CORRIGENDUM. For more details visit website. Further, clarifications regarding queries are attached herewith.

Similar documents
SPICES BOARD (Ministry of Commerce & Industry, Govt. of India) Palarivattom.P.O. N H By Pass Kochi

ENQUIRY QUOTATION SHOULD BE ADDRESSED TO PURCHASE OFFICER ONLY

UNIVERSITY OF CALCUTTA Centre for Research in Nanoscience and Nanotechnology JD-2, Sector-III, Salt Lake City Kolkata

Supply of Batteries

Smart-UPS VT APC Smart-UPS VT 30kVA 208V w/4 Batt. Modules, Start-Up 5X8, Internal Maintenance Bypass

INDIAN INSTITUTE OF TECHNOLOGY, KANPUR DEPARTMENT OF ELECTRICAL ENGINEERING

SmartOnline 120V 2.2kVA 1.8kW Double-Conversion UPS, 2U, Extended Run, Network Card Slot, LCD, USB, DB9

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

TECHNICAL SPECIFICATIONS OF 2 KVA POWER CONDITIONING UNIT

To Date: 23/03/2017. Respective Bidders,

SUPPLY OF HYDRAULIC AERIAL LADDER PLATFORM

NIT No. DEERS/SSDI-JK/05 of 2018 Dated 29/08/2018 E-Tender id No: 2018_FD_ 60565

SINGLE-PHASE SOLUTIONS UNINTERRUPTIBLE POWER SYSTEMS

SmartOnline SUT Series 3-Phase 208/120V 220/127V 20kVA 20kW On-Line Double- Conversion UPS, Tower, Extended Run, SNMP Option

Inviting Tenders for Supply, Installation, Testing and Commissioning of 500 KVA DG Set for Temperature Controlled Warehouse at Medchal, Hyderabad.

SINGLE-PHASE SOLUTIONS UNINTERRUPTIBLE POWER SYSTEMS

SmartOnline SUT Series 3-Phase 208/120V 220/127V 30kVA 30kW On-Line Double- Conversion UPS, Tower, Extended Run, SNMP Option

THE ORIENTAL INSURANCE CO.LTD. REGIONAL OFFICE: IDA Building 4 th Floor, 7,Race Course Road, Indore (M.P.) REQUIREMENT


Tamil Nadu Handicrafts Development Corporation Ltd, Chennai. (Government of Tamil Nadu Undertaking)

Sola/Hevi-Duty S3K Series Mini-Tower UPS

SmartOnline S3MX Series 3-Phase 380/400/415V 60kVA 54kW On-Line Double-Conversion UPS

SmartOnline SUT Series 3-Phase 208/120V 220/127V 40kVA 40kW On-Line Double- Conversion UPS, Tower, Extended Run, SNMP Option

Est ComPower Mini UPS (3 Phase) CPX Mini 10 50kVA

GUIDE SPECIFICATION THREE PHASE UNINTERRUPTIBLE POWER SUPPLY

Technical data sheet VH UL. Digital Energy Uninterruptible Power Supply. GE Digital Energy Power Quality

The table shown below gives the status of basic documents submitted by different tenderers.

On-line, Single Phase, Double Conversion UPS

Liebert NXC. 10kVA - 60kVA. Compact, Efficient, and Reliable Power Solution

GUIDE SPECIFICATION THREE PHASE UNINTERRUPTIBLE POWER SUPPLY

PowerWave 33 Efficient power protection for today s IT and process-related work environments

Safe, reliable, long lasting Lithium Iron Phosphate battery. Next generation capture and release technology. Increased efficiency for greater savings

Security Plus Online Uninterruptible Power Supply

Standalone three-phase UPS system. PowerWave kw Unmatched power performance

Series. Full Three Year Warranty. On-line, Single-phase Parallel Redundant UPS System. 6 and 10 kva Tower. Your Tailored Power Solutions Provider TM

TOSHIBA /20/25/30/50kVA Internal Battery GUIDE SPECIFICATION THREE PHASE UNINTERRUPTIBLE POWER SUPPLY

Series. On-line, Single-phase Parallel Redundant UPS System. 6 and 10 kva Rack Mount. Your Tailored Power Solutions Provider TM

Up to 98% efficient under full load Similar runtimes to the previous 3u model

E-15 Uninterruptible Power Systems (UPS)

