TEST METHOD D6121 L-37 Load Evaluation VERSION CONDUCTED FOR: I = Invalid N = Results cannot be interpreted(refer to comment section)

Similar documents
Report Forms Test Method D 7038 L-33-1 Version Conducted For. N = Results Cannot Be Interpreted (See Comment Section)

Report On Sequence IIIG Evaluation. Version. Conducted For. NR = Non-Reference Oil Test RO = Reference Oil Test

Sequence VH Report Forms Version Conducted For

D ISB Lubricant Performance Test. Report Packet Version No. Method. Conducted For:

D ISM Lubricant Performance Test. Report Packet Version No. Method. Conducted For:

Report On Sequence IVB Evaluation Version. Conducted For. NR = Non-reference oil test RO = Reference oil test

1P D 6681 Final Report Cover Sheet

D 5966 Roller Follower Wear Test. Final Report Cover Sheet. Report Packet Version No. Conducted For:

Mack T-11 D EGR Engine Oil Test. Report Packet Version No. Conducted For

Two-Stroke-Cycle Gasoline Engine Lubricant Evaluation D4857 (Y350M2) ASTM TC Sequence I Test Procedure Title / Validity Declaration Page Form 1

Mack T-12 EGR Engine Oil Test. Report Packet Version No. Conducted For

1R SCOTE Test Procedure Form 1. Method Version Conducted For. Was This Test Run Under a Valid Calibration? (Y/N)

Test Method D5967 Mack T-8. Version. Method: Conducted For

APPLICATION FOR PRODUCT / ECO-LABELLING CERTIFICATION. GPS Coordinates. GPS Coordinates. Fax No. H/P No.

FIELD STUDY. SAE 50 Long-Life Synthetic Transmission Oil Field Study in Over-the-Road Applications

IIIF Timeline 07:24 Monday, May 2,

EU Mutual Recognition Technical Requirements

THERMAL SHOCK TEST REPORT

VIBRATION AND MECHANICAL SHOCK TEST REPORT

PRODUCT APPROVAL SYSTEM

Test Report. for. Chilicon Power 1563 Calle Patricia Pacific Palisades, CA USA. Project Number: G Prepared By:

SFI SPECIFICATION 35.2 EFFECTIVE: DECEMBER 29, 2014 *

This is a new permit condition titled, "2D.1111 Subpart ZZZZ, Part 63 (Existing Non-Emergency nonblack start CI > 500 brake HP)"

ADDINOL Eco Gear Longlife x 4 Long-term warranty. Longlife. Guarantee

Re: Online Reporting of Backflow Assembly Tests and Updates to Backflow Tester Records

BC Spare parts list. Bucket crusher. BC 2500 s/n DEQ Construction Tools GmbH No

NADP AMNet Standard Operating Procedure Site Report D: Annual/As Needed Maintenance

Administrative Component. 1. On what date did the new rules come into force? November 20, 2016.

013 : 2009 CEB SPECIFICATION MOULDED CASE CIRCUIT BREAKERS

TITLE: SPECIFICATION FOR BENCH VICE & BENCH GRINDER TABLE OF CONTENTS. 0.1 Circulation List. 0.2 Amendment Record

MG 100. Spare parts list. Multi grapple. MG 100 s/n DEQ Construction Tools GmbH No

EIA STANDARD EIA/ECA C MATING AND UNMATING FORCE TEST PROCEDURE FOR ELECTRICAL CONNECTORS JUNE 2006 TP-13C EIA/ECA C

CODE BULLETIN C-60. American Chemistry Council Product Approval Code of Practice January 2018 Edition

THERMOELECTRIC SAMPLE CONDITIONER SYSTEM (TESC)

SFI SPECIFICATION 35.1 EFFECTIVE: AUGUST 26, 2008 *

Strategy for Transfer Elemental Designing and Employing Physical Characteristic Modeling of Steering Maneuvering (the Second Report)

IMO. REVIEW OF MARPOL ANNEX VI AND THE NO x TECHNICAL CODE. Proposal to harmonize a record book of engine parameters

BUSINESS LICENCE APPLICATION FOOD TRUCK

Tune-up Information. Owners and operators of all biomass-fired and oil-fired area source boilers.

Auto-Oil Advisory Panel Voice Vote Form 10-DEC-2015

MG Spare parts list. Multi grapple. MG 2700 s/n BGF Construction Tools GmbH No

2018 Clean Diesel Rebate Program

COMMISSION REGULATION (EU) / of XXX

Physical Properties of Window Films

600 Amp Surge Arrester

76th UNECE GRPE session

020: 2013 CEB SPECIFICATION MINIATURE CIRCUIT BREAKER (MCB)

TEST REPORT FOR: Product Design Group Inc. Elevation Manual Wheelchair 115 kg, 253 lb

Drive pinion and ring gear, adjusting

CONTINUOUS IMMERSION AND DUST TEST REPORT

TEST REPORT FOR: Product Design Group Fuze T50 Manual Wheelchair (204 kg / 450 lb)

Feasibility study for Chassis dynamometer based Emission testing procedure as an alternative to HILS for Heavy Duty Hybrid Electric Vehicles (HD-HEV)

53A SPECIFICATION SECTION NO. (COVER ONLY ONE SECTION WITH. OF SPECIFICATION SHEET, ONLY NO. (Type, size, model number, etc.)

