1 UCEM High Voltage Battery Design for Electric Vehicle Team 1822 Tejinder Jutla, Jason Clark and Sung-Lin Chen April 27 th, 2018 ECE 4902 Senior Design II Advisor: Sung Yeul Park Sponsor: UConn Electric Motorsports Club Department of Electrical and Computer Engineering University of Connecticut 1

2 Table of Contents Executive Summary... 3 Background. 3 Accumulator Cell Selection...4 Battery Management System..7 Charging....9 Accumulator Container...9 Overcurrent Protection and Wiring Accumulator Integration and Testing.10 Project Phases Project Budget Appendix A: Relevant FSAE Rules...18 Appendix B: Decision Matrices Appendix C: Part and Component Datasheets Appendix D: Test Procedure Documents..28 Resources

3 Executive Summary In the Spring of 2017 UConn formed a club: UConn Electric Motorsports (UCEM). UCEM will build a formula style electric racecar from the ground up and compete in an international level. UCEM is sponsoring four separate senior design teams, each tasked with building an integral component of a single-seat electrically powered formula-style racecar. From design to production 11 students have each brought together the best components sourced from around the world integrated into a single vehicle. North America s first electrically powered aluminum honeycomb chassis is capable of accelerating from 0-60 mph in under three seconds. The electric racecar will be powered by a tractive accumulator system (the term tractive refers to high voltage system, and accumulator refers to battery), which includes a custom configured lithium ion battery pack, a battery management system (BMS), charger, and other necessary components. Since this is the first time the club is participating in this competition, most of the first semester was used on researching concepts and components to meet the power requirements from the electric motor. The second semester was spent on final design touches, assembly, and testing. Along with meeting the club s requirements, design also had to satisfy Formula Student Automotive Engineering (FSAE) rules. This was accomplished by creating decision matrices, comparing all options that meet requirements of rules and performance. The accumulator design was changed numerous of times, as this system impacts other subsystems on the car. By the end of the first semester, the battery was selected and finalized, the battery management system was identified along with the charger. The accumulator container was designed, with accordance to FSAE rules and collaboration with the chassis team, however it is bound to change. The selected batteries arrived, and the high voltage battery pack was assembled. The BMS was configured to the battery, and tests were conducted to determine the BMS was working correctly. High current wiring was connecting the battery, and providing a main output line, also connected with relays for overcurrent protection. Background There are significant FSAE rules to follow. The maximum allowed voltage is 300 V along with a maximum power from the accumulator of 80 kw. The accumulator must be separated into segments with each segment having a maximum energy of 6 MJ and maximum voltage of 120 V. Each cell must be fuse protected. The maximum power required by the motor selected by the motor team is 80 kw. The team also requested a voltage above 200 V for the accumulator. This voltage is in direct relation to the torque and speed for the motor performance. UCEM, the motor team, and the battery team came to a conclusion for the kwh of the accumulator. The FSAE 2017 results were analyzed from the endurance event to see how much energy the teams used, the completion time, and weights of the vehicles. The conclusion was made that the accumulator needed to be 4-5 kwh for this design. The accumulator must be designed to fit inside an accumulator container. The accumulator container must be removable from the vehicle, therefore must be placed in an accessible area. The accumulator needs to be transported on site to the charging station using a charging cart. A charger must be chosen to integrate into the system to meet the needs for the accumulator. A battery management system is required. All cell voltages must be monitored and at least 30% of their temperatures need to be monitored as well. A BMS must be chosen to communicate with the components of the tractive system and accurately meet the monitoring requirements. 3

4 Accumulator Cell Selection Time and research was first spent on understanding the needs for the battery and making a proper selection of battery cells. It was discovered there were three realistic options to choose from: cylindrical cells, pouches, and modules. Batteries in the style of pouches offer a highpower output, and a simple way to connect them electrically. The problem arises with pressure. The pouches expand and must be pressurized by an outside component. Cylindrical cells are contained within the cylinder and are automatically pressurized by this design. This involves many connections because a single cell does not offer a high-power output. The third option is modules that contain cylindrical cells connected in parallel. This allows for easy electrical connections but comes at an expensive price. The voltage and power requirements ultimately determine how the accumulator needs to be configured. Battery cell options were investigated comparing voltage, discharge current, capacity, weight, and cost. With these values, decision matrices were used to find the exact configuration to reach the desired power of 80 kw. Series connections add voltage, and parallel connections add current and capacity. The below equations were used for determining the configuration. Total Voltage (V) = Cell voltage (V) * # series connections (1) Total Current (A) = Cell discharge current (A) * parallel connections (2) Total Capacity (Ah) = Cell capacity (Ah) * parallel connections (3) Discharge Time = Capacity (Ah) / discharge current (A) (4) C-rate = Current (A) / Capacity (Ah) (5) Power = voltage(v) * current (A); P = VI (6) kwh = Accumulator voltage (V) * Accumulator capacity (Ah) (7) After these calculations, the number of batteries needed are known and calculations of total accumulator weight, volume, and price can be found. These are the ideal parameters to compare different cell types. A decision was made to use Samsung cells. These cells have a great discharge rate to capacity ratio, meaning they won t be drained fast. They are also less expensive than comparable cells and weigh less. The Samsung batteries important parameters can be seen in Table 1. It was calculated roughly 500 cells were needed to meet the requirements given to us. Nominal voltage 3.6 V Maximum Voltage Max. cont. discharge current Max. pulse current (< 1 sec) Capacity Standard charge current Max. charge current 4.2 V 20 A 100A 2.5 Ah 1.25 A 4 A Weight 44 g Table 1: Samsung relevant cell data. 4

5 There were many concerns in the battery team, along with the advisor Professor Park, and the club members of UCEM. The rules require temperature monitoring and fuse protection for each cell, so additional components were needed to assemble the accumulator. With hundreds of cells, all parties realized much time was needed to physically assemble the accumulator with individual cells. There were also concerns for error, because this is a delicate component to the vehicle. Not much time would be left for integrating a battery management system, charger, or other components into the accumulator. After much consideration with UCEM, all parties came to an agreement on using prepackaged modules containing the cylindrical cells. The modules offer simple monitoring, and ease of assembly. Energus Power Solutions is a company that manufactures battery modules that many teams use for the FSAE competition. They even offer the Samsung cells the team chose as a choice for the cells inside the modules. They have different module types and another decision matrix was used to compare modules and their configuration. A decision was made on the Energus Li8PT modules which have 8 Samsung cells in parallel. The important parameters can be found in Table 3. The modules contain temperature sensors for each cell and 2 fuses for each cell, satisfying the FSAE rules. The temperature sensors and assembly of modules can be seen in Figure 1. Factors Li20pT Li8pT Li10pT Li6pT Voltage 3.6 V 3.6 V 3.6 V 3.6 V Capacity 50 Ah 20 Ah 25 Ah 15 Ah Max Current Price $174 $89 $103 $75 Weight 1.05 kg kg kg kg Wh 180 Wh 72 Wh 90 Wh 54 Wh Table 2. Energus module comparison table, with 8 parallel modules chosen in green. Nominal voltage 3.6 V Maximum Voltage Peak Current Capacity Max. charge current w/ cooling Weight 4.2 V 360 A 20 Ah 40 A 427 g Table 3: Energus Li8PT relevant data The accumulator is designed to contain 64 Energus Li8PT modules in series. The modules have 8 cells in parallel already, and offer a maximum current of 360 A, so no further parallel connections are needed as this aligns with the motor requirements. This offers a nominal voltage of 230 V, a maximum voltage of 268 V, a peak discharge current of 360 A, and a 5

6 capacity of 20 Ah. These values can obtain the maximum power of 80 kw and give a 5.3 kwh accumulator. The configuration means the accumulator contains a total of 512 cells. The accumulator must be separated into segments with each segment having a maximum energy of 6 MJ and a maximum voltage of 120 V. The total energy of the accumulator can be found using equation (8). If the accumulator is separated into four segments, each segment has 16 modules. Each 16-module segment has 4.8 MJ and 67.2 V. Energy (J) = Voltage (V) * Capacity (Ah) *3600s (8) Figure 1: Energus Li8PT module (left) showing temperature sensors (top) and assembled (right). Energus provides bus bars and bolts to connect the modules that match their M8 terminals sockets. Once the batteries arrived, the team individually tested each module s voltage. Each module came charged and measured about 3.5V-3.6V. The assembly of the high voltage battery began the day the Energus modules arrived. Caution and care is needed when assembling a high voltage battery or whenever one works with high voltage. Proper safety gear needs to be worn by all persons working on the battery. Each 16-module segment was first assembled using bus bars and bolts provided by Energus. The segments are then connected using high current wiring and maintenance switches. The complete high voltage battery back can be seen in Figure 2. 6

7 Figure 2. Complete 268V battery using Energus modules, along with other components. Battery Management System A battery management system (BMS) is essential to the design and functionality of the tractive accumulator. Many hours of research went into this portion of the design, in simple terms, a battery management system is capable of monitoring/protecting the battery, balancing cells, estimate state of charge, maximize performance and be able to report to users and/or external devices. These are only basic requirements, BMS functions depends on manufacturer as well as customization. The BMS was selected based on three categories: analog versus digital, custom versus off-the-shelf and topology. Digital BMS is better, as it is capable of sensing each cell individually, this advantage allows the BMS to charge or discharge at cell level, as well as locate which cell might be at fault. A BMS off-the-shelf seemed like the only option, as the team does not possess the electrical experience one would need to carry out such an extensive task, several off-the-shelf BMS units are available within budget. Lastly, there are several different BMS topologies. Centralized is compact, least expensive option and easy to replace. Modular BMS are divided into multiple identical modules, one acts as the master, higher cost and more tap wires required. Master-Slave BMS are similar to modular, with the exception to slave prices which are lower. Lastly, distributed BMS have electronics contained on cell boards that are placed directly on the cells being measured, more points of error can occur which may be difficult to detect. The team decided on a centralized digital BMS, since all the voltage and thermistor tap wires are processed within a single BMS. This reduces error and eliminates the need to design individual circuit boards. Table 3 shows a comparison chart for different types of battery management systems. Table 4: quick non-quantitative comparison of BMS topology 7

