Formula Hybrid 2011 Preliminary Electrical Inspection

Size: px
Start display at page:

Download "Formula Hybrid 2011 Preliminary Electrical Inspection"

Transcription

1 Formula Hybrid 2011 Preliminary Electrical Inspection Before beginning inspection Identify Rules and Safety officer, who must explain to us plans for work on HV, avoiding fire hazards, safe work practices, emergency response. Name of RSO: 4.10 High voltage schematic with wire size/rating, fuse rating, enclosures, isolation Electrical Safety Report contains: a. FMEA for HV system and unintended accel. b. Master switch 4.10 operation, c. Accumulator monitoring and d. fusing Note: check off here is only contents, not approving design and implementation. Preliminary Electrical Inspection: must be completed before mechanical inspection or any work on car 4.2 No exposed HV (even with body panels, etc. off); no HV in cockpit 4.6 System for de energizing HV outside accumulator container 4.7 No conductive penetrations of accumulator container. 4.3 No ungrounded metal or conductive body panels etc., that could become energized Accumulator fusing rated for voltage (detailed check of fuse rating to be done later) 4.4 Any low voltage battery must be fused. Note: Issue preliminary electrical sticker on completion of all of the above, including documentation.

2 Formula Hybrid 2011 On Site Inspection Upon arrival, check for safety violations safety glasses in use, etc. and complete Paddock report if any. Y / N Any violations found? (circle one; report violations separately) Safety equipment. Any team member must be able to locate at any time and explain use. Fire extinguishers: min 2, 5 lb. dry chem ABC; others if required. Chem spill absorbent Insulated cable cutters: Bahco 2520s, Knipex , Knipex , Willi Hahn Corp (Wiha) , Willi Hahn Corp (Wiha) are only acceptable choices Insulated gloves with protective overgloves. Check date and condition. Safety glasses MSDS for accumulator, and any additional equipment called for based on MSDS Any team member must be able to identify rules and safety officer. Name: Charger inspection: must be completed before use of charger 4.9 Charging equipment: HV stickers, UL or advance waiver, 4.9 Grounded or insulated enclosures, strain relief, fusing 4.9 Describe charging procedure Note: issue sticker for charger upon approval.

3 Formula Hybrid 2011 Electrical Inspection Needed for Inspection 4.10 High voltage schematic with wire size/rating, fuse rating, enclosures, isolation Electrical Safety Report contains: a. FMEA for HV system and unintended accel. b. Master switch 4.10 operation, c. Accumulator monitoring and d. fusing Note: even though this was checked of previously, it is needed for the full inspection process. Any pending items from preliminary inspection Initial if no remaining issues from preliminary inspection or all are resolved. On site inspection completed successfully High Voltage System (some items are repeats, but checked more carefully now) 4.2 No exposed HV (even w/o body panels) 4.2 No HV in cockpit or behind control panels 4.2 Mechanical linkages to high voltage controls isolated and/or grounded. 4.1 HV/LV segregation: not in same conduit 4.1 HV/LV segregation: in enclosures, adequately spaced and secured or 150 C barrier. 4.1 HV/LV segregation: spacing on PCBs Brake overtravel switch All three master switches tested Strobe: on when HV on, off when HV off HV disable with lockout/tagout capability. Must also disable strobe GFD: review design for latch off, accessible or indicator, no reset from driver's seat GFD test: test multiple points. 4.3 Wire insulation: Marked w/ voltage, temp, gauge. Visible in car or on sample. 4.3 Other insulation materials: rated for temp, at least 60 C 4.3 Test, or approve without test any insulation materials that might get hot. 4.3 Wiring to professional standards, bolted connections locked, conduit routed safely 4.3 HV wiring outside enclosures in LFNC A or B orange conduit, including low power HV. Are there any HV conductors inside frame members? (If so needs further review) 4.3 Conduit anchored at both ends with proper fittings; hold 200 N/45 lbf. 4.3 Exposed conductive objects near HV and conductive body panels grounded. 4.5 Maximum voltage: (must not exceed 300 V) Fuse current ratings match wire sizes Fuses carry adequate voltage rating Parallel cells or strings individually fused Accumulator monitoring sense wires protected Fusible links require lower current series fuse, AMS detectable, current rating

4 Accumulator Type: Manufacturer: Quanity: Part number: Official FH capacity rating: Total capacity: Battery chemistry: Does it contain metallic Li? AMS: must monitor temp, v as specified, latching shut down, no driver reset 4.6 Contactor current rating >= fuse rating, voltage rating 4.6 At least one contactor per container, at least one at most + and most end 4.6 Voltage decay: under 30 V in 60 seconds; label if > 5 seconds. 4.6 Energization indicator: LED for ultracaps; "always energized" label for batteries 4.7 Accumulator enclosure and mounting good for 20g XY, 8g Z 4.7 Fireproof and insulation OK; one face transparent 4.7 No conductive penetrations (grounding is not adequate) 4.7 High voltage label 4.7 Ventilation if needed Cockpit barrier: inside and top, 0.62 inch (1.6 mm) Al + nomex or equivalent, grounded. Low Voltage Systems 4.8 Grounded to frame 4.9 Fused System Design Methodology to ensure fail safe throttle actuation for ICE and elec. mot. Rain certification (optional) Visual inspection Spray test

