1 IMPROVEMENT OF SERBIAN POWER PLANTS TE NT A AND TE NT B BASED ON ALSTOM ECO RAM TM STUDY PERFORMED Authors: Dirk Renjewski, ALSTOM Power Service GmbH, Germany Vladimir Bozinovic, Thermal Power Plants Nikola Tesla Ltd., Serbia Peter Stegelitz, ALSTOM Power Service GmbH, Germany Page 1 of 18

2 1. Abstract In 2006 ALSTOM was awarded a contract for a study for increase of power output, efficiency and availability on the Power Plant TE NT A, unit 6. In a second contract was performed a study for the unit 4 in the same plant focussing just on power output and efficiency. A third contract for the Power Plant TE NT B, unit 2 was given by EPS in 2007 with the same aims. Both plants are lignite fired. Forming a joint team of EPS and ALSTOM the three units have been assessed and areas for potential improvements have been defined. The potential improvements are mainly focused on: - Increase of unit power output based on increased main steam generation in the boiler and modernisation of steam turbines - Increase of unit efficiency based on improvements in Ljungstroem type air preheater, electrostatic precipitator, boiler feed pump and steam turbine - Increase of availability based on a change in maintenance strategy - Necessary adoptions and modernisations of other equipment like alternator, pulverisers, pumps, fans, piping etc. in order to meet the requirements of an increased power output. In a first phase after the assessment the jointly defined potentials have been elaborated conceptually and the economic effects have been defined. Based on those economic effects several potentials have been selected for further elaboration in detail. It has been defined, that the unit power output can be increased in the range of 10 % mainly based on the increased steam generation in the boiler while the efficiency increase is be mainly based on steam turbine modernisations and improvements in the equipment as mentioned above. The approach used by EPS and ALSTOM in this study and the further project execution is of wide interest for other power plant owners as it can be easily used and grant improvements in power plant output, efficiency and availability. 2. ECORAM ECORAM is a tool developed by ALSTOM for detailed analysis of plant design, operation and maintenance of a unit. Based on a systematic investigation of the plant as a whole and considering most modern design approach ideas for increase of power output, increase of operational flexibility, increase of availability, reduction of maintenance cost, reduction of environmental impact are generated. By this the customer of ALSTOM is selecting the goal to be reached. The customer provides the current operation data, the information regarding Page 2 of 18

3 availability and maintenance as well as the basic economic figures for a rough economic analysis of the ideas developed during the project; ALSTOM provides the necessary benchmark data and the plant engineering know-how. The whole project is performed by a joint team of customer and ALSTOM. Joint Team Customer Operation Maintenance Plant data Team Technology (incl. R&D) Service Worldwide experience 1+1>2 Picture 1 Joint team Customer ALSTOM In a first phase the plant conception is analysed, the customer experience in operation and maintenance is evaluated and based on the future operational requirements the gap is defined. By this approach are developed ideas for improvements, which are conceptually designed, determined and evaluated the effects and respective costs of modifications. Integrated Study to Improve Plant Profitability Balance of plant Turbine/Generator Boiler Electrical Environmental I&C Design Operation Maintenance Goal Increase of power output More flexible operation Increase of availability Reduction of maintenance cost - Systematic investigation of the plant - Picture 2 Integrated systematic investigation of the power plant as a whole Page 3 of 18

4 In a second phase economic feasible ideas as per customer selection are further detailed up to basic engineering level including economic comparison with alternative solutions, determination of implementation times spans. As a result the customer will get an investment plan for unit modernisation. Project Set-up Customer Operation Maintenance engineering Service International Experience Steering Committee -Contract, -Definition of targets, -Boundary Conditions Phase 1 Phase 2 Plant assessment and appr. evaluation GO / NOGO Analysis of potentials Solutions Implementation plan Implementation Picture 3 General project set-up The implementation of identified measures can be done by the customer alone or together with an external partner or ALSTOM ECORAM team acting in such a case as consultant of customer. Page 4 of 18

5 The ECO RAM product family was started to be developed in the year Since that time several projects have been performed. The next picture shows the reference list as per August Customer Country Power Station/ Unit Output Main Fuel Order Year Status Phase 1 Phase 2 Vattenfall Europe Generation (VE-G) Germany Jänschwalde 6 x 500 Lignite 2001 Finalised DSK Germany EVA Ibbenbüren 27 Mining Gas 2003 Finalised Hidrocantabrico Spain Abono Finalised RWE Power Germany Neurath E 600 Lignite 2003 Finalised VE-G Germany Schwarze Pumpe 2 x 800 Lignite 2004 Finalised E.on UK United Kingdom Ironbridge 2 x Finalised Energy Randers Denmark Randers CHP 49 e th / Wood 2006 Finalised EPS Serbia TE NT A6 308,5 Lignite 2006 Finalised Start November 2007 British Energy United Kingdom Eggborough 4 x Finalised Start September 2007 EPS Serbia TE NT B2 620 Lignite 2007 Finalised Start November 2007 EPS Serbia TE KO B 2 x 348,5 Lignite 2008 Start February 2008 Picture 4 ECO RAM references Page 5 of 18

6 During the execution of several ECO RAM projects it was found that in some cases the ECO RAM is too large to find a solution for the certain problems in plant operation and maintenance. That s why a new product group called STEP x was developed. The generic approach to such projects is the same as for ECO RAM but as the project is fixed on the solution of a more single problem like just output increase or increase of some equipment capacity etc. the projects can become much smaller and faster to be done. Currently the STEP x product family consists of: STEP C Capacity/ Flexibility Increase STEP L Lifetime Extension STEP R System Re-Design STEP S Plant Status (Due Diligence) STEP W Water Chemistry/ Water Management Customer Country Power Station/ Unit Output Main Fuel Order Year STEP x Status ESKOM South Africa Arnot 6 x STEP C Finalised Vattenfall Heat Germany HKW Berlin- Mitte 400 th Gas / Oil 2004 STEP C Finalised Tavanir Iran Bandar Abbas 4 x 320 Oil / Gas 2004 STEP S Finalised VE-G Germany Jänschwalde / Boxberg 8 x 500 Lignite 2005 STEP L Finalised EnBW Germany Heilbronn STEP C Finalised RWE Germany BASF 3 x 200 ESKOM South Africa Matla 6 x 600 Gas / Oil 2005 STEP R Finalised 2005 STEP C Finalised STEAG SaarEnergie Germany Weiher STEP W Finalised DONG Denmark Studstrup STEP R Finalised ESKOM South Africa Kendal 6 x STEP C Finalised E.on Germany Franken 426 Gas / Oil 2006 STEP C Finalised Page 6 of 18