HST ANTI-SPALL WINDSCREENS (0071/070042)

CB Spare parts list. Hydraulic concrete buster. CB 2500 s/n DEQ Construction Tools GmbH No

Temperature Life with or without Electrical Load Test Procedure for Electrical Connectors and Sockets

SN GF min 7.7 min 8.6 min 7.6 min R&R None Ford

EU RO Mutual Recognition Technical Requirements

State of California AIR RESOURCES BOARD. EXECUTIVE ORDER D Relating to Exemptions Under Section of the Vehicle Code

Informal Document N 20 (30th GRSP, 3-6 December 2001, agenda item 1.4) Insert in the "CONTENTS" the headlines of new annexes 10 & 11 to read:

On February 13, 2018 the Lubricants Standards Group (LSG) reviewed the BOI/VGRA Task Force Proposal #1 Sequence VH BOI Read Table Proposal.

INTERNATIONAL LUBRICANT STANDARDIZATION

The Participant will select one of the two Approval Categories (below) and submit the appropriate documentation.

FIELD STUDY. 75W-90 Long Life Synthetic Gear Lube Study in Over-the-Road Applications

MG 400. Spare parts list. Multi grapple. MG 400 s/n BGF Construction Tools GmbH No

NPS/001/017 Technical Specification for Low Voltage and High Voltage Current Limiting Fuse Links

Sample Lab Test Report. Requested By INDIA

SFI SPECIFICATION 1.1 EFFECTIVE: NOVEMBER 9, 2001 *

Lubricants Group eballot on Revised Seq. IIIH to Seq. IIIG Equivalency in ILSAC GF-5

Schedule No.: 13. Diesel Engine Driven Monoset Pumps for Agricultural Purposes

QUALITY ASSURANCE & LAB ACCREDITATION

SFI SPECIFICATION 1.2 EFFECTIVE: FEBRUARY 9, 2006* PRODUCT: Multiple Disc Clutch Assemblies for Vehicles with Naturally Aspirated Engines

DISCUSSION DOCUMENT. New standards for off-road small spark-ignition engines under consideration

TABLE OF CONTENTS FOREWORD... 2 INTRODUCTION SCOPE NORMATIVE REFERENCES DEFINITIONS AND ABBREVIATIONS... 3

Center for Quality Engineering. Test Report No.: E0G90005

BP 3050, 3050 R. Spare parts list. Bulk pulverizer. BP 3050 s/n DEQ BP 3050 R s/n DEQ

BP 2050, 2050 R. Spare parts list. Bulk pulverizer. BP 2050 s/n DEQ BP 2050 R s/n DEQ

Amendment to Test Report

SFI SPECIFICATION 1.3 EFFECTIVE: MAY 23, 2000 * PRODUCT: Nitro-Methane Drag Race Multiple Disc Clutch Assemblies

SAFETY COMPLIANCE TESTING FOR FMVSS NO. 401 INTERIOR TRUNK RELEASE

SINGLE CYLINDER ENGINE TESTS FOR EVALUATING THE PERFORMANCE OF CRANKCASE LUBRICANTS

Competitive VEX Robot Designer

EXECUTIVE ORDER D 526. Relating to Exemptions Under Section of the California Vehicle Code

EFFICIENCY PERFECTED. DYNAGEAR DG ECOSYSTEM - FORCES AND SPEEDS with helical teeth and ratio i=5. Feed force [N] Feed speed [m/s]

TEST REPORT IEC Luminaires Part 2: Particular requirements: Section Two Recessed luminaires

SAFETY COMPLIANCE TESTING FOR FMVSS NO. 401 INTERIOR TRUNK RELEASE

Procedure for Koehler Digital Constant Temperature Viscosity Bath

APTA RP-BT-002 Transit Bus Foundation Brake Lining Classification

Corrections - STP 512A. Third paragraph - Change MIL-L-2105C to MIL-L-2105D. Table 3- Title change MIL-L-2105C to MIL-L-2105D

UNITED STATES DEPARTMENT OF AGRICULTURE FOREST SERVICE STANDARD FOR SPARK ARRESTERS FOR INTERNAL COMBUSTION ENGINES

DF 78. HINT: Face the rough side of the thrust washer marked by # to the differential case. INSPECTION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

TDG-F-113 CEC New Test Development Proposal for a New Engine Fuels Test Procedure

SERVICE MANUAL Setting the tooth flank backlash: Planetary gearbox Güdel

Technical Specification for 12kV Powder Filled Current Limiting Fuse-Links for Use in Switchgear (In Oil)

ISO :2015/DAM 1

European B1 Fire Rating. soft collection softwall + softblock Fire Retardant (FR) Treated textile products. molo design, ltd

Evaluation of Greenhouse Gas Emission Certification Options for Phase 2

Test report No

Amendment to Test Report

Transcription:

