AECI Health, Safety & Environmental Procedures. Electrical Safety

Size: px
Start display at page:

Download "AECI Health, Safety & Environmental Procedures. Electrical Safety"

Transcription

1 1. Purpose This procedure provides guidance for all personnel that work with or around electrical equipment. It is also the intent of this procedure to comply with 29 CFR , 29 CFR 1910 Subpart S and NFPA 70E. 2. Scope This procedure applies to all AECI employees, contractors and visitors who are required to perform work involving the use electrical equipment on or at AECI work sites. 3. Administrative Duties/Responsibilities The Plant Manager is responsible for monitoring, supporting, and promoting the safety and health programs for their employees. The plant Safety and Environmental Coordinator will support the Plant Manager by developing and coordinating safety and health programs that include, but are not limited to: written procedures and practices, job safety analysis, risk hazard analysis, training, and drills and exercises necessary to fully implement this procedure and monitor its effectiveness. Department Heads, Superintendents, and other supervisors are responsible for participating in company training, drills and exercises, as well as promoting and enforcing adherence to the provisions of all safety and health programs. In addition to the general duty to identify hazards and to work safely, all employees are required to follow the provisions of this procedure as well as those of all plant safety and health programs as a condition of employment. The EHS Department is responsible for reviewing and revising all safety and health programs at least annually. 4. Procedure 4.1 Definitions The Electrical Authority Having Jurisdiction (EAHJ) at AECI's Coal Plants is the Electrical and Instrumentation Superintendent; unless that position is vacant then the Plant Manager shall designate a qualified person to fill the EAHJ until the Electrical and Instrumentation Superintendent position is filled. Page 1 of 21

2 A Qualified Person / Worker is one who possesses the skills and knowledge related to the design and operating principles, of electrical equipment and their installation and has received training on the hazards involved and demonstrates the ability to recognize the various levels of exposure to electrical energy. Such a person is familiar with the proper use of precautionary techniques, personal protective equipment, insulating and shielding materials, insulated tools and test equipment. A person may be considered qualified with respect to certain equipment but still be unqualified for others. An Unqualified Person/Worker is any person who does not meet the definition of a Qualified Person/Worker. An Arc Flash Hazard is a dangerous condition associated with the possible release of energy caused by an electric arc. The Arc Flash Protection Boundary is the approach limit at a distance from a prospective arc source within which a person could receive a second degree burn if an electrical arc flash were to occur. An Electrical Hazard is any dangerous condition such that contact or equipment failure can result in electric shock, arc flash burn, thermal burn, or blast. An Electrical Hazard / Risk Category is the level of risk associated with a specific task. The categories are identified as 0, 1, 2, 3 or 4 (0 being the lowest risk category and 4 being the highest) based on the amount of fault current available, the time it takes to clear the arc and the distance from the source. The risk category determines the level of PPE required for the task. Diagnostics and Testing includes work performed on or near electrically live parts related to tasks such as electrical testing, troubleshooting, or voltage and current measurement. It may require the use of portable test instruments, but no other tools can be used on energized parts. Note: Repairing, replacing, or removing energized exposed components is considered energized work, but diagnostics and testing is not. Energized Work is defined as work performed on equipment or systems electrically connected to an energy source. 4.2 General Requirements 4.2A Temporary circuits A temporary electrical wiring is defined as Approved wiring for power and lighting during a construction, remodeling, maintenance, repair or demolition, and decorative lighting, carnival power and lighting, and similar purposes.. Page 2 of 21

3 Temporary electrical circuits shall be periodically inspected (quarterly) and properly maintained. Once their intended purpose is complete, they shall be taken down. Temporary electrical cords shall be covered or elevated. They must be kept clear of walkways where they may be exposed to damage or create tripping hazards. Temporary lights will be equipped with bulb guards. Broken or burned out bulbs shall be replaced. 4.2B Extension Cords Extension cords used with portable electric tools and appliances must be heavy duty (no less than 12 gauge conductors) of the three wire grounding type and shall conform to OSHA standards. NO FLAT ELECTRICAL CORDS ARE ALLOWED. Extension cords are to be used per manufacturer recommendations. The maximum length for a twelve gauge extension cord with a 15 amp load is 100 feet, however AECI will permit the use of engineered special used cords that are marked and designated for a specific purpose. All extension cords shall be inspected as part of the Assured Grounding Program. Extension cords with a missing ground prong on its plug shall be taken out of service by cutting off the male plug. They may be repaired by a qualified person, but must be tested before placing in service. Extension cords that show damage such as, discoloration of the outer shell; cracked, swollen, pinched, or crushed insulation; loose, bent, or missing blades; etc., shall be taken out of service by having the male plug cut off and tagged or discarded. Extension cords shall not be run across walkways or aisles, concealed behind walls, ceilings or floors, or run through holes in walls, or anywhere they can become damaged or present a tripping hazard. Extension cords may be run through doorways, windows or other pinch points provided they are protected from damage and are used only to provide temporary power. Extension cords cannot be suspended or elevated with conductive material, such as being held up with metal wire. 4.2C Ground Fault Circuit Interrupters (GFCI) GFCIs shall be tested prior to use by depressing the Test button. If the device trips, it may be reset and used. If it does not trip when tested, it shall be tagged and taken out of service and checked by a qualified person. GFCIs shall be inspected as part of the Assured Grounding Program. GFCIs shall be used for all temporary 120V power for electrically powered hand tools (non battery) used by personnel during construction, remodeling, maintenance, repair or demolition of buildings, structures or during similar activities or locations. This Page 3 of 21

4 includes lighting for visual inspection or when work is being performed in damp and/or wet locations, such as outdoors, in basements, in metal tanks, etc... GFCIs are not required to be used with temporary lights unless the cord or lighting fixtures contain a receptacle for equipment to plug into. GFCIs may be of the receptacle, circuit breaker or in line type. 4.3 Assured Grounding Program All cord sets, plug and receptacle cord sets GFCI pigtails and any equipment connected by cord and plug used at AECI facilities that are not part of the permanent wiring of buildings or structures shall be tested, identified, and color coded using the following standards: 4.3A Removing Damaged or Defective Equipment from Service All equipment found damaged or defective or which fails any of the prescribed inspections or tests may not be used until repaired or replaced. All defective equipment shall be tagged with a notice tag stating Do Not Use ; the tag shall also contain the name of person tagging the equipment and the date the equipment was removed from service. 4.3B Daily Visual Inspections The following shall be visually inspected before use for external damage (such as deformed or missing pins or damaged insulation) and for indication of possible internal damage: Cord sets; GFCI pigtails; Plug (attachment cap) and receptacle end of cord sets; Any equipment connected by cord and plug. 4.3C Test Frequency All required tests (visual inspection and continuity) shall be performed with the following frequency: Before first use (out of the box); Before equipment is returned to service following any repairs; Before equipment is used after any incident that can be reasonably suspected to have caused damage; At intervals not to exceed 3 months, except for cord sets and receptacles that are in fixed locations (offices) and not exposed to damage shall be tested at intervals not to exceed 6 months; and Page 4 of 21

5 GFCI protection devices, such as permanently wired GFCI and GFCI pigtails, shall be tested monthly to ensure they trip properly under a load. The testing of permanently wired GFCI shall be documented in the CMMS. All other GFCIs tested shall be documented by using the color code in Table 2. GFCI Breakers shall be tested annually to ensure they will trip under a load. Load test trips on breakers shall be documented in the CMMS. 4.3D Grounding Conductor Testing A qualified person shall use either a continuity tester or an ohmmeter. Each receptacle and plug of the following shall be tested for correct attachment of the equipment grounding conductor and the equipment grounding conductor shall be connected to its proper terminal: All cord sets: Receptacles that are not a part of the permanent wiring of the building or structure: and All plug connected equipment required to be grounded. (Note: This does not apply to double insulated hand or portable powered tools.) 4.3E Cord Set and GFCI Color Code Documentation All tested cord sets and cord and plug connected equipment shall be marked, at one or both ends, with colored tape to denote the quarter that the tests were performed or they may have a tag attached at either end with the written expiration date of the inspection. The previous quarter s marking shall be removed (cutting of tape is prohibited) before adding the current quarter s marking. Use the color code table below. If tags are used in lieu of tape, the expiration date of the inspection may not be crossed out and a new date written on the tag. Table 1: Color Codes for Cord Set Test Requirements Months Color Code Jan., Feb. & March White April, May & June Green July, Aug. & Sept. Red Oct., Nov. & Dec. Orange Page 5 of 21

