Refuelling error at Dampierre unit 4 02/04/2001 Lessons learned. EDF th and 14 th 2003 Expert Meeting KTG - error on Dampierre unit 4

Size: px
Start display at page:

Download "Refuelling error at Dampierre unit 4 02/04/2001 Lessons learned. EDF th and 14 th 2003 Expert Meeting KTG - error on Dampierre unit 4"

Transcription

1 efuelling error at Dampierre unit 4 02/04/2001 Lessons learned

2 eminder of the facts Dampierre 4 was running a forced outage at mid cycle (SG leakage) Error in the running of the sequences in the Spent fuel pool building undetected. (Sequence 25 missed out) Shuffling of the assemblies (wrong positioning) in the reactor up to sequence 138, constitution of a more reactive mass than initially calculated. Nevertheless, No flux alarm annunciator was actuated. (113 assemblies moved) Detection of the anomaly at the time of sequence 139 by the reactor building crane operator. Causes essentially of human origin

3 Normal plan for Dampierre unit 4 P N M L K J H G F E D C B A CNS n G G SA NI NI GI NI GI CNS n 2 N de séquence Nom du groupe de grappes assemblage de premier cycle assemblage de second cycle assemblage de troisième cycle assemblage de quatrième cycle

4 Wrong plan obtained for Dampierre unit 4 CNS n G G SA G G CNS n 2 N deséquence Nomdugroupedegrappes erreursdeséquence assemblagedepremier cycle assemblagedesecondcycle assemblagedetroisièmecycle assemblagedequatrième cycle

5 DAMPIEE UNIT 4 FLUX COUNTING CHANNEL EVOLUTION AET FOTUIT TANCHE 4/ COMPTAGE (c/s) CNS1 CNS2 T4/ N DE SEQUENC E

6 Actual consequences Preservation of margins regarding the risk of criticality. (Keff 0.96 as against 0.95 required in the Final Safety Analysis eport FSA. In case of completion of the 157 sequences, the final Keff should not have been increased) - Boron concentration was above the operating technical specifications (STE) (2,345 ppm against 2,000 required) but realistic (required boron concentration in efuelling Water Storage Tank: 2,425 ppm) - Burn-up of 2,000MWj/tonnes

7 «Dampierre unit 4 Scenario" Findings of the corporate study With the current operating tech. specs. (STE), the risk of criticality cannot be excluded on the sequencing modes for CP0 and CPY 900 MW plants. Margins available in 1,300MW and N4 plants are sufficient. Transmission to the regulatory authority of a document at the end of 2002 isk closely linked to: (See Slides 2 ). Type of core map (position of new assemblies). Sequencing (coiled and diagonal pattern) Source range channels do not automatically detect criticality approach before it occurs (at this point, it should be detected) classified as INES level 2 Limited consequences of criticality event in the specific case of Dampierre unit 4

8 efuelling not in compliance with the core map: issue Wrong positioning of several assemblies. Combined effect too complex for engineering the safety demonstration. Errors with adverse effects (c.f. Dampierre unit 4) The lack of the risk of criticality cannot be demonstrated only by engineering studies equirements of article 45 of the PGE (General regulatory requirements). Basis adopted to keep in hands the risk of criticality. Drawing up of a criticality reference document (transmitted to the regulatory authority at the end of 2002 beginning of 2003)

9 PGE Decree of the 31/12/99 (Article 45) A criticality accident can in no way be the result of a single anomaly, such as the failure of a component or a function, human error (for example, noncompliance with a procedure) or accident situation (forexample,fire) If a criticality accident can be the result of the two anomalies occurring at the same time, then the following must be proven: - The two anomalies must be completely independent; - The probability of each of the two anomalies happening is quite low; - Each anomaly can be highlighted using appropriate and reliable surveillance methods within an acceptable period of time for corrective actions.

10 efuelling not in compliance with te plan Single anomaly Wrong positioning of one assembly Non-criticality demonstrated by studies Choice (fuel building) and/or position (reactor building) Multiple anomalies Wrong positioning of several assemblies Non-criticality cannot be demonstrated by studies Criticality accident

11 Studies (criticality reference) Demonstration of unique refuelling errors. Transmission to the regulatory authority in accordance with a schedule presented in October 2002 Continuation of engineering on other risks. aising of reactor vessel head with the rods undeconnected (end of 2003). Presence of air in fuel handling tools (2003). Dilution during handling activities, capacity of the source range channels to detect this situation (2003)

12 Trends - Operations Short term (2001): corporate prescription = resolving errors. Independent verification of the assembly, mandatory communication between reactor building and fuel building coordinators, management of handling interruptions, checking of CCAs position consistency, counting rate monitoring and positioning in the reactor vessel other location than final one, even temporary, is prohibited (because of positionning difficulties due to bowing issues) In 2002: corporate precription (CPY CP0) = preventive actions. esult of studies conducted: boron concentration + loading in a coiled pattern, request for OEF and formal inspection of positioning within the reactor vessel. Diagonal pattern is no more allowed Sustainable application of the reference base (PC) and amendment to the operating tech. Specs. for boron concentration in the refuelling cavity Studies to ensure increased safety of fuel handling activities. Assessment of fuel handling process reliability. Feasibility of reading the FA number in the reactor building on 900MW plants Coaching, training and OEF