5 Paddock Safety Steward Report Steward: Student name(s): Observed violations Anyone working on the car or within 10 feet of a car being worked on w/o safety glasses. Unsafe welding, grinding, etc.; note any nearby flammalbe materials: batteries/ultracaps Wheels not off the ground (at least 4") when energized (strobe on, unless otherwise disabled) or with engine running. Charging with a charger without a FH approval sticker Charging without a team member familiar with charging operation present Charging while other work (electrical or mechanical) is going on on the car. Energized electrical work without prior approval of inspectors and access control Failure to maintain an orderly and safe working environment Spot checks: Each team member must be familiar with the location and proper use of: Fire extinguishers: min 2, 5 lb. dry chem ABC; others if required. Chem spill absorbent Insulated cable cutters Insulated gloves with protective overgloves Safety glasses MSDS for accumulator, and any additional equipment called for based on MSDS. Each team must have a designated rules and safety officer (RSO) Any team member must be able to tell you who the RSO is

Scrutineer name: Start time: End time: The ESO will be the central team contact during Electrical Ask for the ESO

Scrutineer name: Start time: End time: The ESO will be the central team contact during Electrical Ask for the ESO UNIVERSITY: CAR NUMBER: SES PASSED: YES NO IADR PASSED: YES NO BODY PROTECTION RESISTOR: ESF PASSED: YES NO FMEA PASSED: YES NO TS VOLTAGE: GLVS VOLTAGE: IMPORTANT PRESENT THE VEHICLE FOR INSPECTION IN

More information

Formula Hybrid 2015 Electrical Inspection

Formula Hybrid 2015 Electrical Inspection Formula Hybrid 2015 Electrical ection Team # Date Started: Time Started: Note: liminary Electrical ection must be completed before mechanical inspection or performing any work on the vehicle. School: Vehicle

More information

The international electrical symbol consisting of a red spark on a white-edged blue triangle must be affixed in close proximity to each switch.

The international electrical symbol consisting of a red spark on a white-edged blue triangle must be affixed in close proximity to each switch. IC3.4 Noise Level Re-testing At the option of the officials, noise may be measured at any time during the competition. If a car fails the noise test, it will be withheld from the competition until it has

More information

TECHNICAL INSPECTION SHEET

TECHNICAL INSPECTION SHEET 2018 FORMULA SAE-A ELECTRIC VEHICLE (EV) TECHNICAL INSPECTION SHEET (EV) TECHNICAL INSPECTION SHEET TECHNICAL INSPECTION SHEET UNIVERSITY: TS VOLTAGE: CAR NUMBER: GLVS VOLTAGE: VEHICLE MUST HAVE HVD DISCONNECTED

More information

HV/LV Memo. ECE 492 Spring Abstract. Latest Revision: 16 May Prepared by: Brendan Flood

HV/LV Memo. ECE 492 Spring Abstract. Latest Revision: 16 May Prepared by: Brendan Flood HV/LV Memo ECE 492 Spring 2013 Latest Revision: 16 May 2013 Prepared by: Brendan Flood Abstract This document examines the high-voltage (tractive) and grounded low-voltage systems of the LFEV-ESCM system

More information

2016 FSAE ELECTRIC INSPECTION SHEET

2016 FSAE ELECTRIC INSPECTION SHEET UNIVERSITY: SES PASSED: YES NO BODY PROTECTION RESISTOR: IADR PASSED: YES NO ESF PASSED: YES NO TS VOLTAGE: PART 1 Scrutineer name: Available? Check if yes GLVS VOLTAGE: 1. 2a. SAFETY GEAR CHECK (Bring

More information

2019 Formula SAE Japan Local Rules Number 1 Issued: December 26, 2018(Second Edition)

2019 Formula SAE Japan Local Rules Number 1 Issued: December 26, 2018(Second Edition) 2019 Formula SAE Japan Local Rules Number 1 Issued: December 26, 2018(Second Edition) The purpose of this document is to inform of the local rules that shall apply to 2019 Formula SAE Japan. Any additional

More information

Formula Hybrid ESF -- Part 1

Formula Hybrid ESF -- Part 1 Formula Hybrid ESF -- Part 1 INTRODUCTION Part 1 of the Formula Hybrid ESF is intended to help teams solidify those design decisions that need to be made early in the program. This will also help the technical

More information

PBA Series Prelube Controls

PBA Series Prelube Controls VARNA Products Engineered Innovation PBA Series Prelube Controls Simple, Compact, Industrial Full featured control for running prelube from the control or from a remote station Easy internal wiring connections

More information

Abstract. GLV Systems Test Plan 1

Abstract. GLV Systems Test Plan 1 GLV Systems Test Plan 1 Abstract This document details the acceptance test plan for the Grounded Low Voltage system being developed for the LFEV design project. This is only a test plan draft, and will

More information

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL

SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS - ELECTRICAL This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST

SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST SOLAR PHOTOVOLTAIC SYSTEMS INSPECTOR CHECKLIST The following checklist is an outline of the general requirements found in the 1999 National Electrical Code (NEC) Article 690 for Photovoltaic (PV) Power

