 8.9 Suitable Group meter position for two units Figure 8.10 Multiple units or homes with single supply point eg Community Titled development Issued August 2017 SA Power Networks 2017 Page 113 of 149

114 Refer to clause Figure 8.11 Multiple units or homes with multiple supply points eg Community Titled development. Figure 8.12 High Density single supply Residential Installation Meter box may be permitted in a common low security garage provided the clearances are maintained and any vehicle cannot be parked within the clearance zone access via SA Power Networks master key system Figure 8.13 Multi story Residential Installation Issued August 2017 SA Power Networks 2017 Page 114 of 149 Service & Installation Rules

115 8.5.5 Multiple Non-Residential Metering equipment associated with an installation that is to be or is the subject of a Community Title or Strata Plan shall be installed in a location that is common property and accessible through common property as defined in the Strata Plan or Community Title. Where an installation with multiple tenancies is not subject to Community Title or Strata Plan, the metering shall be located in a common area that is accessible during normal business hours. Requirements: location area defined as a common area; access through common area; location readily accessible, free from animals; security system not compromised (during normal business hours); minimum working and access clearances maintained; locks required to be operated are keyed to SA Power Networks master key system; not reliant on special keys, access codes, security cards, property manager or their agent for access; metering installed in a group or groups; accessible to each tenant supplied via the installed meters; metering at origin of single customer sub-mains; and location free from quarantine restrictions. Figure 8.14 Multi Non Residential Installation with single supply point Issued August 2017 Page 115 of 149

116 Figure 8.15 Multi Non Residential Installation with multiple supply point (Torrens Title) High Density Single Supply Figure 8.16 High Density Non Residential Installation with single supply point Issued August 2017 Page 116 of 149

117 Multi-Storey Figure 8.17 Multi-story Non Residential Installation with group meters Single Customer Rural Installations These may be either domestic or non-domestic or a combination of both. The metering enclosure shall be located in an exterior location as near as practical to the connection point and where SA Power Networks officers can gain safe and unimpeded access (not under carport). Consideration should also be given to selecting a location that does not compromise the customer s quarantine or security requirements. For the purpose of this section, a property generally greater than 4,000 sq. metres (1 acre) and not located within a township boundary can be considered as rural Combined Residential Non-Residential Use (Single or Multiple Customers) Where an installation is used or designed for both Residential and Non-Residential use, the respective portions of the installation will need to be metered separately for Residential and Non-Residential tariffs. The metering will be installed in a group subject to the same criteria as single and multiple residential Public Land Refer Where metering equipment is required to be installed on public land, it shall be located in a secure enclosure or premise which is at least 2m from a SA Power Networks LV service pole, 4m from the earthing of any High voltage infrastructure (ie HV pole, transformers, switching cubicles) and maintaining the working clearances around service pit/pillar as shown in Figure 7.8. A lock shall be fitted to the metering enclosure entry in accordance with clause 4.7. Issued August 2017 Page 117 of 149

118 8.5.9 Unsuitable Metering Locations Metering equipment shall not be installed in the following locations: Behind a security door or gate; Areas to which access is normally restricted for security, health or other reasons including enclosed verandas and areas or yards which may be locked or house animals; SA Power Networks easements; Within 4.0m of SA Power Networks high voltage infrastructure (eg poles, transformers, switching cubicles); Areas intended for product display such as shop windows; A carport or the area on the driveway side of a residential building where a carport is likely to be constructed; On a single occupancy building, over an external elevated area which is greater than 3.0m above finished ground level at the point at which access is obtained; Above a gas meter, which is not suitably enclosed; Where the use of a ladder would be necessary; Over stairways, landings, ramps, in narrow passageways or in other confined spaces, Vehicle docks, car parks, driveways and factory passageways where the metering equipment or a person working thereon would not be effectively protected; Positions in close proximity to or over machinery or open type switchgear; Locations liable to be affected by fumes, dampness, flooding, dust, noise, vibration or other external factors of such nature as may cause deterioration of equipment or unsatisfactory working conditions; Hazardous and wet areas defined in the AS/NZS3000 Wiring Rules; Where ambient temperature is maintained in excess of 45 C; Where exposed to weather unless installed in a suitably approved enclosure; Where there is insufficient light under normal circumstances; In fire isolated stairways, passageways or corridors; Where access is restricted by vegetation; Where projections would pose a hazard; and Gender specific areas. As metering equipment may produce a degree of noise, it should not be installed on a bedroom wall. 8.6 Clearances around Meter Enclosure Individual Residential Installations A minimum horizontal clearance of not less than 0.6 metres shall be provided in front of the meter box as shown in the figures below. In addition, an egress path of at least 600mm must be available in at least one direction. If the egress path is via the enclosure door side, the door must be easily removable or be able to be secured in the fully open position (180 o ). Issued August 2017 Page 118 of 149

119 Figure 8.18 Meter enclosure clearance for individual residential installations A minimum vertical clearance of 2 metres from ground level shall be maintained in this clearance zone. The removable enclosure door must be capable of moving through an arc of at least 120 o Multiple Residential and Commercial Installations A minimum horizontal clearance of not less than 0.6 metres, from any part of the meter box or equipment, including doors enclosing the meter board, in any normal position of opening, must be maintained as shown in the figure below. Figure 8.19 Meter enclosure clearance for multiple residential and commercial installations As per the individual residential installations an egress path must be in at least one direction. This egress path must be at least 750mm wide and 1980mm high. A minimum vertical clearance of 2 metres from ground level shall be maintained in this clearance zone. Issued August 2017 Page 119 of 149

120 8.7 Meter Enclosure Mounting Height 8.8 Access The top of a meter panel shall not be mounted more than 2.0 metres and the bottom not less than 0.7 metres from the ground floor or platform level. Where a platform is required, the access to the platform, its size and any guard rails shall be approved by SA Power Networks Manager. Note: This level shall be correct at the time of connection General The customer must provide convenient and unhindered access to metering locations and equipment, and all other supply related assets at the following times: Meter installation, reading and planned maintenance as a minimum, between the hours of 8:00am to 5:00pm Monday to Friday; At all times for supplying and metering fault rectification; At any other time agreed by SA Power Networks or meter provider and the customer or customer s agent. Within a multiple occupancy electrical installation, all occupants shall have common right of access to their occupancy s metering equipment. Unless otherwise agreed with SA Power Networks, the meter isolator shall be accessible in areas to eliminate the necessity to enter secured areas and rooms or areas that are not normally entered by visitors or available for public access. Access to and the area around the metering equipment shall be kept clear, unobstructed, safe and clean and free of rubbish. Where metering equipment is installed in a room or area set aside for the purpose, such room or area shall be provided with adequate illumination to AS/NZS 1680 for access. Access to elevated positions shall be provided by an approved fixed stairway or ramp and handrail. Access by means of a ladder is not acceptable. Where a perimeter fence restricts access between the metering equipment and public access point, the metering equipment shall be conveniently and safely accessible from the public access side of the fence. Alternatively, a gate in the perimeter fence that enables access to the meter position may be locked with a lock in accordance with clause 4.7. The customer shall ensure that access is not subsequently restricted or the location otherwise rendered unsuitable. Should this occur, the customer shall restore suitable access or arrange for the relocation of the metering equipment at their expense. Issued August 2017 Page 120 of 149

121 8.8.2 Locks Where locks are considered necessary by the customer or are required by these Rules, the customer shall arrange for the lock/s in accordance with clause 4.7 to be installed. Locks shall be used only on doors or gates which provide access to the property and/or to an enclosure or room housing metering equipment, and shall be accessible from outside the door or gate. 8.9 Metering Panels, Surrounds & Enclosures (TIR) General (TIR) Meter mounting facilities shall be provided: in an approved metering enclosure with the customer s switchboard equipment; or on an approved surround; or within or on facilities that are acceptable to SA Power Networks; that is of a type and in a location, accessible and prepared for the meter installation in accordance with these Rules. However, facilities which meet equal or better outcomes than these Rules may be considered in accordance with clause 2.7. Whole current metering enclosures and surrounds that are intended to be stocked and marketed by Electrical Wholesalers and similar distributors are recommended to be accepted for use in accordance with clause 4.4 prior to being manufactured or connected to supply. All metering panels, enclosures, surrounds and supplementary equipment shall comply with: the relevant Australian or IEC Standard/s applicable at the time of manufacture; the relevant Electricity Regulations, Metering Codes and the Rules applicable at the time of connection to the electricity supply network; and be suitable for use in normal service conditions of: Ambient Air Temperature - Maximum 45 o C Minimum -5 o C Average 35 o C (over 24-hour period) maximum altitude (above mean seal level) 2000m. maximum temperature above ambient inside an enclosure 15 C Meter panels (TIR) Size (TIR) Meter panels shall be of a size to adequately accommodate the metering equipment to be installed upon it, and be of an equal or greater size than the meter panels dimensions detailed in these Rules for the metering equipment to be installed subject to the maximum dimensions detailed in clause Whole Current Metering Meter Panels and clause LV CT Metering Panel. Consideration should be given to a larger size meter panel to accommodate: extra metering equipment for possible future tariff changes; extra SA Power Networks equipment such as service fuses; additional communication equipment as provided by approved meter provider; and meter isolator - refer Section 7.5. Issued August 2017 Page 121 of 149

122 Installation (TIR) Meter panels shall be installed: within a suitable metering enclosure with the customer s switchboard equipment; or within a suitable meter only enclosure; or on a suitable surround; or on facilities that are acceptable to SA Power Networks. The customer is required to provide suitable pre-drilled meter panels for fixing of metering equipment and SA Power Networks service protection devices (where required) Materials (TIR) Meter panels shall be constructed of insulating material: to an equal or better standard than that required by the AS/NZS3000 Wiring Rules for switchboards; and suitable for its intended use and environment, including exposure to ultra violet where exposed to daylight Wiring Holes (TIR) Meter panels shall be equipped with wiring holes: to suit each particular metering installation in accordance to this figures below; and to accommodate SA Power Networks service protective devices where required; and of a size to enable free movement of cables through the panel and termination of conductor/s without damage to the cable insulation. Table 8.3: Service Protective Device Panel Space and Drilling Requirements Height (mm) Width (mm) No. of cable holes Single Phase top, 1 bottom Two Phase top, 2 bottom Three Phase top, 3 bottom Ø Figure 8.21 Meter panel hole spacing Service protection devices Issued August 2017 Page 122 of 149