8 As seen in Table 4, a centralized BMS is the better candidate for the task at hand. A complete decision matrix can be found at the end of this document comparing different BMS units (BMS table). The BMS that was selected by our team and club was the Ewert Orion BMS 2 the 72-cell configuration, since the battery packs are configured in a 64-series connection (BMS data sheet). Figure 3: Orion BMS input/output interface The Orion BMS operates at 12v 250Ma, capable of measuring state of charge, discharge current limit and charging current limit. This BMS has dual fully programmable CANBUS 2.0B, this is a high-speed Controller Area Network compared to many other options available. The CANBUS is a basic differential voltage, CAN-HI and CAN-LOW. This feature will be used to control the charger as well as the DC load (motor, inverter, etc.). The Orion BMS is made for electric vehicles, this means that it is of very high quality in both performance and functionality. It is capable of reading cell voltages from 0.5 to 5 volts, EMI resistance and functions between -40 to 80 degrees Celsius. The maximum and minimum open circuit voltage can be set within the BMS, if the voltages reach these set limits the BMS will open the Accumulator Isolation Relays (AIR). The temperature can also be set, so the BMS is again capable of opening the AIR if limit is met. The BMS is also equipped with Onboard Diagnostic (OBD), this will allow the team to read any error codes given by the BMS. The Orion BMS comes with a current sensor with an amperage rating of choice, which is 500A for this design. A temperature expansion module is needed alongside the BMS as the Orion is only capable of 8 thermistor inputs, and we need to be able to have 64 Zener diode inputs for all modules. Their company also offers a state of charge meter as a display module. It provides essential information on the accumulator as well as data logging for diagnostics and future testing. 8

9 Charging The charger is also an important part to the accumulator design. The goal for our charging research is to find one that is compatible with the battery, battery management system and has CAN communication protocol. Our battery pack contains 512 cells; therefore, the voltage and current are very high. All the power management work could be processed by the battery management system. The location of the race is in Canada which can only provide 120V AC voltage, so in the datasheet we can only view output current at 115V AC instead of 230V AC. We cannot just look at the peak power because of its output with 230V AC. In terms of the output power, higher output current gives us faster charging speed. But we also need to take into consideration that higher output power will generate more heat. If the charging environment is hot, it will reduce the performance of the charger. Initially we want to implement a fast charger to reduce charging time, so we chose Elcon PFC 5000 charger. However, charging time is not our priority since we have plenty of time during each event according to the club. We don t need such a high output current charger. There are several chargers we found that have very high charging power output but it s significantly more expensive. Our final decision is the Elcon PFC 2500 charger which delivers sufficient amount of charging current at 6A at half of the price of Elcon PFC 5000 charger. The Elcon charger is one of the few charger brands that is officially compatible with our Orion BMS. As a result, it is easier to implement. Using equation (9) we can find the charge time for our battery pack. Since the battery pack is 20Ah, and the charge current is 6A, the charge time is about 3 hours and 20 minutes. (9) Finally, according to the FSAE rules, if the battery needs to charge, the accumulator is required to be taken out of the car and transported to the charging station. This requirement will make the charger an external device which will reduce total weight of the vehicle. The battery must be transported with a hand cart equipped with a Deadman s braking system. This is for safety reasons. Accumulator Container An accumulator container is required to house the batteries and any other necessary components. This container must be easily removable from the vehicle in order to transport to the charging station at the competition. The tractive accumulator design and function is specified in the FSAE rule handbook (EV3.3). There are a number of requirements, such as grounding to chassis, removable from the chassis frame to be taken to the charging station. This translates into an efficient design which is both lightweight and robust to handle the track debris. The handbook also states that the battery pack has to be broken into segments for safety purposes, along with galvanic isolation requirements. Figure 4 is the final draft of design by this team, the accumulator container is subject to change as time progresses. 9

10 Figure 4. Accumulator container design. Left showing back, openings for output connections. Right showing front opening with top shelf for components and bottom with walls to separate 4 segments. The thickness requirement is as follows: floor must be 3.2mm thick, vertical and the segment separation walls must be 3.2mm thick, and the lid cover must be 2.3 mm thick. The material chosen for the container was aluminum, given its weight and strength properties. This material is also simple to construct out of and will save budget. Overcurrent Protection and Wiring Aside from the internal fuses of the Energus modules, there is one main fuse and two relays that protect the system. The relays are known as the Accumulator Isolation Relays (AIRs). According to the FSAE rules the main fuse must have a current rating that is lower than the continuous current of the component it is protecting, which in this case is the accumulator which has a constant current of 160 A. The fuse must also be rated for the maximum voltage of the system. Bussmann/Eaton FWH-150B is the decided fuse with a current rating of 150 A and maximum voltage of 500 VDC. The rules also state the relays must have a switch off current that is higher than the fuse rating. The relays must be of a normally open type and open both poles of the accumulator meaning one on each side. Kilovac Lev200A4NAA are the decided relays with a switch off current of 500 A and maximum voltage of 900 VDC. The relays must also be supplied with a 12v power supply. The AIRs can be seen in Figure 5. Figure 5. Both AIRs shown with high current wiring. The battery segments must be electrically separated by maintenance plugs or contactors. Maintenance switches from EVWest were found that were rated for 400 A. They have M8 bolts on the bottom that can be connected to ring terminals using wires, the same as the relays. There are 3 maintenance switches, each placed in between the segments of the battery. This offers a safe way to electrically separate the battery segments from one another. 10

11 Figure 6. EVWest maintenance switches. The Orion BMS ships with the necessary wires needed for the voltage taps, SOC meter, and main wires. The main concern was finding wiring that was adequate for the high current path of the accumulator. A high current wire 2/0 AWG from EVwest can handle up to 390A which meets our requirements. This wiring can be used to connect the main fuse, the AIRs, the maintenance switches, and the high current path leading to the motor side of the vehicle. M8 ring terminals can be used to connect wires to the Energus modules because their electrical contacts are M8 bolt sockets. Accumulator Integration and Testing This is a new club to UConn and there was lack of funding in the beginning. Since there was no money at first, the team was not able to get any batteries to do any testing on. With a finalized battery decision, the club ordered the batteries from Energus in late January. Energus had a 6-week lead time due to manufacturing, and the batteries did not arrive until late March. The assembly of the battery began immediately once they arrived. The BMS and charger arrived in mid-march and were set up and integrated with one another as much as possible before the batteries arrived. With the battery pack assembled, the BMS could now be configured with the battery. There are 64 series connections meaning the BMS has to measure 64 cell voltages (since all parallel connections have the same voltage). The Orion BMS 2 ordered is compatible for up to 72 cells, each separated into groups of 12. The voltage tap wires are provided with the Orion BMS 2, each numbered and must be connected in order. The voltage tap connections for one segment are shown in Figure 7. The end of the voltage tap wires were sent into ring terminals and then crimped. The ring terminals can connect to the M8 bolt terminals of the Energus modules. Starting with the most negative end of the complete battery, the ground cable for the first voltage tap group is connected. From here a cable is connected to each positive terminal of the Energus modules and must be in order. Once each group of 12 is complete, the ground for the next group can be connected to the next module, and the process can be repeated until all Energus modules are connected to the BMS through the voltage taps. If there are less then 12 cells in a group of voltage taps, the remaining tap wires must be connected to the positive most cell of the group. 11

12 Figure 7. Voltage tap connections for one battery segment. The Orion BMS software on a computer is able to connect to the BMS through a CAN to USB adapter. With all voltage taps connected correctly, the BMS software displays all cell voltages in real time. The software has a user interface that can allow the customization of settings. Balancing settings were set, along with charging settings. With the voltages being measured the SOC meter could now be tested. The SOC meter communicates with the BMS through CAN communication as well and displays the SOC of the battery in percentage form. As long as all voltage taps are connected correctly, and the battery profile is set up, the SOC meter should be reading correctly. The BMS data sheets state that the provided current sensor placement around the positive charging cable is necessary in order to read an accurate SOC. The Elcon PFC 2500 came equipped with CAN communication and must be placed on a 250 Kbps channel. Since the BMS has 2 CAN channels, one can be set to 250 Kbps while the other can be set to 500 Kbps for other devices. The Orion BMS software was picking up the charger once the charger was connected to the BMS through CAN. The charger turns on and has an indicator LED to signal what it is currently doing. 10 AWG cables are the output of the charger which are in an Anderson connector. The other Anderson connector was also equipped with 10 AWG wires and connected to the main positive and negative terminals of the battery. The Anderson connectors easily connect, allowing an easy way to charge the battery. The connection between the battery and the charger can be seen in Figure 8. The charger is connected to the Orion BMS through CAN and they can communicate with each other about the state of the batteries. The BMS can tell the charger when the batteries are full and can cut off power and prevent the batteries from becoming over charged. The team unfortunately ran out of time and could not test the charger actually charging the batteries. 12