More information

VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines

VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines VARNA Products 15 GPM (57 LPM) Prelube Kit for MTU 4000 Series Marine Engines Installation and Users Manual For the following Prelube Kits: VARNA Products P/N 6423 Kit for 208 VAC 3 Phase VARNA Products

More information

2016 Photovoltaic Solar System Plan Review List

2016 Photovoltaic Solar System Plan Review List Building Division 555 Santa Clara Street Vallejo CA 94590 707.648.4374 2016 Photovoltaic Solar System Plan Review List GENERAL PROJECT INFORMATION PLAN CHECK NO DATE JOB ADDRESS CITY ZIP REVIEWED BY PHONE

More information

Freedom egen System End-of- Line Functional Checklist

Freedom egen System End-of- Line Functional Checklist U Freedom egen System End-of- Line Functional Checklist 976-0361-01-01 Rev A April 2018 DANGER RISK OF FIRE, ELECTRIC SHOCK, EXPLOSION, AND ARC FLASH This checklist is in addition to, and incorporates

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 3-2 Hydraulic Brakes EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with the hydraulic circuits of the yaw and the rotor brakes. You will control brakes by changing

More information

L5000 Plus. Installation & Setup Guide

L5000 Plus. Installation & Setup Guide L5000 Plus Page 1 of 16 JDE1945 IssB s1 May 2009 Contents Description Page Safety... 3 Installation Standards 4 Specification. 4 Installation Procedure Pump Box. 6 Auxiliary Pump Boxes... 7 Connecting

More information

CHAPTER 12. Page TABLE OF CONTENTS /02 DESCRIPTION. General Description Controls and Indicators COMPONENTS

CHAPTER 12. Page TABLE OF CONTENTS /02 DESCRIPTION. General Description Controls and Indicators COMPONENTS CHAPTER 12 HYDRAULIC POWER Page TABLE OF CONTENTS 12-00-01/02 DESCRIPTION General 12-10-01 Description 12-10-01 Controls and Indicators 12-10-02 COMPONENTS Hydraulic System Block Diagram 12-20-01/02 CONTROLS

More information

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST

PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST PHOTOVOLTAIC ELECTRICAL POWER SYSTEMS INSPECTOR/INSTALLER CHECKLIST The following checklist is an outline of the general requirements found in the 2005 National Electrical Code (NEC) Article 690 for Photovoltaic

More information

CALTRAP INSTALLATION AND OPERATIONS MANUAL

CALTRAP INSTALLATION AND OPERATIONS MANUAL INSTALLATION AND OPERATIONS MANUAL NOTE Please read this entire installation and operations manual before energizing the. Safety Considerations: Installing and servicing capacitor equipment can be hazardous.

More information

Abstract. GLV Systems PDR 1

Abstract. GLV Systems PDR 1 GLV Systems PDR 1 Abstract This is the preliminary design report for the GLV project for the LFEV. Included are the materials required by D000 in the LFEV 2015 statement of work. This document will outline

More information

Installation Instructions for Load Management Kit A051C329

Installation Instructions for Load Management Kit A051C329 Instruction Sheet 12-2014 Installation Instructions for Load Management Kit A051C329 1 Introduction The information contained within is based on information available at the time of going to print. In

More information

South Magellan Drive, Torrance, California USA

South Magellan Drive, Torrance, California USA Prepared by: DJ / ND Reviewed/ Approved by: AS Page 1 of 17 SV520002R 101207 www.enovasystems.com 19850 South Magellan Drive, Torrance, California 90502 USA Copyright Prepared by: DJ / ND Reviewed/ Approved

More information

MODEL ELC-12/40-CVM-D BATTERY CHARGER

MODEL ELC-12/40-CVM-D BATTERY CHARGER NATIONAL RAILWAY SUPPLY MODEL ELC-12/40-CVM-D BATTERY CHARGER Installing, Operating and Service Instructions for the ELC-12/40-CVM-D Solid State Charger PLEASE SAVE THESE IMPORTANT SAFETY AND OPERATING

More information

Solar PV Standard Electrical Plan

Solar PV Standard Electrical Plan *** Provide this document to the inspector along with ALL system installation instructions *** Project Address: Permit Number: SCOPE: Standard plan for installation of solar PV systems utilizing 2 wire

More information

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly. SUPPLEMENTAL CORRECTION SHEET FOR SOLAR PHOTOVOLTAIC SYSTEMS (ELEC) This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.

More information

MODEL 422 Submersible Pump Controller

MODEL 422 Submersible Pump Controller MODEL 422 Submersible Pump Controller Monitors True Motor Power (volts x current x power factor) Detects Motor Overload or Underload Operates on 120 or 240VAC, Single-phase or 3-phase Built-in Trip and

More information

Charles Sullivan, Associate Professor, Thayer School of Engineering at Dartmouth

Charles Sullivan, Associate Professor, Thayer School of Engineering at Dartmouth FORMULA HYBRID SAFETY TUTORIAL FUSING Charles Sullivan, Associate Professor, Thayer School of Engineering at Dartmouth Purpose of Fusing Fuses interrupt current in a circuit when the current exceeds a

More information

Physical The ROV will be inspected for any items that may be unsafe to the participants or the facility.