6 All tested in line GFCIs (pigtails) shall be marked, at one or both ends, with colored tape to denote the quarter and month that the tests were performed or they may have a tag attached at either end with the written expiration date of the inspection. The previous quarter s marking shall be removed (cutting of tape is prohibited) before adding the current quarter s marking. Use the color code table below. If tags are used in lieu of tape, the expiration date of the inspection may not be crossed out and a new date written on the tag. Table 2: Color Code Table for GFCI Documentation Months 1 st Color 2 nd Color January White Yellow February White Blue March White Brown April Green Yellow May Green Blue June Green Brown July Red Yellow August Red Blue September Red Brown October Orange Yellow November Orange Blue December Orange Brown 4.4 ARC Flash Analysis An Arc Flash Hazard Analysis shall be performed prior to entering the arc flash protection boundary to work on energized equipment. All energized equipment that may produce an arc flash shall be labeled with appropriate warning labels (See Appendix B) and a label detailing the arc flash Information, such as: Flash Protection Boundary; PPE Category; Shock Hazard when cover is open; Limited, Restricted and Prohibited Approach boundary; and Available incident energy at corresponding working distance Arc Flash Hazard Analysis shall be reviewed every 5 years and/or when major changes have been made to the system that might affect the PPE Category rating of energized equipment. Page 6 of 21

7 An arc flash label shall be affixed to the incoming feed side of a breaker, breaker panel, or row of breakers. At least one label will be placed in a prominent position (preferably eye height), if the incoming voltage is the same for all breakers in panel or row of breakers. Arc flash labeling shall be visually inspected at least annually to verify: It is legible and in good condition (not torn or peeling off); It is in place. 4.5 Working On or Near Live Parts All energized electrical work with an ARC Flash Hazard Category of 3 or greater requires a Permit for Energized Electrical Task (PEET) to be filled out and approved by the EAHJ before the work can begin. A copy of the PEET form is provided in the Appendix. Work related to diagnostics and testing does not require the use of a PEET provided the appropriate safe work practices and PPE are used. The PEET shall be filled out by the person requesting that the energized work be completed. All PEETs shall be submitted to the Electrical/Instrumentation Superintendent or his/her designee for approval. The permit must be posted in the area where the energized work is taking place for the duration of the work. The following work practices shall be put in place to prevent electrical shock or other injuries resulting from either direct or indirect electrical contact: Job Briefing reviewing the specific JSA for the task to be performed; The use of the insulated tools; The use of the proper personal protective equipment (PPE) according to the PPE Category; The use of barricades to prevent unauthorized personnel from entering the arc flash protection boundary; Adequate lighting; Unqualified persons may only cross the Limited Approach Boundary when they are under the direct supervision of a qualified person. Crossing the boundary includes having any portion of the body break the plane of the boundary; Qualified persons may not cross or take any conductive object closer than the Restricted Approach Boundary unless one of the following conditions apply: a) The qualified person is insulated or guarded from the live parts and no un insulated part of the qualified person s body crosses the Prohibited Approach Boundary; or b) The live parts are insulated from the qualified person and from any other conductive object at a different potential. Crossing the Prohibited Approach Boundary is considered the same as making contact with energized parts. Qualified persons may only cross this boundary when all of the following precautions have been taken: Page 7 of 21

8 a) The qualified person has specific training to work on energized parts; and b) The qualified person uses PPE appropriate for working on energized parts, which are rated for the voltage and energy level involved. When working on de energized parts, but still inside the flash protection boundary for nearby live exposed parts the following precautions shall be taken: If parts cannot be de energized, barriers such as insulated blankets must be used to protect against accidental contact or PPE must be worn; Employees shall not reach blindly into areas that might contain exposed live parts; Employees shall not enter spaces containing live parts unless illumination is provided that allows the work to be performed safely; Conductive articles of jewelry and clothing (such as watchbands, bracelets, rings, key chains, necklaces, metalized aprons, etc.) shall not be worn where they present an electrical contact hazard with exposed live parts; 4.6 Approach Boundaries to Exposed Live Parts for Shock Protection Arc Flash Boundary Limited Approach Boundary Restricted Approach Boundary Prohibited Space Restricted Space Limited Space Prohibited Approach Boundary Page 8 of 21

9 4.6A Alternating Current Systems Limited Approach Boundary Nominal System Voltage Range, Phase to Phase Exposed Movable Conductor Exposed Fixed Circuit Part Restricted Approach Boundary; Includes Inadvertent Movement adder Prohibited Approach Boundary < 50 V Not Specified Not Specified Not Specified Not Specified 50 V 300 V 3.0 m (10 ft. 0 in) 1.0 m (3 ft. 6 in) Avoid Contact Avoid Contact 301 V 750 V 3.0 m (10 ft. 0 in) 1.0 m (3 ft. 6 in) 0.3 m (1 ft. 0 in) 25 mm (0 ft. 1 in) 751 V 15 kv 3.0 m (10 ft. 0 in) 1.5 m (5 ft. 0 in) 0.7 m (2 ft. 2 in) 0.2 m (0 ft. 7 in) 15.1 kv 36 kv 3.0 m (10 ft. 0 in) 1.8 m (6 ft. 0 in) 0.8 m (2 ft. 7 in) 0.3 m (0 ft. 10in) 36.1 kv 46 kv 3.0 m (10 ft. 0 in) 2.5 m (8 ft. 0 in) 0.8 m (2 ft. 9 in) 0.4 m (1 ft. 5 in) 46.1 kv 72.5 kv 3.0 m (10 ft. 0 in) 2.5 m (8 ft. 0 in) 1.0 m (3 ft. 3 in) 0.7 m ( 2ft 2 in) 72.6 kv 121 kv 3.3 m (10 ft. 8 in) 2.5 m (8 ft. 0 in) 1.0 m (3 ft. 4 in) 0.8 m (2 ft. 9 in) 138 kv 145 kv 3.4 m (11 ft. 0 in) 3.0 m (10 ft. 0 in) 1.2 m (3 ft. 10 in) 1.0 m (3 ft. 4 in) 161 kv 169 kv 3.6 m (11 ft. 8 in) 3.6 m (11 ft. 8 in) 1.3 m (4 ft. 3 in) 1.1 m (3 ft. 9 in) 230 kv 242 kv 4.0 m (13 ft. 0 in) 4.0 m (13 ft. 0 in) 1.7 m (5 ft. 8 in) 1.6 m (5 ft. 2 in) 345 kv 362 kv 4.7 m (15 ft. 4 in) 4.7 m (15 ft. 4 in) 2.8 m (9 ft. 2 in) 2.6 m (8 ft. 8 in) 500 kv 550 kv 5.8 m (19 ft. 0 in) 5.8 m (19 ft. 0 in) 3.6 m (11 ft. 10 in) 3.5 m (11 ft. 4 in) 765 kv 800 kv 7.2 m (23 ft. 9 in) 7.2 m (23 ft. 9 in) 4.9 m (15 ft. 11 in) 4.7 m (15 ft. 5 in) 4.6B Direct Current Voltage Systems Limited Approach Boundary Nominal Potential Difference Exposed Movable Conductor Exposed Fixed Circuit Part Restricted Approach Boundary; Includes Inadvertent Movement adder Prohibited Approach Boundary < 100 V Not Specified Not Specified Not Specified Not Specified 100 V 300 V 3.0 m (10 ft. 0 in) 1.0 m (3 ft. 6 in) Avoid Contact Avoid Contact 301 V 1kV 3.0 m (10 ft. 0 in) 1.0 m (3 ft. 6 in) 0.3 m (1 ft. 0 in) 25 mm (0 ft. 1 in) 1.1 kv 5 kv 3.0 m (10 ft. 0 in) 1.5 m (5 ft. 0 in) 0.5 m (1 ft. 5 in) 0.1 m (0 ft. 4 in) 5 kv 15 kv 3.0 m (10 ft. 0 in) 1.5 m (5 ft. 0 in) 0.7 m (2 ft. 2 in) 0.2 m (0 ft. 7 in) 15.1 kv 45 kv 3.0 m (10 ft. 0 in) 2.5 m (8 ft. 0 in) 0.8 m (2 ft. 9 in) 0.4 m (1 ft. 5 in) 45.1 kv 75 kv 3.0 m (10 ft. 0 in) 2.5 m (8 ft. 0 in) 1.0 m (3 ft. 2 in) 0.7 m ( 2ft 2 in) 75.1 kv 150 kv 3.3 m (10 ft. 8 in) 2.5 m (8 ft. 0 in) 1.2 m (4 ft. 0 in) 1.0 m (3 ft. 2 in) kv 250 kv 3.6 m (11 ft. 8 in) 3.6 m (11 ft. 6 in) 1.6 m (5 ft. 3 in) 1.5 m (5 ft. 0 in) kv 500 kv 6.0 m (20 ft. 0 in) 6.0 m (20 ft. 0 in) 3.5 m (11ft 6 in) 3.3 m (10 ft. 10 in) kv 800 kv 8.0 m (26 ft. 0 in) 8.0 m (26 ft. 0 in) 3.5 m (16 ft. 5 in) 5.0 m (16 ft. 5 in) Page 9 of 21