7 Customer Country Power Station/ Unit Output Main Fuel Order Year STEP x Status RWE Germany BASF 3 x 200 Gas / Oil 2006 STEP R Finalised DONG Denmark Esbjerg 417 EnBW Germany Heilbronn STEP C Finalised 2006 STEP C Finalised ESKOM South Africa Matimba 6 x 670 ESKOM South Africa Lethabo 6 x 620 ESKOM South Africa Tutuka 6 x 610 ESKOM South Africa Duvha 6 x 600 ESKOM South Africa Majuba 6 x 660 ESKOM South Africa Kriel 6 x STEP C Finalised 2007 STEP C Finalised 2007 STEP C Finalised 2007 STEP C Finalised 2007 STEP C Finalised 2007 STEP C Finalised EPS Serbia TE NT A4 308,5 Lignite 2007 STEP C Finalised Hidrocantabrico Spain Abono SNET France Gardanne STEP C Finalised 2007 STEP W Finalised Vattenfall Heat Germany HKW Berlin- Mitte 400 th Gas / Oil 2008 STEP C Start September 2008 EnBW Germany Marbach DELTA Australia Vales Point 2 x 660 Gas / Oil 2008 STEP C Finalised 2008 STEP S Finalised CGTEE Brazil Presidente Medici 2 x STEP S Finalised Picture 5 STEP x references Page 7 of 18

8 3. Basic situation at TE NT B Picture 6 Power Plant Nikola Tesla B The power plant Nikola Tesla B owned by Electric Power Industry of Serbia (EPS) is located at the town of Obrenovac approximately 40 kilometres southwest of Belgrade. The power plant consists of two identical units with a rated electrical output of 618,4 each. The steam generators installed are capable to burn lignite fuel from Vreoci and Tamnava mines. Main and auxiliary cooling water cycles are of open type mainly. Original suppliers of major equipment are: - Steam generator Rafako, Poland based on a Sulzer license - Steam turbine and generator BBC, Switzerland - Boiler feed pump Sulzer, France - Main transformer Minel, Serbia The units are running in base load operation mode. 4. Site assessment As part of the co-operation between EPS and ALSTOM it was agreed to perform a two week site assessment in order to get an overview about the current operation and maintenance conditions of the units. Therefore by EPS was completed a questionnaire before assessment Page 8 of 18

9 start and during the assessment interviews regarding all operation and maintenance questions have been performed. It was found during the assessment that the boiler operation represents the most non-reliable part of the unit. The reasons for this circumstances are mainly seen in big fluctuations in coal quality as delivered from the mines to the power plant in regard of heating value range from 6,0 MJ/kg up to 9,3 MJ/kg and particle size resulting in damages based on corrosion and erosion on the several heating surfaces as well as lack of pulveriser capacity from time to time. Furthermore it was found that the fresh air flow through the Ljungstroem type air preheater is just 70 % and the other 30 % of fresh air for burning is false air. During the site assessment 25 ideas have been developed. They have been grouped into: - Power output increase Boiler feed pump capacity Pulveriser capacity Boiler improvements in order to reach increase steam flows Cooling water flow increase through auxiliary condenser Increase of steam turbine swallowing capacity in order to meet increased steam flows from boiler - Unit efficiency increase Improve of pulveriser operation Reduction of hot gas recirculation Improve Ljungstroem type air preheater sealing Energy optimisation and improved control system of Electrostatic precipitator In the following two examples the major interest is laid on the power output increase. Page 9 of 18

10 5. Example 1 Optimisation of steam generator area Optimisation of Steam generator and Air Heater High leakage rate across air heater 2 High leakage rate in the boiler area 3 Low amount of combustion air 4 Low amount of secondary air at burners 5 - High damage rate of heating surfaces 6 Limits for a 110 % load operation Picture 7 Optimisation of steam generator and air preheater As determined during the site assessment the steam generator is in general capable for a 10 % main and reheat steam output increase. To reach this it is necessary to bring the steam generator back to the original design conditions including an improved sealing of the furnace and the Ljungstroem type air preheater. The bottleneck for the output increase in this area is seen in the capacity of the beater wheel mills. In general - the beater wheel mill as hearth of a lignite firing system is determining directly the power output of the boiler. Based on the function of the mill acting like a radial fan, the mill sucks the hot flue gases required for coal drying and transport out of the combustion chamber independently. In the same time the lignite is pulverised to a predefined fineness of the coal dust. The basic processes drying, pulverising and dust transport ventilation are linked together in a way that a system analysis is mandatory. Page 10 of 18

11 The picture 8 shows in a schematic manner the circuit of the system beater wheel mill consisting of: - Recirculation duct - Mill - Classifier - Dust piping - Burner - Combustion chamber Height [m] (-) 0 (+) Hot Gas (>1000 C) Primary Air (~300 C) Combustion Chamber Burner Lignite (Feeder) Pressure [mbar] Beater Wheel Mill with Classifier Picture 8 Circuit lignite firing with beater wheel mill Page 11 of 18

12 System parts Pressure loss Pressure win Pressure build up (1) Recirculation duct X (2) Mill door X (3) Combustion chamber X (4) Burner and pulverised coal duct X X (5) Classifier X X Summary PL + PW = (6) Mill Beater Wheel Table 1 Rough system analysis The picture shows that changes on the single components of the system (dimensions, shape, baffles etc.) are changing the requirements on the power output of the mill itself. The same applies if the coal quality is changed and/ or the coal quality range width is widened. The following reasons can reduce the output of the beater wheel mill system: - Pressure loss - Wear or maintenance strategy - Maintenance quality - False or uncontrolled air - Improper measurement instruments or insufficient number thereof installed - Overloading by fuel In order to define the fuel quality depending system optimum in regard of fuel amount and efficiency/ economy the following should be performed: - Detailed assessment of the system - Process analysis - Mill measuring based on mill test operation - Detailed fuel analysis including determination of pulverising capabilities in a beater wheel mill - Assessment of maintenance approach and quality - Theoretical simulation. Page 12 of 18

13 After the first estimation and after the implementation of the measures as mentioned below, the capability of the plant components are likely to be sufficient in order to achieve the requested targets of the mill process: - homogenisation (decreased range of heat value variations), reduction of xylite parts, coal ONLINE - analysis as an active control value etc. - Intense decrease of leakage resulting in improvement of combustion, temperature control, flow etc. - Decrease of pressure loss in the mill - Optimisation of the coal distribution - Increase of the control ability of the mill (new control curves, more and/ or modern measurement equipment) - Use of wear-material with higher life time - Optimisation of the maintenance and repair - Adaptation of the pulverized fuel ducts and the firing system 6. Example 2 - Increase swallowing capacity of steam turbine Picture 9 New HP-Turbine blade path On turbine and generator side the HP-turbine represents a bottleneck. The currently installed HP-turbine is not capable to cover the increased main steam flow without increase in main steam pressure. Therefore it is necessary to redesign the steam path of this turbine. It was performed additionally an analysis of the other equipment in the water-steam-cycle in order to determine other systems to be modified, e.g. alternator and condensate extraction pumps. Page 13 of 18