13 Methods of monitoring and taking action Other methods for surveillance inside the reactor vessel. Feasibility studies (mechanical, neutronics in process first results in 2003, but little chance to obtain a reliable outcome) Alarm for high flux at shutdown. Standardisation of documentation (operating tech. Specs., Low power physics testing rules for start-up). eview plan of actions to be taken Definition of emergency operating procedures (review in February 2003) Longer term studies:. On-line Keff calculation depending on the configuration. Use of the source range channel signal

ANALYSIS OF BREST-OD-300 SAFETY DURING ANTICIPATED OPERATIONAL OCCURRENCES

ANALYSIS OF BREST-OD-300 SAFETY DURING ANTICIPATED OPERATIONAL OCCURRENCES ANALYSIS OF BREST-OD-300 SAFETY DURING ANTICIPATED OPERATIONAL OCCURRENCES D.V. Didorin, V.A. Kogut, A.G. Muratov, V.V. Tyukov, A.V. Moiseev (NIKIET, Moscow, Russia) 1. Brief description of the aim and

More information

Rule No. 1. Scope Definitions Periodicity of technical inspections Technical inspection Inspection requirements...

Rule No. 1. Scope Definitions Periodicity of technical inspections Technical inspection Inspection requirements... Submitted by the Co-Chairs of the IWG on PTI Informal document WP.29-171-21 171 st WP.29, 14-17 March 2017, Agenda item 7.3) PROPOSALS FOR NEW RULE ON PERIODICAL TECHNICAL INSPECTIONS OF MOTOR VEHICLES

More information

AP1000 European 7. Instrumentation and Controls Design Control Document

AP1000 European 7. Instrumentation and Controls Design Control Document 7.3 Engineered Safety Features AP1000 provides instrumentation and controls to sense accident situations and initiate engineered safety features (ESF). The occurrence of a limiting fault, such as a loss

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER C: DESIGN BASIS AND GENERAL LAYOUT 4. CONTROL-ROD DRIVE MECHANISM

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER C: DESIGN BASIS AND GENERAL LAYOUT 4. CONTROL-ROD DRIVE MECHANISM PAGE : 1 / 12 4. CONTROL-ROD DRIVE MECHANISM 4.0. SAFETY REQUIREMENTS 4.0.1. Safety functions The control rod drive mechanisms [CRDMs] carry out the following safety functions: Reactivity control during

More information

AP1000 Plant Overview

AP1000 Plant Overview AP1000 Plant Overview Westinghouse IEEE Subcommittee on Qualification Tom Hayes Passive Plant Projects hayestp@westinghouse.com 1-412-374-4420 Slide 1 Westinghouse Passive Plants Meet Power Company Needs

More information

GASEOUS FUELS SAFETY ASPECTS

GASEOUS FUELS SAFETY ASPECTS Ship Efficiency Conference by The German Society for Maritime Technology Hamburg, 29 September 2009 GASEOUS FUELS SAFETY ASPECTS Bruno DABOUIS 1. REGULATORY CONTEXT 2. USE OF GAS FUEL ENGINES ON SHIPS

More information

Part 70 Operating Permit Amendment

Part 70 Operating Permit Amendment Part 70 Operating Permit Amendment Effective Date: February 18, 2016 Facility Name: Scherer Steam-Electric Generating Plant Facility Address 10986 Highway 87 Juliette, Georgia 31046, Monroe County Mailing

More information

CNS Fuel Technology Course: Fuel Design Requirements

CNS Fuel Technology Course: Fuel Design Requirements 4525 Lakeshore Road Burlington, Ontario L7L 1B3 Phone: 905-639-4090 FAX: 905-639-9506 CNS Fuel Technology Course: Fuel Design Requirements Al Manzer, B.Sc., M. Eng. Senior Fuel Specialist CANTECH Associates

More information

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS PAGE : 1 / 24 4. FUEL HANDLING SYSTEM 4.0. SAFETY REQUIREMENTS 4.0.1. Safety functions The fuel handling system, whose main role is to unload and reload the core, does not directly fulfil a safety function.

More information

Types, Problems and Conversion Potential of Reactors Produced in Russia

Types, Problems and Conversion Potential of Reactors Produced in Russia Types, Problems and Conversion Potential of Reactors Produced in Russia Moscow, Russian-American symposium on Conversion of the Research Reactors to LEU Fuel, 8-10 June 2011 Director, General Designer

More information

DECOMMISSIONING CONSORT CONTROL ROD REMOVAL

DECOMMISSIONING CONSORT CONTROL ROD REMOVAL DECOMMISSIONING CONSORT CONTROL ROD REMOVAL H.J. PHILLIPS, T. CHAMBERS Imperial College Reactor Centre Silwood Park Campus, Buckhurst Road, Ascot, SL57TE, UK ABSTRACT The CONSORT Low Power Research Reactor

More information

Bohunice V-2 power plant mixed core licensing and operation experiences Ondrej Grežďo

Bohunice V-2 power plant mixed core licensing and operation experiences Ondrej Grežďo operation experiences Ondrej Grežďo TM Vienna, 12/2011 Information about our NPP BOHUNICE NPP TYPE: 2 * VVER 440-213 in operation 2* VVER 440-230 in decomisioning 1* A-1 in decomisioning 2 Contents Why?