123 Fixing Arrangements (TIR) The meter panel shall be: capable of being opened to an angle of not less than 60 degrees from the closed position with all metering equipment installed; equipped with hinges; mounted on one vertical edge of the panel; constructed of a suitable non-corroding material that will maintain a structural and dimensional fit after metering equipment has been installed; of a lift-off double off-set type for meter panels installed within enclosures; of a lift-off hinges for meter panels on surrounds; secured in the closed position by a metal fastener or fasteners which requires the use of a tool to release Wiring (TIR) Meter panel wiring shall be wired in accordance with these Rules or the Metering Provider specifications and the AS/NZS 3000 Wiring Rules. Where other wiring passes behind the meter panel, it shall be located and secured in a manner which maintains the required clear metering panel space (both front and rear). This includes maintaining clear space for the meter wiring. Unused meter panel wiring must be terminated in accordance with AS/NZS 3000 Wiring Rules. Acceptable methods to comply with these requirements include the fitting of all intended metering equipment to the panel at the same time, or to ensure unused wiring is appropriately insulated and terminated at the rear of the panel or within a junction box Metering Surrounds & Enclosures (TIR) General (TIR) Meter surrounds and enclosures shall be constructed: to accommodate a meter panel in accordance with these Rules; to have sufficient stability and strength to withstand distortion and contain any energy which might be caused in both normal and fault conditions; any hinges or fixings used to support a meter panel will be of adequate strength to support the weight of the panel and meters therein without sag of the panel when in the open position; hinged meter panels must be capable of movement through an arc of not less than 60 degrees when metering equipment is fixed and connected. The movement of the panel will not be obstructed in any way and the device used to retain the hinged panel in the closed position must be in correct alignment when all necessary equipment is mounted on the panel; access doors of the hinged type must have the hinges mounted on the vertical side. Access doors of the sliding type must move horizontally; and means for securing the meter panel in the closed position must be accessible to the hand where the means for securing it is removed to open the panel eg a screw or nut. Issued August 2017 Page 123 of 149

124 Meter Surrounds (TIR) Meter surrounds shall be constructed to the depth specified in clause to accommodate the meter wiring and to support the meter panel and be constructed: to the specifications of clause ; of sheet steel not be less than 1.2mm thick unless an acceptable strength is achieved with a thinner sheet which is reinforced by the manufacturing process or design or other material; and hot dipped galvanised with a coating weight of Z275 in accordance with AS 1397; or where painted, pre-treated in accordance with the paint supplier s recommendation and coated with a material such as power coating or baked enamel giving a hard durable finish with a service life of not less than 20 years; and with characteristics equal to or better than steel where materials other than steel are used Meter Enclosures (TIR) Meter enclosures shall take the form of a box type enclosure that accommodates the meter panel, metering equipment and may also accommodate a switchboard. Meter enclosures shall be: constructed with materials specified in clause and installed in a manner so that the metering equipment is completely enclosed; and provided with a clearance as required in clauses and Metering equipment must not be exposed to weather, moisture, dust, vibration or mechanical damage. The customer will provide and maintain protection for the metering equipment, by virtue of location or enclosure that provides suitable protection against hazards likely to be present in the installed location. (a) Type not Exposed to Weather or Adverse Environment A meter enclosure not exposed to the weather may be constructed of any suitable material and may or may not be equipped with a door subject to satisfying the above. (b) Type exposed to Weather or Adverse Environment Meter enclosures exposed to the weather or adverse environment shall take the form of a box type enclosure equipped with a hinged door secured by an effective latch and be of sufficient strength and design to withstand all reasonable elements of its installed environment and be constructed: with ventilation and draining that will minimise condensation and provide for draining of moisture that might collect in the enclosures; with a minimum degree of protection of IP23; with a hinged door fitted with: a latch that is easily unlatched to open the door, and which retains the door in the closed position under all conditions that can reasonably be expected; and a retainer when the door is open and in a position to enable work to be performed on the meter panel and equipment safely and without interference. Alternatively, a door less than 0.5m 2 which can be conveniently removed and replaced will be acceptable; be fitted with a lock in accordance with clause 4.7 when installed in public land, isolated and unattended locations and where locking is considered necessary by the customer or otherwise required by these Rules. Issued August 2017 Page 124 of 149

125 8.10 Equipment Acceptance (TIR) Refer to clause 4.4 for information regarding equipment acceptance and suitability of equipment On Meter Panels or Within Enclosures (TIR) Equipment installed on meter panels shall be mounted to allow sufficient space to accommodate all equipment to be installed upon the panel in a manner which enables connection, disconnection and reconnection of all wiring and access to all terminals without dismantling other equipment, or creating a need to remove covers off equipment other than that being worked upon. Equipment must be securely fixed to meter panels in accordance with the Wiring Rules. Fixing screws and fasteners should not protrude through the rear of the panel in a manner that could damage conductors, or create un-earthed exposed metal. Customer s equipment installed on the metering panel shall not in any way compromise or affect the integrity, accuracy or performance of the metering equipment. With the exception of circuit breakers, unscreened magnetic devices such as transformers shall not be installed on the meter panel Security Seals SA Power Networks and meter provider s security seals used in an electrical installation shall be in accordance with clause Customer s Equipment Customer s equipment including devices that consume or measure electricity must not be connected to the supply side of the metering point. This does not include metering equipment supplied by SA Power Networks or registered metering provider or equipment required by , and Meter Panel Labelling (TIR) All labels shall be in accordance with clause 4.5 and shall remain clearly visible after installation of all equipment Single Occupancy (TIR) Every single occupancy meter panel shall be equipped with a label in accordance with clause 4.5 displayed on the meter panel indicating the correct street address. The correct street address can be obtained from the local Municipal Council Multiple Occupancies (TIR) 8.12 Protection (TIR) Each multiple occupancy meter panel, shall be labelled with the correct street address for each occupancy, and to indicate the relationship of meters, fuses and other equipment supplied from the meter panel. A corresponding marking shall also be made on the conductors for each occupancy at the meter panel location to enable resent and future identification of conductors. Additional labelling of multiple occupancies shall be in accordance with clause The customer shall provide adequate and reasonable protection to prevent any physical damage to metering equipment. Issued August 2017 Page 125 of 149

126 The metering equipment and facilities shall be adequately protected against both advertent and inadvertent damage including; mechanical damage, vibration, effects of the weather, sea air, corrosion, damage from vehicles, vandalism and spread of fire etc. Examples of adequate protection requirements include: Where metering is located within an area or in any position capable of being struck by vehicles, suitable protective barriers shall be provided and installed by the customer; and Where metering is installed in a location that is protected from the weather, the metering equipment shall be located: in a meter enclosure; or on a hinged meter panel mounted on a suitable metering surround; and Where metering is installed in locations exposed to the weather, the metering shall be installed in suitable enclosures conforming to these Rules; and be constructed of galvanised steel or an equivalent material; have an IP rating suitable for the environment; installed in a manner to provide protection against vibration, vandalism, weather and all other external factors; and may be locked with a suitable lock in accordance with clause Whole Current Metering Whole current metered electrical installations shall comply with clauses 8.1 and 8.13 where applicable, and the following requirements Clearances Unless otherwise approved by the Responsible Officer, direct metered electrical installations shall be arranged to meet the following clearances: A maximum height of 2.0m to the top of the panel space provided for metering above the floor or ground; A minimum height of 0.7m to the bottom of the panel space provided for metering above the floor or ground; A minimum of 175mm in front of the meter panel to the inner face of the door or any internal projection where the meter panel is enclosed; and A minimum of 75mm behind the meter panel Meter Panels Meter panels supplied in accordance with clause 8.3 and 8.9 shall be arranged to accommodate the required combinations of metering and associated equipment as detailed in clause and For arrangements other than those detailed in the following clauses refer to the Responsible Officer for advice Equipment (TIR) The customer s agent shall arrange for the supply, installation and wiring of: Meter isolator in accordance with clause 7.5 Sealable metering neutral link Isolation of Metering Equipment Supply to each occupancy metering shall be capable of being individually isolated. Issued August 2017 Page 126 of 149

127 Single Occupancy Metering Single occupancy metering equipment shall be capable of being isolated by the meter isolator. Refer to clause Multiple Occupancy Metering The metering for each individual occupancy shall be capable of being individually isolated by a meter isolator installed in accordance with clause 7.5. Note: Panel isolator per panel may also be required, refer clause LV Current Transformer Metering General Where in accordance with clause 8.4 current transformers (CT) metering is to be installed, the applicable requirements of clauses 8.1 to 8.13 and the following rules shall apply: The customer shall supply and install the current transformers and wiring loom and provide adequate space, housing and facilities for the current transformers and metering equipment as detailed in these Rules. NATA approved test results are to be provided for the revenue metering CTs Meter Panel Location and Access The meter isolator and equipment shall be located in accordance with clause 8.4 and accessible in accordance with clause 8.8. Note that clause limits the distance between the meter panel and CT chamber to the lengths specified in Table 8.12 in clause or as otherwise agreed by the Responsible Officer. The meter panel is not permitted in a location subject to varying high intensity magnetic fields. Heavy current carrying conductors shall not be installed behind or near the meter panel, unless effectively shielded by an earthed metallic screen Clearances Unless approved by the Responsible Officer, CT metered installations shall be arranged to meet the following clearances: The lower edge of the meter panel space shall be not less than 0.7m or greater than 2.0m above the floor or ground level. A minimum of 175mm in front of the meter panel to the inner face of the door or any internal protection where the meter panel is enclosed. A minimum of not less than 75mm behind the panel. Clear space for working on meters shall be in accordance with clause 8.9. Unless effectively shielded by an earthed metallic screen from heavy current carrying conductors, the following clearances stated in Table 8.8 shall be maintained between the conductors and meter panel: Issued August 2017 Page 127 of 149

