BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) GENERAL REQUIREMENTS 1 Mobilization (Maximum 3.0% of the total Contract Price) 1 LS $ - 2a Surveying, Layout, and Field Staking 1 LS $ - 2b Maintenance of Traffic 1 LS $ - 3 Performance & Payment Bond 1 LS $ - GENERAL CIVIL 7 Silt Barriers Across Swales 250 EA $ - 8 Silt Fences Along Excavation 6,000 LF $ - 9 Inlet Protection 123 EA $ - 10 Silt Curtain in Canal 32 EA $ - 11 Remove & Replace Asphaltic Concrete Driveway 250 SY $ - 12 Remove & Replace Plain Concrete Driveway 7,100 SY $ - 13 Remove & Replace Decorative Driveway 320 SY $ - 14 Remove & Replace Painted Driveway 160 SY $ - 15 Remove & Replace Pavers Driveway 300 SY $ - 16 Restoration 41,500 LF $ - 17 Pavement Overlay 19,500 SY $ - 18 19 Remove & Replace Asphaltic Concrete Street Pavement (Local Road) Remove & Replace Asphaltic Concrete Street Pavement (4-Lane Divided Road) 74,450 SY $ - 14,150 SY $ - 20 Pavement Patch 1,060 SY $ - Page 1 of 2
BID FORM PART A Name & Category Unit Unit Cost (B) Cost (AxB) 22 Remove & Replace Sidewalk 740 SY $ - 23 Adjustment of Existing Valve Boxes in Roadway 13 EA $ - 24 Replacement of Existing Valve Boxes in Roadway 3 EA $ - 25 Solid Bahia Sod and Grade Median (4-Lane Div Rd) 9,570 SY $ - 27 Record Drawings & Final Submittals 1 LS $ - 482 Structural Repairs to Existing Pavement 1,400 SY $ - 484 Milling Bridges 400 SY $ - 486 Leveling Course for Overlay Streets 200 TON $ - Subtotal Part A $ - Page 2 of 2
BID FORM PART B Name & Category Unit Unit Cost (B) Cost (AxB) STORMWATER SYSTEM 29 Type 'C' Inlet Replacement 102 EA $ - 31 Type 'E' Inlet replacement 3 EA $ - 38 12"x18" ERCP SD Replacement 400 LF $ - 44 15" RCP SD replacement 220 LF $ - 45 18" RCP SD replacement 130 LF $ - 50 15" HDPE/PVC SD replacement 2,540 LF $ - 51 18" HDPE/PVC SD replacement 1,020 LF $ - 52 24" HDPE/PVC SD replacement 190 LF $ - Subtotal Part B $ - Page 1 of 1
BID FORM PART C Name & Category Unit Unit Cost (B) Cost (AxB) POTABLE WATER SYSTEM 64 6" Potable Water Main 13,500 LF $ - 65 8" Potable Water Main 9,200 LF $ - 75 New Potable Water Meter Box on Existing Services 40 EA $ - 76 1" HDPE Potable Water Single Service - Short Side 48 EA $ - 77 1" HDPE Potable Water Single Service - Long Side 38 EA $ - 78 1" HDPE Potable Water Double Service - Short Side 96 EA $ - 79 1" HDPE Potable Water Double Service - Long Side 127 EA $ - 81 2" HDPE Potable Water Service 1 EA $ - 83 6" Gate Valve 31 EA $ - 84 8" Gate Valve 10 EA $ - 102 Fire Hydrant Assembly 26 EA $ - 103 Blow-Off Assembly 1 EA $ - 139 Field adjust existing water main 6" 21 EA $ - 143 Pressure Test & Disinfection 1 LS $ - 645 Field adjust existing water main 24" 4 EA $ - 648 Field adjust existing RAW main 18" 4 EA $ - Subtotal Part C $ - Page 1 of 1
BID FORM PART D Name & Category Unit Unit Cost (B) Cost (AxB) IRRIGATION WATER SYSTEM 144 4" Irrigation Water Main 17,900 LF $ - 145 6" Irrigation Water Main 10,900 LF $ - 146 8" Irrigation Water Main 4,680 LF $ - 149 16" Irrigation Water Main 1,560 LF $ - 151 20" Irrigation Water Main 3,990 LF $ - 152 24" Irrigation Water Main 1,890 LF $ - 155 156 157 158 1" HDPE Irrigation Water Single Services - Short Side 1" HDPE Irrigation Water Single Services - Long Side 1" HDPE Irrigation Water Double Services - Short Side 1" HDPE Irrigation Water Double Services - Long Side 51 EA $ - 59 EA $ - 172 EA $ - 114 EA $ - 160 2" HDPE Irrigation Water Service 4 EA $ - 161 4" Gate Valve 5 EA $ - 162 6" Gate Valve 20 EA $ - 163 8" Gate Valve 4 EA $ - 170 20" Butterfly Valve 3 EA $ - 171 24" Butterfly Valve 1 EA $ - 178 2" Comb. Air/Vac. Release. Valve Assem. 1 EA $ - Page 1 of 2