13 Figure 8. Complete battery pack and charger connected by grey Anderson connector. The team wanted to perform discharge tests on the Energus batteries but were not able to do so because of the late arrival. Future testing needs to be conducted to shows temperature changes due to different discharge rates and charging time. The modules contain the Samsung cells and some temperature vs. discharge data was found as shown in Figure 9. The temperature in this graph increases over 60 C which is the maximum temperature rating for the Samsung cells and by FSAE. This testing data will directly lead to the future design of the cooling system. When batteries charge they start off with a fast current, and the current drops off to top off the charge on the battery. In the future testing phase, the Energus module should be drained to its shut off voltage of 2.5 V and then charged. From this charge time, it can be calculated how long the accumulator will need to charge once the whole system is operational and compared to the calculated charge time value of 3 hours and 20 minutes. The Energus temperature sensors measure the voltage across the sensor or circuit. This voltage corresponds to a certain temperature as seen in Table 5 and Figure 10. The temperature sensors are Zener diodes and the BMS is only compatible with thermistors therefore a custom temperature module is required. This involves multiplexer chips with ADCs taking in the measurement from the sensor and sent along a daisy chain. This can be done using LTC6803 chips. The LTC chips have SPI outputs for communication and can be sent into a microcontroller. The microcontroller must be programmed to read all the data from the LTC chips, and output signals using CAN. The TI TM4C123GXL is a great candidate and was chosen for this design. The MCU can communicate with the Orion BMS through CAN about any temperature readings it finds over the limit. 13

14 Figure 9: Samsung discharge and temperature characteristics. Table 5: Energus temperature sensors voltage to temperature conversions. Figure 10: Energus voltage readings of sensors in relation to the temperature. 14

15 The next step for future teams is the battery integration to the motor side of the vehicle. The first point of contact with the motor side to our accumulator system is the BMS and motor inverter. Through CAN communication the motor side and accumulator side can communicate on the required power draw and in turn the current draw. These systems can be programmed to not draw over a certain current, offering extra protection alongside the fuses and accumulator isolation relays. Once the motor and accumulator sides of the vehicle are integrated and working, all components need to fit inside the designed chassis. After everything is assembled into the vehicle the real testing of the vehicle can begin. UCEM will be performing driving tests before the competition to make sure the vehicle meets the standards of the events at the competition. During these driving tests, team members should be monitoring the BMS to make sure everything is working as it should. All testing documents can be found in Appendix D, these documents are subject to change. Although testing procedures are valid, the university does not have the resources to test the accumulator since it requires a maximum current of 360A. Next step would be to test the accumulator with the motor, since it will be able to provide the load needed to dissipate the power. Project Phases The first phase of the project was understanding the requirements, and also the rules given by FSAE. Much time was spent into cell research and selection type. At first, cylindrical cells were decided on and the Samsung s were chosen. After consideration about having to assemble these cells and not having time to complete the other aspects of the project, it was agreed on that the Energus modules would be used. After analyzing the decision matrix, the Li8PT modules were chosen, with a 64-series configuration to give optimal voltage and current. The next milestone was researching battery management systems and finally selecting a model. The Orion BMS 2 comes with multiple documents detailing how to use it and initialize the system. The unit also comes with software for monitoring the accumulator with a friendly user interface. This centralized unit is also less expensive and smaller than other units such as JTT electronics master/slave BMS. The accumulator container and charger have been undergoing research alongside one another. The dimensions have been received from the chassis team, and the container is designed from these dimensions. The types of chargers have been researched, and the team is confident on the type and model needed for this design. The Elcon PFC 2500 offers a maximum charging current for the accumulator and can provide fast charging. The temperature module was designed except for the coding of the MCU. All components were selected and received by the team, but the team did not have time to finish the coding portion of the temperature module. In the future it will be a good idea to have this custom component on a PCB. The testing and integration with the motor was also not complete because of the lack of time. The batteries arrived late in the school year and the teams did not want to rush the process. The battery must be assembled and tested delicately and cautiously because high voltage has potential to be dangerous. Proper safety protocols need to be in place in order to prevent injury to any student working on the high voltage battery. A safety protocol document was written by this team and will be accessible to any future UCEM members. 15

16 With these final steps taken, the accumulator system is fully designed. The battery pack is assembled and is integrated with the BMS. The future work will be focused on testing components and integrating them into one another. With all integration and testing complete, there will be a fully functioning electric vehicle. Table 6: Project timeline and phases Figure 11: Gantt chart for project. 16

17 Budget The total cost of this project was $9, The final cost breakdown of all the components for the accumulator can be seen in Table 7. The Energus modules were the most expensive part of the accumulator design followed by the Orion BMS 2 and Elcon PFC These are the 3 main components of the system, but many other products were researched, ordered, and integrated. UCEM did not give the team a definite budget for the accumulator system design. The club was waiting on responses from multiple teams working on the vehicle to determine a total price. Components Cost 64 Energus Modules $5,980 Orion BMS 2 $1, SOC w/ data logging $ Elcon PFC 2500 Charger $750 Relays $ Main Fuse $ /0 AWG wire $58 Maintenance Switches AWG wire $50 Ring Terminals $60.9 CANdapter $69 CAN Terminals $100 Total $9, Table 7. Final cost breakdown of accumulator design 17

18 Appendix A: FSAE Relevant Rules EV2.2 Power and Voltage Limitation EV2.2.1 The maximum power drawn from the battery must not exceed 80kW. This will be checked by evaluating the Energy Meter data. EV1.1 High-Voltage (HV) and Low-Voltage (LV) EV1.1.1 Whenever a circuit has a potential difference where the nominal operation voltage is greater than 60V DC or 25V AC RMS it is defined as part of the High Voltage or tractive system. EV1.1.2 The maximum permitted voltage that may occur between any two electrical connections is different between the competitions allowing electric vehicles. The following table lists the respective values: Competition Formula SAE Electric Formula Student Voltage Level 300 VDC 600 VDC EV1.1.4 The tractive system accumulator is defined as all the battery cells or supercapacitors that store the electrical energy to be used by the tractive system. EV1.1.5 Accumulator segments are sub-divisions of the accumulator and must respect either a maximum voltage or energy limit. Splitting the accumulator into its segments is intended to reduce the risks associated with working on the accumulator. EV1.2 Grounded Low Voltage and Tractive System EV1.2.1 The tractive system of the car is defined as every part that is electrically connected to the motor(s) and tractive system accumulators. EV1.2.3 The tractive system must be completely isolated from the chassis and any other conductive parts of the car. EV1.2.4 The tractive-system is a high-voltage system by definition, see EV EV1.2.7 The entire tractive and GLV system must be completely galvanically separated. The border between tractive and GLV system is the galvanic isolation between both systems. Therefore, some components, such as the motor controller, may be part of both systems. EV1.2.8 All components in the tractive system must be rated for the maximum tractive system voltage. EV3.2 Tractive System Accumulator Container General Requirements EV3.2.1 All cells or super-capacitors which store the tractive system energy will be built into accumulator segments and must be enclosed in (an) accumulator container(s). EV3.3 Tractive System Accumulator Container - Electrical Configuration EV3.3.1 If the container is made from an electrically conductive material, then the poles of the accumulator segment(s) and/or cells must be isolated from the inner wall of the accumulator container with an insulating material that is rated for the maximum tractive system voltage. All conductive surfaces on the outside of the container must have a lowresistance connection to the GLV system ground, see EV4.3. Special care must be 18

19 taken to ensure that conductive penetrations, such as mounting hardware, are adequately protected against puncturing the insulating barrier. EV3.3.2 Every accumulator container must contain at least one fuse and at least two accumulator isolation relays, see EV3.5 and EV6.1. EV3.3.3 Maintenance plugs, additional contactors or similar measures have to be taken to allow electrical separation of the internal cell segments such that the separated cell segments contain a maximum static voltage of less than 120VDC and a maximum energy of 6MJ. The separation must affect both poles of the segment. EV3.3.4 Each segment must be electrically insulated by the use of suitable material between the segments in the container and on top of the segment to prevent arc flashes caused by inter segment contact or by parts/tools accidentally falling into the container during maintenance for example. Air is not considered to be a suitable insulation material in this case. EV3.3.5 The Accumulator Isolation Relays (AIRs) and the main fuse must be separated with an electrically insulated and fireproof material to UL94-V0 from the rest of the accumulator. Air is not considered to be a suitable insulation material in this case. EV3.3.7 Contacting / interconnecting the single cells by soldering in the high current path is prohibited. Soldering wires to cells for the voltage monitoring input of the AMS is allowed, since these wires are not part of the high current path. EV3.3.8 Every wire used in an accumulator container, no matter whether it is part of the GLV or tractive system, must be rated to the maximum tractive system voltage. EV3.3.9 Each accumulator container must have a prominent indicator, such as an LED that will illuminate whenever a voltage greater than 60V DC is present at the vehicle side of the AIRs. EV3.5 Accumulator Isolation Relay(s) (AIR) EV3.5.1 In every accumulator container at least two isolation relays must be installed. EV3.5.2 The accumulator isolation relays must open both (!) poles of the accumulator. If these relays are open, no HV may be present outside of the accumulator container. EV3.5.3 The isolation relays must be of a normally open type. EV3.5.4 The fuse protecting the accumulator tractive system circuit must have a rating lower than the maximum switch off current of the isolation relays. EV3.6 Accumulator Management System (AMS) EV3.6.1 Each accumulator must be monitored by an accumulator management system whenever the tractive system is active or the accumulator is connected to a charger. For battery systems this is generally referred to as a battery management system (BMS) however alternative electrical energy storage systems are allowed and therefore AMS will be the terminology used in this document. EV3.6.2 The AMS must continuously measure the cell voltage of every cell, in order to keep the cells inside the allowed minimum and maximum cell voltage levels stated in the cell data sheet. If single cells are directly connected in parallel, only one voltage measurement is needed. EV3.6.3 The AMS must continuously measure the temperatures of critical points of the accumulator to keep the cells below the allowed maximum cell temperature limit stated 19