More information

POWER RAMPING AND CYCLING TESTING OF VVER FUEL RODS IN THE MIR REACTOR

POWER RAMPING AND CYCLING TESTING OF VVER FUEL RODS IN THE MIR REACTOR POWER RAMPING AND CYCLING TESTING OF VVER FUEL RODS IN THE MIR REACTOR A.G. Eshcherkin*, V.A. Ovchinnikov, E.E. Shakhmut, E.E. Kuznetsova, A.L. Izhutov, V.V. Kalygin INTRODUCTION A series of experiments

More information

SUMMARY OF THE IMPACT ASSESSMENT

SUMMARY OF THE IMPACT ASSESSMENT COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 13.11.2008 SEC(2008) 2861 COMMISSION STAFF WORKING DOCUMT Accompanying document to the Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMT AND OF THE COUNCIL

More information

OPAL : Commissioning a New Research Reactor. IAEA Conference, Sydney, November 2007

OPAL : Commissioning a New Research Reactor. IAEA Conference, Sydney, November 2007 OPAL : Commissioning a New Research Reactor IAEA Conference, Sydney, November 2007 Project Timeline Government announcement 1997 Design and licence application 2000/2001 Construction Licence April 2002

More information

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES

EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR CHANGES EU TOY DIRECTIVE 2009/48/EC: OVERVIEW - REGULATORY CONTEXT AND MAJOR The EU Toy Directive was revised in order to take into account the new technological developments and increasing child safety requirements.

More information

About Reasonably Achievable Balance between Economy and Safety indices in WWERs

About Reasonably Achievable Balance between Economy and Safety indices in WWERs IAEA INPRO DF8, Vienna 26-29 August 2014 About Reasonably Achievable Balance between Economy and Safety indices in WWERs Grigory Ponomarenko OKB GIDROPRESS Podolsk, Russian Federation Contents 1. Safety

More information

Community Specifications - an EASA Perspective. Bryan Jolly ATM Rulemaking Officer 17 March 2011

Community Specifications - an EASA Perspective. Bryan Jolly ATM Rulemaking Officer 17 March 2011 Community Specifications - an EASA Perspective Bryan Jolly ATM Rulemaking Officer 17 March 2011 Community Specifications an EASA Perspective EASA Role CS s Community Specification (CS) Certification Specification

More information

CC System B B 3.7 PLANT SYSTEMS. B Component Cooling Water (CC) System BASES

CC System B B 3.7 PLANT SYSTEMS. B Component Cooling Water (CC) System BASES CC System B 3.7.7 B 3.7 PLANT SYSTEMS B 3.7.7 Component Cooling Water (CC) System BACKGROUND The CC System provides a heat sink for the removal of process and operating heat from safety related components

More information

Natural Gas for Transportation Codes & Standards Issues

Natural Gas for Transportation Codes & Standards Issues Natural Gas for Transportation Codes & Standards Issues The safe and cost efficient development of the natural gas for transportation market in North America depends on having a robust system of codes

More information

Nuclear L.L. C. 10 CFR 50.55a

Nuclear L.L. C. 10 CFR 50.55a 'I PSEG Nuclear LLC P.O. Box 236,, Hancocks Bridge, NJ 08038-0236 LR-N09-0046 March 05, 2009 0 PSEG Nuclear L.L. C. 10 CFR 50.55a U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington,

More information

CERTIFICATION MEMORANDUM

CERTIFICATION MEMORANDUM EASA CERTIFICATION MEMORANDUM EASA CM No.: EASA CM PIFS 006 Issue: 01 Issue Date: 2 nd of August 2012 Issued by: Propulsion section Approved by: Head of Products Certification Department Regulatory Requirement(s):

More information

Proposed Special Condition for limited Icing Clearances Applicable to Large Rotorcraft, CS 29 or equivalent. ISSUE 1

Proposed Special Condition for limited Icing Clearances Applicable to Large Rotorcraft, CS 29 or equivalent. ISSUE 1 Proposed Special Condition for limited Icing Clearances Applicable to Large Rotorcraft, CS 29 or equivalent. ISSUE 1 Introductory note: The hereby presented Special Condition has been classified as important

More information

AIR LUBRICATION SYSTEM INSTALLATION

AIR LUBRICATION SYSTEM INSTALLATION Guide for Air Lubrication System Installation GUIDE FOR AIR LUBRICATION SYSTEM INSTALLATION OCTOBER 2018 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2018

More information

TRANSFORMER SERVICE. ABB Ability inspection for transformers TXplore Oil-filled transformer internal inspection service

TRANSFORMER SERVICE. ABB Ability inspection for transformers TXplore Oil-filled transformer internal inspection service TRANSFORMER SERVICE ABB Ability inspection for transformers TXplore Oil-filled transformer internal inspection service 2 ABB ABILIT Y INSPECTION FOR TR ANSFORMERS TXPLORE Use ABB's inspection service to

More information

Using cloud to develop and deploy advanced fault management strategies

Using cloud to develop and deploy advanced fault management strategies Using cloud to develop and deploy advanced fault management strategies next generation vehicle telemetry V 1.0 05/08/18 Abstract Vantage Power designs and manufactures technologies that can connect and

More information

Sec moves to amend H.F. No. 1555, the delete everything amendment. 1.2 (H1555DE3), as follows: 1.9 Page 79, after line 20, insert:

Sec moves to amend H.F. No. 1555, the delete everything amendment. 1.2 (H1555DE3), as follows: 1.9 Page 79, after line 20, insert: 1.1... moves to amend H.F. No. 1555, the delete everything amendment 1.2 (H1555DE3), as follows: 1.3 Page 79, after line 9, insert: 1.4 "Sec.... Minnesota Statutes 2018, section 169.011, is amended by

More information

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS.

CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS. 25.211. Interconnection of On-Site Distributed Generation (DG). (a) (b) (c) Application. Unless the context indicates otherwise, this section and 25.212 of this title (relating to Technical Requirements

More information

Probabilistic Risk Assessment for Spent Fuel Pool Decommissioning in the J. Bohunice V1 NPP

Probabilistic Risk Assessment for Spent Fuel Pool Decommissioning in the J. Bohunice V1 NPP Probabilistic Risk Assessment for Spent Fuel Pool Decommissioning in the J. Bohunice V1 NPP by Zoltán Kovács, Robert Spenlinger and Helena Novakova RELKO Ltd, Engineering and Consulting Services Račianska

More information

Notification of a Proposal to issue a Certification Memorandum. Approved Model List Changes

Notification of a Proposal to issue a Certification Memorandum. Approved Model List Changes Notification of a Proposal to issue a Certification Memorandum Approved Model List Changes EASA Proposed CM No.: Proposed CM 21.A-E Issue 01 issued 02 October 2017 Regulatory requirement(s): 21.A.57, 21.A.61,

More information

Certification Memorandum. Approved Model List Changes

Certification Memorandum. Approved Model List Changes Certification Memorandum Approved Model List Changes EASA CM No.: CM 21.A-E Issue 01 issued 15 August 2018 Regulatory requirement(s): 21.A.57, 21.A.61, 21.A.62, 21.A.91, 21.A.93, 21.A.97, 21.A.114, 21.A.117,

More information

Special Condition. Approval of Turbofan Engine Take-off Thrust at High Ambient Temperature (TOTHAT) rating.

Special Condition. Approval of Turbofan Engine Take-off Thrust at High Ambient Temperature (TOTHAT) rating. Special Condition Approval of Turbofan Engine Take-off Thrust at High Ambient Temperature (TOTHAT) rating. This Special Condition is raised to support the approval of an additional rating for turbofan

More information

IMPLEMENTATION OF THE RCP SHIELD MECHANICAL SEAL MODEL IN THE COMANCHE PEAK PRA

IMPLEMENTATION OF THE RCP SHIELD MECHANICAL SEAL MODEL IN THE COMANCHE PEAK PRA IMPLEMENTATION OF THE RCP SHIELD MECHANICAL SEAL MODEL IN THE COMANCHE PEAK PRA Nathan Larson Principal Engineer Daniel Tirsun Fellow Engineer Aaron Moreno Senior Engineer Glen Rose, TX SHIELD is a trademark

More information

Transport Requirements for Lithium Batteries

Transport Requirements for Lithium Batteries Transport Requirements for Lithium Batteries (and battery-containing devices) Aaron H. Goldberg October 4, 2017 Why Focus on Lithium Battery Transport? Lithium batteries are ubiquitous in electronics,

More information

Journal of Engineering Sciences and Innovation Volume 2, Issue 4 / 2017, pp

Journal of Engineering Sciences and Innovation Volume 2, Issue 4 / 2017, pp Journal of Engineering Sciences and Innovation Volume 2, Issue 4 / 2017, pp. 11-19 Technical Sciences Academy of Romania www.jesi.astr.ro A. Mechanics, Mechanical and Industrial Engineering, Mechatronics

More information

REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS

REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS REGULATORY CONTROL OF NUCLEAR FUEL AND CONTROL RODS 1 GENERAL 3 2 PRE-INSPECTION DOCUMENTATION 3 2.1 General 3 2.2 Initial core loading of a nuclear power plant, new type of fuel or control rod or new

More information

ESF on Fire Protection Proposed ESF on Fire Protection Engine attachment points applicable to Piston Engines EASA

ESF on Fire Protection Proposed ESF on Fire Protection Engine attachment points applicable to Piston Engines EASA ESF on Fire Protection Proposed ESF on Fire Protection Engine attachment points applicable to Piston Engines EASA UK CAA Comment: Paragraph (2) of the ESF should clarify whether the other features of the

More information

Selective Coordination Requirements

Selective Coordination Requirements Selective Coordination Requirements Background Selective coordination of all upstream overcurrent protective devices in the supplying circuit paths is required by the NEC for a limited number of specific

More information

Neutronics of Prismatic Fluoride Salt Cooled High Temperature Reactors

Neutronics of Prismatic Fluoride Salt Cooled High Temperature Reactors Neutronics of Prismatic Fluoride Salt Cooled High Temperature Reactors Workshop on Advanced Reactors Concepts PHYSOR 2012 Knoxville, TN April 15, 2012 Dan Ilas IlasD@ornl.gov Main Neutronic Design Characteristics

More information

ECE/RCTE/CONF/4/Add.1/Rev.2

ECE/RCTE/CONF/4/Add.1/Rev.2 ECE/RCTE/CONF/4/Add.1/Rev.2 8 May 2018 Agreement Concerning the adoption of uniform conditions for periodical technical inspections of wheeled vehicles and the reciprocal recognition of such inspections

More information

13 th Military Airworthiness Conference 25 th September 2013 EASA Presentation. Pascal Medal Head Of Certification Experts Department EASA

13 th Military Airworthiness Conference 25 th September 2013 EASA Presentation. Pascal Medal Head Of Certification Experts Department EASA 13 th Military Airworthiness Conference 25 th September 2013 EASA Presentation Pascal Medal Head Of Certification Experts Department EASA Index Summary of European Civil Airworthiness Certification Civil