Load Evaluation VERSION CONDUCTED FOR: V = Valid I = Invalid N = Results cannot be interpreted(refer to comment section) NR = Non-Reference Test Oil RO = Reference Oil Result Test Stand: Date Completed: Test Number Stand Run Number: Time Completed: Formulation/Stand Code: Alternate Codes: Test Hardware A : Test Version B: In my opinion this test been conducted in a valid manner in accordance with Test Method D6121 and the appropriate amendments through the information letter system. The remarks included in this report describe the anomalies associated with this test. A Nonlubrited or Lubrited B Standard or Canadian Submitted By: Testing Laboratory Signature Typed Name Title Section

Form 1 Test Result Summary Sheet Oil Test Lab: Stand: Stand Run : Start Date: Date Completed: EOT Time: Test Length: TMC Laboratory Viscosity Grade: Formulation Stand Code: Latest Information Letter Test Was Run Under: Pinion Batch: Ring Batch: Last Reference Oil Calibrating Stand Information - Fill Out For Non-reference Oil Tests Only Stand: Stand Run: TMC Date Completed: Pinion Batch: Ring Batch: Original Merit Results C Transformed Results Correction Factor Corrected Transformed Results Severity Adjustment A Final Transformed Results Final Merit Results Ring Gear Results Wear Rippling Ridging Pitting/Spalling Scoring Original Merit Results B,C Transformed Results Correction Factor Corrected Transformed Results Severity Adjustment A Final Transformed Results Final Merit Results Pinion Gear Results Wear Rippling Ridging Pitting/Spalling Scoring A AT THE PRESENT TIME THERE ARE NO SEVERITY ADJUSTMENTS B WITH ANY APPLICABLE EXCLUSIONS APPLIED C IF TOOTH BREAKAGE OCCURS, LEAVE RESULTS BLANK AND REPORT IN COMMENT SECTION

Form 2 Gear Tooth Surface Condition Gear Batch Identification Pinion Batch: Ring Batch: Match Number: Serial Number: Assemble Date: Pattern Contact Length Rating: Pattern Contact Flank Rating: Gear Test Phase After Completion of Pinion and Ring Gear Drive Side Inspection Rater s Initials: Gear Condition Original Ring Rating Original Pinion Rating Burnish Discoloration Corrosion Deposits Wear Rippling Ridging Pitting/Spalling Scoring Original Ring Rating Original Pinion Rating Pinion Rating With Exclusion Applied If Applicable Pitting/Spalling Original Individual Tooth Ratings 1 2 3 4 5 6 7 Test Method Defined Rating Exclusion Comments (See Annex A12) Total Lines of Test Method Exclusions:

Form 3 Operational Summary Sheet Lab: Stand : Stand Run: Before Test (lbf-in.) After Test - hot (lbf-in.) After Test - cool (lbf-in.) Pinion Torque Checks Full Axle Assembly Break Turn Before Test (in.) After Test (in.) Difference (in.) Backlash Measurements Laboratory s Position Measurements 1 2 3 4 Minimum Maximum Average Manufacturer s Measurements Manufacturer s Specification Manufacturer s Measurements 0.004 0.012 (in.) General Operating Conditions Gear Conditioning Phase: Start Finish Average Total 1. Time (hh:mm) Time (mmmmm) Maximum Minimum Average 2. Gear-lubricant Temperature ( F) 3. Dyno Torque 1 (lbf-ft) Dyno Torque 2 (lbf-ft) 4. Dyno Speed 1 (r/min) Dyno Speed 2 (r/min) Gear Testing Phase: 1. Time (hh:mm) Time (mmmmm) Maximum Minimum Average 2. Gear-lubricant Temperature ( F) 3. Dyno Torque 1 (lbf-ft) Dyno Torque 2 (lbf-ft) 4. Dyno Speed 1 (r/min) Dyno Speed 2 (r/min)

Form 4 Lost Time and Comments Sheet Test Lost Time: Record the time shutdown, time off test conditions, early inspections/termination with reason and minimum oil temperature in F. Number of Downtime Occurrences Test Date Downtime Reasons Hours Other Comments Number of Comment Lines Total Downtime (hours)

Form 4A Lost Time and Comments Sheet Test Lost Time: Record the time shutdown, time off test conditions, early inspections/termination with reason and minimum oil temperature in degrees F. Number of Downtime Occurrences Test Date Downtime Reasons Hours Other Comments Number of Comment Lines Total Downtime (hours)

Form 4B Lost Time and Comments Sheet Test Lost Time: Record the time shutdown, time off test conditions, early inspections/termination with reason and minimum oil temperature in degrees F. Number of Downtime Occurrences Test Date Downtime Reasons Hours Other Comments Number of Comment Lines Total Downtime (hours)

Form 5 Operational Validity Summary Gear Conditioning Gear Testing Controlled Parameter Allowable % Out This Test % Out Actual Time Out min:s Allowable % Out This Test % Out Actual Time Out min:s Gear Oil Temperature 5 5 Wheel Speed 5 5 Wheel Speed 2 5 5 Dyno Load 5 5 Dyno Load 2 5 5