128 TS 100: Electrical Design Standards for Underground Distribution Cable Networks (up to and including 33kV) DISTANCE BETWEEN METER PANEL AND THE NEAREST CONDUCTOR (mm) Interpolate for intermediate values Table 8.8 Conductors to Meter Panel Clearances Wiring The meter panel shall be prepared and wired in accordance with Figure 8.23 and all wiring shall be connected in accordance with Figure 8.22 and Figure 8.24 The responsibility for provision and installation of the wiring loom shall be in accordance with clause Figure 8.22 Current Transformer and busbar wiring diagram TS 100: Electrical Design Std for Underground Distribution Cable Networks (up to & including 33kV) Issued - June 2014 SA Power Networks 2014 Page 128 of 149 RATING OF CONDUCTOR (Amps)

129 TS 100: Electrical Design Standards for Underground Distribution Cable Networks (up to and including 33kV) 9. High Voltage Electrical Installations 9.1 Scope This section provides information and requirements for connection of customer s electrical installations at 7,600 volts (7.6kV) or 11,000 volts (11kV) whichever is available. The intent is to ensure that customer s electrical installation is safe for all personnel and operates in a manner that does not adversely affect the SA Power Networks distribution network. These requirements are additional to the requirements of the South Australian Distribution Code and AS/NZS 3000 Wiring Rules. They apply to new installations and also alterations and additions to existing installations. HV supply at 3.3kV or 6.6kV is no longer available. In general, alterations to existing installations with supplies at these voltages must comply with these Rules. However, technical characteristics will differ from those outlines in Table 9.1 in clause 9.4 below. Further information will be provided by the SA Power Networks Manager. Supply at 33kV or 66kV are beyond the scope of this document. For information regarding supply at these higher voltages, the relevant SA Power Networks Manager must be contacted directly, with specific details of the electrical installation and load requirements. Switching and maintenance of high voltage installations must only be undertaken by appropriately qualified and trained personnel. In order for Market Participants to meet their maintenance requirements and the requirements of the National Electricity Rules, safe access to the High Voltage Instrument Transformers is necessary. Unless the instrument transformers can be electrically isolated from the installation, isolation of the customers High Voltage installation is required at intervals prescribed by the appropriate Market Participant. 9.2 Contractual Arrangements A customer requiring a supply of electricity at high voltage shall be required to enter into: an Electricity Supply Contract with a Retailer; and a connection contract or a specific electricity distribution connection agreement. 9.3 Systems of Supply SA Power Networks will negotiate the system of supply and the voltage of supply with regard to the proximity of its relevant high voltage systems to the customer s point of supply and the nature of the customer s load. One of the following nominal supply voltages may be made available: 7.6kV; 11kV; 33kV; and 66kV. As most of the existing 7.6kV areas of supply are scheduled for conversion to 11kV, any customer currently taking supply at 7.6kV should take this into account. The supply shall be made available at a nominal frequency of 50 Hertz (cycles per second). 9.4 Preliminary Information The customer should provide at the earliest possible notice (preferably 18 months) to their selected Retailer and SA Power Networks of the intention to plan for a high voltage supply. The following preliminary information shall be provided to SA Power Networks: A single line diagram of the proposed installation. (Refer Figure 9.1 at the end of this section). An overall site plan showing the location of the HV equipment; The preferred point of supply (new installation); The anticipated maximum demand (MVA) required for the installation; TS 100: Electrical Design Std for Underground Distribution Cable Networks (up to & including 33kV) Issued - June 2014 SA Power Networks 2014 Page 129 of 149

130 Any proposed on-site generation; Any disturbing loads (eg large motors, arc furnaces, etc); and The HV metering design arrangements. The customer must obtain formal approval from the relevant SA Power Networks Manager. Negotiations for supply should precede detailed design work, placement of orders for equipment and letting of contracts to avoid loss to the customer arising from designs or equipment being found by the Distributor to be unsuitable for connection to the supply system. The characteristics of the 11kV distribution network are detailed below. System nominal voltage System highest voltage Frequency Number of Phases 3 System neutral Earthing System (typical) Maximum fault level Short time current Power frequency withstand voltage Impulse withstand voltage 1.2/50 µs wave 9.5 Installation Design (TIR) 11 kv r.m.s. phase to phase 12 kv r.m.s. phase to phase 50 Hz Solidly earthed CMEN (urban areas) / MEN (rural areas) 380 MVA (20 ka/ph symmetrical) Supplied on request Fault clearing time of 0.5 s is applicable (1.0 s for recloser protected feeders) 28 kv r.m.s. Table 9.1 Electrical Characteristics 95 kv peak (overhead lines) 75 kv peak (underground lines) The installations supply, protection, earthing and metering arrangements shall be: Installed to the satisfaction of SA Power Networks. Details to be provided on application; Arranged to comply to the requirements of clause 6.5, the Electricity Distribution Code, Metering Code and National Electricity Rules in respect to interference to SA Power Networks supply system; and Comply with all applicable Regulations, Codes of Practice and these Rules. Issued August 2017 Page 130 of 149

131 9.5.1 Power Transformers (TIR) For compatibility with SA Power Networks equipment, transformers must comply with AS 2374 Power Transformers (all parts)/ It is recommended (but not essential) that power transformers be purchased in accordance with the latest SA Power Networks power transformer purchase purchasing specification. A copy of this specification is available on request from SA Power Networks Manager. The high voltage winding configuration must be either: unearthed star; or delta There is no limitation on the secondary (or tertiary) winding configurations Protective Equipment (TIR) Protective equipment must comply with AS 1025 High Voltage Switchgear and Control Gear and AS 2067 Switchgear Assemblies and Ancillary Equipment for Alternative Voltages Above 1kV. Equipment must be rated to withstand the conditions in which it is installed (refer Table Conversion from Low Voltage to High Voltage Supply When a customer seeks to convert their installation from a low voltage supply arrangement to a high voltage supply arrangement, consultation with the relevant SA Power Networks Manager is required. 9.7 General Design (TIR) Circuit Connections (TIR) The normal supply arrangement for up to 4MVA is via a single high voltage supply. For loads 4MVA or greater, multiple supply arrangements are required for reliability purposes. Arrangements can usually be made for additional high voltage supplies where required. Paralleling of high voltage feeders may be permitted subject to the conditions as detailed in clause Control of Incoming High Voltage Supply (TIR) The main control for each incoming supply shall consist of a single automatic circuit breaker equipped with earth fault and over current protection capable of making and breaking the maximum prospective fault currents on all three phases. The main control circuit breaker shall: be located as near as possible to the customer s point of supply; and prior to the metering transformers; and be readily accessible to authorised persons; and operate simultaneously in all active conductors; and be able to be locked in the open position. The locking device must be capable of accepting an SA Power Networks padlock fitted with a 10mm shackle; and be provided with adequate means of isolation for maintenance purposes. This may be achieved by rack-out circuit breaker. Issued August 2017 Page 131 of 149

132 Normally, where more than one high voltage supply is provided to a customer, the main circuit breakers shall be interlocked in such a manner that paralleling of the high voltage supplies shall not be possible. Approved interlocking methods are: hard wired electrical interlocking; and/or mechanical interlocking In any case, the customer must notify the SA Power Networks Network Operations Centre prior to transferring load. Paralleling of high voltage feeders to provide a no break supply may also be considered, if technically viable and will be subject to the installation of additional protection at the zone substation and the electrical installation at the customer s expense. These contract conditions are to be a negotiated agreement with SA Power Networks and included in a network connection contract Power Factor (TIR) Power factor averaged over any 5 minute period must be maintained at better than detailed in Table 9.2 or as specified in the SA Distribution Code at the time. Maximum Demand Up to 100kVA Between 100kVA and 2MVA Over 2MVA Voltage Leading Lagging Leading Lagging Leading Lagging 3.3kV and 11kV Supply Disturbances (TIR) Table 9.2 Minimum Power Factor Supply disturbances caused by the electrical installation must comply with AS61000 Part Voltage Unbalance Factor (TIR) The customer must ensure that the load drawn by the electrical installation does not cause the voltage unbalance factor at the service point, as defined in the SA Distribution Code to exceed that set out in Table 9.3. Time Period Maximum Voltage Unbalance Factor Continuous 1% 5 Minutes 1.5% Instantaneous 3.0% Safety Signs (TIR) Table 9.3 Voltage Unbalance Factor Safety signs must be installed as detailed in AS/NZS3000 Wiring Rules. All signs must comply with AS1319 Warning Signs. Issued August 2017 Page 132 of 149