10 4.7 Inspection Schedule for Rubber Insulating Equipment Type of Equipment When to Test Rubber insulating line hose Upon indication that insulating value is suspect Rubber insulating covers Upon indication that insulating value is suspect Rubber insulating blankets Before first issue and every 12 months thereafter * Rubber insulating sleeves Before first issue and every 12 months thereafter * Rubber insulating gloves Before first issue and every 6 months thereafter * (*) If the insulating equipment has been electrically tested but not issued for service, it may not be placed into service unless said testing has taken placed within the previous 12 months. 4.8 Working in the Vicinity of Overhead lines 4.8A Unqualified Person When an unqualified person is working in an elevated position near overhead lines, or on the ground in the vicinity of overhead lines, the person may not bring any conductive object closer to unguarded, energized overhead lines than the following distances: For voltages to ground 50 kv or below 10 ft. For voltages to ground over 50 kv 10 ft. plus 4 in. for every 10 kv over 50 kv 4.8B Qualified Person When a qualified person is working in the vicinity of overhead lines, whether in an elevated position or on the ground, the qualified person may not approach or take any conductive object without an approved insulating handle closer than 10 ft. on lines above 69 kv (phase to phase) 4.9 Grounding When ground cables are applied for energy control as part of the LOTO program each cable shall be identified as a separate tagging device on the LOTO clearance listing Switching Operations When switching operations are performed ARC Flash PPE requirements and boundaries shall be observed. When performing switching operations on unmarked distribution panels, category 0 PPE shall be worn. Page 10 of 21

11 5.0 Arc Flash Clothing, PPE and Other Protective Equipment Employees working in areas where electrical hazards are present shall be provided with, and shall use, protective equipment that is designed and constructed for the specific part of the body to be protected and for the work to be performed. When an employee is working within or is present within the Flash Protection Boundary when work is being performed he/she shall wear protective clothing and PPE based upon the ARC Flash Analysis Hazard/Risk Category. (Appendix A) 5.1 Protective Clothing and PPE Requirements Arc rated clothing (outer layer) with a minimum of 8 cal/cm 2 is required as the regular daily work attire for Instrument Techs and Electricians. Any deviation from this practice requires approval from the Electrical and Instrumentation Superintendent. Flash suits design shall permit easy and rapid removal by the wearer. The entire flash suit, including the hood s face shield, shall have an arc rating that is suitable for the arc flash exposure. Face Shields shall have an arc rating suitable for the arc flash exposure. Face shields without an arc rating shall not be used. Eye protection (safety glasses or goggles) and hearing protection shall always be worn under face shields or hoods. Heavy duty leather gloves or arc rated gloves shall be worn where required for arch flash protection. Heavy duty leather gloves shall have a minimum thickness of 0.03 in. (0.7mm). Where insulating rubber gloves are used for shock protection, leather protectors shall be worn over the rubber gloves. Heavy duty leather work shoes provide some arc flash protection to the feet and shall be used in all exposures greater than 4 cal/cm 2. Clothing made from flammable synthetic materials that melt at temperatures below 315 C (600 F), such as acetate, nylon, polyester, polypropylene, and spandex, either alone or in blends, shall not be used. Non melting, flammable (non arc rated) materials (such as cotton, polyester cotton blends, nylon, nylon cotton blends, silk, rayon and wool fabrics) can be used as under layers to arc rated clothing, but they cannot be counted toward arc flash protection. Page 11 of 21

12 5.2 Care and Maintenance of Arc Rated Clothing and Arc rated Flash Suits Arc rated apparel shall be inspected before each use. The EAHJ or his/her designee shall inspect all arc flash suits and protective PPE semi annual to ensure that it is maintained properly. Work clothing or arc flash suits that are contaminated or damaged (ripped, torn, frayed or have excessive wear) to the extent that their protective qualities are impaired, shall not be used. Protective items that become contaminated with grease, oil, or flammable liquids or combustible materials shall not be used. Arc flash suits shall be maintained in a clean and sanitary condition, laundered at least 1x per year or as necessary to maintain them in a clean and sanitary condition. Damaged suits shall be taken out of service, repaired by the manufacturer or a laundry facility that is capable of repairing per industry standards: ASTM F 1506 or replaced. Suits shall be laundered per the manufacturer s recommendations on the label of the garments. Arc Flash suit and protective face shields shall be replace when they become damaged, have lost their protective qualities, or have been in service for 8 years. When new suits and gear are purchased, their serial numbers shall be recorded and they will be tracked from cradle to grave by: service dates, laundering dates and repair dates. The EAHJ or his/her designee shall set up a tracking program for those departments that have ARC Flash Equipment. Arc rated apparel shall be stored in a manner that prevents physical damage; damage from moisture, dust, or other deteriorating agents (chemical fumes); or contamination from flammable or combustible materials. Protective leather gloves shall be replaced when they show excessive wear (holes or cuts that reduce their minimum thickness requirements). 5.3 Other Protective Equipment Insulated tools shall be rated for the voltage on which they are used. Insulating tools used on or around energized parts shall meet the requirements of IEC and be stamped VDE certified or meet the requirements of ASTM F and be stamped accordingly. Insulated tools and equipment shall be inspected prior to each use. The inspection shall look for damage to the insulation or damage that may limit the tool from performing its intended function or could increase the potential for an incident (example, screw driver with a damaged tip). Insulated tools whose outer protective coating has been damaged so that the undercoat color is visible shall be taken out of service and replaced. Page 12 of 21

13 Rubber insulating equipment (gloves, blankets, sleeves, etc.) shall be visually inspected before each day s use. In addition to a visual inspection rubber gloves shall be given an air test inspection, compressed air is not to be used to inflate gloves for testing. All rubber insulating equipment shall be sent off to a third party for testing according to the schedule in section 4.7. Hot sticks shall be inspected before each use for damage and/ or defects, any hot stick found damaged or defective shall be removed from service and sent off for repair and electrical testing per ASTM F 711 before being placed back in service or replacement if repair not feasible. Hot sticks shall be electrically tested every two years per ASTM F 711 by a third party provider. 6. Enforcement Enforcement of this procedure, as with other procedures, will be in accordance with the provisions of AECI Policy No. 514 Employee Conduct and Discipline. 7. Training Requirements 7.1 Training All personnel who work on or around electrical equipment or who can be reasonably expected to be exposed to an ARC Flash Hazard shall be trained on electrical safety related practices and this procedure. Personnel whose job requires them to rack out or in breakers and switch gear which requires some form of ARC Flash PPE to be worn, shall be trained in the selection of the proper gear, how to visually inspect and perform an air test for rubber gloves, inspect ARC flash suits for damage and how to properly maintain ARC Flash suits. This training may be conducted in house by a qualified employee. In addition, Qualified Personnel (employees) shall be trained in the proper use of personal protective equipment including arc flash suits; insulating and shielding materials; and insulated tools and test equipment. Personnel permitted to work within the limited approach boundary of exposed energized electrical conductors and circuit parts operating at 50 volts or more shall, at a minimum, be additionally trained in the following: 1. Skill and techniques necessary to distinguish exposed energized electrical conductors and circuit parts from other parts of electrical equipment. Page 13 of 21