14 7. Example 3 Energy optimisation of Electrostatic precipitator The currently installed ESP control is trying to introduce as much energy as possible into the system and therefore to remove the maximum possible amount of dust. It is proposed to install a different control system as the recent experience with different lignite fuel types has shown that there will be no any further decrease of dust emissions upon certain strength of the electric field. The proposed system performs automatic self optimisation of the power input in relation to the required dust emission level. By this power savings in the range of up to 80 % can be realised without an important change of the emitted dust level. Energy optimisation of ESP Installation of dust emission measurement and connection with the control cubicles and installation of new control equipment Control cubicles High Tension Rectifier Dust emission measuring Picture 10 Energy optimisation of ESP 8. Example 4 Change in maintenance strategy The currently used in TE NT B maintenance strategy is based on performing major overhauls every 8 years with a usual 120 days period, medium overhaul every 3 years 45 days period planned - and minor overhauls each year for a time span of 30 days. This maintenance strategy is reflecting the pure preventive maintenance approach and does not fit to current needs in Serbian electric power grid suffering a lack of electricity. Page 14 of 18

15 In order to improve the maintenance strategy it is recommended to perform intensive technical and social competency based training for operation and maintenance staff on all levels and to provide them with modern computerised maintenance management systems. After performing those measures it is possible to change the maintenance strategy to a more predictive type one in one of the following two alternatives: Major overhaul every 8 years for a 73 days period Medium overhaul every 4 years for a 44 days period Minor overhaul every year for a 9 days period Or Major overhaul every 6 years for an 86 days period Medium overhaul every 6 years for a 60 days period No minor overhaul as the equipment will be maintained during unplanned shutdowns only. For this an unplanned unavailability of the unit per year should be considered. As the major reason for unplanned shutdown of the unit is seen in boiler area no change compared to today s situation in unavailability is expected. The installation of new or modernised/ retrofitted equipment in the power plant gives the additional chance to increase the time span between two overhauls. E.g. for ALSTOM steam turbines the maintenance recommendation shows a time span of equivalent operation hours between two major overhauls. 9. Summary TE NT B The study performed show that it will be possible to increase the power output of each unit in TE NT B by 49 without major investments required. A further output increase is possible based on new IP- and LP-turbine design but is requiring major changes in the alternator and therefore higher investments. By this the steam generator is not overloaded the material limits are used to a higher extend only. Page 15 of 18

16 10. TE NT A The power plant Nikola Tesla A owned by Electric Power Industry of Serbia (EPS) is located at the town of Obrenovac approximately 30 kilometres southwest of Belgrade. The power plant consists of six units with a rated electrical output of 2 x 210, 1 x 305 and 3 x 308,5. The steam generators installed are capable to burn lignite fuel from Vreoci and Tamnava mines. Main and auxiliary cooling water cycles are of open type mainly. The unit analysed have been No. 4 and No. 6. Original suppliers of major equipment are Unit No. 4 - Steam generator Tlmace, Slovakia based on a Babcock license - Steam turbine and generator ALSTOM, France - Boiler feed pump Sulzer, France - Main transformer Minel, Serbia Unit No. 6 - Steam generator Rafako, Poland based on a Sulzer license - Steam turbine and generator ALSTOM, France - Boiler feed pump Sulzer, France - Main transformer Minel, Serbia The units are running in base load operation mode. Page 16 of 18

17 Picture 11 Power Plant Nikola Tesla A It was determined by the assessment and further home office elaborations that on both units the steam production from the steam generator can be increased by 10 % as well as for TE NT B. This was taken as basic point for the further elaborations. On unit A4 the maximum achievable power output is limited by the alternator design to a maximum of 386 MVA while on unit A6 this value is 405 MVA both based on stator cooling water flow and hydrogen pressure increase to a technically reasonable and economic extend. Page 17 of 18

18 As EPS is considering the installation of an additional district heating extraction from the power plant, the study recommended using for this the unit A4. On unit A6 it was recommended to use the maximum permissible power output increase. In order to reach this it was proposed to perform the following activities: - Steam generator Extended major overhaul - Beater wheel mills system Improve operation - Steam turbine Retrofit of all turbine parts - Alternator Increase of stator cooling water flow and hydrogen pressure after major overhaul - Boiler feed pump Replacement of pump cartridge Page 18 of 18

Power Generation Flexibilisation Case Studies from Germany. By Ronald Rost & Arun Kumar Sarna

Power Generation Flexibilisation Case Studies from Germany. By Ronald Rost & Arun Kumar Sarna Power Generation Flexibilisation Case Studies from Germany By Ronald Rost & Arun Kumar Sarna Agenda About VPC & Encotec Moorburg Flexibilisation flexgen Jaenschwalde 2 VPC GmbH Flexibilisation case studies

More information

Willem van der Westhuizen Pump Consultant Eskom Enterprises Engineering Johannesburg South-Africa. Master Degree in Mechanical Engineering

Willem van der Westhuizen Pump Consultant Eskom Enterprises Engineering Johannesburg South-Africa. Master Degree in Mechanical Engineering SELECTING THE OPTIMISED PUMP CONFIGURATION AND DRIVE OPTION FOR THE CONDENSATE EXTRACTION AND BOILER FEED PUMPS FOR THE NEW ESKOM SUPERCRITICAL POWER STATIONS Abstract: Willem van der Westhuizen Pump Consultant

More information

THERMAL GENERATION PROJECTS

THERMAL GENERATION PROJECTS THERMAL GENERATION PROJECTS Client /Project Country Project Details Date Power Utility Pakistan Owner s Engineering review of Basic and Detailed Engineering Operation & Maintenance Service Provider Advisory

More information

Furnace-based optimisation of a lignite-fired steam generator

Furnace-based optimisation of a lignite-fired steam generator Vo lu me 9 Is sue / Pa ge to Furnace-based optimisation of a lignite-fired steam generator by Daniel Sommer, Piotr Olkowski, Dieter Rüsenberg and Heinz-Jürgen Wüllenweber VGB PowerTech l Optimisation

More information

VPC Corporate Presentation

VPC Corporate Presentation VPC Corporate Presentation 21/22. 09. 2016 Agenda About VPC Services Portfolio Experience & Customers 2 VPC Profil Shareholder palero Locations Range of services Engineering services for power generation

More information

Case studies on adoption of advanced coal-fired power technology in emerging economies

Case studies on adoption of advanced coal-fired power technology in emerging economies Case studies on adoption of advanced coal-fired power technology in emerging economies Cleaner and more efficient coal technologies in Russia Expert meeting 10 December 2012, World Trade Center, Moscow

More information

Steam Turbine performance improvement solutions for Indian fleets

Steam Turbine performance improvement solutions for Indian fleets Steam Turbine performance improvement solutions for Indian fleets Pradeep Agarwal 2013-02-13 Steam Turbine Thermal Service in India Strong local presence Close to customers 7 field offices Local footprint:

More information

Experiences with the improvement of minimum load in coal fired power stations. Manfred Schesack

Experiences with the improvement of minimum load in coal fired power stations. Manfred Schesack Experiences with the improvement of minimum load in coal fired power stations Manfred Schesack Outline 1 2 STEAG Minimum load reduction 3 Frequency control 4 Roadmap 2017-12-01 Improvement of flexibility