133 9.8 Protection (TIR) Prior to placing orders for equipment, the customer shall discuss the installations protection requirements with SA Power Networks. The customer s protection systems must be designed to coordinate with SA Power Networks feeder protection. The settings applied to the protection relays shall discriminate with SA Power Networks protective equipment to ensure that, for faults in the electrical installation, the customer s circuit breaker will operate before the SA Power Networks protective equipment by at least 0.2s. If SA Power Networks must modify its protection to grade with the electrical installation, the customer will be charged for the full cost of that work. As a minimum, the electrical installation must have a single main control for each incoming supply. Refer to clause This must have over-current protection initiated by protection relays comprising at least two extremely inverse and instantaneous phase elements and one standard inverse and instantaneous earth element. More complex protection arrangements may be required in particular cases to meet acceptable protection performance criteria depending on the electrical installation arrangement, the Distributor s system arrangement and the required protection performance levels. It is preferred that current transformers for over current protection be located on the supply side of the main circuit breaker. Protection settings and equipment shall be subject to the acceptance of SA Power Networks prior to commissioning. The settings of the protection relay shall be fixed by the SA Power Networks security seal. Any modification of the settings shall be subject to the prior acceptance of SA Power Networks. The protection relay labelling is to include a notice Settings only to be changed with prior approval from the Distributor. In general, the customer s primary phase fault protective devices for faults at the voltage level of the supply shall detect and clear bolted short circuit faults in a time not greater than 100 milliseconds at the fault level nominated at the point of supply. Any proposed operating time greater than 100 milliseconds shall be discussed with SA Power Networks at an early stage. Details of the current SA Power Networks feeder protection settings may be obtained via the SA Power Networks Manager. Where the electrical installation, downstream of the main switch includes any length of overhead line or equipment connected between any phase and neutral, Sensitive Earth Fault (SEF) protection must be fitted which grades with SA Power Networks SEF protection. Feeder protection settings may be changed from time to time. Customers with HV supply will be advised of any permanent changes. It is the customer s responsibility to ensure that correct coordination with SA Power Networks feeder protection settings is maintained after being advised of the changed by SA Power Networks. SA Power Networks will not be responsible for any costs incurred in making such a change. The customer is required to provide the SA Power Networks Manager with full documentation of protection settings used as detailed in Table 9.4. Issued August 2017 Page 133 of 149

134 The Customer s High Voltage Service CB Protection Relay Settings Phase Over current Earth Over current Relay Type x x Current Pick-up Value in amps(a) x x Time Multiplier Setting in (%) x x Characteristic Description or Equation x x Instantaneous Pick-up Value in amp(a)s x x Table 9.4 Protection Settings Detail Supporting documentation is required if the customer uses relays that have not been previously assessed by SA Power Networks. 9.9 Insulation Coordination (TIR) The safety clearances, separation of live parts and insulation levels (impulse strength) shall be in accordance with AS 2067 and AS Short Time Withstand Current (TIR) High voltage switchgear, conductors, associated equipment, and earthing systems shall be capable of withstanding the maximum fault current, which may be imposed for duration of at least one second, and in some cases for three seconds. Actual fault currents and their maximum duration at any particular location on SA Power Networks high voltage system will be made available upon request Earthing (TIR) General (TIR) The earthing system of the customer s high voltage installation shall comply with AS/NZS 2067 and these Rules. In locations where SA Power Networks employs a Common Multiple Earth Neutral (CMEN) system of earthing, the customer s HV and LV earthing systems shall be installed separately. A single removable bonding point between the HV and LV earthing systems is required at each HV/LV customer transformer. The customer s HV earthing system shall be connected to the SA Power Networks common neutral conductor via the customer s neutral conductor. In locations where SA Power Networks employs a Multiple Earth Neutral (MEN) system of earthing, the customer s HV and LV earthing systems must be kept separate. An approved earthing device is required to provide an earthing facility on the consumer mains. A mechanism which is capable of securing the earthing device in both the open and closed position, shall be fitted to the earthing device. The securing mechanism must be capable of accepting an SA Power Networks padlock with a 10mm shacking and may have provision for additional padlocks for the customer s requirements. Issued August 2017 Page 134 of 149

135 Special attention should be paid to the management of step and touch potentials that may occur under earth fault conditions associated with any earthing system installed within an electrical installation. Particular attention should be paid to the separation of independent earthing systems and the proximity of earthed infrastructure such as metallic fences and building to earthing systems so as to avoid the possibility of hazardous step and touch potentials. Earthed primary neutral windings are not permitted on any transformer of the nominal supply voltage. It is recommended that the customer use Delta-Star transformers to comply with this requirement. All metallic substation fences, doors or enclosures should be connected to the earthing system and a grading ring should be installed around the substation enclosure in accordance with AS Reinforcing in the substation floor or walls should be connected to the common earth terminal bar Size of Earthing Conductors (TIR) Earthing systems shall be designed to withstand the maximum system design fault current levels as specified in clause All conductors used within the electrical installation for combined or separate earthing systems shall have a minimum equivalent copper cross-sectional area as follows: Sub transmission voltage earthing conductors: 66kV 120mm 2 High voltage earthing conductors: 33kV 70mm 2 11kV 95mm 2 7.6kV 95mm 2 Low voltage earthing conductors: 120mm Earthing of Metering Equipment (TIR) The enclosure of the meter, metering transformers and any metal supporting structure/s shall be connected to the same earth grid as the Current Transformer and Voltage Transformer secondaries. The customer is responsible for providing earthing of the metering enclosure to the requirements of AS/NZS A suitable earth grid is required for all metering installations SA Power Networks Acceptance Requirements The customer shall submit the following details for written acceptance prior to supply at high voltage being made available: Final single line diagram; A schematic of the metering circuitry Agreed maximum demand; Main circuit breaker specification; Protection settings for main circuit breaker; Compliance to Distribution Code, eg Systems study etc; Copy of HV Metering VT and CT test certificates refer to clause ; Before final connection is made the customer must provide: The Network copy of the Electrical Certificate of Compliance; Issued August 2017 Page 135 of 149

136 A copy of: 9.13 Metering o The installations HV operating procedures refer to clause ; o Commissioning and test certificates as determined by the customer and as prescribed by AS/NZS 3000 which must include trip tests on the incoming circuit breaker refer also to clause 9.14; o HV plant and equipment maintenance plan refer to clause ; and o HV clearance to energise the installation. The following high voltage metering requirements are applicable to single feeder high voltage installations (up to 66kV) and are consistent with the National Electricity Rules, the SA Metrology Procedures and the Electricity Metering Code. Other high voltage installations such as dual high voltage feeders and cogeneration installations will require additional provisions General Requirements Metering equipment shall be installed by the Meter Provider in accordance with the applicable requirements of Section 8 LV Metering and the following specifications. These include: A clear, illuminated (during normal business hours), paved and level space as specified in clause 8.8, shall be provided in front of the metering position to allow access for meter reading and to accommodate test personnel and their equipment. A clear space of 1.0m deep is required in front of the meter position for safe access by the meter provider and SA Power Networks personnel. Access must be direct (ground floor), or by stairs or lift. Ladder access is not acceptable. Metering equipment must not be subjected to industrial contamination, extremes in temperature, or vandalism. Enclosures must comply to the same requirements contained in clause Metering Instrument Enclosure Requirements Panel The customer shall provide the meter panel/s and a suitable enclosure or surround for mounting a lift-off hinged panel on which to mount the metering equipment. A clear space of 2.1m high by 1.2m wide is required to provide access for mounting metering equipment. See clause 8.5. The minimum size meter panel for a single HV metering installation shall be in accordance with Meter enclosures shall comply with clause 8.9. The door on meter enclosures shall be labelled Electricity Meters Enclosure The customer shall install and maintain a metering instrument enclosure complying with the requirements of clause 8.9. Issued August 2017 Page 136 of 149

137 Metering Transformers Compliance Voltage transformers shall comply with AS Voltage Transformers for Measurement and Protection, and the current transformers shall comply with AS Current Transformers for Measurement and Protection. The transformers shall meet the performance requirements detailed in clause 9.4 (Table 9.1. For voltages other than 11kV, consult the relevant SA Power Networks Manager. The metering transformers shall be solely for metering revenue purposes. The metering transformers are to be mounted within the customer s high voltage switchgear and shall be acceptable to SA Power Networks. The CT and VT nameplate data is to be duplicated and displayed in the CT/VT marshalling point compartment. Test certificates from a NATA registered laboratory shall be provided to SA Power Networks and the relevant meter provider prior to installation. The test certificate shall show conclusive evidence that the transformers comply with the relevant Australian Standard specification. A copy shall be retained inside the metering enclosure. The following minimum information shall be written in English and be included on the test certificate: Serial No. Make Rating Burden Class Specification Date of test Proof of compliance with high voltage insulation requirements Test ratio(s), Burden(s), Current(s), Voltages. Absolute values of Magnitude and Phase. Errors at each test point Statement of uncertainty in determination of errors Transformer Layout The following requirements apply to the transformers and their enclosure: The metering transformers must be mounted within a HV chamber which is able to be placed under the SA Power Networks or the meter provider security seals. The layout of the transformers will be such that identification of transformer polarities can be readily established, and such that there is ready access to the secondary terminals of all transformers. No other devices apart from metering equipment (with the exception of anticondensate heaters) shall be located within the HV chamber. The voltage transformers will be permanently mounted within the metering HV chamber. Issued August 2017 Page 137 of 149

138 The secondary windings of the voltage transformers shall be protected with 32 Ampere HRC off set tag fuse bases fitted with 6 Ampere fuse links located at the test marshalling point. To permit the required maintenance and inspection by the meter provider, the CTs and VTs shall be located immediately after the main incoming circuit breaker. Provision shall be made within the HV chamber for the bonding of all high voltage conductors to earth, to facilitate disconnection of supply and work to be carried out on the metering transformers. The current and voltage transformers shall be completely encapsulated with the secondary terminal box part of the resin body of the transformer Secondary Wiring The customer is responsible for supplying suitable wiring and facilities for the interconnection of the marshalling point terminals and the metering instrument terminals. The following requirements apply in addition to the requirements of AS/NZS The secondary terminals of the metering transformers are to be connected to the metering loom via a terminal strip at the marshalling point. The marshalling point must be readily accessible for safe access and inspection to the same extent as required for a metering enclosure. The marshalling point shall also contain a suitable earthing bar to allow for the earthing of secondary wiring circuits. A security cover must be provided for the terminals at the marshalling point. The cover must be capable of being sealed in position with SA Power Networks or the meter provider s security seal so as to prevent unauthorised access. Refer clause 4.8. Secondary wiring from the marshalling point to the meter position shall be wired, supplied and installed by the customer. The wiring shall be a maximum of 15m in length with a standard 10 core 2.5mm 2 wiring loom, labelled in accordance with clause A test block shall be provided on the same panel as intended to be used for the metering instrument. The test block must have facilities for bridging of the CT secondary circuits and opening of secondary VT circuits in order to facilitate meter testing and replacement. The test block must have a security cover and facilities for SA Power Networks or the meter provider s security seal. All metering secondary circuit terminals are to be screw type as specified in AS/NZS3000. A schematic of the metering circuitry is to be supplied to the metering provider prior to connection and a permanent copy shall be retained in the metering instrument enclosure. Refer to Figure 9.1 for the Typical HV Metering Secondary Wiring Diagram 2 CT Arrangement. Issued August 2017 Page 138 of 149

