July 24, Project IR

Size: px
Start display at page:

Download "July 24, Project IR"

Transcription

1 July 24, 2017 Project IR Maria Pope Manager, Facilities Operation and Maintenance John Wayne Airport, Orange County 3160 Airway Avenue Costa Mesa, California Re: Central Utility Plant Operating Cost Analysis Dear Ms. Pope: Amec Foster Wheeler Environment & Infrastructure, Inc. (Amec Foster Wheeler) performed an analysis to compare estimated costs associated with two scenarios for supplying electricity and air conditioning to Landside facilities (terminals and parking structures) at John Wayne Airport (JWA). This analysis was authorized by JWA under Task Order 4J-01 dated September 23, The following sections of this letter summarize the objective, background, basis, and results of the analysis. OBJECTIVE Currently, most of the electricity and air conditioning used in JWA Landside facilities and operations are supplied by the JWA Central Utility Plant (). If the were not in operation (e.g., permanently shut down), all electricity would have to be purchased from a public utility (Southern California Edison [SCE]), and JWA would need to maintain and operate an air conditioning plant powered by purchased electricity. The objective of this analysis was to compare the costs associated with continued operation of the with costs associated with providing electricity and air conditioning to Landside facilities by obtaining electricity from SCE. The analysis entailed a review of current (2016) electricity generation and air conditioning costs, and a comparison of those costs with the estimated costs that would be incurred for electricity and air conditioning if the were not in operation. BACKGROUND JWA began operation of the in The produces chilled water (used for air conditioning of the terminals) and generates electricity for the terminal buildings and parking structures. Without the, all electricity would have to be obtained from SCE, and JWA would have to maintain and operate the electric chillers in the to produce air conditioning for the terminals. The has been in operation for over six years. During this time, operations and cost data have been collected and operations have been optimized to produce more reliable and efficient electricity and air conditioning. In accordance with the current Interconnect Agreement between JWA and SCE (required by Public Utilities Commission Rules), JWA must import a minimum amount of electricity (at least 200 kilowatts) at all times. The Interconnect Agreement Amec Foster Wheeler Environment & Infrastructure, Inc. 121 Innovation Drive, Suite 200 Irvine, CA USA Tel (949) Fax (949) Page 1 of 15

2 Maria Pope John Wayne Airport July 24, 2017 Page 2 establishes the electricity import rate structure, which is classified as a Time-Of-Use (TOU) Schedule 8-B-S (Standby, Option B). During the winter months (October through May) the (along with the mandatory 200 kw import) can supply all electrical needs of the airport. However, during the summer months, the airport s electricity and air condition demands are greater and the cannot supply all of the electricity needed. Therefore, during the summer months some additional electricity (above the mandatory 200 kw) is purchased from SCE. The relies mainly on the use of lithium bromide absorption chillers to supply chilled water for airport air conditioning needs. The absorption chillers produce chilled water by recovery of waste heat from the generation of electricity. Thereby, air conditioning is produced using recovered heat, rather than by use of electricity. However, if the electric generators were shut down, terminal air conditioning would have to be supplied fully by the electrical chillers (which rely completely on electricity). If the were shut down, all of JWA s electricity would be supplied by SCE. Because there would no longer be an Interconnect Agreement with SCE (Interconnect Agreement is only allowed with self-generating electric facilities), JWA would import all electricity under a TOU-8 Critical Peak Pricing (CPP) commercial rate schedule, rather than a TOU-8-B-S rate schedule. COST ANALYSIS BASIS An analysis was performed to compare the costs of continuing to operate the with the costs of shutting down the electricity generation portion of the, continuing to operate the electric chillers and cooling tower, and obtaining all required electricity from SCE. Key factors that would result in cost differences between the two scenarios are listed below in Table 1. TABLE 1 Key Factors Accounting for Cost Differences Factor SCE Electricity Import Rate TOU-8-S (Option B) TOU-8-CPP Schedule Electricity Import Amount Air Conditioning Production Import 200 kilowatts at all times (minimum), sometimes higher in summer months Lithium Bromide Adsorption Chillers using heat recovery (mainly), electric chillers as needed Fuel (Natural Gas) Usage High None Operator Requirements Full time Part time Equipment Maintenance High Low SCE Departing Load Charge Yes None Import all electricity required by the airport Landside facilities and operations Electric Chillers (always); no lithium bromide adsorption chillers P:\164420\Docs\ Cost Analysis\July 24, 2017\Central Utility Plant Operating Cost Analysis.docx Page 2 of 15

3 Maria Pope John Wayne Airport July 24, 2017 Page 3 COST ANALYSIS RESULTS Electricity costs associated with both scenarios are broken down into two seasons: summer and winter. Summer rates (consisting of the four months of June-September) for electricity are significantly higher than winter rates (consisting of the eight months of October-May) under both SCE rate schedules. The cost analysis indicates that continued operation of the would be much less expensive than operation of the electric chillers and cooling tower (no ) in the summer months. This is due to the higher SCE electricity rates in the summer. It also indicates that continued operation of the would be less expensive than purchasing electricity in the winter months (all months other than the summer months), although not to the same extent as in the summer months. Table 2 below summarizes estimated costs associated with the two scenarios. Costs associated with the scenario are based upon actual data from year 2016 (as provided in Appendix A), with the exception of the major overhaul costs. Major overhaul costs are estimated based upon the past and predicted costs to maintain the for the life of the plant, as a yearly average. Costs associated with the no scenario are based upon estimated electricity use rates and their associated rate schedule, and estimated labor, parts, and maintenance costs to maintain the chillers and cooling towers (including both JWA labor and contractor labor). No other factors, such as those that may be associated with inflation, property taxes, insurance, etc., have been included in the cost estimates. TABLE 2 Annual Operating Costs versus Item Electricity $1,846,405 1 $6,761,652 Operators $1,666,710 1 $291,200 Fuel (Natural Gas) $835,253 1 $0 Major Overhauls (averaged over life of the plant) $400,000 $0 Chiller Plant and Cooling Tower Operation & Included in $125,000 Maintenance Operators Cost Annual Total $4,748,368 $7,177,852 Annual Difference $2,429,485 Note: 1 Costs are based upon actual billings or contracts for year P:\164420\Docs\ Cost Analysis\July 24, 2017\Central Utility Plant Operating Cost Analysis.docx Page 3 of 15

4 Maria Pope John Wayne Airport July 24, 2017 Page 4 CONCLUSION The annual estimated costs to continue operating the are significantly lower than the estimated costs associated with the shutdown the. The annual estimated cost saving for continued operation of the is $2,429,485. Amec Foster Wheeler appreciates this opportunity to provide services to JWA. Please contact Robert Romansik at (949) should you have any questions regarding this letter. Sincerely, Amec Foster Wheeler Environment & Infrastructure, Inc. Robert Romansik Principal - Chemical Duane Paul, P.G. Senior Associate Hydrogeologist Enclosure Appendix A: Supporting Data P:\164420\Docs\ Cost Analysis\July 24, 2017\Central Utility Plant Operating Cost Analysis.docx Page 4 of 15