14 2. Skills and techniques necessary to determine the nominal voltage of exposed energized electrical conductors and circuit parts. 3. Approach distances specified in section 4.6A & 4.6B of this procedure and the corresponding voltages to which the qualified person will be exposed. 4. Decision making process necessary to determine the degree and extent of the hazard and the personal protective equipment and job planning necessary to perform the task safely. Personnel will be trained in the proper selection of voltage detectors, their proper use and limitations. Personnel who are exposed to shock hazards and those employees who are responsible for taking action in case of an emergency shall be trained in methods of release for victims who come in contact with exposed energized electrical conductors or circuit parts. They shall also be trained annually on cardiopulmonary resuscitation (CPR) and the use of automatic external defibrillator (AED), and trained biennial in First Aid methods. Training can consist of classroom and/or on the job or a combination of both. The degree of training is determined by the amount of risk associated to an employee. 7.2 Retraining Employees shall be retrained on tasks that are performed less often than once per year before they are permitted to perform the task. Personnel shall receive additional training or retraining under any of the following conditions: 1. When the supervision or annual inspections indicate that personnel are not complying with the safety related work practices. 2. If new technology, new types of equipment, or changes in procedures necessitate the use of safety related work practices that are different from those that a person would normally use. 3. If personnel must employ safety related work practices that are not normally used during his or her regular job duties. Qualified Personnel shall receive retraining every 3 years at a minimum on this procedure and NFPA 70E updates or whenever this procedure is updated. Page 14 of 21

15 8. Recordkeeping Safety training records shall be updated in Training Tracking by the Environmental and Safety Administrator. Signature sheets, tests and any other applicable documents shall be scanned and uploaded to the EH&S SharePoint site by the Environmental and Safety Administrator. Page 15 of 21

16 Employee Acknowledgement I have read and been informed about the content, requirements, and expectations of Safety Procedure I have received a copy of the procedure and agree to abide by the procedural guidelines. I understand that if I have questions, at any time, regarding Safety Procedure 1301, I will consult with my immediate supervisor or Safety and Environmental Coordinator or Specialist. Please read Safety Procedure 1301 carefully to ensure that you understand the procedure before signing this document. Printed Name Employee Number Signature Date Page 16 of 21

17 Permit for Energized Electrical Task (PEET) Part I: To Be Completed by the Requester: Job/Work Order Number (1) Description of circuit/equipment/job location: (2) Description of work to be done: (3) Justification of why the circuit/equipment cannot be de energized or the work deferred until the next scheduled outage: Part II: To Be Completed by the Electrically Qualified Persons Doing the Work: Yes/No (1) Detailed job description has been developed for performing the above detailed work? Y/N (2) Description of safe work practices have been identified on a Job Safety Analysis Form? Y/N (3) An Arc Flash Analysis has been performed on equipment to be worked on? Y/N (4) Means used to restrict the access of unqualified persons from the work area have been identified? Y/N (5) A documented job briefing has been performed concerning the above work? Y/N (6) Does the work involve anyone besides an Electrically Qualified Person(s)? Y/N (7) Do you agree the above described work can be done safely? Y/N If no return to requester Electrically Qualified Person(s) Date Part III: Approval to Perform The Work While Electrically Energized: Electrical Authority Having Jurisdiction Date Page 17 of 21

18 Appendix A PPE Category 0 Protective Clothing and PPE Protective Clothing, Non-melting or Untreated Natural Fiber (i.e., untreated cotton, wool, rayon, or silk, or blends of these materials) with a Fabric Weight of at Least 4.5 oz. /yd 2 Shirt (long sleeve) Pants (long) Protective Equipment Safety glasses or safety goggles (SR) Hearing protection (ear canal inserts) Heavy duty leather gloves (AN) (See Note 1.) Electrical Shock Hazard PPE (Use when working on or near exposed live parts) Voltage Rated Gloves Leather Covers Voltage Rated Tools PPE Category 1 Protective Clothing and PPE Arc Rated Clothing, Minimum Arc Rating of 4 cal/cm 2 (See Note 3.) Arc rated long sleeve shirt and pants or arc rated overall Arc rated face shield (see Note 2) or arc flash suit hood Arc rated jacket, parka, rainwear, or hard hat liner (AN) Category Protective Clothing and PPE Protective Equipment Hard hat Safety glasses or safety goggles (SR) Hearing protection (ear canal inserts) Heavy duty leather gloves (See Note 1.) Leather work shoes (AR) Electrical Shock Hazard PPE (Use when working on or near exposed live parts) Voltage Rated Gloves Leather Covers Voltage Rated Tools Page 18 of 21

19 PPE Category 2 Protective Clothing and PPE Arc Rated Clothing, Minimum Arc Rating of 8 cal/cm 2 (See Note 3.) Arc rated long sleeve shirt and pants or arc rated overall Arc rated flash suit hood or arc rated face shield (See Note 2) and arc rated balaclava Arc rated jacket, parka, rainwear, or hard hat liner (AN) Protective Equipment Hard hat Safety glasses or safety goggles (SR) Hearing protection (ear canal inserts) Heavy duty leather gloves (See Note 1.) Leather work shoes Electrical Shock Hazard PPE (Use when working on or near exposed live parts) Voltage Rated Gloves Leather Covers Voltage Rated Tools PPE Category 3 Protective Clothing and PPE Arc Rated Clothing Selected so That the System Arc Rating Meets the Required Minimum Arc Rating of 25 cal/cm 2 (See Note 3.) Arc rated long sleeve shirt (AR) Arc rated pants (AR) Arc rated coverall (AR) Arc rated arc flash suit jacket (AR) Arc rated arc flash suit pants (AR) Arc rated arc flash suit hood Arc rated gloves (See Note 1.) Arc rated jacket, parka, rainwear, or hard hat liner (AN) Protective Equipment Hard hat Safety glasses or safety goggles (SR) Hearing protection (ear canal inserts) Leather work shoes Electrical Shock Hazard PPE (Use when working on or near exposed live parts) Voltage Rated Gloves Leather Covers Voltage Rated Tools Page 19 of 21

20 PPE Category 4 Protective Clothing and PPE Arc Rated Clothing Selected so That the System Arc Rating Meets the Required Minimum Arc Rating of 40 cal/cm 2 (See Note 3.) Arc rated long sleeve shirt (AR) Arc rated pants (AR) Arc rated coverall (AR) Arc rated arc flash suit jacket (AR) Arc rated arc flash suit pants (AR) Arc rated arc flash suit hood Arc rated gloves (See Note 1.) Arc rated jacket, parka, rainwear, or hard hat liner (AN) Protective Equipment Hard hat Safety glasses or safety goggles (SR) Hearing protection (ear canal inserts) Leather work shoes Electrical Shock Hazard PPE (Use when working on or near exposed live parts) Voltage Rated Gloves Leather Covers Voltage Rated Tools AN: as needed (optional). AR: as required. SR: selection required. (1) If rubber insulating gloves with leather protectors are required by Table 130.7(C)(15)(a), additional l leather or arc rated gloves are not required. The combination of rubber insulating gloves with leather protectors satisfies the arc flash protection requirement. (2) Face shields are to have wrap around guarding to protect not only the face but also the forehead, ears, and neck, or, alternatively, an arc rated arc flash suit hood is required to be worn. (3) Arc rating is defined in Article 100 and can be either the arc thermal performance value (ATPV) or energy of break open threshold (EBT). ATPV is defined in ASTM F 1959, Standard Test Method for Determining the Arc Thermal Performance Value of Materials for Clothing, as the incident energy on a material, or a multilayer system of materials, that results in a 50 percent probability that sufficient heat transfer through the tested specimen is predicted to cause the onset of a second degree skin burn injury based on the Stoll curve, in cal/cm 2. EBT is defined in ASTM F 1959 as the incident energy on a material or material system that results in a 50 percent probability of break open. Arc rating is reported as either ATPV or EBT, whichever is the lower value. Page 20 of 21

21 Appendix B Acceptable Arc Flash Labels Pre 2012 Labeling Boundaries PPE Requirements Max Incident Energy Note: Shock Hazard Voltage Included on label Note: Shock Hazard Voltage label is required in addition to this label Post 2012 Labeling Page 21 of 21

Illinois State University. Electrical Safety Procedure

Illinois State University. Electrical Safety Procedure Illinois State University Electrical Safety Procedure Illinois State University Facilities Management Revision Date: May 2014 Illinois State University Facilities Management Electrical Safety Procedure

More information

BP-Husky Refinery Toledo, OH

BP-Husky Refinery Toledo, OH BP-Husky Refinery Toledo, OH Document Type: Procedure Refinery Wide Procedure No.: SAF 095 Effective Date: 2/25/16 Owner: D. Clark Working on or near Energized Electrical Equipment Rev. No.: 6 Auth. By:

More information

NFPA 70E Standard for Electrical Safety Requirements for Employee Workplaces. Table Hazard Risk Category Classification