More information

Ronnie van Eeden. Senior Mining Engineer. Overview

Ronnie van Eeden. Senior Mining Engineer. Overview Senior Mining Engineer Overview is a qualified Mining Engineer with other commercial qualifications. He has 46 years of experience in the coal industry working for mining houses, the smaller coal industry,

More information

Modification of Kiln Plants to Meet Russian Demands

Modification of Kiln Plants to Meet Russian Demands Modification of Kiln Plants to Meet Russian Demands By Wolfgang Pajonke and Matthias Mersmann, KHD Humboldt Wedag AG, Germany The Russian Cement Industry is About Start Through After the continuous decline

More information

Lecture 7a: Large Scale Oxyfuel Demonstrations. G Hesselmann APP OFWG Capacity Building Course 5 th & 6 th February 2009, Daejeon, Korea

Lecture 7a: Large Scale Oxyfuel Demonstrations. G Hesselmann APP OFWG Capacity Building Course 5 th & 6 th February 2009, Daejeon, Korea Lecture 7a: Large Scale Oxyfuel Demonstrations G Hesselmann APP OFWG Capacity Building Course 5 th & 6 th February 2009, Daejeon, Korea Large Scale Demonstrations Significant Projects A Selection of Coal-Fired

More information

ENERGY EFFICIENT DRIVE FOR COAL GRINDING MILLS

ENERGY EFFICIENT DRIVE FOR COAL GRINDING MILLS ENERGY EFFICIENT DRIVE FOR COAL GRINDING MILLS Abstarct: Since the implementation of vertical roller mill for coal grinding the design concept of the gearboxes to drive the mill changed totally. Based

More information

ABB PSPG-E7 MODAKOND More efficient and dynamic unit control. ABB Group May 8, 2014 Slide 1 ABB

ABB PSPG-E7 MODAKOND More efficient and dynamic unit control. ABB Group May 8, 2014 Slide 1 ABB ABB PSPG-E7 MODAKOND More efficient and unit control Group May 8, 2014 Slide 1 OPTIMAX MODAKOND Challenge Conventional solution for frequency control (or to improve control performance for flexible plant

More information

Vasilikos Power Station

Vasilikos Power Station Vasilikos Power Station General Vasilikos Power Station constitutes the biggest work of infrastructure ever undertaken in Cyprus. Phase I of the station is in commercial operation since the year 2000.

More information

We Keep the World in Motion. Power Plants

We Keep the World in Motion. Power Plants Power Plants March 2011 Which kind of power plants and applications are our motors used for? ELIN Motoren offers drive solutions for selected applications in all forms of thermal power plants: Pumps -

More information

Flexibility Solutions for Thermal Power Plants and Their Implementation: The View of a German Utility

Flexibility Solutions for Thermal Power Plants and Their Implementation: The View of a German Utility Flexibility Solutions for Thermal Power Plants and Their Implementation: The View of a German Utility Dr. Nicolas Mertens Flexibilisation of Indian Thermal Power Plants, New Delhi, 30/11/2018 Presentation

More information

CCT Pre-Engineering Study for a 700 deg C high efficient PC-Power Plant

CCT Pre-Engineering Study for a 700 deg C high efficient PC-Power Plant CCT 2009 Fourth International Conference on Clean Coal technologies 18-21 May 2009 Pre-Engineering Study for a 700 deg C high efficient PC-Power Plant 1 Step by Step Power Plant Development VGB E max -

More information

Power Generation Services Solutions for challenging Markets

Power Generation Services Solutions for challenging Markets Power Generation Services Solutions for challenging Markets Philipp Leifeld, GT Service Engineering / Dirk Kampe Marketing GT Modernizations & Upgrades Matthias Migl, Principal Key Expert Overall Plant

More information

Brochure. Synchronous generators for steam and gas turbines Proven generators reliable power

Brochure. Synchronous generators for steam and gas turbines Proven generators reliable power Brochure Synchronous generators for steam and gas turbines Proven generators reliable power We provide motors, generators and mechanical power transmission products, services and expertise to save energy

More information

We Keep the World in Motion. Power Plants

We Keep the World in Motion. Power Plants We Keep the World in Motion. Power Plants www.elinmotoren.at December 2013 Which kind of power plants and applications are our motors used for? ELIN Motoren offers drive solutions for selected applications

More information

Steinmüller Engineering GmbH POWER-GEN Europe, Vienna

Steinmüller Engineering GmbH POWER-GEN Europe, Vienna Steinmüller Engineering GmbH 2013-06-06 POWER-GEN Europe, Vienna Combustion optimisation, efficiency improvements and emission reduction by installation of modern LowNO x firing systems at existing bituminous

More information

Drive system for high pressure grinding rolls Increased roller life and productivity

Drive system for high pressure grinding rolls Increased roller life and productivity Drive system for high pressure grinding rolls Increased roller life and productivity High pressure grinding rolls in mineral processing Moving from cement to hard rock High pressure grinding rolls (HPGRs),

More information

EDS: AN EUROPEAN STUDY FOR NEW DEVELOPMENTS IN AUTOMOTIVE TECHNOLOGY TO REDUCE POLLUTION

EDS: AN EUROPEAN STUDY FOR NEW DEVELOPMENTS IN AUTOMOTIVE TECHNOLOGY TO REDUCE POLLUTION EDS: AN EUROPEAN STUDY FOR NEW DEVELOPMENTS IN AUTOMOTIVE TECHNOLOGY TO REDUCE POLLUTION Prof. Dr. Ir. G. Maggetto Ir. P. Van den Bossche Vrije Universiteit Brussel Brussels, Belgium Abstract The study

More information

STEAM TURBINE MODERNIZATION SOLUTIONS PROVIDE A WIDE SPECTRUM OF OPTIONS TO IMPROVE PERFORMANCE

STEAM TURBINE MODERNIZATION SOLUTIONS PROVIDE A WIDE SPECTRUM OF OPTIONS TO IMPROVE PERFORMANCE STEAM TURBINE MODERNIZATION SOLUTIONS PROVIDE A WIDE SPECTRUM OF OPTIONS TO IMPROVE PERFORMANCE Michael W. Smiarowski, Rainer Leo, Christof Scholten, Siemens Power Generation (PG), Germany John Blake,

More information

ENCAP Integrated Project. A two phase approach in the development and validation of pre-combustion technologies of capture of CO2

ENCAP Integrated Project. A two phase approach in the development and validation of pre-combustion technologies of capture of CO2 ENCAP Integrated Project A two phase approach in the development and validation of pre-combustion technologies of capture of CO2 CASTOR - ENCAP - CACHET - DYNAMIS Common Workshop 22 January 2008 Lyon Leif

More information

Common Technical Training Workshop January CASTOR-SP2: overview. Jan Hopman (TNO)