5 APPENDIX A Supporting Data Page 5 of 15

6 Electric Import April-16 Total Electricity used (kwh) 1,785, , ,340 1,005, ,440 2,126,411 Reactive Usage (kvarh) 782, , , ,611 Maximum 4,928 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 1,888 1,044 1,064 2,108 On peak Mid peak Off peak Mid peak 264, ,016 1,005, ,440 2,126,411 Off peak 1,520,544 0 On peak Mid peak Off peak Mid peak 2,720 3,200 1,050 Off peak 4, Quantity Rate Cost SCE Import Quantity Rate Cost Demand - Facility Related 6,450 $18.34 $ 118, On peak $ Mid peak $ Off peak $ Mid peak 264,784 $ $4, ,391,195 $ $55, Off peak 1,520,544 $ $27, ,520,544 $ $35, bond charge (kwh) 1,785, $9, ,911, $21, Customer charge $ $ $ Power factor charge (kvar) 1,888 $ $ $ $2, Capacity reservation charge $56, energy credit (kwh) 1,785, $ On peak 0 $18.97 Mid peak 0 $3.58 On peak $ Mid peak $ Off peak $ Mid peak $12, ,391,195 $ $109, Off peak 1,520,544 $ $49, ,520,544 $ $55, s-backup on peak Mid peak Subtotal for billing month $ 161, Sate tax $ ,911, $1, Total monthly bill $161, SCE monthly bill $161, DEPARTING LOAD $38, Total monthly cost $200, $399, Cost Difference between vs $198, Page 6 of 15

7 May-16 Total Electricity used (kwh) 1,813, , , , ,532 1,888,526 Reactive Usage (kvarh) 803, , , ,171 Maximum 5,216 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 1, ,822 On peak Mid peak Off peak Mid peak 283, , , ,532 1,888,526 Off peak 1,530,624 0 On peak Mid peak Off peak Mid peak 4,288 3,200 1,050 Off peak 5,216 Demand - Facility Related 6,450 $ $ 95, On peak $ Mid peak $ Off peak $ Mid peak 283,136 $ $5, ,171,662 $ $50, Off peak 1,530,624 $ $27, ,530,624 $ $35, bond charge (kwh) 1,813, $9, ,702, $19, Customer charge $ $ $ Power factor charge (kvar) 1,888 $ $ $ $1, Capacity reservation charge $56, energy credit (kwh) 1,813, $ On peak 0 $ $122, Mid peak 0 $ 3.58 $18, On peak $ Mid peak $ Off peak $ Mid peak $13, ,171,662 $ $ 99, Off peak 1,530,624 $ $49, ,530,624 $ $55, s-backup on peak Mid peak Subtotal for billing month $162, Sate tax $ $ $ Total monthly bill $163, SCE monthly bill $163, DEPARTING LOAD $38, Total monthly cost of SCE $202, $500, Cost Difference between vs $297, Page 7 of 15

8 June-16 Total Electricity used (kwh) 807,456 2,567,707 1,079,086 4,516, ,060 7,202,334 Reactive Usage (kvarh) 639,832 2,034,663 3,578,950 5,613,613 Maximum 4,832 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 1,856 5,902 10,382 16,284 On peak 32, ,262 1,806, , ,451,919 Mid peak 60, ,904 1,806, , ,656, Off peak 320,296 1,026, , ,929,559 Mid peak 26,912 0 Off peak 366,672 0 On peak 896 4,800 1,650 Mid peak 1,728 4,800 1,650 Off peak 4,512 3,200 1,050 Mid peak 1,440 Off peak 4,832 Demand - Facility Related 6,450 $ $ 118, On peak 32,896 $ $ ,484,815 $ $58, Mid peak 60,680 $ $ ,717,241 $ $63, Off peak 320,296 $ $4, ,249,855 $ $52, Mid peak 26,912 $ $ ,912 $ $ Off peak 366,672 $ $6, ,672 $ $8, bond charge (kwh) 807, $4, , $4, Customer charge $ $ $ Power factor charge (kvar) 1,856 $ $ Power factor charge (kvar) 1,856 $ $ $ $9, Capacity reservation charge $59, energy credit (kwh) 807, $ On peak 6,450 $ $122, Mid peak 6,450 $ 3.58 $23, On peak 32,896 $ $2, ,484,815 $ $175, Mid peak 60,680 $ $2, ,717,241 $ $128, Off peak 320,296 $ $9, ,249,855 $ $71, Mid peak $1, ,912 $ $1, Off peak 366,672 $ $11, ,672 $ $13, s-backup on peak 896 $ $8, Mid peak 1,728 $ $2, Subtotal for billing month $116, Sate tax $ ,456 $ $ Total monthly bill $116, SCE monthly bill $116, DEPARTING LOAD $38, Total monthly cost of SCE $155, $851, Cost Difference between vs $696, Page 8 of 15

9 July-16 Total Electricity used/produced (kwh) 593,200 2,727,630 1,096,826 4,590, ,633 7,465,082 Reactive Usage (kvarh) 552,496 2,540,466 4,275,808 6,816,274 Maximum 3,232 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 1,440 6,621 11,144 17,766 On peak 44, ,775 1,836, , ,384,419 Mid peak 83, , ,836, , ,555, Off peak 464,808 1,635, , ,553,458 Mid peak 0 0 Off peak 0 0 On peak 1,504 4,800 1,650 Mid peak 1,824 4,800 1,650 Off peak 3,232 3,200 1,050 Mid peak 0 Off peak 0 Demand - Facility Related 6,450 $ $ 118, On peak 44,768 $ $ ,429,187 $ $56, Mid peak 83,624 $ $1, ,638,656 $ $61, Off peak 464,808 $ $7, ,018,266 $ $70, Mid peak 0 $ Off peak 0 $ bond charge (kwh) 593, $3, , $3, Customer charge $ $ $ Power factor charge (kvar) 0 $ Power factor charge (kvar) 1,440 $ $ $ $10, Capacity reservation charge $59, energy credit (kwh) 593, $ On peak 6,450 $ $122, Mid peak 6,450 $ 3.58 $23, On peak 44,768 $ $2, ,429,187 $ $171, Mid peak 83,624 $ $3, ,638,656 $ $124, Off peak 464,808 $ $13, ,018,266 $ $95, Mid peak $ Off peak 0 $ $ s-backup on peak 1,504 $ $16, Mid peak 1,824 $ $3, Subtotal for billing month $112, Sate tax $ ,200 $ $ Total monthly bill $112, SCE monthly bill $112, DEPARTING LOAD $37, Total monthly cost of SCE $150, $859, Cost Difference between vs $708, Page 9 of 15