NFPA 70E Standard for Electrical Safety Requirements for Employee Workplaces. Table Hazard Risk Category Classification Table 3-3.9.1 Hazard Risk Classification Table 3-3.9.1 Hazard Risk Classification Panelboards rated 240 V and below Notes 1 and 3 - - - Circuit breaker (CB) or fused switch operation with covers on 0 N

More information

CAL/OSHA ELECTRICAL LOW VOLTAGE

CAL/OSHA ELECTRICAL LOW VOLTAGE Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to electrical exposure to low voltage (less than or equal to

More information

ELECTRICAL GROUNDING SAFETY PROGRAM

ELECTRICAL GROUNDING SAFETY PROGRAM ELECTRICAL GROUNDING SAFETY PROGRAM PURPOSE / SCOPE The purpose of this program is to ensure the proper installation, maintenance, inspection, and testing of equipment grounding conductors on construction

More information

Energized Electrical Work

Energized Electrical Work Manitoba STANDARD PROCEDURE INSTRUCTION Title Energized Electrical Work Department Supersedes SPI Dated N/A SPI 32-4 Effective Date MAR 30, 2012 Energized Electrical Work SPI 32-4 Page 1 of 9 STANDARD

More information

ESSENTIAL SAFETY RESOURCES

ESSENTIAL SAFETY RESOURCES ESSENTIAL SAFETY RESOURCES GS-3029 Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations Manager s Signature: Type Name Table of Contents PURPOSE...

More information

120-ELECTRICAL SAFETY PROGRAM

120-ELECTRICAL SAFETY PROGRAM 120.1 PURPOSE A. To set forth procedures for the safe use of electrical equipment, tools, and appliances at Central New Mexico Community College (CNM). 120.2 SCOPE A. This program applies to all CNM employees

More information

Electrical Safety Program

Electrical Safety Program Electrical Safety Program Medford Area Public School District 124 West State St School District: Medford, WI 54451 715 748 4620 Review Date(s): January 2018 Program Dave Makovsky Coordinator: Purpose and

More information

Electrical Safe Work Practices

Electrical Safe Work Practices Electrical Safe Work Practices Responsible Official: Matthew Early, VP for Campus Services Administering Division/Department: Facilities Management Effective Date: April, 22 Policy Sections: I. Purpose

More information

AVOIDING ELECTROCUTION HAZARDS

AVOIDING ELECTROCUTION HAZARDS Print AVOIDING ELECTROCUTION HAZARDS MODULE DESCRIPTION This module will provide information that helps you recognize and avoid common electrocution hazards in your work environment. OBJECTIVES After completing

More information

ELECTRICAL SAFETY-RELATED WORK PRACTICES

ELECTRICAL SAFETY-RELATED WORK PRACTICES ELECTRICAL SAFETY-RELATED WORK PRACTICES This checklist is provided to assist organizations in reviewing compliance with OSHA Standard 29 CFR 1910.331 through 1010.335. Refer to the complete Standard for

More information

January 30, Ms. Safety Director Sample Medical Corp. PO Box X Somewhere, CT. Re: NFPA 70E Hazard Assessment. Date of Visit.

January 30, Ms. Safety Director Sample Medical Corp. PO Box X Somewhere, CT. Re: NFPA 70E Hazard Assessment. Date of Visit. 3018 Eastpoint Parkway Louisville, KY 40223 (502) 716-7073 January 30, 2006 Ms. Safety Director Sample Medical Corp. PO Box X Somewhere, CT Re: NFPA 70E Hazard Assessment Date of Visit January 24, 2006

More information

Unqualified persons: People with little or no such training related to electrical equipment and safety.

Unqualified persons: People with little or no such training related to electrical equipment and safety. Electrical Safety University of Tennessee Safety Guide GS-070 Document Contact: EHS-General Safety Date effective: August 1, 2009 Revision Date: March 14, 2012 Purpose This documents serves as a guide

More information

ENERGIZER BATTERY MANUFACTURING ST. ALBANS, VERMONT

ENERGIZER BATTERY MANUFACTURING ST. ALBANS, VERMONT ENERGIZER BATTERY MANUFACTURING ST. ALBANS, VERMONT HOUSE RULES FOR OUTSIDE CONTRACTORS Safety Equipment Safety equipment required for all Contractor's employees, including also all subcontractor's employees,

More information

Definitions. Exposed part. Live or energized part. De-energized part

Definitions. Exposed part. Live or energized part. De-energized part Electrical Safety Definitions Exposed part Live or energized part De-energized part 1a Definitions De-energized exposed parts that are not locked/tagged are considered to be energized exposed parts 1b

More information

Electrical Safety Program

Electrical Safety Program Electrical Safety Program Last Reviewed Date: Effective Date: 1/2008 Applies to: Employees, Faculty, Students, Others For More information Contact: EHS, Occupational Health and Safety at 860-486-3613,

More information

Electrical Safety CSA Z462 & NB Regulations

Electrical Safety CSA Z462 & NB Regulations Electrical Safety CSA Z462 & NB Regulations WorkSafeNB s 2014 Health and Safety Conference Daniel Roberts Senior Manager, Electrical Safety Consulting at Schneider Electric Vice-chair CSA Z462 daniel.roberts@schneider-electric.com

More information

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST

WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST WIRING DESIGN & PROTECTION REQUIREMENTS CHECKLIST Use & Identification of Grounded and Grounding Conductors YES NO N/A Grounded conductors are identifiable and distinguishable from all other conductors.

More information

Unrestricted. S.Mukhopadhyay

Unrestricted. S.Mukhopadhyay Unrestricted S.Mukhopadhyay 10.09.15 Electrical safety A report says that every year 5500 Indians die due to electric shock and 800 due to electric fire. 12% work place death due to electrocution ELECTRICAL

More information

take to complete our safety compliance

take to complete our safety compliance This presentation is one of three steps you will take to complete our safety compliance requirements ECR Energizer Contractor Representative Primaryliaison between Energizer and the contractor for matters

More information

BP OIL -- TOLEDO REFINERY

BP OIL -- TOLEDO REFINERY BP OIL -- TOLEDO REFINERY Document Type: Procedure Effective Date: August 31, 2017 Owner: Dane P. Clark Refinery Wide Electrical Distribution System Switching and Isolation Auth. By: Rick J. Chmelovski

More information

Electrical Safety Policy (EHS-0018)

Electrical Safety Policy (EHS-0018) PAGE 1 OF 20 001 COPY# Electrical Safety Policy OHS-0018 Dates Original: April 2, 2012 Revised: September 09, 2014 Electrical Safety Policy (EHS-0018) For Issued: April 2012 Revised: September 2014 PAGE

More information

California State University Bakersfield Electrical Safety Program. Revised November 2017

California State University Bakersfield Electrical Safety Program. Revised November 2017 California State University Bakersfield Electrical Safety Program Revised November 2017 THIS PAGE INTENTIONALLY LEFT BLANK Contents 1.0 PURPOSE... 3 2.0 SCOPE... 3 3.0 REFERENCES... 4 4.0 DEFINITIONS...

More information

OSHA Update. Electric Power Generation, Transmission and Distribution Standard (Part 1910 & 1926)

OSHA Update. Electric Power Generation, Transmission and Distribution Standard (Part 1910 & 1926) OSHA Update Electric Power Generation, Transmission and Distribution Standard (Part 1910 & 1926) 5/14/2014 Significant Changes to the Standards General Training Host Employer & Contractor Responsibilities

More information

ELECTRICAL PERSONAL PROTECTIVE EQUIPMENT STANDARD

ELECTRICAL PERSONAL PROTECTIVE EQUIPMENT STANDARD Suncor-Wide Standard ELECTRICAL PERSONAL PROTECTIVE EQUIPMENT STANDARD Effective: On Date Approved Owned by Director of Maintenance and Reliability Services Reviewed every 5 years Livelink ID: 251254973

More information

Short Circuit/Coordination & Arc Flash Study Specifications

Short Circuit/Coordination & Arc Flash Study Specifications Delphi Short Circuit/Coordination & Arc Flash Study Specifications April 28, 2005 Short Circuit/Coordination & Arc Flash Specification Table of Contents I. General Overview 3 II. Engineering Firm Requirements..

