RAILWAY TECHNOLOGY AND INNOVATION DRIVERLESS TRAINS

Size: px
Start display at page:

Download "RAILWAY TECHNOLOGY AND INNOVATION DRIVERLESS TRAINS"

Transcription

1 By Alan Trestour Customer Director, Alstom Transport and Alan De-Reuck Customer Director, Alstom Transport 1. Definition of train Automation The notion of Automatic Train Operation (ATO) defines the operational safety levels against functional requirements needed to help automate train operations. The International Association of Public Transport (UITP) has defined five Grades of Automation (GoA) for trains. The GoA s are defined according to basic functions of train operation and split in operational responsibilities whether it is for humans or the system itself. GoA 0 is a train driver on-sight operation, similar to a tram system running in street traffic, reliant entirely on train driver to manage the system safety. GoA 1 is a train operation where a train driver controls starting and stopping, operation of doors and handling of emergencies or sudden diversions, but with an Automatic Train Protection (speed and signal past at danger protection control). GoA 2 is semi-automatic train operation (STO) where stopping is automated but a driver in the cab starts the train, operates the doors, drives the train if needed and handles emergencies. Many ATO systems are GoA 2. GoA 3 is driverless train operation (DTO) where starting and stopping are automated but a train attendant operates the doors and drives the train in case of emergencies. GoA 4 is unattended train operation (UTO) where starting and stopping, operation of doors and handling of emergencies are fully automated without any on-train staff. 2. History of driverless system and levels of train Automation Figure 2 First Light rail automated transit systems (VAL) Historically, ATO was first used on automated guideway transits and subways which were easier to ensure safe transportation of humans. The name VAL was originally used for this system of operation because it represented the route of the first line Villeneuve d Ascq à Lille (i.e.: Villeneuve d Ascq to Lille) this system was the first fully automated driverless metro in Europe, starting service in 1983 and can cope with unanticipated demand by inserting additional trains into the network as required, remotely from the control centre. The control centre computer system automatically speeds up or slows down trains in order to maintain a timetable. The train length is just 26 metres in length (two linked cars), 2 metres in width and with a passenger capacity of 152 per twin-unit train the VAL trains are smaller in size and mass than traditional suburban trains. They partially make up for their low passenger capacity however by being able to operate at headways of as close as 60 seconds. Figure 1 Grades of Automation 7

2 The advantage of using lightweight trains such as these is that it reduces the cost of building the overall system. Shorter trains require shorter (cheaper to construct) stations whilst lighter-weight railcars require physical infrastructure which is of a lower mass and therefore also less expensive to construct. Most ATO system operators elect to maintain a driver (train operator) to mitigate risks associated with failures or emergencies; however, this operational arrangement is made at the discretion of the train service operator. More recently, modern rail systems are linked with Automatic Train Control (ATC) and in many cases Automatic Train Protection (ATP) where normal controller operations such as route setting and train regulation are carried out by the computer system. An ATO and overlay of ATC/ ATP combined systems work together to maintain a train within a defined tolerance of its timetable. The combined overall system marginally adjusts operating parameters such as the ratio of power to coast when moving and station dwell time, in order to bring a train back to the required timetable slot defined for it. From standalone Speed Code systems to CBTC (Communications Based Train Control) Speed Code systems were first introduced in the 1960s, to manage automatic operations of guided vehicles including light trains. A Speed Code system transmits a signal indication from the interlocking to the train via the rails. This system met the main requirements of operators including: Presentation of a cab-signal on the driver display Full safety from the ATP supervision Driver assistance with ATO operation Some reduction in equipment (only a few back-up line-side signals are required) This technology however has two limitations. Firstly, the train only sees a code for the speed to be reached by the next track circuit section. There the train does not have a view of the track speed profile and the train-running speed is not optimized. Secondly, very short track circuits of 50 metres are required if the trains are to be able to run at short intervals (headway); this makes the implementation of such a system fairly complex with much trackside equipment to be maintained. Figure 3 Typical CBTC System 8

3 The CBTC technology was first developed in the 1980s as an improvement to the previous existing Speed Code systems. Definition of a CBTC system is a continuous, automatic train control system utilizing high-resolution train location determination independent of track circuits; continuous, high-capacity, bidirectional train-to-wayside data communications; train-borne and wayside processors capable of implementing Automatic Train Protection (ATP) functions, as well as optional Automatic Train Operation (ATO) and Automatic Train Supervision (ATS) functions., as defined in the IEEE 1474 standard. 4. Alstom Transport achieved the implementation of a radiobased moving block on a driverless heavy metro in 2003 on the Singapore North-East line, the world s second longest fully underground, automated and driverless, rapid transit line with a waveguide transmission system. 5. The implementation of CBTC to modern radio (compact and standardized), was achieved both by Alstom Transport and Siemens in Beijing for the 2009 Olympics. 3. Drivers, benefits and Risks of driverless metros Modern CBTC technology has been developed in a series of stages from 1980 to today: 1. Bi-directional transmission (train to track, track to train) for moving block was implemented in 1985 using a cable loop placed between the rails (as shown on the photo below) on a medium capacity line in Vancouver. Figure 4 Cable loop 2. Alstom Transport, Siemens and Ansaldo developed the function of transmission of the track in running profile (description of track and speed) to the train in The implementation of CBTC on a driverless heavy metro with transmission by a cable placed between the rails was achieved on Paris Line 14 (METEOR) 9

4 Urban transit systems such as urban rail in large cities are facing continuous increases in ridership demand around the world as a result of urban economic activity encouraging transit in ever increasing numbers to and from within the cities. This increase in urban transit demand is translated by pressures on the system with respect to: Augmentation in capacity of the transit system Higher performances in availability and reliability of the system Increased complexity of the operating environments (such as timetable and resources management) Higher operating costs Benefits of driverless systems There are many benefits for choosing an automated, driverless system. Some of these benefits include: Increasing the capacity Conventional suburban lines are built for a train frequency of between 180 to 200 seconds headways (or 3-3 ½ minutes), which are typically maximum frequencies of train movements during morning and evening peak hours. With a new ATC system in place, additional (virtual) blocks exist between stationary block signals, thus significantly increasing line capacity a typical example being train frequency of 90 seconds achieved on the Moscow Metro with up to 9 million persons travelling on these trains on a daily basis. However, these new blocks can only be used by ATC-operated trains since they are virtual and have no stationary signal associated with them that can be observed by a driver-operated train without ATC equipment. Thus the increased line capacity can only be effectively used after the system has been converted to full ATC operation. Reduced Operating Costs Reduction in Operating cost by controlled energy consumption and optimizing deployment of resources. No driver required. These experienced resources can be trained as service employees, available to passengers inside the carriages and on platforms to look out for disruptions and possible crime, thus increasing the subjective security, supply information and answer passenger queries and other general passenger assistance. Improve safety and passenger satisfaction Former drivers who were behind a closed door before, busy with the operation of the train can be trained for redeployment as key customer service attendants, more visible and responsive to passenger needs. Automatic Train Regulation: Operating flexibility and improved on time running reliability ATC-controlled trains in storage tracks can be activated instantly, making it possible for the line controller to put additional trains into passenger service at a moment s notice when he observes unexpected increases in passenger numbers on the line. The fact that resource notice and central control interface are minimal enables this to be achieved at relatively short notice. Figure 5 Evolution of rail ATC and Interlocking equipment over time 10