10 August-16 Total Electricity used (kwh) 296,720 2,736,722 1,014,545 1,036, ,406 3,950,157 Reactive Usage (kvarh) 96, , ,926 1,226,932 Maximum 2,208 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 928 8,559 3,240 11,799 On peak 33, , , , ,139,870 Mid peak 54, , , , ,317, Off peak 208,720 1,451, , ,658,366 Mid peak 0 0 Off peak 0 0 On peak 1,280 4,800 1,650 Mid peak 1,120 4,800 1,650 Off peak 2,208 3,200 1,050 Mid peak 0 Off peak 0 Demand - Facility Related 6,450 $ $ 118, On peak 33,096 $ $ ,172,966 $ $27, Mid peak 54,792 $ $ ,372,312 $ $32, Off peak 208,832 $ $3, ,867,198 $ $43, Mid peak 0 $ $ Off peak 0 $ $ bond charge (kwh) 296, $1, , $1, Customer charge $ $ $ Power factor charge (kvar) 0 $ Power factor charge (kvar) 928 $ $ $ $7, Capacity reservation charge $59, energy credit (kwh) 296, $65.28 On peak 6,450 $ $122, Mid peak 6,450 $ 3.58 $23, On peak 33,096 $ $2, ,172,966 $ $82, Mid peak 54,792 $ $2, ,372,312 $ $64, Off peak 208,832 $ $5, ,867,198 $ $59, Mid peak $ Off peak 0 $ $ s-backup on peak 1,280 $ $13, Mid peak 1,120 $ $2, Subtotal for billing month $93, Sate tax $ ,720 $ $86.05 Total monthly bill $93, SCE monthly bill $93, DEPARTING LOAD $36, Total monthly cost of SCE $130, $582, Cost Difference between vs $452, Page 10 of 15

11 September-16 Total Electricity used (kwh) 282,616 2,515,847 1,264,976 5,294,619 64,009 7,874,476 Reactive Usage (kvarh) 95, ,245 1,791,451 2,642,695 Maximum 1,568 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 352 3,134 6,594 9,728 On peak 32, ,283 2,117, , ,649,135 Mid peak 50, , ,117, , ,133, Off peak 199,304 1,032,230 1,058, ,091,154 Mid peak 0 0 Off peak 0 0 On peak 1,376 4,800 1,650 Mid peak 992 4,800 1,650 Off peak 1,568 3,200 1,050 Mid peak Off peak Demand - Facility Related 6,450 $ $ 118, On peak 32,664 $ $ ,681,799 $ $62, Mid peak 50,648 $ $ ,184,130 $ $74, Off peak 199,304 $ $3, ,290,458 $ $53, Mid peak $ $ Off peak $ $ bond charge (kwh) 282, $1, , $1, Customer charge $ $ $ Power factor charge (kvar) 0 $ Power factor charge (kvar) 352 $ $ $ $5, Capacity reservation charge $59, energy credit (kwh) 282, $62.18 On peak 6,450 $ $122, Mid peak 6,450 $ 3.58 $23, On peak 32,664 $ $2, ,681,799 $ $189, Mid peak 50,648 $ $2, ,184,130 $ $150, Off peak 199,304 $ $5, ,290,458 $ $72, Mid peak $ Off peak 0 $ $ s-backup on peak 1,376 $ $15, Mid peak 992 $ $1, Subtotal for billing month $92, Sate tax $ ,616 $ $81.96 Total monthly bill $92, SCE monthly bill $92, DEPARTING LOAD $37, Total monthly cost of SCE $130, $874, Cost Difference between vs $743, Peak total $ 2,949, Peak Average $ 737, Page 11 of 15

12 October-16 Total Electricity used (kwh) 409,776 1,836, ,000 3,252,172 97,327 5,185,930 Reactive Usage (kvarh) 59, , , ,848 Maximum 1,952 4,800 1,650 6,450 Standby 6,650 6,650 6,650 Reactive Demand (kvar) 288 1,291 2,286 3,576 On peak 5,856 Mid peak 9,952 Off peak 14,912 Mid peak 138,304 1,285,502 2,276,520 68,129 3,630,151 Off peak 240, , ,651 29,198 1,555,779 On peak 544 1,650 Mid peak 576 1,650 Off peak 864 1,050 Mid peak 1,952 Off peak 1,952 Demand - Facility Related 6,450 $ $ 118, On peak 5,856 $ $89.71 $ Mid peak 9,952 $ $ $ Off peak 14,912 $ $ $ Mid peak 138,304 $ $2, ,768,455 $ $88, Off peak 240,752 $ $3, ,796,531 $ $41, bond charge (kwh) 409, $2, ,039, $21, Customer charge $ $ $ Power factor charge (kvar) 0 $ Power factor charge (kvar) 288 $ $ $ $2, Capacity reservation charge $59, energy credit (kwh) 409, $90.15 On peak $ Mid peak $ 3.58 On peak 5,856 $ $ $ Mid peak 9,952 $ $ $ Off peak 14,912 $ $ $ Mid peak $5, ,768,455 $ $172, Off peak 240,752 $ $7, ,796,531 $ $65, s-backup on peak 544 $ $ Mid peak 576 $ $ Subtotal for billing month $84, STate tax $ $ $1, Total monthly bill $84, SCE monthly bill $84, DEPARTING LOAD $30, Total monthly cost of SCE $115, $511, Cost Difference between vs $396, Page 12 of 15

13 November-16 Total Electricity used (kwh) 958,176 1,359, ,116 2,285,795 80,649 3,726,054 Reactive Usage (kvarh) 249, , , ,701 Maximum 4,512 4,800 1,650 6,450 Standby 4,233 6,650 6,650 Reactive Demand (kvar) 1,632 2,316 3,893 6,209 On peak Mid peak Off peak Mid peak 267, ,727 1,600,057 56,454 2,608,238 Off peak 690, , ,739 24,195 1,117,816 On peak 1,650 Mid peak 1,650 Off peak 1,050 Mid peak 267,392 1,650 Off peak 690,784 1,050 Demand - Facility Related 279 $ $5, ,450 $ $ 118, On peak $ $ Mid peak $ $ Off peak $ $ Mid peak 267,392 $ $4, ,875,630 $ $67, Off peak 690,784 $ $10, ,808,600 $ $42, bond charge (kwh) 958, $5, ,566, $19, Customer charge $ $ $ Power factor charge (kvar) 0 $ Power factor charge (kvar) 1,632 $ $ $ $4, Capacity reservation charge $38, energy credit (kwh) 958, $ On peak $ Mid peak $ 3.58 On peak $ $ Mid peak $ $ Off peak $ $ Mid peak $10, ,875,630 $ $131, Off peak 690,784 $ $22, ,808,600 $ $65, s-backup on peak $ Mid peak $ Subtotal for billing month $97, STate tax $ $ $1, Total monthly bill $97, SCE monthly bill $97, DEPARTING LOAD $20, Total monthly cost of SCE $118, $450, Cost Difference between vs $331, Page 13 of 15