More information

What is electricity? A form of energy that is carried through wires and is used to operate machines, lights, etc. PPT-SM-ES

What is electricity? A form of energy that is carried through wires and is used to operate machines, lights, etc. PPT-SM-ES Electrical Safety What is electricity? A form of energy that is carried through wires and is used to operate machines, lights, etc. PPT-SM-ES 2015 2 There are two forms of electricity Static electricity

More information

TECHNICAL TOPICS UNIVERSITY. General Electrical Safety BEST PRACTICES

TECHNICAL TOPICS UNIVERSITY. General Electrical Safety BEST PRACTICES UNIVERSITY TECHNICAL TOPICS BEST PRACTICES General Electrical Safety Abstract Electrical systems by nature are considered extremely dangerous to most human beings as these systems operate under conditions

More information

Safety Training Topic ELECTRICAL SAFETY

Safety Training Topic ELECTRICAL SAFETY Safety Training Topic Purpose of Meeting To remind workers that electrical hazards can result in a serious injury. To reinforce electrical safety rules. To consider ways to protect yourself from electrical

More information

Electrical Safety in Die Casting

Electrical Safety in Die Casting Electrical Safety in Die Casting April 2016 Beau Glim NADCA Project Manager NADCA Safety Series 4 parts Basic Safety Machine Maintenance Safety Electrical Safety Managing Safety General safety information

More information

NFPA 70E Electrical Safety in the Work Place. R. Casey 2/1/05

NFPA 70E Electrical Safety in the Work Place. R. Casey 2/1/05 NFPA 70E Electrical Safety in the Work Place R. Casey 2/1/05 The Other Electrical Hazard Arc flash: high-intensity intensity flash (eye damage) and superheated ball of gas (skin burns and melting)created

More information

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #23 GUIDELINES FOR WORKING WITH LIGHTING SYSTEMS AND OTHER ELECTRICAL EQUIPMENT All electrical systems and electrically energized equipment

More information

SECTION 14: AERIAL LIFT PROGRAM

SECTION 14: AERIAL LIFT PROGRAM SECTION 14: AERIAL LIFT PROGRAM Fisher Auto Parts is committed to promoting a safe and healthy environment for all employees and customers. Protection from accidental loss of any resources, especially

More information

Electrical Safety. Electrical Safety Webinar. Electrical. Printing Industries Alliance Printing Industries Alliance 1

Electrical Safety. Electrical Safety Webinar. Electrical. Printing Industries Alliance Printing Industries Alliance 1 Webinar 1 Electrical 2 1 Webinar Introduction An average of one worker is electrocuted on the job every day There are four main types of electrical injuries: Electrocution (death due to electrical shock)

More information

What is electricity? A form of energy that is carried through wires and is used to operate machines, lights, etc. PPT-SM-ES

What is electricity? A form of energy that is carried through wires and is used to operate machines, lights, etc. PPT-SM-ES Electrical Safety What is electricity? A form of energy that is carried through wires and is used to operate machines, lights, etc. PPT-SM-ES 2015 2 There are two forms of electricity Static electricity

More information

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE

Great Western Painting Crane Operator - Offshore CRANE OPERATOR - OFFSHORE Crane Operator - Offshore CRANE OPERATOR - OFFSHORE Cranes, like all pieces of heavy equipment, if not properly operated, inspected and maintained have a potential for causing major bodily injury or property

More information

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012 PAGE 1 OF 5 PURPOSE: OVERHEAD CRANES AND LIFTS PROCEDURE The purpose of this procedure is to define the safety and training requirements for use of overhead cranes and lifts. Procedure: Definitions Designated

More information

Powered Industrial Truck Safety Program

Powered Industrial Truck Safety Program Powered Industrial Truck Safety Program 0 TABLE OF CONTENTS Forklift Safety Program 1.0 Overview.. 2 2.0 Purpose....2 3.0 Procedures..2 4.0 Responsibilities. 4 5.0 Training Requirements......5 Appendix

More information

Electrical Hazards in Construction

Electrical Hazards in Construction Electrical Hazards in Construction WELCOME Tim Dawson Presentation developed by Dawson Safety Services - 2013 Dangers of Electrical Shock Currents above 10 ma* can paralyze or freeze muscles. Currents

More information

OVERHEAD & GANTRY CRANE / RIGGING

OVERHEAD & GANTRY CRANE / RIGGING Overhead & Gantry Crane / Rigging OVERHEAD & GANTRY CRANE / RIGGING Overhead and gantry cranes - 1910.179 Crawler locomotive and truck cranes. - 1910.180 Slings. 1910.184 Cranes, like all pieces of heavy

More information

Electrical Safety. Introduction

Electrical Safety. Introduction Electrical Safety Introduction Electrical hazards 300 electrocutions every year in the U.S. Leading cause is insufficient training ALL were preventable What is Electricity? How Electricity Works Created

More information

Fixed Ladder: A ladder that cannot be readily moved or carried because it is an integral part of a building or structure

Fixed Ladder: A ladder that cannot be readily moved or carried because it is an integral part of a building or structure Ladder Safety University of Tennessee Safety Guide GS-045 Document Contact: EHS-General Safety Date effective: May 1, 2013 Revision Date: May 1, 2013 Purpose The purpose of this procedure is to ensure

More information

Chapter 5. Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI)

Chapter 5. Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI) Chapter 5 Imagine That Engineering Inc. Assured Equipment Grounding Conductor Program (AEGCP) Ground Fault Circuit Interrupter (GFCI) Imagine That Engineering Inc. has adopted this program for equipment

More information

FACT SHEET Standard: Electrical Safety

FACT SHEET Standard: Electrical Safety What is a Ground Fault Circuit Interrupter? FACT SHEET The ground-fault circuit interrupter, or GFCI, is a fast-acting circuit breaker designed to shut off electric power in the event of a ground-fault

More information

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks

1 Clearheart Construction Co., Inc. Mobile Crane - Onshore MOBILE CRANES Cranes and derricks Mobile Crane - Onshore MOBILE CRANES Cranes and derricks. - 1926.550 Cranes, like all pieces of heavy equipment, if not properly operated, inspected and maintained have a potential for causing major bodily

More information

An average of one worker is electrocuted on the job every day There are four main types of electrical injuries:

An average of one worker is electrocuted on the job every day There are four main types of electrical injuries: Electrical Safety Introduction An average of one worker is electrocuted on the job every day There are four main types of electrical injuries: Electrocution (death due to electrical shock) Electrical shock

More information

The New 2017 National Electric Safety Code Overview and Significant Changes. Presented by. Mickey Gunter October 28, 2016

The New 2017 National Electric Safety Code Overview and Significant Changes. Presented by. Mickey Gunter October 28, 2016 The New 2017 National Electric Safety Code Overview and Significant Changes Presented by Mickey Gunter October 28, 2016 NESC Technical Subcommittees Subcommittee 1 Coordination, Definitions Subcommittee

More information

ELECTRICAL. 60 Minutes

ELECTRICAL. 60 Minutes ELECTRICAL 60 Minutes AGENDA Electrical definitions Electrical shocks, burns and secondary injuries Electrical hazards in the workplace Safety devices and prevention steps Do s and Don ts INTRODUCTORY

More information

Electrical Safety. Facilitator Guide

Electrical Safety. Facilitator Guide Electrical Safety Facilitator Guide Contents Overview...................................................2 Tips For Conducting An Effective Training Session..................... Successful Safety Programs.......................................

More information

Surface Regulations and Policies

Surface Regulations and Policies Surface Regulations and Policies COAL FATALITIES 1970-2002 350 300 250 200 150 100 50 0 1970 1973 1976 1979 1982 1985 1988 1991 1994 1997 2000 From January 1, 1970 through today, a total of 240 coal miners

More information

Basic Electrical Safety

Basic Electrical Safety Basic Electrical Safety Concerned About Electricity? How many sets of holiday lights do you plug into one extension cord? Do you still use your hot and sparking electric drill? Is your vacuum cleaner s

More information

GENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash?