5 Securing a driverless system corridor An important consideration for CBTC full UTO systems is that they are generally totally closed systems of operation fully segregated and secure right of ways with controlled access. Generally, this requires building high chain-link fencing along the corridor tracks with CCTV cameras and monitored secured access gates. Perimeter intrusion detection systems linked to the CCTV system are also recommended these provide instantaneous information on the location and nature of the intrusion to the Operating Control Centre (OCC). If at grade road crossings are present, they all need to be replaced by over/under pass for the UTO tracks. If the line runs next to a freight route, specific provision will have to be taken to prevent encroachment secured right of way following a derailment. Operating risks of automatic driverless trains Automated railways work on the basis of the trains collecting information about the line ahead, signals, maximum speeds, train positions etc. as they travel, very much reliant on the robustness of the communications network. Should the communications fail, the system fails bringing operations to a complete stop within the controlled area, as this is the only realistic way of ensuring absolute safety. Where there are railway staff on the trains it is often possible for them to override the no code / automatic stop, but for safety (to reduce the risk of colliding with a train in front especially when in tunnels) when in this emergency mode the trains are normally restricted to a very slow speed. Typically, this will be something like 10mph or 15km/h. If the fault is just that one train has lost the ability to receive the communications signal, then it is usually possible for the train to be driven at this speed to somewhere where it can be taken out of service without blocking the rest of the route. But, realistically at that very slow speed it is inevitable that all other trains behind it (plus the passengers!) will experience significant delays. 4. Driverless systems functionality & Technology enablers for driverless system The main objective of CBTC is to increase capacity by safely reducing the time interval (headway) between trains travelling along the line. Traditional legacy signaling systems were designed to ensure the detection of the trains in discrete sections of the track called blocks. Each block is protected by signals that prevent a train entering an occupied block. Since every block is fixed by the infrastructure, these systems are referred to as fixed block systems. Unlike the traditional fixed block systems, in CBTC systems the protected section for each train is not statically defined by the infrastructure (except for the virtual block technology, with operating appearance of a moving block but still constrained by physical blocks). This can be achieved with the trains continuously communicating their exact position to the equipment in the track by means of a bi-directional link (train to track and track to train); either using inductive loops or radio communication. A trackside computer tracks all trains in the assigned section of line and calculates an appropriate movement authority for each train. As a result, trains are routed continuously and can then run at shorter headways than when driven manually on sight. In fully automated mode, metro trains are driven by the automatic train control (ATC) together with control and protection of the line by interlockings. To this end, the trackside computers are constantly exchanging data with the computers of the higher-level system in the control centre and the computers on board the train by radio (using high frequencies). On board, the Automatic Train Operation (ATO) system replaces the metro driver and controls the train s speed. The ATO computer is continuously monitored and, if necessary, corrected by the Automatic Train Protection (ATP) system which comprises track side and train borne elements. 11

6 Figure 6 Conventional fixed block system Figure 7 Moving block system 12

7 Figure 8 CBTC Communications Network Please refer below for the definitions of the system s elements. Automatic Train Protection (ATP): The ATP system (includes on board and trackside components) is responsible for the basic safety function. It avoids collisions, red signal overrunning (SPAD) and exceeding speed limits by applying brakes automatically. A line equipped with ATP corresponds (at least) to a GoA1. Automatic Train Operation (ATO): Ensures partial or complete automatic train piloting and driverless functionalities. The ATO system performs all the functions of the driver, except for door closing. The driver only needs to close the doors, and if the way is clear, the train will automatically proceed to the next station. This corresponds to a GoA2. Many newer systems are completely computer controlled; however, most system operators still elect to maintain a driver, or a train attendant of some kind to mitigate risks associated with failures or emergencies. This corresponds to a GoA3. Automatic Train Control (ATC): It performs automatically normal controller operations such as route setting and train regulation. The ATO and ATP systems work together to maintain a train within a defined tolerance of its prescribed timetable. The combined system will marginally adjust operating parameters such as the ratio of power to coast when moving and station dwell time, in order to bring the train back to the timetable slot defined for it. There is no driver, and no staff assigned to accompany the train, corresponding to a GoA4. ATC equipment is made of: train-borne equipment, including: UNIVIC computer which implements both ATP and ATO functions and interface with other onboard ATC equipment and train equipment (traction, doors control, emergency brake ) on a redundant network (2 computers on trains). Beacon antenna, which sends an energizing signal to activate the balises on the track that reads messages sent back to the balise, detects the precise balise location and sends information to the UNIVIC. 13

8 Odometer, which measures the wheel rotations for calculation of distance and speed by the UNIVIC. DMI, which in the event of manual driving will present the train control indicators to the driver in a backup operation included degraded model (in UTO configuration). Track side equipment, including: Zone Controller (ZC), which calculates the right location and movement for each train and supervises the PSD. Line Controller (LC), which provides the TSR on request and line data update permanently to each train. Balise which provides localization information to the train, and are placed every 200m along the track. Finally, two other key components of the CTBC are the ATS (Automatic Train Supervision) and the DCS (Data Communications System). The DCS allows the overall system to have a continuous communication between all parts of the CBTC system and can also provide telecommunication services (radio and LAN networks) for non-vital signalling functions such as PIS and CCTV. The DCS network is configured fully redundant and uses standard protocol between all sub-systems. The ATS is a traffic management function, and is dedicated to the overall monitoring of all signalling and train operation data and to the management and supervision of the traffic regulation algorithms including scheduled timetable and headway. It automatically issues commands on track routing and assigns new operational missions to trains. The operator can also intervene in event of a degraded operation to move the train manually (via a joystick). 5. High level of Safety on driverless trains: There is no compromise on the safety of passengers on driverless systems, as summarized by the following points: In the event of an emergency call or emergency brake activated by a passenger, the OCC (Operations Control Centre) will obtain direct audible and visual communication link thanks to full passenger CCTV surveillance inside trains. Therefore, each incident is monitored live and appropriate intervention can be triggered quickly and effectively. In the event of a fire break out inside the train, smoke detector and temperature sensors will trigger an instant alarm in the OCC and the train is stopped automatically at the next station, where personnel can investigate the cause of the fire alarm. A public-address system in the passenger area serves for the announcement of operational and traffic information. If required, passengers can contact the OCC at any time via the emergency call point. A passenger who triggers an alarm is connected directly via an audio visual radio. Visual and audible signals announce closing of passenger doors on the train. The train doors are interlocked with Platform Screen Doors (PSD), by means of flashing light at the doors as well as a beeping sound. The information is also relayed to persons of impaired vision and hearing. The above functions combined together with the speed control, monitoring and train spacing protection make the driverless trains one of the safest modern transport systems. The DCS allows the overall system to have a continuous communication between all parts of the CBTC system and can also provide telecommunication services (radio and LAN networks) for non-vital signalling functions such as PIS and CCTV. 14