139 Service & Installation Rules Figure 9.1 High Voltage metering secondary wiring diagram Issued August 2017 SA Power Networks 2017 Page 139 of 149

140 Access to Meters Where other meter providers have metering installed in SA Power Networks substations and require access to their metering, they must apply to SA Power Networks Network Access group. SA Power Networks Network Access Procedure, Technical Standard TS-085 and the Request for Network Access form is available at Charges will apply for persons requiring access and they will be advised at time of request for Network Access form has been processed SA Power Networks Connection Assets Where the customer supply point is within a metering cubicle and SA Power Networks is no longer designated as the Responsible Person or Meter Provider in MSATS, then this cubicle will be the SA Power Networks connection point. The designated Responsible Person is responsible for the testing and calibration of the current and voltage transformers within the cubicle. In some circumstances, SA Power Networks will request that the metering CT and VT be relocated to an alternate position if SA Power Networks believes there is any risk to the reliability of supply to the customer supplied from this supply point. SA Power Networks may enter into contractual arrangements with the customer s Responsible Person for the testing, calibration and maintenance of current and voltage transformers associated with the metering installation on a case-by-case basis Testing & Commissioning (TIR) For all new or altered high voltage electrical installations, SA Power Networks requires that all inspections and commissioning tests be carried out to ensure the installation complies with AS/NZS 3000 and the SA Power Networks Service and Installation Rules. In addition to the AS/NZS 3000 requirements, SA Power Networks requires: A copy of the completed Electrical Certificate of Compliance covering the installation; Proof of HV and earthing system testing conducted after installation of equipment on site; An SA Power Networks officer witnesses the commissioning tests of the customer s protection systems via primary injection test; NATA approved test results are to be provided for the revenue metering CTs and VTs. The results of all tests shall be provided to the SA Power Networks Manager prior to connection of the installation. These tests shall be performed by a competent testing organisation. SA Power Networks will not connect the whole or any part of the installation unless a validly completed Electrical Certificate of Compliance is provided. Where any testing is carried out by SA Power Networks, the customer will be required to contribute to the cost of the services provided. SA Power Networks may, on application from the customer, carry out other specific testing of high voltage equipment at the customer s expense. Testing by SA Power Networks will only be done under conditions that allow SA Power Networks personnel to use standard isolation and safe working procedures laid down for the operation of similar SA Power Networks equipment. This may involve completely de-energising the electrical installation, if proper provision has not been made for safe operation or isolation. Issued August 2017 Page 140 of 149

141 9.15 Customer s HV Installation Operation & Maintenance (TIR) Operating Procedures (TIR) SA Power Networks requires HV customers to have, maintain and use up-to-date HV Operation Procedures and a trained operator. The customer is responsible for providing suitably trained personnel to operate and maintain the customer s equipment, refer clause 9.1. Unless specifically contracted, SA Power Networks will not provide personnel or equipment for such purposes. SA Power Networks must be able to gain safe and unimpeded access to the main switch at all times. A single line wiring diagram showing all aspects of the high voltage installation shall be provided in a suitable display enclosure adjacent to all control and isolating switches within the electrical installation Trained Operators (TIR) The customer shall ensure that high voltage switches, other than control switches designated for the use of plant operators, shall be operated only be persons selected and authorised by the customer for that purpose. The customer shall ensure 24-hour availability of a suitably trained High Voltage Operator to undertake switching operations on the high voltage assets as required by SA Power Networks for the purpose of inspection of HV metering transformers, load shedding, routine maintenance and emergency repair of the incoming high voltage supply cable. The customer must provide SA Power Networks with a current list of their authorised high voltage operators. This list must be made available to the SA Power Networks Network Operation Centre Maintenance (TIR) A customer who takes supply at high voltage shall ensure that the high voltage installation is maintained in good order to ensure that any malfunction will not create a hazard or cause interference to the SA Power Networks supply system. The customer shall provide a written maintenance proposal for the Main Incoming Circuit Breaker and protection system before supply is made available. The customer must provide upon request, documentation of maintenance records as evidence that the required maintenance has been carried out. Issued August 2017 Page 141 of 149

142 Service & Installation Rules Figure 9.2 Location of HV connection point Issued August 2017 SA Power Networks 2017 Page 142 of 149

143 10. Appendices 10.1 Appendix 1 Single Phase URDs The following localities are served by single phase padmounted transformers. It is not possible to provide three phase services within these areas without augmentation to the SA Power Networks distribution mains. Please note that some streets immediately adjoining those identified may be served from these transformers. Suburb Name Street Name Street Name Street Name Hallet Cove Valkyrie St Reynella Lana St Flagstaff Hill Portia St Emerald St Craigburn Dr Cuillin Gr Daveys Rd Torresan Cr Sarapta Ct Aberfoyle Park Jaimey Gr Walters Cr Nuriootpa Jones Munzberg Gawler Myrtlebank Ct Mount Gambier Tenison Heights Elm Ave, Chestnut Cl Willow Av Jarrah St Millicent Rd Casuarina Ct Jacaranda Ct Dino Pl Lemana Ct Berrigan Ct Lark Pl Jenkins St Leigh Creek Coolabah St Coral Pl Belah St Black Butt St Boobialla Pl Mulga St Red Gum Pl Quandong Pl Mallee St Kurrajong Pl Blackoak Dr Gimlet Pl Ironbark Pl Myall Pl Mount Barker Duffield St Murray St Acacia St Fletcher Rd Port Augusta West Crighton Dr McSporran Cr Butler Cr Chinnery St McIntosh Cr Cole Cr Taylor Cr Hardy Ct Freeman Ct O Reilly Ct Hobbs Ct Pt Lincoln New West Rd Issued August 2017 Page 143 of 149

144 Suburb Name Street Name Street Name Street Name Smithfield Warooka Dr Morialta Dr Parachilna Ct Mora Cr Wahroonga Dr Adaluna Ct Amaroo Ct Talia Ct Wilterna Dr Para Hills (including Gulfview Heights) Cornwall Dr Kara Ct McGill Ct Glenarbon St Parkeston Ct Nelson Rd Yulinda Tce Salisbury Downs Delta Ct Amsterdam Cr Karungi Ct Lerida Cr Soria St Venlo Ct Felicia Ave Breda Ct De Mille St Elstree St Parafield Gardens Eugene Cr Salas Rd Mitchell Park Maldon Ave Constable Ct Marion Hersey Ct Belair McGregor Ct Redgum Dr Pasadena Redgum Dr Dianella Ct Tacoma Bl Dernancourt Orange Grove Ct Donnika St St Agnes Sarina Farm Rd Tregrehen Ct Claridge Ct Modbury North Carruthers Dr Rose Ct Pooraka Duffield Dr Templer Ct Batten Ct Palmer Ct Cowan Dr Henderson Ave Lock Cr Rains Rd Davidson Ct Windsor Gardens Brady Ct Issued August 2017 Page 144 of 149

145 Service & Installation Rules 10.2 Appendix 2 SA Power Networks Service Fuse Time/Current Characteristics Time/Current Curves for Typical SA Power Networks Service Fuse Sheet 1 For Service Fuse Type ME & MF (TIR) Issued August 2017 SA Power Networks 2017 Page 145 of 149

146 Service & Installation Rules Sheet 2 For Service Fuse Type J (TIR) Issued August 2017 SA Power Networks 2017 Page 146 of 149

147 Service & Installation Rules Sheet 3 For Service Fuse Type NH Size 2 (TIR) Issued August 2017 SA Power Networks 2017 Page 147 of 149

148 Service & Installation Rules Sheet 4 For Service Fuse Type NH Size 3 (TIR) Issued August 2017 SA Power Networks 2017 Page 148 of 149

149 Service & Installation Rules Sheet 5 For Service Fuse Type NH Size 4A (TIR) Issued August 2017 SA Power Networks 2017 Page 149 of 149

Service & Installation Rules

Service & Installation Rules Service & Installation Rules CONSOLIDATED AMENDMENTS - MARCH 2011 Published 3 September 2012 SA Power Networks www.sapowernetworks.com.au Issue 3 September 2012 Page 1 of 55 Revision Notes: DATE SECTION

More information

Technical Standard - TS 129. Small Inverter Energy Systems (IES) - Capacity not exceeding 30kW. SA Power Networks. Published: November 2017

Technical Standard - TS 129. Small Inverter Energy Systems (IES) - Capacity not exceeding 30kW. SA Power Networks. Published: November 2017 TS 130: Inverter Energy Systems (IES) - capacity up to or equal to 200 kw Technical Standard - TS 129 Small Inverter Energy Systems (IES) - Capacity not exceeding 30kW Published: November 2017 SA Power

More information

Service & Installation Rules 2014

Service & Installation Rules 2014 Victorian Electricity Distributors Service & Installation Rules 2014 Incorporating Amendment 1 - April 2017 (A1) These Service & Installation Rules form the following Distributors Reasonable Technical

More information

Basic Connection Services Application and Price Guide

Basic Connection Services Application and Price Guide Basic Connection Services Application and Price Guide 2016-17 Disclaimer TasNetworks (which, for the purposes of this disclaimer, includes all of its related bodies corporate, its officers, employees,

More information

This page is purposely left blank

This page is purposely left blank Section 1. Information contained within this section shall be read in conjunction with all sections of this manual This page is purposely left blank Cover Issue: 03.01.2011 Page 2 of 2 1.1 Contents Section