Common Technical Training Workshop January CASTOR-SP2: overview. Jan Hopman (TNO) CASTOR - ENCAP - CACHET - DYNAMIS Common Technical Training Workshop 22-24 January 2008 CASTOR-SP2: SP2: Overview Jan Hopman (TNO) 1 CASTOR-SP2 SP2 Members Knowledge IFP NTNU SINTEF TNO USTUTT Industrial

More information

Coal Fired Boilers. Technologies for Improved Efficiency & Reduced Emissions. C.Jayadevan Bharat Heavy Electriclas Ltd. Tiruchirappalli, India

Coal Fired Boilers. Technologies for Improved Efficiency & Reduced Emissions. C.Jayadevan Bharat Heavy Electriclas Ltd. Tiruchirappalli, India Coal Fired Boilers Technologies for Improved Efficiency & Reduced Emissions C.Jayadevan Bharat Heavy Electriclas Ltd. Tiruchirappalli, India Power Generation Options Hydro Thermal Nuclear Non Conventional

More information

SGT5-2000E Latest Service Improvements for Optimized Operations, Maintenance and LNG Fuel Conversion Upgrade Grit Hennig

SGT5-2000E Latest Service Improvements for Optimized Operations, Maintenance and LNG Fuel Conversion Upgrade Grit Hennig SGT5-2000E Latest Service Improvements for Optimized Operations, Maintenance and LNG Fuel Conversion Upgrade All rights reserved. siemens.com/power-generation-services Siemens Gas Turbines Table of content

More information

Automatic CFD optimisation of biomass combustion plants. Ali Shiehnejadhesar

Automatic CFD optimisation of biomass combustion plants. Ali Shiehnejadhesar Automatic CFD optimisation of biomass combustion plants Ali Shiehnejadhesar IEA Bioenergy Task 32 workshop Thursday 6 th June 2013 Contents Scope of work Methodology CFD model for biomass grate furnaces

More information

Service and Rehabilitation Electrical Power Systems

Service and Rehabilitation Electrical Power Systems Service and Rehabilitation Electrical Power Systems From water to wire 3 ANDRITZ HYDRO Electrical Power System Modernization and rehabilitation International technology group ANDRITZ is a globally leading

More information

Alstom in South Africa

Alstom in South Africa Alstom s Presence Medupi Kusile Kriel Johannesburg Transport Gibela Factory Koeberg Key Data: Provided major equipment for 12 out of 13 South Africa s coal-fired power plants and for the only nuclear power

More information

Development of Japan s Next Flagship Launch Vehicle

Development of Japan s Next Flagship Launch Vehicle 20 Development of Japan s Next Flagship Launch Vehicle - To compete and survive in the global commercial market - ATSUTOSHI TAMURA *1 MAYUKI NIITSU *2 TAKANOBU KAMIYA *3 AKIHIRO SATO *4 KIMITO YOSHIKAWA

More information

Retrofitting of Mitsubishi Low NOx System

Retrofitting of Mitsubishi Low NOx System 111 Retrofitting of Mitsubishi Low NOx System Susumu Sato *1 Yoshinori Kobayashi *1 Takao Hashimoto *2 Masahiko Hokano *2 Toshimitsu Ichinose *3 (MHI) has long been engaged in low NOx combustion R & D

More information

A powerful retrofit ABB drive retrofits extend life cycle of shovels and draglines

A powerful retrofit ABB drive retrofits extend life cycle of shovels and draglines Reprint from World Coal, September 2012 A powerful retrofit ABB drive retrofits extend life cycle of shovels and draglines Shovel excavators and draglines are mechanically robust and can have a life cycle

More information

Making Electricity since December Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada

Making Electricity since December Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada Making Electricity since December 2015 Melody Collis Facilities Engineering Assistant Manager Toyota Motor Manufacturing Canada Cambridge 1 Company Culture Vision Woodstock TMMC's goal is to maintain a

More information

SACAFMA 24 JULY 2009 ESKOM PRESENTATION

SACAFMA 24 JULY 2009 ESKOM PRESENTATION SACAFMA 24 JULY 2009 ESKOM PRESENTATION BY KOOS JORDAAN 1 CONTENTS RECOVERY PLAN SUPPLY AND DEMAND COAL QUALITIES/ LOAD LOSSES ENVIRONMENTAL COST REDUCTION 2 STATE OF THE POWER SYSTEM: COAL SUPPLY TREND

More information

Flexibility options from power plant technology to latest storage solutions

Flexibility options from power plant technology to latest storage solutions Flexibility options from power plant technology to latest storage solutions Dr. Dirk Schettler / Dr. Jens Reich, STEAG Energy Services GmbH Flexibility-Workshop within IGEF-Study-Tour Berlin 19 September

More information

CENELEC TC 8X/WG 06 System Aspects of HVDC Grids

CENELEC TC 8X/WG 06 System Aspects of HVDC Grids CENELEC TC 8X/WG 06 System Aspects of HVDC Grids Best Paths Dissemination Event Paris, 5 November 2015 Frank Schettler (Siemens, Convenor) Overview Introduction to CLC TC 8X/WG 06 Scope and present status

More information

Beyond 60% - Pioneering H-class Efficiency with World Class Flexibility

Beyond 60% - Pioneering H-class Efficiency with World Class Flexibility SCC5-8000H / Irsching 4 Beyond 60% - Pioneering H-class Efficiency with World Class Flexibility Irsching General Manager for GT Power Plant Solutions Europe, Africa, Asia and Australia Siemens AG 2011.

More information

White paper. MARPOL Annex VI fuel strategies and their influence on combustion in boilers

White paper. MARPOL Annex VI fuel strategies and their influence on combustion in boilers MARPOL Annex VI fuel strategies and their influence on combustion in boilers May 2018 Intro In 2004, MARPOL Annex VI Regulations for the Prevention of Air Pollution from Ships were adopted and in regulation

More information

Electricity sector transformation and the expected impact of Climate Change mitigation measures

Electricity sector transformation and the expected impact of Climate Change mitigation measures Electricity sector transformation and the expected impact of Climate Change mitigation measures 26 September 2018 Mandy Rambharos Climate Change and Sustainable Development Eskom Holdings SOC Ltd Overview

More information

Ring-geared mill drives. RMD plus Variable-speed solution with mill application features

Ring-geared mill drives. RMD plus Variable-speed solution with mill application features Ring-geared mill drives RMD plus Variable-speed solution with mill application features High performance and flexibility in grinding Ring-geared mill drives in mineral processing Grinding is a significant

More information

GEA charge air cooler. Innovations that put big things into motion. GEA Heat Exchangers GEA Maschinenkühltechnik

GEA charge air cooler. Innovations that put big things into motion. GEA Heat Exchangers GEA Maschinenkühltechnik GEA charge air cooler Innovations that put big things into motion GEA Heat Exchangers GEA Maschinenkühltechnik Charge air cooler in general GEA Maschinenkühltechnik Established component developer For