14 December-16 Total Electricity used (kwh) 1,525,648 1,046, ,510 1,245,243 6,912 2,298,656 Reactive Usage (kvarh) 698, , ,397 1,049,759 Maximum 4,736 4,800 1,650 6,450 Standby 4,233 6,650 6,650 Reactive Demand (kvar) 1,888 1,295 1,541 2,836 Electricity (kwh) On peak Mid peak KWH) (kwh) Mid peak 167, , ,670 4,838 1,609,059 Off peak 1,358, , ,573 2, ,597 Demand (kw) On peak 1,650 Mid peak 1,650 Off peak 1,050 (kw) Mid peak 267,392 Off peak 690,784 2,298,656 Demand - Facility Related 503 $18.00 $9, ,450 $ $ 118, On peak $ Mid peak $ Off peak $ Mid peak 167,544 $ $2, ,776,603 $ $41, Off peak 1,358,104 $ $21, ,047,701 $ $47, bond charge (kwh) 1,525, $8, ,134, $16, Customer charge $ $ $ Power factor charge (kvar) 0 $ Power factor charge (kvar) 1,888 $ $1, $ $2, Capacity reservation charge $38, energy credit (kwh) 1,525, $ Demand On peak 0 $ Mid peak 0 $ 3.58 On peak $ Mid peak $ Off peak $ Mid peak $6, ,776,603 $ $81, Off peak 1,358,104 $ $43, ,047,701 $ $74, s-backup on peak $ Mid peak $ Subtotal for billing month $131, STate tax $ $ $ Total monthly bill $131, SCE monthly bill $131, DEPARTING LOAD $30, Total month cost of SCE $162, $384, Cost Difference between vs $221, Page 14 of 15

15 Table 1 Electric Costs, versus Annual Operating Plant Type Winter - Electric Operating Costs 1,279,526 - Electric Operating Costs 3,593,444 Difference Annual Summer Total Annual $ $ 566,879 $ 1,846,405 $ $ 3,168,208 $ 6,761,652 $ 2,313,918 $ 2,601,329 $ 4,915,248 Table 2 Annual Costs Associated with versus Operating Plant Type Total Annual Electric Cost - One AC Mechanic - One Operator / Supervisor - Water Treatment - Chiller Extended Warranty - Contract Chiller Mechanics & Repairs - Contract Cooling Tower Mechanics & Repairs $ 1,846,405 $ 6,761,652 $166,400 $124,800 $20,000 $30,000 $25,000 $50,000 Annual Operator Contract Cost (includes all routine maintenance & equip.) Annual Major Overhauls (accrual) Cost Annual Fuel (natual gas) Cost Total $ 1,666,710 $ 400,000 $ 835,253 $ 4,748,368 $ 7,177,852 Annual Cost Saving for Operation $2,429,485 Page 15 of 15

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-27 CUSTOMER GENERATION PRICE PLAN FOR RESIDENTIAL SERVICE Effective: April 2015 Billing Cycle AVAILABILITY: The E-27 Price Plan is subject

More information

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED

Schedule TOU-EV-8 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, DEMAND METERED Southern California Edison Revised Cal. PUC Sheet No. 66647-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 64807-E Schedule TOU-EV-8 Sheet 1 APPLICABILITY Applicable solely for

More information

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-21 PRICE PLAN FOR RESIDENTIAL SUPER PEAK TIME-OF-USE SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing Cycle

More information

Schedule TOU-EV-9 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, LARGE DEMAND METERED

Schedule TOU-EV-9 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING, LARGE DEMAND METERED Southern California Edison Revised Cal. PUC Sheet No. 66651-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 64815-E Schedule TOU-EV-9 Sheet 1 APPLICABILITY Applicable solely for

More information

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING

Schedule TOU-EV-7 Sheet 1 GENERAL SERVICE TIME-OF-USE, ELECTRIC VEHICLE CHARGING Southern California Edison Revised Cal. PUC Sheet No. 66642-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 64800-E Schedule TOU-EV-7 Sheet 1 APPLICABILITY Applicable solely for

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62149-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 54195-E Schedule TOU-EV-4 Sheet 1 APPLICABILITY Applicable solely for

More information

TERRITORY: This rate schedule applies everywhere PG&E provides electric service. I

TERRITORY: This rate schedule applies everywhere PG&E provides electric service. I Original Cal. P.U.C. Sheet No. 36419-E ELECTRC SCHEDULE E-TOUPP Sheet 1 (N) RESDENTAL TME-OF-USE PLOT PROJECT SERVCE (N) APPLCABLTY: This schedule is available to residential customers who have been selected

More information

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents

March 30, 2005 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. 1% Franchise Surcharge for City of Santa Barbara Residents Akbar Jazayeri Director of Revenue and Tariffs March 30, 2005 ADVICE 1881-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: 1% Franchise Surcharge for City of

More information

Methodology of Cost Allocation

Methodology of Cost Allocation Methodology of Cost Allocation Robin Kliethermes May 17, 2013 1 Purpose of Cost Allocation Determine whether each class of customers is providing the utility with a reasonable level of revenue necessary

More information

Rate Schedules. Effective 1/1/2019

Rate Schedules. Effective 1/1/2019 Rate Schedules 2019 Effective 1/1/2019 SUMMARY OF RATE SCHEDULES REVISIONS FOR RATES EFFECTIVE JANUARY 1, 2019 (1) Rate component changes for Residential and Heating Service rate schedules. (2) General

More information

Southern California Edison Company Demand Response Appendices to SCE-1, Volumes 1-4 ERRATA Replacing Appendix D, Pages D-1 & D-3

Southern California Edison Company Demand Response Appendices to SCE-1, Volumes 1-4 ERRATA Replacing Appendix D, Pages D-1 & D-3 Application No.: Exhibit No.: Witness: A.11-03-003 SCE-1, Volume 5 (Appendices to SCE-1 Volumes 1 4) - ERRATA (U 338-E) Southern California Edison Company Demand Response Appendices to SCE-1, Volumes 1-4

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 66268-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 65843-E Schedule TOU-8 Sheet 1 APPLICABILITY Applicable to general service

More information

Schedule DP-1 SMALL GENERAL SERVICE (EXPERIMENTAL)

Schedule DP-1 SMALL GENERAL SERVICE (EXPERIMENTAL) I. APPLICABILITY This schedule is applicable only to a Customer who qualifies for Electric Service in accordance with Schedule GS-1 as of the Customer s effective date for billing under this schedule.

More information

Small General Service Time-of-Use Rate Schedule GS-TOU3

Small General Service Time-of-Use Rate Schedule GS-TOU3 I. Applicability Small General Service Time-of-Use This Rate Schedule 1-GS-TOU3 applies to single- or three-phase service, delivered at standard voltages designated by SMUD as available at the customer

More information

Douglas Electric Cooperative Roseburg, Oregon

Douglas Electric Cooperative Roseburg, Oregon Douglas Electric Cooperative Roseburg, Oregon Policy Bulletin 30-8 Net Metering Services Policy: Net metering service is available, on an equal basis, to Customers who own and operate a net metering generating

More information

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E. San Francisco, California Revised Cal. P.U.C. Sheet No. 42736-E Cancelling Revised Cal. P.U.C. Sheet No. 41884-E ELECTRIC SCHEDULE EL-1 Sheet 1 APPLICABILITY: This schedule is applicable to single-phase and polyphase residential

More information

KCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 1st Revised Sheet No. 149 Canceling P.S.C. MO. No. 1 Original Sheet No.