20 in the cell data sheet or below 60 C, whichever is lower. Cell temperature must be measured at the negative terminal of the respective cell and the sensor used must be in direct contact with either the negative terminal or its busbar. If the sensor is on the busbar, it must be less than 10mm away from the cell terminal. EV3.6.4 For centralized AMS systems (two or more cells per AMS board), all voltage sense wires to the AMS must be protected by fusible link wires or fuses so that any the sense wiring cannot exceed its current carrying capacity in the event of a short circuit. The fusing must occur in the conductor, wire or pcb trace which is directly connected to the cell tab. EV3.6.5 Any GLV connection to the AMS must be galvanically isolated from the tractive system. EV3.6.6 For lithium based cells the temperature of at least 30% of the cells must be monitored by the AMS. The monitored cells have to be equally distributed within the accumulator container(s). EV3.6.7 The AMS must shutdown the tractive system by opening the AIRs, if critical voltage or temperature values according to the cell manufacturer s datasheet and taking into account the accuracy of the measurement system are detected. If the AMS does perform a shutdown, then a red LED marked AMS must light up in the cockpit to confirm this. EV6.1 Overcurrent Protection EV6.1.1 All electrical systems (both low and high voltage) must have appropriate overcurrent protection. EV6.1.4 If multiple parallel batteries, capacitors, strings of batteries or strings of capacitors are used then each string must have individual overcurrent protection to protect all the components on that string. Any conductors, for example wires, busbars, cells etc. conducting the entire pack current must be appropriately sized for the total current that the individual overcurrent protection devices could transmit or additional overcurrent protection must be used to protect the conductors. EV8.2 Charging EV8.2.1 There will be a separated charging area on the event site. Charging tractive system accumulators is only allowed inside this area. EV8.2.2 Accumulators must be removed from the car for charging within a removable accumulator container and placed on the accumulator container hand cart for charging. EV8.2.3 The accumulator containers must have a label with the following data during charging: Team name and Electrical System Officer phone number(s). EV8.3 Chargers EV8.3.1 Only chargers presented and sealed at Electrical Tech Inspection are allowed. All connections of the charger(s) must be isolated and covered. No open connections are allowed. EV8.3.2 All chargers must either be accredited to a recognized standard e.g. CE or where built by the team they must be built to high standards and conform with all electrical requirements for the vehicle tractive system, for example EV4.1, EV4.3 and EV4.6 as appropriate. 20

21 EV8.3.3 The charger connector must incorporate an interlock such that neither side of the connector become live unless it is correctly connected to the accumulator. EV8.3.4 HV charging leads must be orange EV8.3.5 When charging, the AMS must be live and must be able to turn off the charger in the event that a fault is detected. EV8.3.6 When charging the accumulator, the IMD must be active and must be able to shut down the charger. Either the charger must incorporate an active IMD or an active IMD must be within the accumulator. 21

22 Appendix B: Decision Matrices Table B.1: Energus modules comparison sheet. 22

23 Table B.2: Cylindrical cell comparison sheet Table B.3: BMS comparison sheet and selection. 23

24 Table B.4: Charger Comparison 24

25 Appendix C: Part and Component Datasheets Table C.1: Energus Li8PT data table. Full Energus data sheet here. 25

26 Table C.2: Samsung R data table. Full Samsung data sheet here. Orion BMS documents found here 26

27 ElCon PFC 2500 Battery Charger Technical Data Full Elcon PFC 2500 data sheet here 27

28 Appendix D: Test Procedure Documents 1. Purpose Charger Test Procedure The Charger is an important part of the accumulator system. The purpose to test a charger is to see whether it perform as expected so that it will not damage the battery pack. Also, to make sure it can charge our battery pack correctly. 2. Equipment Needed Part Name Elcon PFC V 20A charger Digital Multi Meter Timer Cable Input AC source Load Orion BMS Nomenclature High Frequency industry charger Test tool used to measure various value To measure time Cable that can handle up to 20A Need to have 120V AC to 240V AC Max Can draw up to 20A Battery Management System 3. Test Procedure 3.1: General test To test a charger, we need to first test the whether the actual output voltage and current of the charger is what it designed or programmed to be. Action Results Know the charger s programmed N/A output voltage and current Prepare a Multi Meter switch Multi Meter to measure DC DC output voltage should match expected value output voltage and current Switch to DC output current DC output current should match expected value 28

29 3.2: Charging time Next, we need to test its charging time. The charging time equation is: where time h is in hours. Action Make sure the output voltage from the charger is larger than the overall voltage of the battery or battery pack. Otherwise it won t charge. Results N/A Calculate the expected charging time using the equation above. Get expected value to compare later Charge the battery and start a timer N/A to time the overall charge time When the battery is full, the charger N/A will shut down Stop the timer. Compare the expected charge time and actual charge time. Charge time may not be exactly the same so few minutes off is acceptable. 3.3: Thermal testing Next we test the thermal for the charger. Most charger come with over temperature protection. In our case, if the Elcon PFC 2500 charger s internal temperature of the charger exceeds 75, the charging current will reduce automatically. If exceeds 85, the charger will shut down protectively. When the internal temperature drops, it will resume charging automatically. To test this over temperature protection function: 29

30 Action Find a load, whether the battery or machine load that can drain high current or near max charger design current Plug in the charger into Orion BMS system to use it measure temperature of the charger Wait the charger s temperature to go up. Monitor charger s temperature using BMS. Measure the temperature Connect the output to a Multi meter and set it to DC current mode Observe the temperature and output current if temperature is over 75 degree C Observe the temperature and output current if temperature is over 85 degree C. Results Charge indicator should be on. Observe whether BMS pick up charger temperature Get charger temperature Get the output current from the charger Output current should reduce if temperature is over 75 degree C. Output current should be 0 if temperature of the charger is 85 degree C. 3.4: Short-circuit Protection Short-circuit Protection: When the charger encounters unexpected short circuit across the output, charging will automatically stop. When fault removes, the charger will re-start in 10 seconds. Action Results Grab a wire that can handle up to 20A. N/A Connect positive and negative terminal on the charger Short-circuit detected, charger will shut down for 10 seconds Disconnect positive and negative terminal Charger should restart To test this function, we can simply use a wire to connect the positive terminal and negative terminal together to simulate a short circuit. And the we can observe whether the charger stop charger or not. 30

31 3.5: Reverse Connection Protection: When the battery is polarity reversed, the charger will disconnect the internal circuit and the battery, the charging will stop and avoid been damaged. To test this protection function, connect the positive terminal of the charger to negative terminal of the load and negative terminal of the charger to positive terminal of the load. Plug in the charger and if charger is not charging then this function works. 3.6: Input Low-voltage Protection When the input AC Voltage is lower than 85V, the charger will shut down protectively and automatically resume working after the voltage is normal again. Action Set the input AC voltage to 120V AC and plug it into the charger Connect the charger to a random load that it can charge Next lower the input AC voltage to the charger under 85V Crank up the AC input voltage to V, observe the charger. Results N/A N/A The charger should shut down and stop charging The charger should resume charging. 31

32 BMS TEST PROCEDURE UConn Electric Motorsports ACCEPTANCE TEST PROCEDURE NO. 01 DATE: 12/09/17 TITLE: BMS Pre-integration Test Procedure PREPARED BY: Tejinder Jutla 32

33 CHECKED BY: APPROVED BY: Table of Contents 1.0 Purpose Applicable Documents Drawings Test Equipment WARNING Test Procedure BMS SOC BMS Balance BMS Charging BMS Discharging Troubleshooting Grounding Wire Shielding Wire Routing 37 33

34 1.0 Purpose The Battery Management System basic functions will be tested in this Acceptance Test, main objective it to demonstrate satisfactory operation of the system installed on the FSAE racecar and compliance to the appropriate sections of the FSAE Rulebook This Acceptance Test will confirm operation of the BMS at a component level, before integration to any other systems. This will mitigate risks of failure and promote safety of person working on the tractive accumulator. 2.0 Applicable Documents 1) Orion BMS Operational Manual 2) Orion BMS Troubleshooting Manual 3) Orion BMS Wiring Manual 4) Orion BMS Software Utility Manual 3.0 Drawings 1) Enclosure Assembly, Std. Capacity, Technical Outline 2) Orion BMS Quick-Start Guide 4.0 Test Equipment Part Number Nomenclature Orion BMS Standard Size Battery Management System 62 Li2x4PT Li-ion building block with temp sensor-3.6v/18c AeroVironment ABC-150 Testing of advanced batteries, fuel cells, capacitors, and other alternative energy technologies Digital Multi Meter test tool used to measure two or more electrical values PFC 2500 Battery Charger Constant current constant voltage charger 34

35 5.0 WARNING This Test Procedure requires the use of high current and high voltage equipment(s). Safety is the highest priority. The rules of the lab and instructor of the lab must be respected and in compliance with the university s safety rules. Verify all members of the team have the correct safety training to be working in such an environment. At this stage, the BMS is deemed unreliable unless proven otherwise by completing this Test Procedure. If the test procedure fails, identify, and correct the problem using other documentation if available. 6.0 Test Procedure 6.1 BMS SOC ACTION Assuming the battery pack is ideal, connect to ABC-150 at the negative terminal and discharge pack Connect battery pack to the BMS and note the reading Confirm the DMM reading with that of the BMS RESULTS Voltage across terminal should result in a decrease, confirm with DDM BMS should signal and give an indication of low voltage, charger should be activated at this point to bring voltage back up This will give you accuracy reading prediction from the BMS 6.2 BMS Balance ACTION Take one pack from the 62 packs connected in module, using the ABC- 150, discharge this one pack and connect back to the battery Connect battery pack to the BMS and note any messages given At this point, allow BMS to balance the battery pack RESULTS The one pack that was discharged will be out of balance compared to the rest of the packs. Confirm and note the voltage of this pack BMS should be able to read the pack that is out of balance, and point out exactly which one is the culprit. Battery pack should be balanced out to original values 35