More information

DRAFT: Front Contact Surface Head Restraint

DRAFT: Front Contact Surface Head Restraint DRAFT: Front Contact Surface Head Restraint 20071012 PROPOSAL FOR DRAFT AMENDMENTS TO DRAFT GTR ON HEAD RESTRAINTS Transmitted by the expert from the Netherlands Note: The text reproduced below was prepared

More information

SUBJECT: Automatic Stability Control with Traction Control System (ASC+T)

SUBJECT: Automatic Stability Control with Traction Control System (ASC+T) Group 34 34 01 90 (2105) Woodcliff Lake, NJ October 1990 Brakes Service Engineering -------------------------------------------------------------------------------------------------------- SUBJECT: Automatic

More information

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2017 RELIABILITY SCORECARD

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2017 RELIABILITY SCORECARD OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2017 RELIABILITY SCORECARD May 1, 2017 Table of Contents 1.0 Introduction...3 2.0 Summary...3 3.0 Purpose...3 4.0 Definitions...4 5.0 Analysis...5

More information

E/ECE/324/Rev.1/Add.48/Rev.6/Amend.3 E/ECE/TRANS/505/Rev.1/Add.48/Rev.6/Amend.3

E/ECE/324/Rev.1/Add.48/Rev.6/Amend.3 E/ECE/TRANS/505/Rev.1/Add.48/Rev.6/Amend.3 5 February 2016 Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and the Conditions

More information

By Edmund Hughes, Technical Officer, Marine Environment Division, IMO

By Edmund Hughes, Technical Officer, Marine Environment Division, IMO A new chapter for MARPOL Annex VI requirements for technical and operational measures to improve the energy efficiency of international shipping By Edmund Hughes, Technical Officer, Marine Environment

More information

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES

ARTICLE AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES TABLE OF CONTENTS ARTICLE 2.0000 AIR POLLUTION CONTROL REGULATIONS AND PROCEDURES Section 2.1400 Nitrogen Oxides 2.1401 Definitions... 214-01 2.1402 Applicability... 214-04 2.1403 Compliance Schedules...

More information

Guidelines for Safety Structure Homologation / Approval

Guidelines for Safety Structure Homologation / Approval TECHNICAL DEPARTMENT MotorSport New Zealand Inc MotorSport House 69 Hutt Road, Thorndon Wellington 6015 PO Box 3793, Wellington 6014 Phone: 04-815-8015 Fax: 04-472-9559 Email: technical@motorsport.org.nz

More information

The IAEA does not normally maintain stocks of reports in this series.

The IAEA does not normally maintain stocks of reports in this series. IAEA-TECDOC- The IAEA does not normally maintain stocks of reports in this series. However, microfiche copies SAFETY ASPECTS OF STATION BLACKOUT AT NUCLEAR POWER PLANTS IAEA, VIENNA, 1985 IAEA-TECDOC-332

More information

Notification of a Proposal to issue a Certification Memorandum. Rotor Drive System Gearbox TBO Development

Notification of a Proposal to issue a Certification Memorandum. Rotor Drive System Gearbox TBO Development EASA Proposed CM No.: Proposed CM-RTS-002 Issue 01 Revision 01 Notification of a Proposal to issue a Certification Memorandum Rotor Drive System Gearbox TBO Development EASA Proposed CM No.: Proposed CM

More information

1: CANDU Reactor. B. Rouben McMaster University Nuclear Reactor Physics EP 4D03/6D Sept-Dec September 1

1: CANDU Reactor. B. Rouben McMaster University Nuclear Reactor Physics EP 4D03/6D Sept-Dec September 1 1: CANDU Reactor B. Rouben McMaster University Nuclear Reactor Physics EP 4D03/6D03 2015 Sept-Dec 2015 September 1 Outline A quick look at the design of CANDU Reactors: Reactor Assembly Pressure Tubes

More information

Diesel Engine Runaway The risks revealed by Test Results

Diesel Engine Runaway The risks revealed by Test Results Diesel Engine Runaway The risks revealed by Test Results Presenter: Stephen Gale Educating industry professionals on diesel engine safety for over 17 years. Presentations Given: Texas City Safety Council

More information

AP1000 Nuclear Power Plant Squib Valve Design Challenges & Regulatory Interface. September 2017

AP1000 Nuclear Power Plant Squib Valve Design Challenges & Regulatory Interface. September 2017 AP1000 Nuclear Power Plant Squib Valve Design Challenges & Regulatory Interface September 2017 Randy C. Ivey Director Supplier Quality Oversight Westinghouse Electric Company AP1000 is a trademark or registered

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Integrated Compliance Assurance Framework February 12, 2016 Q1. What are the Integrated Compliance Assurance Framework and Manual 013: Compliance and Enforcement Program? A1.