9 AMSTERDAM 5 LINES BEIJING AIRPORT EXPRESS BEIJING L1 & L2 TORONTO YUS LINE LILLE L1 LAUSANNE M2 WUHAN L2 & L4 BEIJING L6 BEIJING FANGSHAN & L9 MEXICO L12 MALAGA L1 & L2 MILAN L1 DUBAI AL - SAFOOH LINE RIYADH 3 LINES SHANGHAI L10 WUXI L1 & L2, NINGBO L1 KUNMING L1 SHENZHEN L2 & L5 SHANGHAI L12 & L13 & L16 GUANGZHOU L6 TAICHUNG HONG KONG SIL (E) PANAMA L1 SINGAPORE NORTH EAST LINE SINGAPORE CIRCLE LINE SAO PAULO L1 & L2 & L3 SANTIAGO L1 Radio CBTC Reference Renovation Driverless Figure 9 Alstom Reference Sites 6. Alstom s driverless systems around the world Through its cutting-edge information solutions, Alstom brings operators the means to ensure the transport of passengers in total safety and fluidity, optimising the capacity of urban lines. Alstom provides cities all over the world with its CBTC Urbalis signalling system, which represents a footprint of around 25% of global CBTC solutions deployed worldwide. This range offers comprehensive and upgradeable signalling solutions and guaranteed reliability, safety and security of the train operations. All four different grades of signalling control automation from GoA 1 (ATP) to full GoA 4 (UTO) can be offered with the Urbalis product range, and there is a solution adapted to each metro service operating requirement. With 9 fully UTO metro system projects awarded over the last fourteen years (including Sydney Metro Northwest), Alstom is constantly striving to innovate in the field of metro driverless solutions. 15

10 City Line/system New line / Rev / Ext Award Year Commissioning No Lines km km at grade km tunnel km elevated No of trains No of stations Singapore North-East Line New Line Singapore Circle Line New Line Lausanne m2 Revamping Shanghai Shanghai L 10 TIS SIG New Line Hong Kong SIL (E) New Line Taichung Green Line New Line Lille Line 1 renovation Revamping Riyadh Orange Purple Yellow Lines New Line Figure 10 Alstom s URBALIS range CBTC deployment reference for UTO (full driverless automation) on metro lines across the world (excludes Sydney awarded in 2014) Paper sources: 1. UITP METRO AUTOMATION FACTS, FIGURES AND TREND 2. Observatory of Automated Metros home page: 3. ALSTOM Urbalis 400 product range description (Alstom copyright) 4. ALSTOM CBTC RANGE IRSE presentation June

Australia s First Fully Automated Metro Opportunities & Solutions. Oliver Fried Technical Director, Sydney Metro

Australia s First Fully Automated Metro Opportunities & Solutions. Oliver Fried Technical Director, Sydney Metro Australia s First Fully Automated Metro Opportunities & Solutions Oliver Fried Technical Director, Sydney Metro Overview Sydney s rail future - Opportunities for metro Project features & performance Fully

More information

Automation in urban public transportation

Automation in urban public transportation Edgar Sée, RATP Group, Paris line 4 automation Project director Automation in urban public transportation N o v e m b e r 2 0 1 6 CONTENTS WHAT IS CBTC? BENEFITS OF AUTOMATED SYSTEMS AUTOMATION : RATP

More information

Driverless Train Operation

Driverless Train Operation Driverless Train Operation siemens.com.cn/ingenuityforlife Table of content Grade of Automation 3 Passengers expectations of driverless operation 4 Operators expectations of driverless operation 5 Siemens

More information

Urban Mass Transit Goes Driverless

Urban Mass Transit Goes Driverless Urban Mass Transit Goes Driverless Dr Gerard Yelloz Siemens Tansportation Systems Presentation APM 07 Siemens Urban Mass Transit Goes Driverless - Definitions MASS Transit = Light and Heavy metros greater

More information

System integration through operability

System integration through operability BCN RAIL 2011 November 29 th 1/39 Summary Introduction to EGIS EGIS GROUP EGIS RA IL Preamble Lille Metro line 1 renewal Project presentation requirements 2/39 1 Introduction to EGIS EGIS GROUP Key figures

More information

Research on Signal System Interoperability of Urban Rail Transit. Page 1

Research on Signal System Interoperability of Urban Rail Transit. Page 1 Research on Signal System Interoperability of Urban Rail Transit Page 1 Agenda I Background II Solution for Urban Rail Interoperability III Solution for Urban & Mainline Rail Interoperability Page 2 I.

More information

Driverless CBTC specific requirements for CBTC systems to overcome operation challenges

Driverless CBTC specific requirements for CBTC systems to overcome operation challenges Computers in Railways X 401 Driverless CBTC specific requirements for CBTC systems to overcome operation challenges M. P. Georgescu Alcatel Canada Inc, Transport Automation Solutions, Train Control, Canada

More information

WORLD REPORT ON METRO AUTOMATION - JULY Copenhagen Nuremberg Lausanne Budapest Brescia Milan Rome Dubai

WORLD REPORT ON METRO AUTOMATION - JULY Copenhagen Nuremberg Lausanne Budapest Brescia Milan Rome Dubai STATISTICS BRIEF WORLD REPORT ON METRO AUTOMATION - JULY 2016 INTRODUCTION Automated metro lines are a proven solution for metro systems around the world. As of July 2016, there are 55 fully automated

More information

Precision Station Stopping Progress Update

Precision Station Stopping Progress Update Washington Metropolitan Area Transit Authority Precision Station Stopping Progress Update Presented to: The Board of Directors; Customer Service, Operations and Safety Committee By PlanninghDevelopmenthEngineeringhConstruction