UP Electricity Regulatory Commission Vidyut Niyamak Bhawan, Vibhuti Khand, Gomti Nagar, Lucknow. Public Notice

UniStar III Series. Full Three Year Warranty. On-line, Single-phase UPS System. 1, 2, & 3kVA Tower Model

Delivery Schedule. Specification. Delivery Schedule. Specification

3. MAJOR SYSTEM COMPONENTS Emergency Lighting Power System shall consist of the following major subsystems:

Eaton 93PS 8-40kW UPS Technical Specification Manufacturer s declaration in accordance with IEC

INVITATION FOR TENDER FOR SUPPLY OF SOLAR PV SYSTEMS

3 Uninterruptible Power Systems

NLC INDIA LIMITED (formerly Neyveli Lignite Corporation Limited) ('NAVARATNA'-Government of India Enterprise) MATERIALS MANAGEMENT COMPLEX

Regional Office: Vijayapura Plot No6, Trimurthy Nagar Managuli Bypass Road, Vijayapura Diesel Generator Required on Rental Basis

BaartaIya iva&aana isaxaa EvaM AnausaMDaana samstaana paunao

Onfiniti. 1 Phase UPS

Central Electronics Limited Materials Management Division

Technical Specification SENTINEL PRO

SmartOnline SVTX Series 3-Phase 380/400/415V 20kVA 18kW On-Line Double-Conversion UPS, Tower, Extended Run, SNMP Option

gimagination at work Technical data sheet Uninterruptible Power Supply LP Series 6 & 10 kva GE Digital Energy

KEOR HP. THREE-PHASE UPS from 100 to 800 kva GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

University of Peradeniya INVITATION FOR BIDS

Options & service. Additional 9355 options. Proven warranty and support services. Extensive service options for enhanced reliability.

SmartPro Medical-Grade UPS, Line Interactive, Lithium Battery, 6 Outlets - 230V, 1kVA, 750W, Full Isolation

Illuminator Series CR NEMA 3R

POWER+ PREMIUM CBS. BS-EN Emergency electrical installations Electric power systems Emergency lighting Escape lighting

DELPHYS GP. Green Power 2.0 range 160 to 1000 kva/kw

Chapter 3.1: Electrical System

Supply, Installation and Commissioning of 1 No 50 Watt LED. based SPV SLS at Nadia District Library, Krishna Nagar, Nadia.

TENDER DOCUMENT BHARAT HEAVY ELECTRICALS LIMITED, HEEP, RANIPUR, HARIDWAR

SAVE ENERGY FOR BENEFIT OF SELF AND NATION

MASTERYS IP+ 10 to 80 kva

FN Series Scalable N+1 UPS 3kVA to 24kVA Rackmount

(i) in paragraph 9, for sub-paragraph (i) the following shall be substituted, namely:-

Department : COIMBATORE LPG Plant Department officer : PL.KANNAN. System ID : 11 Tender Reference No. :

INVITATION FOR QUOTATION. TEQIP-III/2018/uceo/Shopping/48

S.No. Tender Queries BRPL Reply 1 For 11KV(E) 3Cx300sqmm A2XWY High Ampacity cable conductor details specification not

Queries received on. Page No. / Clause No. Queries / Modifications / Changes Suggested. S. No. Technical Specifications as per RFP

INDIAN MARITIME UNIVERSITY KOLKATA CAMPUS

MAHARASHTRA NATURAL GAS LIMITED

Technical Data Sheet. Uninterruptible Power Supply. Critical Power. imagination at work

Three Phase UPS Systems Range: 10 to 500kVA

Tender documents for supply, erection & commissioning of Plante Type Battery to 2x210 MW IB Thermal Power Station.

VOLUME -III TECHNICAL SPECIFICATION FOR MISCELLANEOUS PUMPS (HORIZONTAL)

KEOR HP. THREE-PHASE UPS from 100 to 800 kva GLOBAL SPECIALIST IN ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES

Technical Data Sheets

Uninterruptible Power Supplies

UPS SYSTEMS PDUs SURGE PROTECTORS POWER INVERTERS DATACENTER UPS. Product Catalog

Tender No:- MTL/PUR/213/Elect/ (K)/9. 2 NEW Moulded case Circuit Breaker with O/L & S/C No 02

TECHNICAL SPECIFICATIONS

Three-phase UPS system. DPA UPScale ST kw Best-in-class modular UPS for maximum availability

Safe, reliable, long lasting Lithium Iron Phosphate battery. Next generation capture and release technology. Increased efficiency for greater savings

NIT No.:-10/WEX/MCR/HYD. PRESS/2-303/ /Dt

CONTAINER 1MWh. CONTAINER 1 MWh. Electrocell presents the INNOVA 1MWh on/off-grid energy storage system.