KCP&L GREATER MISSOURI OPERATIONS COMPANY P.S.C. MO. No. 1 1st Revised Sheet No. 149 Canceling P.S.C. MO. No. 1 Original Sheet No. P.S.C. MO. No. 1 1st Revised Sheet No. 149 Canceling P.S.C. MO. No. 1 Original Sheet No. 149 AVAILABILITY This schedule is available for all general service use, such as combined lighting and power service

More information

June 13, Dear Mr. Klauss,

June 13, Dear Mr. Klauss, A Photovoltaic and Energy Storage Consultancy June 13, 2014 Martin Klauss, Assistant Superintendent Business and Administrative Services Oak Park Unified School District OPUSD 5801 Conifer Street, Oak

More information

Southern California Edison Revised Cal. PUC Sheet No. Withdrawn Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No. Withdrawn Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 52399-E APPLICABILITY Schedule TOU-PA-5 Sheet 1 Applicable where SCE determines that 70% or more of the customer's electrical usage

More information

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 20th Revised CPUC Sheet No. 84 Canceling 19th Revised CPUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 20th Revised CPUC Sheet No. 84 Canceling 19th Revised CPUC Sheet No. SOUTH LAKE TAHOE, CALIFORNIA 20th Revised CPUC Sheet No. 84 Canceling 19th Revised CPUC Sheet No. 84 APPLICABILITY This rate schedule is applicable to all domestic power service to separately metered single

More information

RATE APPLICATION MANUAL. Kansas City Board of Public Utilities

RATE APPLICATION MANUAL. Kansas City Board of Public Utilities RATE APPLICATION MANUAL Kansas City Board of Public Utilities APPROVED BY THE BPU BOARD February 1, 2017 RATES EFFECTIVE January 1, 2018 RATE APPLICATION MANUAL BOARD OF PUBLIC UTILITIES PAGE TABLE OF

More information

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018)

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA (November 2018) ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY TIME-OF-USE GENERAL POWER RATE--SCHEDULE TGSA () Availability This rate shall be available for the firm power requirements

More information

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 11th Revised CPUC Sheet No. 80 Canceling 10th Revised CPUC Sheet No.

LIBERTY UTILITIES (CALPECO ELECTRIC) LLC SOUTH LAKE TAHOE, CALIFORNIA 11th Revised CPUC Sheet No. 80 Canceling 10th Revised CPUC Sheet No. SOUTH LAKE TAHOE, CALIFORNIA 11th Revised CPUC Sheet No. 80 Canceling 10th Revised CPUC Sheet No. 80 APPLICABILITY TERRITORY This time-of-use rate schedule is optional for Customers for whom Schedule D-1

More information

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition

March 13, 2000 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION. Modification to Power Factor Adjustment Special Condition Donald A. Fellows, Jr. Manager of Revenue and Tariffs March 13, 2000 ADVICE 1439-E (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Modification to Power Factor

More information

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E Revised Cal. P.U.C. Sheet No. 41679-E Cancelling Revised Cal. P.U.C. Sheet No. 40893-E ELECTRIC SCHEDULE ESR Sheet 1 APPLICABILIT: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase

More information

STANDBY SERVICE. Transmission Service Primary Service Secondary Service

STANDBY SERVICE. Transmission Service Primary Service Secondary Service a division of Otter Tail Corporation Rate Designation C-10M, Page 1 of 6 STANDBY SERVICE OPTION A: FIRM OPTION B: NON-FIRM On-Peak Off-Peak On-Peak Off-Peak Transmission Service 927 928 937 938 Primary

More information

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES

ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES Revised Cal. P.U.C. Sheet No. 33759-E Cancelling Revised Cal. P.U.C. Sheet No. 33566-E ELECTRIC SCHEDULE E-1 Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase

More information

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E

Revised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E Revised Cal. P.U.C. Sheet No. 35229-E Cancelling Original Cal. P.U.C. Sheet No. 28209-E ELECTRIC SCHEDULE EM-TOU Sheet 1 APPLICABILITY: TERRITORY: This schedule is applicable to service for residential

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 62668-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57597-E Schedule TOU-8 Sheet 1 APPLICABILITY Applicable to general service

More information

Zero Emission Bus Impact on Infrastructure

Zero Emission Bus Impact on Infrastructure Zero Emission Bus Impact on Infrastructure California Transit Association (CTA) Fall Conference Nov 17, 2016 Russ Garwacki Director, Pricing Design & Research 626.302.6673 Russell.Garwacki@sce.com Barbara

More information

MISSOURI SERVICE AREA

MISSOURI SERVICE AREA MO.P.S.C. SCHEDULE NO. 6 3rd Revised SHEET NO. 61 CANCELLING MO.P.S.C. SCHEDULE NO. 6 2nd Revised SHEET NO. 61 LARGE PRIMARY SERVICE RATE *RATE BASED ON MONTHLY METER READINGS Summer Rate (Applicable during

More information

Agricultural Service Rate Schedule AG

Agricultural Service Rate Schedule AG I. Applicability Agricultural Service This Rate Schedule 1-AG applies to single- or three-phase nonresidential agricultural service, delivered at standard voltages designated by SMUD as available at the

More information

CHOPTANK ELECTRIC COOPERATIVE, INC. DENTON MARYLAND TERMS AND CONDITIONS

CHOPTANK ELECTRIC COOPERATIVE, INC. DENTON MARYLAND TERMS AND CONDITIONS CHOPTANK ELECTRIC COOPERATIVE, INC. DENTON MARYLAND TERMS AND CONDITIONS CHOPTANK ELECTRIC COOPERATIVE, INC. TERMS AND CONDITIONS TABLE OF CONTENTS PAGE NO. GENERAL 1 100 ELECTRIC SERVICE 101 Application

More information

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS Revised Cal. P.U.C. Sheet No. 31575-E Cancelling Revised Cal. P.U.C. Sheet No. 29680-E ELECTRIC SCHEDULE E-9 APPLICABILITY: This optional experimental schedule applies to electric service to customers

More information

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No.

Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No. Portland General Electric Company Eleventh Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Tenth Revision of Sheet No. 7-1 AVAILABLE In all territory served by the Company. APPLICABLE To Residential

More information

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY GENERAL POWER RATE--SCHEDULE GSB Availability This rate shall apply to the firm electric power requirements where a

More information

Electrical District No. 3 SOLAR Q & A

Electrical District No. 3 SOLAR Q & A D3 Electrical District No. 3 SOLAR Q & A What are some things I should consider before going solar? Leasing verses owning: Know the Pros and Cons of each, as well as the Short-term and Long-Term effects

More information

Street Address. City-Village-Township

Street Address. City-Village-Township Schedule Designation D11 Primary Supply Agreement D11 963-1816 77/15 THIS AGREEMENT, dated, 20, by and between (Name) a, (Legal Entity and State of Organization) herein called the "Customer", and DTE Electric

More information

Large General Service Time-of-Use Storage Program

Large General Service Time-of-Use Storage Program Large General Service Time-of-Use Storage Program AVAILABILITY Available throughout the Company s entire electric service area where the facilities of the Company are of adequate capacity and are adjacent

More information

BrightRidge Large Commercial and Industrial Rates October 2017 Billing Cycle All Rates Subject to TVA s Fuel Cost Adjustment (separate schedule)

BrightRidge Large Commercial and Industrial Rates October 2017 Billing Cycle All Rates Subject to TVA s Fuel Cost Adjustment (separate schedule) KEY RATE DEFINITIONS Seasonal Rate Periods (applicable to all rates) Billing Months are defined as June, July, August, and September. Billing Months are defined as December, January, February, and March.