More information

Electricity Safety (Electrical Installations) Regulation 2005

Electricity Safety (Electrical Installations) Regulation 2005 New South Wales Electricity Safety (Electrical Installations) Regulation 2005 under the Electricity Safety Act 1945 Her Excellency the Governor, with the advice of the Executive Council, has made the following

More information

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements

AS/NZS :2016. Grid connection of energy systems via inverters AS/NZS :2016. Part 1: Installation requirements AS/NZS 4777.1:2016 Australian/New Zealand Standard Grid connection of energy systems via inverters Part 1: Installation requirements AS/NZS 4777.1:2016 AS/NZS 4777.1:2016 This joint Australian/New Zealand

More information

Large Embedded Generation User Guide A

Large Embedded Generation User Guide A Large Embedded Generation User Guide A For Generating Systems AS4777 compliant and up to 200kW January 2013 SA Power Networks www.sapowernetworks.com.au Table of Contents 1. Introduction... 3 1.1 Embedded

More information

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers

Contents. 1 Introduction. 2. Advisory and Information Systems. 3. Supply. 3.1 Quality of Electric Supply. 3.2 Interference with other Customers DISTRIBUTION CODE Contents 1 Introduction 2. Advisory and Information Systems 3. Supply 3.1 Quality of Electric Supply 3.2 Interference with other Customers 3.3 Application for the Supply of Electricity

More information

Construction and Connection of Street Light Assets

Construction and Connection of Street Light Assets Construction and Connection of Street Light Assets 1. INTRODUCTION... 2 2. FURTHER INFORMATION... 3 3. DEFINITIONS... 3 3.1 Designer... 3 3.2 Street Light Asset Owner... 3 3.3 Road Owner... 4 3.4 Developer...

More information

Title Low Voltage Distribution and Installations Earthing References and Definitions. Reference Number PDS 03 (ARTC Standard: EP SP)

Title Low Voltage Distribution and Installations Earthing References and Definitions. Reference Number PDS 03 (ARTC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Low Voltage Distribution and Installations Earthing References and Definitions Reference Number PDS 03 (ARTC Standard: EP 12 00 00 02 SP) Document

More information

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)*

Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Australian Capital Territory Utilities (Technical Regulation) (Electricity Transmission Supply Code) Approval 2016 (No 1)* Disallowable instrument DI2016 189 made under the Utilities Technical Regulation

More information

FAQ s. Designing metering switchboards as per Victorian service installation rules

FAQ s. Designing metering switchboards as per Victorian service installation rules FAQ s Designing metering switchboards as per Victorian service installation rules Designing metering switchboards as per Victorian service installation rules Q: Who develops the Victorian service installation

More information

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY

INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY INTERCONNECTION STANDARDS FOR CUSTOMER-OWNED GENERATING FACILITIES 25 kw OR LESS PUBLIC UTILITY DISTRICT NO. 1 OF CHELAN COUNTY Table of Contents Chapter 1. Purpose and scope. Pg 3 Chapter 2. Application

More information

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP)

Title High Voltage and 1500 System Earthing References and Definitions. Reference Number PDS 02 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title High Voltage and 1500 System Earthing References and Definitions Reference Number PDS 02 (RIC Standard: EP 12 00 00 01 SP) Document Control

More information

Enquiry Form for Micro and Small Generators 5MW and Less

Enquiry Form for Micro and Small Generators 5MW and Less Enquiry form Enquiry Form for Micro and Small Generators 5MW and Less Connect an embedded generator (incl. solar, wind & micro-hydro) to the TasNetworks Distribution Network Please print and complete relevant

More information

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna

Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna Bihar Electricity Regulatory Commission Vidyut Bhawan, J.L.Nehru Marg, Patna 800 021 ------------------------------------------------------------------------------------------------------------- ROOFTOP

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3001:2008 (Incorporating Amendment No. 1) AS/NZS 3001:2008 Australian/New Zealand Standard Electrical installations Transportable structures and vehicles including their site supplies AS/NZS 3001:2008

More information

Model Standing Offer for Micro Embedded Generator Basic Connection Services

Model Standing Offer for Micro Embedded Generator Basic Connection Services Model Standing Offer for Micro Embedded Generator Basic Connection Services MICRO EMBEDDED GENERATORS BASIC CONNECTION SERVICES NEW CONNECTION WITH MICRO EMBEDDED GENERATOR EXISTING CONNECTION WITH NEW

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities

New Ulm Public Utilities. Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities New Ulm Public Utilities Interconnection Process and Requirements For Qualifying Facilities (0-40 kw) New Ulm Public Utilities INDEX Document Review and History... 2 Definitions... 3 Overview... 3 Application

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

AS/NZS :2013. Wheelchairs AS/NZS :2013. Australian/New Zealand Standard

AS/NZS :2013. Wheelchairs AS/NZS :2013. Australian/New Zealand Standard AS/NZS 3695.2:2013 Australian/New Zealand Standard Wheelchairs Part 2: Requirements and test methods for electrically powered wheelchairs (including mobility scooters) Superseding AS 3695 1992 AS/NZS 3695.2:2013

More information

UK Power Networks Use of System Charging Methodology

UK Power Networks Use of System Charging Methodology UK Power Networks Use of System Charging Methodology Effective From: 1 July 2018 Published: 15 June 2018 Contents General Introduction... 3 Who we are 3 Licence Obligations 3 Price Control 3 Connection

More information

Substation Lightning Protection. Document Number: 1-11-FR-11

Substation Lightning Protection. Document Number: 1-11-FR-11 Substation Lightning Protection Document Number: 1-11-FR-11 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-11 Substation Lightning Protection Asset

More information

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy

SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL. Estimation and Costing & Utilization of Electrical Energy 1 SSC-JE STAFF SELECTION COMMISSION ELECTRICAL ENGINEERING STUDY MATERIAL Estimation and Costing & Utilization of Electrical Energy Estimation and Costing & Utilization of electrical Energy Estimation

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

Guidelines when working near TasNetworks electrical assets

Guidelines when working near TasNetworks electrical assets Guidelines when working near TasNetworks electrical assets About TasNetworks Tasmanian Networks Pty Ltd (ACN 167 357 299) ( TasNetworks ) is the owner and operator of the regulated electricity network

More information

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION

EXTRA ORDINARY 16 AASHAADHA, 1937(S) BIHAR ELECTRICITY REGULATORY COMMISSION REGISTERED NO. PT.-40 The B Bihar Gazett te EXTRA ORDINARY PUBLISHED BY AUTHORITY 16 AASHAADHA, 1937(S) (NO.PATNA 737) PATNA, TUESDAY, 7 TH JULY 2015 BIHAR ELECTRICITY REGULATORY COMMISSION NOTIFICATION

More information

Umatilla Electric Cooperative Net Metering Rules

Umatilla Electric Cooperative Net Metering Rules Umatilla Electric Cooperative Net Metering Rules Version: July 2017 Umatilla Electric Cooperative NET METERING RULES Rule 0005 Scope and Applicability of Net Metering Facility Rules (1) Rule 0010 through

More information

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010

Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 1 of 5. Comparison of Indian Electricity Rules, 1956 Vs CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 2 Definitions 2 Not seen the definition for Inspector. But with, - Qualifications,

More information

ACTEWAGL DISTRIBUTION SERVICE AND INSTALLATION RULES VERSION 8 I 2017 NOVEMBER 2017 VERSION 8 SM11144

ACTEWAGL DISTRIBUTION SERVICE AND INSTALLATION RULES VERSION 8 I 2017 NOVEMBER 2017 VERSION 8 SM11144 ACTEWAGL DISTRIBUTION SERVICE AND INSTALLATION RULES VERSION 8 I 2017 NOVEMBER 2017 VERSION 8 SM11144 CONTENTS ACTEWAGL DISTRIBUTION SERVICE AND INSTALLATION RULES ACTEWAGL DISTRIBUTION USEFUL WEB LINKS

More information

AS/NZS 3112:2004 AS/NZS

AS/NZS 3112:2004 AS/NZS AS/NZS 3112:2011 Incorporating Amendment No. 1, 2, and 3 Australian/New Zealand Standard Approval and test specification Plugs and socket-outlets Superseding AS/NZS 3112:2004 AS/NZS 3112:2011 AS/NZS 3112:2011

More information

Resident Permit and Visitor Permit Guidelines

Resident Permit and Visitor Permit Guidelines OPERATING GUIDELINES Resident Permit and Visitor Permit Guidelines Approved by: GM, City Services May 2003 Subsequent Amendments: 9 September 2016 Associate Director (Vanessa Godden) Amended to reflect

More information

Louisville Gas and Electric Company

Louisville Gas and Electric Company P.S.C. Electric No. 11, Original Sheet No. 57 APPLICABLE In all territory served. AVAILABILITY OF SERVICE Available to any customer-generator who owns and operates a generating facility located on Customer

More information

Queensland Electricity Connection and Metering Manual

Queensland Electricity Connection and Metering Manual Queensland Electricity Connection and Service and Installation Rules Issued Date: 01/12/2017, Effective Date: 01/12/2017 THIS PAGE HAS BEEN DELIBERATELY LEFT BLANK Check this is the latest version before

More information

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State

PUBLIC Law, Chapter 539 LD 1535, item 1, 124th Maine State Legislature An Act To Create a Smart Grid Policy in the State PLEASE NOTE: Legislative Information cannot perform research, provide legal advice, or interpret Maine law. For legal assistance, please contact a qualified attorney. Emergency preamble. Whereas, acts

More information

Parking Control Bylaw 2014

Parking Control Bylaw 2014 Parking Control Bylaw 2014 1 Thames-Coromandel District Council - Parking Control Bylaw 2014 1. TITLE 1.1. This Bylaw is the Thames-Coromandel District Council Parking Control Bylaw 2014. 2. EXPLANATORY

More information

Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw

Major Customer Connections. Preliminary Enquiry Form Embedded Generation > 30 kw Major Customer Connections Preliminary Enquiry Form Embedded Generation > 30 kw MARCH 2018 Privacy Notice Ergon Energy is collecting information (including personal information) on this form for the purposes

More information

Key elements of the AS3000 Wiring standards and some of the recent changes.