Distinctive Features: Bidirectional solar PCU Hybrid inverter (Solar/ Grid/BATT) Vector Modulated Inverter Control Multiple DSP control operation

Master Plus kva

S P E C I F I C A T I O N No. BHE/PW/PUR/JNGI-CLE/429

TELECOM- MUNICATIONS DEVICES INDUSTRIAL EMERGENCY DEVICES. (Servers Farms, ISP/ASP/POP)

TECHNICAL BID T 3627

TECHNICAL SPECIFICATION FOR A 10 TO 50 KVA THREE PHASE, UNINTERRUPTIBLE POWER SYSTEM WaveRider III

BIDDERS SHOULD SUBMIT THE DOWNLOADED DOCUMENTS, DULY FILLED, STAMPED AND SIGNED, AS PER THE INSTRUCTIONS GIVEN HEREUNDER.

PowerWave 33 S kw Efficient and reliable power protection for IT equipment in small- and medium-sized organizations

MKN-DSP SERIES - THREE PHASE

Est FlexiPower Mini UPS FPX Mini kVA

Technical Specifications. Sentinel PRO 700 VA up to 3000 VA 1000 VA ER-2200 VA ER-3300 VA ER

True double-conversion online single-phase UPS. PowerValue 11 RT 1 10 kva Single-phase UPS for critical applications

Transcription:

HCC No. 23/2017 HIGH COURT OF KARNATAKA, HIGH COURT BUILDINGS, BENGALURU-1 DATED: 20 th APRIL 2018. CORRIGENDUM High Court of Karnataka, Bengaluru vide Brief Tender Notification No. HCK_DJ/2017-18/IND57 dated 14.03.2018 had called for procurement of 38 nos. of 2 KVA, 192 nos. of 5 KVA, 38 nos. of 10 KVA and 1 no. of 20 KVA UPS to 200 Court Complexes, 46 Jail Locations, DLSA, TLSC, Karnataka Judicial Academy. The last date fixed for uploading tender on 13.04.2018 at 4.00 PM and opening on 16.04.2018 at 4.00 p.m.is hereby extended up to 28.04.2018 at 4:00 PM and opening on 03.05.2018 at 4.00 PM. For more details visit https://eproc.karnataka.gov.in website. Further, clarifications regarding queries are attached herewith. Sd/- T.G SHIVASHANKARE GOWDA REGISTRAR (COMPUTERS) AND TENDER INVITING AUTHORITY HIGH COURT OF KARNATAKA, BENGALURU - 560 001. Page 1 of 11

ANNEXURE 2-A SPECIFICATION OF 5 KVA ON-LINE UPS Sl.No. as in Parameter Description Queries from Bidders Read As 1 Capacity 4 kw / 5 KVA comes with 0.9 output power factor 2 Max. Configurable 4 kw / 5 KVA comes with 0.9 output power factor 9, Internal Auto & Manual should be either of - OR internal Auto & Manual / Internal Auto & Manual 12 Input voltage range 160-280V Normally input Voltage which will be mentioned as +/- 2%-3% is standard 13 Input Total Distortion Distortion Less than 5% for full load Input Distortion < 10% 15 Battery Recharging Time Not more than 180 minutes Recharge Time Should be 6-8 Hrs for 90%, charging time of 180 min is not sufficient. To reduce Battery capacity to 75 AH instead of 100 AH, charging should 10% of Battery AH Time : 480-600 minutes Page 2 of 11

16 Not less than 120 minutes Run-time with load of 3600 W Interface: comes with 0.9 output power factor instead of 0.8 P.F. Not less than 120 minutes with full load 0.8 P.F. 17 Interface Port(s) DB-9, RS-232, RJ-45 10/100 Base-T Interface should be either of any one OR two interface is required from the List and USB interface is also available RJ-45 is mandatory Environmental: 21 Environment 0 45 ºC Please consider Temperature 0 40 ºC 26 (new) Transformer: Required or Not required? Is required Page 3 of 11