36 6.3 BMS Charging ACTION RESULTS Turn on power to the charger BMS should appear operational, since the BMS is digital, note the cell voltages, and current is now flowing into the pack N/A BMS is aware of the current flowing into the pack, the SOC value is increasing Verify cell temperature readings, making sure they are not excessive BMS should read correct values, if temp reaches beyond 60C then bms should shut off charging (60 degrees C) N/A Note that balancing starts occurring on the most charged cells when their voltages reach a certain threshold N/A As soon as any cell s voltage reaches the maximum threshold, charging is interrupted Turn off power to the charger Pack is fully charged 6.4 BMS Discharging ACTION RESULTS Turn on the load, in this case, the pack should be connected to the ABC-150 which will act as the motor BMS should appear operational, since the BMS is digital, note the cell voltages, and current is now flowing out of the pack N/A BMS is aware of the current flowing out of the pack, the SOC value is decreasing Verify cell temperature readings, BMS should read correct values making sure they are not excessive (60 degrees C) Discharge at 18C (360A) for five sec. Repeat step but at 8C (180A) constant As soon as any cell s voltage reaches the minimum threshold, batteries should be discharged current until voltage cutoff at 60C Turn off load N/A 36

UCEM Tractive Accumulator System. ECE 4901 Senior Design I

UCEM Tractive Accumulator System. ECE 4901 Senior Design I UCEM Tractive Accumulator System Final Report as of December 11, 2017 Submitted By Tejinder Jutla, Jason Clark and Sung-Lin Chen ECE 4901 Senior Design I Adviser: Sung Yeul Park Customer: UConn Electric

More information

HV/LV Memo. ECE 492 Spring Abstract. Latest Revision: 16 May Prepared by: Brendan Flood

HV/LV Memo. ECE 492 Spring Abstract. Latest Revision: 16 May Prepared by: Brendan Flood HV/LV Memo ECE 492 Spring 2013 Latest Revision: 16 May 2013 Prepared by: Brendan Flood Abstract This document examines the high-voltage (tractive) and grounded low-voltage systems of the LFEV-ESCM system

More information

Abstract. GLV Systems Test Plan 1

Abstract. GLV Systems Test Plan 1 GLV Systems Test Plan 1 Abstract This document details the acceptance test plan for the Grounded Low Voltage system being developed for the LFEV design project. This is only a test plan draft, and will

More information

Abstract. Acceptance Test Plan Draft - TSV 1

Abstract. Acceptance Test Plan Draft - TSV 1 Acceptance Test Plan Draft - TSV 1 Abstract The Acceptance Test Plan defines the necessary test procedures to be used in order to verify all functional requirements and specifications for the integrated

More information

University of New Hampshire: FSAE ECE Progress Report

University of New Hampshire: FSAE ECE Progress Report University of New Hampshire: FSAE ECE Progress Report Team Members: Christopher P. Loo & Joshua L. Moran Faculty Advisor: Francis C. Hludik, Jr., M.S. Courses Involved: ECE 541, ECE 543, ECE 562, ECE 633,

More information

Orion BMS Purchasing Guide Rev. 1.2

Orion BMS Purchasing Guide Rev. 1.2 www.orionbms.com Orion BMS Purchasing Guide Rev. 1.2 Main Components... 2 Orion BMS Unit... 2 Current Sensor... 4 Thermistors... 5 CANdapter... 6 Wiring Harnesses... 7 Cell voltage tap wiring harnesses...

More information

Design Report of the High Voltage Battery Pack for Formula SAE Electric

Design Report of the High Voltage Battery Pack for Formula SAE Electric Design Report of the High Voltage Battery Pack for Formula SAE Electric Liam West, Barry Shepherd, Nathaniel Karabon, Josh Howell, Mike Pyrtko Department of Mechanical Engineering University of Wisconsin-Madison

More information

Overview. Battery Monitoring

Overview. Battery Monitoring Wireless Battery Management Systems Highlight Industry s Drive for Higher Reliability By Greg Zimmer Sr. Product Marketing Engineer, Signal Conditioning Products Linear Technology Corporation Overview

More information

Ram Racing CSU Formula SAE

Ram Racing CSU Formula SAE Ram Racing 2016 CSU Formula SAE Background/History Colligate Electric Racecar design competition Ram Racing was established in 1996 2 nd iteration of Formula SAE Electric Competition Static events Design

More information

2019 Formula SAE Japan Local Rules Number 1 Issued: December 26, 2018(Second Edition)

2019 Formula SAE Japan Local Rules Number 1 Issued: December 26, 2018(Second Edition) 2019 Formula SAE Japan Local Rules Number 1 Issued: December 26, 2018(Second Edition) The purpose of this document is to inform of the local rules that shall apply to 2019 Formula SAE Japan. Any additional

More information

Xtalin Accumulator Monitoring System and. Xtalin Accumulator Balancing System devices

Xtalin Accumulator Monitoring System and. Xtalin Accumulator Balancing System devices www.xtalin.com lagler@xtalin.com Xtalin Accumulator Monitoring System and Xtalin Accumulator Balancing System devices Datasheet - Public Table of content 1. List of abbreviations... 4 2. List of all AMS

More information

80V 300Ah Lithium-ion Battery Pack Data Sheet

80V 300Ah Lithium-ion Battery Pack Data Sheet 80V 300Ah Lithium-ion Battery Pack Data Sheet 80 V, 300 amp-hour capacity, maintenance-free energy storage, IP65 design, fully integrated BMS, integrated fuse and safety relay protection, highly configurable

More information

Formula Hybrid ESF -- Part 1

Formula Hybrid ESF -- Part 1 Formula Hybrid ESF -- Part 1 INTRODUCTION Part 1 of the Formula Hybrid ESF is intended to help teams solidify those design decisions that need to be made early in the program. This will also help the technical

More information

Orion 2 BMS Operation Manual

Orion 2 BMS Operation Manual www.orionbms.com Orion 2 BMS Operation Manual The Orion BMS 2 by Ewert Energy Systems is the second generation of the Orion BMS. The Orion BMS 2 is designed to manage and protect Lithium ion battery packs

More information

CP-250E-60/72-208/240-MC4 Microinverter with Modular Trunk Cable

CP-250E-60/72-208/240-MC4 Microinverter with Modular Trunk Cable CP-250E-60/72-208/240-MC4 Microinverter with Modular Trunk Cable Chilicon Power Aug 2016 1 CONTENTS CP-250E Microinverter System... 3 The CP-100 Cortex Gateway... 3 Important Safety Information... 4 Inverter

More information

Contents. Formula Student UK Appendix FSUK-C-2

Contents. Formula Student UK Appendix FSUK-C-2 Contents 1. General... 3 1.1. Objective of the FSA Cost Rule Extension... 3 2. Materials parameterization clarification... 4 2.1. ECU, Rapid Prototyping... 4 2.2. ECU, Automotive... 4 2.3. ECU, Industrial...

More information

Optimizing Battery Accuracy for EVs and HEVs

Optimizing Battery Accuracy for EVs and HEVs Optimizing Battery Accuracy for EVs and HEVs Introduction Automotive battery management system (BMS) technology has advanced considerably over the last decade. Today, several multi-cell balancing (MCB)

More information

HIGH-RELIABILITY POUCH CELL CONNECTION AND COST ASPECTS OF A ROBUST BMS SOLUTION

HIGH-RELIABILITY POUCH CELL CONNECTION AND COST ASPECTS OF A ROBUST BMS SOLUTION HIGH-RELIABILITY POUCH CELL CONNECTION AND COST ASPECTS OF A ROBUST BMS SOLUTION 3rd Israeli Power Sources, Batteries, Fuel-Cells, Smart-Grid & EV Conference May 29 th / 30 th 2013, Herzelia Dr. Uwe Wiedemann

More information

AVL SERIES BATTERY BENCHMARKING. Getting from low level parameter to target orientation

AVL SERIES BATTERY BENCHMARKING. Getting from low level parameter to target orientation 1 AVL SERIES BATTERY BENCHMARKING Getting from low level parameter to target orientation CONTENTS OVERVIEW 1. AVL Introduction 2. Focus Series Battery Benchmarking 3. Benchmarking process 4. Target comparability

More information

Elite Power Solutions Automatic Battery Control (ABC) Operation Manual

Elite Power Solutions Automatic Battery Control (ABC) Operation Manual Elite Power Solutions Automatic Battery Control (ABC) Operation Manual Elite Power Solutions 335 E Warner Rd. STE 3 Chandler, AZ 85225 www.elitepowersolutions.com ABC Operation Manual Page 1 Table of Contents

More information

Introduction: Supplied to 360 Test Labs... Battery packs as follows:

Introduction: Supplied to 360 Test Labs... Battery packs as follows: 2007 Introduction: 360 Test Labs has been retained to measure the lifetime of four different types of battery packs when connected to a typical LCD Point-Of-Purchase display (e.g., 5.5 with cycling LED