GENERAL HOUSEKEEPING. 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash? Inspection Checklist GENERAL HOUSEKEEPING 1. Are all aisles, passageways, stairways and stairwells kept clear of tools, hoses, and trash? 2. Is oil, grease, or other liquids, when spilled on the floor

More information

EV-2051-M Electric Motor. Operation and Maintenance Manual

EV-2051-M Electric Motor. Operation and Maintenance Manual EV-2051-M Electric Motor Operation and Maintenance Manual Table of Contents Safety... 3 General...3 Safety Notices...6 Cautions, Warnings and Dangers...7 Cautions...8 Warnings...11 Dangers...13 Important

More information

Safe Working on or near low voltage electrical installations & equipment

Safe Working on or near low voltage electrical installations & equipment Safe Working on or near low voltage electrical installations & equipment Guidance Notes Version 1.11 28 June 2017 Gippsland Water Document Details Business Owner Procedure Process Owner/s Document Title

More information

ELECTRICAL AREA CONTROLLED ACCESS PROCEDURE SP-18 NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-18

ELECTRICAL AREA CONTROLLED ACCESS PROCEDURE SP-18 NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-18 NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-18 CONTROLLED ACCESS PROCEDURE HEAD of MAGNET OPERATIONS Bryon Dalton EH&S MANAGER Angela Sutton HEAD OF FACILITIES

More information

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and

In This Document MODULE DESCRIPTION This module provides information on the safety concerns and Crane Safety Fact Sheet In This Document MODULE DESCRIPTION This module provides information on the safety concerns and Introduction necessary precautions you will need to be aware of when working Crane

More information

VP, Facilities and Construction Management

VP, Facilities and Construction Management Title: Effective Date: November 2005 Revision Date: January 12, 2017 Issuing Authority: Responsible Officer: VP, Facilities and Construction Management Director Environmental Health and Safety PURPOSE

More information

BUCKET TRUCK SAFETY EQUIPMENT

BUCKET TRUCK SAFETY EQUIPMENT BUCKET TRUCK SAFETY EQUIPMENT Phone Number 800.222.4664 General Safety Guidelines - Safe Use of Bucket Trucks, Aerial Lifts) (Per OSHA Standard 1910.67, 1926.453) Definitions: An aerial device, by definition,

More information

"ELECTRICAL SAFETY IN THE WORKPLACE"

ELECTRICAL SAFETY IN THE WORKPLACE MAJOR PROGRAM POINTS "ELECTRICAL SAFETY IN THE WORKPLACE" Part of the "GENERAL SAFETY SERIES" Quality Safety and Health Products, for Today...and Tomorrow Outline of Major Points Covered in the "Electrical

More information

APPENDIX D - ELECTRIC CART REGULATIONS TERMINAL BUILDING

APPENDIX D - ELECTRIC CART REGULATIONS TERMINAL BUILDING APPENDIX D - ELECTRIC CART REGULATIONS TERMINAL BUILDING A. Scope These Rules and Regulations outline the requirements and procedures for the safe operation of electric cart vehicles (hereinafter Vehicles

More information

Ryko Solutions, Inc. Crane and Jib Safety Program

Ryko Solutions, Inc. Crane and Jib Safety Program Ryko Solutions, Inc. Crane and Jib Safety Program CONTENTS PURPOSE...3 POLICY...3 SCOPE...3 RESPONSIBILITIES...3 FITNESS FOR DUTY...4 INSPECTIONS...4 FREQUENT INSPECTION...4 PERIODIC INSPECTIONS...5 RATED

More information

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES...

PURPOSE... 1 II. SCOPE... 2 III. REFERENCES... 2 IV. RESPONSIBILITIES... Reed College 3203 Southeast Woodstock Blvd. Portland Oregon 97202-8199 Crane Safety Policy Effective Date: Revision Dates: February 9, 2011, June 25, 2012, July 2016 Review Dates: I. PURPOSE... 1 II. SCOPE...

More information

NJ TRANSIT STANDARD MAINTENANCE PROCEDURE MECHANICAL DEPARTMENT. The following approvals were obtained prior to the issuance of this procedure:

NJ TRANSIT STANDARD MAINTENANCE PROCEDURE MECHANICAL DEPARTMENT. The following approvals were obtained prior to the issuance of this procedure: Subject: Blue Signal Protection Morrisville Number: 398004 Revision: 3 Effective: September 8, 2014 Supersedes #: Rev. 2 of January 15, 2014 NJ TRANSIT STANDARD MAINTENANCE PROCEDURE MECHANICAL DEPARTMENT

More information

PAD-MOUNTED SWITCHGEAR INSPECTION & MAINTENANCE RECOMMENDATIONS TYPE PSI/II. 15kV 25kV. Qualified Persons

PAD-MOUNTED SWITCHGEAR INSPECTION & MAINTENANCE RECOMMENDATIONS TYPE PSI/II. 15kV 25kV. Qualified Persons Page 1 Qualified Persons... 1 Safety Information... 2 Procedures... 3 Maintenance... 3 Security Inspection (Exterior)... 3 Verify Securing Devices... 3 Maintaining the Exterior... 3 Replacing Labels...

More information

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists

Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists Material Handling - Cranes, Hoists, Slings, Chain Falls, and Ratchet Hoists University Facilities Internal Procedure: July 1, 2013 Effective date: July 1, 2013 Last Modified: April 2013 Approved by: Bob

More information

Revision History. 1. PURPOSE To set forth minimum site requirements for the construction, use and maintenance of portable ladders.

Revision History. 1. PURPOSE To set forth minimum site requirements for the construction, use and maintenance of portable ladders. No.: WYN032.039 Page: 1 of 6 Preparer: Owner: Approver: EHS Specialist EHS Hub Manager Site Manager Revision History Revision Date Revision Number Nature of Change 5/01 1 Formerly W-39 10/12 2 Reformatted

More information

Powered Industrial Trucks

Powered Industrial Trucks INDIANA UNIVERSITY-PURDUE UNIVERSITY at INDIANAPOLIS IUPUI Department of Environmental Health and Safety 620 Union Drive, Room 043, Indianapolis, Indiana 46202 Powered Industrial Trucks Purpose and Background

More information

36CSR27 TITLE 36 LEGISLATIVE RULE BOARD OF COAL MINE HEALTH AND SAFETY SERIES 27 RULES AND REGULATIONS GOVERNING SURFACE AREAS

36CSR27 TITLE 36 LEGISLATIVE RULE BOARD OF COAL MINE HEALTH AND SAFETY SERIES 27 RULES AND REGULATIONS GOVERNING SURFACE AREAS TITLE 36 LEGISLATIVE RULE BOARD OF COAL MINE HEALTH AND SAFETY SERIES 27 RULES AND REGULATIONS GOVERNING SURFACE AREAS 36-27-1. General. 1.1. Scope. -- Rules and Regulations Governing Surface Areas. 1.2.

More information

CRANE & HOIST SAFETY PROGRAM

CRANE & HOIST SAFETY PROGRAM CRANE & HOIST SAFETY PROGRAM 1.0 PURPOSE The purpose of the Crane and Hoist Safety Program is to: 1.1 Ensure a safe work environment for employees who operate, maintain, or work around cranes and hoists

More information

SECTION 11 POWERED INDUSTRIAL TRUCKS

SECTION 11 POWERED INDUSTRIAL TRUCKS SECTION 11 POWERED INDUSTRIAL TRUCKS 11.1 Powered Industrial Truck Procedure 11.2 Forklift Inspection 11.3 Operator Performance Evaluation Checklist Revised: May 2009 Updated: November 2017 Reviewed: October

More information

POTENTIAL HEALTH & SAFETY HAZARDS

POTENTIAL HEALTH & SAFETY HAZARDS Number: OH&S 18.11.1 Revision Date: 09/15/2014 TRU Electrical Safety 1. PURPOSE 1.1. The purpose of these guidelines is to provide the framework for controlling the risks associated with electricity to

More information

TAMPA ELECTRIC COMPANY ENERGY SUPPLY ELECTRICAL SAFETY PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY ELECTRICAL SAFETY PROGRAM TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 SCOPE 2 RESPONSIBILITY 3 EMPLOYEE TRAINING INCLUDING DOCUMENTATION 4 ELECTRICAL EQUIPMENT LABELING 5 APPROACH DISTANCES AND BOUNDARIES 5 8 GENERAL

More information

Appendix B PCC Electrical Safety Training

Appendix B PCC Electrical Safety Training Appendix B PCC Electrical Safety Training ELECTRICAL SAFETY TRAINING OBJECTIVES OSHA regulations have been adopted on electrical safety-related work practices for general industry. These new standards

More information

SM-1700 Secondary Shunt Trip Coil Assembly. Powered by Safety

SM-1700 Secondary Shunt Trip Coil Assembly. Powered by Safety SM-1700 Secondary Shunt Trip Coil Assembly Powered by Safety SM-1700 Secondary Shunt Trip Coil Assembly SM-1700 Contact Information Powell Electrical Systems, Inc. www.powellind.com info@powellind.com

More information

Arc Fault Circuit Interrupter (AFCI) FACT SHEET

Arc Fault Circuit Interrupter (AFCI) FACT SHEET Arc Fault Circuit Interrupter (AFCI) FACT SHEET THE AFCI The AFCI is an arc fault circuit interrupter. AFCIs are newly-developed electrical devices designed to protect against fires caused by arcing faults