More information

M-22 DUAL FUEL ENGINE

M-22 DUAL FUEL ENGINE Guideline No.: M-22(201510) M-22 DUAL FUEL ENGINE Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection

More information

Distribution Forecasting Working Group

Distribution Forecasting Working Group Distribution Forecasting Working Group Electric Vehicle Uncertainty and Proposals to Improve DER Methods Meeting 2: May 2, 2018 READ AND DELETE For best results with this template, use PowerPoint 2003

More information

Super-Critical Water-cooled Reactors

Super-Critical Water-cooled Reactors Super-Critical Water-cooled Reactors (SCWRs) SCWR System Steering Committee T. Schulenberg, H. Matsui, L. Leung, A. Sedov Presented by C. Koehly GIF Symposium, San Diego, Nov. 14-15, 2012 General Features

More information

MIT ICAT M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n

MIT ICAT M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n M I T I n t e r n a t i o n a l C e n t e r f o r A i r T r a n s p o r t a t i o n Standard Flow Abstractions as Mechanisms for Reducing ATC Complexity Jonathan Histon May 11, 2004 Introduction Research

More information

Module 09 Heavy Water Moderated and Cooled Reactors (CANDU)

Module 09 Heavy Water Moderated and Cooled Reactors (CANDU) Prof.Dr. Böck Technical University Vienna Atominstitut Stadionallee 2, 1020 Vienna, Austria ph: ++43-1-58801 141368 boeck@ati.ac.at Module 09 Heavy Water Moderated and Cooled Reactors (CANDU) 1.10.2016

More information

CONSIDERATIONS REGARDING THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR. PART 1 - PRESENTATION OF THE FUEL CHANNEL

CONSIDERATIONS REGARDING THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR REACTOR. PART 1 - PRESENTATION OF THE FUEL CHANNEL 6 th International Conference Computational Mechanics and Virtual Engineering COMEC 2015 15-16 October 2015, Braşov, Romania CONSIDERATIONS REGARDING THE HORIZONTAL FUEL CHANNELS IN THE CANDU 6 NUCLEAR

More information

REGULATIONS Official Journal of the European Union L 200/1

REGULATIONS Official Journal of the European Union L 200/1 31.7.2009 Official Journal of the European Union L 200/1 I (Acts adopted under the EC Treaty/Euratom Treaty whose publication is obligatory) REGULATIONS REGULATION (EC) No 661/2009 OF THE EUROPEAN PARLIAMENT

More information

Notice of Proposed Amendment Regular update of CS-25

Notice of Proposed Amendment Regular update of CS-25 European Aviation Safety Agency Rulemaking Directorate tice of Proposed Amendment 2014-06 Regular update of CS-25 RMT.0606 27.03.2014 EXECUTIVE SUMMARY This tice of Proposed Amendment (NPA) makes use of

More information

E/ECE/324/Rev.2/Add.106/Rev.6/Amend.5 E/ECE/TRANS/505/Rev.2/Add.106/Rev.6/Amend.5

E/ECE/324/Rev.2/Add.106/Rev.6/Amend.5 E/ECE/TRANS/505/Rev.2/Add.106/Rev.6/Amend.5 28 October 2016 Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and the Conditions

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Interconnected Electric System Protection Requirements Applicability 1 Section 502.3 applies to: the legal owner of a generating unit directly connected to the transmission system with a maximum authorized real power rating greater than 18 MW; the legal owner

More information

Technical Article. ISO26262: ams deploys unique technology to meet every new safety requirement. Roland Einspieler

Technical Article. ISO26262: ams deploys unique technology to meet every new safety requirement. Roland Einspieler Technical ISO26262: ams deploys unique technology to meet every new safety requirement Roland Einspieler ISO26262: ams deploys unique technology to meet every new safety requirement Roland Einspieler As

More information

OpenEVSE - 40A Charging Station

OpenEVSE - 40A Charging Station OpenEVSE - 40A Charging Station P50 Advanced P50 Standard http://www.openevse.com Read and save these instructions prior to installing and operating your Charging Station. Retain this installation guide

More information

Guideline for Parallel Grid Exit Point Connection 28/10/2010

Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection 28/10/2010 Guideline for Parallel Grid Exit Point Connection Page 2 of 11 TABLE OF CONTENTS 1 PURPOSE... 3 1.1 Pupose of the document... 3 2 BACKGROUND

More information

Lloyd s Register Type Approval System Test Specification Number GT04

Lloyd s Register Type Approval System Test Specification Number GT04 Lloyd s Register Type Approval System Test Specification Number GT04 Gas Turbines Performance and test specifications for Gas Turbines to be used in Marine, Offshore and Industrial Applications 2004 Lloyd's

More information

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions).

3.1 Air Pollution Control Officer (APCO): as defined in Rule 1020 (Definitions). RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006; Amended December 15, 2011) 1.0 Purpose The purpose

More information

Thermal analysis of IRT-T reactor fuel elements

Thermal analysis of IRT-T reactor fuel elements Thermal analysis of IRT-T reactor fuel elements A Naymushin, Yu Chertkov, I Lebedev and M Anikin National Research Tomsk Polytechnic University, TPU, Tomsk, Russia E-mail: agn@tpu.ru Abstract. The article

More information

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2018 RELIABILITY SCORECARD

OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2018 RELIABILITY SCORECARD OKLAHOMA CORPORATION COMMISSION REGULATED ELECTRIC UTILITIES 2018 RELIABILITY SCORECARD June 1, 2018 Table of Contents 1.0 Introduction...3 2.0 Summary...3 3.0 Purpose...3 4.0 Definitions...4 5.0 Analysis...5

More information

Current and Prospective Tests in Reactor MIR.M1

Current and Prospective Tests in Reactor MIR.M1 The 18th IGORR Conference 3-7 December 2017, The International Conference Centre, Darling Harbour, Sydney, Australia Current and Prospective Tests in Reactor MIR.M1 Alexey IZHUTOV INTRODUCTION Research