More information

SGT-2000E gas turbine series

SGT-2000E gas turbine series SGT-2000E gas turbine series Value for customers This PDF offers an advanced interactive experience. For the best viewing experience, please use Acrobat Reader X or higher. SGT-2000E series: Reliable,

More information

ABB DRIVES SERVICE. Optimize your wind economy. Wind Converter Services

ABB DRIVES SERVICE. Optimize your wind economy. Wind Converter Services ABB DRIVES SERVICE Optimize your wind economy. Wind Converter Services 2 ABB Drives Service Targeting superior lifetime performance ABB Drives Service your strategic partner, offering wind converter services

More information

Diesel Power Generating Plants. Introduction

Diesel Power Generating Plants. Introduction Diesel Power Generating Plants Introduction Steve Mackay Dean of Engineering Worked for 30 years in Industrial Automation 30 years experience in mining, oil and gas, electrical and manufacturing industries

More information

Unit C of the Scholven Power Plant Automated with System 800xA

Unit C of the Scholven Power Plant Automated with System 800xA Unit C of the Scholven Power Plant Automated with The plant Originally, the plant was intended to serve as a power generation facility supplying auxiliary power to a mine located in a Gelsenkirchen district.

More information

RAFAKO s proecological investments boilers and biomass installations

RAFAKO s proecological investments boilers and biomass installations RAFAKO s proecological investments boilers and biomass installations Presented: Krzysztof JANECZEK 22 23 March 2017 r. Content: 1. Introduction. 2. Biomass boilers. 3. Modernization of PC boiler at Stalowa

More information

Jukka Tolvanen Market manager Energy efficiency. ABB Day VSD and energy efficiency

Jukka Tolvanen Market manager Energy efficiency. ABB Day VSD and energy efficiency Jukka Tolvanen Market manager Energy efficiency ABB Day VSD and energy efficiency ABB Singapore Sep. 22-23 - 1 - Finland country in northern Europe ABB EE kick off meeting - 2 - Famous finns ABB EE kick

More information

Mitsubishi Hitachi Power Systems America. Coal to Gas Conversions

Mitsubishi Hitachi Power Systems America. Coal to Gas Conversions Mitsubishi Hitachi Power Systems America Coal to Gas Conversions Joe Brown AMS Product Manager 9/28/15 MITSUBISHI HITACHI POWER SYSTEMS AMERICAS, INC. Units Faced with Environmental Challenges Shut Down

More information

How energy storage applications are finding their role in the energy system

How energy storage applications are finding their role in the energy system Energy Expertise Market Analysis Successful Consulting How energy storage applications are finding their role in the energy system Energy Storage Europe 2018 Düsseldorf March 13, 2018 1 In Germany, the

More information

Warsztatowa 8 BRIENZ, Hermann Schmidtendorf, President of INTERLOK Supervision Board

Warsztatowa 8 BRIENZ, Hermann Schmidtendorf, President of INTERLOK Supervision Board INTERLOK Ltd. WORLD STEAM CONGRESS Warsztatowa 8 BRIENZ, 6.-8.10.2003 PL-64-920 Pila (POLAND) email: office@interlok.info email : interlok@wp.pl Hermann Schmidtendorf, President of INTERLOK Supervision

More information

ABB Ability Performance Optimization for power generation

ABB Ability Performance Optimization for power generation ABB Ability Performance Optimization for power generation Maintain peak performance in any market As the world's leading provider of integrated power and automation solutions to the energy and water industries,

More information

D6.5 Public report on experience & results from FCEV city car demonstration in Oslo

D6.5 Public report on experience & results from FCEV city car demonstration in Oslo D6.5 Public report on experience & results from FCEV city car demonstration in Oslo Final Report Dissemination level: PU February 2013 Page 1 of 13 Introduction WP6 Deliverable D6.5 Public report on experience

More information

Adiabatic Compressed Air Energy Storage in Context of the Markets

Adiabatic Compressed Air Energy Storage in Context of the Markets Adiabatic Compressed Air Energy Storage in Context of the Markets Policy Debate: Facilitating energy storage to allow fast growth of sustainable energy Dr.-Ing. E. Hauptmeier Brussels, 26th of June 2013

More information

Comparing combined gas tubrine/steam turbine and marine low speed piston engine/steam turbine systems in naval applications

Comparing combined gas tubrine/steam turbine and marine low speed piston engine/steam turbine systems in naval applications POLISH MARITIME RESEARCH 4(71) 2011 Vol 18; pp. 43-48 10.2478/v10012-011-0025-8 Comparing combined gas tubrine/steam turbine and marine low speed piston engine/steam turbine systems in naval applications

More information

SIGENTICS HV Series S-modyn

SIGENTICS HV Series S-modyn SIGENTICS HV Series S-modyn High-voltage 3-phase salient pole generators siemens.com/sigentics Answers for industry. SIGENTICS: 4-pole generators for industrial turbines The energy business is characterized

More information

UNIT IV INTERNAL COMBUSTION ENGINES

UNIT IV INTERNAL COMBUSTION ENGINES UNIT IV INTERNAL COMBUSTION ENGINES Objectives After the completion of this chapter, Students 1. To know the different parts of IC engines and their functions. 2. To understand the working principle of

More information

Appendix G Examples and Recommended Methods

Appendix G Examples and Recommended Methods Reporting Outages to the Generating Availability Data System (GADS) Introduction The examples in this appendix illustrate the reporting of outages and deratings to GADS. They are based on a fictional 600

More information

GENERATOR SEAL OIL SYSTEM

GENERATOR SEAL OIL SYSTEM GENERATOR SEAL OIL SYSTEM Eskom power utility utilized Flownex SE simulation capabilities to mitigate system shutdowns caused by generator hydrogen (H 2 ) seal ring failures. Engineers modelled the hydrogen

More information

Combustion Equipment. Combustion equipment for. Solid fuels Liquid fuels Gaseous fuels

Combustion Equipment. Combustion equipment for. Solid fuels Liquid fuels Gaseous fuels Combustion Equipment Combustion equipment for Solid fuels Liquid fuels Gaseous fuels Combustion equipment Each fuel type has relative advantages and disadvantages. The same is true with regard to firing

More information

Power Station Fans. Heavy Duty Axial and Centrifugal Fans. a company of

Power Station Fans. Heavy Duty Axial and Centrifugal Fans. a company of Power Station Fans Heavy Duty Axial and Centrifugal Fans a company of History&Technology. Thomas Neff Vice President, Order Execution The roots of TLT-Turbo GmbH go back far into the last century. In 1873

More information

Worldwide Pollution Control Association

Worldwide Pollution Control Association Worldwide Pollution Control Association IL Regional Technical Seminar September 13-15,211 Visit our website at www.wpca.info Babcock Power Inc. The Future Of Coal Fired SCRs In A Carbon Capture World 211

More information

Emission Reduction Program (ERP) For Existing Pulverized Fuel Fired Thermal Power Plants