ANNEXURE 2-B SPECIFICATION OF 10 KVA ON-LINE UPS Sl.No. as in Parameter Description Queries from Bidders Read As 1 Capacity 8 kw / 10 KVA comes with 0.9 output power factor 2 Max. Configurable 8 kw / 10 KVA comes with 0.9 output power factor 3 Nominal Voltage 220-230V Configurable for 220 voltage Configurable to range of voltage 9 10 12 13 Nominal Input Voltage Input voltage range Input Total Distortion, Internal Auto & Manual 220-230V Three phase 160-280V Distortion Less than 5% for full load should be either of - OR internal Auto & Manual Mention three phases of 220-230V Normally input Voltage which will be mentioned as +/- 2%- 3% is standard Input Distortion < 10% / Internal Auto & Manual Page 4 of 11

15 Battery Recharging Time Not more than 180 minutes Recharge Time Should be 6-8 Hrs for 90%, charging time of 180 min is not sufficient. To reduce Battery capacity to 75 AH instead of 100 AH, charging should 10% of Battery AH Time : 480-600 minutes 16 Run-time Not less than 120 minutes with load of 6400 W Now a day s almost all UPS comes with 0.9 output power factor instead of 0.8 P.F. Not less than 120 minutes with full load of 0.8 P.F. Interface: 17 Interface Port(s) DB-9, RS-232, RJ-45 10/100 Base-T Interface should be either of any one OR two interface is required from the List and USB interface is also available RJ-45 is mandatory Environmental: 21 Environment 0 45ºC Please consider Temperature 0 45ºC 26 (new) Transformer: Required or Not required? Is required ANNEXURE 2-C SPECIFICATION OF 20 KVA ON-LINE UPS Sl.No. as in 1 Parameter Description Queries from Bidders Read As Capacity 14 kw / 20 kva 14 kw / 20 kva OR 16kw / 20 KVA 16 kw / 20 kva Page 5 of 11

2 Max. Configurable 14 kw / 20 kva 14 kw / 20 kva OR 16kw / 20 KVA 16 kw / 20 kva 3 Nominal Voltage 220-230V Configurable for 220 voltage Please Mention Single Phase 9, Internal Auto & Manual should be either of - OR internal Auto & Manual / Internal Auto & Manual 10 Nominal Input Voltage 220-230V, Three phase Mention three phases of 220-230V 12 Input voltage range 160-280V Normally input Voltage with to be mentioned +/- 2%-3% is standard 13 Input Total Distortion Distortion Less than 5% for full load Input Distortion < 10% 15 Battery Recharging Time Not more than 180 minutes Recharge Time Should be 6-8 Hrs for 90%, charging time of 180 min is not sufficient. To reduce Battery capacity to 75 AH instead of 100 AH, charging should 10% of Battery AH Time : 480-600 minutes 16 Interface: Run-time Not less than 120 minutes with load of 12800 W comes with 0.9 output power factor instead of 0.8 P.F. Not less than 120 minutes with full load of 0.8 P.F. Page 6 of 11

17 Interface Port(s) DB-9, RS-232, RJ-45 10/100 Base-T Interface should be either of any one OR two interface is required from the List and USB interface is also available RJ-45 is mandatory Environmental: 21 Environment 0 45ºC Please consider Temperature 0-40ºC 26 (new) Transformer: Required or Not required? Is required ANNEXURE 2-D SPECIFICATION OF 2 KVA ON-LINE UPS Sl.No. as in 1 3 Parameter Description Queries from Bidders Read As Capacity Voltage and Frequency (On Mains) 2 KVA ONLINE 230 +/- 5% with AVR (Automatic Voltage Regulation) 50 Hz +/- Synchronized with Input Frequency 2KVA/1.4 kw or 2KVA/1.6 kw? AVR will be part of Off Line UPS parameter and voltage will be 230 +/- 1% tolerance 2 KVA ONLINE; 1.6 kw Voltage : 230 V +/- 1% AC Single Phase Regulation (Steady State): Less than +/-1% in the following conditions 1. No Load to full load/full load to no load 2. 0.6 Lag to unity PF 3. During entire backup time complete input voltage range Frequency : 50 Hz +/- 0.5% Page 7 of 11