BID FORM PART D Name & Category Unit Unit Cost (B) Cost (AxB) 179 Hydrant Assembly (Irrigation) 14 EA $ - 180 Blow-Off Assembly (Irrigation) 1 EA $ - 214 24" Irr Jack & Bore under Veterans Pkwy @ SW 17th Ave 1 LS $ - 226 Pressure Test 1 LS $ - Subtotal Part D $ - Page 2 of 2
BID FORM PART E Name & Category Unit Unit Cost (B) Cost (AxB) WASTEWATER GRAVITY SEWER SYSTEM 227 8" Gravity Sewer Pipe (0-6 FT) 11,600 LF $ - 228 8" Gravity Sewer Pipe (6-8 FT) 7,420 LF $ - 229 8" Gravity Sewer Pipe (8-10 FT) 7,440 LF $ - 230 8" Gravity Sewer Pipe (10-12 FT) 5,100 LF $ - 231 8" Gravity Sewer Pipe (12-14 FT) 3,330 LF $ - 232 8" Gravity Sewer Pipe (14-16 FT) 870 LF $ - 245 Sanitary Sewer Single Services 178 EA $ - 246 Sanitary Sewer Double Services 260 EA $ - 247 Sanitary Sewer Manholes (0-6 FT) 33 EA $ - 248 Sanitary Sewer Manholes (6-8 FT) 18 EA $ - 249 Sanitary Sewer Manholes (8-10 FT) 9 EA $ - 250 Sanitary Sewer Manholes (10-12 FT) 5 EA $ - 251 Sanitary Sewer Manholes (12-14 FT) 4 EA $ - 252 Sanitary Sewer Manholes (14-16 FT) 1 EA $ - 264 Sanitary Sewer Manholes (16-18 FT) w/ coating 1 EA $ - 279 Sanitary Sewer Drop Manholes (8-10 FT) 5 EA $ - 280 Sanitary Sewer Drop Manholes (10-12 FT) 4 EA $ - Page 1 of 2
BID FORM PART E Name & Category Unit Unit Cost (B) Cost (AxB) 281 Sanitary Sewer Drop Manholes (12-14 FT) 1 EA $ - 289 Sanitary Sewer Drop Manholes (12-14 FT) w/ Coating 1 EA $ - 307 Sanitary Sewer Master drop Manholes (12-14 FT) 2 EA $ - 308 Sanitary Sewer Master drop Manholes (14-16 FT) 1 EA $ - 315 Sanitary Sewer Frame & Cover 85 EA $ - 329 Gravity Sanitary Sewer Testing 1 LS $ - Subtotal Part E $ - Page 2 of 2
BID FORM PART F Name & Category Unit Unit Cost (B) Cost (AxB) WASTEWATER LIFT STATION & FORCE MAIN SYSTEM 330 4" Sewer Force Main 780 LF $ - 331 6" Sewer Force Main 1,940 LF $ - 334 12" Sewer Force Main 1,570 LF $ - 342 6" Plug Valve 1 EA $ - 391 Duplex Pump Station #546 3-Phase 1 LS $ - 396 Duplex Pump Station #551 3-Phase 1 LS $ - 398 Duplex Pump Station #553 3-Phase 1 LS $ - 407 Lift Station Start-Up Test 3 EA $ - 408 Force Main Pressure Test and Flush 1 LS $ - 608 Electrical Hand Holes 3 EA $ - 646 Field adjust existing force main 24" 5 EA $ - 647 Field adjust existing WAS main 6" 5 EA $ - 649 Connect to existing 6" WAS Main w/ 6" FM 1 EA $ - 650 651 652 Electrical Conduit & Conductor from Duplex Lift Station 546 to LCEC Power Supply Junction Electrical Conduit & Conductor from Duplex Lift Station 551 to LCEC Power Supply Junction Electrical Conduit & Conductor from Duplex Lift Station 553 to LCEC Power Supply Junction 90 LF $ - 90 LF $ - 50 LF $ - Page 1 of 2
BID FORM PART F Name & Category Unit Unit Cost (B) Cost (AxB) 653 654 655 WASTEWATER LIFT STATION & FORCE MAIN SYSTEM ALLOWANCES Contractor Direct Payment of LCEC Service Request Invoice for Providing Power to Duplex Lift Station 546 Contractor Direct Payment of LCEC Service Request Invoice for Providing Power to Duplex Lift Station 551 Contractor Direct Payment of LCEC Service Request Invoice for Providing Power to Duplex Lift Station 553 1 LS $ 5,000.00 $ 5,000.00 1 LS $ 12,000.00 $ 12,000.00 1 LS $ 12,000.00 $ 12,000.00 Subtotal Part F $ 29,000.00 Bidder acknowledges that (1) each Base Bid Price includes an amount considered by Bidder to be adequate to cover Contractor s overhead and profit for each separately identified item, (2) estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price Bid items will be based on actual quantities, determined as provided in the Contract Documents, and (3) The City reserves the right to make Awards based on Article 1, Section 1.04 of this Bid Form Subtotal Part A $ - Subtotal Part B $ - Subtotal Part C $ - Subtotal Part D $ - Subtotal Part E $ - Subtotal Part F TOTAL BASE BID COST $ 29,000.00 $ 29,000.00 (in words) Page 2 of 2