More information

siemens.com/mobility Trainguard Full interoperability for rail traffic

siemens.com/mobility Trainguard Full interoperability for rail traffic siemens.com/mobility Trainguard Full interoperability for rail traffic Siemens we offer our customers optimized ETCS solutions One of the major challenges faced by society is to ensure mobility. To remain

More information

AŽD Praha. ATO system type AVV. in everyday operation at Czech railway network. Vladimír Kampík. European Affairs Director, AŽD Praha

AŽD Praha. ATO system type AVV. in everyday operation at Czech railway network. Vladimír Kampík. European Affairs Director, AŽD Praha AŽD Praha ATO system type AVV in everyday operation at Czech railway network Vladimír Kampík European Affairs Director, AŽD Praha Rail traffic automation 3 pillars TARGET: Increase capacity and effectives

More information

Option 2 - Convert to Automatic Train Control (ATC) Signalling Technology

Option 2 - Convert to Automatic Train Control (ATC) Signalling Technology Option 2 - Convert to Automatic Train Control (ATC) Signalling Technology Option 2 is substantially different from the previous options, in that replacement of the existing signalling system, rather than

More information

Automatic Train Control. Stuart Landau CH2M HILL, System Engineer. Port Authority of NY and NJ, Program Manager. Jersey City, NJ

Automatic Train Control. Stuart Landau CH2M HILL, System Engineer. Port Authority of NY and NJ, Program Manager. Jersey City, NJ Automatic Train Control At the Port Authority Trans-Hudson Stuart Landau CH2M HILL, System Engineer Jersey City, NJ Doug Dreisbach Port Authority of NY and NJ, Program Manager Jersey City, NJ Introduction

More information

Preliminary market consultation session

Preliminary market consultation session Preliminary Market Consultation (Article 35-A of the Public Procurement Code) Metropolitano de Lisboa, E.P.E. Opening of a public contract procurement procedure for the leasing of rolling stock and signaling

More information

Extending the Useful Life of the MR-73 Metro Cars François Chamberland

Extending the Useful Life of the MR-73 Metro Cars François Chamberland Extending the Useful Life of the MR-73 Metro Cars François Chamberland Executive Director Technical Services Société de Transport de Montréal Montréal, Province of Québec Program A few facts about STM

More information

Development of a Train Control System by Using the On-board Interlocking

Development of a Train Control System by Using the On-board Interlocking PAPER Development of a Train Control System by Using the On-board Interlocking Takayasu KITANO Train Control Systems Laboratory, Signalling and Transport Information Technology Division Tatsuya SASAKI

More information

WORLD METRO FIGURES 2018

WORLD METRO FIGURES 2018 STATISTICS BRIEF WORLD METRO FIGURES 8 INTRODUCTION Metros are of critical importance for mobility, as societies are becoming ever more urbanised. At the end of 7, there were metros in 82 cities in 56

More information

INTRODUCTION. Ansaldo STS. Ansaldo STS is a leading technology company operating in railway and underground transportation.

INTRODUCTION. Ansaldo STS. Ansaldo STS is a leading technology company operating in railway and underground transportation. Brescia Subway INTRODUCTION The origin of the project Metro Brescia comes from a decision of Brescia city council in 1987, when in accordance with the technical and economic examination of the various

More information

METRO PERFORMANCE. The quest for system performance in Singapore re-signalling project. L Y Lam FIRSE

METRO PERFORMANCE. The quest for system performance in Singapore re-signalling project. L Y Lam FIRSE METRO PERFORMANCE The quest for system performance in Singapore re-signalling project L Y Lam FIRSE Land Transport Authority, Singapore The Singapore North-South-East-West Line re-signalling project is

More information

MODURBAN MODURBAN. Dan Otteborn, Member of the MODURBAN Supervisory Board

MODURBAN MODURBAN. Dan Otteborn, Member of the MODURBAN Supervisory Board MODURBAN Modular Urban guided Rail systems Dan Otteborn, Member of the MODURBAN Supervisory Board V2 MODURBAN Brief project overview Total Budget: 20 million Project Duration: 51 Months - Jan 2005-March

More information

A SURVEY PAPER ON DRIVERLESS METRO TRAIN

A SURVEY PAPER ON DRIVERLESS METRO TRAIN A SURVEY PAPER ON DRIVERLESS METRO TRAIN 1 Chavan Rohit Dnyaneshwar, 2 Dabhade Swapnil Dilip, 3 Kesbhat Amol Surendra, 4 Nage Mohan Ramadas, 5 Mrs.Gauri. K. Jagtap 1 Chavan Rohit Dnyaneshwar, 2 Dabhade

More information

Using cloud to develop and deploy advanced fault management strategies

Using cloud to develop and deploy advanced fault management strategies Using cloud to develop and deploy advanced fault management strategies next generation vehicle telemetry V 1.0 05/08/18 Abstract Vantage Power designs and manufactures technologies that can connect and

More information

Der ERTMS-Markt außerhalb Europas

Der ERTMS-Markt außerhalb Europas Der ERTMS-Markt außerhalb Europas DR. KLAUS MINDEL www.thalesgroup.com ETCS worldwide market Africa 2 ETCS worldwide market Near middle far East 3 ETCS worldwide market middle south America More information?

More information

The New Development of CTCS in the Intercity Railway SUMMARY 1 INTRODUCTION 2 CTCS OVERVIEW. 2.1 CTCS Levels

The New Development of CTCS in the Intercity Railway SUMMARY 1 INTRODUCTION 2 CTCS OVERVIEW. 2.1 CTCS Levels The New Development of CTCS in the Intercity Railway Anthony Weiqing Xue, Ricardo Rail (Formerly Lloyd s Register Rail) Sara Cui, Ricardo Rail (Formerly Lloyd s Register Rail) Fei Yan, Beijing Jiaotong

More information

SKYWAY AN INNOVATIVE TRANSPORT AND INFRASTRUCTURE SOLUTIONS

SKYWAY AN INNOVATIVE TRANSPORT AND INFRASTRUCTURE SOLUTIONS SKYWAY AN INNOVATIVE TRANSPORT AND INFRASTRUCTURE SOLUTIONS Location above the ground provides several global benefits: fast safe sustainable SKYWAY easily accessible elevated transport system comfortable

More information

Is it worth the candle?