More information

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after January 1, 2014. NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after January 1, 2014. SECTION 1. AVAILABILITY AND APPLICABILITY 1.1 This Rate Schedule

More information

This rate schedule applies anywhere the City of Palo Alto provides Electric Service. Demand Charge (kw) $3.49 $20.35 $23.84

This rate schedule applies anywhere the City of Palo Alto provides Electric Service. Demand Charge (kw) $3.49 $20.35 $23.84 A. APPLICABILITY: This schedule applies to Demand metered secondary Service for non-residential Customers with a Maximum Demand of at least 1,000KW per month per site, who have sustained this Demand level

More information

FLORENCE ELECTRICITY DEPARTMENT. GENERAL POWER RATE--SCHEDULE GSC (October 2015) Availability

FLORENCE ELECTRICITY DEPARTMENT. GENERAL POWER RATE--SCHEDULE GSC (October 2015) Availability FLORENCE ELECTRICITY DEPARTMENT GENERAL POWER RATE--SCHEDULE GSC () Availability This rate shall apply to the firm electric power requirements where a customer s currently effective onpeak or offpeak contract

More information

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. Availability ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY MANUFACTURING SERVICE RATE--SCHEDULE MSD Availability This rate shall apply to the firm electric power requirements

More information

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. LARGE MANUFACTURING SERVICE RATE SCHEDULES (November 2018)

ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY. LARGE MANUFACTURING SERVICE RATE SCHEDULES (November 2018) ELECTRIC POWER BOARD OF THE METROPOLITAN GOVERNMENT OF NASHVILLE AND DAVIDSON COUNTY LARGE MANUFACTURING SERVICE RATE SCHEDULES () Availability These rates shall apply to the firm electric power requirements

More information

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 18, 2002 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs January 18, 2002 ADVICE 115-G (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Decrease in Santa Catalina Island

More information

STANDBY SERVICE. RULES AND REGULATIONS: Terms and conditions of this schedule and the General Rules and Regulations govern use of this schedule.

STANDBY SERVICE. RULES AND REGULATIONS: Terms and conditions of this schedule and the General Rules and Regulations govern use of this schedule. ELECTIC ATE SCHEDULE Page 1 of 8 Ninth evision STANDBY SEVICE DESCIPTION OPTION A: FIM OPTION B: NON-FIM On-Peak Shoulder Off-Peak On-Peak Shoulder Off-Peak Transmission Service 50-941 50-942 50-943 50-950

More information

SUMMARY OF TOTAL CURRENT PRICES - ELECTRIC

SUMMARY OF TOTAL CURRENT PRICES - ELECTRIC Electric Summary Sheet No. S-1 HOW A CUSTOMER BILL IS CALCULATED 7 RESIDENTIAL SERVICE For a customer who used 1,000 kwh during one month (assuming 30 days of service). Schedule 7 is referred to on customer

More information

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019.

NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service. Effective: For bills rendered on and after February 1, 2019. NORTHEAST NEBRASKA PUBLIC POWER DISTRICT RATE SCHEDULE LP-2 Large Power Service Effective: For bills rendered on and after February 1, 2019. SEDC:60/7/8/9 SECTION 1. AVAILABILITY AND APPLICABILITY 1.1

More information

January 1, 2018 RATE SCHEDULE. 395 Southgate Drive, Guelph, ON N1G 4Y1. Billing: Admin: Fax:

January 1, 2018 RATE SCHEDULE. 395 Southgate Drive, Guelph, ON N1G 4Y1. Billing: Admin: Fax: January 1, 2018 RATE SCHEDULE 395 Southgate Drive, Guelph, ON N1G 4Y1 Billing: 519-822-3010 Admin: 519-822-3017 Fax: 519-822-0960 Time-of-Use rates for electricity came into effect for the majority of

More information

Advanced Rate Design. Smart Electric Power Alliance Grid Evolution Summit. David Littell Principal The Regulatory Assistance Project (RAP)

Advanced Rate Design. Smart Electric Power Alliance Grid Evolution Summit. David Littell Principal The Regulatory Assistance Project (RAP) July 27, 2017 Advanced Rate Design Smart Electric Power Alliance Grid Evolution Summit David Littell Principal The Regulatory Assistance Project (RAP) 550 Forest Avenue, Suite 203 Portland, Maine United

More information

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

January 20, 2004 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION Akbar Jazayeri Director of Revenue and Tariffs January 20, 2004 ADVICE 123-G (U 338-E) PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION SUBJECT: Increase in Santa Catalina Island

More information

Street Address. City-Village-Township

Street Address. City-Village-Township Schedule Designation D11 Primary Supply Agreement D11 963-1816 8/18 THIS AGREEMENT, dated, 20, by and between (Name) a, (Legal Entity and State of Organization) herein called the "Customer", and DTE Electric

More information

Matthew K. Segers Office 202, An Exelon Company Assistant General Counsel

Matthew K. Segers Office 202, An Exelon Company Assistant General Counsel m Pepco Holdings. Matthew K. Segers Office 202,872.3484 An Exelon Company Assistant General Counsel 202.331.6767 EP9628 701 Ninth Street NW Washington, DC 20068-0001 Mail Log No. 222693 pepcoholdings.com

More information

Group 3: Pricing from 1 April 2018 and load management

Group 3: Pricing from 1 April 2018 and load management Group 3: Pricing from 1 April 2018 and load management This document is intended to provide background to Network Tasman s Group 3 pricing, in particular the Regional Coincident Peak Demand (RCPD) price,

More information

New York s Mandatory Hourly Pricing Program

New York s Mandatory Hourly Pricing Program New York s Mandatory Hourly Pricing Program Case 03-E-0641 Chris Graves NYS Department of Public Service October 2009 Mandatory Hourly Pricing (MHP) Background September 1998 Niagara Mohawk institutes

More information

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Revised Cal. P.U.C. Sheet No E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California Revised Cal. P.U.C. Sheet No. 25718-E** Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No. 24808-E APPLICABILITY: TERRITORY: This voluntary schedule is available to customers for

More information

D Original Sheet No. 11!81 Revised

D Original Sheet No. 11!81 Revised KANSAS CITY POWER & LIGHT COMPANY P.S.C. MO. No. 7 Third Cancelling P.S.C. MO. No. 7 Second D Original Sheet No. 11!81 Revised D Original Sheet No. 11!81 Revised For Missouri Retail Service Area LARGE

More information

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California

Revised Cal. P.U.C. Sheet No E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No E San Francisco, California Revised Cal. P.U.C. Sheet No. 26003-E Pacific Gas and Electric Company Cancelling Revised Cal. P.U.C. Sheet No. 25736-E APPLICABILITY: This schedule is applicable to single-phase and polyphase residential

More information

FLORENCE ELECTRICITY DEPARTMENT. MANUFACTURING SERVICE RATE--SCHEDULE TDMSA (October 2015) Availability

FLORENCE ELECTRICITY DEPARTMENT. MANUFACTURING SERVICE RATE--SCHEDULE TDMSA (October 2015) Availability FLORENCE ELECTRICITY DEPARTMENT MANUFACTURING SERVICE RATE--SCHEDULE TDMSA () Availability This rate shall apply to the firm electric power requirements where (a) a customer s currently effective onpeak

More information

Net Metering in Illinois. Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014

Net Metering in Illinois. Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014 Net Metering in Illinois Eric P. Schlaf Senior Economic Analyst Illinois Commerce Commission January 31, 2014 Topics What is Net Metering Benefits of Net Metering Net Metering in US Net Metering in Illinois

More information

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.

AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire. AVAILABLE: Within established City Limits. AUSTIN UTILITIES Schedule (110) Issued 11/12/13 Supersedes (110) Issued 11/13/12 Sheet No. 1 of 1 RESIDENTIAL SERVICE APPLICABLE: To single-family residences

More information

ENERGY & UTILITIES. Electricity Metering & Sub-Metering Concepts and Applications. BuildingsOne April 30, 2018

ENERGY & UTILITIES. Electricity Metering & Sub-Metering Concepts and Applications. BuildingsOne April 30, 2018 BuildingsOne April 30, 2018 The measurement of base building systems and tenantspecific equipment electricity consumption, through submetering applications, is increasing in importance within the commercial

More information

Schedule D DOMESTIC SERVICE

Schedule D DOMESTIC SERVICE Southern California Edison Rosemead, California (U 338-E) Revised Cal. PUC Sheet No. 50818-E Cancelling Revised Cal. PUC Sheet No. 50295-E Sheet 1 APPLICABILITY Applicable to domestic service including

More information

Effect of DG Installation on Customer Load Shapes

Effect of DG Installation on Customer Load Shapes Effect of DG Installation on Customer Load Shapes P R E S E N T E D T O Westar Energy P R E S E N T E D B Y The Brattle Group J u n e 2 3, 2017 Copyright 2017 The Brattle Group, Inc. Characteristics of

More information

SOLAR FEASIBILITY STUDY

SOLAR FEASIBILITY STUDY SOLAR FEASIBILITY STUDY KAKE SENIOR CENTER KAKE ALASKA June 24, 2015 Submitted By: BacGen Technologies, Inc, Maud de Bel Maud@bacgen.com 206-459-9418 Executive Summary BacGen investigated the feasibility

More information

Emerald People s Utility District RATE SCHEDULES. Rate Schedules Effective April 1, 2018

Emerald People s Utility District RATE SCHEDULES. Rate Schedules Effective April 1, 2018 Emerald People s Utility District RATE SCHEDULES 2018 Rate Schedules Effective April 1, 2018 Connect With Us 33733 Seavey Loop, Eugene, OR 97405 Phone: 541-746-1583 Toll-free: 800-422-4086 Fax: 866-284-7953

More information

Large Power Service Time-of-Use (LPS-TOU)

Large Power Service Time-of-Use (LPS-TOU) Original Sheet No.: 302 Large Power Service Time-of-Use (LPS-TOU) AVAILABILITY Available throughout the Company s entire electric service area where the facilities of the Company are of adequate capacity

More information

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report

Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report Imperial Irrigation District Energy Consumers Advisory Committee Agenda Report 260 TO: FROM: SUBJECT: ECAC Members Jamie Asbury, deputy energy manager, Business/Regulatory Five (5) Generator Interconnection

More information

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Southern California Edison Original Cal. PUC Sheet No. 52386-E Schedule TOU-PA-3-SOP Sheet 1 APPLICABILITY Applicable where SCE determines that 70% or more of the customer's electrical usage is for Agricultural

More information

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E

Revised Cal. P.U.C. Sheet No E Cancelling Revised Cal. P.U.C. Sheet No E Revised Cal. P.U.C. Sheet No. 40092-E Cancelling Revised Cal. P.U.C. Sheet No. 38105-E ELECTRC SCHEDULE EV Sheet 1 RESDENTAL TME-OF-USE SERVCE FOR PLUG-N ELECTRC VEHCLE CUSTOMERS APPLCABLTY: This optional

More information

KANSAS CITY POWER & LIGHT COMPANY P.S.C. MO. No. 7 Third D Original Sheet No. 19 t8l Revised

KANSAS CITY POWER & LIGHT COMPANY P.S.C. MO. No. 7 Third D Original Sheet No. 19 t8l Revised KANSAS CITY POWER & LIGHT COMPANY P.S.C. MO. No. 7 Third D Original Sheet No. 19 t8l Revised Cancelling P.S.C. MO. No. 7 Second D Original Sheet No. --13!_ t8l Revised Missouri Retail Service For Area

More information

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New

More information

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New

More information

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV.

PASNY DELIVERY SERVICE. Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. PSC NO: 12 Electricity Leaf: 4 Rate I Applicability: To PASNY Customers who are not served under Rate II, Rate III, or Rate IV. Applicable to demand-metered service, street lighting in The City of New

More information

ELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE

ELECTRIC SCHEDULE AG-ICE Sheet 1 AGRICULTURAL INTERNAL COMBUSTION ENGINE CONVERSION INCENTIVE RATE - EXPIRATION TRANSITION RATE Revised Cal. P.U.C. Sheet No. 36458-E Cancelling Revised Cal. P.U.C. Sheet No. 36036-E ELECTRIC SCHEDULE AG-ICE Sheet 1 APPLICABILITY: This rate schedule is available to agricultural customers who currently

More information

Explanation of VEPGA Rates & Schedules (What you need to know)

Explanation of VEPGA Rates & Schedules (What you need to know) Virginia Energy Purchasing Governmental Association (VEPGA) Explanation of VEPGA Rates & Schedules (What you need to know) MAY 4, 2017 Presented by: Glenn A. Watkins President/Senior Economist Technical

More information

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017

Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017 Reforming the TAC and Retail Transmission Rates. Robert Levin California Public Utilities Commission Energy Division August 29, 2017 1 CPUC Staff Rate Design Proposals Restructure the High-Voltage TAC

More information

EXHIBIT A ORDINANCE NO. O CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE

EXHIBIT A ORDINANCE NO. O CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE ORDINANCE NO. O-2017-14 CITY OF LAURINBURG, NORTH CAROLINA SCHEDULES OPR RESIDENTIAL TIME-OF-USE SERVICE AVAILABILITY This schedule is closed to new customers. Available to Residential Consumers being

More information

Solar Power. Demonstration Site. Annual Performance Report 2017

Solar Power. Demonstration Site. Annual Performance Report 2017 Solar Power Demonstration Site Annual Performance Report 217 Version :1. July 12, 218 Solar Power Demonstration Site 217 Performance Report Introduction INTRODUCTION The Solar Power Demonstration Site

More information

SHORE POWER RATE BC HYDRO 333 DUNSMUIR STREET VANCOUVER, BC

SHORE POWER RATE BC HYDRO 333 DUNSMUIR STREET VANCOUVER, BC SHORE POWER RATE BC HYDRO 333 DUNSMUIR STREET VANCOUVER, BC 28 January, 2015 INTRODUCTION OUTLINE 1. Introduction 2. Background and Context Shore power Need for a Shore Power Rate: Port requests Initiatives

More information

ELECTRICITY RATES. Rates Effective October 1, 2009

ELECTRICITY RATES. Rates Effective October 1, 2009 ELECTRICITY RATES FOR COMMERCIAL AND INDUSTRIAL CUSTOMERS Rates Effective October 1, 2009 If you would like information about our services, details about your rights and responsibilities, or a copy of

More information

Consolidated Edison Company of New York, Inc.