More information

Hazards SAFETY CORNER. of Establishing an. Work Condition

Hazards SAFETY CORNER. of Establishing an. Work Condition Hazards of Establishing an Electrically Safe Work Condition Written By Tony Demaria & Dean Naylor, Tony Demaria Electric, Mose Ramieh, III, Power Generation & Testing When working around electrical equipment,

More information

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program

UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program UC Irvine Environmental Health & Safety SECTION: TITLE: Powered Industrial Truck (Forklift) Safety Program INITIATOR: Desirée Villarreal REVISION DATE: 10/17/2014 1. Program Description 2. Scope 3. Definitions

More information

Actsafe Safety Bulletin #23 WORKING WITH LIGHTING SYSTEMS AND OTHER ELECTRICAL EQUIPMENT

Actsafe Safety Bulletin #23 WORKING WITH LIGHTING SYSTEMS AND OTHER ELECTRICAL EQUIPMENT WORKING WITH LIGHTING SYSTEMS AND OTHER ELECTRICAL EQUIPMENT This Safety Bulletin is intended to assist all production personnel with understanding the Regulations and to warn of potential electrical and

More information

"ELECTRICAL SAFETY IN THE LABORATORY"

ELECTRICAL SAFETY IN THE LABORATORY MAJOR PROGRAM POINTS "ELECTRICAL SAFETY IN THE LABORATORY" Part of the "LABORATORY SAFETY SERIES" Quality Safety and Health Products, for Today...and Tomorrow Outline of Major Points Covered in the "Electrical

More information

IB PowlVac ITE-HK Remote Racking Device

IB PowlVac ITE-HK Remote Racking Device IB-51802 PowlVac ITE-HK Remote Racking Device for use with ITE-HK 5kV & 15kV Circuit Breakers and PowlVac ITE-HK 5kV & 15kV Replacement Circuit Breakers Powered by Safety PowlVac ITE-HK Remote Racking

More information

ELECTRICAL - GENERAL REQUIREMENTS SELF INSPECTION CHECKLIST

ELECTRICAL - GENERAL REQUIREMENTS SELF INSPECTION CHECKLIST Name of School: OPTIONAL INFORMATION Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: ELECTRICAL - GENERAL REQUIREMENTS SELF INSPECTION CHECKLIST Guidelines: This checklist covers

More information

OBAE, OBAEXU, ON BOARD Battery Chargers

OBAE, OBAEXU, ON BOARD Battery Chargers C O R P O R A T IO N O P E R A T I N G I N S T R U C T I O N S OBAE, OBAEXU, ON BOARD Battery Chargers INTRODUCTION: The OBAE line of chargers are designed for the permanent installation on battery powered

More information

ESSENTIAL SAFETY RESOURCES

ESSENTIAL SAFETY RESOURCES ESSENTIAL SAFETY RESOURCES GS-3009 DRIVING SAFETY Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations Manager s Signature: Type Name Table

More information

ARC FLASH MANAGEMENT REVIEW. October 2017

ARC FLASH MANAGEMENT REVIEW. October 2017 ARC FLASH MANAGEMENT REVIEW October 2017 PURPOSE: The issue of Arc Flash Exposure has been knocking around for the past couple of months but unsure if we all understand the issue with this item and how

More information

Electrical Hazard Three factors determine the resistance of a substance to the flow of electricity: conductors insulators extreme caution

Electrical Hazard Three factors determine the resistance of a substance to the flow of electricity: conductors insulators extreme caution Electrical Safety Electrical Hazard Three factors determine the resistance of a substance to the flow of electricity: What it is made of. Its size. Its temperature. Substances with very little resistance

More information

440/880LB ELECTRIC HOIST STF-4488EH

440/880LB ELECTRIC HOIST STF-4488EH ELECTRIC HOIST 440/880LB WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result

More information

Ontario Operations MAINTENANCE STANDARD PROCEDURE. Table of Contents. Electrical Electrical Department Energized Electrical Work Procedure

Ontario Operations MAINTENANCE STANDARD PROCEDURE. Table of Contents. Electrical Electrical Department Energized Electrical Work Procedure MAINTENANCE STANDARD PROCEDURE Ontario Operations TITLE Department Energized Work Procedure VALE # MPROC-50007 DATED 2018-05-04 PAGE Page 1 of 17 REV. 4 Table of Contents 1.0 PURPOSE... 2 2.0 APPLICATION...

More information

LABORATORY SAFETY SERIES: Electrical Safety

LABORATORY SAFETY SERIES: Electrical Safety ERI Safety Videos Videos for Safety Meetings 2952 LABORATORY SAFETY SERIES: Electrical Safety Leader s Guide Marcom Group Ltd. INTRODUCTION TO THE PROGRAM Structure and Organization Information in this

More information

Authorised By: Health and Safety Committee TITLE : ELECTRICAL SAFETY GUIDELINES IN-STORE DISPLAYS

Authorised By: Health and Safety Committee TITLE : ELECTRICAL SAFETY GUIDELINES IN-STORE DISPLAYS Original Issue: May 2012 Document No.: SMS.10.2 Revision No.: v4 (May) 2014 Page: 1 of 11 Revision Date: June 2015 Authorised By: Health and Safety Committee TITLE : ELECTRICAL SAFETY GUIDELINES IN-STORE

More information

Electrical Safety - Protecting Yourself Against Electrical Injuries. from NIOSH Electrical Safety Student Manual

Electrical Safety - Protecting Yourself Against Electrical Injuries. from NIOSH Electrical Safety Student Manual Electrical Safety - Protecting Yourself Against Electrical Injuries from NIOSH Electrical Safety Student Manual Oct 9 11:26 AM 1 Electricity is Dangerous There is a risk of an electrical injury - 1. Whenever

More information

1/2 HP SUMP PUMP OWNER'S MANUAL

1/2 HP SUMP PUMP OWNER'S MANUAL TM 1/2 HP SUMP PUMP OWNER'S MANUAL WARNING: Read carefully and understand all INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety precautions may result in serious

More information

Powered Industrial Vehicle Policy

Powered Industrial Vehicle Policy Powered Industrial Vehicle Policy Policy The Flight Department is committed to protecting employees from the hazards involved in the operation of powered industrial vehicles. This Policy is established

More information

OBE, OBEXU, ON BOARD Battery Chargers

OBE, OBEXU, ON BOARD Battery Chargers C O R P O R A T IO N O P E R A T I N G I N S T R U C T I O N S OBE, OBEXU, ON BOARD Battery Chargers INTRODUCTION: These chargers are designed for the permanent installation on battery powered vehicles

More information

Electrical Safety and Energy Control Program. San Jose State University

Electrical Safety and Energy Control Program. San Jose State University San Jose State University One Washington Square San Jose, California Facilities Development and Operations Department September 2, 2011 Page intentionally left blank. Electrical Safety and Energy Control

More information

University of Vermont Physical Plant Department Burlington, Vermont

University of Vermont Physical Plant Department Burlington, Vermont University of Vermont Physical Plant Department Burlington, Vermont ELECTRICAL SAFETY PROGRAM in accordance with VOSHA 29 CFR 1910 Subparts S VOSHA 29 CFR 1926 Subpart K NFPA 70E 2012 REVISED AND DISTRIBUTED

More information

ELECTRICAL SAFETY TRAINING

ELECTRICAL SAFETY TRAINING ELECTRICAL SAFETY TRAINING ELECTRICAL SAFETY TRAINING OVERVIEW Regulations & Standards Terms ELECTRICAL HAZARDS SAFETY MODEL Recognize hazards: work environment, electrical system, wrong PPE Evaluate hazards:

More information

Electrical Work (CPC-ALL-HSE-PRC-167)

Electrical Work (CPC-ALL-HSE-PRC-167) (CPC-ALL-HSE-PRC-167) DRM Retention Code: CG01 - CA Document to be reviewed every 2 years or less versions of this document are valid to be used until notified of revision via the Document Control Process.

More information

50 Ft. Retractable Cord Reel

50 Ft. Retractable Cord Reel 50 Ft. Retractable Cord Reel with Triple Tap Owner s Manual WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other

More information

Ladder Safety Program

Ladder Safety Program Ladder Safety Program For Adopted LC-1022 Rev. 06/16 Page 1 I. Introduction The Organization recognizes that employees use ladders on a regular

More information