4 8 10 Voltage and Frequency (On Battery) Efficiency Other features 230 V +/- 3% with 50 Hz 84% or more with Full Load 80% at Half Load Cold start, Auto Start, Generator Compatible, No Load, Shutdown, RS232 Communication, Display 230 V +/- 3% with 50 Hz, Single phase Increase the full load to 90% No Load shut down is for Offline UPS parameter and in Online there is no Load shutdown parameter not available Cold start, Auto Start, Generator Compatible, RS232 Communication, Display 14 16 20 (new) Environmen t Audible Noise at 1 mtr from Surface of unit 0-45 0 C Not more than 45.00 dba Please consider Temperature 0-40 0 C Not more than 55.00 dba Transformer: Required or Not required? Is required Other Queries in General related to UPS and Batteries for 5KVA, 10KVA, 20KVA or 2 KVA UPS Sl.No. Brief Particulars Description as in Description at Queries from Bidders / Modification requested Read As 1 Battery Type Exide Tubular C10 rated, 6EL, 100 AH or higher Battery in all specifications sl.no.14-5kva, 14-10KVA, 14-20KVA & 6-2 KVA respectively at page no, 15, 16, Minimum VAH is also provided for all UPS systems, But again mentioned the minimum battery capacity each UPS. Since, Battery VAH Page 8 of 11

2 3 4 5 with 5 (Five) Years warranty UPS 5 KVA for Backup time of 2.0 Hours, minimum VAH- 18000, as per specification in Annexure-2A UPS 10 KVA for Backup time of 2.0 Hours, minimum VAH- 27000, as per specification in Annexure-2B UPS 20 KVA for Backup time of 2.0 Hours, minimum VAH- 54000, as per specification in Annexure-2C UPS 2 KVA for Backup time of 2.0 Hours, minimum VAH- 9000, as per specification in Annexure-2D 17 & 18 of is mentioned, the restriction on minimum battery capacity should not have been there in clause 2.Quantity, sl.no.1, at page no. 2 of in clause 2.Quantity, sl.no.2 at page no. 2 of in clause 2.Quantity, at page no. 3 of in clause 2.Quantity, at page no. 4 of minimum VAH not < 14400 VAH minimum VAH not < 24000 VAH minimum VAH not < 36000 VAH minimum VAH not < 5760 VAH 6 EMD Exemption has not been given to SSI/MSME Unit in clause 7.Earnest Money Deposit (EMD), at page no. 4 of EMD Exemption to SSI/MSME Unit s in the Clause in Page 9 of 11

7 Higher Capacity UPS & Higher Backup UPS, in built battery provision is not possible. in document at page no.1 Required Battery can have separate cage of enclosure Bidder may provide Separate Battery Stand along with UPS 8 Please confirm can we give BG instead of DD in Clause 7, page no 4 of ; EMD Rs 20 Lacs : of confirm can we give BG instead of DD s at Clauses in the 9 Please confirm PBG Period in months in Clause 10.5, page no 5 of ; 10% PBG period contract +3 months confirm PBG Period in months 10 EMD 20 Lacks 11 Annexure-2 Battery Type in Clause 7, pg.no.4- EMD 20 Lacks in all specifications sl.no.14-5kva, 14-10KVA, 14-20KVA & 6-2 KVA respectively at page no, 15, 16, 17 & 18 of This looks too high small vendors cannot participate. Request you to relook into it. Battery AH is depending upon Backup & DC Voltage of UPS System, it varies brand to brand. Request you to remove AH rating and Model Number Make it 75 AH Batteries Page 10 of 11

12 13 Annexure-2 Battery Type Temperature / Environment 0-45 0 C 14 Noise Level 15 Additional Query on to change the P.F. as 0.9 instead of 0.8 in all specifications sl.no.14-5kva, 14-10KVA, 14-20KVA & 6-2 KVA respectively at page no, 15, 16, 17 & 18 of in all specifications, Environment - in in all specifications, Audible Noise at 1 mtr - in in all specifications full load condition of New Technology of Gel batteries is introduced instead of conventional Tubular Batteries at 10% more price Please consider Temperature 0-40 0 C please consider < 55 db at 1 meter, instead of < 45 db Now a days almost all UPS comes with 0.9 output power factor instead of 0.8 P.F. 16 Additional Query on Safety measures in all technical specifications of Mention safety, environment clauses like CE, UL, BIS. RoHS etc., Vendor to get at his cost - Type test certificate (Performance Test) conducted by randomly choosing one out of newly supplied UPS from all categories by Government recognized Laboratory. 17 Performance Bank Guarantee Period in Clause 10.5 PBG, pg no-5 of..period of contract + 3 months clarify Period of warranty + 3 months *** Page 11 of 11