Physical The ROV will be inspected for any items that may be unsafe to the participants or the facility. Documentation Be sure and bring these items to the safety inspection table; they will be used to help answer questions. Physical The ROV will be inspected for any items that may be unsafe to the participants

More information

Installation Instructions for Remote Mount HMI 211 Display Panel Kit A045J206

Installation Instructions for Remote Mount HMI 211 Display Panel Kit A045J206 Instruction Sheet 7-2013 Installation Instructions for Remote Mount HMI 211 Display Panel Kit A045J206 1 Introduction The information contained within is based on information available at the time of going

More information

Installation Instructions

Installation Instructions NOTE: Read the entire instruction manual before starting the installation. This symbol indicates a change since the last issue. SAFETY CONSIDERATIONS Installing and servicing air conditioning equipment

More information

Emergency Response Guide

Emergency Response Guide Emergency Response Guide 2013 ILX Hybrid Prepared for Fire Service, Law Enforcement, Emergency Medical, and Professional Towing Personnel by Honda Canada Inc. Introduction This information has been prepared

More information

OICA Draft Proposal for the ELSA Meeting July in Bonn

OICA Draft Proposal for the ELSA Meeting July in Bonn OICA Draft Proposal for the ELSA Meeting July 22-24 in Bonn ELECTRICAL SAFETY PROVISIONS FOR VEHICLES IN USE 1. Scope General This module shall apply to the drive train of electric vehicles, hybrid vehicles

More information

Emergency Services Guidance for Competition Electric Vehicles

Emergency Services Guidance for Competition Electric Vehicles NEDRA Technical Information Bulletin 2013.001 Emergency Services Guidance for Competition Electric Vehicles Authors Michael Dunn Technical Director National Electric Drag Racing Association tech@nedra.com

More information

R-200A Digital Controller TECHNICAL MANUAL. A new standard of reliability. This manual should remain with the unit.

R-200A Digital Controller TECHNICAL MANUAL. A new standard of reliability. This manual should remain with the unit. R-200A Digital Controller TECHNICAL MANUAL A new standard of reliability This manual should remain with the unit. IMPORTANT SAFETY INSTRUCTIONS Save These Instructions The manufacturer suggests that these

More information

FADA Certified Technician Exam Specifications

FADA Certified Technician Exam Specifications 1 Overview This study guide is intended to help students in Florida automotive programs study for the FADA Certified Technician exam. This guide contains test specifications, a task list, and sample questions.

More information

TRIBUTE HYBRID EMERGENCY RESPONSE GUIDE ERG-08HEV

TRIBUTE HYBRID EMERGENCY RESPONSE GUIDE ERG-08HEV TRIBUTE HYBRID EMERGENCY RESPONSE GUIDE CONTENTS TRIBUTE HYBRID EMERGENCY RESPONSE GUIDE FOREWORD...- 1 - TRIBUTE HYBRID VEHICLE IDENTIFICATION... - 3 - HIGH-VOLTAGE ELECTRICAL AND FUEL DISCONNECT FEATURES...

More information

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE 2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE PAGE 1 OF 5 This Reference provides a very comprehensive list of aspects of a solar PV installation that could be reviewed, clarifying

More information

27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2

27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2 1 27.6 Vdc 1 Amp Switch Mode Power Supply for Fire EN54-4:1997 +A1 +A2 STX2401-C STX2401-T FEATURES 0843-CPR-0213 14 Elmdene International Ltd Tel: +44(0)23 9269 6638 3 Keel Close, Interchange Park, Fax:

More information

2009 ESCAPE HYBRID MARINER HYBRID

2009 ESCAPE HYBRID MARINER HYBRID 2009 ESCAPE HYBRID MARINER HYBRID EMERGENCY RESPONSE GUIDE 1 FOREWORD The emergency response procedures for the Escape Hybrid and Mariner Hybrid vehicles are similar to those for traditional gasoline-powered

More information

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012

PAGE 1 OF 5 HEALTH, SAFETY & ENVIRONMENTAL MANUAL PROCEDURE: S360 Overhead Cranes & Lifts Procedure REV 4.0 8/14/2012 PAGE 1 OF 5 PURPOSE: OVERHEAD CRANES AND LIFTS PROCEDURE The purpose of this procedure is to define the safety and training requirements for use of overhead cranes and lifts. Procedure: Definitions Designated

More information

This Process Chart assumes that the system has been inspected and the proper signage has been installed.