Is it worth the candle? Sustainability for Signalling and Control Systems Projects Is it worth the candle? ASPECT 2012 - Peter Symons Tritun Pty Ltd Trains are Good 910kg greenhouse gas saved p.a. from Brisbane Airport to City

More information

Practices for Energy Sustainability Enhancement in Metro Systems

Practices for Energy Sustainability Enhancement in Metro Systems GREEN TRANSPORTATION Saturday June 4, 2016 - Athens, Hellas George Leoutsakos MSc,DIC,PhD, Deputy Engineering Manager ATTIKO METRO SA gleoutsakos@ametro.gr Elias Chronopoulos MSc,DIC,PhD, Rolling Stock

More information

Intelligent Transportation Systems. Secure solutions for smart roads and connected highways. Brochure Intelligent Transportation Systems

Intelligent Transportation Systems. Secure solutions for smart roads and connected highways. Brochure Intelligent Transportation Systems Intelligent Transportation Systems Secure solutions for smart roads and connected highways Secure solutions for smart roads and connected highways Today s technology is delivering new opportunities for

More information

INTELLIGENT URBAN MOBILITY SOLUTIONS MARTIN ERTL CHIEF INNOVATION OFFICER BOMBARDIER TRANSPORTATION BERLIN,

INTELLIGENT URBAN MOBILITY SOLUTIONS MARTIN ERTL CHIEF INNOVATION OFFICER BOMBARDIER TRANSPORTATION BERLIN, INTELLIGENT URBAN MOBILITY SOLUTIONS MARTIN ERTL CHIEF INNOVATION OFFICER BOMBARDIER TRANSPORTATION BERLIN, 20.06.2013 We take care of cities Challenges and solutions Each city faces diverse challenges

More information

Annex A. to Technical Specification "Operations and traffic management" adopted by

Annex A. to Technical Specification Operations and traffic management adopted by Document version : 1 Annex A to Technical Specification "Operations and traffic management" adopted by Commission Decision 2008/231/EC of 1 st February 2008 concerning the technical specification of interoperability

More information

DC Tarction Power Supply Global product offering for DC traction power supply applications

DC Tarction Power Supply Global product offering for DC traction power supply applications DC RAILWAY INFRASTRUCTURE LINE CARD DC Tarction Power Supply Global product offering for DC traction power supply applications Since decades, ABB supplies worldwide traction power supply systems to deliver

More information

Railway Obsolescence Management Contract

Railway Obsolescence Management Contract Railway Obsolescence Management Contract Olivier Vivancos, Alstom IIOM Conference, June 2017 A complete range of transport solutions ROLLING STOCK Tram, metro, suburban/regional, high speed, very high

More information

A GENERIC FRAMEWORK FOR HAZARD ANALYSIS OF AUTOMATED VEHICLES IN TRANSIT SERVICE

A GENERIC FRAMEWORK FOR HAZARD ANALYSIS OF AUTOMATED VEHICLES IN TRANSIT SERVICE A GENERIC FRAMEWORK FOR HAZARD ANALYSIS OF AUTOMATED VEHICLES IN TRANSIT SERVICE PROPOSED TRB, FEDERAL AGENCY AND ITS / AUTOMOTIVE INDUSTRY COLLABORATION J. Sam Lott, Kimley-Horn and Associates, Inc. Shared

More information

Amtrak Signal and Train Control Systems PRACTICAL PTC. On Amtrak Owned Property. November 20, 2008

Amtrak Signal and Train Control Systems PRACTICAL PTC. On Amtrak Owned Property. November 20, 2008 Amtrak Signal and Train Control Systems PRACTICAL PTC On Amtrak Owned Property November 20, 2008 PRACTICAL POSITIVE TRAIN CONTROL on Amtrak ACSES / ATC in the Northeast Corridor + ITCS for the Emerging

More information

The purpose of the paper is to present the benefits of this free-propagation DCS for Mass Transit applications.

The purpose of the paper is to present the benefits of this free-propagation DCS for Mass Transit applications. starts Siemens Transportation Systems - News and Trends No. 4 - May 2006 Siemens Airlink Free-propagation CBTC Radio for Improved Service operation In comparison with systems using wire techniques, this

More information

Jumper cables for durability, flexibility and multiple functions

Jumper cables for durability, flexibility and multiple functions Jumper cables for durability, flexibility and multiple functions exans, worldwide leader in cables and cabling systems As a global expert in cables and cabling systems, Nexans brings an extensive range

More information

Shaping the Future of Railway Industry Student Engagement Event 20 th September 2016

Shaping the Future of Railway Industry Student Engagement Event 20 th September 2016 Shaping the Future of Railway Industry Student Engagement Event 20 th September 2016 Siemens Mobility Head of Product Sales Bülent Yilmaz ~Product Line Manager - Alex Moffatt BSC Hon. ~Team Leader EM Eng.

More information

Mechanical Trainstop Systems

Mechanical Trainstop Systems Mechanical Trainstop Systems Synopsis This document defines the functional requirements for mechanical trainstop systems and the requirements relating to their use on both track and trains. Signatures

More information

Review of the state-of-the-art of Train Control Systems Technology in the world and comparative study on the most important 3-4 of them

Review of the state-of-the-art of Train Control Systems Technology in the world and comparative study on the most important 3-4 of them Review of the state-of-the-art of Train Control Systems Technology in the world and comparative study on the most important 3-4 of them Project Team João ALMEIDA (CP - jcdalmeida@mail.cp.pt ) David DE

More information

The design and implementation of a simulation platform for the running of high-speed trains based on High Level Architecture

The design and implementation of a simulation platform for the running of high-speed trains based on High Level Architecture Computers in Railways XIV Special Contributions 79 The design and implementation of a simulation platform for the running of high-speed trains based on High Level Architecture X. Lin, Q. Y. Wang, Z. C.

More information

Satellite navigation traffic control system for low traffic lines Actual status and future deployment in Romania

Satellite navigation traffic control system for low traffic lines Actual status and future deployment in Romania Satellite navigation traffic control system for low traffic lines Actual status and future deployment in Romania Teodor Gradinariu UIC Burkhard Stadlmann Wels University, Austria Ioan Nodea RCCF, Romania

More information

Technological systems for High Speed lines, ERTMS, security, power systems. Renato Casale Italferr (FS Group), Italy

Technological systems for High Speed lines, ERTMS, security, power systems. Renato Casale Italferr (FS Group), Italy Technological systems for High Speed lines, ERTMS, security, power systems Renato Casale Italferr (FS Group), Italy 1 Technological systems for High Speed lines Signalling Power supply Safety and security

More information

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update

SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update MEETING DATE: August 31, 2005 SUBJECT: Russell Hill Subway Train Accident Of August 11, 1995 Due Diligence Checklist Update RECOMMENDATION It is recommended that the Commission: i) Receive for information