More information

Rosatom Seminar on Russian Nuclear Energy Technologies and Solutions

Rosatom Seminar on Russian Nuclear Energy Technologies and Solutions ROSATOM STATE ATOMIC ENERGY CORPORATION ROSATOM VVER-100 Reactor Plant and Safety Systems Rosatom Seminar on Russian Nuclear Energy Technologies and Solutions N.S. Fil Chief Specialist, OKB GIDROPRESS

More information

RULE LIQUEFIED PETROLEUM GAS TRANSFER OR DISPENSING (Adopted 1/13/2015)

RULE LIQUEFIED PETROLEUM GAS TRANSFER OR DISPENSING (Adopted 1/13/2015) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 74.33 LIQUEFIED PETROLEUM GAS TRANSFER OR DISPENSING (Adopted 1/13/2015) A. Applicability and Purpose The purpose of this rule is to reduce Reactive Organic

More information

Grid Impacts of Variable Generation at High Penetration Levels

Grid Impacts of Variable Generation at High Penetration Levels Grid Impacts of Variable Generation at High Penetration Levels Dr. Lawrence Jones Vice President Regulatory Affairs, Policy & Industry Relations Alstom Grid, North America ESMAP Training Program The World

More information

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0

ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES Revision 0 ATCO ELECTRIC LTD. (Transmission System) SERVICE QUALITY AND RELIABILITY PERFORMANCE, MEASURES AND INDICES 2018-04-24 - Revision 0 EUB Decision 2007-071 Board Direction 52 For questions or comments regarding

More information

Uwe Arnold Dirk Schneider. Gilles Clement AREVA NC. AREVA GmbH

Uwe Arnold Dirk Schneider. Gilles Clement AREVA NC. AREVA GmbH Uwe Arnold Dirk Schneider AREVA GmbH Gilles Clement AREVA NC AB Atomenergi ordered the facility by Allis-Chalmers (USA) Time of operation:1960 to 2005 SVAFO R2 Dismantling Historical background Three sister

More information

BREAKER FAILURE PROTECTION

BREAKER FAILURE PROTECTION 29 th Annual HANDS-ON RELAY SCHOOL March 12-16, 2012 BREAKER FAILURE PROTECTION Brent Carper, PE Protection & Integration Engineer brent.c@relayapplication.com OUTLINE Protection System Failures and Breaker

More information

CERTIFICATION MEMORANDUM

CERTIFICATION MEMORANDUM EASA CERTIFICATION MEMORANDUM EASA CM No.: EASA CM - CS 004 Issue: 01 Issue Date: 16 th of October 2013 Issued by: Cabin Safety section Approved by: Head of Certification Experts Department Regulatory

More information

By: Eugenijus Uspuras Algirdas Kaliatka Sigitas Rimkevicius ASME 2012 Verification & Validation Symposium May 2-4, 2012, Las Vegas, NV

By: Eugenijus Uspuras Algirdas Kaliatka Sigitas Rimkevicius ASME 2012 Verification & Validation Symposium May 2-4, 2012, Las Vegas, NV Computer codes validation for transient analysis at nuclear power plants with RBMK-1500 reactor By: Eugenijus Uspuras Algirdas Kaliatka Sigitas Rimkevicius ASME 2012 Verification & Validation Symposium

More information

Special Condition C-04 on Interaction of Systems and Structure on helicopters configured with Fly-by-Wire (FBW) Flight Control System (FCS)

Special Condition C-04 on Interaction of Systems and Structure on helicopters configured with Fly-by-Wire (FBW) Flight Control System (FCS) Special Condition C-04 on Interaction of Systems and Structure on helicopters configured with Fly-by-Wire (FBW) Flight Control System (FCS) This Special Condition is published for public consultation in

More information

ECTOS Deliverable 4. European Commission. Fifth Framework For Research And Development

ECTOS Deliverable 4. European Commission. Fifth Framework For Research And Development The Hydrogen Fuelling Station ECTOS Deliverable 4 Ecological City Transport System. Demonstration, Evaluation And Research Project Of Hydrogen Fuel Cell Bus Transportation System Of The Future. Contract:

More information

AHCA SEMINAR/FHEA TRADE SHOW Improving Standby Generator Reliability. September 22, PowerSecure. All rights reserved.

AHCA SEMINAR/FHEA TRADE SHOW Improving Standby Generator Reliability. September 22, PowerSecure. All rights reserved. AHCA SEMINAR/FHEA TRADE SHOW Improving Standby Generator Reliability September 22, 2014 1 2013 PowerSecure. All rights reserved. What You Will Learn About Standby Power Reliability Gain understanding of

More information

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus

AIR QUALITY PERMIT. Kennesaw State University - Marietta Campus AIR QUALITY PERMIT Permit No. Effective Date February 11, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted

More information

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006)

RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) RULE 4352 SOLID FUEL FIRED BOILERS, STEAM GENERATORS AND PROCESS HEATERS (Adopted September 14, 1994; Amended October 19, 1995; Amended May 18, 2006) 1.0 Purpose The purpose of this rule is to limit emissions

More information

March 11, Public Docket A U.S. Environmental Protection Agency Room M-1500, Waterside Mall 401 M Street, SW Washington, DC 20460

March 11, Public Docket A U.S. Environmental Protection Agency Room M-1500, Waterside Mall 401 M Street, SW Washington, DC 20460 March 11, 1999 Public Docket A-97-50 U.S. Environmental Protection Agency Room M-1500, Waterside Mall 401 M Street, SW Washington, DC 20460 To Whom It May Concern: The State and Territorial Air Pollution