This Process Chart assumes that the system has been inspected and the proper signage has been installed. 1) Address Identified 2) Check information system(s) to determine if solar electric system is on site and if type of system is known: YES SYSTEM TYPE KNOWN? YES NO SYSTEM DIRECTORY FOUND AND SYSTEM TYPE

More information

INSTALLATION AND OPERATION MANUAL ARM-4073 AUTOMATIC REPRESSURE MODULES

INSTALLATION AND OPERATION MANUAL ARM-4073 AUTOMATIC REPRESSURE MODULES INSTALLATION AND OPERATION MANUAL ARM-4073 AUTOMATIC REPRESSURE MODULES SYSTEM CONCEPT When not transferring fuel, the pressure in the underground closed piping system of a gasoline station may fall due

More information

South Magellan Drive, Torrance, California USA

South Magellan Drive, Torrance, California USA SV400003R Prepared by: Reviewed/ Approved by: Page 1 of 21 www.enovasystems.com 19850 South Magellan Drive, Torrance, California 90502 USA SV400003R Prepared by: Reviewed/ Approved by: Page 2 of 21 FOREWORD

More information

Installation and Construction Notes for EVSE4

Installation and Construction Notes for EVSE4 Installation and Construction Notes for EVSE4 You need to read and understand this if you want to build an EVSE that will be safe and need to pass a building inspectors review. Before beginning this process

More information

A48 / A48B (base plate) BATTERY CHARGER

A48 / A48B (base plate) BATTERY CHARGER A48 / A48B (base plate) BATTERY CHARGER CPN41054 ISSUE DATE: 12315-8/98 ECN/DATE 106 BRADROCK DRIVE DES PLAINES, IL. 60018-1967 (847) 299-1188 FAX: (847)299-3061 15349-07-07/02 16041 6/03 14575-2/01 INSTRUCTION

More information

R-200A R-200C Digital Controller TECHNICAL MANUAL. A new standard of reliability. This manual should remain with the unit.

R-200A R-200C Digital Controller TECHNICAL MANUAL. A new standard of reliability. This manual should remain with the unit. R-200A R-200C Digital Controller TECHNICAL MANUAL A new standard of reliability This manual should remain with the unit. IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS The manufacturer suggests

More information

Manual. EN Appendix. Lynx Ion BMS 400A / 1000A

Manual. EN Appendix. Lynx Ion BMS 400A / 1000A Manual EN Appendix Lynx Ion BMS 400A / 1000A 1. SAFETY INSTRUCTIONS 1.1 In general Please read the documentation supplied with this product first, so that you are familiar with the safety signs en directions

More information

Installation Instructions Electric Heaters 5 20 kw

Installation Instructions Electric Heaters 5 20 kw Small Packaged Products 2 to 5 Tons Accessory Electric Heaters Cancels: IIK 564A-24-2 IIK 564A-24- -02 Installation Instructions Electric Heaters 5 20 kw NOTE: Read the entire instruction manual before

More information

Application Note Three Phase String Inverters NEC 2014 Compliance

Application Note Three Phase String Inverters NEC 2014 Compliance Application Note Three Phase String Inverters NEC 2014 Compliance Version 2.0 July 07, 2014 The technical information and cross references of this document are subject to a continuous improvement and the

More information

ESCAPE HYBRID EMERGENCY RESPONSE GUIDE. Version 1.0

ESCAPE HYBRID EMERGENCY RESPONSE GUIDE. Version 1.0 ESCAPE HYBRID EMERGENCY RESPONSE GUIDE Version 1.0 1 FOREWORD Escape Hybrid emergency response procedures are similar to those for a traditional gasoline powered vehicle with the exception of the high

More information

Acceptance Test Report

Acceptance Test Report ACCEPTANCE TEST REPORT 1 Acceptance Test Report ECE 492 Spring 2014 Latest Revision: 13 May 2014 Prepared by: Drew Jeffrey Abstract The Acceptance Test Report (ATR) contains the summary of results obtained

More information

Corinthian Vintage Auto Racing Vehicle Safety Requirements

Corinthian Vintage Auto Racing Vehicle Safety Requirements 1. SEAT BELT/HARNESS: All race cars must be equipped with an approved 5 or 6 point racing safety harness of nylon web material. Lap belts and shoulder belts must be a minimum of 2" wide. All harness mounting

More information

CPS 3Phs String Inverters NEC 2014 Compliance

CPS 3Phs String Inverters NEC 2014 Compliance Application Note: NEC 2014 Compliance Revision: 062016 CPS 3Phs String Inverters NEC 2014 Compliance This application note describes the major changes within the NFPA 70, National Electric Code, specifically

More information

Technical Manual. DLM Module. This manual should remain with the unit.

Technical Manual. DLM Module. This manual should remain with the unit. Technical Manual DLM Module This manual should remain with the unit. Safety Rules SAVE THESE INSTRUCTIONS! Read the following information carefully before attempting to install, operate or service this

More information

R-200A R-200B Digital Controller TECHNICAL MANUAL. A new standard of reliability. This manual should remain with the unit.