Emission Reduction Program (ERP) For Existing Pulverized Fuel Fired Thermal Power Plants Emission Reduction Program (ERP) For Existing Pulverized Fuel Fired Thermal Power Plants Stochiometric combustion through Coal Mass Flow Balancing & Online Unburnt Carbon In Ash Measurement Anup Shukla

More information

Combustion and Boiler Performance Assessment of Kardia Power Plant

Combustion and Boiler Performance Assessment of Kardia Power Plant Combustion and Boiler Performance Assessment of Kardia Power Plant Dr. M. Michel, I. Tsolakidis DEBCO Final Conference Brussels, December 10, 2012 Thermal Calculation of the Boiler Boiler design 100%-Load

More information

\Performance of the Regenerative Burners in BaoSteel 2050 Hot Strip Mill Furnace Baoshan, China

\Performance of the Regenerative Burners in BaoSteel 2050 Hot Strip Mill Furnace Baoshan, China \Performance of the Regenerative Burners in BaoSteel 2050 Hot Strip Mill Furnace Baoshan, China Steven J. O'Connor, Applications Engineer, Bloom Engineering Company Jian Cao Qin, Production Engineer Bao

More information

EU SUSTAINABLE ENERGY WEEK JUNE Prof. Dr Ozren Ocić. 22 June Energy

EU SUSTAINABLE ENERGY WEEK JUNE Prof. Dr Ozren Ocić. 22 June Energy EU SUSTAINABLE ENERGY WEEK 18-22 JUNE 2012 Prof. Dr Ozren Ocić 22 June 2012 Energy ENERGY EFFICIENCY in OIL PROCESSING INDUSTRY Prof. Dr Ozren Ocić, Chem. Eng. Faculty of Management E-mail: oocic@eunet.rs

More information

Technology Options for the Cement Industry with the Use of Alternative Fuels

Technology Options for the Cement Industry with the Use of Alternative Fuels Alf-Cemind Workshop / Athen 16 th May 2007 Technology Options for the Cement Industry with the Use of Alternative Fuels Andreas Hand Head of Pyro Process Engineering KHD Humboldt Wedag GmbH Contents: 1.

More information

INITIATING AND FUNDING R&D. IGRC 2014 Copenhagen September Brad Douville, Vice-President, Westport

INITIATING AND FUNDING R&D. IGRC 2014 Copenhagen September Brad Douville, Vice-President, Westport INITIATING AND FUNDING R&D IGRC 2014 Copenhagen September 17-19 Brad Douville, Vice-President, Westport 1 Driving a Shift to Natural Gas as a Transportation Fuel» Energy transitions are enormously difficult»

More information

Feeder systems. A schematic diagram. for renewable energies

Feeder systems. A schematic diagram. for renewable energies Competence... With over 60 employees the department Energy distribution and infrastructure has an experienced core of installers, foremen and engineers for the realisation of the most diverse customer

More information

The Enhanced Platform

The Enhanced Platform Power Generation The Enhanced Platform The Next Generation of Industrial Steam Turbines www.siemens.com / energy / steamturbines Advanced Steam Turbine Design Figure 1: Enhanced Platform Design The Enhanced

More information

Development of a sample rooftop solar project

Development of a sample rooftop solar project Development of a sample rooftop solar project Ádám Szörényi, enhome (innogy/rwe) Budapest, 16 November, 2016 Today s Topics I. II. III. IV. V. VI. VII. Why Solar? Our Business Main Phases of PV projects

More information

Alstom CFB boilers achieve high combustion efficiency with challenging discarded coal. Hugh Kennedy 16 th July 2013

Alstom CFB boilers achieve high combustion efficiency with challenging discarded coal. Hugh Kennedy 16 th July 2013 Alstom CFB boilers achieve high combustion efficiency with challenging discarded coal Hugh Kennedy 16 th July 2013 Agenda Baima 300 MWe CFB demonstration plant Page 3 Emile Huchet 125 MWe captive power

More information

3. Steam Turbines and Boilers

3. Steam Turbines and Boilers 3. Steam Turbines and Boilers 3.1. Steam turbines 3.1.1 Steam turbines as a main engine In 2016, Kawasaki Heavy Industries, Ltd. (KHI) delivered a URA Type Marine Propulsion Turbine for an LNG carrier

More information

Chapter 5 Oxygen Based NOx Control

Chapter 5 Oxygen Based NOx Control Chapter 5 Oxygen Based NOx Control Editor s Note: Chapter 5 is written by Dr. Brian Doyle and is drawn primarily from personal knowledge and the material developed for the NOx Emissions course offered

More information

Emissions Legislation

Emissions Legislation Emissions Legislation Potential Impact of the Medium Combustion Plant Directive 1 SAACKE Presentation All rights reserved by SAACKE Combustion Services Ltd, UK and SAACKE GmbH, Bremen The formation of

More information

HYSYS System Components for Hybridized Fuel Cell Vehicles

HYSYS System Components for Hybridized Fuel Cell Vehicles HYSYS System Components for Hybridized Fuel Cell Vehicles J. Wind, A. Corbet, R.-P. Essling, P. Prenninger, V. Ravello This document appeared in Detlef Stolten, Thomas Grube (Eds.): 18th World Hydrogen

More information

Innovative Power Transmission RENK-MAAG. right in the middle!

Innovative Power Transmission RENK-MAAG. right in the middle! Innovative Power Transmission RENK-MAAG right in the middle! RENK-MAAG GmbH is your partner for new and replacement turbo gearboxes, synchronous clutch and gear couplings of the highest quality and reliability

More information

SGT-2000E gas turbine series

SGT-2000E gas turbine series SGT-2000E gas turbine series Value for customers This PDF offers an advanced interactive experience. For the best viewing experience, please use Acrobat Reader X or higher. SGT-2000E series: Reliable,

More information

Credit: Image Source / Rex / Shutterstock. Sustainability Research November 2017

Credit: Image Source / Rex / Shutterstock. Sustainability Research November 2017 Credit: Image Source / Rex / Shutterstock Sustainability Research November 2017 Sustainability Research November 2017 AGENDA Methodology Respondent Profile Main Findings Summary Presented by: Heather Macleod,

More information

TURBO GENERATORS BEST QUALITY FOR THERMAL POWER PLANTS

TURBO GENERATORS BEST QUALITY FOR THERMAL POWER PLANTS TURBO GENERATORS BEST QUALITY FOR THERMAL POWER PLANTS 1 2 Turbo generators with top modern standards International technology group ANDRITZ is a globally leading supplier of plants, equipment, and services

More information

elektronik Designing vehicle power nets A single simulation tool from initial requirements to series production

elektronik Designing vehicle power nets A single simulation tool from initial requirements to series production www.atzonline.de elektronik 04 April 2013 Volume 8 Offprint from ATZelektronik 4/2013 Springer Automotive Media Springer Fachmedien Wiesbaden GmbH for Bosch Engineering Designing vehicle power nets A single