More information

Wiring & Installation Manual

Wiring & Installation Manual www.orionbms.com Wiring & Installation Manual The Orion BMS 2 by Ewert Energy Systems is the second generation of the Orion BMS. The Orion BMS 2 is designed to manage and protect lithium ion battery packs

More information

INTRODUCTION Team Composition Electrical System

INTRODUCTION Team Composition Electrical System IGVC2015-WOBBLER DESIGN OF AN AUTONOMOUS GROUND VEHICLE BY THE UNIVERSITY OF WEST FLORIDA UNMANNED SYSTEMS LAB FOR THE 2015 INTELLIGENT GROUND VEHICLE COMPETITION University of West Florida Department

More information

2016 FSAE ELECTRIC INSPECTION SHEET

2016 FSAE ELECTRIC INSPECTION SHEET UNIVERSITY: SES PASSED: YES NO BODY PROTECTION RESISTOR: IADR PASSED: YES NO ESF PASSED: YES NO TS VOLTAGE: PART 1 Scrutineer name: Available? Check if yes GLVS VOLTAGE: 1. 2a. SAFETY GEAR CHECK (Bring

More information

Scrutineer name: Start time: End time: The ESO will be the central team contact during Electrical Ask for the ESO

Scrutineer name: Start time: End time: The ESO will be the central team contact during Electrical Ask for the ESO UNIVERSITY: CAR NUMBER: SES PASSED: YES NO IADR PASSED: YES NO BODY PROTECTION RESISTOR: ESF PASSED: YES NO FMEA PASSED: YES NO TS VOLTAGE: GLVS VOLTAGE: IMPORTANT PRESENT THE VEHICLE FOR INSPECTION IN

More information

Power Distribution System User s Manual. Model: PDS-100

Power Distribution System User s Manual. Model: PDS-100 Power Distribution System User s Manual Model: PDS-0 Section Page Product Overview... 1 I) General Information... 2 II) Important Safety Information... 2 III) Installation... 3 A) Materials Provided...

More information

Kart Team. Project Plan: Group 13-22

Kart Team. Project Plan: Group 13-22 Project Plan: Group 13-22 Kart Team Team Members: Adam Woody (Team Leader) Nick Marquardt (Webmaster) Kevin Flynn (Communications) Andy Goiffon Chris Larson May 13-22 Kart Team Project Plan Executive Summary

More information

Energy Storage and Management Systems

Energy Storage and Management Systems Energy Storage and Management Systems Formula Electric SAE Powertrain UNIVERSITY OF IDAHO May 3, 2013 Team Formula EV: Antonio Telleria, Blazen Ingram, Chihan Wang Advisor: Herb Hess, Mentor: Jaz Veach

More information

Lithium Ion Medium Power Battery Design

Lithium Ion Medium Power Battery Design Bradley University Lithium Ion Medium Power Battery Design Project Proposal By: Jeremy Karrick and Charles Lau Advised by: Dr. Brian D. Huggins 12/10/2009 Introduction The objective of this project is

More information

Battery Management Systems and Their Role in Safety and Reliability

Battery Management Systems and Their Role in Safety and Reliability Battery Management Systems and Their Role in Safety and Reliability Part 2 presented by Chris Ewert from Ewert Energy Systems, a designer of BMS systems for large format lithium batteries Outline What

More information

The international electrical symbol consisting of a red spark on a white-edged blue triangle must be affixed in close proximity to each switch.

The international electrical symbol consisting of a red spark on a white-edged blue triangle must be affixed in close proximity to each switch. IC3.4 Noise Level Re-testing At the option of the officials, noise may be measured at any time during the competition. If a car fails the noise test, it will be withheld from the competition until it has

More information

Test Plans & Test Results

Test Plans & Test Results P10227 Variable Intake System for FSAE Race Car Test Plans & Test Results By: Dave Donohue, Dan Swank, Matt Smith, Kursten O'Neill, Tom Giuffre Table of contents 1. MSD I: WKS 8-10 PRELIMINARY TEST PLAN...

More information

Freedom egen System End-of- Line Functional Checklist

Freedom egen System End-of- Line Functional Checklist U Freedom egen System End-of- Line Functional Checklist 976-0361-01-01 Rev A April 2018 DANGER RISK OF FIRE, ELECTRIC SHOCK, EXPLOSION, AND ARC FLASH This checklist is in addition to, and incorporates

More information

Implementation of a Grid Connected Solar Inverter with Maximum Power Point Tracking

Implementation of a Grid Connected Solar Inverter with Maximum Power Point Tracking ECE 4600 GROUP DESIGN PROJECT PROGRESS REPORT GROUP 03 Implementation of a Grid Connected Solar Inverter with Maximum Power Point Tracking Authors Radeon Shamilov Kresta Zumel Valeria Pevtsov Reza Fazel-Darbandi

More information

Manual. EN Appendix. Lynx Ion BMS 400A / 1000A

Manual. EN Appendix. Lynx Ion BMS 400A / 1000A Manual EN Appendix Lynx Ion BMS 400A / 1000A 1. SAFETY INSTRUCTIONS 1.1 In general Please read the documentation supplied with this product first, so that you are familiar with the safety signs en directions

More information

BMS16 v cell Lithium Battery Management System

BMS16 v cell Lithium Battery Management System ZERO EMISSION VEHICLES AUSTRALIA http://www.zeva.com.au Safety Warning Although 8-16 cell lithium battery packs do not involve lethal voltages, they frequently involve dangerous amounts of current and

More information

SUBJECT AREA(S): Amperage, Voltage, Electricity, Power, Energy Storage, Battery Charging

SUBJECT AREA(S): Amperage, Voltage, Electricity, Power, Energy Storage, Battery Charging Solar Transportation Lesson 4: Designing a Solar Charger AUTHOR: Clayton Hudiburg DESCRIPTION: In this lesson, students will further explore the potential and challenges related to using photovoltaics

More information

TECHNICAL INSPECTION SHEET

TECHNICAL INSPECTION SHEET 2018 FORMULA SAE-A ELECTRIC VEHICLE (EV) TECHNICAL INSPECTION SHEET (EV) TECHNICAL INSPECTION SHEET TECHNICAL INSPECTION SHEET UNIVERSITY: TS VOLTAGE: CAR NUMBER: GLVS VOLTAGE: VEHICLE MUST HAVE HVD DISCONNECTED

More information

BOOST POWER 1212 Product Description

BOOST POWER 1212 Product Description BOOST POWER 1212 Product Description Contents 1 Introduction...4 2 General Description...4 2.1 Compatibility with standard Lead-Acid Batteries... 4 3 Battery Performance...5 3.1 Discharge Capability...

More information

Solar Powered Golf Cart

Solar Powered Golf Cart Solar Powered Golf Cart Group 9 Jake Bettis Jacob Krueger Matt Roland Matt Tourtelot Project Description The main objective of this project is to design and build a solar-powered, energy efficient electric

More information

USER MANUAL MINI BMS DISTRIBUTED VERSION

USER MANUAL MINI BMS DISTRIBUTED VERSION USER MANUAL MINI BMS DISTRIBUTED VERSION MiniBMS is a battery management system designed for LiFePo4 cells, used in Electric Vehicles. MiniBMS is designed to be reliable and cost effective solution; it

More information

AC : HYBRID MINI-BAJA CAR PROJECT

AC : HYBRID MINI-BAJA CAR PROJECT AC 2007-1591: HYBRID MINI-BAJA CAR PROJECT Michael Rudisill, Northern Michigan University Jesse Racine, Northern Michigan University Tim Nelson, Northern Michigan University Michael Truscott, Northern

More information

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor

Installation and Maintenance Instructions. World Leader in Modular Torque Limiters. PTM-4 Load Monitor World Leader in Modular Torque Limiters Installation and Maintenance Instructions PTM-4 Load Monitor 1304 Twin Oaks Street Wichita Falls, Texas 76302 (940) 723-7800 Fax: (940) 723-7888 E-mail: sales@brunelcorp.com

More information

mygrid Installation Notes

mygrid Installation Notes mygrid Introduction mygrid kits provide an easy to install, compliant, Solar Hybrid (On-Grid) or Off-Grid battery system. These installation notes outline all the processes required to effectively install

More information

POWERTRAIN SOLUTIONS FOR ELECTRIFIED TRUCKS AND BUSES

POWERTRAIN SOLUTIONS FOR ELECTRIFIED TRUCKS AND BUSES POWERTRAIN SOLUTIONS FOR ELECTRIFIED TRUCKS AND BUSES PDiM 2017 (Heimo Schreier) Burak Aliefendioglu Fredrik Haag AVL H. Schreier, B Aliefendioglu, F. Haag PDIM 2017 30 November 2017 1 TRUCK & BUS ELECTRIFICATION

More information

HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS

HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS 2013 NDIA GROUND VEHICLE SYSTEMS ENGINEERING AND TECHNOLOGY SYMPOSIUM POWER AND MOBILITY (P&M) MINI-SYMPOSIUM AUGUST 21-22, 2013 TROY, MICHIGAN HIGH VOLTAGE vs. LOW VOLTAGE: POTENTIAL IN MILITARY SYSTEMS

More information

Turbo-charging Your Forklift Fleet: The Power of Industrial Lithium Forklift Batteries

Turbo-charging Your Forklift Fleet: The Power of Industrial Lithium Forklift Batteries Turbo-charging Your Forklift Fleet: The Power of Industrial Lithium Forklift Batteries Presented by: Samer Elshafei Director of Commercial Product and Business Development selshafei@navitassys.com PRESENTATION

More information

BMS 12/200 for 12,8 Volt lithium iron phosphate batteries Especially designed for vehicles and boats