R-200A R-200B Digital Controller TECHNICAL MANUAL. A new standard of reliability. This manual should remain with the unit. R-200A R-200B Digital Controller TECHNICAL MANUAL A new standard of reliability This manual should remain with the unit. IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS The manufacturer suggests

More information

2006/2007 ESCAPE HYBRID OR MARINER HYBRID

2006/2007 ESCAPE HYBRID OR MARINER HYBRID 2006/2007 ESCAPE HYBRID OR MARINER HYBRID EMERGENCY RESPONSE GUIDE 1 FOREWORD Escape Hybrid or Mariner Hybrid emergency response procedures are similar to those for a traditional gasoline powered vehicle

More information

Installation Instructions Electric Heaters 5 20 kw

Installation Instructions Electric Heaters 5 20 kw Small Packaged Products to 5 Tons Accessory Electric Heaters Cancels: IIK 564A--1 IIK 564A-- 11-01 Installation Instructions Electric Heaters 5 0 kw NOTE: Read the entire instruction manual before starting

More information

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System

Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System Summary of General Technical Requirements for the Interconnection of Distributed Generation (DG) to PG&E s Distribution System This document is intended to be a general overview of PG&E s current technical

More information

AUTOMATIC BEST BATTERY SELECTOR INSTALLATION & OPERATION BBS-4800 BBS-4800E

AUTOMATIC BEST BATTERY SELECTOR INSTALLATION & OPERATION BBS-4800 BBS-4800E AUTOMATIC BEST BATTERY SELECTOR INSTALLATION & OPERATION BBS-4800 BBS-4800E SENS part no: 101312 Document revision: K DCN No. 107455 Date 4/2/18 1840 Industrial Circle Longmont, CO 80501 Fax: (303) 678-7504

More information

PROFIRE 1100i IGNITION FLAME SAFETY CONTROLLER

PROFIRE 1100i IGNITION FLAME SAFETY CONTROLLER PROFIRE 1100i IGNITION FLAME SAFETY CONTROLLER Cautions WARNING: EXPLOSION HAZARD- -DO NOT SERVICE UNLESS AREA IS KNOWN TO BE NON- HAZARDOUS -DO NOT OPEN WHEN ENERGIZED EXPLOSION HAZARD- -SUBSTITUTION

More information

HI-POT/CONTINUITY TESTER Model PLEP01

HI-POT/CONTINUITY TESTER Model PLEP01 HI-POT/CONTINUITY TESTER Model PLEP01 Instruction Manual MITCHELL INSTRUMENT CO. Dear Customer: Congratulations! Mitchell Instrument Co. is please to present you with your Hipot/Continuity Tester. This

More information

ELECTRIC VEHICLE DISMANTLING MANUAL

ELECTRIC VEHICLE DISMANTLING MANUAL RAV4 EV Electric Vehicle ELECTRIC VEHICLE DISMANTLING MANUAL QEA38 Series Foreword This guide was developed to educate and assist dismantlers in the safe handling of Toyota RAV4 EV electric vehicles. RAV4

More information

Elite Power Solutions Automatic Battery Control (ABC) Operation Manual

Elite Power Solutions Automatic Battery Control (ABC) Operation Manual Elite Power Solutions Automatic Battery Control (ABC) Operation Manual Elite Power Solutions 335 E Warner Rd. STE 3 Chandler, AZ 85225 www.elitepowersolutions.com ABC Operation Manual Page 1 Table of Contents

More information

FHC-1D user manual. Features

FHC-1D user manual. Features Phason The Fan and Heater Control (FHC-1D) automatically controls the temperature in a room by adjusting the speed of variable speed fans and controlling a heater interlock. When the temperature is at

More information

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS

DISCONNECT SWITCH REQUIREMENTS FOR DISTRIBUTED GENERATION CUSTOMERS Prepared by: SXZO DISCONNECT SWITCH REQUIREENTS FOR DISTRIBUTED GENERATION CUSTOERS 060559 Department: Electric Distribution Section: Design and Construction Approved by: D.Jantz (DWJ7) Date: 8/15/17 Rev.

More information

Battery Control Center - Diesel

Battery Control Center - Diesel Service Manual CAUTION: All servicing of the Battery Control Center should be done only by a qualified Service Technician. Inadvertent shorts inside the Battery Control Center could result in severe damage

More information

ESSENTIAL SAFETY RESOURCES

ESSENTIAL SAFETY RESOURCES ESSENTIAL SAFETY RESOURCES GS-3009 DRIVING SAFETY Originator: Safety Advisor s Signature: Type Name Approval: HSE Manager s Signature: Type Name Approval: Operations Manager s Signature: Type Name Table

More information

Technical Regulations 2019

Technical Regulations 2019 Release date: 21-10-2018 Version: 0.2 (Concept) Authors: Goudswaard, J.C., Bullée, P.A., Drabbe, M. 1 Table of contents 1 Table of contents... 1 2 About... 3 3 Changes and releases... 3 4 Electrical...

More information

This document describes the commissioning checklist procedures for the Capstone MicroTurbine systems.

This document describes the commissioning checklist procedures for the Capstone MicroTurbine systems. Capstone Capstone Turbine Corporation 21211 Nordhoff Street Chatsworth CA 91311 USA Telephone: (818) 734-5300 Facsimile: (818) 734-5320 Website: www.microturbine.com Work Instructions Commissioning Checklist

More information

Definitions. Scope. Customer Generation Interconnection Requirements

Definitions. Scope. Customer Generation Interconnection Requirements Updated 02/1 Page 1 Scope The purpose of this document is to describe Idaho Power s requirements for the installation and testing of Customer Generation acilities that are interconnected with Idaho Power

More information

Installation Instructions for Aux 101 Kit A044Z055

Installation Instructions for Aux 101 Kit A044Z055 Instruction Sheet 7-2013 Installation Instructions for Aux 101 Kit A044Z055 1 Introduction The information contained within is based on information available at the time of going to print. In line with