Consolidated Edison Company of New York, Inc. PSC NO: 11 Electricity Leaf: 1 Initial Superseding Economic Development Delivery Service No. 2 Consolidated Edison Company of New York, Inc. Schedule For Economic Development Delivery Service Subsequent

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2018-72 A RESOLUTION ESTABLISHING A SCHEDULE OF ELECTRICAL RATES TO BE CHARGED CUSTOMERS FOR ENERGY AND POWER FROM THE ELECTRIC DISTRIBUTION SYSTEM OF THE CITY; TO REPEAL CONFLICTING RATES

More information

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE

THE NARRAGANSETT ELECTRIC COMPANY LARGE DEMAND RATE (G-32) RETAIL DELIVERY SERVICE Sheet 1 AVAILABILITY Electric delivery service shall be taken under this rate for all purposes by any customer who is placed on the rate by the Company in accordance with this paragraph. The Company shall

More information

FOR COMMERCIAL, INDUSTRIAL AND LIGHTING CUSTOMERS

FOR COMMERCIAL, INDUSTRIAL AND LIGHTING CUSTOMERS Electricity Rates FOR COMMERCIAL, INDUSTRIAL AND LIGHTING CUSTOMERS At Puget Sound Energy our goal is to meet your needs as a full service natural gas and electric utility. As the largest energy utility

More information

Proposal Concerning Modifications to LIPA s Tariff for Electric Service

Proposal Concerning Modifications to LIPA s Tariff for Electric Service Proposal Concerning Modifications to LIPA s Tariff for Electric Service Requested Action: Staff proposes to modify its Tariff for Electric Service to increase the Daily Service Charge or Monthly Charge

More information

is attached to and becomes a part of a agreement dated, 20

is attached to and becomes a part of a agreement dated, 20 Electric Process Heat Schedule Designation R1.2 Standard Contract Rider No. 1.2 DE 963-1635 8/18 THIS RIDER, dated, 20 is attached to and becomes a part of a agreement dated, 20 between (Legal Entity and

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57591-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57763-E Schedule GS-2 Sheet 1 APPLICABILITY Applicable to single- and

More information

LADWP Energy Storage Update. Board of Water and Power Commissioners August 15, 2017

LADWP Energy Storage Update. Board of Water and Power Commissioners August 15, 2017 LADWP Energy Storage Update Board of Water and Power Commissioners August 15, 2017 Energy Storage Overview Energy Storage (ES) is the capture and re-dispatch of already produced energy using various technologies.

More information

Electricity Rates. For Commercial and Industrial Customers

Electricity Rates. For Commercial and Industrial Customers Electricity Rates For Commercial and Industrial Customers Rates Effective May 1, 2011 If you would like information about our services, details about your rights and responsibilities, or a copy of our

More information

COVER PAGE FOR THE NEW JERSEY ELECTRIC TARIFF CURRENT UPDATE This Internet update on or about: November 30, 2015

COVER PAGE FOR THE NEW JERSEY ELECTRIC TARIFF CURRENT UPDATE This Internet update on or about: November 30, 2015 COVER PAGE FOR THE NEW JERSEY ELECTRIC TARIFF CURRENT UPDATE This Internet update on or about: November 30, 2015 Tariff Change Effective: December 1, 2015 Total Pages + 2 Covers: 75; Total Sheets: 1 to

More information

Schedule TOU-PA-2-SOP Sheet 1 TIME-OF-USE - AGRICULTURAL AND PUMPING SUPER OFF-PEAK - SMALL TO MEDIUM

Schedule TOU-PA-2-SOP Sheet 1 TIME-OF-USE - AGRICULTURAL AND PUMPING SUPER OFF-PEAK - SMALL TO MEDIUM Southern California Edison Revised Cal. PUC Sheet No. 54265-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 52345-E Schedule TOU-PA-2-SOP Sheet 1 APPLICABILITY Applicable where

More information

SERVICE CLASSIFICATION NO. 7 LARGE GENERAL TIME-OF-DAY SERVICE

SERVICE CLASSIFICATION NO. 7 LARGE GENERAL TIME-OF-DAY SERVICE 5th Revised Leaf No. 122 Superseding 4th Revised Leaf No. 122 LARGE GENERAL TIME-OF-DAY SERVICE APPLICABLE TO USE OF SERVICE FOR Sales and delivery of electric power supply provided by the Company or delivery

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION ) ) ) ) SETTLEMENT TESTIMONY MYRA L. TALKINGTON MANAGER, REGULATORY FILINGS ENTERGY SERVICES, INC.

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION ) ) ) ) SETTLEMENT TESTIMONY MYRA L. TALKINGTON MANAGER, REGULATORY FILINGS ENTERGY SERVICES, INC. BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION OF FOR APPROVAL OF CHANGES IN FOR RETAIL ELECTRIC SERVICE SETTLEMENT TESTIMONY OF MYRA L. TALKINGTON MANAGER, REGULATORY FILINGS

More information

is attached to and becomes a part of a agreement dated, 20,

is attached to and becomes a part of a agreement dated, 20, Electric Metal Melting (Alternative) Schedule Designation R1.1 Standard Contract Rider No. 1.1 DE 963-7033 8/18 THIS RIDER, dated, 20, is attached to and becomes a part of a agreement dated, 20, between

More information

Power Supply Cost Recovery

Power Supply Cost Recovery First Revised Sheet No. D-1.00 Cancels Original Sheet No. D-1.00 Power Supply Cost Recovery Power Supply Cost Recovery (PSCR) refers to a pricing mechanism commonly employed by utilities such as (Cherryland).

More information

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES

STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES STATE OF NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION DE 17-058 LIBERTY UTILITIES (GRANITE STATE ELECTRIC) CORP. d/b/a LIBERTY UTILITIES Request for Approval of Energy Supply Solicitation and Resulting Rates

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 57606-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57765-E Schedule PA-2 Sheet 1 APPLICABILITY Applicable where SCE determines

More information

JEA Distributed Generation Policy Effective April 1, 2018

JEA Distributed Generation Policy Effective April 1, 2018 Summary This JEA Distributed Generation Policy is intended to facilitate generation from customer-owned renewable and non-renewable energy generation systems interconnecting to the JEA electric grid. The

More information