Key elements of the AS3000 Wiring standards and some of the recent changes. Key elements of the AS3000 Wiring standards and some of the recent changes. Dean of Engineering Steve Mackay Worked for 30 years in Industrial Automation 30 years experience in mining, oil and gas, electrical

More information

Addressing ambiguity in how electricity industry legislation applies to secondary networks

Addressing ambiguity in how electricity industry legislation applies to secondary networks In Confidence Office of the Minister of Energy and Resources Chair, Cabinet Business Committee Addressing ambiguity in how electricity industry legislation applies to secondary networks Proposal 1 This

More information

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015

Procedure PR D Electrical Permits. Engineering Procedure Electrical Distribution Unit. Version 1.0. Date in Force: 4 November 2015 Engineering Procedure Electrical Distribution Unit PR D 78500 Electrical s Version 1.0 Date in Force: 4 November 2015 Procedure UNCONTROLLED COPY WHEN PRINTED Approved by: Sean Budge Manager Electrical

More information

Joint Operating Procedures for First Nations Consultation on Energy Resource Activities

Joint Operating Procedures for First Nations Consultation on Energy Resource Activities Joint Operating Procedures for First Nations Consultation on Energy Resource Activities October 31, 2018 Contents Revision History... iv Definitions of Key Terms... v 1 Background... 1 2 Roles and Responsibilities...

More information

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT

SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & INTERCONNECTION AGREEMENT INTERCONNECTION AGREEMENT FOR SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION THIS AGREEMENT MUST ACCOMPANY

More information

Part 1 Preliminary... 2

Part 1 Preliminary... 2 Sunshine Coast Regional Council Local Law No. 5 (Parking) 2011 Contents Part 1 Preliminary... 2 1 Short title... 2 1A Commencement... 2 2 Purpose and how it is to be achieved... 2 3 Definitions the dictionary...

More information

Automated and Electric Vehicles Bill

Automated and Electric Vehicles Bill Automated and Electric Vehicles Bill SECOND MARSHALLED LIST OF AMENDMENTS TO BE MOVED IN COMMITTEE OF THE WHOLE HOUSE Amendment No. [Amendments marked * are new or have been altered] Clause 8 37 Page 5,

More information

Requirements for Secondary Voltage Revenue Metering (750 V and less)

Requirements for Secondary Voltage Revenue Metering (750 V and less) Requirements for Secondary Voltage Revenue Metering (750 V and less) To view the latest revision of this document go to: http://www.bchydro.com/ext/metering/ January 28, 2010 Copyright 2008 by BC Hydro.

More information

DISTRIBUTION BUSINESS DISTRIBUTION STANDARD: SERVICE AND INSTALLATION RULES DS-I-CA-01

DISTRIBUTION BUSINESS DISTRIBUTION STANDARD: SERVICE AND INSTALLATION RULES DS-I-CA-01 DISTRIBUTION BUSINESS DOCUMENT TITLE: DISTRIBUTION STANDARD: SERVICE AND INSTALLATION RULES DOCUMENT I.D. NUMBER: DS-I-CA-01 REV NO. DATE REVISION DESCRIPTION APPROVAL 0 Aug 01 Original Issue Prepared

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and HIGH VOLTAGE METAL CLAD SWITCHGEAR WITH SPOUTS Copyright National Grid plc 2014, all rights reserved. No part of this publication

More information

Jemena Electricity Networks (Vic) Ltd

Jemena Electricity Networks (Vic) Ltd Jemena Electricity Networks (Vic) Ltd 2016-20 Electricity Distribution Price Review Regulatory Proposal Revocation and substitution submission Public 6 January 2016 ABBREVIATIONS TABLE OF CONTENTS Abbreviations...

More information

Micro Embedded generation

Micro Embedded generation Application form Micro Embedded generation Application for new connection and supply of an embedded generator (incl. solar, wind & micro-hydro) Please print and complete relevant sections of this form

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 3112:2011 AS/NZS 3112:2011 Australian/New Zealand Standard Approval and test specification Plugs and socket-outlets AS/NZS 3112:2011 This Joint Australian/New Zealand Standard was prepared by Joint

More information

Net +Plus Connection Code

Net +Plus Connection Code Net +Plus Connection Code LANKA ELECTRICITY COMPANY (PRIVATE) LIMITED 1.0 BACKGROUND The existing Net Metering Concept launched in the year 2010 noticed an exponential growth in the recent year and at

More information

UNS Electric, Inc. Rules and Regulations

UNS Electric, Inc. Rules and Regulations Original Sheet No.: 902 A. In these, the following definitions will apply unless the context requires otherwise: 1. Actual Cost: The cost incurred by the Company for labor, materials and equipment including

More information

Guidelines for connection of generators:

Guidelines for connection of generators: Guidelines for connection of generators: Greater than 30 kva, and not greater than 10 MW, to the Western Power distribution network January, 2017. EDM 32419002 / DM 13529244 Page 1 of 14 Contents 1 INTRODUCTION...

More information

THE CORPORATION OF THE TOWNSHIP OF MIDDLESEX CENTRE BY-LAW NUMBER

THE CORPORATION OF THE TOWNSHIP OF MIDDLESEX CENTRE BY-LAW NUMBER THE CORPORATION OF THE TOWNSHIP OF MIDDLESEX CENTRE BY-LAW NUMBER 2006-052 BEING A BY-LAW TO REGULATE AND CONTROL PARKING WITHIN THE TOWNSHIP OF MIDDLESEX CENTRE WHEREAS the Municipal Act authorizes local

More information

SERVICE AND INSTALLATION RULES

SERVICE AND INSTALLATION RULES DOCUMENT TITLE: SERVICE AND INSTALLATION RULES DOCUMENT NO.: DS-I-CA-01 DS I CA 01.1 November 2017 Page 1 of 82 REV NO. Service and Installation Rules DATE REVISION DESCRIPTION APPROVAL 4 Oct 2014 Revise

More information

Export limits for Embedded Generators up to 200 kva connected at Low Voltage

Export limits for Embedded Generators up to 200 kva connected at Low Voltage Export limits for Embedded Generators up to 200 kva connected at Low Voltage Standard Operating Procedure Document number: SOP 33-06 Issue number: 5 Status: FINAL Approver: J Bridge Date of approval: 3

More information

Consumer Guidelines for Electric Power Generator Installation and Interconnection

Consumer Guidelines for Electric Power Generator Installation and Interconnection Consumer Guidelines for Electric Power Generator Installation and Interconnection Habersham EMC seeks to provide its members and patrons with the best electric service possible, and at the lowest cost

More information

Land Transport Rule Traction Engines [2008]

Land Transport Rule Traction Engines [2008] Land Transport Rule Traction Engines [2008] Rule 63001 Overview Land Transport Rules are law produced by Land Transport New Zealand for the Minister of Transport. Land Transport NZ drafts Rules in plain

More information

Gisborne District Traffic and Parking Bylaw DOCS_n144966

Gisborne District Traffic and Parking Bylaw DOCS_n144966 Gisborne District Traffic and Parking Bylaw 2011 DOCS_n144966 Contents 1. TITLE 1 2. COMMENCEMENT AND REPEALS 1 3. APPLICATION 1 4. INTERPRETATION 1 5. GENERAL 3 6. PARKING 7. PARKING OF HEAVY MOTOR VEHICLES

More information

NZQA registered unit standard version 1 Page 1 of 6

NZQA registered unit standard version 1 Page 1 of 6 Page 1 of 6 Title Demonstrate knowledge of theory and legislation for registration of electrical appliance servicepersons Level 3 Credits 3 Purpose This unit standard covers the theory assessment required

More information

SUBSTATION INTERLOCKING SCHEMES

SUBSTATION INTERLOCKING SCHEMES SUBSTATION INTERLOCKING SCHEMES This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses

More information

NP 007 Service Rules

NP 007 Service Rules NP 007 Service Rules This document should be read in conjunction with: NP 003 Installation rules NP 010 Meter Manual Disclaimer: This document may be regularly updated. Persons not on a Power and Water

More information

AS/NZS 3007:2013. Electrical equipment in mines and quarries Surface installations and associated processing plant AS/NZS 3007:2013

AS/NZS 3007:2013. Electrical equipment in mines and quarries Surface installations and associated processing plant AS/NZS 3007:2013 AS/NZS 3007:2013 Australian/New Zealand Standard Electrical equipment in mines and quarries Surface installations and associated processing plant AS/NZS 3007:2013 AS/NZS 3007:2013 This Joint Australian/New

More information

AS/NZS ISO :2013

AS/NZS ISO :2013 ISO 7176-28:2012, IDT Australian/New Zealand Standard Wheelchairs Part 28: Requirements and test methods for stair-climbing devices AS/NZS ISO 7176.28:2013 This Joint Australian/New Zealand Standard was

More information

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS

STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS STATEMENT OF CHARGING METHODOLOGY FOR USE OF THE SOUTHERN ELECTRIC POWER DISTRIBUTION PLC EMBEDDED DISTRIBUTION NETWORKS Effective from 1 st April 2013 The methodology set out in this statement was approved

More information

AS/NZS 1927:1998 AS/NZS

AS/NZS 1927:1998 AS/NZS AS/NZS 1927:2010 Incorporating Amendment No. 1 Australian/New Zealand Standard Pedal bicycles Safety requirements Superseding AS/NZS 1927:1998 AS/NZS 1927:2010 AS/NZS 1927:2010 This Joint Australian/New

More information

KAPITI COAST DISTRICT COUNCIL TRAFFIC BYLAW 2010

KAPITI COAST DISTRICT COUNCIL TRAFFIC BYLAW 2010 PART 10 OF THE KAPITI COAST DISTRICT COUNCIL CONSOLIDATED BYLAWS KAPITI COAST DISTRICT COUNCIL TRAFFIC BYLAW 2010 1 Title, Commencement and Application... 2 2 Bylaw Validation... 2 3 Objective and Scope...