BMS 12/200 for 12,8 Volt lithium iron phosphate batteries Especially designed for vehicles and boats BMS 12/200 for 12,8 Volt lithium iron phosphate batteries Especially designed for vehicles and boats www.victronenergy.com Why lithium-iron phosphate? Lithium-iron-phosphate (LiFePO4 or LFP) is the safest

More information

BMS-LiFePower. 123SmartBMS. Instruction manual

BMS-LiFePower. 123SmartBMS. Instruction manual BMS-LiFePower 123SmartBMS Instruction manual Index Introduction...2 Keep the batteries in perfect condition...2 Package contains (12 Volt, 4 cells)...3 Specs...3 Placing the cell modules...4 Mounting the

More information

PRELIMINARY DESIGN REVIEW. LFEV-ESCM-2014 February 13, 2014

PRELIMINARY DESIGN REVIEW. LFEV-ESCM-2014 February 13, 2014 PRELIMINARY DESIGN REVIEW LFEV-ESCM-2014 February 13, 2014 LFEV-Y2-2014 Continuation of Lafayette Formula Electric Vehicle-Energy Storage, Control, and Management (LFEV-ESCM) project for use in the Formula

More information

MiniBMS User Manual. Distributed version

MiniBMS User Manual. Distributed version MiniBMS User Manual Distributed version MiniBMS is a battery management system designed for LiFePo4 cells, used in Electric Vehicles. MiniBMS is designed to be reliable and cost effective solution; it

More information

Silvertel. Ag Features. Multi-Stage Charging. Battery Reversal Protection. Reduced Power Consumption. Wide DC or AC Input Voltage Range

Silvertel. Ag Features. Multi-Stage Charging. Battery Reversal Protection. Reduced Power Consumption. Wide DC or AC Input Voltage Range Silvertel V1.1 October 2012 Pb 1 Features Multi-Stage Charging Battery Reversal Protection Reduced Power Consumption Wide DC or AC Input Voltage Range High Efficiency DC-DC Converter Programmable Charge

More information

Acceptance Test Report

Acceptance Test Report ACCEPTANCE TEST REPORT 1 Acceptance Test Report ECE 492 Spring 2014 Latest Revision: 13 May 2014 Prepared by: Drew Jeffrey Abstract The Acceptance Test Report (ATR) contains the summary of results obtained

More information

Installation and Construction Notes for EVSE4

Installation and Construction Notes for EVSE4 Installation and Construction Notes for EVSE4 You need to read and understand this if you want to build an EVSE that will be safe and need to pass a building inspectors review. Before beginning this process

More information

Solar Power-Optimized Cart

Solar Power-Optimized Cart Solar Power-Optimized Cart Initial Project and Group Identification Document Due: September 17, 2013 Group #28 Group Members: Jacob Bitterman Cameron Boozarjomehri William Ellett Potential Sponsors: Duke

More information

Plug Into the Current Future

Plug Into the Current Future Green Energy Solutions & Electric Mobility Plug Into the Current Future enquiries@freedomwon.co.za +27(0)71 890 9958 +27(0)82 256 7430 www.freedomwon.co.za Leading Lithium (LiFePO4) battery energy storage

More information

Autonomously Controlled Front Loader Senior Project Proposal

Autonomously Controlled Front Loader Senior Project Proposal Autonomously Controlled Front Loader Senior Project Proposal by Steven Koopman and Jerred Peterson Submitted to: Dr. Schertz, Dr. Anakwa EE 451 Senior Capstone Project December 13, 2007 Project Summary:

More information

SMT. Installation and Operation Manual. Model:SMT WITH MPPT TECHNOLOGY

SMT. Installation and Operation Manual. Model:SMT WITH MPPT TECHNOLOGY SMT WITH MPPT TECHNOLOGY Installation and Operation Manual Model:SMT SMT Dimensions Specification Summary System Voltage 12 V/24V Rated Battery Current 12V, 5A 8A 10A 15A 20A 25A 24V, 5A 8A 10A 15A Rated

More information

INTRODUCTION. Specifications. Operating voltage range:

INTRODUCTION. Specifications. Operating voltage range: INTRODUCTION INTRODUCTION Thank you for purchasing the EcoPower Electron 65 AC Charger. This product is a fast charger with a high performance microprocessor and specialized operating software. Please

More information

AC Induction Motor Controller with VCL

AC Induction Motor Controller with VCL Motor Controllers AC Induction Motor Controller with VCL www.curtisinstruments.com 1 The Ultimate Class III Truck Control System: Superb Performance and Value This new AC induction motor controller (inverter)

More information

620 Magnolia Avenue Suite B Ontario, CA (909) Diagnostic and Troubleshooting. Golf Cart. Revision: A Date:

620 Magnolia Avenue Suite B Ontario, CA (909) Diagnostic and Troubleshooting. Golf Cart. Revision: A Date: 620 Magnolia Avenue Suite B Ontario, CA 91762 (909) 923-1973 Diagnostic and Troubleshooting Golf Cart Revision: A Date: 9-25-13 Diagnostics Diagnostics information can be obtained by observing the fault

More information

EV Power - Battery Control Unit Instructions. 8 Cell 24V

EV Power - Battery Control Unit Instructions. 8 Cell 24V EV Power - Battery Control Unit Instructions. 8 Cell 24V PAGE 1 OF 12 BCU-EVPPAK Features - Simple to install and use, microprocessor control. - Low power requirement, just 15mA when switched on with relay

More information

Plug Into the Current Future

Plug Into the Current Future Green Energy Solutions & Electric Mobility Plug Into the Current Future enquiries@freedomwon.co.za +27(0)71 890 9958 +27(0)82 256 7430 www.freedomwon.co.za Leading Lithium (LiFePO4) battery energy storage

More information

Lithium Ion Battery Charger for Solar-Powered Systems

Lithium Ion Battery Charger for Solar-Powered Systems Lithium Ion Battery Charger for Solar-Powered Systems General Description: The is a complete constant-current /constant voltage linear charger for single cell Li-ion and Li Polymer rechargeable batteries.

More information

NeverDie Battery Management System Section 1: Overview

NeverDie Battery Management System Section 1: Overview Section 1: Overview PURPOSE: A Battery Management System or BMS Protects the Battery From Being Damaged by External Sources A BMS Protects the User and the External Sources from a Failed Battery A BMS-Based

More information

EV Power - A-Series 8 Cell, 16 Cell and 24Cell Chargers Installation & Usage Instructions.

EV Power - A-Series 8 Cell, 16 Cell and 24Cell Chargers Installation & Usage Instructions. A-CHARGERS MANUAL 1.1 EV Power - A-Series 8 Cell, 16 Cell and 24Cell Chargers Installation & Usage Instructions. A-Series Charger Features - Simple to install and use, microprocessor control. - LiFePO4

More information

SimpliPhi Power PHI Battery

SimpliPhi Power PHI Battery Power. On Your Terms. SimpliPhi Power PHI Battery INTEGRATION GUIDE: VICTRON Optimized Energy Storage & Management for Residential & Commercial Applications Utilizing Efficient, Safe, Non-Toxic, Energy

More information

SAE Mini BAJA: Suspension and Steering

SAE Mini BAJA: Suspension and Steering SAE Mini BAJA: Suspension and Steering By Zane Cross, Kyle Egan, Nick Garry, Trevor Hochhaus Team 11 Progress Report Submitted towards partial fulfillment of the requirements for Mechanical Engineering

More information

ISA Intimidator. July 6-8, Coronado Springs Resort Walt Disney World, Florida

ISA Intimidator. July 6-8, Coronado Springs Resort Walt Disney World, Florida ISA Intimidator 10 th Annual Intelligent Ground Vehicle Competition July 6-8, 2002- Coronado Springs Resort Walt Disney World, Florida Faculty Advisor Contact Roy Pruett Bluefield State College 304-327-4037

More information

CP /240-MC4 User Manual

CP /240-MC4 User Manual CP-250-60-208/240-MC4 User Manual Chilicon Power LLC Dec 2015 1 CONTENTS Important Safety Instructions... 3 Safety Instructions... 3 CP-250 Microinverter System Introduction... 4 Inverter Label Information...

More information

The Traveler Series: Adventurer

The Traveler Series: Adventurer The Traveler Series: Adventurer RENOGY 30A Flush Mount Charge Controller Manual 2775 E. Philadelphia St., Ontario, CA 91761 1-800-330-8678 Version: 2.2 Important Safety Instructions Please save these instructions.