More information

Controlling the Speed of Tilting Trains Through Curves

Controlling the Speed of Tilting Trains Through Curves Controlling the Speed of Tilting Trains Through Curves Synopsis This document mandates the means by which Tilting Trains may be operated at higher speeds than nontilting trains around curves. Signatures

More information

ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS

ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS CONTACT: Adif International Department Sor Ángela de la Cruz, 3 28020, Madrid, Spain +34 917 744 247 adifinternational@adif.es international.adif.es ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS CUTTING-EDGE

More information

Reducing Vehicle Use in Megacities Johanna Partin, N. America Regional Director Transportation and Energy Conference August 8, 2013

Reducing Vehicle Use in Megacities Johanna Partin, N. America Regional Director Transportation and Energy Conference August 8, 2013 Reducing Vehicle Use in Megacities Johanna Partin, N. America Regional Director Transportation and Energy Conference August 8, 2013 1 1 Megacities and Climate Change 2 C40 Cities Climate Leadership Group

More information

Near-Term Automation Issues: Use Cases and Standards Needs

Near-Term Automation Issues: Use Cases and Standards Needs Agenda 9:00 Welcoming remarks 9:05 Near-Term Automation Issues: Use Cases and Standards Needs 9:40 New Automation Initiative in Korea 9:55 Infrastructure Requirements for Automated Driving Systems 10:10

More information

Sustainable Railway Solutions

Sustainable Railway Solutions Siemens Ltd., China Infrastructure & Cities Sector Rail Systems Head Office Beijing 7, Wangjing Zhonghuan Nanlu, Chaoyang District, 100102, Beijing Tel.: +86 10 6476 8888 Fax: +86 10 6476 4890 Branch Office

More information

Vernon G. Hartsock, PMP Deputy Chief / Chief Engineer Maryland Transit Administration. Tedd L. Snyder, P.E. Senior System Engineer CH2M Hill

Vernon G. Hartsock, PMP Deputy Chief / Chief Engineer Maryland Transit Administration. Tedd L. Snyder, P.E. Senior System Engineer CH2M Hill Baltimore Metro Retrofit A Combined Train Control and Railcar Procurement Vernon G. Hartsock, PMP Deputy Chief / Chief Engineer Maryland Transit Administration Tedd L. Snyder, P.E. Senior System Engineer

More information

Smart transit system and e-mobility technologies for the GCC s railway aspirations

Smart transit system and e-mobility technologies for the GCC s railway aspirations Smart transit system and e-mobility technologies for the GCC s railway aspirations Serge Van Themsche Vice President, Europe, Middle East, Africa & Brazil Systems Division, Bombardier Transportation GCC

More information

Singapore Northeast Line:

Singapore Northeast Line: Singapore Northeast Line: will soon be the largest, fully automatic metro system in the world Transport Project Story A SPECIFIC NEED Singapore seeks its ideal transport system Contents A specific need

More information

Mr. Preetam Ganguly. AXONIS Mobility Solution for SMART Cities

Mr. Preetam Ganguly. AXONIS Mobility Solution for SMART Cities Mr. Preetam Ganguly AXONIS Mobility Solution for SMART Cities Agenda of the Presentation Alstom Introduction Procurement models Alstom Solution for Urban Mobility - AXONIS Conclusion 2 Alstom Transport:

More information

Sneak Circuit Analysis: Lessons Learned from Near Miss Event

Sneak Circuit Analysis: Lessons Learned from Near Miss Event Sneak Circuit Analysis: Lessons Learned from Near Miss Event James Li Centre of Competence for Mass Transit AME, Bombardier Transportation, Kingston, Canada Email: james.li@rail.bombardier.com (Received

More information

DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE. 29 March Jean-Pierre ORSI Director Europe SYSTRA

DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE. 29 March Jean-Pierre ORSI Director Europe SYSTRA DESIGN AND BUILD A HIGH SPEED RAILWAY: THE FRENCH EXPERIENCE Jean-Pierre ORSI Director Europe SYSTRA 1 Fundamental parameters of the Trans-European high speed railway system. Speed increase on conventional

More information

Alberto Castagnoli Ansaldo STS Business Development Transportation Solutions BU

Alberto Castagnoli Ansaldo STS Business Development Transportation Solutions BU An Innovative Solution for a Sustainable Urban Mobility: Tram Wave, The Ansaldo STS Catenary-Free Proposal Alberto Castagnoli Ansaldo STS Business Development Transportation Solutions BU The Challenge

More information

Automation in Mining. Underground mining automation project Mark Yseboodt Chile November siemens.com/mining. Restricted Siemens AG 2016

Automation in Mining. Underground mining automation project Mark Yseboodt Chile November siemens.com/mining. Restricted Siemens AG 2016 Automation in Mining Underground mining automation project Chile Restricted Siemens AG 2016 siemens.com/mining Automation in Mining: Underground project Table of content Introduction 3 Block Cave 6 Deep

More information

INFRASTRUCTURE SYSTEMS FOR INTERSECTION COLLISION AVOIDANCE

INFRASTRUCTURE SYSTEMS FOR INTERSECTION COLLISION AVOIDANCE INFRASTRUCTURE SYSTEMS FOR INTERSECTION COLLISION AVOIDANCE Robert A. Ferlis Office of Operations Research and Development Federal Highway Administration McLean, Virginia USA E-mail: robert.ferlis@fhwa.dot.gov

More information

Electric buses Solutions portfolio

Electric buses Solutions portfolio Electric buses Solutions portfolio new.abb.com/ev-charging new.abb.com/grid/technology/tosa Copyright 2017 ABB. All rights reserved. Specifications subject to change without notice. 9AKK107045A5045 / Rev.

More information

Modern rail vehicles for mass transit systems

Modern rail vehicles for mass transit systems Siemens at the UITP World Congress 2013 Modern rail vehicles for mass transit systems Sandra Gott-Karlbauer, CEO Urban Transport Urban Transport answers the mobility demands of cities - today and tomorrow

More information

INTRODUCTION Automatic block signaling provides for the safe operation of trains based upon the capabilities of the engine driver. Unpredictable human

INTRODUCTION Automatic block signaling provides for the safe operation of trains based upon the capabilities of the engine driver. Unpredictable human INTRODUCTION Automatic block signaling provides for the safe operation of trains based upon the capabilities of the engine driver. Unpredictable human failures, however, may negate such protection. It

More information

CA PACITY TRA MWAY. November CODATU XVII High capacity tramway November

CA PACITY TRA MWAY. November CODATU XVII High capacity tramway November CODA TU XVII HIGH CA PACITY TRA MWAY November 2017 CODATU XVII High capacity tramway November 2017 1 EGIS, A GLOBAL OFFER CODATU XVII High capacity tramway November 2017 2 EGIS & LIGHT RAIL TRANSIT European

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Setting Back or Propelling on Running Lines Rule Number: 4015 Version 1.0, 31 March 2016 Setting Back or Propelling on Running Lines Rule Number: 4015 Document

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Shunting and Marshalling Rule Number: 4013 Version 1.0, 31 March 2016 Shunting and Marshalling Rule Number: 4013 Document Control Identification Document title

More information

BYD SkyRail Elevate Your Commute, Elevate Your Life

BYD SkyRail Elevate Your Commute, Elevate Your Life BYD SkyRail Elevate Your Commute, Elevate Your Life 1800 S Figueroa St. Los Angeles, CA 90015 BYD COMPANY LIMITED Facebook.com/bydcompany Twitter.com/bydcompany Youtube.com/bydcompany www.byd.com 1(800)

More information

A new perspective. The Kalmar RTG range.