More information

An overview of Directive (EU) 2015/2193 from the Power Generation business perspective

An overview of Directive (EU) 2015/2193 from the Power Generation business perspective Our energy working for you. TM Power topic #EMERPT-6194-EN Technical information from Cummins Power Generation Medium Combustion Plants Directive White Paper By Pedro Ponte, Project Application Engineer

More information

DILLARD'S INC TEST PROTOCOL FOR DILL USA- (V13) KEYCHAIN / BATTERY OPERATED KEYCHAIN / KEYCHAIN WITH LIGHT

DILLARD'S INC TEST PROTOCOL FOR DILL USA- (V13) KEYCHAIN / BATTERY OPERATED KEYCHAIN / KEYCHAIN WITH LIGHT By/Date: Page 1 of 5 Criteria Notes esults ating SCOPE: This protocol is applicable for testing of keychain / battery operated keychain / keychain with light. SUPPLEMENTY POTOCOL Note: dditional cost,

More information

Advanced Digital Valve Controller

Advanced Digital Valve Controller Advanced Digital Valve Controller................................................... By Stan Miller, CCI; Presented at AUG January 8-12, 2007 22591 Avenida Empresa Rancho Santa Margarita, CA 92688 949.858.1877

More information

Operational risks of old nuclear power plants in Switzerland

Operational risks of old nuclear power plants in Switzerland 111 NPP Beznau NPP Mühleberg Operational risks of old nuclear power plants in Switzerland 1 Five nuclear power plants in Switzerland Beznau seit 1969 in Betrieb Mühleberg seit 1971 in Betrieb Gösgen seit

More information

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program.

A member-consumer with a QF facility shall not participate in the Cooperative s electric heat rate program. Electric Tariff _2nd Revised Sheet No. 72 Filed with Iowa Utilities Board Cancels _1st Sheet No. _72 Cooperative is a member of Central Iowa Power Cooperative (CIPCO), a generation and transmission cooperative

More information

A new approach to the results of internal inspection

A new approach to the results of internal inspection > CEPS designed and manufactured this temporary traps for a inspection tool run. > by: Aleš Brynych, CEPS a. s. & Alexandrs Jelinskis, LatRosTrans Ltd A new approach to the results of internal inspection

More information

PDS COLLISION AVOIDANCE AACSA UNDERGROUND IMPLEMENTATION LEARNINGS

PDS COLLISION AVOIDANCE AACSA UNDERGROUND IMPLEMENTATION LEARNINGS PDS COLLISION AVOIDANCE AACSA UNDERGROUND IMPLEMENTATION LEARNINGS Coal South Africa - 11 June 2015 Prepared for the SACEA Workshop 1 PDS BACKGROUND NEW DENMARK EXAMPLE SUCCESSES CHALLENGES AACSA COLLISION

More information

HarmonHy (SES ) Harmonization of Standards and Regulations for a Sustainable Hydrogen and Fuel Cell Technology

HarmonHy (SES ) Harmonization of Standards and Regulations for a Sustainable Hydrogen and Fuel Cell Technology (SES6-513542) Harmonization of Standards and Regulations for a Sustainable Hydrogen and Fuel Cell Technology a "Specific Support Action" under the 6 th Framework Programme of the European Commission Areas

More information

SMS and the EASA management system requirements

SMS and the EASA management system requirements SAE 2013 SMS in Design & Manufacture Madrid, 19-20 March 2013 SMS and the EASA management system requirements Eric SIVEL EASA Rulemaking Deputy Director EASA management system framework - State of play

More information

GREENER SHIPPING SUMMIT 2017

GREENER SHIPPING SUMMIT 2017 GREENER SHIPPING SUMMIT 2017 EU MRV Regulation Methods of Data Collection of Fuel Differences/Consequences/Evaluation of Methods Antonios Georgantzis 14 November 2017 Eugenides Foundation The EU MRV Timeline

More information

Certification Memorandum. Vibration Health Monitoring: Prioritisation of Maintenance Alerts

Certification Memorandum. Vibration Health Monitoring: Prioritisation of Maintenance Alerts EASA CM No.: CM-DASA-001 Issue 01 Certification Memorandum Vibration Health Monitoring: Prioritisation of Maintenance Alerts EASA CM No.: CM-DASA-001 Issue 01 issued 02 July 2015 Regulatory requirement(s):

More information

WHITE PAPER Autonomous Driving A Bird s Eye View

WHITE PAPER   Autonomous Driving A Bird s Eye View WHITE PAPER www.visteon.com Autonomous Driving A Bird s Eye View Autonomous Driving A Bird s Eye View How it all started? Over decades, assisted and autonomous driving has been envisioned as the future

More information

Vehicle Dimensions and Mass: Changes from 8 July 2015 Questions and answers

Vehicle Dimensions and Mass: Changes from 8 July 2015 Questions and answers Vehicle Dimensions and Mass: Changes from 8 July 2015 Questions and answers What is in this package? Changes to the Land Transport Rule: Vehicle Dimensions and Mass 2002 (the VDAM Rule) were approved in

More information

COMMENT RESPONSE DOCUMENT

COMMENT RESPONSE DOCUMENT EASA COMMENT RESPONSE DOCUMENT Proposed Special Condition for Installation of Structure Mounted Airbag Commenter 1 : Boeing (Operational Regulatory Affairs) Comment # [1] Statement of Issue Text states

More information