More information

Slippage Detection and Traction Control System

Slippage Detection and Traction Control System Slippage Detection and Traction Control System May 10, 2004 Sponsors Dr. Edwin Odom U of I Mechanical Engineering Department Advisors Dr. Jim Frenzel Dr. Richard Wall Team Members Nick Carter Kellee Korpi

More information

Amendment of UN ECE R100 regarding in-use requirements for vehicles of category L Status:

Amendment of UN ECE R100 regarding in-use requirements for vehicles of category L Status: 0 1. Scope The following prescription apply to safety requirements with respect to the electric power train of road vehicles of categories M and N, with a maximum design speed exceeding 25 km/h and vehicles

More information

MD10. Engine Controller. Installation and User Manual for the MD10 Engine Controller. Full Version

MD10. Engine Controller. Installation and User Manual for the MD10 Engine Controller. Full Version MD10 Engine Controller Installation and User Manual for the MD10 Engine Controller. Full Version File: MartinMD10rev1.4.doc May 16, 2002 2 READ MANUAL BEFORE INSTALLING UNIT Receipt of shipment and warranty

More information

Cover. L5v2 Plug-In Conversion Module(PCM) Diagnostic Trouble Codes

Cover. L5v2 Plug-In Conversion Module(PCM) Diagnostic Trouble Codes Cover L5v2 Plug-In Conversion Module(PCM) Diagnostic Trouble Codes Copyright 2009 A123 Systems, Inc. All rights reserved DOCUMENT NOTICE: The information contained in this manual is the property of A123

More information

External Hard Drive: A DFMA Redesign

External Hard Drive: A DFMA Redesign University of New Mexico External Hard Drive: A DFMA Redesign ME586: Design for Manufacturability Solomon Ezeiruaku 4-23-2013 1 EXECUTIVE SUMMARY The following document serves to illustrate the effects

More information

NORDAC 2014 Topic and no NORDAC

NORDAC 2014 Topic and no NORDAC NORDAC 2014 Topic and no NORDAC 2014 http://www.nordac.net 8.1 Load Control System of an EV Charging Station Group Antti Rautiainen and Pertti Järventausta Tampere University of Technology Department of

More information

SECTION DC POWER SUPPLY/BATTERY CHARGER

SECTION DC POWER SUPPLY/BATTERY CHARGER SECTION 26 33 05 PART 1 - GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide the single-phase heavy-duty industrial battery charger and all accessories required, complete and operable, in accordance

More information

POWER PROFET A simpler solution with integrated protection for switching high-current applications efficiently & reliably

POWER PROFET A simpler solution with integrated protection for switching high-current applications efficiently & reliably CONTENTS 2 Efficient Alternative 4 Diagnosis and Protection 6 3 Integrated Protection 6 Switching Cycles 7 Power Loss Reduction Improved Power Protection POWER PROFET A simpler solution with integrated

More information

Sonnenschein Lithium HC (High Current)

Sonnenschein Lithium HC (High Current) Sonnenschein Lithium HC (High Current) Sonnenschein Lithium is a range of, 18 and 36 Volt Lithium battery modules. These Lithium modules offer significant cycling, charge time, weight and volume improvements

More information

BATTERY CHARGERS FAN COOLED HIGH FREQUENCY CHARGERS UP 30% ENERGY SAVINGS! HIGH FREQUENCY BUILT-IN CHARGER AQHF24-30FC G2 TECHNICAL PECIFICATIONS

BATTERY CHARGERS FAN COOLED HIGH FREQUENCY CHARGERS UP 30% ENERGY SAVINGS! HIGH FREQUENCY BUILT-IN CHARGER AQHF24-30FC G2 TECHNICAL PECIFICATIONS HIGH FREQUENCY CHARGERS HIGH FREQUENCY BUILT-IN CHARGER AQHF24-30FC G2 UP 30% ENERGY SAVINGS! FAN COOLED TECHNICAL PECIFICATIONS Main input 230VAC ±10% 50-60Hz High frequency single-phase battery charger

More information

ARAI Date of hosting on website: 27 th October 2015 Last date for comments: 27 th November 2015

ARAI Date of hosting on website: 27 th October 2015 Last date for comments: 27 th November 2015 ARAI Date of hosting on website: 27 th October 2015 Last date for comments: 27 th November 2015 CHECK LIST FOR PREPARING AMENDMENT TO AUTOMOTIVE INDUSTRY STANDARD (AIS) Draft Amd. No 01 to AIS-099 : Approval

More information

Fuse state indicator MEg72. User manual

Fuse state indicator MEg72. User manual Fuse state indicator MEg72 User manual MEg Měřící Energetické paráty, a.s. 664 31 Česká 390 Czech Republic Fuse state indicator MEg72 User manual Fuse state indicator MEg72 INTRODUCTION The fuse state

More information

User Manual. BMS123 Smart

User Manual. BMS123 Smart User Manual BMS123 Smart Introduction After the introduction of affordable LiFePO4 batteries, off-grid solutions became available for wide public. It is vital that such batteries are charged very carefully.

More information

arxiv:submit/ [math.gm] 27 Mar 2018

arxiv:submit/ [math.gm] 27 Mar 2018 arxiv:submit/2209270 [math.gm] 27 Mar 2018 State of Health Estimation for Lithium Ion Batteries NSERC Report for the UBC/JTT Engage Project Arman Bonakapour Wei Dong James Garry Bhushan Gopaluni XiangRong

More information

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY

INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES KILOWATTS IN THE STATE OF NEW JERSEY INTERCONNECTION STANDARDS FOR PARALLEL OPERATION OF SMALL-SIZE GENERATING FACILITIES 10-100 KILOWATTS IN THE STATE OF NEW JERSEY January 1, 2005 Rockland Electric Company 390 West Route 59 Spring Valley,

More information

StartSentry. UCS-80Kj and UCS-80KjC. Ultra Capacitor. Table of Contents

StartSentry. UCS-80Kj and UCS-80KjC. Ultra Capacitor. Table of Contents StartSentry UCS-80Kj and UCS-80KjC Ultra Capacitor Table of Contents Introduction...2 General Description...2 Safety Precautions...3 Specifications...4 Mounting Requirements...5 Typical Transit Bus Wiring...5

More information

High Frequency SineWave Guardian TM

High Frequency SineWave Guardian TM High Frequency SineWave Guardian TM 380V 480V INSTALLATION GUIDE FORM: SHF-IG-E REL. January 2018 REV. 002 2018 MTE Corporation High Voltage! Only a qualified electrician can carry out the electrical installation

More information

Modular Standardized Electrical and Control Solutions for Fast Track Projects

Modular Standardized Electrical and Control Solutions for Fast Track Projects Modular Standardized Electrical and Control Solutions for Supporting fast track projects ABB is the leading supplier of electrical and control equipment for power plants. The company offers a comprehensive

More information

Newsletter November This month CFS10. Engine. Body. Welcome CFS10 p.1 CFS10 West p.4 What now? p.5 Interested? p.5

Newsletter November This month CFS10. Engine. Body. Welcome CFS10 p.1 CFS10 West p.4 What now? p.5 Interested? p.5 Newsletter November 2010 CFS10 This year s team includes 25 members of different nationalities and with different educational backgrounds. The team consists of six different subgroups, responsible for

More information

Formula Hybrid 2011 Preliminary Electrical Inspection

Formula Hybrid 2011 Preliminary Electrical Inspection Formula Hybrid 2011 Preliminary Electrical Inspection Before beginning inspection 2.1.9 Identify Rules and Safety officer, who must explain to us plans for work on HV, avoiding fire hazards, safe work

More information

Plug Into the Current Future

Plug Into the Current Future Green Energy Solutions & Electric Mobility Plug Into the Current Future enquiries@freedomwon.co.za +27(0)71 890 9958 +27(0)82 256 7430 www.freedomwon.co.za Leading Lithium (LiFePO4) ba ry energy storage

More information

Operations Manual Pika Harbor Smart Battery

Operations Manual Pika Harbor Smart Battery Operations Manual Pika Harbor Smart Battery Harbor Flex / Harbor Plus Part of the Pika Energy Island M00017-02 Harbor Smart Battery Serial Number: RCP Number: We are committed to quality and constant improvement.

More information

Accurate and available today: a ready-made implementation of a battery management system for the new 48V automotive power bus

Accurate and available today: a ready-made implementation of a battery management system for the new 48V automotive power bus Accurate and available today: a ready-made implementation of a battery management system for the new 48V automotive power bus Gernot Hehn Today s personal vehicles have an electrical system operating from

More information

Power your day-to-day when others are power-less. Humless Sentinel User s Guide.

Power your day-to-day when others are power-less. Humless Sentinel User s Guide. Power your day-to-day when others are power-less. Humless Sentinel User s Guide www. User s Guide Contents Safety Instructions page 6 Meet The Power page 7 Charging Your Unit page 12 Powering Your Devices

More information

MiniBMS V3 User Manual

MiniBMS V3 User Manual MiniBMS V3 User Manual CleanPowerAuto LLC MiniBMS is a battery management system designed for LiFePo4 cells, used in Electric Vehicles. MiniBMS is designed to be reliable and cost effective solution; it

More information

Rover Series. Rover 20A 40A Maximum Power Point Tracking Solar Charge Controller

Rover Series. Rover 20A 40A Maximum Power Point Tracking Solar Charge Controller Rover Series Rover 20A 40A Maximum Power Point Tracking Solar Charge Controller 0 2775 E. Philadelphia St., Ontario, CA 91761 1-800-330-8678 Version 1.5 Important Safety Instructions Please save these

More information

User s Manual. ACH550-CC/CD Packaged Drive with Classic Bypass Supplement for ACH550-UH HVAC User s Manual

User s Manual. ACH550-CC/CD Packaged Drive with Classic Bypass Supplement for ACH550-UH HVAC User s Manual User s Manual ACH550-CC/CD Packaged Drive with Classic Bypass Supplement for ACH550-UH HVAC User s Manual ii ACH550-CC/CD Packaged Drive with Classic Bypass ACH550 Drive Manuals GENERAL MANUALS ACH550-UH

More information

M:2:I Milestone 2 Final Installation and Ground Test

M:2:I Milestone 2 Final Installation and Ground Test Iowa State University AerE 294X/AerE 494X Make to Innovate M:2:I Milestone 2 Final Installation and Ground Test Author(s): Angie Burke Christopher McGrory Mitchell Skatter Kathryn Spierings Ryan Story

More information

APPLICATION NOTE QuickStick 100 Power Cable Sizing and Selection

APPLICATION NOTE QuickStick 100 Power Cable Sizing and Selection APPLICATION NOTE QuickStick 100 Power Cable Sizing and Selection Purpose This document will provide an introduction to power supply cables and selecting a power cabling architecture for a QuickStick 100

More information