A new perspective. The Kalmar RTG range. A new perspective. The range. All new s enable you to take advantage of automating some or all of your processes; from remote control to fully automated moves. Securing the future of your business. s extensive

More information

Railroad Technology. As the basis for a Skype virtual SIG Presentation Ken Sandock

Railroad Technology. As the basis for a Skype virtual SIG Presentation Ken Sandock Railroad Technology As the basis for a Skype virtual SIG Presentation Ken Sandock 10-1-14 Railroad technology has always been at the forefront of engineering: Steam Hydraulic Pneumatic Electrical Electronic

More information

ABB FACTS Customer Service. FACTS Care Upgrades

ABB FACTS Customer Service. FACTS Care Upgrades ABB FACTS Customer Service FACTS Care Upgrades 2 FACTS Care Upgrades ABB FACTS FACTS Care ABB is a pioneer and the recognized market leader in the FACTS field. Developments move quickly, technical know-how

More information

SYSTEM INTEGRATION. Railway and urban transport electrification Energy-efficient and reliable solutions

SYSTEM INTEGRATION. Railway and urban transport electrification Energy-efficient and reliable solutions SYSTEM INTEGRATION Railway and urban transport electrification Energy-efficient and reliable solutions 2 R A I LWAY & U R B A N T R A N S P O R T E L E C T R I F I C AT I O N S O L U T I O N S ABB s substation

More information

Modal Choice for Mass Rapid Transit

Modal Choice for Mass Rapid Transit Modal Choice for Mass Rapid Transit Session 1: Public Transport Beyond BRT - Light Rail Transit or Metro Niklas Sieber (PhD) and Olaf Scholz-Knobloch Transport Training Initiative TTi International Urban

More information

Platform Steering Group #11 The Italian feedback from the field (ERTMS lines in commercial operation)

Platform Steering Group #11 The Italian feedback from the field (ERTMS lines in commercial operation) Platform Steering Group #11 The Italian feedback from the field (ERTMS lines in commercial operation) LILLE - Valenciennes, - E R A February, the 5 th - 2009 Overview 1. Italian ETCS high speed lines in

More information

Rule Book, Section 1 Revised June 26, 2011

Rule Book, Section 1 Revised June 26, 2011 February 2012 Rule Book, Section 1 Revised June 26, 2011 UTA TRAX Pre-Test Study Guide TRAX personnel must be able to communicate clearly in English and understand the specialized language of our business.

More information

Building smart transport in Moscow

Building smart transport in Moscow Building smart transport in Moscow Moscow addressed its road and public transit congestion problems and developed one of the world s smartest and most-used public transportation systems. Here s how. Maksim

More information

E61, E63, E64, E70, E81, E87, E90, E91, E92, E93 BMW AG - TIS

E61, E63, E64, E70, E81, E87, E90, E91, E92, E93 BMW AG - TIS VS-42 es Baugruppe/Group: 32 meeknet.co.uk/e64 32 01 03 (001) Active Steering E60, E61, E63, E64, E70, E81, E87, E90, E91, E92, E93 weltweit Datum/Date: 04/2003 Update: 02/2007 Introduction Active Steering

More information

Terminology. Glossary of Railway. Glossary of Railway Terminology

Terminology. Glossary of Railway. Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Glossary of Railway Terminology Issue 1 07 June 2014 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Contents approved

More information

Overview of Transit Projects in the Transportation Investment Act in MARTA Jurisdictions. June 11, 2012

Overview of Transit Projects in the Transportation Investment Act in MARTA Jurisdictions. June 11, 2012 Overview of Transit Projects in the Transportation Investment Act in MARTA Jurisdictions June 11, 2012 TIA-023: I-20 East $ 225 million Project will construct bus P&R intended to be future rail stations

More information

Runaway and derailment of a rail vehicle near Bury, Greater Manchester, 22 March 2016

Runaway and derailment of a rail vehicle near Bury, Greater Manchester, 22 March 2016 Independent report Runaway and derailment of a rail vehicle near Bury, Greater Manchester, 22 March 2016 1. Important safety messages This accident demonstrates the importance of: ensuring that trains

More information

TPWS in action. Decisive steps towards main line ATP on IR. Akhilesh Yadav, Director/ Signal/ RDSO

TPWS in action. Decisive steps towards main line ATP on IR. Akhilesh Yadav, Director/ Signal/ RDSO TPWS in action Decisive steps towards main line ATP on IR Akhilesh Yadav, Director/ Signal/ RDSO Outline of presentation 1. IR requirements for ATP 2. Roadmap 3. Current installations 4. Lessons learnt

More information

ALSTOM Supplier Forum Metronet Rail Cars. December 13, 2017

ALSTOM Supplier Forum Metronet Rail Cars. December 13, 2017 ALSTOM Supplier Forum Metronet Rail Cars December 13, 2017 Agenda Welcome & Introduction - Dominic Clark Alstom Sourcing process and program for the Metronet Project- Tommy Famuliak & Ilan Le-Peutrec Local

More information

IRSE CBTC SEMINAR Toronto Canada, December 1, LUNCHEON ADDRESS By Dr. Alan F. Rumsey, P.Eng., FIRSE ARE YOU A VISIONARY OR A SKEPTIC?