More information

A TECHNICAL INSPECTOR S GUIDE TO THE 2012 FSAE RULES PART 1 RULES CHANGE SUMMARY & ADMINISTRATIVE CHANGES

A TECHNICAL INSPECTOR S GUIDE TO THE 2012 FSAE RULES PART 1 RULES CHANGE SUMMARY & ADMINISTRATIVE CHANGES A TECHNICAL INSPECTOR S GUIDE TO THE 2012 FSAE RULES PART 1 RULES CHANGE SUMMARY & ADMINISTRATIVE CHANGES 2012 FSAE Rules Format Index Introduction Part A - Administrative Regulations Appendix S - SAE

More information

HYBRID VEHICLE BATTERY

HYBRID VEHICLE BATTERY HYBRID BATTERY X HYBRID BATTERY NICKEL METAL HYDRIDE HYBRID VEHICLE BATTERY Hybrid Vehicle (HV) Battery Pack. Wear Protective safety clothing at all times! The 300 Series Hybrid contains a high voltage

More information

Spring Bearing Rocker Replacement Installation [Kit # ] for Elevance Continental-Style Delivery Unit

Spring Bearing Rocker Replacement Installation [Kit # ] for Elevance Continental-Style Delivery Unit Spring Bearing Rocker Replacement Installation [Kit # 002-2076-00] for Elevance Continental-Style Delivery Unit Note Use this kit to replace one or more Spring Bearing Rockers in an Elevance Continental-Style

More information

SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual

SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual Combiner Box Installation & Operations Manual SunLink PV System Disconnect with Arc Fault Detection Installation and Operations Manual TABLE OF CONTENTS Notices and Safety Precautions Pages 1-2 Combiner

More information

Monicon Instruments Co., Ltd. CHR-1285/2485 CHR-1285/2485 BATTERY CHARGER

Monicon Instruments Co., Ltd. CHR-1285/2485 CHR-1285/2485 BATTERY CHARGER CHR-1285/2485 BATTERY CHARGER TEL:886-4-2238-0698 FAX:886-4-2238-0891 Web Site:http://www.monicon.com.tw E-mail:sales@monicon.com.tw Copyright 2007 Monicon Instruments Co., Ltd. All right reserved. Contents

More information

BOOST POWER 1212 Product Description

BOOST POWER 1212 Product Description BOOST POWER 1212 Product Description Contents 1 Introduction...4 2 General Description...4 2.1 Compatibility with standard Lead-Acid Batteries... 4 3 Battery Performance...5 3.1 Discharge Capability...

More information

HousePower BMS. CleanPowerAuto LLC

HousePower BMS. CleanPowerAuto LLC HousePower BMS CleanPowerAuto LLC Features: Designed for 12V and 24V LiFePo4 battery banks, replacing Lead Acid house banks in marine and RV applications, with minimal changes to existing systems and wiring

More information

Manifold QF. Contents. Description. Installation & Setup Guide. Safety 3. Introduction 3. Installation Standards 4. Specifications 5.

Manifold QF. Contents. Description. Installation & Setup Guide. Safety 3. Introduction 3. Installation Standards 4. Specifications 5. Contents Description Page Safety 3 Introduction 3 Installation Standards 4 Specifications 5 Materials 5 Overall System Configurations 6 Manifold Installation 7 Fixing Unit to Wall 7 Water Connection 8

More information

Today, we re going to talk about battery safety. We ll discuss all the key issues associated with using batteries safely, including battery hazards,

Today, we re going to talk about battery safety. We ll discuss all the key issues associated with using batteries safely, including battery hazards, Today, we re going to talk about battery safety. We ll discuss all the key issues associated with using batteries safely, including battery hazards, battery charging, and battery maintenance. Although

More information

Electrical Inspection

Electrical Inspection Electrical Inspection Test Procedure Test Purpose System Description Test Procedure Test Form Revision History Revision Date Version No. Detail 9/30/04 A First Draft 10/7/04 B Second Draft with corrections

More information

OPERATION MANUAL MODELS TWE-250 TWE-321 TWE-375 TRU WELD EQUIPMENT COMPANY 6400 N. HONEYTOWN ROAD SMITHVILLE, OHIO (330)

OPERATION MANUAL MODELS TWE-250 TWE-321 TWE-375 TRU WELD EQUIPMENT COMPANY 6400 N. HONEYTOWN ROAD SMITHVILLE, OHIO (330) OPERATION MANUAL MODELS TWE-250 TWE-321 TWE-375 TRU WELD EQUIPMENT COMPANY 6400 N. HONEYTOWN ROAD SMITHVILLE, OHIO 44677 (330) 669 2773 CONTENTS Section Description Pages 1 Introduction 3 2 External Features

More information

PRECISION UK Ltd DUPLEX AGSS PLANT

PRECISION UK Ltd DUPLEX AGSS PLANT DUPLEX AGSS PLANT Contents Page Section Page Product Description General 3 AGSS Plant 3 AGSS Remote Switch 3 Operation General 4 Safety General 5 Installation General 5 Mechanical 5 Electrical 7 Wiring

More information

Surface Regulations and Policies

Surface Regulations and Policies Surface Regulations and Policies COAL FATALITIES 1970-2002 350 300 250 200 150 100 50 0 1970 1973 1976 1979 1982 1985 1988 1991 1994 1997 2000 From January 1, 1970 through today, a total of 240 coal miners

More information

Owner's/Installation Manual

Owner's/Installation Manual Owner's/Installation Manual Power Management Module (PMM) and Starter Kit NOTE: The starter kit must be purchased and installed prior to individual PMM usage. Model Numbers: 00686-0 PMM 00699-0 PMM WITH

More information

The information in this guide will allow response to emergencies involving Balance Hybrid E450 vehicles.