More information

The SGT5-8000H proven in commercial operation

The SGT5-8000H proven in commercial operation www.siemens.com/energy The SGT5-8000H proven in commercial operation Answers for energy. 2 375 MW Output of the Siemens Gas Turbine SGT5-8000H.* * Gross: ISO ambient conditions 375 MW Rated output of 375

More information

AIR CLASSIFIERS FOR INDUSTRIAL MINERALS CTM SERIES

AIR CLASSIFIERS FOR INDUSTRIAL MINERALS CTM SERIES AIR CLASSIFIERS FOR INDUSTRIAL MINERALS CTM SERIES w w w. c e m t e c. a t CEMTEC your partner for success. CEMTEC operates on the basis of individual responsibility. Each member of our team is authorised

More information

Vattenfall Capital Markets Day 2009

Vattenfall Capital Markets Day 2009 Vattenfall Capital Markets Day 2009 Presentation by: Helene Biström Senior Executive Vice President Head of Business Group Pan Europe Amsterdam, 23 September 2009 Contents Overview Business Group Pan Europe

More information

Corso di Motori Aeronautici

Corso di Motori Aeronautici Corso di Motori Aeronautici Mauro Valorani Laurea Magistrale in Ingegneria Aeronautica (MAER) Sapienza, Università di Roma Anno Accademico 2011-12 Sett. 13: Conclusioni 1 FP7 Aero Engine Scenario ERS Strategy

More information

Dave Bone. DREAM Project Coordinator

Dave Bone. DREAM Project Coordinator Validation of radical engine architecture systems the alternative solution for a cleaner future Dave Bone Rolls-Royce plc Dave Bone Rolls-Royce plc DREAM Project Coordinator DREAM Project Coordinator This

More information

11th Symposium on EnInnov The Economics of implementing Smart Metering in Europe. MMag. Alexander Gabl, Dipl.-Ing. Erwin Smole

11th Symposium on EnInnov The Economics of implementing Smart Metering in Europe. MMag. Alexander Gabl, Dipl.-Ing. Erwin Smole 11th Symposium on EnInnov The Economics of implementing Smart Metering in Europe MMag. Alexander Gabl, Dipl.-Ing. Erwin Smole Graz, February 2010 Table of Contents Page 1 European perspective 1 2 Cost-benefit

More information

Within the 300 GW total, the Energy Department estimates that 54 GW will be required from offshore wind to feed the large coastal demand centers.

Within the 300 GW total, the Energy Department estimates that 54 GW will be required from offshore wind to feed the large coastal demand centers. THE MOST ADVANCED WIND- ENERGY TESTING CENTER COMING TO SOUTH CAROLINA In a one- of- a- kind testing facility under construction at the Clemson University Restoration Institute, offshore wind turbine manufacturers

More information

Turbocharging: Key technology for high-performance engines

Turbocharging: Key technology for high-performance engines Engine technology Turbocharging: Key technology for high-performance engines Authors: Dr. Johannes Kech Head of Development Turbocharging Ronald Hegner Team Leader, Design of Turbocharging Systems Tobias

More information

STEEL INDUSTRY ELECTRIC ARC FURNACES REFRACTORY CONCEPT SOLUTIONS

STEEL INDUSTRY ELECTRIC ARC FURNACES REFRACTORY CONCEPT SOLUTIONS STEEL INDUSTRY ELECTRIC ARC FURNACES REFRACTORY CONCEPT SOLUTIONS TOGETHER FOR MORE AT CALDERYS, OUR MISSION IS TO DELIVER VALUE TO OUR CUSTOMERS. We are a world leader in providing refractory solutions

More information

ELECTRICAL SYSTEMS AND CONSTRUCTION

ELECTRICAL SYSTEMS AND CONSTRUCTION FET FIRST ELECTRICAL SYSTEMS AND CONSTRUCTION NQF Level 4 Student's Book T. Neeuwfan, B. Els FET FIRST Electrical Systems and Construction NQF Level 4 Student s Book T. Neeuwfan; B. Els 2010 All rights

More information

tanfang -> Service for high power rectifiers Improve the reliability of your operations G7967_HPR_Service_Portfolio_ indd 1

tanfang -> Service for high power rectifiers Improve the reliability of your operations G7967_HPR_Service_Portfolio_ indd 1 tanfa Service for high power rectifiers Improve the reliability of your operations renzu G7967_HPR_Service_Portfolio_121203.indd 1 03.12.12 10:25 Service for high power rectifiers Competence makes all

More information

Repowering or extended operation -Spain- Andreas Thomas, Managing Director Beaufort 9 GmbH

Repowering or extended operation -Spain- Andreas Thomas, Managing Director Beaufort 9 GmbH Repowering or extended operation -Spain- Andreas Thomas, Managing Director Beaufort 9 GmbH About Us Beaufort 9 is an innovative and flexible Service provider along the whole value chain of Wind power projects

More information

The international SAACKE Group. SAACKE Marine Systems - Company Presentation / 02

The international SAACKE Group. SAACKE Marine Systems - Company Presentation / 02 The international SAACKE Group SAACKE Marine Systems - Company Presentation - 2018 / 02 Agenda 1. SAACKE Group a. Company b. Development 3. SAACKE SERVICE 4. SAACKE Product Portfolio 2. SAACKE Marine Systems

More information

STEEL INDUSTRY STEEL LADLES REFRACTORY CONCEPT SOLUTIONS

STEEL INDUSTRY STEEL LADLES REFRACTORY CONCEPT SOLUTIONS STEEL INDUSTRY STEEL LADLES REFRACTORY CONCEPT SOLUTIONS TOGETHER FOR MORE AT CALDERYS, OUR MISSION IS TO DELIVER VALUE TO OUR CUSTOMERS. We are a world leader in providing refractory solutions and services.

More information

Pressurized Air Cooled Generators

Pressurized Air Cooled Generators PGI Orlando Dec. 13, 2016 Pressurized Air Cooled Generators Mike Zborovsky New App Generator Portfolio Owner siemens.com Pressurized Air-Cooled Generator (SGenX-2000P) Table of content Introduction 3 Portfolio

More information

PROCESS ECONOMICS PROGRAM

PROCESS ECONOMICS PROGRAM PROCESS ECONOMICS PROGRAM Abstract Process Economics Program Report No. 29C SRI INTERNATIONAL Menlo Park, California 94025 ETHYLENE PLANT CONVERSION (July 1985) This report deals with the technology and

More information

Operational Experience with Startup Optimization for Steam Boilers. E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants

Operational Experience with Startup Optimization for Steam Boilers. E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants Operational Experience with Startup Optimization for E.ON s Staudinger, Heyden, Ingolstadt und Zolling Power Plants Starting up economically BoilerMax is a predictive boiler load-margin computer implementing

More information

Steinmüller-Tagung April 2013

Steinmüller-Tagung April 2013 Steinmüller-Tagung 2013 23. 24. April 2013 Titel / title: Revamp and Retrofit of FGD Plants Vortragender / presenter: Dr. S. Binkowski Gummersbach, Germany 1 Employment Record Dr.-Ing. Stefan Binkowski

More information