IRSE CBTC SEMINAR Toronto Canada, December 1, LUNCHEON ADDRESS By Dr. Alan F. Rumsey, P.Eng., FIRSE ARE YOU A VISIONARY OR A SKEPTIC? IRSE CBTC SEMINAR Toronto Canada, December 1, 2016 LUNCHEON ADDRESS By Dr. Alan F. Rumsey, P.Eng., FIRSE ARE YOU A VISIONARY OR A SKEPTIC? Are you a person who embraces change, with original ideas about

More information

Tires are available in a number of sizes and tread patterns dependent on the vehicle usage. Tire sizes are as follows:

Tires are available in a number of sizes and tread patterns dependent on the vehicle usage. Tire sizes are as follows: Published: Jan 26, 2005 Wheels and Tires GENERAL A number of alloy wheel and tire size combinations are available. A Tire Pressure Monitoring System (TPMS) is also available. This system monitors the pressure

More information

Automotive Electronics/Connectivity/IoT/Smart City Track

Automotive Electronics/Connectivity/IoT/Smart City Track Automotive Electronics/Connectivity/IoT/Smart City Track The Automobile Electronics Sessions explore and investigate the ever-growing world of automobile electronics that affect virtually every aspect

More information

Auxiliary Power Systems. Delivering the power as you need

Auxiliary Power Systems. Delivering the power as you need Auxiliary Power Systems Delivering the power as you need Our know-how at the heart of auxiliaries Today s trains are equipped with an increasing number of electrical auxiliaries to boost thermal comfort,

More information

Case Study STREAMS SMART MOTORWAYS

Case Study STREAMS SMART MOTORWAYS Case Study STREAMS SMART MOTORWAYS One of the key challenges facing road agencies today is maximising road network efficiency while reducing impacts on the community. Increasingly, road agencies are turning

More information

TRIMOD HE UPS. MODULAR THREE-PHASE UPS from 10 to 80 kw THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

TRIMOD HE UPS. MODULAR THREE-PHASE UPS from 10 to 80 kw THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES TRIMOD HE UPS MODULAR THREE-PHASE UPS from 10 to 80 kw THE GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES TRIMOD HE HIGH performance HIGH efficiency LOW environmental impact DEVELOPMENTS

More information

ERDF LINKY PROGRAM. The rollout of smart meters in France 02/11/2015

ERDF LINKY PROGRAM. The rollout of smart meters in France 02/11/2015 ERDF LINKY PROGRAM The rollout of smart meters in France 02/11/2015 ERDF The main French DSO Electricity distribution is a regulated activity, overseen by the French Energy Regulatory Commission(CRE).

More information

Kathrine Wilson-Ellis Strategic Safety Team. Phil Proctor Future Technologies

Kathrine Wilson-Ellis Strategic Safety Team. Phil Proctor Future Technologies Kathrine Wilson-Ellis Strategic Safety Team Phil Proctor Future Technologies Who are we? 1 st April 2015 Highways England is a public sector company, owned by the Government Primary role of Highways England

More information

Electrified Transportation. Sujeet Mishra,

Electrified Transportation. Sujeet Mishra, Electrified Transportation Sujeet Mishra, IRSEE sujeet@sujeet.org @sujeetmishra Few Quick Points Electricity is transportation is almost as old as electricity In modern context, for a developing economy

More information

Application and Development of CTCS

Application and Development of CTCS Application and Development of CTCS China Railway Corporation Zhao Yang Feb. 2016 Contents I. The Application of CTCS II. The Optimization and the Improvement of CTCS III. Conclusion I. The Application

More information

How do you make your vehicles fit for the future?

How do you make your vehicles fit for the future? How do you make your vehicles fit for the future? Refurbishment and accident repair Enhancing the attractiveness of your vehicles Answers for mobility. 1 2 Today and tomorrow: Guaranteed availability Reduced

More information

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan

Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, SUBJECT: Scarborough Rt Strategic Plan Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: August 30, 2006 SUBJECT: Scarborough Rt Strategic Plan RECOMMENDATIONS It is recommended that the Commission: 1. Endorse

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures s Rule Number: 3025 Version 1.0, 31 March 2016 Temporary Speed Restrictions Rule Number: 3025 Document Control Identification Document title Number Version Date

More information

Integrated & Green Mobility

Integrated & Green Mobility Bonn-Chengdu Partnership for Sustainable Low-Carbon Development, 22.10.2013, Chengdu Integrated & Green Mobility Mr. Zheng Gang Answers for infrastructure and cities. Improving traffic efficiency is the

More information

Course Code: Bendix Wingman Fusion System Overview Study Guide

Course Code: Bendix Wingman Fusion System Overview Study Guide Course Code: 8792 Bendix Wingman Fusion System Overview Study Guide 2015 Navistar, Inc. 2701 Navistar Drive, Lisle, IL 60532. All rights reserved. No part of this publication may be duplicated or stored

More information

Cybercars : Past, Present and Future of the Technology

Cybercars : Past, Present and Future of the Technology Cybercars : Past, Present and Future of the Technology Michel Parent*, Arnaud de La Fortelle INRIA Project IMARA Domaine de Voluceau, Rocquencourt BP 105, 78153 Le Chesnay Cedex, France Michel.parent@inria.fr

More information

The Barcelona transport system: plans to automate the metro and new technologies to improve customer service

The Barcelona transport system: plans to automate the metro and new technologies to improve customer service The Barcelona transport system: plans to automate the metro and new technologies to improve customer service By Michael Pellot Director of International Affairs Index Introduction: Barcelona Public Transport

More information

Railway Infrastructure. Competent Solutions for Electric Railways and Tramways. the power connection THE PFISTERER GROUP

Railway Infrastructure. Competent Solutions for Electric Railways and Tramways. the power connection THE PFISTERER GROUP Competent Solutions for Electric Railways and Tramways THE PFISTERER GROUP the power connection Solutions for Today s and Future Challenges Reliable and maintenance-free infrastructure provides the basis

More information

Wikov Flexible-pin Gearboxes for Industrial Applications

Wikov Flexible-pin Gearboxes for Industrial Applications Wikov Flexible-pin Gearboxes for Industrial Applications By Jan Vosatka, Wikov Industry a.s. and Vilem Rosko, Orbital2 Ltd. Introduction Various industrial driven machines are demanding continuous powertrain

More information

Transportation Solution. Onboard Surveillance

Transportation Solution. Onboard Surveillance Transportation Solution Onboard Surveillance VIVOTEK Transportation Solution Successful Deployments Around The World About VIVOTEK VIVOTEK is a premium brand in the global security market and an expert

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Handsignals and Verbal Commands Rule Number: 2003 Version 1.0, 31 March 2016 Handsignals and Verbal Commands Rule Number: 2003 Document Control Identification Document

More information

Chapter 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes

Chapter 4. HS2 Route Capacity and Reliability. Prepared by Christopher Stokes Chapter 4 HS2 Route Capacity and Reliability Prepared by Christopher Stokes 4 HS2 ROUTE CAPACITY AND RELIABILITY Prepared by Christopher Stokes 4.1 This chapter relates to the following questions listed

More information