The information in this guide will allow response to emergencies involving Balance Hybrid E450 vehicles. Introduction The emergency response procedures for the Balance Hybrid E450 vehicle are similar to those for traditional gasoline-powered vehicles with the addition of special considerations for the high-voltage

More information

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers

Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers Supersedes IL 33-858-4 Dated 05/02 Digitrip Retrofit System for ITE K-3000, K-3000 S, K-4000 and K-4000 S Breakers Digitrip Retrofit System for ITE K-3000, Digitrip Retrofit System for ITE K-3000, K-3000

More information

Holden Volt Emergency Response Guide 9/11/12

Holden Volt Emergency Response Guide 9/11/12 Holden Volt Emergency Response Guide 9/11/12 1 Course Overview Duration: 2 hours Course Content: Vehicle Introduction Battery and Electrical Technology Emergency Operations Response to the Incident 2 Course

More information

ELECTRIC ACTUATOR 94OE IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS

ELECTRIC ACTUATOR 94OE IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS ELECTRIC ACTUATOR E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS 94OE IOM Electric Actuator Specifications...2 Overview...3 Actuator Wiring Diagrams...4

More information

ELECTRIC ACTUATOR HVAC/BAC ELECTRIC IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS

ELECTRIC ACTUATOR HVAC/BAC ELECTRIC IOM. E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS HVAC/BAC ELECTRIC IOM ELECTRIC ACTUATOR E024, EO25, E026, EO29 & E030 Installation Operation and Maintenance Instructions TABLE OF CONTENTS Electric Actuator Specifications... 2 Overview... 3 Actuator

More information

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R

INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R INSTRUCTIONS FOR THE RELIANCE Fast/Tran TM ARL0909 & ARL0909R THE RELIANCE Fast/Tran IS NOT FOR "DO-IT-YOURSELF" INSTALLATION. It must be installed by a qualified electrician thoroughly familiar with all

More information

Abstract. Acceptance Test Plan Draft - TSV 1

Abstract. Acceptance Test Plan Draft - TSV 1 Acceptance Test Plan Draft - TSV 1 Abstract The Acceptance Test Plan defines the necessary test procedures to be used in order to verify all functional requirements and specifications for the integrated

More information

Sentry Battery Charger. Installation and Operations Manual Section 75

Sentry Battery Charger. Installation and Operations Manual Section 75 Sentry Battery Charger Installation and Operations Manual 00-02-0616 03-03-08 Section 75 In order to consistently bring you the highest quality, full featured products, we reserve the right to change our

More information

Installation and Operating Procedures For C&D Technologies TRUE Front Access TEL Series Batteries

Installation and Operating Procedures For C&D Technologies TRUE Front Access TEL Series Batteries RS-2046 Installation and Operating Procedures For C&D Technologies TRUE Front Access TEL Series Batteries FOLLOW MANUFACTURER S PUBLISHED INSTRUCTIONS WHEN INSTALLING, CHARGING AND SERVICING BATTERIES.

More information

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market

JEEVES. JEEVES Installation Manual. Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market 1 888-323-8755 www.nwlifts.com JEEVES Installation Manual The Easiest Do-It-Yourself Dumbwaiter on the Market This manual will cover the installation procedure step-by-step. The installation of this dumbwaiter

More information

2014 Cadillac ELR. GM s First Responder Guides are available at

2014 Cadillac ELR. GM s First Responder Guides are available at 2014 Cadillac ELR GM Service Technical College provides First Responder Guides (FRG) and Quick Reference (QR) Sheets free of charge to First Responders. FRGs and QRs can be displayed in a classroom as

More information

RANGER & EXPLORER Class Safety Inspection Sheet Tutorial

RANGER & EXPLORER Class Safety Inspection Sheet Tutorial Safety Process Safety Inspections will start before the competition. In the past it has been done with a review by competition staff. Staff reviewed technical documents in the hopes of spotting problems.

More information

DIESEL Engine Fire Pump Controllers Features

DIESEL Engine Fire Pump Controllers Features 1-1 Printer / Recorder The industrial grade thermal printer is housed in a rugged steel enclosure within the controller. The on/off switch, feed and reset buttons are front accessible. A bi-color status

More information

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016

ELECTRIC SERVICE RULES DISTRIBUTED GENERATION Issued Jan 2016 DISTRIBUTED GENERATION CHAPTER 5 500. SCOPE This chapter includes distributed or customer-owned generation connected in parallel and operating with Alliant Energy s electric distribution system. For all

More information