More information

CORPORATION OF THE CITY OF NEW WESTMINSTER BYLAW NO. 7850, A Bylaw regarding the licencing and regulation of food trucks

CORPORATION OF THE CITY OF NEW WESTMINSTER BYLAW NO. 7850, A Bylaw regarding the licencing and regulation of food trucks CORPORATION OF THE CITY OF NEW WESTMINSTER BYLAW NO. 7850, 2016 A Bylaw regarding the licencing and regulation of food trucks The Council of the Corporation of the City of New Westminster in open meeting

More information

CHAPTER 2 HOW TO APPLY FOR ELECTRICITY

CHAPTER 2 HOW TO APPLY FOR ELECTRICITY CHAPTER 2 HOW TO APPLY FOR ELECTRICITY CHAPTER 2 HOW TO APPLY FOR ELECTRICITY 2.1 Electricity Supplied by HK Electric We supply electricity to Hong Kong Island and Lamma Island. The electricity supplied

More information

AS/NZS 3131:2001 AS/NZS

AS/NZS 3131:2001 AS/NZS AS/NZS 3131:2015 Australian/New Zealand Standard Approval and test specification Plugs and socket-outlets for stationary appliances Superseding AS/NZS 3131:2001 AS/NZS 3131:2015 AS/NZS 3131:2015 This joint

More information

RMS CONDITIONAL REGISTRATION SCHEME HISTORIC (CRS-H) RULES FOR MEMBERS. Mustang Owners Club Australia (N S W) Inc.

RMS CONDITIONAL REGISTRATION SCHEME HISTORIC (CRS-H) RULES FOR MEMBERS. Mustang Owners Club Australia (N S W) Inc. Mustang Owners Club Australia (N S W) Inc. Email: cpregistrar@nsw.mustang.org.au 1-12-16 INTRODUCTION 1. The Mustang Owners Club of Australia (NSW) Inc. (herein known as the Club ) is approved by the Roads

More information

CITY OF HAMILTON BY-LAW NO

CITY OF HAMILTON BY-LAW NO Authority: Item 8, General Issues Committee Report 17-001 (PED16099(a)) CM: January 25, 2017 Bill No. 013 CITY OF HAMILTON BY-LAW NO. 17-013 To Amend By-law No. 07-170, a By-law to License and Regulate

More information

ESS Lighting Instruction Pack Original Energy Saver

ESS Lighting Instruction Pack Original Energy Saver ESS Lighting Instruction Pack Original Energy Saver For projects completed: AFTER 1 July 2014 This Instruction Pack is designed to simplify the processing of Energy Savings Certificates for commercial

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS XXV. NET METERING A. Applicability and Availability 1. The terms Net Metering Service, Demand Charge-based Time-of- Use Tariff, Net Metering Customer, Customer, Time-of-Use Customer, Time-of-Use Tier,

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION IEC TS 62257-9-2 First edition 2006-10 Recommendations for small renewable energy and hybrid systems for rural electrification Part 9-2: Microgrids IEC 2006 Copyright - all rights

More information

Locating Ground Mounted Equipment

Locating Ground Mounted Equipment Network Asset Technical Document Locating Ground Mounted Equipment Original issue: April 2008 Prepared by: Lee Chan & Robert Rogerson This revision: Original Issue Date for next review: April 2013 Copyright

More information

Energy Regulation : Australian Experience. Engr.Khondkar Abdus Saleque

Energy Regulation : Australian Experience. Engr.Khondkar Abdus Saleque Energy Regulation : Australian Experience Engr.Khondkar Abdus Saleque 14/11/2014 Australian Energy Regulator Australia is a federal Country with Six Sates and two territories Victoria, NSW, Queensland,

More information

Substation LV AC Supplies. Document Number: 1-11-FR-04

Substation LV AC Supplies. Document Number: 1-11-FR-04 Substation LV AC Supplies Document Number: 1-11-FR-04 VERSION 1.0 June 2018 This functional requirements document is in line with the organisation's 1-11-ACS-04 LV AC Supplies Asset Class Strategy Intellectual

More information

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT

SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT SANTA CLARA CITY RENEWABLE NET METERING & INTERCONNECTION AGREEMENT This Net Metering and Interconnection Agreement ( Agreement ) is made and entered into as of this day of, 2018, by the City of Santa

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance WASHING HIGH VOLTAGE INSULATORS USING PORTABLE WASHING EQUIPMENT Copyright National Grid plc 2014, all rights reserved.

More information

WORKING SAFELY NEXT TO WEST MIDLANDS METRO

WORKING SAFELY NEXT TO WEST MIDLANDS METRO WORKING SAFELY NEXT TO WEST MIDLANDS METRO GUIDELINES FOR BUSINESSES, CONTRACTORS, EVENT ORGANISERS & OTHERS WORKING ON OR NEAR TO WEST MIDLANDS METRO. If you own, occupy a building or other assets near

More information

Managing Electrical Safety on Boats

Managing Electrical Safety on Boats Managing Electrical Safety on Boats Note Throughout this document there are several specific terms with which you should be familiar, and they are defined in the dictionary below. These terms are identified

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to

More information

PRIVATELYOWNED POWER POLES AND POWERLINES

PRIVATELYOWNED POWER POLES AND POWERLINES PRIVATELYOWNED POWER POLES AND POWERLINES Privately-owned power poles and powerlines Privately-owned power poles and overhead powerlines must be properly maintained to ensure that they do not pose a serious

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION IEC/TS 62257-7-3 TECHNICAL SPECIFICATION Edition 1.0 2008-04 Recommendations for small renewable energy and hybrid systems for rural electrification Part 7-3: Generator set Selection of generator sets

More information

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION

APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION APPLICATION FOR INSTALLATION OF SMALL SCALE EMBEDDED ELECTRICITY GENERATION Work Order No: File Reference: 16/2/1 This application form for the connection of small scale embedded generation is for small

More information

Electrical Testing Company Pty Ltd / / AS/NZS 3003:2011 Body (Rev E)

Electrical Testing Company Pty Ltd /  / AS/NZS 3003:2011 Body (Rev E) AS/NZS 3003:2011 Electrical Testing Company Pty Ltd / www.electricaltestingcompany.com.au / AS/NZS 3003:2011 Body (Rev E) Body Protected Electrical Areas (shall comply with Section 2 and Section 3 of the

More information

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS

Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS Date Issued: 10 August 2009 Status: ISSUED Review Date: 10 August 2011 Ref: NS5.3 DISTRIBUTED GENERATION TECHNICAL REQUIREMENTS TABLE OF CONTENTS 1. PURPOSE AND SCOPE OF THIS DOCUMENT... 3 2. DEFINITIONS...

More information

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT

REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT REVISED 8/1/2018 SOLAR PHOTOVOLTAIC DISTRIBUTED GENERATION CUSTOMER GUIDELINES, APPLICATION & WGC INTERCONNECTION AGREEMENT INTRODUCTION Lathrop Irrigation District has created a policy to allow safe connection

More information

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min

Draft Agenda. Item Subject Responsible Time. 4. GAS INFORMATION SERVICES PROJECT IMO 10 min. 5. OPTIONS FOR GAS BULLETIN BOARD SYSTEM IMO 15 min Gas Advisory Board Draft Agenda Meeting No. 1 Location: Parmelia Hilton, Swan B Room 14 Mill Street, Perth WA 6000 Date: 20 December 2011 Time: 11:15am 12:15pm Item Subject Responsible Time 1. WELCOME

More information

Guidance for Low Voltage Electrical Installations

Guidance for Low Voltage Electrical Installations Guidance for Low Voltage Electrical Synopsis This document provides information in support of GI/RT7007 Low Voltage Electrical. Signatures removed from electronic version Submitted by Anne E Blakeney Standards

More information

The Use of Electricity In Mines Regulations

The Use of Electricity In Mines Regulations The Use of Electricity In Mines Regulations Repealed by Chapter E-6.3 Reg 4 (effective February 28, 1996). Formerly Chapter E-7.1 Reg 5. Table of Contents 1 Title 2 CSA Standard adopted with amendment

More information

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA

TRANSMISSION LICENCE NO. 1 OF 2011 LICENCE FOR TRANSMISSION OF ELECTRICITY IN THE STATE OF MAHARASHTRA MAHARASHTRA ELECTRICITY REGULATORY COMMISSION World Trade Centre, Centre No.1, 13th floor, Cuffe Parade, Mumbai - 400 005. Tel. No. 022 22163964/65/69 Fax 022 22163976 E-mail mercindia@mercindia.org.in

More information

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP)

Title Electrical Technical Maintenance Coding System. Reference Number PMP 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category General Title Reference Number PMP 01 (RIC Standard: EP 00 00 00 02 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards and

More information

To complete the process for a net metering interconnection, please follow the steps below:

To complete the process for a net metering interconnection, please follow the steps below: We appreciate your interest in Rocky Mountain Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system

More information

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 Lihue, Kauai, Hawaii Original Sheet 5 RULE NO. 2 CHARACTER OF SERVICE

KAUAI ISLAND UTILITY COOPERATIVE KIUC Tariff No. 1 Lihue, Kauai, Hawaii Original Sheet 5 RULE NO. 2 CHARACTER OF SERVICE Lihue, Kauai, Hawaii Original Sheet 5 RULE NO. 2 A. GENERAL 1. The character of service available at any particular location must be ascertained by the Company business office, and will depend upon the

More information

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001

CLP POWER HONG KONG LIMITED. SUPPLY RULES March 2001 CLP POWER HONG KONG LIMITED SUPPLY March 2001 ADVISORY SERVICE Advice concerning matters relating to the supply of electricity may be obtained free of charge from the Company. OTHER COMPANY PUBLICATIONS

More information

Standard retail electricity supply

Standard retail electricity supply Standard retail electricity supply Schedule of charges from 1 July 2011 Schedule of charges for standard retail electricity supply The following charges have been approved by the Independent Competition